Weatherskin Your Location DATE Your Address Your City Your Email QUOTE# SITE LOCATION: CUSTOMER NAME: CONTACT INFO: JOB DESCRIPTION Project DRIVEWAY: Clean, prep and coat garage with Weatherskin interior epoxy (1/4 “domino flake finish – approved by client – pictures attached) with a topcoat of Polyaspartic. THE SCOPE OF WORK To supply all labor, equipment and materials to facilitate work as outlined below. • To “SAFE OUT” the work area and follow State legislation. • Sweeping and removal of any debris from garage. • Disposal of all debris associated with work within this scope of work. • Concrete grinding and preparation of the existing substrate. • To remove, move or reposition any baseboard or casings, or structures etc.… necessary to facilitate the work. The Items will be reinstalled after the new membrane has been installed. If any said items need to be replaced. **Weatherskin will source and purchase new. These items will be charged back to the customer at COST+15%.
7
Embed
JOB DESCRIPTION - Weatherskin - Groundbreaking, …€¦ · Web viewDRIVEWAY: Clean, prep and coat garage with Weatherskin interior epoxy (1/4 “domino flake finish – approved
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Weatherskin Your Location
DATEYour AddressYour CityYour Email
QUOTE# SITE LOCATION:
CUSTOMER NAME: CONTACT INFO:
JOB DESCRIPTION
Project
DRIVEWAY: Clean, prep and coat garage with Weatherskin interior epoxy (1/4 “domino flake finish – approved by client – pictures attached) with a topcoat of Polyaspartic.
THE SCOPE OF WORK
To supply all labor, equipment and materials to facilitate work as outlined below.
• To “SAFE OUT” the work area and follow State legislation. • Sweeping and removal of any debris from garage. • Disposal of all debris associated with work within this scope of work. • Concrete grinding and preparation of the existing substrate.• To remove, move or reposition any baseboard or casings, or structures etc.…
necessary to facilitate the work. The Items will be reinstalled after the new membrane has been installed. If any said items need to be
replaced. **Weatherskin will source and purchase new. These items will be charged back to the customer at
COST+15%. • To prepare for new sealant coatings on all concrete surfaces up to
approximately ______________ square feet. • To fill cracks with either a concrete patch-filler or polyurethane-caulking product
(used on compression joints).• To install Weatherskin coatings on garage flooring. Tinted broadcast coat with
Polyaspartic topcoat. Primer or membrane coat included.
• This quote is subject to a quick site visit prior to any work starting. At least one Weatherskin representative will view the site.
• This quotation does not include any substrate repairs. • We will require a vehicle/material staging area at the building/home. • All work and scheduled timelines of completion are weather dependent. • Weatherskin’s coating requires day and overnight temperatures to be 5 degrees
above zero or better. So, winter application is usually not preferred unless the client uses heating.
• A minimum of 1-weeks’ notice will need to be given before commencement of work. To ensure material orders, deliveries are lined up to ensure a smooth work process.
• An agreed upon price in writing or email will be required prior to commencement of any new or out of scope work being performed.
• Any out of scope work will be charged at the following rates: Man, and truck @$95 per hr., Foreman or Lead hand @$75 per hr. Laborers @ $60 per hour.
• A COST +15% will be applied to any materials or services required to perform the out of scope work.
• 2-year Weatherskin _________YOUR LOCATION__________ Service Warranty (one time every year we will send a man to do visual inspection of the work and performance of our system. An assessment report will be done and given to the client for their review)
• 5-year Weatherskin limited product warranty on coating application• A 50% deposit will be required upon 1 weeks’ notice of job commencement to
facilitate material orders and the remaining 50% upon completion.
Execution
Expected timeline to complete project as per specifications provided weather complies: 2 days due to cure and dry times (Dates to be determined)
COST
ALL COMPONENTS AS LISTED IN SCOPE: ___________ sq. Ft @ $___________ = $______________
If you have any questions or concerns, please do not hesitate to call or email.
YOUR NAMEYOUR TITLEYOUR EMAILYOUR CELL-PHONE
The Weatherskin _____YOUR LOCATION______ team thanks you for the opportunity to quote this project. We look forward to working with you. Please sign below for acceptance of this quote. One signature from ______Home Owner_______.