Top Banner
KCR 320 KCR 320 - - LDB201 Tunnels LDB201 Tunnels TUNNEL PRESENTATION TUNNEL PRESENTATION Pierre LONGCHAMP Pierre LONGCHAMP Directeur Directeur technique technique travaux travaux souterrains souterrains de Bouygues TP de Bouygues TP
40

KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Jan 14, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

KCR 320 KCR 320 -- LDB201 TunnelsLDB201 TunnelsTUNNEL PRESENTATIONTUNNEL PRESENTATION

Pierre LONGCHAMP Pierre LONGCHAMP DirecteurDirecteur technique technique travauxtravaux souterrainssouterrains de Bouygues TPde Bouygues TP

Page 2: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

SommaireSommaire

1 – Type de contrat

2 – Tracé Tunnel et contraintes d’environnement

3 – Géologie

4 – Principe du Tunnelier choisi

5 – Mode de confinements du tunnelier

6 – Conception du revêtement du Tunnel

7 - Rameaux de communication et congélation

8 - Analyse de trois aspects particulièrement délicats du projet

Page 3: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

1 – Type de contract:

• Conception – construction

• Projet d’origine :

• Viaduc ???

• Forfait avec risque géologique

Page 4: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

2 2 –– Trace Tunnel & Trace Tunnel & ContraintesContraintes dd’’environnementenvironnement

Page 5: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

West Approach: 525 m.

Kwu Tung Box335 m.

TBM tunnels: 3550 m.

East Approach:

800 m.

Exis

ting

Eas

t R

ail

Page 6: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Long Valley

Page 7: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

3 3 –– GGééologieologie Tunnel & Reconnaissance de SolTunnel & Reconnaissance de Sol

Page 8: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

KCRC LDB201 Ground Investigation BoreholesKCRC LDB201 Ground Investigation Boreholes

Page 9: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

LDB201 LDB201 –– Tunnel Alignment & GeologyTunnel Alignment & Geology

3390 m. of TBM bored twin tunnelsWest Approach East Approach

Page 10: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Study of Rock Samples RecoveredStudy of Rock Samples Recovered

Page 11: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Study of Soil Samples RecoveredStudy of Soil Samples Recovered

Page 12: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Verification of Ground Conditions by Mapping in Verification of Ground Conditions by Mapping in TBM TBM

Page 13: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

4 4 -- Description Description TunnelierTunnelier & & PrincipesPrincipes

Page 14: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

115 mètres

Description Description TunnelierTunnelier

• Poids Total : 1200 t

• Poussée Totale : 6600 t

• Vitesse Max. d’avancement : 80 mm /min

Train suiveurBouclier.

Page 15: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

TunnelierTunnelier en mode en mode modemode fermferméé

Mode fermé :

Air compriméPression de terre

Type: Bouclier à confinement mixte (Classification AFTES GT 4) :• Outils d’abattage (282 dents pour terrain meuble + 60 mollettes pour rochedure)

•Puissance installée sur la tête (2250 kW)

Diametre d’excavation: 8.75 m

Vis d’Archimède

Page 16: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Configuration en mode Configuration en mode ouvertouvert

Trémie

Godet releveur

Convoyeur à bande

Page 17: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION
Page 18: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

TBM SPECIFICATIONSTBM SPECIFICATIONSTBM - “MULAN”• Type : Mixed face shield

Earth Balance Pressure (EPB)-Compressed AIR- Open mode• General Specifications :

Internal diameter 7.625 m, Minimum tunnel radius = 400 m, Max tunnel slope = 4%Total length 108 m - Total weight 1,400 tonsSupply of material by trainEvacuation of spoil : 1 m wide conveyor beltPower supply 11kVolts - Total installed power : 4,100 kW.

• Shield : in 3 parts : Cutter head center shield, articulated tailskin12.5 meters, thickness 70 mm - Weight 860 tons (inc Head) Cutter head drive : 9 motors * 240 kW, 0 to 3 rpm.

Page 19: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

TBM - “MULAN” (cont’d)Hydraulic grippers and stabilizersHydraulic segment erector, radio controlled.2 personnel air locks + 1 emergency lock + 2 equipment locksThrust : 0 to 5,200 tons, 13 pairs of thrust ramsexcavation speed : 0 to 80 mm/mn

• Backup, 6 gantries (90 meters)Grouting system : 0 to 40 m3/hVentilation system 15 m3/sFoam injection systemBentonite injection “recaking” systemBreathable and industrial compressed air system

Page 20: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

• Technical specificationDirection Technique Bouygues TP

• Manufacturer : NFM (Framatome Group France) under Mitsubishi licence

Design in LyonComponents manufactured in France & EuropeSteel structure & assembly in Shanghai (SHMP)

Page 21: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

View of TBM in tunnel during excavationView of TBM in tunnel during excavation

Page 22: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

KCRC DB320 Tunnel (25m under water table)KCRC DB320 Tunnel (25m under water table)

Page 23: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

TBM Tunnel with Permanent Ways InstalledTBM Tunnel with Permanent Ways Installed

Page 24: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

6 6 ––Tunnel LiningTunnel Lining

Page 25: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Typical Section at Cross Passage LocationTypical Section at Cross Passage Location

Page 26: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Proposed TBM Lining with Proposed TBM Lining with PrecastPrecast Segments Segments

Ring: 1800 mm

SegmentUniversal keyed segments (13 positions)

• 4 + 2 secondary key segments + 1 keystone

• Length : 1.8 m

• Thickness : 40 cm

• Design life : 120 years

• Fully watertight after installation

• High construction tolerances

• Finished tunnel inner diameter = 7.625 m

• Finished tunnel outer diameter = 8.425 m

Page 27: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Ring Build inside TBMRing Build inside TBM

Straight Curved

Plan view

Page 28: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

PrecastPrecast segment factorysegment factory

Page 29: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

l Straight Curved

Plan viewStraight ring

l’’

Straight Curvedl’p/2 p/2

lmoy

d ext

Plan viewUniversal tapered ring

d int

d int

d ext

SegmentsSegments

Page 30: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

8 8 –– Cross Passage Ground Treatment & Ground Cross Passage Ground Treatment & Ground Freezing Freezing

Page 31: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Assessment of Ground Conditions at Each Cross PassageAssessment of Ground Conditions at Each Cross Passage

Page 32: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Ground TreatmentGround Treatment

Page 33: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Ground Treatment by Jet GroutingGround Treatment by Jet Grouting

Page 34: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Jet Grout Treated GroundJet Grout Treated Ground

Connection of Treated Ground with Tunnel Segments

Page 35: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Ground treatment by Ground Freezing Ground treatment by Ground Freezing –– Long Valley, Long Valley, CP2, 3 and 4CP2, 3 and 4

Page 36: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Ground Treatment by Ground FreezingGround Treatment by Ground Freezing

Page 37: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Analyse de trois aspects particulièrement délicats du projet :

1. Le confinement à l’air comprimé en roche dur.

2. Les transitions de roches dures à sols meubles sous la nappe

3. Un problème de soutènement très pointus avec un front situé dans des alluvions perméables et un « toit » d’alluvions maritimes très peu perméables

Page 38: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Le confinement à l’air comprimé en roche dur

Intérêts d’un confinement à l’air comprimé par rapport au mode ouvert (quand cela est possible):

• Franchissement des discontinuités

• Maîtrise des infiltrations d’eau

• Maîtrise de la stabilité temporaire des anneaux de voussoirs

• Meilleure maitrise des injections de bourrage

Inconvénients ;

• Peu : usure quoique …….

Page 39: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Les transitions de roches dures à sols meubles et perméable sous la nappe

• Problématique : confiner au premier contact des alluvions où le front est encore à 100 % en roche dure• Solutions :

• Pression de Boue : Aisée mais ….• usure• Production de bloc

• Pression de terre : Difficile mais…•Cela marche grâce aux progrès des conditionneur de déblais

Page 40: KCR 320 - LDB201 Tunnels TUNNEL PRESENTATION

Un problème de soutènement très pointus avec• un front situé dans des alluvions perméables sans cohésion• un « toit » d’alluvions maritimes argileuses très peu perméables avec cohésion.

• Problématique : • Absence de fuite d’air

Confiance à poursuivre sous confinement d’air comprimé• L’air comprimé chasse l’eau du terrain• Absence de gradient de pression au niveau du front absence de souténement création d’une caverne dans les alluvions jusqu’au toit du sol imperméable