Presented By:- Mr. M. K. Somani, Superintending Engineer Mr. Pradip Sah, Executive Engineer Ms. Reeta, Assistant Engineer KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR World Highest NDCT Height of NDCT:- 202 m. Completion Period:- 767 days Completion Date:- 12.04.2012 2X600 MW=1200 MW KaTPP, Jhalawar
40

KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

Oct 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

Presented By:-

Mr. M. K. Somani, Superintending Engineer

Mr. Pradip Sah, Executive Engineer

Ms. Reeta, Assistant Engineer

KALISINDH THERMAL POWER PROJECT,

RRVUNL, JHALAWAR

World Highest NDCT

Height of NDCT:- 202 m.

Completion Period:- 767 days

Completion Date:- 12.04.2012

2X600 MW=1200 MW

KaTPP, Jhalawar

Page 2: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

2

History of Power Development in RajasthanRajasthan 1949; 19 princely states merged.

Total number of towns and villages electrifiedMax 42.

Installed generating capacity 13.27 MW.

Rajasthan State Electricity Board (RSEB) formed 1st July 1957 and

development of power sector started.

Under new Power Reforms Undertaken by State Government, RSEB was

unbundled into five Power Companies in July 2000.

Rajasthan Rajya Vidyut Utpadan Nigam Limited (RRVUNL) is one of them.

RRVUNL is also managing and operating the following Inter State Projects (ISP)

S.No Power Station Present Capacity

01. Rana Pratap Sagar Hydel PS (4X43 MW) 172 MW

02. Jawahar Sagar Hydel PS (3X33 MW) 99 MW

Total 271 MW

Introduction of RRVUNL

RRVUNL has been entrusted with the job of development of power projects

under state sector, in the state along with operation & maintenance of state owned

power stations.

Present Installed Capacity of RRVUNL is 7277.35 MW and 271 MW (ISP).

Page 3: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

S.No. Power Station Present Capacity

1. Suratgarh STPS, Suratgarh, Distt-Shriganganagar 1500 MW

2. Kota STPS, Kota 1240 MW

3. Chhabra Thermal Power Station, Chhabra, Distt. Baran 2320 MW

4.Kalisindh Thermal Power Station, Kalisindh, Distt.

Jhalawar1200 MW

5. Dholpur CCPS , Dholpur 330 MW

6. Giral Lignite TPS ,Giral, Distt. Barmer 250 MW

7. Ramgarh Gas Thermal Power Station,Distt. Jaisalmer 273.50 MW

8. Mahi Hydel Power Station.Distt-Banswara 140 MW

9. Mini Micro Hydel Schemes 23.85MW

Total 7277.35 MW

PRESENTLY INSTALLED CAPACITY

3

S. No. Power Station / Unit Capacity

1. Suratgarh Supercritical Thermal Power Station U# 7 660 MW

2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW

Total Capacity 1320 MW

ONGOING PROJECTS OF RRVUNL

Page 4: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

ENERGY CONSUMPTION OVERVIEW

4

Performance Parameters for FY 2019-20

S. No. Parameters Unit Value

1. Annual Generation MU 5708.09

2. PLF % 54.15

3. Availabilty % 70.08

4. Gross Heat rate KCal/KWh 2377.02

5. Aux.consumption % 6.82

6. DM Water consumption M3 222599.5

7. Raw Water consumption M3 14923873

8. Sp. Oil consumption (ml/KWh) 0.812511

Page 5: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

5

7.7

5

7.3

4

7.5

6

7.7

7

7.6

2

7.4

4

7.5

9

7.7

2

8.1

3

6.2

9

5.9

2

6.1

2

5.8

5

0.0

0

6.4

9

6.1

9

0.0

0

0.0

0

5.8

6

6.3

5

6.1

7

6.1

4

6.0

2

6.4

4

0.00

2.00

4.00

6.00

8.00

10.00

Auxiliary Power Consumption (%)

Unit # 1

Unit # 2

28

0.0

9

35

0.9

7

34

8.0

3

36

4.7

9

30

2.2

5

35

6.0

3

31

6.5

8

10

0.5

5

12

8.6

3

30

9.4

8

27

0.6

29

0.1

1

46

.6

0.0

0

26

4.5

5

23

9.5

3

0.0

0

0.0

0

19

1.7

3

26

9.8

8

35

1.2

7

34

8.3

3

34

2.6

5

23

5.4

4

050

100150200250300350400

Monthwise Generation (MU)

Unit # 1

Unit # 2

PERFORMANCE PARAMETERS FOR FY 2019-20

Page 6: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

6

64

.84

78

.62

80

.56

81

.72

67

.71

82

.41

70

.92

23

.28

28

.81

69

.33

64

.80

64

.99

76

.08

88

.07

94

.75

10

0.0

0

10

0.0

0

10

0.0

0

10

0.0

0

30

.00 55

.69

92

.42

78

.79

10

0.0

0

0.00

20.00

40.00

60.00

80.00

100.00

120.00

PLF v/s Availability Unit # 1

PLF

Availabilty

10

.79

0.0

0

61

.24

53

.66

0.0

0

0.0

0

42

.95

62

.47

78

.69

78

.03

82

.05

52

.74

11

.93

0.0

0

78

.53

66

.08

0.0

0

0.0

0

55

.31 77

.41

92

.95

10

0.0

0

10

0.0

0

83

.40

0.00

20.00

40.00

60.00

80.00

100.00

120.00

PLF v/s Availability Unit # 2

PLF

Availabilty

PERFORMANCE PARAMETERS FOR FY 2019-20

Page 7: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

7

23

94

.17

24

16

.30

23

93

.66

23

86

.12

23

81

.18

23

52

.18

23

90

.21

24

07

.48

23

77

.02

2320.002340.002360.002380.002400.002420.002440.00

(17-18) (18-19) (19-20)

Gross Heat Rate (KCal/KWh)

Unit-1

Unit-2

Station

6.3

0

6.9

2

7.2

3

6.7

5

5.7

8

6.2

2

6.5

2

6.6

4

6.8

2

0.00

2.00

4.00

6.00

8.00

(17-18) (18-19) (19-20)

APC (%)

Unit-1

Unit-2

Station8

7.9

9

92

.46

84

.78

85

.35

30

.78 55

.378

6.6

7

51

.62

70

.08

0.00

20.00

40.00

60.00

80.00

100.00

(17-18) (18-19) (19-20)

Availabilty (%)

Unit-1

Unit-2

Station

SPECIFIC ENERGY CONSUMPTION

FY % Improvement

SHR

2017-18 -0.188

2018-19 0.722

2019-20 -1.265

Page 8: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

BENCHMARKING

8

23

20

.63

23

20

.63

23

33

.28

23

90

.21

24

07

.48

23

77

.02

2250.00

2300.00

2350.00

2400.00

2450.00

(17-18) (18-19) (19-20)

Gross Heat Rate (Kcal/Kwh)

Normative

Value

Station

5.2

5

5.2

5

5.2

56.5

2

6.6

4

6.8

2

0.00

2.00

4.00

6.00

8.00

(17-18) (18-19) (19-20)

APC (%)

Normative

Value

Station

Normative Values are as allowed by RERC

PAT

Cycle

SHR for Baseline

year FY 2015-2016

Target Net Heat

Rate for

FY 2019-2020

Station Gross

SHR Achieved

FY 2019-2020

Station Net SHR

Achieved

FY 2019-2020

PAT-

II

2726.52 KCal

/KWh

2648.02 KCal

/KWh

2377.02

KCal/KWh

2550.998

KCal/KWh

Page 9: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

BENCHMARKING

9

Name Capacity SHR

(KCal/KWh)

APC

(%)

KaTPP 1200 MW

(2X600)

2407.48 6.64%

SIMHADRI SUPER

THERMAL POWER

STATION- NTPC

2000 MW

(4X500)

2585 5.94%

NTPC Limited –

RAMAGUNDAM SUPER

THERMAL POWER STATION

2600MW (3x200 +

3x500 + 1x500 ) +

10 MW Solar

2501 6.23%

Mettur 1440 MW

(4X210+600)

2402.66 6.93%

National Benchmarking (FY 2018-19)

Road Map for Future Target

Online Energy Monitoring System has been installed for

close monitoring of APC and henceforth reduction in APC.

Page 10: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

10

ENERGY MANAGEMENT AT KATPP

Planning, Execution and Implementation of

Energy Conservation Projects

Encourage staff to keep VFDs in operational

condition.

Monitor performance of all HT Equipment to

reduce Auxiliary Power Consumption.

Procurement and Utilization of Energy

Efficient Equipment.

Adherence of predicted parameters of

running Units.

Head-Energy Management

Addl. C. E.

R

E

S

P

O

N

S

I

B

I

L

I

T

I

E

S

Budget Allotted for Energy Conservation Projects in 2020-21

(Million Rs.):- 24.47.

Page 11: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

ENCON PROJECTS FY 2020-21

11

S.

No.

Project Detail Investment

(Rupees)

Verified

Savings

(Rs.)

Verified

energy

savings

(KWh)

Units Fuel Status Pay

back

year

1 Replacement of HPSV

lamps in turbine hall by

efficient induction lamps

1000000 384788 83000 - - Under

progress

2.60

2 Installing natural

ventilators in TG area

22500000 6699020 1445000 - - Under

progress

3.36

3 Insulating steam pipes &

boiler .

146900 1930596 332277 MT 187 Under

progress

0.08

4 Pump coating of raw water

pumps to reduce power

consumption. (1 No)

181000 232798 50226 - - Under

progress

0.78

5 Pump coating of CW water

pumps to reduce power

consumption.

499000 3890097 836580 - - Under

progress

0.13

6 Pump coating of ACW

water pumps to reduce

power consumption.

144000 183546 39600 - - Under

progress

0.78

Total 24470900 13320845 2786683

Page 12: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

12

ENCON PROJECTS FY 2019-20

S. No. Project DetailsInvestments

(Rs.)

Savings

Payback

Months(Rs.) KWh

1.

Pump coating of CW

water pumps to

reduce power

consumption.

499000 3890097 836580 1.54

2.Insulating steam

pipes & Boiler2815175 1233265 264933 27.39

Total 3314175 5123362 1101513

Page 13: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

13

ENCON PROJECTS FY 2018-19

S. No. Project DetailsInvestments

(Rs.)

SavingsPayback

(Months)(Rs.) KWh

1.

Pump coating of

ACW water pumps

to reduce power

consumption.

144000 183546 39600 9.41

2.

Pump coating of

raw water pumps

(1 No.).

181000 232798 50226 9.33

3.Insulating steam

pipes & Boiler2200000 1274979 251949 20.71

Total 2525000 1691323 341775

Page 14: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

14

S. No. Project DetailsInvestments

(Rs.)

Savings

Payback

(Months)(Rs.) KWh

1.Tap changing of Lighting

transformer of Unit # 1 & 20 69540 15000 0

2.

Replacement of

Conventional Tube lights (40

W) of Plant by efficient LED

tube lights (20 W)

190180 406113 87600 5.62

3.Changing 150 W HPSV

Lamps with 90 W LED684160 276157 59568 29.73

4.Changing 150 W HPSV

Lamps with 70 W LED871205 533000 114975 19.61

5.Annual Maintenance of

Units as per requirement0 82734056 17846000 0

Total 1745545 84018866 18123143

ENCON PROJECTS FY 2017-18

Page 15: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

15

RENEWABLE ENERGY SOURCES

Renewable Energy Sources are looked after by our State

Entity i.e. Rajasthan Renewable Energy Corporation

(RREC), Jaipur. They take care of all renewable energy

projects in the State.

There is no such specific project under taken by KaTPP,

RRVUNL.

Page 16: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

16

PERFORMANCE MONITORING AT KATPP

Daily Meeting

Discussion on Hurdles and further Improvement

in Plant Operation.

Discussion on Daily Defects and their solution.

Discussion on Plant Performance Parameters and

issues related with them.

Review inventory status, purchase of spares, if

required for improvement during maintenance.

Also sought latest status of already placed Purchase

orders.

Discusses to hire consultancy, if requires for

improvement of Plant Performance.

Chaired by Plant Head (Chief Engineer)

Monthly

Meeting Review reports submitted by Cross Functional Task

Force and discuss suggestions for improvement of

different areas of Plant and execution thereof.

Page 17: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

17

INNOVATIVE PROJECTS SUMMARY1. Erection of Isolation Gate at PA Fan Discharge Duct (FY 2018-19)

Impact:- Recently in Dec 2019 one PA fan of Unit#1 was under

breakdown for 15 days and with the help of this recently erected gate

Unit run continuously on 60-70% load instead of shutdown the Unit and

the damaged fan was attended in parallel.

2. Refractory Works in Economizer and LTSH Bends (FY 2017-18)

Perforated Plates (size-600X25X6MM) covered by refractory for

protecting bends from erosion due to flue gases.

Impact:- BTL due to erosion of bends from flue gases has been

controlled.

3. Shielding Plates in Heat Recovery Area (FY 2017-18)

Impact:- Erosion of bends from flue gases has been controlled.

Page 18: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

18

INNOVATIVE PROJECTS1. Erection of Isolation Gate at PA Fan Discharge Duct FY 2018-19

Problem:-

During running of Unit, If any

one PA Fan goes under

breakdown, It required to be

isolated to attend the problem.

With available discharge

damper it was not possible to

isolate the PA Fan completely.

Due to Passing of air from

discharge damper PA Fan under

breakdown rotates in reverse

direction, due to which

maintenance work was not

possible and also it hurdles

when again PA Fan is required

to be taken in service.

Investment (Rs. In Lakhs):- 23.524

Annual savings (Rs. In Lakhs) :- 5873.76

(Estimated)

Replication Potential :- Can be explored by

other plants also if they are also facing such type of

problems.

Page 19: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

19

INNOVATIVE PROJECTS2. Refractory Works in Economizer and LTSH Bends

(FY 2017-18)

Original Perforated Plates After Modification

Eroded Tubes and Bends in Economizer and LTSH Area of Boiler before modification

Perforated PlatesRefractory

Page 20: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

20

INNOVATIVE PROJECTS

2. Refractory Works in Economizer and LTSH Bends

(FY 2017-18)

Problem:- Erosion in bends could

cause BTL.

Investment:- Rs. 1.0 Lakhs.

Estimated Annual Saving:- Rs. 5484.371 Lakhs

Replication Potential:- Yes. Can be explored by other plants

also if they are having high BTLs in Economizer and LTSH Bends.

Action Taken:- Covered porous plate

(perforated plate of size-600X25X6MM) in

economizer and LTSH area by refractory.

Page 21: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

21

INNOVATIVE PROJECTS3. Shielding Plates in Heat Recovery Area (FY 2017-18)

Project Details

Problem Action Taken

During Annual Shutdown while

carrying out De-metering of

Tubes and Bends in Heat

Recovery Area, It had been

Observed that Tubes and Bends

started eroding due to Impact of

Flue Gasses.

Provided SS (Stainless Steel) shielding

plates on tubes & bends in front Heat

Recovery Area for protecting erosion

of tubes and bends due to flue gases.

This arrangement was not provided by

OEM in original design.

Investment:- Rs. 3.38 Lakhs.

Estimated Annual Saving:- Rs. 3656.25 Lakhs

Replication Potential:- Yes. Can be explored by other plants also.

Page 22: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

22

OTHER MODIFICATIONS1. Modification Done in Wet Bottom Ash Hopper (BAH) to avoid damage of

Refractory and Seal Trough

Original Drawing of BAHOEM -M/s Macawber Beekay Pvt. Ltd, Noida.

Modified Drawing of BAH

In consultation with OEM

Page 23: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

Problem

Whenever Clinkers fall in Bottom Ash Hopper, It causes damage of refractoryon walls of bottom ash hoppers & seal trough due to explosion occurred bysplashing of water on the refractory of walls.

Impact

Frequent Occurrence of this phenomenon leads disturbance in furnace, whichfurther causes drastic variation in draft making Units unstable and prone totripping.

Sometimes this phenomenon may become cause of accident and human injuryalso.

23

OEM suggestion

Additional strengthening (by MS/SS angles, plates stiffeners & SS anchors

etc)

Result

Refractory of said portion has been carried out in both units but the problem

remains the same.

OTHER MODIFICATIONS1. Modification Done in Wet Bottom Ash Hopper (BAH) to avoid damage of

Refractory and Seal Trough

Page 24: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

Result:- Frequent problem of damage of bottom ash

hoppers walls, seal trough, refractory etc. was resolved.

24

Our Observation

Main problem in the existing design

was rectangular portion of Bottom Ash

Hopper. At the time of explosion water

of bottom ash hopper spreads & strikes

on the walls of rectangular portion and

seal trough which resulting damage of

refractory of walls & seal trough of

bottom ash hopper.

Modifications done

The bottle neck portion of

bottom ash hopper was

minimized to provide

path/space (by providing

taper plates) for water

splashing during the falling of

clinkers in bottom ash

hoppers.

OTHER MODIFICATIONS1. Modification Done in Wet Bottom Ash Hopper (BAH) to avoid damage of

Refractory and Seal Trough

Page 25: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

2. Water System

Guidelines of pollution control board - Zero liquid

discharge.

Seepage of condenser pit is being transferred to CT

blow down tank through pipe line for further

utilization of water in Fire Fighting / Ash Handling /

Service Water System which were initially drained

in open area.

25

OTHER MODIFICATIONS

Page 26: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

26

PROJECTS IMPLEMENTED THROUGH KAIZENSupervisor Level

Investment:- Rs. 2.0 Lakhs

Annual saving :- Rs. 5342.381 Lakhs.(Estimated)

Problem:- BTL observed 6 times in two

Financial Years due to misalignment of tubes and

bends of economizer & LTSH zone.

Action Taken

Implemented at site in year 2019.

Observation

All tubes remained aligned and BTL

also controlled in these zone.

1. Boiler Area

Proposed Solution

Providing U-Clamps upon these tubes

and bends, for preventing tubes and

bends to be misaligned and henceforth

to be eroded due to flue gasses.U- Clamps

Page 27: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

27

PROJECTS IMPLEMENTED THROUGH KAIZEN

Annual Saving in APC:-10.78 MU (Rs. 2.97 Crores) and

running operation/maintenance cost of compressors also reduced.

2. Conveying air

compressors

(Saving of APC)

OEM Design

Installed =15 Nos. (11 Nos. working + 4

Nos. Stand By).

Supervisor observation & Suggestion

Daily pattern of loading/unloading hours of

running compressors and suggested to reduce

the nos. of compressors in service. Now only 8

Nos. compressors are running on full load & 7

Nos. compressors on partial load.

Annual Saving

4.91 MU.

Same practice adopted for Instrument & Service Air Compressors

Annual saving :-5.87 MU.

Page 28: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

28

PROJECTS IMPLEMENTED THROUGH KAIZEN

Saving of Water: - 91250 Cubic Mtr Annully.

Workmen Level

Pollution Control Board

Guideline

Zero liquid discharge.

Suggestion

Modify existing drainage system

of BTG area.

Action Taken:- Some drainages/trenches have

modified and water transferred to already existing

boiler-ESP drain sump then tube settler for

clarification then finally this water is transferred to

HP/LP suction pit for use of bottom overflow &

bottom De-Ashing of Units.

Result:- Saving in fresh water consumption

besides helping in achieving Zero Liquid Discharge.

Page 29: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

29

ENVIRONMENT MANAGEMENT

ASH UTILIZATIONParticulars UOM 2017-18 2018-19 2019-20

Ash Stock in Plant (yard + pond) Tons 630147 463709 277014

Ash Generated Tons 1087936 914091 1014713

Ash Utilization % 90.17 118.22 118.38

Ash Utilized in manufacturing of

cement/concrete – other similar

products

%

67.28 71.23 62.84

Ash Utilized in Fly Ash Bricks % 10.54 8.38 8

Ash Utilized in Mine filling % Nil NIL NIL

Ash Utilized for Roads pavements % 0 5.8 21.27

Ash Utilization in Other Areas – Please

mention below

%

1. In Ash Dyke raising % 0.32 0.28 0.42

2. In reclamation of low lying area % 0.44 0.13 0.13

3. Others(lifted/utilized by Red Bricks

manufactures/potters from Ash Dyke)

%11.59 32.39 25.71

Expenditure on Ash Utilization (annual) INR

(Lakhs)Nil Nil Nil

Page 30: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

30

ENVIRONMENT MANAGEMENT

ASH UTILIZATION630147

463709

277014

0

200000

400000

600000

800000

2017-18 2018-19 2019-20

Ash stock in Plant(yard+pond) Tons

1087936

914091

1014713

800000

900000

1000000

1100000

1200000

2017-18 2018-19 2019-20

Ash Generated (Tons)

Ash of KaTPP Utilized in following areas:-

Manufacturing of cement/concrete – other similar products

Fly Ash Bricks

Roads pavements

Ash of KaTPP Utilized in Other Areas also as mentioned below

Particulars UOM 2017-18 2018-19 2019-20

1. In Ash Dyke raising % 0.32 0.28 0.42

2. In reclamation of low lying area % 0.44 0.13 0.13

3. Others(lifted/utilized by Red Bricks

manufactures/potters from Ash Dyke)

%11.59 32.39 25.71

Page 31: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

31

ENVIRONMENT MANAGEMENT

ASH UTILIZATION

90.17118.22 118.38

0

100

200

2017-18 2018-19 2019-20

Ash Utilization (%)

67.28

10.540 0

01020304050607080

Ash Utilization (2017-18)

62.84

80

21.27

0

10

20

30

40

50

60

70

Ash Utilization (2019-20)71.23

8.380

5.8

0

10

20

30

40

50

60

70

80

Ash Utilization (2018-19)

Annual Expenditure

at KaTPP on Ash

Utilization - NIL

Page 32: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

Infrastructure for Ash Handling and Disposal

Pneumatic Ash Conveying System

Slurry Pumps

Dry Conveying through Bulkers(Telescopic Chute)

32

ENVIRONMENT MANAGEMENT

ASH UTILIZATION

Ash Handling Methods

Method of Ash

HandlingUOM Value Remarks

Ash Handled (Wet

Method) % 20 Through Slurry pumps

Ash Handled (Dry

Method) % 80 Through Bulkers

Ash Handled (Semi

Wet) % Nil

Through Ash

Conditioners and

dumpers

Page 33: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

33

ENVIRONMENT MANAGEMENT- EMISSIONParticulars UOM 2017-18 2018-19 2019-20

Total CO2 Emissions Per KW

of Generation

Ton/kW NA NA NA

Current SOx Emissions at Full

Load* (U#1/U#2)

mg/Nm3 653 / 745 991 / 790 769 / 1110

Current NOx Emissions at Full

Load* (U#1/U#2)

mg/Nm3 83 /123 108 / 110 74 / 149

Particulate Matter * (U#1/U#2) mg/Nm3 34 / 44 40 / 14 63 / 24

Mercury* Mg/Nm3 NA NA NA

Infrastructure available at KaTPP for Emission Measurement and Control

Continuous Emission Monitoring System

Ambient Air Quality Monitoring System

Future Plan for achieving Target:-

FGD is planned to install in phased manner to control SOX emission.

Best Practices Adopted for Emission Control and Monitoring:-

For control of NOx emission OFA is installed and for SPM ESP are

installed. Also, monitoring of air is being done for optimized air-fuel ratio.

Page 34: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

34

ENVIRONMENT MANAGEMENT-WATERParticulars UOM Normative Value

by MOEF

2017-18 2018-19 2019-20

DM water

Consumption of Plant

% 1 0.95 0.86 0.84

Raw Water

Consumption of Plant

m3/MW 3.5 2.84 2.69 2.64

Best Practices in Water Management

Recycle waste of Dual media filter, Ultra Filtration, Rapid Gravity Filter

backwash & Cooling Tower Blow down through Effluent Treatment Plant.

Metering and measuring of water through flow meters at different

locations.

Treated waste water is used for Cooling Tower Make-Up.

For treatment of waste water Effluent Treatment Plant (ETP) is installed

of capacity 4033 KLD. Complete effluent is being recycled and Zero

Liquid Discharge concept is maintained. Treated waste water of ETP

clarifier is also used for gardening.

Treated waste water after passing through Reverse Osmosis is used for

production of De-Mineralised (DM) Water.

Page 35: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

1. Turbine Rotor Seized

Reason:- Both UPS power supply failure .

Unit Shut Down Period:- 146.26 days (Unit #2), 04.06.2016 to

19.11.2016.

Loss of Generation:- 2106.15 MU

35

MAJOR ISSUES FACED BY KATPP

2. Generator Stator Fault and failure of GT

Unit Shut Down Period:- 240.46 days (Unit #2) 07.04.2018 to

04.12.2018.

Loss of Generation:- 3462.67 MU

3. Electrical fault (Buchholz relay operated, Y-Phase flange

damaged)

Unit Shut Down Period:- 62.97 days (Unit #2), 04.04.2019 to

06.06.2019.

Loss of Generation:- 906.78 MU

Page 36: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

4. Generator Stator Earth Fault

Unit Shut Down Period:- 84.89 days (Unit #2), 21.07.2019 to

14.10.2019.

Loss of Generation:- 1222.45 MU

5. 1 No. PA under Shut Down

36

MAJOR ISSUES FACED BY KATPP

Particulars Unit # 1 Unit # 2

Reason High Vibration High Vibration

Shut Down Period 26 days (14.12.2019 to

08.01.2020)

18 days (21.01.2020 to

07.02.2020)

Loss of Generation 163.457 MU 77.0468 MU

Impact:- Unit ran on partial Load during these days.

Cumulative Loss:- Million Rs. 430.5018.

Page 37: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

37

BEST PRACTICES ADOPTED AT KATPP

Previous Running of MDBFP during Cold

Start Up :- 20 to 23 hours

Practice Changed:-

In Current year only one TDBFP are being

run during cold and warm start up of units

in place of MDBFP if one unit is running

already to reduce APC.

Only two compressors are being kept in

service (1-SAC & 1-IAC) in place of

earlier practice of 3-nos. for reduction of

APC.

One CWP pump has been taken out from

service for full winter season and only two

CWPs are being run per unit (without

sacrificing vacuum) in place of earlier

practice of 3-nos.Reduction in APC.

Page 38: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

38

BEST PRACTICES ADOPTED AT KATPP

All 03 Nos. of CPU are being

taken in service during unit start

up of unit which has reduced

time of DPR and helped in early

normalization / achieving full

load of unit.

Monitoring and Supervision at the time of turbine rolling and heat soaking

Maintaining controlled firing rate/ heat input

Result

Unit is being synchronized in 10 to 12 hours in comparison to previous

years’Unit synchronization time of 15 to 18 hours during the cold start up.

Reduction in Unit start up

and synchronization time,

during hot as well as cold

Start Up

Passing of steam through high energy drains to

condenser and to start up flash tank/ IBD have been

arrested / minimized.

More valves are being replaced immediately.

Reduced

Energy Losses

Page 39: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

39

TRAINING PROGRAMS AT KATPP

TrainingsFlexible Operation of Thermal power Plant for

Balancing of the Grid

Strategies for Cost Effective Maintenance

Management System in a Power Station

Leadership and Emotional Intelligence

Boiler Tube Failures- Causes and Remedial Measures

Erection, Commissioning & best practices in O&M

and failure analysis of synchronous generators

including static excitation in Power Plant

Many more Training imparted on different topics

related with Power Plant.

Page 40: KALISINDH THERMAL POWER PROJECT, RRVUNL, JHALAWAR … · Suratgarh Supercritical Thermal Power Station U# 7 660 MW 2. Suratgarh Supercritical Thermal Power Station U# 8 660 MW Total

Thank You

40

Team Members Contact Details

Mr. M. K. Somani, Superintending Engineer; Email: [email protected]

Mr. Prdip Sah, Executive Engineer; Email: [email protected]

Ms. Reeta, Assistant Engineer; Email: [email protected]