Top Banner
KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM
9

KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM.

Jan 18, 2016

Download

Documents

Mavis Jennings
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM.

KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting

Tuesday, 26th of June, 2007

PAC07, Albuquerque, NM

Page 2: KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM.

2

IPNS RCS RF System Block Diagram:

Page 3: KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM.

3

Third Cavity Installed in L6 Straight Section:

Page 4: KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM.

4

Third Cavity and Final Amplifier:

Final amplifier uses two Eimac 3CW150000H3 water-cooled power triodes in a grounded-grid, cathode-driven, push-pull topology.• Operated Class A.• Plate power supplied by an 8 kV, 24 A DC power supply.• Typical operating point:

•Vplate = 8 kVDC•Vgrid = -320 VDC• Zero-signal plate current/tube ~ 5 A

Page 5: KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM.

5

Final Plate Supply: 8 kV, 24 A DC Cavity Bias Supply: 0 to 1000 A DC

Final Grid and Filament Cabinet

Final Plate Supply, Cavity Bias Supply and Filament and Grid Supply Cabinet:

Page 6: KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM.

6

Predriver and Driver Amplifiers:

Predriver amplifier uses two Eimac YU-106 water-cooled power triodes in a grounded-grid, cathode-driven, push-pull topology.• Operated Class A.• Plate power supplied by a 5 kV, 4 A DC power supply.• Typical operating point:

• Vplate= 5 kVDC• Vgrid = +35 VDC• Zero-signal plate current/tube ~ 1 A

Driver amplifier uses two Eimac 4CW25000A water-cooled power tetrodes in a grid-driven, push-pull topology. • Operated Class A.• Plate power supplied by a 5 kV, 10 A DC power supply.• Typical operating point:

• Vplate = 5 kVDC• Vscreen = 1.5 kVDC • Vgrid = -300 VDC• Zero plate current/tube ~ 3 A

Page 7: KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM.

7

Timeline:• Summer Shutdown, 2005: Disassembled test stand and moved equipment into place.

• Winter Shutdown, 2005-2006: Installed third cavity in RCS.

• March, 2006: Operated all three cavities with beam (3rd cavity operated in fundamental mode).

• Septemember, 2006: Operated 3rd cavity in second harmonic mode (for first ~4ms of cycle) with beam.

Page 8: KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM.

8

3 2 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 170

2

4

6

8

10

12

14

16

18

20

22

Fundamental Rectified Gap VoltageSecond Harmonic Recitified Gap Voltage

Cycle Time (ms)

Rec

tifie

d G

ap V

olta

ge (

kV)

Vfi

V2fi

T i( )

0 90 180 270 3601.5

1

0.5

0

0.5

1

1.5

Fundamental Gap VoltageSecond Harmonic Gap VoltageTotal Vector Sum Gap Voltage

Degrees

Volta

ge (R

elat

ive

Uni

ts) Vf

t

V2ft

VTotalt

t

Time

Injection

Mountain range plot starting at injection without second harmonic, duration ~4 ms.

Mountain range plot starting at injection with second harmonic, duration ~4 ms.

Bunch profile without second harmonic, at ~1.8 ms after injection. Bunch profile with second harmonic, at ~1.8 ms after injection.

Rectified fundamental and second harmonic gap voltage. Single-turn, vector sum of gap voltages, at ~1.8 ms after injection.

Results with Second Harmonic:

Page 9: KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM.

9

Future Plans: