Top Banner
John Street Corridor Improvements STAKEHOLDER MEETING MMM | DTAH | DPM | LURA | MULVEY & BANANI | IMPLOSION STUDIOS | URBAN TREES + SOILS | AUBRUM | SMART WATERING SYSTEMS April 10, 2015
52
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: John Street Corridor Improvements - Stakeholder Meeting Presentation

John Street Corridor ImprovementsSTAKEHOLDER MEETING

MMM | DTAH | DPM | LURA | MULVEY & BANANI | IMPLOSION STUDIOS | URBAN TREES + SOILS | AUBRUM | SMART WATERING SYSTEMS April 10, 2015

Page 2: John Street Corridor Improvements - Stakeholder Meeting Presentation

Project Schedule

PROJECT INITIATION

TORONTO ENTERTAINMENT DISTRICT BIA MASTER PLAN

ENVIRONMENTAL ASSESSMENT

REQUEST FOR PROPOSALS AND PROJECT AWARD

APRIL -AUGUST 2014

JULY 2013 - MARCH 2014

2010-20122009 SEPTEMBER - DECEMBER 2014

JANUARY - MAY 2015

SUMMER 2015

DATA COLLECTION AND GEOTECHNICAL INVESTIGATION

DESIGN DRAWINGS

TENDER DRAWINGS AND SPECS

PROJECT SUMMARY REPORT

PROJECT TENDER

ALTERNATIVE DESIGN REPORT

DESIGN REVIEW PANEL

PRELIMINARY DESIGN REPORT, 1ST SUBMISSION

STAKEHOLDER MEETING

PUBLIC OPEN HOUSE

PRELIMINARY DESIGN REPORT, SUBSEQUENT SUBMISSIONS

Page 3: John Street Corridor Improvements - Stakeholder Meeting Presentation

Context

Page 4: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing Site - East Side South of Stephanie

Page 5: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing Site - East Side South of Queen

Page 6: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing Site - East Side North of Adelaide

Page 7: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing Site - West Side North of Adelaide

Page 8: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing Site - TIFF, North of King

Page 9: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing Site - Metro Hall, South of King

Page 10: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing Site - CBC, North of Front

Page 11: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing Site - Looking North from South Side of Front Street

Page 12: John Street Corridor Improvements - Stakeholder Meeting Presentation

LEGENDExisting Events Facilities (Buildings)1. Art Gallery of Ontario2. OCAD3. St. George-the-Martyr Anglican Church4. CTV5. Princess of Wales Theatre6. TIFF Bell Tower7. Roy Thomson Hall8. CBC9. Toronto Convention Centre10. Rogers Centre

Existing Events Facilities (Parks)11. Grange Park12. David Pecault Square

Existing Events Facilities (Road ROW)13. Queen and John (+CTV parking lot) for MMVA14. King and John for TIFF and other film festivals15. John and Front (CBC - World Cup type events)

Potential Events Faciilties of Existing/Proposed Open Spaces16. Pinnacle Condos Plazas17. Metro Hall Plazas18. Tridel Courtyard + Isabella Valancy Crawford Park

Potential Events Facilities of proposed Mews (BIA Masterplan)19. Nelson St.20. Pearl St.21. Mercer St.22. Widmer St.

1 11

12

13

14 1516

17

18

2 3

45

6

7

89

10

19 20

21

22

RICH

MOND

ST.

W.

QUEE

N ST

. W.

STEP

HANI

E ST

.

JOHN ST.

NELS

ON S

T.

ADEL

AIDE

ST.

W.

PEAR

L ST.

KING

ST.

W.

WEL

LINGT

ON S

T. W

.

FRON

T ST

. W.

JOHN STREET EVENTS/FESTIVALS LOCATIONS

Existing and Potential Event Areas

Page 13: John Street Corridor Improvements - Stakeholder Meeting Presentation

Overall Plan

North

Page 14: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing

Proposed

SOUTH OF STEPHANIE ST.

Page 15: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing

Proposed

AT BELL MEDIA (CTV)

Page 16: John Street Corridor Improvements - Stakeholder Meeting Presentation

Overall Plan

North

Page 17: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing

Proposed

BETWEEN RICHMOND AND ADELAIDE

Page 18: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing

Proposed

BETWEEN ADELAIDE AND KING

Page 19: John Street Corridor Improvements - Stakeholder Meeting Presentation

Overall Plan

North

Page 20: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing

Proposed

AT METRO HALL

Page 21: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing

Proposed

BETWEEN WELLINGTON AND FRONT

Page 22: John Street Corridor Improvements - Stakeholder Meeting Presentation

Nominal Size Cross DeckSuitable in event zones with movable planters

Nominal Size Side DeckSuitable midblock throughout street

Event Sections

Page 23: John Street Corridor Improvements - Stakeholder Meeting Presentation

EVENT SCENARIO: POP-UP CAFES

Pop-up CafesSuitable in event zones with movable planters

Tent Event with Emergency Vehicle AccessSuitable midblock throughout street

Event Sections

Page 24: John Street Corridor Improvements - Stakeholder Meeting Presentation

Planters• use of planters within the design• planters already onsite; equipment for relocation already necessary for other

planters onsite• can be used for any location on street

Street Closure

Page 25: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing - View South at South-East Corner of Richmond and John

Page 26: John Street Corridor Improvements - Stakeholder Meeting Presentation

Proposed - View South at South-East Corner of Richmond and John

Page 27: John Street Corridor Improvements - Stakeholder Meeting Presentation

MarkingsCurb Pavers Tactile Surface

300mm Granite Roll Curb Cast Iron Tactile Plates Paver Pavement Markings

Unit Paver Tactile Buffer

Materials

Concrete Unit Pavers

Interlocking Paver

Page 28: John Street Corridor Improvements - Stakeholder Meeting Presentation

Random Field Pattern

Page 29: John Street Corridor Improvements - Stakeholder Meeting Presentation

Globular Cluster (at Event Spaces) Generative DesignRI

CHMO

ND S

T. W

.

QUEE

N ST

. W.

STEP

HANI

E ST

.

JOHN ST.

NELS

ON S

T.

ADEL

AIDE

ST.

W.

PEAR

L ST.

KING

ST.

W.

WEL

LINGT

ON S

T. W

.

FRON

T ST

. W.

JOHN STREET PAVING NODES

RICH

MOND

ST.

W.

QUEE

N ST

. W.

STEP

HANI

E ST

.

JOHN ST.

NELS

ON S

T.

ADEL

AIDE

ST.

W.

PEAR

L ST.

KING

ST.

W.

WEL

LINGT

ON S

T. W

.

FRON

T ST

. W.

JOHN STREET PAVING NODES

Page 30: John Street Corridor Improvements - Stakeholder Meeting Presentation

City Centre, Nieuwegein, Netherlands

Paving Module Gradient

Module

Light

DarkPaving Pattern

Page 31: John Street Corridor Improvements - Stakeholder Meeting Presentation

Dominant Tree Species: American Elm CultivarsUlmus americana ‘Princeton’(Princeton Elm)

Ulmus americana ‘Valley Forge’(Valley Forge Elm)

Ulmus japonica x wilsoniana ‘Morton’(Accolade Elm)

• Stately tree that will create canopy above street

• Urban tolerant• Graceful mature form• Fast growing• Use hybrids which are Dutch Elm

Disease resistant

Desired Canopy

Toronto examples proven to favour climate

Species Selection

Page 32: John Street Corridor Improvements - Stakeholder Meeting Presentation

Diversity with Common Hackberry

Celtis occidentalis(Common Hackberry)

• Similar in form to the American Elm• Can add diversity to planting• Urban tolerant. • Graceful mature form

Species Selection

Page 33: John Street Corridor Improvements - Stakeholder Meeting Presentation

Diversity with Red OakQuercus Rubra

Autumn Blaze Maple at Metro HallAcer x freemanii ‘Jeffersred’ Autumn Blaze

Species Selection

Page 34: John Street Corridor Improvements - Stakeholder Meeting Presentation

Continuous soil cell system under trees

Target 30m3/tree

Soil Volume

Page 35: John Street Corridor Improvements - Stakeholder Meeting Presentation

Stormwater Management and Irrigation

Queensway- Toronto, ONpilot project for passive irrigation system

Page 36: John Street Corridor Improvements - Stakeholder Meeting Presentation

2011 2013

20142012

Trees at Sugar Beach

Page 37: John Street Corridor Improvements - Stakeholder Meeting Presentation

Trees at Water’s Edge Promenade

20132010

Page 38: John Street Corridor Improvements - Stakeholder Meeting Presentation

Ulmus Elm varieties

Celtis occientalisCommon Hackberry

Quercus RubraRed Oak

Existing TreeAcer x freemanii ‘Je�ersred’ Autumn Blaze

JOHN STREET TREE PLANTING STRATEGY

Ulmus Elm varieties

Celtis occientalisCommon Hackberry

Quercus RubraRed Oak

Existing TreeAcer x freemanii ‘Je�ersred’ Autumn Blaze

JOHN STREET TREE PLANTING STRATEGY

Tree Planting Strategy

Page 39: John Street Corridor Improvements - Stakeholder Meeting Presentation

Tree Planting - Strategy

Ulmus Elm varieties

Celtis occientalisCommon Hackberry

Quercus RubraRed Oak

Existing TreeAcer x freemanii ‘Je�ersred’ Autumn Blaze

JOHN STREET TREE PLANTING STRATEGY

Ulmus Elm varieties

Celtis occientalisCommon Hackberry

Quercus RubraRed Oak

Existing TreeAcer x freemanii ‘Je�ersred’ Autumn Blaze

JOHN STREET TREE PLANTING STRATEGY

Page 40: John Street Corridor Improvements - Stakeholder Meeting Presentation

Lighting

Page 41: John Street Corridor Improvements - Stakeholder Meeting Presentation

Typical Section

Light Pole

Page 42: John Street Corridor Improvements - Stakeholder Meeting Presentation

Light Pole

Base PoleBase Pole + Features

Street LightStreet Car Lines

Traffic Light

Pedestrian LightFeature Light

Regulatory SignageStreet Sign

Wayfinding Sign

Programmable Banner

Security CameraWiFi

Catenary

Flower Basket

Event Lighting

Event Power Outlet

Base PoleBase Pole + Features

Page 43: John Street Corridor Improvements - Stakeholder Meeting Presentation

Catenary Lighting

Lighting EffectsEvent and Feature Lighting

Page 44: John Street Corridor Improvements - Stakeholder Meeting Presentation

JOHN STREET POWER SUPPLY

JOHN STREET LIGHTING DATA

JOHN STREET FIBER BACKBONE

LEGENDPower supply panel box3 locations

120V Power

Power outlet at maximum interval if located every 3 poles - 75m

Power outlet intervals if located at every pole - 24m

Lighting Control RackLocated in Metro Hall

Lighting Data (DMX) Over fiber backbone

Lighting Poles recieving DMX lighting data (ALL POLES)

Lighting Poles recieving DMX lighting data c/w DMX input ports (for basic external access to lighting network)

DMX lighting data master panels x 3 (with extended access to network)

Backbone Network RackLocated in Metro Hall

Fiber Backbone

Shared Master - Power/Network/DMX cabinets

Lighting / Power Supply

Page 45: John Street Corridor Improvements - Stakeholder Meeting Presentation

Bike Parking

On John Street• Custom bike rings parallel to curb as required (may be

removable in event spaces)• Align with tree planting

Modified Street• Custom bike rings parallel or perpendicular to curb• Potential drop off/layby areas adjacent to bike parking zones• To be coordinated with BIA Masterplan visions (not shown here)

Page 46: John Street Corridor Improvements - Stakeholder Meeting Presentation

220 New bike parking spots on John Street

based on Toronto City Standard 2 spots per bike ringapproximately 140 existing bike parking spots

70 spots 46 spots 20 spots 56 spots 24 spots4 spots

Bike Parking

Page 47: John Street Corridor Improvements - Stakeholder Meeting Presentation

Site Furnishings

Page 48: John Street Corridor Improvements - Stakeholder Meeting Presentation

Integrated Art

Page 49: John Street Corridor Improvements - Stakeholder Meeting Presentation

Semi-permanent and Impermanent Art

Page 50: John Street Corridor Improvements - Stakeholder Meeting Presentation

Existing - View South at King and John (Luma Restaurant Patio)

Page 51: John Street Corridor Improvements - Stakeholder Meeting Presentation

Proposed - View South at King and John (Luma Restaurant Patio)

Page 52: John Street Corridor Improvements - Stakeholder Meeting Presentation

Proposed - View South at King and John (Luma Restaurant Patio)