- 1. NAME: RUSDIANTONIS/CLASS : 10097825/XI TP 3ADDRESS : VILLAGE
TLAJUNG Hick RT 01/12 KAB. BOGORSMK Muhammadiyah 1 Cileungsi JL. No
orchids. 86 Cileungsi district, Bogor Telp.8230985 Fax.
82480034
2. I. IDENTITY Name: Rusdianto Place/Date of birth : Bogor/
October 15, 1993 Gender: Male Blood Type:B NIS/Class/Progli:
10097825/XI TP 3 Name of Parent/guardian : Tugiman Address :
Rt.1/12 kp. Momonot Tlajung daughter Hillbilly Mountain District
No. 18 Bogor Handphone/Telp: 087770063815 Cileungsi, December 11,
2011Signature of student COMPANY IDENTITY (DU / IN) Name of DU / IN
: PT. PAMA PERSADA NUSANTARA Bid. / Type of Business : Industrial
Address : Jl. Kingdom Narogong km. 23, 8 tower scenic area of
industry Name of leader: Personal Mr. Santoso Name of supervisor:
Mr. Suhadi Pkl start date: October 11, 2010 Pkl completion date :
December 11, 2010 3. APPROVAL SHEETINDUSTRY WORKING PRACTICESSMK
MUHHAMMADIYAH 1 Cileungsi "TERAKREDETASI A" CERTIFICATION SHEET
BUSINESS / INDUSTRYINDUSTRY WORKING PRACTICESOn this day Monday the
11th of October 2010, Has endorsed the book industryjournal reports
of work practices (prakerin) above:Name : RusdiantoNIS / Class /
Progli : 10097825/XI TP Engine 3/TeknicThe name Mentioned above to
implement work practices in the industry: Name of DU / IN : PT.
PAMA PERSADA NUSANTARA Address: Zone Tower Permai Bogor Km 23.8
Cileungsi Start prakerin : On October 11, 2010 Done prakerin:
December 11, 2010Knowing the October 11, 2010DU Leader / Supervisor
DI industry 4. II. JOURNAL PRAKERINA. INTRODUCTION The purpose of
the preparation of journals and reports of students activities
Duringthe implementation of industry practices (prakerin) is to
increase of the quality andrelevance of vocational high school
Muhammadiyah 1 Cileungsi working with businessand industry That
covers aspects of the development of moral character ,
knowledge,skills, arts and health culture. The development of these
aspects leads to theimprovement and development of life skille
(life skills), the which is realized throughthe achievement of the
Standards of Competence. Standard and Basic competence of industry
work practices (prakerin) functionalign school curriculum with
business and industry, so That students can actualize anddevelop
themselves to the world of business and industry. Industry practice
for the students can Produce a superior personal
character,Abilities and ethics to get along, adaptability,
initiative skills, ability to cooperate,ability and skills to work
in the company and or independent.B.LEGAL BASISImplementation of
industry practices (prakerin) PSG based on: Pancasila and 1945
Constitution. Law No.20 of RI TH.2003 about the national education
system GoI Peranturan Th.2005 19, of the National Education
Standards. Regulation 22 TH.2006 minister of national education,
about the standard ofthe ISI. 5. Regulation No.23 TH.2006 minister
of national education, the Standard of Competence Graduates (SKL).
Regulation of the Minister of National Education TH.2006 No.24, on
the implementation of the ISI standards and SKL on elementary and
secondary education units. Decision No. Education Minister. 080?
U/1993 of vocational curriculum as follows,"The implementation of
education Carried out through two pathways (Link and Match) of
school education and special education schools.C.PURPOSEDestination
industry working practices so That Learners have the
followingcapabilities:1. Understanding and appreciate the business
activities and industry.2. Understanding the workplace culture
(mental attitude and personality).3. Understand and be Able to use
equipment to business and industry.4. Understanding the production
process from raw materials to finished goods.5. Understanding the
administration / business and industry menegement.6. Have the
skills and independence to work and Trying.7. Intertwining
relationship the between the school faforable partner
institutions.8. The implementation of the learning process in
business and industry.9. Introduction and implementation of
marketing for prospective graduate students. 6. D. INSTRUCTIONS FOR
STUDENT USE1. Students are required to read the entire journal is
closely2. Fill in the data / information in accordance with this
question journalized3. Standard practice in competency this
journal4. Prakerin always taken the time and always maintain the
cleanliness of the journal and this report5. Reported after
conducting prakerin6. Following the oral examination prakerinE.
INSTRUCTIONS FOR USE OF SCHOOL COACH1. Read and appreciate the
entire contents of this journal2. Guiding students in filling
journals and this report3. Establishing good relations with
industry Mentors4. Guiding the students before leaving prakerin5.
Students, monitor student progress in place prakerin6. Resolving
student problems together7. Responsible or the make a report after
students erection prakerin 7. F. COACHS GUIDE FOR INDUSTRIAL USE 1.
Working closely with school counselors and teachers in
theimplementation of practice 2. Provide support to the
implementation prakerin by Providing facilities andmaterial
practices 3. Provide guidance and training in accordance with the
needs of businessand industry 4. Provide an assessment to students
prakerin tailored to the existing format 5. Together with the
school signed certificate / recognition Abilities ofstudentsG.
STUDENT Code PRAKERIN / PKL 1. Obeying the rules and regulations at
the company / business and industry 2. Maintain and uphold the
authority of, and Will not do the Things That candestroy religion,
schools and parents 3. And always try, to be disciplined, creative
and Responsible adultsinofative 4. Well dressed, polite and
respectful to everyone 8. 5. Giving Them know (permissions) to the
coach industry, if Unable to attend (sick)6. Complete and sign with
Their parents sign a statementH. HOPE AFTER PRAKERIN1. Have a noble
character and Devotion to the Almighty GOD (Students can Enhance
the personality of the which include: accuracy, dexterity,
discipline, independence and responsibility)2. Having insight into
the world of industry and mental readiness to work independently3.
Students can Improve Their standard of competence (life skill to
have) a better life skills4. Studentscan Enhance creativity and
initiative in learning, work and community 9. STUDENT COUNTER 10.
III. Noted the companys organizational structure (owners &
responsible person) 11. CHAPTER IINTRODUCTIONA. Company
BackgroundPT. PAMA PERSADA NUSANTARA is a company engaged in the
field ofnon-oil mining contractor in IndonesiaThat are used
Sciences include:1. Basic sciences include: Mathematics
engineering, engineering physics, computer programming language,
materials engineering structural mechanics, control and
automation2. Applied science include: CAD, welding equipment metal
industry, machine maintenance, safetyThe problems faced byStudents
explore the material in the company of heavy equipment
manitenanceand engineering / modification unit. Will the unit be
used continuously Damaged ifwithout treatment, so That a unit in
the industry requires regular maintenance to bedone periodically to
the unit is Damaged and Will not be an obstacle in theproduction
process within a company. 12. Purpose and objectives1. The purpose
of this report is students writes: a. That the Various Study Often
problems occur in the PT. Pama Persada Nusantara, problems. That
Often Happen to find a solution based on science That have been
studied are: engine maintenance b. Apply the theoretical knowledge
obtained paraktek That has been into a real school. c. Helping to
find and solve technical and non technical issues in the use and
maintenance of heavy equipment in a corporate environment.2. The
purpose of this company is students writes: a. Gain experience on
the care units of heavy equipment in the companys real, so students
get a clearer picture about the Various Things about the world of
work is applicable. b. Get a real picture and clearer understanding
of the components inside the unit That Is used with care. 13. B.
Methods of practical work The method is a way of working
systematically to facilitate the implementation of an activity in
order to Achieve the specified goals. The method used is: 1)
Guidance In this case, the method used to Convey materials mentor
That growing niche or learning materials to be oral and written and
Mentors to the praktikan work practice field. 2) Observation "The
method of observation is an observational research method (review)
field Carried out carefully before practice. 3) Interview "This
method is a method of research interviews conducted by a researcher
to the speaker. 4) Practice "Method of practice is a method of
research conducted by a real implementation on the ground. 14. C.
SystematicsIn this report, contains about treatments and how to
repair, engineering andmodification on the job in general track in
PT. PAMA PERSADANUSANTARA.CHAPTER IICOMPANY OVERVIEWA. History of
company PT. Pama Persada Nusantara (PAMA) was formed in 1989. PAMA
derivedfrom heavy equipment rental division to its parent company
PT United Tractor Tbkis specialized heavy equipment sales and
distributors. For many, many famousbrands Such as Komatsu and
Nisan. Major shareholder of PT. Astra InternationalTbk, one of the
companies in Indonesia. PAMA is one herald mining contractor
inIndonesia, where Indonesia has a wealth not inferior to other
nations. Against thebackdrop of a solid and constant desire to
Improve Their professional and generatecustomer satisfaction, PAMA
has grown in Indonesias mining industry, andprovides all the
capabilities and services to clients and partners. PAMA is
thelargest mining contractor in Indonesia, has done 40% of coal
mining spread in partsof Indonesia in 2003. 15. PAMA today operate
with many mining regions in Kalimantan andSumatra, the scope of the
projects handled include coal mining. Goldmining, construction and
removal of soil. Coal mining into business with themajority of
140.68 million cubic meters of bada areas in the mine and
Transportedin 2003. In 2003, PAMA earn income above U.S. $ 320
million. PAMA assets includes1028 units of heavy equipment and the
number of employees 4316 people, in theconduct of mining with
Various conditions in Indonesia, PAMA has gained muchexperience
covers all the steps the which have been operating a fare study
ofwealth, preproduction, development and production of regular
mining construction. PAMA has built a good relationship with his
client. With the success ofoperations in the construction and
mining projects have been rewarded / rewardwith an extension of
negotiations on the repetition of the original mining contract isa
commitment to quality reporting PAMA perfect operational
flexibility andreliability. PAMA attention to the importance of
safety, health and the environment tointroduce the draft PAMA /
good design and management system (PSMS) a, thewhich is based on
three design Accreditation international recognition,
theinternational ONV SEQ Rating System; National Occupatil Safety
Association (NOSA); AND Sut Africa Chamber of Mine-mine Safty
Management System(MSMS). 16. PAMA also apply seperty management
system ISO 9001, ISO 14001, Gren Astracompany (AGC), siystems
Management of safety and health (SMK3) PAMAMnagemen Human Resources
(PHRM) PAMA production management system(PPMs), Total Productive
Mantenance (TPM), With a trainer / instructor with a goodand
professional workers and full support from the parent company, PAMA
Willcontinue to expand on the overall planning to become a leading
contractor in SoutheastAsia.B. Vision and Mission The vision and
mission of the PT. Pama Persada Nusantara are as follows:1. Company
Vision Being a mining contractor grade world with productivity,
enggenering, safety and environmental best.2. Company Mission a.
Providing services with the operation of heavy equipment in the
field of open andmining overburden That enables subscriber to get
the best return on the world stage b. Provide opportunities for
employees to develop their competence to measure inobjective c.
Providing the best MVA and EVA to shareholders. d. Continually
seeks to master the technology and engineering capabilities
andenvironmentally sound as well as human safety for the progress
of the nation and theState 17. IV. Take note of the manufacturing
process (production) and or service1. Unit at the Promontory Priuk
pic: GL. Mekanik Activity: mobilisai: Helper mechanical Pic:
ExpeditionWelder2. To in yards Cileungsi Activity: part-Genune
Activity: Check documents spb.c / ws / n-Local Part Pic :
MechanicsSecurity3. The unit Entered the parking lot 8. Running
Activity: Lower unit Pic : Mechanical Helper mechanical4. Parking
in accordance Activity status model Activity: Set the distance
units of the between unit + 15 m Pic : Mechanical5. Completeness
and check the condition of the unit Pic-GL. Mechanical Activity:
Q.A.L Unit condition Report Recommended part 18. Pic: Fore -GL.
mekanik UNIT READY -Logistic -ppc USE / SALEActivity promotion
repair cost analysis-DEMO ASIS$ Activity : PromotionDemo 20. V.
Take note of the marketing process and marketing areaVI. Take note
of the selection process or the hiring of employees1. Identified
there (identify Them)2. Develop a position description (explanation
of the development of positions)3. Identify the key selection
criteria (to identify the key criteria)4. Create the advertis-ment
(making the advertisement)5. Paper selection listiny short (forum /
paper checks initial selection) 21. 6.Initial screening interview
(interview) 7. Psicometric testing (pisicotes) 8. Assessment
centers / simulation (removal and simulation) 9. Second / tehnical
interview (interview techniques) 10. Reference checking (checking
of certificate) 11. Offer (offer) 12. New employees (new hires)4.
Note safty equipment for the industry and carry out the work Sefty
shoes Sefty helmet Welding gloves Masks Ear plug Ear Muff 22. 5.
Take note of the steps in operation any or all of the machines used
when prakerin Washing machine P2h (checks, equipment, daily)
Prepaire hose to spray water Hose that contain the flow of water
put into washing machine hose into the electrical panel legran Turn
on the washing machine are marked with green or start To turn off
the washing machine or simply press the red button off6. Note raw
materials and auxiliary materials used in industry Auxiliary
materials WD 40 to remove the rust Sandpaper Thiner Cat Clean and
remove rust on electric einer 23. A. Student Activities ReportVII.
DAILY ACTIVITY REPORTS STUDENTS competency/topic : Install Bottom
Guard DZ 273 type of work : Track/ 12 October 2010 Description of
activities Install guard Botom d 375 A. Tools in use: Handle 1
Socket 36 Short Pipe Jack hidroulik Cain blocks Combination Lock 36
Belt How it works: Tie Belt Bottom Guard below, then associate cain
blocks mounted on both sides trackshue Lift SLOWLY by turning the
crank cain bloks second, after cainblok since hydraulic lift used
to help hold the Bottom Guard. After the Bottom Guard lifted use
the key combination for installing bolts 36. To Bottom Guard held
tight to use a socket 36 and the handle 1 "is already connected to
the pipe. 24. competency/topic : Water Refill 1100 pc &
installtype of work : radiator hose frames Track/ 12
track/13October 2010Description of ActivityRefill water radiator
hose install pc 1100 & framesA. Refill the radiator waterThat
tools are used Gallon emptyHow it works: Check the radiator to be
objec tanks filled with water Use a gallon to fill the tank of the
radiator After Completing the water, cover with a rapid
re-radiators the make surethe radiator cap tightly closedB. Install
hose framesTools used: The key to pass 36 Container / bucket 25.
How it works: Remove the hose by using key frames pass36 Pour the
used oil is in the frame That hose into the bucket Attach the new
hose using key frames pass 36 competency/topic :Repair batrai cover
273 DZ type of work :track/14October 2010Description of
activitiesRepair cover batrai DZ 273Tools used: Sandpaper Sanpolac
Isamu (priming) ScrapsWork Airways: Putty using sanpolac dank Will
cover the repair ape Flatten the surface using sandpaper cover
After the flat surface of the cover, the cover painting by Isamu
(priming)and then, paint the cover by using a compressor. 26.
competency/topic : Install 273 DZ Bottom Guardtype of work : Track
/ October 18, 2010Description of ActivityInstall 273 DZ Bottom
GuardTools used: Combination Lock 32 Socket 32 Handle 1 TokrainHow
it works: Raise the Bottom Guard by using forklift Then attach the
bolts and tightened with a socket 32 and the handle to use your 1
"and the combination lock 32 In order to use the bolts are securely
attached tokrain and socket 32 27. competency/topic :Cleaning
trackling type of work :Track / October 19, 2010Description of
ActivityCleaning tracklingTools used: Scraps KatcherHow it works:
Clean trackling with using a scrap of land That Sticks Spray
trackling using katcher until clean. 28. competency/topic : Repair
cover 263 DZtype of work : Track / October 20, 2010Description of
ActivityDZ 263 Repair CoverTools used: Sandpaper Sanpolac Isamu
(priming) ScrapsHow it works: Putty Will cover the repair by using
sanpolac and skarp Flatten the surface using sandpaper After the
flat surface of the cover, the cover painting by Isamu(priming)
Then paint the cover by using a compressor 29. competency/topic :
Cleaning tracklingtype of work : Track / 21-22 October
2010Description of ActivityCleaning tracklingTools used: Scraps
KatcherHow it works: Clean trackling with using a scrap of land
That Sticks Spray trackling using katcher until clean. 30.
competency/topic : Final checks DZ unitstype of work : Track / 25
October to 1 November 2010Description of activitiesFinal checks DZ
unitsA. Refill oil dozer unitsTools used: Pumps Jerry cansHow it
works: Open the lid dozer oil tank and pour the oil from the pump
using the supplied jerrycans Clean the work area of oil spills by
using SawdustB. Painting Dozer unitTools used: CompressorsHow it
works: Close the glass cabin units by using paper That Is not
exposed to paint Spray the unit to average Dozer and tidy. 31.
competency/topic : Remove install sprocket D-375 Atype of work :
Track / 03-04 November 2010Description of ActivityRemove sprocket
install D-375 ATools used: Socket 46 Handle 1 Rechet Power raint
Short PipeHow it works:A. Remove sprocket Loosen the bolts are
tight by using the power raint already connected witha short pipe
with a socket 46 After the bolt is loose for easy to use handles
and sockets 46 32. competency/topic : Cleaning trackling type of
work : Track / November 5, 2010Description of ActivityCleaning
TracklingTools used: Scraps KatcherHow it works: Clean trackling
with using a scrap of land That Sticks Spray trackling using
katcher to clean 33. competency/topic :Install the cover
undercarige type of work :Track / November 6, 2010Description of
ActivityInstall cover undercarigeTools used: Combination Lock 30
Socket 30 Handle 1 How it works: Attach the cover to undercarige
already repaired Replace the which the bolts 30 are provided using
a combination lock 30 In order to use the bolts are securely
attached socket 30 and handle 1 Painting undercarige up neatly 34.
competency/topic : Drain the transmission oiltype of work : Track /
November 10,2010Description of activitiesDrain transmission
oilTools used: Key L 5 Containers Pumps Sawdust StocksHow it works:
Remove the transmission oil cap and provided input into the bucket
Fill the tank using a transmission with new oil pump to taste Clean
the area of the former oil spills by using Sawdust and cleancotton
waste 35. competency/topic :Removeinstall hose assy frame type of
work :Track / November 11,2010Description of ActivityRemove install
hose assy frameTools used: Combination Lock 36How it works: Remove
the hose frame to be removed using the pass key 36 Then attach the
new hose That frames have been made available usingpass key 36
competency/topic : Dasboard INNERCABIN type of work : Track / 12-13
November 2010Description of activitiesDasboard InnercabinTools
used: Stocks Sekrap and Thinner 36. How it works: Wipe the glass
cabin with clean cotton waste if Necessary use paint thinner to
moisten the dust cloth and then clean the glass cabin If there is
old paint / rust scrap use and clean with dust cloth moistened with
paint thinner competency/topic : Repair cover undercarige type of
work : Track /November 15 , 2010Description of ActivityReapir cover
undercarigeTools used: Sandpaper Sanpolac Isamu priming Spatula
Combination Lock 30 & 24 Socket 30 & 36How it works:Putty
That Will undercarige repaired using sanpolac and putty knife
Flatten the surface using sandpaper cover After the flat surface of
the cover, the cover painting by Isamu 37. Then painting the cover
with compressed After the cover undercarige pairs nicely painted
cover with a combinationlock to use your 30 & 36 and rechet
competency/topic :Completed bolt cover enggine type of work :Track
/ November 16,2010Description of ActivityCompleted bolt cover
undercarigeTools used: Combination Lock 19 Socket 19 RechetHow it
works: Replace the bolt That Had been cleaned using a wire brush
and container. Tighten the lock bolt by using a combination of 19
In order to use the bolt is securely attached to the socket 19 and
rechet. 38. competency/topic :Install 273 DZ hidllertype of work
:Track / November 17,2010Description of activityInstall 273 DZ
hidllerTools used: Handle 1 Socket 30 Rechet Tokraint extencaint
How it works: Attach hidller ready, to undecarige by using forklift
After hidller installed correctly, enter the bolts That have been
cleaned first, then Tighten using the socket handle and advance to
more easily use rechet to tighten the bolts After the bolts tight,
use the function tokrain tighten bolts in accordance with the size
39. competency/topic : Painting Standtype of work : Track / 20-22
November 2010Description of activityPainting boothTools used: Pilok
Duct Tape Cater Cat SekrapHow it works: Clean the stand by using
scrap until blended ago Paint booths with red paint After the paint
is dry use the duct tape and cater for the load stand identityand
then use paint to paint the identity of the load pilok stand 40.
competency/topic :Install the sprocket 273 DZtype of work :Track /
23-24 september2010Description of activityInstall sprocket 273
DZThat tools are used: Tokraint Handle Socket 36How it works:
Attach tith frameundercarige sprocket to 36 and insert the supplied
bolt and tighten the bolt using a socket 36 and handle After the
bolt tight to fit a standard bolt mounted using tokrait and socket
36. 41. competency/topic : Cleaning tracklingtype of work : Track /
25-26 November 2010Description of ActivityCleaning TracklingTools
used: Skap KatcherHow it works: Clean trackling by using a scrap of
land That Sticks Spray trackling by using katcher until clean. 42.
competency/topic :PSMS (painting workshop)type of work :Track
/Novemeber 29 - December 1, 2010Description of activitiesPSMS
(painting workshop)Tools used: BrushHow it works: Mix the paint
with a thiner then stirred with a flat Painting workshop clean and
tidy. 43. competency/topic : Refill diesel units Dozertype of work
: Track / 2-4 December 2010Description of activitiesRefill diesel
units DozerTools used: PumpsHow it works: Open the tank lid and
fill with diesel fuel That has been providedusing the pump Fill the
tank if there is enough diesel fuel is spilled IMMEDIATELYclean by
using Sawdust That has been provided. 44. competency/topic :
Install the cover undercarigetype of work : Track / 5-9 December
2010Description of ActivityInstall cover undercarigeTools used:
Combination Lock 30 Socket 30 Handle 1 How it works: Attach the
cover to undercarige already repaired Replace the which the bolts
30 are provided using a combination lock 30 In order to use the
bolts are securely attached socket 30 and handle 1 Painting
undercarige up neatly 45. competency/topic : Washing unit Dozertype
of work : Track / 10-11 December 2010Description of ActivityWashing
unit DozerTools used: Scraps KatcherHow it works: Clean trackling
with using a scrap of land That Sticks Spray trackling using
katcher until clean. 46. Format prakerin student assessment
(PSG)(Assessment by supervisor)Name of companyAddressNo aspect of
the assessmentvaluea. Aspects of personality 1. Attitudes and
behavior 80 2. Presence attendance / discipline 88 3. Initiative
and creative ability74 4. Motivation and responsibili95 5. Mental
readiness in working85 47. b. Aspects of competence 1. Timeliness
of work completed85 2. Quality of work 80 3. Knowledge of75 4. The
timing of the prakerin78 5. Knowledge of machining85 6. Knowledge
of production process 87 7. Read engineering drawings 85 8. The use
of machining80 9. Number of values1007 The average value82,85 Pass
both the 48. I. IDENTITY Name : Anggra Rivaldi Place / Date of
birth: Bekasi Augustus 22, 1994 Gender : Male Blood Type :- NIS /
Class / progli : 10097662/XI TP 2 Name of parent / guardian: Arief
sutandi Address: Rt 02/05 kp. babakan, ds. DayeuhKec. Cileungsi
Kab. Bogor No HP / Tel: 02126724528 Cileungsi, December 11,
2011Signature of student 49. COMPANY IDENTITY (DU / IN)Name of DU /
IN : PT. PAMA PERSADA NUSANTARABid. / Type of Business :
IndustrialAddress : Jln. Kingdom Narogong km.23, 8 towerscenic area
of industryTel / fax :Name of leader: Personal Mr. SantosoName of
supervisor: Mr. SamsudinPkl start date: 11 October 2010Pkl
completion date : December 11, 2010 50. STUDENT COUNTER 51. CHAPTER
IICOMPANY OVERVIEWA. History of company PT. Pama Persada Nusantara
(PAMA) was formed in 1989. PAMAderived from heavy equipment rental
division to its parent company PT UnitedTractor Tbk is specialized
heavy equipment sales and distributors. Formany, many famous brands
Such as Komatsu and Nisan. Major shareholder ofPT. Astra
International Tbk, one of the companies in Indonesia. PAMA is one
herald mining contractor in Indonesia, where Indonesia hasa wealth
not inferior to other nations. Against the backdrop of a solid
andconstant desire to Improve Their professional and generate
customersatisfaction, PAMA has grown in Indonesias mining industry,
and provides allthe capabilities and services to clients and
partners. PAMA is the largestmining contractor in Indonesia, has
done 40% of coal mining spread in parts ofIndonesia in 2003. PAMA
today operate with many mining regions inKalimantan and Sumatra,
the scope of the projects handled include coalmining. Gold mining,
construction and removal of soil. Coal mining intobusiness with the
majority of 140.68 million cubic meters of bada areas in themine
and Transported in 2003. 52. In 2003, PAMA earn income above U.S. $
320 million. PAMA assetsincludes 1028 units of heavy equipment and
the number of employees 4316people, in the conduct of mining with
Various conditions in Indonesia, PAMAhas gained much experience
covers all the steps the which have been operatinga fare study of
wealth, preproduction, development and production of regularmining
construction. PAMA has built a good relationship with his client.
Withthe success of operations in the construction and mining
projects have beenrewarded / reward with an extension of
negotiations on the repetition of theoriginal mining contract is a
commitment to quality reporting PAMA perfectoperational flexibility
and reliability. PAMA attention to the importance of safety, health
and the environment tointroduce the draft PAMA / good design and
management system (PSMS) a,the which is based on three design
Accreditation international recognition, theinternational ONV SEQ
Rating System; National Occupatil Safety Association( NOSA); AND
Sut Africa Chamber of Mine-mine Safty Management System(MSMS). PAMA
also apply seperty management system ISO 9001, ISO14001, Gren Astra
company (AGC), siystems Management of safety andhealth (SMK3) PAMA
Mnagemen Human Resources (PHRM) PAMAproduction management system
(PPMs), Total Productive Mantenance (TPM),With a trainer /
instructor with a good and professional workers and fullsupport
from the parent company, 53. PAMA Will continue to expand on the
overall planning to become a leading contractor in Southeast
Asia.B. Vision and Mission The vision and mission of the PT. Pama
Persada Nusantara are as follows:1. Company Vision Being a mining
contractor grade world with productivity, enggenering, safety and
environmental best.2. Company Missiona. Providing services with the
operation of heavy equipment in the field of open and mining
overburden That enables subscriber to get the best return on the
world stageb. Provide opportunities for employees to develop their
competence to measure in objectivec. Providing the best MVA and EVA
to shareholders.d. Continually seeks to master the technology and
engineering capabilities and environmentally sound as well as human
safety for the progress of the nation and the State 54. III. Noted
the companys organizational structure (owners & responsible
person) 55. IV. Take note of the manufacturing process (production)
and or service 1.Unit at the Promontory Priuk pic: GL. Mekanik
Activity: Mobilisai: - Helper mechanical Pic : Expedition welder2.
To in yards Cileungsi Activity: part-Genune Activity: Check
documents spb.c / ws / n-Local Part Pic : Mechanics security3. The
unit Entered the parking lot 8. Running Activity: Lower unit Pic :
Mechanical Helper mechanical4. Parking in accordance Activity
status model: Activity: Set the distance units of the between unit
+ 15 m Pic : Mechanical 56. 5. Completeness and check the condition
of the unit Pic-GL. Mechanical Activity: Q.A.L Unit condition
report Recommended part Pic : Fore - GL.mekanik UNIT READY
-Logistic - ppc USE / SALE Activity promotion repair cost analysis
DEMOASIS$Activity: PromotionDemo 59. V. Take note of the marketing
process and marketing area 60. VI. Take note of the selection
process or the hiring of employees 1.Identified there (identify
Them) 2. Develop a position description (explanation of the
development of positions) 3. Offer (offer) 4. Identify the key
selection criteria (to identify the key criteria) 5. Create the
advertis-ment (making the advertisement) 6. Paper selection listiny
short (forum / paper checks initial selection) 7. Initial screening
interview (interview) 8. Psicometric testing (pisicotes) 9.
Assessment centers / simulation (removal and simulation) 10. Second
/ tehnical interview (interview techniques) 11. Reference checking
(checking of certificate) 12. New employees (new hires)4.Note safty
equipment for the industry and carry out the work Sefty shoes Sefty
helmet 61. Welding gloves Masks Ear plug Ear Muff5. Take note of
the steps in operation any or all of the machines used when
prakerin Washing machine P2h (checks, equipment, daily) Prepaire
hose to spray water Hose that contain the flow of water put into
washing machine Put hose into the electrical panel legran Turn on
the washing machine are marked with green or start To turn off the
washing machine or simply press the red button off6. Mencatat raw
materials and auxiliary materials used in industry Auxiliary
materials WD 40 to remove the rust Sandpaper Thiner Cat Clean and
remove rust on electric einer 62. VII. DAILY ACTIVITY REPORTS
STUDENTSStudent Activities ReportNo. DAY / DATE TYPE OF ACTIVITY1.
11-14 October 2010 : > p5m (talk five minutes)> Cleaning
grader2. 15 October 2010: > Cleaning blade> Cleaning
propeller of a pile of oil> Open the hose auto lube3. 16 October
2010: > Break> Cleaning system on the grader over 233
units> Cleaning Minning plate> Cleaning sap4. 18 October
2010: > 233 unit graders cabin cleaning> Sand the cover unit
233 Grader5. 19 October 2010: > Clean the filter> Sand the
cover unit 233 Grader 63. 6. 20 Octobe, 2010 : > Cleaning the
tandem > Attach nipple grase7. 21 October 2010 : > Cleaning
and wrap it over breakesystem demean plastic wrap8. 22 October 2010
: > Sand the front as 233 units graders9. 25 October 2010 : >
Pump oil pump chain tandem with Install the nuts10. 26 October
2010: > Replacing the wheel and tire unit 233 Grader >
Cleaning the glass cabin 233 unit graders11. 27 October 2010: >
Cleaning the glass cabin unit 233 Grader : > Suck the oil in 233
unit graders because of leakages in sap / breaking system12. 28
October 2010: > Painting cabin units graders > Sucking oil
> Grader unit 23313. 01 November 2010 : > Cleaning air from
red silicon tandem > Cleaning the red rings on silicon > Sand
the tandem unit 233 Grader > Sand tendem chain 64. 14. 2-4
November 2010 : > Placing and open tire unit 233 Grader >
Installing over breaking the system15. 5 November 2010: >
Cleaning the glass cabin16. 6 November 2010: > Transmission oil
change on a 233 unit graders17. 8 November 2010: > Put nuts
guard fh 16 > Remove the site operator fh 1618. 9 November 2010:
> Scrap skotlet fh 16 : > Fill the oil tendem 233 unit
graders19. 10 November 2010 : > Filling oil tendem > Install
the plate on the sap : > Install tire Grader 233 : > Painting
graders hose 23320. 11 November 2010 : > Sand the chassis / cab
fh 16 : > Support painting cabin fh 1621. 12 November 2010 :
> Cleaning covers fh 16 65. 22. 13 November 2010 : > Support
graders painting cabin 266 > Clean the work area / bays23. 14
November 2010 : > Sand the door Grader 266 > Cleaning the
area24. 15 November 2010 : > Rreleasing water separator / filter
fh 16 > Painting the cover fh 1625. 18 November 2010 : >
Cleaning water separator FH 16 > Painting water separator fh 16
> Filling diesel water separator fh 16 > Cleaning the chain
graders tendem 27726. 19 November 2010 : > 266 painting door
graders27. 22 November 2010 : > 266 washing graders28. 23
November 2010 : > 266 painting door graders29. 24 November 2010
: > 266 washing graders > Fix the cylinder riper30. 25
November 2010 : > Rreplacing the valve WL > Riper GR-fixing
cylinder 266. 66. 31. 26 November 2010 : > Fixing cylinder 266
riper GR32. 29 November 2010 : > Attach hose cylinder >
Clining area33. 30 November - 3 December : > After finish the
workshop area > Support unit parking34. 4 December 2010: >
Cannibal mud guard fh 1635. 6 December 2010: > Release the
piping > Releasing electrically ct system (crane truck) 01836. 8
December 2010: > Moving cabin ct (truck crane) 01837. 9 December
2010: > Release unit of a crane truck covers 018 > Cleaning
cabins ct (truck crane) 01838. 10 December 2010 : > washing
cabin ct (truck crane) 018 > washing cover (truck crane) 01839.
11 December 2010 : > Washing engine ct (truck crane) 018 >
Clening area ct (truck crane) 018 67. Format prakerin student
assessment (PSG)(Assessment by supervisor)Name of companyAddressNo
aspect of the assessmentValuea. Aspects of personality1. Attitudes
and behavior802. Presence attendance / discipline803. Initiative
and creative ability 754. Motivation and responsibility 755. Mental
readiness in working 75 68. Valueb. Aspects of competence 1.
Timeliness of work completed75 2. Quality of work 75 3. Knowledge
of safety 70 4. The timing of the prakerin80 5. Knowledge of
machining75 6. Knowledge of production process 78 7. Read
engineering drawings 70 8. The use of machining70Number of values
the average valuePass both the 69. IDENTITYName: WAHYUDINPlace /
Date of birth : Bogor December 12, 1993Gender: MaleBlood Type:ANIS
/ Class / progli: 10097857/XI tp 3Name of parent / guardian :
NasanAddress : Kp. Walahir Rt. 07/ 04 Ds. Nambo Kec. KlapanunggalNo
HP / Tel : 085714211271Cileungsi, December 11, 2011 Signature of
student 70. COMPANY IDENTITY (DU / IN)Name of DU / IN : CV. RIZKY
JAYA PERSADABid. / Type of Business : -Address : Jln. Pesantren Ds.
Pasir angin Rt 01/05 Pasir angin, Cileungsi, BogorTel / fak : (021)
82498741, 82498640Name of leader: Mr. Waliyadi I Adnan. STName of
supervisor: Mr. TonyPkl start date: July 27, 2010Pkl completion
date : October 26, 2010 71. Student Counter 72. III. Noted the
companys organizational structure (owners & responsible person)
73. NOTE THE PREPARATION WORK AND K 31. Record the steps or
preparatory work has not Following the directives of the leadership
of the company Making planning what work will be done Preparing
sefty2. Noting industrial machines that are used the following
function M / c Tool =) make the goods according to customer
perrmintaan (corresponding image) M / c scrap =) make / take over
the plate thickness of 1 mm M / c milling =) Make goods according
to customer demand (corresponding image) M / c grinding surface =)
make the goods to be fine (go to precision measurements) Mic weld
=) welding / connect between the plate3. Take note of the following
hand tools in the industry functions Hand grinding machine (smooths
rough objects) Stingy (smooths rough objects) Sandpaper (removing
rust and dirt) 74. 4. Noting sefty equipment for the industry and
carry out the work Gloves (to avoid minor cuts / scrapes hand)
Masks (avoid dust) Helmet (avoiding impact in the head) Glass eyes
(avoid dirt / dust) Shoes (to protect feet)5. Take note of the
steps in operate any or all of the machines used when prakerin
Lathes Reading working drawings Preparation tool and the workpiece
Operation lathes Put the material into a machine with a fast dibble
On the dial (should be straight) Prepare a chisel Turn the key on
75. 6. Record the raw materials and auxiliary materials used in
industry Material 400 ss Material s 45 c Material SKD 11 Material
VCN Material pvc Material crethane Material mc blue Material
credits 304 (stainless)7. Take note of the manufacturing process
(production) and or service Machining of materials The process of
cutting Lathe process Milling process Cnc process 76. 8. Notes the
marketing process and marketing area Costumer PT. Yamaha PT. VTE
PT. Sanyo PT. Winteq PT. Toyota t huso9.Record the employee
selection process or acceptance hiresJobs - (notably, the Internet)
- (Directly in the test on the machine in their respective
fields)Interview salary + placementmachine 3 - month trialContract
1 yearAGENDA NOTE TO MAKE WORK1. 27 Juli 2010: > Grinding
components gaspan > Clean pvc news 77. 2. 28 July 2010 : >
Attach the clamp bolts> Paint the gutters 5 assy line 7>
Install cables3. 29 July 2010 : > Grinding plate t-2>
Grinding pvc-news> Install clamp bolt4. 30 July 2010 : >
Grinding plate> Install adjuster-plate> Install clamp bolt5.
02 August 2010 : > Clean test jigli> Painting the carrier>
Grinding plate6. 03 August 2010 : > Cutting oil gaspan>
Pressing oil gaspan7. 04 August 2010 : > Sand the bushing or
ring> Sand the pin> Sand the shim ute> Grinding oil gaspan
78. 8. 05 August 2010 : > Grinding oil containment secodry
collector> Clean the bushing / rings9. 06 August 2010 : >
Grinding components gaspan> Welding components gaspan> Lathe
gaspan round d = 40510. 09 August 2010: > Sand the pin>
Welding components gaspan> Sand the rounded gaspan d = 40510
August 201011. 10 August 2010: > Drilled components gaspan>
Lathe gaspan round d = 40512. 11 August 2010: > Weld components
gaspan> Grinding carier13. 12 August 2010: > Sand component
gaspan> Grinding carier> Cut pindal 1314. 13 August 2010:
> Weld carier> Grinding carier 79. 15. 16 August 2010 : >
a lathe bushing or ring > Sand the pin16. 18 August 2010 : >
Grinding carier > Cut the plate (m / c cutt whell) > Cut The
Iron (M / C Cutt Whell) > Grinding iron17. 19 August 2010 : >
a lathe bolts d = 9. 40 > Grinding plate > Drill the plate d
= 618. 20 August 2010 : > Cut the pvc (m / c jig saw) >
Drilled pvc (m / c drill)19. 23 August 2010 : > Lathe bolts d =
9. 40 > Grinding plate t = 2 > Sand the plate t = 220. 24
August 2010 : > Install adjuster plate > Lathe bolts d = 9.
4021. 25 August 2010 : > a lathe bolts d = 9.40 > Sand the
bushing / rings22. 26 August 2010 : > Cut the plate t = 2 >
Grinding plate t = 2 > Gluing acrylic saind bord 80. 23. 27
August 2010: > a lathe bolts d = 9.40> Pressing gaspan box24.
30 August 2010: > Gluing pvc news> Grinding pvc news>
Clear pvc news25. 31 August 2010: > a lathe pin> Improving
the welding transformer 22026. 01 September 2010 : > Repair
welding transformer 220> Improving the ac outlet27. 02 september
2010 : > lathe bolts d = 9.40> Cut round gaspan28. 03
september 2010 : > Cut plate> Grinding plate> Drill the
plate d = 1029. 16 September 2010 : > to cut iron> Grinding
of iron> Sand box gaspan> Clean the box gaspan 81. 30. 17
september 2010 : > Sand the pin> Sand box gaspan31. 20
september 2010 : > Drilled pvc> Sand box gaspan32. 21
september 2010 : > Drilled pvc> Sand box gaspan33. 22
september 2010 : > Cut the iron> Grinding of iron> Cut the
plate (m / c cutt whell)> Grinding plate34. 23 september 2010 :
> Oil pressing gaspan35. 24 september 2010 : > Gluing pvc
news> Grinding pvc news> Cut the clear rubber36. 27 September
2010 : > Gluing pvc news: > Clear pvc news37. 28 September
2010 : > Gluing pvc news> Clear pvc news> Cut the clear
rubber 82. 38. 29 september 2010 : > Grinding oil gaspan>
Gaspan oil sand> Filing pin39. 30 september 2010 : > Gaspan
oil sand> Clean up oil gaspan40. 01 october 2010 : > Sand
component gaspan> Pressing oil gaspan> Filing pin41. 04
october 2010 : > Install pvc> Clean the grinding machine42.
05 october 2010 : > Grinding oil gaspan> Gaspan oil sand>
Drill carrier43. 06 october 2010 : > Clean carrier> Gaspan
oil sand> Lathe vacuum tank assy44. 07 october 2010 : >
Cleaning jig cover uder> Clean the jig side cover 3> Clean
the jig sped meters45. 08 october 2010 : > Cutting plate>
Grinding plate> Sand the pin 83. 46. 13 October 2010 : > Cut
pvc (m / c mosque s)> Sand box gaspan> Cut the plate47. 14
october 2010 : > Cut pvc (m / c jig saw)> Sand box gaspan48.
15 October 2010 : > Gaspan sand box> Cut the pin (m / c jig
saw)> Sand the pin (m / c lathe)49. 18 october 2010 : >
Grinding carier> Help make the carrier50. 19 October 2010 : >
Helped make the carrier>Grinding carier> Gaspan oil sand51.
20 October 2010 : > Helped improve the milling machine>
Grinding oil gaspan> Gaspan oil sand 84. 52. 21 October 2010 :
> Helped make the carrier> Lathe pin> Drilled pvc (m / c
drill)53. 25 october 2010 : > Cutting pin (m / c jig saw)>
Cut the pvc (m / c jig saw)54. 26 October 2010 : > Cut pvc (m /
c jig saw)> Cut acrylic (m / c jig saw) 85. Format prakerin
student assessment (PSG)(Assessment by supervisor)Name of
companyAddressNo aspect of the assessmentvaluea. Aspects of
personality1. Attitudes and behavior922. Presence attendance /
discipline913. Initiative and creative ability 954. Motivation and
responsibility 955. Mental readiness in working 95 86. b. Aspects
of competence 1. Timeliness of work completed90 2. Quality of work
90 3. Knowledge of safety 89 4. The timing of the prakerin89 5.
Knowledge of machining89 6. Knowledge of production process 89 7.
Read engineering drawings 89 8. The use of machining82 9. Number of
values1.175The average valuePass both the