Metrolinx invites you to participate in an online consultation for Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum for The Crosstown. Through this online consultation you will learn more about a change to the west light rail transit alignment that will enable an underground station at Weston Road and Mount Dennis and the preliminary planning for a new vehicle maintenance and storage facility at Eglinton and Black Creek. Have your say at thecrosstown.ca.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Welcome to the Online Consultation

KEELE STREET TO JANE STREET SECTION

BLACK CREEK MAINTENANCE & STORAGE FACILITY

ADDENDUM TO THE ENVIRONMENTAL PROJECT REPORT

December 12, 2012 – January 4, 2013

December 12, 2012 Western Alignment and MSF Update 1

Page 2: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Purpose of the Online Consultation Since the approval of the Environmental Project Report (EPR) for The Eglinton Crosstown Light

Rail Transit (LRT) Project by the Minister of the Environment in 2010, the Province of Ontario

divided the Project into two implementation phases in order to meet funding limitations. The two

phases are:

• Phase 1 covers the 19 kilometre section from Mt. Dennis neighbourhood to Kennedy

Station which will be implemented immediately; and

• Phase 2 covers the 14 kilometre section from Pearson International Airport to the Mt.

Dennis neighbourhood which will be deferred until further notice.

This phasing has resulted in changes to the project in the section from Jane Street to West

Launch Shaft. In addition, the Project now includes as part of Phase 1, the Black Creek

Maintenance and Storage Facility (MSF) that was not assessed in the original EPR. Finally,

refinements in the operating plan for the LRT and a desire to provide a connection to future GO

Train service at Mt. Dennis have resulted in changes to the Project.

The purpose of the online consultation is to receive your input regarding the changes to the

Project and the Black Creek Maintenance and Storage Facility.

More details on the Black Creek Maintenance and Storage Facility and the changes to the

project appear on the following panels.

December 12, 2012 Western Alignment and MSF Update 2

Page 3: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Study Areas

December 12, 2012 Western Alignment and MSF Update 3

Page 4: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Why an Addendum to the EPR is Required? The approved Project in the 2010 EPR included a street-level LRT alignment within the centre of

Eglinton Avenue between Jane Street to east of Black Creek Drive, with surface stops at Jane

Street, Weston Road and Black Creek Drive. As noted earlier, the MSF was not assessed at that

time.

The recent changes to the Project between Jane Street and West Launch Shaft include:

• An off-street (elevated) route north of Eglinton Avenue with a bridge over Black Creek Drive to

avoid traffic interference with LRT vehicles accessing the MSF;

• An underground Mt. Dennis Station under the railway corridor, along with direct passenger

connection to future GO rail station and Passenger Pick up and Drop off;

• A 15-bay bus terminal to provide passenger transfers between TTC bus, LRT and GO rail;

• An underground alignment from the Mt. Dennis Station to the Eglinton Flats area with a

transition to surface LRT just east of Jane Street and a surface stop on the west side of Jane

Street; and

• The previously proposed Black Creek Stop is now removed due to technical constraints.

An Addendum to the EPR is required to assess these changes and to assess the effects of the

Black Creek MSF

December 12, 2012 Western Alignment and MSF Update 4

Page 5: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

2012 − New Proposed Plan/Profile

An off street LRT alignment north of Eglinton Avenue with an underground stop at Mt.

Dennis, underground alignment west of Mt. Dennis and a surface stop at Jane Street.

See link below to download the PDF of the 2012

New Proposed Plan/Profile

December 12, 2012 Western Alignment and MSF Update 5

Page 6: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

December 12, 2012 Western Alignment and MSF Update 6

Jane Street / Eglinton Flats *Key Project Elements:

• Jane Stop is maintained;

• U-Turns on Eglinton Avenue are retained;

• Transition from surface to underground LRT portal located east of Jane Street

*- Part of Phase 2

Implementation

Original -2010

New - 2012

Page 7: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Mt. Dennis Neighbourhood

December 12, 2012 Western Alignment and MSF Update 7

Key Project Elements:

• Underground alignment between portal and Mt. Dennis Station using cut and cover construction, road widening is no longer required;

• Properties along north side of Eglinton Avenue, west of Weston Road are no longer required;

• Limit of Phase 1 implementation is Weston Road; and

• Weston Road stop has been shifted east.

Page 8: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Weston Road to Black Creek Drive

December 12, 2012 Western Alignment and MSF Update 8

Key Project Elements:

• Underground Mt. Dennis Station using cut and cover construction;

• Property required from Bank of Nova Scotia, Daycare and Keelsdale Drive;

• Pedestrian connections for future GO rail station;

• Passenger Pick Up and Drop Off (PPUDO);

• 15 bay bus terminal with new bus only signalized intersection on Eglinton Avenue;

• Kodak Building to be retained; and

• Elevated LRT structure over Black Creek Drive.

Page 9: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Black Creek Drive to West Launch Shaft

December 12, 2012 Western Alignment and MSF Update 9

Key Project Elements:

• Elevated LRT structure over Black Creek Drive and Black Creek;

• Eglinton Avenue relocated to the south, east of Black Creek Drive;

• LRT ties into underground alignment at West Launch Shaft;

• Black Creek Stop has been removed; and

• Property is required along the north side of Eglinton Avenue, east of Black Creek Drive for elevated structure.

Page 10: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Mt. Dennis Station

December 12, 2012 Western Alignment and MSF Update 10

Artistic Rendering of Mt. Dennis Station

Page 11: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Maintenance and Storage Facility

December 12, 2012 Western Alignment and MSF Update 11

Key Project Elements:

• Ultimate storage yard capacity of 162 vehicles;

• Facilities for Maintenance of vehicles;

• Office facilities and employee parking; and

• Facilities for Maintenance of Way vehicles and staff.

Page 12: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Effect on Adjacent Studies

December 12, 2012 Western Alignment and MSF Update 12

The Eglinton Connects Study being undertaken by the City of

Toronto in partnership with Metrolinx is planning to develop an

urban design vision for the entire Eglinton Corridor.

The Mount Dennis Mobility Hub Study being undertaken by Metrolinx is planning for seamless mobility around the station, maximize connections to transit for the surrounding neighbourhoods, create an attractive public realm and leverage transit investment for future investment in the community .

There are two concurrent studies that are influenced by the proposed changes to

the Eglinton LRT within the study area.

Study area showing 800m radius from the centre of the mobility hub

located at the proposed station area.

Page 13: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Potential Impacts of the Changes

• Property: Acquisition of 4 properties is required, this is a

reduction from the 37 properties identified in the 2010 report.

• Parks: The south edge of Coronation Park encroached upon

by the elevated structure.

• Vegetation: Additional vegetation will be removed by the

project. Permits and approvals will be obtained through City of

Toronto and TRCA.

• Utilities: Overhead utilities along the north side of Eglinton

Avenue will require relocation.

• Noise and Vibration: Meets provincial criteria

December 12, 2012 Western Alignment and MSF Update 13

Page 14: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Potential Impacts of the Changes

• Waterways: Widening of the Eglinton Avenue Road bridge at

Black Creek will be required. The new LRT elevated structure

over Black Creek will span the entire waterway. No impact to

fish habitat is anticipated.

• Contaminated Soils and Groundwater: Contaminated soils

and groundwater will be managed in accordance with

provincial legislation and regulations.

• Cultural Heritage: Kodak Building #9 and its heritage

features will be maintained. Bank of Nova Scotia Building to

be removed and documented.

• Archaeology: No impact to archaeological resources.

December 12, 2012 Western Alignment and MSF Update 14

Page 15: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Mitigation of Potential Impacts During Construction

December 12, 2012 Western Alignment and MSF Update 15

Measures will be implemented during construction to avoid, minimize or mitigate adverse

environmental impacts including:

• Erosion and sedimentation control;

• Minimize release of dust and other airborne pollutants and mud and litter;

• Reinstatement of temporary work sites following construction;

• Development and implementation of traffic management plans;

• Installation of decking at cut-and-cover excavations;

• Restriction of truck haul of construction materials and equipment to major arterial roads;

• Noise and vibration control;

• Construction staging and sequencing to mitigate the potential impacts on local businesses

to the extent possible; and

• Ongoing management and monitoring of construction activities.

Page 16: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Mitigation of Potential Impacts of LRT Operations and Maintenance

December 12, 2012 Western Alignment and MSF Update 16

Measures will be implemented during LRT operations and

maintenance to avoid, minimize or mitigate adverse effects including:

• Stormwater run-off from will be treated in accordance with

applicable City of Toronto, Toronto and Region Conservation

Authority (TRCA) and Ministry of the Environment (MOE)

requirements;

• Noise generated by LRT vehicles and by bus terminal operations

will be attenuated, if required, to meet MOE standards;

• Vibration generated by LRT vehicles and by bus terminal

operations will be attenuated, if required, to meet MOE standards;

• Air emissions generated by bus terminal operations will be

attenuated, if required, to meet MOE standards; and

• The potential for traction power stray current will be controlled using

isolated and insulated power supplies.

Page 17: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

EPR Consultation Process and Next Steps

December 12, 2012 Western Alignment and MSF Update 17

We are Here

Page 18: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Commitments to Future Work

December 12, 2012 Western Alignment and MSF Update 18

Metrolinx is proceeding with the delivery of the Eglinton LRT through Public Private

Partnership and Alternative Financing + Procurement (AFP).

Through this process Metrolinx is committed to:

• Continuing Public Consultation: Consult with the public, property owners and stakeholder

agencies during the design of the LRT alignment, stops/ stations, bus terminals and

ancillary facilities.

• Incorporate City of Toronto urban design criteria into the design of the LRT facilities.

• Construction Issues: Conduct further research, analysis and develop plans including :

― Noise, vibration and air emissions monitoring and mitigation

― Traffic, transit and pedestrian management strategies

― Utility and municipal services relocation plans

― Emergency response plans (Fire, Police and Emergency Medical Services)

― Vegetation restoration, edge management and streetscape plans

― Soil and groundwater management strategy

― Erosion and sedimentation control plan

Page 19: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

19

Format for Feedback • Please submit your feedback online at ww.thecrosstown.ca by January 4th, 2012.

• A consultation report will be posted online within 10 to 15 business days.

Page 20: Keele Street to Jane Section and Black Creek Maintenance & Storage Facility Environmental Project Report Addendum Online Consultation

Please Get in Touch With Us!

The Crosstown Team Franca Di Giovanni, Denise Jayawardene Mark Iogna Nicole Di Carlo E-mail: [email protected] Online: www.thecrosstown.ca Tel: 416-782-8118 Visit our West Community Office at 1848 Eglinton Avenue West (at Dufferin)

THANK YOU FOR YOUR PARTICIPATION December 12, 2012 Western Alignment and MSF Update 20

Community Office Hours

Monday, Wednesday, Friday:

9:00 a.m. – 5:00 p.m.

Tuesday & Thursday: by appointment