Christian Bjerg Mammen CEO, JJ X-Ray 1
Christian Bjerg Mammen
CEO, JJ X-Ray
1
JJ X-Ray dates back to 1996 with background from the National Research
Center, RISØ, in Denmark
In 2006 members from the x-ray group at the University of Copenhagen
joined the company with knowledge in Synchrotron Radiation, Optics, X-Ray
Systems
The company has now 12 employees and is located at Scion DTU at the
DTU Campus
JJ X-Ray develops, designs and produces advanced instrumentation for the
Synchrotron Radiation and Neutron Facilities worldwide
2
Denmark
as member
nation
1%
1%
12.5%
Accelerator
X-ray Optics and beam transport End station
5
The instrumentation is a collaboration between European XFEL, DTU and JJ X-Ray
We will design, produce, deliver, install and commission the complete beamline
The project is financed by DASTI as an in kind contribution as part of the Danish membership of the European XFEL.
Contract signed November 2011
Installation will be completed by March 2016 (delayed 1 year)
6
20 individual components
168 motorized axis
Ultra High Vacuum (1·10-9 mbar)
Sub-micron resolution
Complete component integration
7
Sample stage
Johan Spectrometer
Von Hamos
Spectrometer
LPD detector
Robot arm
8
10 actuators holding up to 16
lenses each
Water cooled
Positioned in X-Y plane with 1
µm accuracy
5 axis of external positioning
9
The 10 lens cassettes with different number of lenses
10
The lens
actuator and
the casette
11
Cooled CRL’s
UHV compatible refractive Beryllium
witd 1-D focusing lenses installed at
NSLS-II 2014
JJ X-Ray has various types of in-house test equipment and facilities
to test and validate the performance of the products
Laboratory
including a 50
m2 ISO 5 clean
room
We deliver advanced, customized mechanical solutions for the facilities
We have collaborations with, and deliver systems to 40+ facilities worldwide
More general:
How to get contracts? – your customer is the scientist and not the
procurement officer
Start communication early with the scientists – Get involved before the
tender is written – be the expert
Keep in mind that the purpose of these facilities is to make new science
SCIENCE IS WHY WE ARE HERE
13
14
Two identical LODCM’s for LCLS at SLAC installed June 2011 at
the XPP and XCS beamlines
LODCM at XPP beamline, LCLS