Top Banner
26
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Kbt corporate
Page 2: Kbt corporate

2

Page 3: Kbt corporate

3

Page 4: Kbt corporate

4

EPL-3943

EPL-3941 EPL-3942

EPL-3979

EPL-3944

Grootfontein Otavi

Otjituuo

Harasib

Gross Otavi

Kombat

Copper Smelter

Mined -12 Mt @ 2.3% Cu, 1.9% Pb, 18 g/t Ag Historic Resource 2.2 Mt @ 2.2% Cu, 22 g/t Ag

Tsumeb Mine – 30Mt at 4.3% Cu, 13.9% Pb/Zn, 95g/t Ag

Tschudi Project Reserve 22.7 Mt @ 0.95% Cu

Page 5: Kbt corporate

5

Asis Far West Sector

Historic Resource of 2.2Mt @ 2.2% Cu and 22g/t Ag*

*A qualified person has not done sufficient work to classify this historical estimate as current mineral resources or mineral reserves. Kombat Copper is not treating the historical estimate as current mineral resources or mineral reserves and the historical estimate should not be relied upon.

Page 6: Kbt corporate

6

Page 7: Kbt corporate

7

Page 8: Kbt corporate

8

Page 9: Kbt corporate

9

sandstone

Fe-Mn

ore

dolomite

Page 10: Kbt corporate

10

Rod and Ball Crushers Flotation and Filtration Circuits Shaft Hoist

Page 11: Kbt corporate

11

*A qualified person has not done sufficient work to classify this historical estimate as current mineral resources or mineral reserves. Kombat Copper is not treating the historical estimate as current mineral resources or mineral reserves and the historical estimate should not be relied upon.

Page 12: Kbt corporate

12

750 Sector

Page 13: Kbt corporate

13

Year 1 Year 2

Page 14: Kbt corporate

*A qualified person has not done sufficient work to classify

this historical estimate as current mineral resources or mineral reserves. Kombat Copper is not treating the historical estimate as current mineral resources or mineral reserves and the historical estimate should not be relied upon. Additional metallurgical and engineering studies are required.

Page 15: Kbt corporate

15

Sabre Resources –– Guchab Deposit GCDD0001 - 107.75m @ 1.15% Cu, 6.90g/t Ag GCDD0005 - 22.20m @ 3.45% Cu, 29.70g/t Ag GCDD0011 - 18.85m @ 1.06% Cu, 15.05g/t Ag GCDD0014 - 53.10m @ 1.23% Cu, 11.20g/t Ag GCDD0015 - 51.85m @ 1.35% Cu, 15.50g/t Ag GCDD0025 - 58.62m @ 1.38% Cu, 28.30g/t Ag GCDD0019 - 45.65m @ 1.04% Cu, 12.27g/t Ag GCDD0039 - 23.15m @ 1.29% Cu, 4.5g/t Ag GCDD0045 - 21.86m @ 2.22% Cu, 44.6g/t Ag GCDD0046 - 26.40m @ 2.44% Cu, 43.6g/t Ag

*Full technical details of Sabre’s drilling results can be found in the presentation titled Exploring the Kombat Copper Trend Otavi Mountain Land, Northern Namibia, Africa Down Under Conference, Perth, Western Australia. Copies of this report and related presentations can be found on Sabre’s website.

Category Tonnes Cu % Pb % Ag g/t

Inferred 157,549 1.54 5.85 15.43

Page 16: Kbt corporate

16

Page 17: Kbt corporate

17 *Full technical details of Weatherly’s Tschudi Deposit can be found in the report titled Tschudi Copper Deposit Geological Modelling and Mineral Resource Estimate by Coffey Mining (SA), November 13, 2009. Copies of this report and related presentations can be found on Weatherly’s website.

Page 18: Kbt corporate

18

Kombat Copper EPL 3941

Weatherly ML

2km

Page 19: Kbt corporate

19

EPL-3943

EPL-3941 EPL-3942

EPL-3979

EPL-3944

Grootfontein

Otavi Otjituuo

Harasib

Gross Otavi

Kombat

Copper Smelter

Mined -12 Mt @ 2.3% Cu, 1.9% Pb, 18 g/t Ag Historic Resource 2.2 Mt @ 2.2% Cu, 22 g/t Ag

Tsumeb Mine – 30Mt at 4.3% Cu, 13.9% Pb/Zn, 95g/t Ag

Tschudi Project Reserve 22.7 Mt @ 0.95% Cu

Otjikoto Mine 29MT @ 1.4g/t

Base Metals

Base Metals

Base Metals and Gold

Page 20: Kbt corporate

20

Angola

Botswana

South Africa

Zambia

Kombat Mine

Page 21: Kbt corporate

21

Page 22: Kbt corporate

22

52 Week Price Performance

$0.00

$0.02

$0.04

$0.06

$0.08

$0.10

$0.12

$0.14

$0.16

$0.18

$0.20

Page 23: Kbt corporate

23

Page 24: Kbt corporate

24

Page 25: Kbt corporate

25

Page 26: Kbt corporate

26