Top Banner
KAISAB COMPANY LIMITED Building Maintenance Unit (BMU) Contractors Kaisab Co. Ltd. and German Manufacturers GEDA provide access solutions for building maintenance of facade and external/internal curtain walls. Our main scope is to design, manufacture and install BMU systems in full compliance with the European Standard providing safe working environment to our clients
7

Kacc case study

Nov 28, 2014

Download

Business

kaisabcompany

Case study of Kaisab company ltd carried on King Abdullah Center for Cancer and Liver Diseases (KACC)
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Kacc   case study

KAISAB COMPANY LIMITEDBuilding Maintenance Unit (BMU) Contractors

• Kaisab Co. Ltd. and German Manufacturers GEDA provide access solutions for building maintenance of facade and external/internal curtain walls. Our main scope is to design, manufacture and install BMU systems in full compliance with the European Standard providing safe working environment to our clients

Page 2: Kacc   case study

KACC Project CASE STUDY

  GENERAL INFORMATION Project Name: King Abdullah Center for Cancer and Liver Diseases - KACC Building Location: King Faisal Specialist Hospital City: Riyadh Country: Saudi ArabiaProject Height (m): 115 Building Type(s): HospitalProject Type: TowerOwner: King Faisal Specialist HospitalConsultant: Mustang Al-HejailanMain Contractor: Al-Bawani Co. LtdBMU Sub-Contractor: Kaisab Co. LtdBMU Manufacturer: GEDA

Page 3: Kacc   case study

DESCRIPTION

 1. Design, manufacture, installation of Building Maintenance Unit System

(BMU) running over the upper roof along the building parameters for access purpose of building facades to execute cleaning and maintenance

2. Design of machine & rails are based on the European Standard for BMU (EN 1808) taking special machinery components (auxiliary winch) to perform glass panels’ replacement in case of facade maintenance. The BMU cradle has been equipped with extendable soft rollers to provide a safe working condition while working on a glass fins facade. Moreover, the BMU system has been outfitted with a restraining system which enables the machine operator to work in a safe environment for a high rise tower. All safety procedures and aspects have been provided according to EN1808 and clarified in the machine’s technical data

3. Project completion : June 2013

Page 4: Kacc   case study

BMU DESIGN FOR KACC

Page 5: Kacc   case study

3D DEMONSTRATION OF BMUKACC PROJECT

Page 6: Kacc   case study

UPPER ROOF LAYOUT SHOWING BMU APPROACH

Page 7: Kacc   case study

BMU TECHNICAL DATA & SAFETY FEATURES