Kazakhstan
Kazakhstan
Pilot initiative proposal
• Almaty – Issyk-kul route co-deployment among energy, ICT and transport taking into account disaster risks and social inclusion along the route
• 80% in Kazakhstan and 20% in Kyrgyzstan
• The pilot include 1) building the road, 2) co-deployment of ICT (and electricity), 3) disaster warning and mitigation system
• Benefits include:• Much shorter time to travel from Almaty to Issyk-kul (currently via Bishkek)• Increase in tourists from Kazakhstan, Russia, China and Mongolia• Increased accessibility to the communities along the route• Increased opportunities for entrepreneurships and SMES along the route
• Financing options: PPP (Design-Build-Operate-Transfer), Project Funds? Bonds?
• Possible funding agencies; Islamic Development Bank, ADB, EBRD, Eurasian Economic Union
Continued
• Risks: changes in tourist flow, SME staffing, re-routing of agricultural produce flow, natural disasters, currency risks, policy risks, environmental clearance, land acquisition?
• Possible mitigation measures: disaster risk assessment, guarantee required for the implementation, risk allocation (who is taking which risk?)
• Need coordination, legal instruments and frameworks?
Implementation
modality
• Proposal to establish a secretariat or single body to coordinate activities of various government agencies and partners
• The proposed location of the secretariat
• AIFC
• Within the government
• SONCA
• SPECA
Recommendations and the way forward• ESCAP requests the appointment
of focal points
• The project could invite other countries for possible replication, cross-border connectivity and phase 2 of the project
• The feasibility/ assessment for the pilot initiative to be undertaken
• National workshops to be organized in 2019 and 2020 in Kazakhstan