1 SSRI:NDAQ | SSO: TSX Mexico
Jun 19, 2015
1 SSRI:NDAQ | SSO: TSX
Mexico
2 SSRI:NDAQ | SSO: TSX
PRODUCTION
Pirquitas
DEVELOPMENT
Pitarrilla San Luis
Diablillos
RESOURCES
Berenguela
Challacollo
San Agustin Veta Colorada Candelaria
Maverick Springs
Sunrise Lake
2 SSRI:NDAQ | SSO: TSX
Our Assets
3 SSRI:NDAQ | SSO: TSX 3 SSRI:NDAQ | SSO: TSX
LARGE SCALE OPPORTUNITY DISCOVERED BY SILVER STANDARD
PITARRILLA
4 SSRI:NDAQ | SSO: TSX
Mine Design Open-Pit
Plant Design 16,000 tpd with Leach & Flotation Circuits
Resources (M + I) 656M oz Ag Estimated Construction Time ~3 Years
Pitarrilla at a Glance
4 SSRI:NDAQ | SSO: TSX
(2)
5 SSRI:NDAQ | SSO: TSX
Pitarrilla: Recent Accomplishments
$25M investment in August 2011
Hired project manager and development team
Baseline environmental survey commenced
Released updated mineral resource estimate Measured + Indicated: 655.7M oz Ag
Inferred: 65.0M oz Ag
Advanced construction and operations camps
5 SSRI:NDAQ | SSO: TSX
6 SSRI:NDAQ | SSO: TSX
Pitarrilla: 2012 Feasibility Study
6 SSRI:NDAQ | SSO: TSX
Contracted M3 Engineering for Feasibility study
Scheduled to be completed by mid-year 2012
Design based on:
16,000 tpd open-pit mine
Leach and flotation processing facilities
Producing silver doré and separate zinc and lead concentrates
7 SSRI:NDAQ | SSO: TSX
W E
Pitarrilla: Mineralization Zones
7 SSRI:NDAQ | SSO: TSX
Cordon Colorado
Javelina Creek / East South Ridge
Breccia Ridge
Likely Pit Shape
8 SSRI:NDAQ | SSO: TSX 8 SSRI:NDAQ | SSO: TSX
San Agustin at a Glance
Resources (M + I)
48M oz Ag 1.59M oz Au
2012 Focus Expand gold resource with drilling program in H2 2012
(5)
9 SSRI:NDAQ | SSO: TSX
MEXICO
9 SSRI:NDAQ | SSO: TSX