JIGAWA STATE GOVERNMENT DUE PROCESS AND PROJECT MONITORING BUREAU OFFICE OF THE EXECUTIVE GOVERNOR FIRST QUARTER PROJECTS REPORT JANUARY TO MARCH, 2021
82

JIGAWA STATE GOVERNMENT

Mar 17, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: JIGAWA STATE GOVERNMENT

JIGAWA STATE GOVERNMENT

DUE PROCESS AND PROJECT MONITORING BUREAU

OFFICE OF THE EXECUTIVE GOVERNOR

FIRST QUARTER PROJECTS REPORT

JANUARY TO MARCH, 2021

Page 2: JIGAWA STATE GOVERNMENT

WEB: WWW.JIGAWADUEPROCESS.COM

EMAIL: [email protected]

CONTENTS: SECTION (A) - EXECUTIVE SUMMARY

SECTION (B) - CHARTS

SECTION (C) - PRE-CONTRACTS EVALUATIONS JANUARY TO DECEMBER 2020

SECTION (D) - CONTRACTS AWARDED JANUARY TO DECEMBER 2020

SECTION (E) - COMPLETED PROJECTS /ON-GOING PROJECTS

- MINISTRY OF HEALTH

- MINISTRY OF WATER RESOURCES

- MINISTRY OF WORKS AND TRANSPORT

- MINISTRY OF EDUCATION, SCIENCE & TECHNOLOGY

- MINISTRY OF LAND AND HOUSING

- MINISTRY OF COMMERCE

- DUTSE CAPITAL DEVELOPMENT AUTHORITY

- CABINET OFFICE

- MINISTRY OF FINANCE AND ECONOMIC PLANNING

- BINYAMINU USMAN POLYTECHNIC, HADEJIA

- GOVERNMENT HOUSE

- MINISTRY OF INFORMATION, YOUTH AND SPORTS

Page 3: JIGAWA STATE GOVERNMENT

- MINISTRY OF AGRICULTURE

- MINISTRY OF WOMEN AFFAIRS

- DEPUTY GOVERNOR’S OFFICE

- MINISTRY FOR LOCAL GOVERNMENT

Page 4: JIGAWA STATE GOVERNMENT

1.00 EXECUTIVE SUMMARY. The first quarter report consists of three sections only namely, pre-contract evaluation, post contract and

contracts awarded from January to March 2021.

In line with the provision of section 4(j) of the Jigawa State Due Process and Project Monitoring Bureau Law

No. 13 of 2019, ‘To provide relevant procurement and budget performance information to interested parties’

the three sections under review in this report are as follows;

2.00 Pre-Contract Evaluation: - The section covers vetting of proposed new projects to be awarded valued at

N3,959,037,938.41 submitted by various Ministries, Departments and Agencies (MDAs) to the Bureau of which

it recommended N4,237,733,060.59 for execution. The process resulted in the increase of N278,695,122.18

against government which is equivalent to 7.03% of the submitted cost.

3.00 Post Contract Evaluation: - The section records both ongoing and completed projects within the

reporting period amounting to N66,910,682,991.51 only out of which N65,068,916,337.26 is carried forward, as

ongoing, from the previous year. It could be recalled that the sum of N78.241 billion only was approved for

Capital expenditure representing 50% of the total approved budget this year.

Page 5: JIGAWA STATE GOVERNMENT

4.00 Contracts Awarded: - A total of 122No. Contracts were awarded to date amounting to N1,991,595,547.37

only representing 2.5% of the capital budgetary provision for new and ongoing projects (N78.241Billion). Though

the level of performance is not encouraging, considering time lapse (first year report), it is not disturbing taking

into consideration that there is enough time for improvement to achieve, at least, the projected 75% budget

performance by end of the year 2021.

5.00 Observations: - The performance of some capital projects, brought forward from the previous year, is

not encouraging due to time lag in completion. This may be due to funding problems from the contractors not

willing to invest adequately to ensure prompt completion, or due to covid-19 pandemic which resulted in total

lockdown on world economic, thereby resulting in hyperinflation on commodities. Alternatively, it might have

arisen due to government non-approval and payment of the 30% mobilization on new contracts which could

have enhance their performances considerably, though it is not aright but a privilege. The Ministries affected

include Works & Transport, Education, Water Resources, Finance and Cabinet Office.

6.00 Conclusion/Recommendations: - In conclusion the levels of performance of ongoing projects need to be

enhanced by all concerned to ensure that all contracts awarded were completed within reasonable period.

Page 6: JIGAWA STATE GOVERNMENT

In addition, government should consider revoking contracts delayed un-necessarily, after payment of adequate

mobilization where necessary, or charge liquidated damages on delayed delivery.

The Ministry of Justice should ensure that; a provision for liquidated damages and interest on delayed payment

clauses were inserted in all our agreements to discourage any delay in contracts discharge.

The Council Affairs should be directed to insert/reflect the provision of Performance Bond of 10% of the contract

sum in all award letters being issued to contractors.

Furthermore, more efforts should be made to improve the quantum of contracts awarded through open

competitive process to enable the state record 80% by the end of the year.

Finally, no contractor should be allowed to bid for any contract so long as he has not delivered on previous

contract from the preceding years.

Page 7: JIGAWA STATE GOVERNMENT

……………………… …………………… Alh Garba Halilu Sara Ado Hussaini MON Special Adviser. Director General.

Page 8: JIGAWA STATE GOVERNMENT

SECTION (B)

CHARTS

JANUARY TO MARCH 2021

Page 9: JIGAWA STATE GOVERNMENT

PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIES

JANUARY-MARCH, 2021

FINANCE AGRICULTURE INFORMATION COMMERCE WATER RESOURCES

33,073,215,073.83

8,648,602,784.39

11,115,800,552.55

7,745,329,245.29

873,109,178.58 1,114,089,895.54

WORKS &TRANSPORT

DCDA EDUCATION HEALTH LAND & HOUSING CABINET OFFICE

PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIES

JANUARY-MARCH, 2021

WORKS & TRANSPORT DCDA EDUCATION

HEALTH LAND & HOUSING CABINET OFFICE

Page 10: JIGAWA STATE GOVERNMENT

17,168,322.96

194,284,715.28

360,764,566.38

920,981,998.06

PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIES

JANUARY-MARCH, 2021

Deputy Governor's Office BU Poly Hadejia Govt. House Min for Local Govt.

Completed, - , 0%

On-going, - , 0%

ANALYSIS OF PROJECTS PERFORMANCE JANUARY-DECEMBER, 2020

Completed On-going

Page 11: JIGAWA STATE GOVERNMENT

SECTION ( C )

PRE-CONTRACT EVALUATION

JANUARY TO MARCH, 2021

Page 12: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE

MINISTRY OF HEALTH

1

Proposed Change of Purpose from Consumables for Dialisis to Solar Electric System for

Gabari Comprehensive health Centre (First & Second Quarter 2020 Constituency Projects) 3,700,000.04 3,542,125.00 157,875.04 Min of Health

2

Proposed Construction of staff quarters at the ongoing Construction of Specialist Hospital

Hadejia 115,008,152.50 90,925,732.50 24,082,420.00 Min of Health

3

Proposed Construction of staff quarters at the ongoing Construction of Specialist Hospital

Kazaure 115,008,152.50 90,925,732.50 24,082,420.00 Min of Health

4 Proposed procurement of family planning consumables 7,260,726.50 7,260,726.50 - Min of Health

5 Construction of 100 Beds General Hospital Guri (addional works) 13,558,650.85 14,389,345.98 (830,695.13) Min of Health

6

Proposed upward review on Consultancy fee for the construction of new General Hospital

at Birnin Kudu 31,731,770.03 20,196,881.85 11,534,888.18 Min of Health

7 Proposed Constr. Of Wall fence and Renovation work under constituency at Gumel LGA 19,233,975.57 20,835,496.48 (1,601,520.91) Min of Health

8

Consultancy fee for the supervision of the Construction of 250 Beds Space New Specialist

Hospital Kazaure 19,139,000.17 11,004,973.15 8,134,027.02 Min of Health

9 Proposed Upgrading of Kiyawa PHC to Cottage Hospital 153,275,436.20 182,049,916.00 (28,774,479.80) Min of Health

10 Proposed upgrading of Karkarna Primary Health Care (PHC) to General Hospital 179,617,490.56 199,304,005.40 (19,686,514.84) Min of Health

11 Proposed Upgrading of Maigatari Primary Health Care (PHC) to General; Hospital 152,709,674.83 204,727,223.10 (52,017,548.27) Min of Health

12 Proposed Upgrading of Kiyawa PHC to Cottage Hospital 153,275,436.20 182,049,916.00 (28,774,479.80) Min of Health

13 Proposed renovation/improment of Kanya Babba PHC (Phase II) 168,157,703.61 200,928,997.22 (32,771,293.61) Min of Health

- MINISTRY OF WATER RESOURCES -

14

Rehabilitation of 5No. Water supply schemes at Takwasa magaji da'u Takwasa Mai Gari,

unguwar Naino, lamintani and jarmai in Babura LGA Ringim Zone 434,300.00 404,000.00 30,300.00 Stowa

15

Rehabilitation of 6no. Water Supply Schemes at Kurgun, Kanya Masallaci, Kanya Yamma,

Garin Ganau, Unguwar Shuri and Babura Kofar Fada in Babura LA Ringim Zone 436,500.00 436,500.00 - Stowa

16

Rehabilitation of 7no. Water Supply schemes at Jigawar Arewa, babura Gabas, kankaren

nagona, Kayarda, Wadar Kanawa, Garin Baki and Hammadi in Babura LGA Ringim Zone 374,000.00 374,000.00 - Stowa

1 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 13: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE

17

Rehabilitation of 7No. Water supply schemes at Babura Bakin Tasha, Jigawar Dan Ali, Dan

Kano, Giginya, Marken Biki and Carbin Malamai in Babura Lga Zone 518,250.00 518,250.00 - Stowa

18

Rehabilitation of 6no water schemes at Ando, Yanmaulu, Aduware, Garin Goto, Jamus and

Unguwar Gamji in Babura LGA Ringim Zone 412,650.00 412,650.00 - Stowa

19

Proposed rehabilitation and upgrading of motorised Borehole to Solar Powered Borehiole

under (PEWASH Programme) 70,293,158.58 73,447,762.53 (3,154,603.95) Ruwasa

20 Re-Pipeline Recticulations (28.6km) in Kazaure Town (Proposed Change of Purpose) 3,060,000.00 3,060,000.00 - Water Board

21

Upgrading and Conversion of Motorised water supply scheme to solar powered in

Abunabo and gagiya Towns in guri LGA 1,975,000.00 1,975,000.00 - Stowa

22

Upgrading and Conversion of Motorised water supply scheme to solar powered at Aujara

Small Towns 1,560,000.00 1,560,000.00 - Stowa

23

Upgrading and Conversion of Motorised water supply schemes to solar powered at Buji

Gari in Buji LGA 1,420,000.00 1,420,000.00 - Stowa-

MINISTRY OF EDUCATION -

24

Renovation of 2No. Hostel block at GUSS fantai, 2No. Hostel at GUCSS Dutse, Renovation

works at GDSS Wurno, GGUSS Gwaram, GDSS M/Madori and GGSS Sule Tankarkar (Lot-1) 3,588,519.74 3,517,059.74 71,460.00 Min of Educ

25

Constr. Of Hotel Block at SAIS Fatara in Dutse (2020 MOEST 2nd and 3rd Quarter Capital

Project) (Lot-7D) 1,512,842.83 877,161.00 635,681.83 IEB

26 Proposed procurement of Direct image machine and Examination materials 14,850,000.00 16,362,843.75 (1,512,843.75) Legal Ringim

27

Constr. Of 2No. Technical College Fence at Government science and technical College

Birnin Kudu and government Science and technical College Karkarna (2020 MOEST Capital

project) 3,360,831.64 3,205,272.32 155,559.32 Science Board

28 Proposed Constr. Of Front wall fence at biniyaminu Usman Polytechnic Hadejia 140,868,387.00 162,732,013.31 (21,863,626.31) Min of Education

29

Proposed Constr. Of wall fencing at Govt Science Technical College Ringim and day

Science Secondary School Hadejia 95,841,220.48 104,448,979.90 (8,607,759.42) ScienceTech Board

30

Proposed Procurement and Distribution of Learning and Teaching Materials for the

Programme of 81 Remedial Centres and 36 Continuining Education Centre 1,878,600.00 2,206,168.75 (327,568.75) Mass Educ

31

Proposed Payment of Facilitators and Coordinators Allowance for the Programme of 81

Remedial Centres and 36 Continuining Education Centres 52,650,000.00 52,650,000.00 - Mass Educ

32

Proposed Procurement workshop materials and consumables items for 4No. Technical

Colleges 4,856,749.22 4,775,620.31 81,128.91 ScienceTech Board

33

Proposed Procurement of Science Laboratory Equipments Reagents and Food 7 Nutrition

materials for all Science Secondary School Across the State 5,558,010.00 5,740,700.00 (182,690.00) ScienceTech Board34 Proposed subscription of periodicals 1,989,200.00 1,928,800.00 60,400.00 Library Board

2 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 14: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE

35 Proposed procurement of Library Equipments 4,999,000.00 6,085,843.75 (1,086,843.75) Library Board

36

Proposed Procurement of Core Text Books for distribution to Newly Established Senior

Secondary Schools Across The state 27,331,000.00 33,937,250.00 (6,606,250.00) Min of Education

37

Proposed Procurement of Science Laboratory Equipments for Distribution to 9No. Centres

of Excellence Core-3 (GGSS Sule Tankarkar, GUSS Roni, GDSS Kaugama, GDSS Danzomo,

GDSS Kiyawa, GDSS Sankara, GDSS Birniwa, GDSS Kiri and Jigacad Bamaina) 81,037,107.92 81,037,107.92 - Min of Education

38

Proposed procurement of Science laboratory equipments for Jigawa State College of

Remedial and Advance Studies Babura 14,082,268.00 14,082,268.00 - Min of Education

39

Proposed Procurement of Science laboratory Equipments for Distribution to 9Number

Senior Secondaryu Schools (GDSS Kila, GDSS Kwalam, GDSS Galamawa, GDSS Sakwaya,

GDSS K/Hausa, GDSS Shagari Quarter Hadejia, GDSS Guri, GDSS Jahun and GDSS Roni) 29,497,284.00 29,497,284.00 - Min of Education

40 Proposed food order for (500) students per week 608,000.00 614,200.00 (6,200.00) Min of Education

41

Proposed External Electrical power supply 33/11KV main Substation (Outdor type) Lot-1

of phase 3 (Supply and installation og 33Kv Main Substation Equipment and Accessories) 49,495,553.18 48,041,124.94 1,454,428.24 SLU

42 Proposed procurement of (500No) 3 Seater desks for all science school Across the state 9,942,190.00 13,706,250.00 (3,764,060.00) ScienceTech Board

43

Submission of Second Quarter 2021 Capital project Proposal (Accreditation Exercise for

and Program) (Kazaure Informatics School). 5,000,000.00 5,000,000.00 - JSIIT

44

Proposed Procurement of ICT gadgets for the Converted 5No. Day Science Secondary

Schools 14,895,972.66 14,211,903.12 684,069.54 ScienceTech Board

45 Proposed Procurement and Distribution of Instructional materials for Nomadic Schools 7,711,100.00 9,992,259.38 (2,281,159.38) Nomadic

46

Proposed Fumigation of 42No. Newly Established Schools Against termite, Bats and avain

Creature Across the state 12,964,500.00 12,728,946.00 235,554.00 Min of Education

47

Proposed procurement of (8,000 Copies) of School Head manual for School Management

in Basic Education project in Jigawa State 20,000,000.00 16,000,000.00 4,000,000.00 SUBEB

48

Proposed Renewal of Internet Service subscription at the University Permanent Site for

the year 2021 (K/Hausa) 13,867,500.00 12,900,000.00 967,500.00 SLU

49

Proposed Construction of wall fence and Adminstrative Blocks at Dangantsaure site

Nomadic School Dutse LGA 13,544,963.37 13,867,855.81 (322,892.44) Min of Education

50 Proposed Subscription of Internet Band Switch for the year 2021 (Kazaure Informatics) 4,518,225.00 4,518,225.00 - JSIIT

51

Proposed procurement of (28,822 Cartons) of Chalk Distribution to Basic Schools Across

the State 46,115,200.00 30,983,650.00 15,131,550.00 SUBEB

-

3 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 15: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE

MINISTRY OF LAND & HOUSING -

52 Procurement of SFTAS DLI5 Office Equipments 19,478,034.00 20,780,333.18 (1,302,299.18) Min of Land

53 Procurement of SFTAS DLI5 Field Equipments 5,936,500.00 9,298,078.12 (3,361,578.12) Min of Land

54 Procurement of SFTAS DLI5 Programme Equipment (Project vehicles repairs and Logistics) 17,979,000.00 17,868,600.00 110,400.00 Min of Land

55 Procurement of SFTAS DLI5 Programme Equipment 25,414,534.00 30,078,411.31 (4,663,877.31) Min of Land

MINISTRY OF WORKS & TRANSPORT

56

Proposed Relocation of urban town street light installation affected by the project (Ringim

township road) 21,585,508.00 22,182,148.24 (596,640.24) Min of Works

57

Proposed Relocation of Electrical Installations (KEDCO) Affected by Roads Project (Ringim

township road) 11,998,000.00 11,504,650.00 493,350.00 Min of Works

58 Proposed maintenance of failed section of tasheguwa-Guro Road 148,643,789.44 191,976,106.88 (43,332,317.44) JIRMA

59 Proposed Maintenance of Failed section of Jahun-Tsakuwawa-Gujungu Road 220,879,443.75 247,993,288.59 (27,113,844.84) JIRMA

60 Proposed Maintenance of Gujungu-Hadejia Road 913,681,722.45 913,681,722.45 - JIRMA

61 Proposed Mitigation Measures of Gully Erosion in Jigawar Sarki Dutse LGA (revised scope) 52,480,384.69 87,125,613.75 (34,645,229.06) Min of Works

62 Annual Running cost in respect of Urban Town streetlighting Installations (Year 2021) 221,097,500.00 221,162,400.00 (64,900.00) Min of Works

-

MINISTRY OF WOMEN AFFAIRS -

63

Proposed re-Activation of Existing Solar Streetrlight with Prepared integrated Stand Alone

solar streetlights at Duhuwa and Nisan Marke in Kiyawa and Ringim LGA 9,944,287.50 9,831,412.50 112,875.00 Alternative Energy

- CABINET OFFICE -

64

Proposed Constr/Renovation of Proposed Mobile Police Force Office/residential

Accomodation at Hadejia 57,557,411.12 58,543,556.70 (986,145.58)

Directorate of

Special Serv

65 Proposed Procurement of (5No.) Brand new Toyota Hilux (2020 Model) (Diesel Engine) 104,500,000.00 104,500,000.00 - Special Services

4 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 16: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE

- MINISTRY OF INFORMATION -

66

Proposed procurement and Installation of inverter at main Station (MCR) and Supply of

14no. 1 horse power inverter air conditioners (Dutse) 11,852,735.00 11,094,000.00 758,735.00 JTV

67

Proposed procurement and Installation of Virtual Studio Equipments and Nigcomsat

registration for Jigawa State Television Dutse 13,457,562.50 12,373,250.00 1,084,312.50 JTV

-

MINISTRY OF ENVIRONMENT -

68

Proposed production of 2.5 Million Assorted tree seedling for the year 2021 (Supply of

materials) 13,356,250.00 15,259,960.94 (1,903,710.94) Min of Environ

69 Proposed Production of 2.5 Million assorted tree Seedling for the year 2021 (Logistics) 14,623,440.00 9,214,760.00 5,408,680.00 Min of Environ

70 Proposed Construction of Drainage and Culvert Across the State ( Constituency Project) 86,569,442.23 114,693,079.23 (28,123,637.00) Min of Environment

71

Proposed Procurement of items to Be Distributed to the Community Organizations as

Government Support for the Clearance of Type and Other Aquatic weeds Along the

Riverine Areas 8,046,500.00 10,236,015.63 (2,189,515.63) Min of Environment-

GOVERNMENT HOUSE -

72 Upgrading (Conversion) of Lexus LX 570 2012 Model to 2020 Model 9,995,000.00 9,599,750.00 395,250.00 Govt House

- OFFICE OF THE DEPUTY GOVERNOR -

73

Proposed Replacement and Refurbishing of Existing wall security light for both office and

Residence of Deputy Governor 2,661,000.00 2,451,473.00 209,527.00 Dept Govt office-

DIRECTORATE OF ECONOMIC EMPOWEREMENT -

74 Proposed Procurement of (50Unit) of Hijoy Tricycles 39,072,500.00 52,503,671.80 (13,431,171.80)

Directorate

Economic -

MINISTRY OF AGRICULTURE -

75

Proposed Construction of Small scale Abbatoir at Kazaure in Kazaure Constituency (1St

and 2nd Quarter Constituency Projects) 13,176,835.08 13,781,152.84 (604,317.76) Min of Agric

- MINISTRY FOR LOCAL GOVERNMENT -

5 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 17: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE

76 Proposed construction of Hadejia Zonal Office 18,400,305.47 20,840,604.22 (2,440,298.75) Auditor Geeneral-

-

MINISTRY OF FINANCE, BUDGET AND ECONOMIC PLANNING - 77 Proposed Implementation of Additional Projects from 2014 MDGs-CGS Saving 1,926,000.00 1,761,000.00 165,000.00 Budget & Eco

- - - - -

TOTAL 3,959,037,938.41 4,237,733,060.59 (278,695,122.18)

6 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 18: JIGAWA STATE GOVERNMENT

SECTION ( D )

CONTRACTS AWARDED

JANUARY TO MARCH, 2021

Page 19: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021

FIRST QUARTER REPORT

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N)

EXECUTING

MINISTRIES

COMP.

PERIOD

WORKS1 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type at Danfa in Babura constituency (lot20B) JEC/26/2021/VOL.I/17 Gidan adede general engerprises

Ltd3,856,152.12 Min of Education 17 weeks

2 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at karangi,kadirawa and zango in kiyawa

constituency (lot 24)JEC/30/2021/VOL.I/17 Gidan adede general engerprises

Ltd11,457,590.06 Min of Education 19 weeks

3 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at JSS yalo and JASS Dankayyawa

inkaugama constituency (lot 5)JES/7/2021/VOL.I/17 Wajedu Nig Ltd 7,672,304.24 Min of Education 10 weeks

4 1/26/2021 Upgrading and conversion of motorised water supply schemes to solar powered at 6NO, small town

(Chamo,Gambasha,Yabaza,Giginya,Amaryawa and Mamudawa) and construstion of 2NO, new solar

powered water supply scheme at Barandau and Jalomi arewa in Dutse, Birnin kudu, Jahun,Kazaure

and Ringim zones (Lot 1)

JEC/2/2021/VOL.I/7 Sims global reources Nig Ltd 74,008,751.25 Min of Water

Resources4 month

5 1/26/2021 Upgrading and conversion of 2NO, Motorised water supply scheme to solar powered at Abunabo and

Gagiya town in Guri LGA,Hadejia zone (Lot 2)JEC/33/2021/VOL.I/7 Khanadi global links Ltd 44,658,993.75 Min of Water

Resources3 month

6 1/25/2021 Construction of 1 block of 2 classrooms islamiyya SUBEB type each at Malaluwa and Farin Dutse

constituency, Gwaram LGA (lot 8)JEC/11/2021/VOL.I/17 AD2 intergrated technical

services Ltd7,672,304.24 Min of Education 20 weeks

7 1/26/2021 Upgrading and conversion of motorised water supply schemes to solar powered at Aujara town in

Jahun LGA,Jahun zone (Lot 3)JEC/34/2021/VOL.I/7 Khanadi global links Ltd 35,977,777.50 Min of Water

Resources3 month

8 1/22/2021 Construction of 1 block of 2 classrooms islamiyya type each at As-habulkafi, Sheik Buna shagari, Nurul

yaqeel islamiyya, Maman wale quarters and Kwarin manu in Hadejia constituency (Lot 14A)JEC/19/2021/VOL.I/17 AG global services Ltd 15,401,531.28 Min of Education 14 weeks

9 1/22/2021 Construction of 1 block of 2 blocks 6NO. Cubicle toilets, construction of gate and front view fencing at

maje nursey and primary school and IMN school in Hadejia constituency (Lot 14C)JEC/20/2021/VOL.I/17 AG global services Ltd 9,250,000.00 Min of Education 14 weeks

10 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at G/kanawa,Kuzuzumi and Koko in kanya

constituency, Babura LGA (Lot 11)JEC/16/2021/VOL.I/17 Gidan adede general engerprises

Ltd11,508,456.36 Min of Education 15 WEEKS

11 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Autatuwa in bulangu constituency (Lot

4)JEC/6/2021/VOL.I/17 Na bakwai general engerprises

Ltd3,865,152.12 Min of Education 19 weeks

12 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Amanga Gari,Danzomo and

Turkusawa in sule tamkarkar constituency (Lot 16)JEC/21/2021/VOL.I/17 Na bakwai general engerprises

Ltd11,452,590.06 Min of Education 17 Weeks

13 1/25/2021 Construction of 1 block of 3 classrooms islamiyya SUBEB type at Maigatari in garki constituency (Lot

12)JEC/17/2021/VOL.I/17 A.G.M & sons Nig Ltd 10,501,978.85 Min of Education 12 weeks

14 1/25/2021 Completion of 1 block of 2 classrooms islamiyya type each at Karwai and Charkawa in Ringim

constituency (Lot 7A)JEC/9/2021/VOL.I/17 A.G.M & sons Nig Ltd 7,672,974.08 Min of Education 16 weeks

Page 1 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021

Page 20: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021

FIRST QUARTER REPORT

15 1/22/2021 Construction of 1 block of 2 classrooms islamiyya type and Completion of 1 block of 4 classrooms at

GGSS K/hausa and Ruba in Kafin Hausa constituency (Lot 23)JEC/29/2021/VOL.I/17 AMM manzo Nig Ltd 4,626,917.43 Min of Education 19 weeks

16 1/25/2021 Completion of classrooms islamiyya type school at Dangyatin in Miga constituency (Lot 1B) JEC/1B/2021/VOL.I/17 AD2 intergrated technical

services Ltd3,164,974.00 Min of Education 14 weeks

17 1/25/2021 Renovation of 1 block of 2 classrooms islamiyya type at Sansani in Miga constituency (Lot 1C) JEC/3/2021/VOL.I/17 Gidan adede general engerprises

Ltd3,277,162.90 Min of Education 14 Weeks

18 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Tsangayar Liman, Uku da sisi and

Chirimbi in Babura constituency (Lot 20A)JEC/25/2021/VOL.I/17 Mufabamex Concept Nig Ltd 11,508,456.36 Min of Education 17 weeks

19 1/26/2021 Construction of 1 block of 2 classrooms islamiyya type each at Zangayan,Malandi,Birniwa,Izala and

Birniwa Day JSS (Staff room) in Birniwa constituency (Lot 26)JEC/32/2021/VOL.I/17 Kafiyama General Enterprices Ltd 15,344,130.32 Min of Education 12 weeks

20 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at GGSS Guri, guri Yamma and Garbagal

in Guri constituency (Lot 3)JEC/5/2021/VOL.I/17 Mugin investiment Nig Ltd 11,452,890.05 Min of Education 19 weeks

21 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Kalgwai,Kadirawa and Zango in Kiyawa

constituency (Lot 25)JEC/31/2021/VOL.I/17 Mugin investiment Nig Ltd 7,672,304.24 Min of Education 12 weeks

22 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Tudun wada, Duhuwa and Saya saya in

Dutse constituency (Lot 10C)JEC/15/2021/VOL.I/17 Mugin investiment Nig Ltd 11,501,819.64 Min of Education 19 weeks

23 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Amaryawa cikin

gari,Takwardawa,Jama'a Zugai,U/Dinya,Dansure Gabas,Mai karauchi,Sankau gari,Tudun Dan

biriri,Gumau and Roni Gari in Roni constituency (Lot 22)

JEC/28/2021/VOL.I/17 Jignaj Global Constructions Ltd 38,361,571.20 Min of Education 16 weeks

24 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Z/Sainawam Gidan Dogon

Faci,Dankawa,Wailare and Kurkyet in Gwiwa constituency (Lot 18)JEC/23/2021/VOL.I/17 Jignaj Global Constructions Ltd 15,304,471.36 Min of Education 14 weeks

25 3/2/2021 Re-surfacing of road parking space/storm gutter drainage at General Hospital jahun JEC/33/2021/VOL.I/6 Sukudai Construction Nig Ltd 13,379,159.41 Min of Health 12 Weeks

26

22/01/2021

Constr.of 1 Block of 2 Classroom Islamiyya type Each at Dakido and Garmaka in Maigatari

Constituency (Lot-19A) JEC/24/2021/VOL.I/17 Pullad Global Consult Ltd 7,672,304.24 Min of Education 17 Weeks

27

22/01/2021

Constr. Of 1 Block of 2 Classrooms Islamiyya Type Each at Wurmawa, Yar Jigawa, Katafila, Darul

Sunnah and Tahsin in Jahun Constituency (Lot-2) JEC/4/2021/VOL.I

Babandoki General Enterprises

Ltd 19,180,162.90 Min of Education 18 Weeks

28

22/01/2021

Constr. Of 1 Block of 3 classrooms Islamiyya Type, Constr. Of 2 Classroom (Rural Type) and Constr. Of

wall fencing and 1 Block Islamiyya at Abubakar Mosques, Ummul-Khair Islamiyya, Aminu Sani

Primary and Zango Constituency Projects Lot-9 JEC/12/2021/VOL.I/17

Babandoki General Enterprises

Ltd 22,774,106.00 Min of Education 11 eeks

29

18/02/2021

Constr. Of 3No. 5 Daily Prayer Mosque (2021 Constituency Project) Lot-2 at Mashagwar majiya,

Akubushin and Kalauri in Auyo Constituency JEC.37/2021/VOL.I/26 Yayarin Tukur Nig Ltd 6,968,835.81 Cabinet Office 12 Weeks

30

18/02/2021

Constr. Of 2No. 5 Daily Prayer Mosque (2021 Constituency Project) Lot-1A at Unik Babba and Unik

Ganik Gana in Auyo Constituency JEC/36/2021/VOL.I/26 Nabakwai General Entr 4,670,665.52 Cabinet Office 12 Weeks

Page 2 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021

Page 21: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021

FIRST QUARTER REPORT

31

19/02/2021 Renovation of 2No. Friday Prayer Mosque at Gidan Baki and Jirma in Garki Constituency (Lot-123) JEC/140/2021/VOL.I/13 Jignaj Global Constr Nig Ltd 13,904,254.84 Cabinet Office 12 Weeks

32

18/02/2021

Completion/Renovation of 3No. Friday Prayer Mosque at Nahuce, Garadoo and Harbo sabuwa in

Jahun Constituency (Lot-131) JEC/148/2021/VOL.I/13

Babandoki General Enterprises

Ltd 13,957,671.49 Cabinet Office 12 Weeks

33

18/02/2021

Completion/Renovation of 2No. Friday Prayer Mosque at M. Saidu Izala and Yan Kunama in Jahun

Constituency (Lot-130) JEC/147/2021/VOL.I/13

Babandoki General Enterprises

Ltd 9,952,904.72 Cabinet Office 12 Weeks

34

18/02/2021 Renovation of 2No. Friday Prayer Mosque at Dina and Duju in Jahun Constituency (Lot-129) JEC/146/2021/VOL.I/13

Babandoki General Enterprises

Ltd 6,606,678.07 Cabinet Office 8 weeks

35

18/02/2021

Renovation of 2no. 5 Daily Prayer Mosque at Sule Bakin Tasha and Tsangayar Sule in Sule Tankarkar

Constituency (Lot-82) JEC/106/2021/VOL.I/13 Ngaloma Constr Co. Ltd 6,223,303.28 Cabinet Office 8 weeks

36

18/02/2021

Constr. Of 3No 5Daily Prayer Mosque at K/Arewa, M Musbahu, Marayo and Hannun Giwa in Sule

Tankarkar Constituency Lot-63 JEC/86/2021/VOL.I/13 Ngaloma Constr Co. Ltd 7,019,301.51 Cabinet Office 12 Weeks

37

18/02/2021

Constr. Of 2No 5 Daily Prayer Mosque at Burmanawa and unguwar Liman in Sule Tankarkar

constituency (Lot-65) JEC/88/2021/VOL.I/13 Ngaloma Constr Co. Ltd 4,677,629.32 Cabinet Office 12 Weeks

38

18/02/2021

Constr. Of 3No. 5 Daily Prayer Mosque at Madobi, Tsalle, Jikai and Lageniya in Sule Tankarkar

Constituency (Lot-64) JEC/87/2021/VOL.I/13 Ngaloma Constr Co. Ltd 7,017,211.32 Cabinet Office 12 Weeks

39

18/02/2021

Constr. Of 3No. 5 daily prayer mosqye at Dilima, Sabaru and Gargadin Giwa in Birnin Kudu

Constituency Lot5 JEC/39/2021/VOL.I/26 Nushe Business Res Ltd 7,003,920.00 Cabinet Office 12 Weeks

40

18/02/2021

Completion/Renovation of 1No. Friday Prayer Mosque at Galadimawa in Taura Constituency (Lot

144) JEC/160/2021/VOL.I/13 Nushe Business Res Ltd 2,841,372.17 Cabinet Office 8 weeks

41

18/02/2021

Completion/ Renovation of 2No. Friday Prayer Mosque at Kangal and Malamawar in Taura

Constituency Lot-145 JEC/161/2021/VOL.I/13 Nushe Business Res Ltd 15,715,256.97 Cabinet Office 12 Weeks

42

18/02/2021

Constr. Of 3No. 5 Daily prayer mosque at Dagwaji, Rahaji and Sabuwar Kaura in Birnin Kudu

Constituency Lot-6 JEC/40/2021/VOL./13 Nushe Business Res Ltd 6,886,864.71 Cabinet Office 12 Weeks

43

19/02/2021

Constr. Of 3No. 5 Daily Prayer Mosque at Yafashiya, Dorawa Maiyado and Kafin Zaki in Birnin Kudu

Constituency Lot-07 JEC/41/2021/VOL.I/13 Nushe Business Res Ltd 7,015,043.60 Cabinet Office 12 Weeks

44

19/02/2021

Constr. Of 3No. 5 Daily Prayer Mosque at Barikin Dangiwa, Katsawa and Kauyen Madora in Birnin

Kudu Constituency Lot-8 JEC/42/2021/VOL.I/13 Nushe Business Res Ltd 7,003,293.45 Cabinet Office 12 Weeks

45

19/02/2021

Constr. Of 3No. 5 daily prayer mosque at Tajira Burin Warji and Babaldu in Birnin Kudu Constituency

Lot-11 JEC/44/2021/VOL.I/13 Nushe Business Res Ltd 7,012,453.68 Cabinet Office 12 Weeks

46

19/02/2021

Constr. Of 3No. 5 Daily Prayer Mosque at Lakar Kadanya, Juwan Tudu and Juwan Kwari in Birnin Kudu

Constituency Lot-12 JEC/45/2021/VOL.I/13 Nushe Business Res Ltd 7,006,387.44 Cabinet Office 12 Weeks

47

19/02/2021

Constr. Of 3No. 5 daily Prayer Mosque at Kauyen Gonar Faruku and Birnin Kudu in Birnin Kudu

Constituency Lot-13 JEC/46/2021/VOL.I/13 Nushe Business Res Ltd 4,667,780.76 Cabinet Office 12 Weeks

48

25/01/2021

Constr. Of 1 block of 2 Classrooms Islamiyya type each at Budai sabuwa, Kantamawa and Algama

Ringim Constituency Lot7B JEC/10/2021/VOL.I/17 Nushe Business Res Ltd 11,509,462.02 Cabinet Office 12 Weeks

Page 3 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021

Page 22: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021

FIRST QUARTER REPORT

49

25/01/2021

Completion of 1 Block of 3 Classrooms Islamiyya and Constr. Of 1 of 2 Classrooms Subeb Type at

Aujara and Taura Constituency Lot-13 JEC/18/2021/VOL.I/17 Nushe Business Res Ltd 13,976,503.95 Cabinet Office 12 Weeks

50

1/3/2021 Constr. Of 33KV Inter Town Connection (ITC) from Gagarawa Sub-Station to Gujungu Town JEC/184/2021/VOL.I/6 Arrayyan venture Global Ltd 35,959,298.80 Min of Works 12 Weeks

51

4/3/2021

Constr. Of 1 Block of 2 Classrooms Islamiyya type each at Gululu, Nasarawa and Rukumawa in Miga

Constituency (Lot-1) JEC/1B/2021/VOL./17 Loyalty Properties Ltd 11,478,353.53 Min of Education 14 Weeks

5216/03/2021 Constr. Of 250 Capacity theater at college of islamic and legal studies Ringim (Lot-1) JEC/250/2021/VOL.I/7 Ngaloma Construction Ltd 74,864,074.07 Min of Education 24 Weeks

5316/03/2021 Constr. Of 1 Blockof 3 Classroom at college of Islamic and Legal Studies Ringim (Lot-3) JEC/248/2021/VOL.I/7 Pullad Global Consult Ltd 18,419,746.61 Min of Education 12 Weeks

5416/03/2021 Constr. Of lecture Hall at College of Islamic & Legal Studies Ringim (Lot-2) JEC/249/2021/VOL.I/8 A.A. Maikatako Gen Ent Ltd 25,004,616.22 Min of Education 20 Weeks

5517/03/2021 Renovation of A Block at Jigawa State Scholarship Board Headquarters, Dutse JEC/251/2021/VOL.I/7 Panjatan 05 General Entr Ltd 4,941,196.04 Min of Education 4 weeks

GOODS

56 17/02/2021 Procurement of two (2No) Toyota Land Cruiser Jeeps to Government House, Dutse JEC/35A/2021/VOL.I/4 Math Global Invest Nig Ltd 105,000,000.00 Government House 4 Weeks

57 10/3/2021 Supply of Diesel o Urban Town Streetlights Generator at Auyo Court LGA (Lot-1A) JEC/197/2021/VOL.I/17 TSX Global Serv Ltd 14,996,250.00 Min of Local Govt 12 Months

58 10/3/2021 Supply of Diesel to Urban Streetlights Generators at Gantsa Town in Buji LGA (Lot-5) JEC/199/2021/VOL.I/17 TSX Global Serv Ltd 21,494,625.00 Min of Local Govt 12 Months

59 10/3/2021 Supply of Diesel Town Streetlights at Generators at Kazaure Kanti Kazaure LGA (Lot-16B) JEC/200/2021/VOL.I/17 TSX Global Serv Ltd 18,995,250.00 Min of Local Govt 12 Months

60 10/3/2021 Supply of Diesel to Urban Streetlights Generators at Kazaure Yan Makada in Kazaure LGA (Lot-16C) JEC/201/2021/VOL.I/17 TSX Global Serv Ltd 18,495,374.00 Min of Local Govt 12 Months

61 10/3/2021 Supply of Diesel to urban town Streetlights Generator at Babura Motor Park in Babura LGA (Lot-2B) JEC/211/2021/VOL.I/17 TSX Global Serv Ltd 12,996,750.00 Min of Local Govt 12 Months

62 10/3/2021

Supply of Diesel to Urban Town Streetlights Generators at Kazaure Sha'iskawa in kazaure LGA (Lot-

16D) JEC/210/2021/VOL.I/17 TSX Global Serv Ltd 14,996,250.00 Min of Local Govt 12 Months

63 10/3/2021 Supply of diesel to urban streetlights Generator at Garki Secretariat in Garki LGA (Lot-6A) JEC/240/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 17,495,625.00 Min of Local Govt 12 Months

64 10/3/2021

Supply of diesel to urban town streetlights Generators at Birnin Kudu Unity Bank in Birnin Kudu LGA

(Lot-4C) JEC/238/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 15,496,125.00 Min of Local Govt 12 Months

Page 4 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021

Page 23: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021

FIRST QUARTER REPORT

65 10/3/2021 Supply of diesel to urban town streetlights Generators at Roni Hospital in Roni LGA (Lot-23A) JEC/239/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 12,996,750.00 Min of Local Govt 12 Months

66 10/3/2021 Supply of Diesel to urban town streetlights Generators at Ringim Kofar fada in Ringim LGA (Lot-22A) JEC/237/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 15,496,125.06 Min of Local Govt 12 Months

67 10/3/2021 Suupply of Diesel to Urban Streetlights Generators at Ringim Galadanchi in Ringim LGA (Lot-22B) JEC/236/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 17,495,625.00 Min of Local Govt 12 Months

68 10/3/2021 Supply of Diesel to Urban Town Streetlights Generators at Garki Kofar fada in Garki LGA (Lot-6B) JEC/235/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 17,495,625.00 Min of Local Govt 12 Months

69 10/3/2021 Supply of Diesel to Urban Streetlights Generators at Taura LGA (Lot-25) JEC/234/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 18,995,250.00 Min of Local Govt 12 Months

70 10/3/2021 Supply of Diesel to Urban Streetlights Generator at Roni cikin Gari Roni LGA (Lot-23B) JEC/232/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 12,996,750.00 Min of Local Govt 12 Months

71 10/3/2021 Supply of diesel to urban streetlights Generator at Ringim EPI in Ringim LGA (Lot-22C) JEC/233/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 16,995,750.00 Min of Local Govt 12 Months

72 10/3/2021 Supply of Diesel to Urban town Streetlights Generator at Guri Secretariat in Guri LGA (Lot-9A) JEC/218/2021/VOL.I/17 SAG Nig ltd 15,966,000.00 Min of Local Govt 12 Months

73 10/3/2021 Supply of Diesel to Urban Streetlights Generators at guri market in guri LGA (Lot-9B) JEC/219/2021/VOL.I/17 SAG Nig ltd 15,966,000.00 Min of Local Govt 12 Months

74 10/3/2021

Supply of Diesel to Urban Town Streetlights Generators at kafin hausa Cikin Gari in Kafin hausa LGA

(Lot-15B) JEC/220/2021/VOL.I/17 SAG Nig ltd 15,496,125.00 Min of Local Govt 12 Months

75 10/3/2021 Supply of Diesel to Urban town Streetlights Generators at Miga Town Miga LGA (Lot-21) JEC/198/2021/VOL.I/17 TSX Global Serv Ltd 21,994,500.00 Min of Local Govt 12 Months

76 10/3/2021 Supply of Diesel to urban town streetlights Generators at Gwiwa Town in gwiwa LGA (Lot-11) JEC/192/2021/VOL.I/17 TSX Global Serv Ltd 17,495,625.00 Min of Local Govt 12 Months

77 10/3/2021 Supply of Diesel to Urban Streetlights Generators at babura Kofar Fada in babura LGA (Lot-2A) JEC/193/2021/VOL.I/17 TSX Global Serv Ltd 16,995,750.00 Min of Local Govt 12 Months

78 10/3/2021

Supply of Diesel to Urban Town Streetlights Generatorsn at Birniwa Secretariat in Birninwa LGA (Lot-

3A) JEC/195/2021/VOL.I/17 TSX Global Serv Ltd 13,996,500.00 Min of Local Govt 12 Months

79 10/3/2021 Supply of Diesel to Urban Town Streetlights Generators at jahun Kofar fada in jahun LGA (Lot-13B) JEC/194/2021/VOL.I/17 TSX Global Serv Ltd 16,995,750.00 Min of Local Govt 12 Months

80 22/02/2021 Procurement of 2No. GS4 Luxury vehicles JEC/182/2021/VOL.I/6 CIG Motors Co. Ltd 27,152,500.00 Govt House 2 Weeks

81 10/3/2021 Supply of diesel to urban town streetlights Generator at gwaram New in Gwaram LGA (Lot-10D) JEC/244/2021/VOL.I/17 Pullad Global Consult Ltd 13,496,625.00 Min of Local Govt 12 Months

82 10/3/2021 Supply of Diesel to Urban Town Streetlights Generators at Gwaram Old in Gwaram Lga (Lot-10C) JEC/243/2021/VOL.I/17 Pullad Global Consult Ltd 13,496,625.00 Min of Local Govt 12 Months

83 10/3/2021

Supply of Diesel to Urban Town Streetlights Generators at Gwaram Primary School in Gwaram LGA

(lot-10B) JEC/242/2021/VOL.I/17 Pullad Global Consult Ltd 12,996,750.00 Min of Local Govt 12 Months

84 10/3/2021

Supply of Diesel to Urban Town Streetlights Generators at Gwaram Cikin Gari In Gwaram LGA

(Lot10A) JEC/241/2021/VOL.I/17 Pullad Global Consult Ltd 14,496,375.00 Min of Local Govt 12 Months

85 10/3/2021 Supply of Diesel to Urban streetlights Generators at Bamaina Old in Birnin Kudu Lga (Lot-4E) JEC/191/2021/VOL.I/17 TSX Global Serv Ltd 9,300,000.00 Min of Local Govt 12 Months

86 10/3/2021

Supply of Diesel to Urban Streetlights Generators at Sule Tankarkar Cikin Gari Sule Tankarkar LGA

(Lot24B) JEC/190/2021/VOL.I/17 TSX Global Serv Ltd 11,497,125.00 Min of Local Govt 12 Months

Page 5 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021

Page 24: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021

FIRST QUARTER REPORT

87 10/3/2021 Supply of Diesel to urban Streetlights Generator at Gumel Kofar Fada in Gumel LGA (Lot-8A) JEC/189/2021/VOL.I/17 TSX Global Serv Ltd 19,995,000.00 Min of Local Govt 12 Months

88 10/3/2021

Supply of Diesel to urban Streetlights Generators at Malam Madori G/Ganye in Malam Madori LGA

(Lot-19B) JEC/188/2021/VOL.I/17 TSX Global Serv Ltd 18,995,250.00 Min of Local Govt 12 Months

89 10/3/2021 Supply of Diesel to Urban town Streetlights Generators at Bamaina New in Birnin Kudu LGA (Lot-4F) JEC/187/2021/VOL.I/17 TSX Global Serv Ltd 14,996,250.00 Min of Local Govt 12 Months

90 10/3/2021 Supply of Diesel to urban town Streetlights Generator at Birniwa Kasuwa in Birniwa LGA (Lot-3B) JEC/185/2021/VOL.I/17 TSX Global Serv Ltd 21,994,500.00 Min of Local Govt 12 Months

91 10/3/2021 Supply of Diesel to Urban town streetlights Generator at Gagarawa Town in Gagarawa LGA (Lot-7) JEC/186/2021/VOL.I/17 TSX Global Serv Ltd 17,995,500.00 Min of Local Govt 12 Months

92 10/3/2021

Supply of Diesel to Urban town Streetlights Generator at Birnin Kudu Primary School in birnin kudu

Lga (Lot-4B) JEC/216/2021/VOL.I/17 TSX Global Serv Ltd 13,996,500.00 Min of Local Govt 12 Months

93 10/3/2021

Supply of Diesel to Urban town Streetlights Generator at Birnin Kudu Open Theater in Birnin Kudu

LGA (Lot-4D) JEC/215/2021/VOL.I/17 TSX Global Serv Ltd 15,996,000.00 Min of Local Govt 12 Months

94 10/3/2021

Supply of Diesel to Urban town streetlight Generator at Kiri Kasamma G/Wanka in Kiri Kasamma LGA

(Lot-17A) JEC/205/2021/VOL.I/17 TSX Global Serv Ltd 15,496,125.00 Min of Local Govt 12 Months

95 10/3/2021 Supply of Diesel to urban town streetlights Generators at Kazaure Kofar Fada in Kazaure LGA (lot-16A) JEC/204/2021/VOL.I/17 TSX Global Serv Ltd 11,497,125.00 Min of Local Govt 12 Months

96 10/3/2021 Supply of Diesel to Urban town streetlights generator at Kiyawa LGA (Lot-18B) JEC/203/2021/VOL.I/17 TSX Global Serv Ltd 11,997,000.00 Min of Local Govt 12 Months

97 10/3/2021 Supply of Diesel to Urban town streetlights Generator at Jahun Round About in Jahun LGA (lot-13A) JEC/202/2021/VOL.I/17 TSX Global Serv Ltd 16,995,750.00 Min of Local Govt 12 Months

98 10/3/2021

Supply of Diesel to urban town streetlights Generator at hadejia Local Education Authority (L.E.A) in

Hadejia LGA (Lot-12C) JEC/217/2021/VOL.I/17 TSX Global Serv Ltd 18,995,250.00 Min of Local Govt 12 Months

99 10/3/2021

Supply of Diesel to Urban town Streetlights Generators at Karkarna Secretariat Yankwashi LGA (Lot-

26B) JEC/213/2021/VOL.I/17 TSX Global Serv Ltd 12,996,750.00 Min of Local Govt 12 Months

100 10/3/2021

Supply of Diesel to Urban town streetlights Generator at Kiri Kasamma Cikin Garik in Kiri Kasamma

LGA (Lot-17B) JEC/212/2021/VOL.I/17 TSX Global Serv Ltd 15,496,125.00 Min of Local Govt 12 Months

101 10/3/2021

Supply of Diesel to Urban Town Streetlights Generators at Birnin Kudu Jarda in Birnin Kudu LGA (Lot-

4A) JEC/209/2021/VOL.I/17 TSX Global Serv Ltd 15,966,000.00 Min of Local Govt 12 Months

102 10/3/2021

Supply of Diesel to Urban town Streetlights Generator at Karkarna Kofar Fada in Yankwashi LGA (Lot-

26A) JEC/208/2021/VOL.I/17 TSX Global Serv Ltd 11,997,000.00 Min of Local Govt 12 Months

103 10/3/2021

Supply of Diesel to Urban town Streetlights generator at Birnin Kudu Pilot School in Birnin Kudu LGA

(Lot-4G) JEC/207/2021/VOL.I/17 TSX Global Serv Ltd 11,497,124.00 Min of Local Govt 12 Months

104 10/3/2021 Supply of Diesel to Urban Town Streetlights Generator at Hadejia Kofar Fada in Hadejia LGA (Lot-12A) JEC/206/2021/VOL.I/17 TSX Global Serv Ltd 18,995,250.00 Min of Local Govt 12 Months

105 10/3/2021 Supply of Diesel to Urban Town Streetlights Generator at Kiyawa Junction in Kiyawa LGA (Lot-18A) JEC/196/2021/VOL.I/17 TSX Global Serv Ltd 14,996,250.00 Min of Local Govt 12 Months

106 10/3/2021

Supply of Diesel to Urban Town Streetlights Generator at Babura Special Primary in babura LGA (Lot-

2C) JEC/214/2021/VOL.I/17 TSX Global Serv Ltd 14,496,375.00 Min of Local Govt 12 Months

107 10/3/2021

Supply of Diesel to Urban Streetlights of Generator at Kaugama Primary School in kaugama LGA (Lot-

14A) JEC/222/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 11,997,000.00 Min of Local Govt 12 Months

108 10/3/2021 Supply of Diesel to Urban Town Streetlights Generators at Auyo Kofar Fada in Auyo LGA (Lot-1B) JEC/223/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 10,997,250.00 Min of Local Govt 12 Months

Page 6 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021

Page 25: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021

FIRST QUARTER REPORT

109 10/3/2021

Supply of Diesel to urban town Streetlights Generator at Kaugama Secretariat in Kaugama LGA (Lot-

14B) JEC/221/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 13,996,500.00 Min of Local Govt 12 Months

110 10/3/2021

Supply of Diesel to urban town Streetlights generator at Hadejia Malam Madori Road in hadejia LGA

(Lot-12B) JEC/225/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 18,495,375.00 Min of Local Govt 12 Months

111 10/3/2021

Supply of Diesel to Urban Town Streetlights Generator at Malam Madori Kofar Gari in malam Madori

LGA (Lot-19c) JEC/226/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 18,995,250.00 Min of Local Govt 12 Months

112 10/3/2021

Supply of Diesel to urban town streetlights Generator at Kafin Hausa Market in Kafin hausa LGA (Lot-

15A) JEC/227/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 13,996,500.00 Min of Local Govt 12 Months

113 10/3/2021

Supply of Diesel to urban town Streetlights Generator at Maigatari Motor Park in Maigatari LGA (Lot-

20B) JEC/230/2021/VOL.I/17 Watt Electronics Ltd 13,996,500.00 Min of Local Govt 12 Months

114 10/3/2021 Supply of Diesel to Urban town Streetlights generator at Gumel T/Asibiti in Gumel LGA (Lot-8C) JEC/228/2021/VOL.I/17 Watt Electronics Ltd 17,995,500.00 Min of Local Govt 12 Months

115 10/3/2021 Supply of Diesel to Urban town streetlights Generator at Maigatari Kara in Maigatari LGAc(Lot-20A) JEC/229/2021/VOL.I/17 Watt Electronics Ltd 13,996,500.00 Min of Local Govt 12 Months

116 10/3/2021 Supply of Diesel to urban town streetlight Generator at Gumel dantanoma in Gumel LGA (Lot-8B) JEC/231/2021/VOL.I/17 Watt Electronics Ltd 18,995,250.00 Min of Local Govt 12 Months

117 10/3/2021 Supply of Diesel to Urban town streetlights generator at hadejia Makabarta in Hadejia LGA (Lot-12D) JEC/224/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 17,995,500.00 Min of Local Govt 12 Months

SERVICES

118 1/2/2021

Commissioning as consultant for the supervision of the construction of Ringim Township Road

(4.4km) FGPC/136/2012/VOL.I/196 Himma Tech Serv & Co Ltd 16,784,194.48 Min of Works 6 Months

119 1/2/2021 Commissioning as Consultant for the supervision of the rehabilitation of Sara- Gantsa Road JEC/2/2021/VOL.I/72 SIIS Engineering Consult 3,176,149.69 Min of Works 6 Months

120 1/2/2021

Commissioning as consultant for the supervision of the Construction of Sections of Abunabo-

ChapChapNo-Lafiyari-Kadira-Guri Road (Eastern bye-pas phase III Road) (2.4km) JEC/59/2017/VOL.I/78 Curves & Straight Design Ltd 10,483,569.12 Min of Works 16 Months

121 1/2/2021 Commissioning as consultant for the supervision of the rehabilitation of gwaram-Basirka Road (63km) FGPC/223/2018/VOL.I/72 Apex Design & Associates 88,582,945.16 Min of Works 22 Months

122 12/2/2021

Registration of Urban Properties Across the State Under World Bank Supported SFTAS Program (DLI-

5) ( Approval for the engagement of consultant) GHS/9/VOL.I/644 Linx Spatial System Ltd 13,459,000.00 Min of Land 1 Year

1,991,595,547.37TOTAL=

Page 7 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021

Page 26: JIGAWA STATE GOVERNMENT

SECTION ( E )

COMPLETED/ ON-GOING PROJECTS

JANUARY TO MARCH, 2021

Page 27: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Health

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1

Commissioning/engagement as consultants for the

supervision of construction of new general hospital at

Birnin kudu Design Plus B/Kudu 74,010,950.99 74,010,950.99 73,825,923.61 27/5/2014 10 month 99 On-going

2

General Renov. /Improvement works at Fagam Primary

Health Care Ngaloma Const. Co. Ltd. Gwaram 64,869,057.07 71,417,939.66 64,370,619.95 30/12/2016 12 weeks 86 On-going

3 Constr. Of New 250 Bed Specialist Hospital in Hadejia PHILKO LIMITED Hadejia 1,593,314,294.25 1,894,557,085.99 1,458,779,763.98 11/10/2017 18 months 77 On-going

4

Engagment as Consultant for the supervision of the

Constr. of New Specialist Hospital, Hadejia HAG Eng. Nig. Ltd. Hadejia 67,363,041.01 78,830,914.46 67,290,130.60 19/10/2017 16 months 85 On-going

5 Constr of New General Hospital at Gantsa in Buji LGA Ngaloma Constr Ltd. Buji 465,983,075.70 664,813,704.78 504,306,295.13 12/7/2018 9 months 76 On-going

6 Constr of New General Hospital at Garki Babandoki Gen. Entp. Garki 493,805,327.06 692,635,956.14 508,320,622.25 12/7/2018 12 months 74 On-going

7

Constr of New General Hospital at Guri town,

Headquarters of Guri LGA Retro Constr Ltd. Guri 538,386,262.75 538,386,262.75 471,710,986.43 12/7/2018 12 months 88 On-going

8

Constr of New School of Nursing and Midwifery at

Babura, Headquarters of Babura LGA Gridarch Nig. Ltd. Babura 591,562,261.76 591,562,261.76 525,877,945.18 12/7/2018 12 months 89 On-going

9

Upgrading of sule tankarkar Primary Health Center (PHC)

to a full Pledged general hospital Math Global Invest Ltd S/tankarkar 132,915,319.86 132,915,319.86 129,090,486.22 13/11/2020 8 Weeks 100 Completed

10

Engagement as Consultant for the Supervision of the

Constr. of New General Hospital, Guri AADC Limited Guri 34,870,673.74 34,870,673.74 30,389,792.16 30/8/2018 12 months 87 On-going

11

Engagement as Consultant for the Supervision of the

Constr. of New Specialist Hospital, Kazaure HAG Eng. Consultants Kazaure 78,006,110.10 78,006,110.10 51,531,977.61 10/8/2018 16 months 66 On-going

12 Constr. Of staff quarters at Birnin Kudu General Hospital

Babandoki General

Enterprises Ltd B/Kudu 94,028,008.60 94,028,008.60 84,850,124.97 13/11/2020 6 Weeks 90 On-goiing

13

Re-surfacing of road parking space/storm gutter drainage

at General Hospital jahun

Sukudai Construction Nig Ltd Jahun 13,379,159.41 13,379,159.41 3/2/2021 12 Weeks

Balance C/F 4,242,493,542.30 4,959,414,348.24

1a

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 28: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Health

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

Balance B/F 4,242,493,542.30 4,959,414,348.24

14

Engagement as Consultant for the Supervision of the

Constr. of New General Hospital, Gantsa Blue Urban Transnational Buji 33,925,256.47 49,154,984.75 34,568,528.76 10/8/2018 9 months 69 On-going

15

Engagement as Consultant for the Supervision of the

Constr. of New General Hospital, Garki Zeebro Global Resources Garki 34,321,462.71 49,497,067.98 33,842,195.43 10/8/2018 12 months 67 On-going

16 Constr. of New Specialist Hospital at Kazaure Afdin Constr Co. Ltd. Kazaure 1,893,240,056.40 2,089,997,698.90 1,628,253,839.55 5/7/2018 16 months 78 On-going

17

Supply and Installation of Medical equipments to the

newly constructed 31no. BHC across the state. Mashasha Investment Ltd. Across the state 98,065,965.00 98,065,965.00 25/4/2018 20 weeks On-going

18

Consultant for the supervision of the construction of

new school of Nursing and Midwifery at Babura INTERGRAPH CONSULT Babura 50,318,699.92 50,318,699.92 45,584,364.14 24/12/2018 12 months 90 On-going

19

Supply and Installation of Medical equipments to the

newly constructed 31no. BHC across the state. G.M. Sara & Sons Ltd. Across the state 4,129,061.98 4,129,061.98 16/4/2018 6 weeks On-going

20

Supply and Installation of Medical equipments to the

newly constructed 31no. BHC across the state. G.M. Sara & Sons Ltd. Across the state 4,129,061.98 4,129,061.98 16/4/2018 6 weeks On-going

21

Construction of LI block as maternity wing Lot-32 at

Ba'auzini BHC in Kazaure LGA Dangata Memorial Inv. Ltd Kazaure 17,159,889.57 17,159,889.57 17,159,889.57 14/1/2020 20 weeks 100 On-going

22

Engagement of Glalaxy ITT for the Development and

Meintenance Database for Jigawa State Contributory

Healthcare Management Scheme Galaxy ITT Ltd In the state 18,273,817.00 18,273,817.00 30/06/2020 3 years On-going

23

Upgrading Bulangu Cottege Hospital to General Hospital

in Bulangu town Dangata Memorial Inv. Ltd K/Hausa 98,846,893.09 98,846,893.09 98,821,369.20 20/2/2020 16 weeks 100 Completed

Balance C/F 6,494,903,706.42 7,438,987,488.41

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 29: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Health

1b

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

Balance B/F 6,494,903,706.42 7,438,987,488.41

24

Constr. Of 906meter Asphalt Overly and Culvert as

External Road, Linking Birnin Kudu General Hospital (Lot-

1) Ganan Constr Co Ltd B/Kudu 101,091,796.18 101,091,796.18 19,419,519.00 19/11/2020 16 Weeks 19 On-goiing

25

Supply and Installation of Hospital Equipment to 20 LI

Blocks Across the State

Babandoki General

Enterprises Ltd in the state 57,178,880.00 57,178,880.00 30/12/2020 8 Weeks On-goiing

26

Commissioning as consultant for the Supervision of the

upgrading of Sule tankarkar Primary Health care to full

pledged General Hospital

Curves & Straights Design

Ltd S/tankarkar 2,326,018.10 2,326,018.10 1,817,539.73 31/12/2020 3 Months 78 On-goiing

27

Commissioning as consultant for the supervision of the

construction of asphalt overlay as road linking the Birnin

Kudu General Hospital

Landbase Engineering

Services Ltd B/Kudu 1,769,106.42 1,769,106.42 31/12/2020 12 Weeks On-goiing

28

Supply and Installation of Hospital Equipment to 15 LI

Blocks Across the State Zaramat Global Company B/Kudu 42,884,160.00 42,884,160.00 30/12/2020 8 Weeks On-goiing

29

Constr. Of 906 Meters asphalt overlay and culverts as

external Road Linking Birnin Kudu General Hospital Ganan Constr. Nig Ltd B/Kudu 101,091,796.18 101,091,796.18 13/11/2020 3 Months On-goiing

Total 6,801,245,463.30 7,745,329,245.29

.

1c

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 30: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Health

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 31: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Water Resources

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1

Rehab. of Water Supply Schemes across the state at

Gwaram Zone (Water Board) Interworld I & E Gwaram 27,207,315.85 27,207,315.85 25,403,004.38 9/21/2015 12 weeks 89 On-going

2

Constr of 3no. Water Collection points (Lot-26) of

Dunbule kusure and Zago Granitoid Eng Ltd. Yankwashi 3,781,047.00 3,781,047.00 3,781,046.90 8/7/2020 8 weeks 100 Completed

3

Constr. of Hand Pumps Water Supply Schemes (phase II) as

Constituency projects at Yosaro, Dilima/Zaramba and

Mungulo in B/Kudu Constituency. A.A. Aljazeera Agro Properties B/Kudu 1,657,215.00 1,657,215.00 29/3/2017 8 weeks Stalled

4

Constsruction of Hand pumps Water supply schemes (phase

II) as constituency project at Yola, Masanawa, Larabar Gulai,

Katanga Kudu, Dan koli and Dubal in Kiyawa Constituency. DE-MASTBO Kiyawa 3,331,430.00 3,331,430.00 29/03/2017 8 weeks Stalled

5

Construction of Solar Powered Water supply schemes

(Phase II) as constituency Projects at Sabuwar Rafa (Andaza

ward ) in Dutse constituency DE-MASTBO Dutse 6,270,000.00 6,270,000.00 29/03/2017 8 weeks Stalled

6

Constr. Of 4no. Hand pumps Water supply schemes (phase

II) as Constituency projects at Kofar Gidan Liman, Bayan

Gidan Sarkin Bai, Zankuwa fulani and Sabuwar SSS in Garki

Constituency. Taqib Ventures Nig. Ltd. Garki 2,340,000.00 2,340,000.00 21/6/2017 8 weeks Stalled

7

Constr. Of Solar Powered Water Supply Schemes (Phase I) as

Constituency Project at Marma in Kirikasamma Constituency LOYALTY PROPERTIES LTD K/Kasamma 6,943,387.00 6,943,387.00 7/8/2017 8 Weeks Stalled

8

Construction of (1No.) Hand pump water supply Schemes

2017 Constituency Project Phase II (Lot-3) at Tsattiya in

Dutse Constituency Loyalty Properties Ltd Dutse 798,000.00 798,000.00 1/24/2018 8 weeks On-going

9

Construction of 91No.) Solar Powered water supply scheme

2017 constituency Phase II Project (Lot-16) at Gambawa in

Miga Constituency Loyalty Properties Miga 6,968,430.00 6,968,430.00 1/24/2018 8 weeks On-going

10

Constr. Of (1no.) Solar [powered water supply scheme 2017

constituency phase II project (LOT-27) at Gacharam in Guri

Constituency. Limis Brothers & Co. Guri 6,968,430.00 6,968,430.00 24/1/2018 8 weeks On-going

11

Conversion of Motorizied Boreholes to Solar Powered

Water supply at Garki main Station in Garki Local Govt Area. Sims Global Resources Garki 34,070,557.50 34,070,557.50 18,327,487.50 7/2/2018 12 Weeks 52 On-going

BAL. C/F 100,335,812.35 100,335,812.35

2a

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 32: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 100,335,812.35 100,335,812.35

12

Constr of (1no.) Solar Powered water supply schemes 2017

constituency phase III projects (Lot-13) at Kangarwa in

Maigatari Constituency Jignaj Global Constr Ltd. Maigatari 6,968,430.00 6,968,430.00 21/3/2018 8 weeks On-going

13

Construction of (9No.) Hand Pumps Water supply scheme

2017 Constituency phase II Projects (Lot-8) at Gidan Iliyasu,

Mai Goro, Falari Burburwa, Zulkiya Kila, Kila by pass, Sara

cikin gari, Kuka manoma, Kafin torto and Fiji in Gwaram

Constituency. A.A. Aljazeera Agro Proc. Gwaram 7,202,791.35 7,202,791.35 5,588,165.61 24/1/2018 8 Weeks 74 On-going

14

Constr of (1no.) Solar Powered Water Supply Scheme

Constituency Projects (2018 phase 1) Lot-7 at

Constituency. Jignaj Global Ltd. 6,023,115.00 6,023,115.00 17/10/2018 8 weeks On-going

15

Constr of Water Collection points constituency projects

(2018 phase III) Lot-22 at Gari kudu, Yarbarewa,

Nabanawa, Garki Arewa, Maizaure, Jangari, Dunguzu,

Gurarraji and Koyama in Garki Constituency. Mugin Invest. Nig. Ltd. Garki 12,588,450.00 12,588,450.00 12,588,450.00 28/2/2020 10 weeks 100 Completed

16

Constr of Hand pump Boreholes as constituency projects

(2018 phase II) Lot-14 at Kanzon Kokori, D/Kyaure

Yamma, Gafaya B., G.Baba Gagare D/Toca, Aguran

Mazana, Dangoli Gabas and Gafaya in Kafin Hausa

Constituency. Alkawakeb Global Concept K/Hausa 5,164,110.00 5,164,110.00 18/12/2018 8 weeks On-going

17

Constr. Of (4no.) Hand pumps water supply Scheme

Consultancy projects (2018 phase) Lot 20 at Fulanin G.

Dunfu in Taura Constituency. Faahm Integrated Resource Taura 2,942,100.00 2,942,100.00 17/10/2018 6 weeks On-going

18

Construction of (1NO.) Hand Pumps Water supply

scheme Constituency projects (2018 Phase I) Lot 18 at

Ban-iyaka in Roni Constituency. HikimaSynergy Gen Entp Nig Roni 733,918.50 733,918.50 17/10/2018 4 weeks On-going

BAL. C/F 141,958,727.20 141,958,727.20

2b

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 33: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Water Resources

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 141,958,727.20 141,958,727.20

19

Construction of Block of 2-Classroom Islamiyya (1NO.)

Lot-11 at Jibori in Kirikasamma Constituency. Tosarawa Global Ltd. Kirikasamma 3,097,448.45 3,097,448.45 1/11/2018 4 Weeks On-going

20

Construction of (8NO.) Hand Pumps Water supply

scheme Constituency projects (2018 Phase I) Lot 14 at

Muna, Mundu, Kwagga, Fulanin Hauwa, Jakai Fulani,

Dangaigai, Inguwar Goje and Kadagawa in Kanya Babba

Constituency. Babura Local Government Area. DeeTech Nig Ltd. Babura 5,905,200.00 5,905,200.00 15/10/2018 8 weeks On-going

21

Construction of the (1 No.) Solar Powered Water Supply

Schemes 2018 Constituency Phase III Projects (Lot-18) at

Kaya Jamu in Maigatari Constituency. Alkawakeb Global Concept Maigatari 6,023,115.00 6,023,115.00 23/11/2018 8 weeks On-going

22

Construction of the (1 No.) Solar Powered Water Supply

Schemes Constituency Projects (2018 Phase II) Lot-32 at

Yalwa in Gagarawa Constituency. Farham Intgratred Resources Gagarawa 6,023,115.00 6,023,115.00 23/11/2018 8 weeks On-going

23

Construction of Water Collection Point as Constituency

Projects (2018 Phase II) Lot-32 at Maigatari (2No.)

Maloya, Bosuwa, Galadi, Madana and Jajeri in Maigatari

Constituency. Jag & H Intgrated Services Ltd. Maigatari 7,358,173.38 7,358,173.38 18/12/2018 8 weeks On-going

24

Constr of Hand pump Boreholes as constituency projects

(2018 phase II) Lot-14 at Kanzo kokori, D/kyaure

yamma, Gafaya B, Baba Gagare D/Toca, Aguran mazana,

Dangoli Gabas and Gafaya in K/Hausa Constituency. Alkawakeb Global Concept K/Hausa 5,164,110.00 5,164,110.00 18/12/2018 8 weeks On-going

25

Conversion of (15No.) Hand Pumps to Solar Powered Water

supply Schemes at Babura Yamma, Yangadi, Zuru, Gadi, Dan

Barage, Hayin Buzu, Kuka, Gasakoli, Duzau, Yada, Kaki Zago,

Gatuta Sansami, Kankare tukurkusa and Lamba in Babura

L.G.A. Sims Global Resources Ltd Babura 15,301,125.00 15,301,125.00 8,160,600.00 31/12/2018 10 weeks 53 On-going

BAL. C/F 190,831,014.03 190,831,014.03

2c

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 34: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 190,831,014.03 190,831,014.03

26

Conversion of (12No.) Hand Pumps to Solar Powered Water

supply Schemes at Dan Amale, Walawa, Yanmaulu, Unguwar

Ma'aruf, Batali, Kanya Gari, Dankarda, Babura Gabas,

Malamawa, Figi, Dunkumi and Duwala in Babura L.G.A. Sims Global Resources Ltd Babura 12,240,900.00 12,240,900.00 7,140,525.00 31/12/2018 10 weeks 58 On-going

27

Constr of Hand Pump Boreholes Water Supply Schemes

Constituency projects (2019 First Quarter) Lot-8 at mai

dashi, Idi gwamna, unguwar malam, rigar lamido, adiyani

islamiyya, dagana Nato, daba, dirba, rigar malam wuri, yalwa

tsangaya, goni garin una, askandi arinjasko, rigar wakilin

dajjo lafiya, rigar babare, and rigar duka maza in Guri

Constituency AYH Intg. Serv. Ltd Guri 10,331,489.00 10,331,489.00 11/12/2019 8 weeks On-going

28

Conversion of 10No hand Pump Boreholes to Solar in at Uku

da Sisi, Ajjah, Mudirin gadi, Mundu, unguwar Ganji, Kafin

Danyayi, Unguwar gawo, Dabawa, Katirje and Tsadarwa in

Babura Local Government Area Sims Global Res Babura 10,276,880.00 10,276,880.00 8,221,500.00 11/7/2018 8 weeks 76% On-Going

29

Construction of 1No. Solar Powered Water Supply Scheme

at Dora in Garki LGA Ringim Zone Sims Global Resources Ringim 6,023,325.00 6,023,325.00 16/4/2019 8 Weeks On-going

30

Construction of 6No Hand Pump Boreholes water supply

scheme at Yandamo Kulle 2, umarni, Modoji Babba, Fulanin

Riggade, Gidan Hardo Musa ( Fulanin Asayaya) in Sule

Tankarkar Local Government Area and Tamburawa in Kafin

Hausa LGA K-Manu Gen Construction

S/tankarkar +

K/Hausa 4,427,640.00 4,427,640.00 3,680,475.75 8/5/2019 12 weeks 83 On-going

31 Rehab. Of 19no. Water supply schemein Ringim Sims Nig. Ltd. Ringim 17,361,750.00 17,361,750.00 11/10/2019 8 weeks On-going

32

Renov of 2no. Solar Powered water Supply schemes

Contituency project ( 2019 Phase 1) Lot- 24 at Gidan Kudege

and Kurneji in Gwiwa Constituency Jignaj Global Contr Ltd Gwiwa 3,227,700.00 3,227,700.00 11/12/2019 8 weeks On-going

BAL. C/F 254,720,698.03 254,720,698.03

2d

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 35: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 254,720,698.03 254,720,698.03

33

Rehabilitation of 3no. Water supply scheme at danzomo,

maitsamiya, and dankumbo in sule tankarkar (gumel zone

2019) Lot-2 capital projects LIMIS Brothers & Co S/Tankarkar 4,628,531.25 4,628,531.25 19/12/2019 4 weeks On-going

34

Consr rof 1NO. Solar Powered Water Supply Scheme Lot-7

at Daki daka in Garki LGA (Ringim zone 2019)-capital project LIMIS Brothers & Co Ringim 6,019,125.00 6,019,125.00 19/12/2019 8 weeks On-going

35

Constr of 1NO. Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-1 at Kafardu in auyo

Constituency Faahm Integrated Ltd Auyo 6,018,915.00 6,018,915.00 23/12/2019 8 weeks On-going

36

Constr of 1NO. Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-44 at alkalawa in

K/hausa Constituency Hambiscons Nig Ltd K/hausa 6,016,920.00 6,016,920.00 6,016,920.00 23/12/2019 8 weeks 100 Completed

37

Constr of 1NO. Solar Powered Water Supply Scheme

Constituecy project (2019 Phase 1) Lot-43 at Kore in K/hausa

Constituency Hambiscons Nig Ltd K/Hausa 6,016,920.00 6,016,920.00 23/12/2019 8 weeks On-going

38

Construction of hand pump boreholes water supply

schemes constituency projects (2019 first quarter) Lot-3 at

kazura, rugar taho, fulanin karanga, fulanin karanga gabas,

fulanin fagi, rugar saga, fulanin diginsa, Gidan Mal Dahiru,

Birniwa U/yamma, rugar idi kulla, rugar haberi, mara,

diginsa, fulanin batu, Umaru mai goro, fulanin mai zariya,

korewa, fulanin kachallari, dargazawa, fulanin kishinde,

gidan amadu, fulanin kazadama and inkibulawa gabas in

birniwa constituency Dabino integ serv Ltd Kaugama 15,492,109.50 15,492,109.50 14/12/2019 12 weeks On-going

39

Construction of solar power water supply scheme

constituncy project (2019 phase I) Lot-32 at Ganbabituwa in

kirikasamma constituency. Dabino Integ Serv. Ltd K/Kasamma 6,017,235.00 6,017,235.00 11/12/2019 8 weeks On-going

40

Constr. of Solar Powered Water Supply Scheme

Constituency Project (2019 PHASE 1) LOT-15 At Dawar Gada

in Maigatari Constituency A.S.Maifata Gen. EntP. Ltd Maigatari 6,015,765.00 6,015,765.00 11/12/2019 8 weeks On-going

BAL. C/F 310,946,218.78 310,946,218.78

2e

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 36: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 310,946,218.78 310,946,218.78

41

Constr. of Solar Powered Water Supply Scheme

Constituency Project (2019 PHASE 1) LOT-25 At Fagoji in

Dutse Constituency JAG & H Interg. Service Dutse 6,021,015.00 6,021,015.00 11/12/2019 8 Weeks On-going

42

Constr of Hand Pump Boreholes Water Supply Schemes

Constituency projects (2019 First Quarter) Lot-29 at

gangawa, sabara, ruwan dawa, kulleran, ganwa fulani,

fanisau, tazara sabon gida, tula, majiga, harbo, dina, kamai

gitsira, dogawa gabashi, bayan kotun cikin gari, gundin

sabon gida and yamma in Jahun Constituency Sasco Multi Serv Nig Ltd Jahun 11,791,752.00 11,791,752.00 11/12/2019 14 Weeks On-going

43

Constr of Hand Pump Boreholes Water Supply Schemes

Constituency projects (2019 First Quarter) Lot-12 at sabuwar

jawo (sabaru ward), fulanin ballami (dandi ward), K/Mal. Ali

headmaster (gada ward), K/alta makeri (gada ward) and

makabarta gabas (gada ward) in kazaure Constituency Yanduna Venture Nig Ltd Kazaure 3,686,287.50 3,686,287.50 11/11/2019 8 Weeks On-going

44

Constr. Of 31No. Hand Pump Borehole water supply

schemes (2019 First Quarter Constituency Project) LOT-16 at

G/Tela Kabo Fulanin Dandabino, G/Musa Shanu Fulanin

Tsanfau, Mekekiya Gari, Gidan Haruna Babe, Dungundun

Gari, Fulanin Danmodi, Dangoho Gari, Muku Gari, Maigatari

Albasu, G.A gaiya Fulanin Dantsakuwa, Karangi Gari,

Tsangayar Kirgi, G/Shu'aibu Ajiya Fulanin Kakudi, Dankulli

Gari, Lululu, Zangunan Jeke, Gidan Hardo Yahaya,Gidan

Dashi, G/ Hardo Amadu Fulanin Kukule, Gidan Alh. Dare,

Gidan Hardo Katore Fulanin Dan Marke, Haro Kandir,

Fulanin Barawa, Gidan Mati, Gidan Jikan Banki, Fulanin

Jarimawa, Tashar Hajja, Fulanin Dukuku, Hardo Murnai,

Gidan Bulama Suna and Fulanin Mailefe in Sule Tankarkar

constituency H.M Dangara Ltd S/tankarkar 22,872,730.00 22,872,730.00 21/01/2020 12 weeks On-going

45

Constr. Of 6No Water Collection Points First Quarter, 2019

Constituency Projects at Karkarna Sabon Gari, karkarna Cikin

gari, Dole, Sabuwa, Sada and furji in yankwashi constituency

(Lot-24) Granitoid Engineering Serv Ltd Yankwashi 7,562,094.00 7,562,094.00 17/01/2020 8 weeks On-going

46

Constr. Of 3No Hand Pumps Water Supply Scheme ( Phase I

2019 Constituency Projects) at Yankwashi Fulani, Rauda

Gabas and Dumbule in Yankwashi Constituecy (Lot-17) Granitoid Engineering Serv Ltd Yankwashi 2,213,032.50 2,213,032.50 17/01/2020 8 weeks On-going

BAL. C/F 365,093,129.78 365,093,129.78

2f

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 37: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Water Resources

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 365,093,129.78 365,093,129.78

47

Constr. Of 1No. Solar Power Water Supply Scheme (2019

second Quarter Phase II Constituency Project) Lot-30 at

Fagoji in Dutse Contituency loyalty properties ltd Dutse 6,015,765.00 6,015,765.00 14/1/2020 8 Weeks On-going

48

Construction of 3No. Daily Prayer Mosque (2019 first

Quarter Constituency Projects) Lot-5 at dirimowa, kubuna

kulola and dikimba in birniwa Constituecy. Kafiyama Gen. Entp. Td Birniwa 5,884,566.00 5,884,566.00 14/1/2020 8 Weeks On-going

49

Constr. Of 1No. Solar Power Water Supply Scheme (2019

first Quarter Phase I Constituency Project) Lot-3 at

Shabarawa in Maigatari Contituency Limis brothers & co Maigatari 6,012,405.00 6,012,405.00 14/1/2020 8 Weeks On-going

50

Upgrading and conversion of 7 No. Motorised water supply

scheme to solar powered system at danbanki, nagwamitse,

albasu, maimazari, tsangarwa , farin dutse and kwarko in

gumel and birnin kudu zone Lot-1 (2019 capital project)

across the state SIMS Global Resource Ltd State 72,451,698.17 72,451,698.17 68,999,517.30 14/1/2020 8 Weeks 100 Completed

51

Constr. Of 50No Hand pump Boreholes at School of Nursing

Birnin Kudu, Mobile Base (744), Tinubu, Kargo Gidan

Jungodo, Rafin Dinya, Duzau Masallacin Juma'a, Kyambo

Fulani, Gidan Kaboji Leko Zakoki, Gandun sarki, Kauyen

Fulani, Sabon Gari Gidan S/Fawa, Kanawa, Jelawa,

F/Kungurguma, Dabaza, Naira, Jallawa, Kwadage, Yan Lada,

Balarabe, Kalali, Rugar Gwamna, Bulangu Makabarta,

Bulangu bakin Kasuwa, kadage, Kalali, Rugar Gwamna,

Sintali, Kadage, Kayarda Gari, Kayarda Fulani, Rugar Alh.

Mari, Unguwar Sani, Yantuba, Gobirawa Fulani, Gujungurin

FulNI, Burukum Fulani, Rugar gagarawa, Waje gari Muku and

Tudun Yola Across the State. SIMS Global Resource Ltd in the state 36,897,000.00 36,897,000.00 27,303,780.00 22/1/2020 20 weeks 74 On-going

BAL. C/F 492,354,563.95 492,354,563.95

2g

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 38: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 492,354,563.95 492,354,563.95

52

Constr of (4no.) Hand pump norehole water supply schemes (2019

second qtr. Constituency project) (Lot-5) at Maibarewa, Digawa

(Karnaya ward), K/Fulani and Kaduwawa in Dutse Farham Syny. Limited Dutse 2,947,896.00 2,947,896.00 2,210,922.00 14/1/2020 8 weeks 75 On-going

53

Upgrading and Conversion of Motorized water supply schemes to

Solar Powered water Supply Schemes in Eight (8No) Small towns of

babura, Garki and Kaugama Lga Sims Global Resources Ltd State 89,056,885.61 89,056,885.61 75,499,652.02 7/7/2020 6 Months 85 On-going

54

Rehabilitation of Eighteen Number (18No.) Small Towns at garki

LGA (Jaya, Rafin Marke, Tagwaye,Kukar mekiya, Garkin magarya

among others Sims Global Resources Ltd Garki 17,676,225.00 17,676,225.00 12,789,000.00 7/7/2020 12 Months 73 On-going

55

Upgrading and Conversion of 12no. Motorized Boreholes to Solar

Powered at Basirka ,… Sims Global Resource Ltd State 173,097,198.75 173,097,198.75 150,174,150.00 26/08/2020 20 weeks 87 On-going

56

Constr of (24no) Hand pumps water supply schemes (2018 phase

III constituency project) (Lot-8) at Nasarawa Mugin Invest. Limited Garki 17,703,000.00 17,703,000.00 16,965,375.00 28/2/2020 20 weeks 95 On-going

57

Water Collection Point at Korewa yamma and gwarga in birniwa

Constituency (2019 2nd Quarter (Lot-23) MU'azu Memorial Gen Merch Birniwa 2,521,958.00 2,521,958.00 2,521,957.99 8/7/2020 8 weeks 100 Completed

58

Constr. Of Hand Pumps Boreholes water supply scheme

Constituency Projects (2019 2nd Quarter) at Dirbe Fulani, Shafawa,

karkarna Gabas, kawaye, Darere and Karkarna Fulani in Yankwashi

Constituency(Lot-21) Granitoid Engineering Ltd Yankwashi 4,422,726.00 4,422,726.00 4,422,726.00 8/7/2020 8 weeks 100 Completed

59

Supply of Water Chemicals to Kazaure Water Treatment Plant

Across the State (Lot-17) Tade Business Resources State 40,392,000.00 40,392,000.00 21/07/2020 12 Weeks On-going

60

Procurement of 136,440 Ltrs of Ago Diesel for Gwiwa, Roni,

Yankwashi and Kazaure Lga Lot-10 Muhabib Nigeria Limited Kazaure 37,521,000.00 37,521,000.00 21/07/2020 12 Months On-going

61

Supply of water treatment chemicals to Birnin Kudu Water

Treatment Plant Across the State Lot-18 Tade Business Resources State 44,550,000.00 44,550,000.00 21/07/2020 12 Months On-going

62

Rehabilitation work at Kazaure Town water supply schemes

(Jekarade, Mohd Ayuba, Gezoji and Ganduli water Stations Sims Global Resources Ltd Kazaure 12,473,590.50 12,473,590.50 27/07/2020 8 weeks On-going

63

Water Collection Points at Kandahar, Lokon Sule wandu (Majema),

Mamman Wale Quarters, Gawon Dogari, Dubantu Kan Gada,

Nasarawa, Bayan Gidan Shinkafa (Nguru Road), Kofar Gari

matsaro, Opp Gidan Alh. Nasalla Gawuna, Atafi, K/Naganda and

Maje Nursery and Primary School in hadejia Constituency (2019

2nd Quarter) Lot-22 Alh. Umaru Babandoki Nig Ltd Hadejia 15,064,014.00 15,064,014.00 10/7/2020 8 weeks On-going

64

Contract for the supply of 600,000 liters of AGO Diesel to Rural

Electricity Board Generators MY Oil Nigeria Limited State 150,000,000.00 150,000,000.00 27/07/2020 12 Months On-going

65

Supply of Services Materials to Stowa Water Schemes Across the

State (Lot-16) Limis Brothers & Co State 56,751,816.00 56,751,816.00 21/07/2020 12 Months On-going

66

Supply of Service Materials to water Board Emirate Water Stations

Across the State Lot-14 Limis Brothers & Co State 21,611,040.00 21,611,040.00 21/07/2020 12 Months On-going

67

Supply of Water Chemicals to Kazaure Water Treatment Plant

Across the State (Lot-17) Tade Business Resources State 40,392,000.00 40,392,000.00 21/07/2020 12 Weeks On-going

BAL. C/F 1,218,535,913.81 1,218,535,913.81

2h

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 39: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Water Resources

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 1,218,535,913.81 1,218,535,913.81

68

Constr. Of Hand Pump Boreholes water supply scheme

constituency projects (2019 2nd Quarter) at Unguwar sa'idu,

Fulanin Madaci, Unguwar Shege, unguwar kale,Tafin Sale, Unguwar

gayya, Bata Kasha, Najeri, Galma, Kashin Ganji, Rafin Baka,

Barnawa Gari, Maigora kaya, Chakirawa, Zakoki, Katoro Fulani,

Adnus, Gagarwa Fulani, Fulanin Mai Daraja, Gayya ta Arewa,

Digawar Zogali, Gurum Yamma, Dulawa Tsohuwa, Fulanin

Mashema, (Baushe Yamma) Gorunan Tsohuwa, Fulanin Ufalata

Gabas, Dandagare Gari, Jaftawa, Fulanin Makera, Fulanin Shabaru,

Garke Arwe(Layin Amiru) Sabuwar Unguwa (Layin Dan Bayaro)

Kwarin Fulani, Fulanin Danbarwa, Yarkurshe, Chakurawa, Tumbi,

kafdodo, Kirya, Dan Baraje Gari and Ba'awa in Garki Constituency

Lot-6 MMA Integrated Concept Garki 30,991,275.00 30,991,275.00 14,757,750.00 8/7/2020 16 Weeks 48 On-going

69

Procurement of 319,200Ltrs of Ago Diesel for Sule Tankarkar ,

Maigatari, Gagarawa and Gumel LGA Lot-11 Nushe Business Resources Ltd State 87,780,000.00 87,780,000.00 21/07/2020 12 Months On-going

70

Supply of Service materials to 22 LGA Headquarters Across the

State Lot-15 Limis Brothers & Co State 17,171,484.00 17,171,484.00 21/07/2020 12 Months On-going

71

Rehabilitation of 18No Small Towns water supply schemes at Garki

LGA Sims Global Resource Ltd Garki 17,676,225.00 17,676,225.00 29/06/2020 16 Weeks On-going

72

Rehabilitation of 246no Hand pumps at babura and 146No at garki

LGA M.2 International Ltd Garki 18,548,618.75 18,548,618.75 21/08/20220 24 Weeks On-going

73

Constr. Of Hand Pump Boreholes water supply scheme

constituency project (2019 2nd Quarter) at garin Mati, Bulangu

Unguwa dan Aro, Auduga, Gatasaya, Kira babba Makabarta,

Getere, Suso, Shakato Makabarta, Zango Gari Bakin Kasuwa and

Garin Gami Chiromari in Bulangu constituency Lot-3 Nabakwai General Ent k/Hausa 7,379,400.00 7,379,400.00 7/7/2020 8 Weeks On-going

74

Procurement of 246,600 Ltrs of Ago Diesel for Dutse, Kiyawa,

Jahun and Miga LGA (Lot-6) Areas Safah and Fresh Intern Ltd Across the state 67,815,000.00 67,815,000.00 21/07/2020 12 Months On-going

75 Procurement of 480,000ltrs of Ago Diesel for Dutse Emirate (Lot-1) Safah and Fresh Intern Ltd Dutse 132,000,000.00 132,000,000.00 21/07/2020 12 Months On-going

76

Rehabilitation of 146No hand Pumps at Communuties in Garki LGA

Lot-2 M2 International Ltd Garki 6,202,093.75 6,202,093.75 1/9/2020 6 Weeks On-going

77

Constr. Of Hand Pump Boreholes water supply scheme

constituency projects (2019 2nd Quarter) at Gidan Baro, Rataba,

Gidan Mai Unguwa, Unguwar Gamji, Dan Makeri, ruwaji, Deetech Nig Ltd Babura 8,851,800.00 8,851,800.00 9/11/2020 8 weeks On-going

78

Constr. Of hand pump Boreholes water supply scheme

constituency project (2019 2nd Quarter) at Gawon Dogari, Abuja

Amare, Shabaru, Guducin, Dala, Gawuna Pri Sch, Gagulmari and

Mafichin sarki in Hadejia constituency (Lot-9) Alh Umaru Babandoki Ltd Hadejia 5,903,100.00 5,903,100.00 22/07/2020 8 weeks On-going

79

Constr. Of 7No. New Solar Powered water schemes at Gidan Maje,

Unguwar Shuri, Masko, gangarar Hauware, jan mutum, Waje and

kadi all in Babura Local Govt Area (Ringim Zone) Sims Global Resources Ltd Ringim 43,084,387.50 43,084,387.50 42,082,425.00 17/12/2020 8 Weeks 100 Completed

80

Constr. Of 2No. New Solar powered water schemes at Mudari and

Cirinbin Yamma All in Babura LGA ( Ringim Zone) Sims Global Resources Ltd Babura 12,309,825.00 12,309,825.00 17/12/2020 8 Weeks On-going

BAL. C/F 1,674,249,122.81 1,674,249,122.81

2i

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 40: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 1,674,249,122.81 1,674,249,122.81

81

Rehabilitation of 60No Solar powered water schemes across the

state at (Maje, balago, kwalele,shatari dun, kwanda, jama'ar isah

kwarin shudi, kwarin shida, and dan fusan, in kiyawa LGA), ( Kudai,

Gorin Zobiya and Yalwa in dutse LGA), ( Sankau, Gwiwa Gari,

Darina and Dabi in Gwiwa LGA), (Gora in roni LGA) (Model

Boarding in kazaure LGA) (Kajaimaran, Gaduwa, daba, abunabo,

Alanjo, Adiyani, Madamuwa, Gayin, Giryo, Musari and yalwan

musari in guri LGA) (Fizar garun Gabas, Dakido, Shayya, kampala,

Makwalla, Kadume, Kwari , Girdo and Garin Magaji in Malam

Madori LGA), ( Kiri Kasamma gari and Madachi in Kiri kasamma

LGA) , (Gatare and atauya in birniwa LGA), (Ayama and Kuka in

Auyo LGA), (Hirin and Jangangari Primary School in BKD LGA),

(Laya, Rungo, Nasarawa, Tsangarwa, Sabuwar Gwaram and

Girajeni in gwaram LGA), (Gubanbiya in Buji LGA), Katije, K/Hausa

and Bulangu in Kafin Hausa LGA), Girtigina in Kaugama LGA), (

Gunka in Jahun LGA) and (Taka Lafiya in Miga LGA) (Lot-3) Arrayan Ventures Global Serv Ltd Miga 58,595,670.00 58,595,670.00 54,507,600.00 17/12/2020 8 Weeks 100 Completed

82

Procurement of 3no 3.0HP Cri Submersible Pump with all Electrical

protection Drives and Rewinding of 3No 11KVA vertical Boosters

CNP-CR-32-64 at Brinin Kudu Pumps Stations Sims Global Resources Ltd B/kudu 5,564,737.50 5,564,737.50 31/12/2020 8 Weeks On-going

83

Overhauling of 350KVA 1no, 100KVA 1No. 60KVA 2no. Generating

Set and Rewinding 8No. Of Flight pumps station at Dutse Sims Global Resources Ltd Dutse 8,639,452.50 8,639,452.50 31/12/2020 8 Weeks On-going

84

Complete Overhauling of 150KVA 1No, 40KVA 1No. Generating set,

Supply and installation of 10HP 2No, 5.5hp3No., 3.0 Hp 1No and

1.5hp 1No.CRI Complete Original Submersible pumps at Gumel

Town Sims Global Resources Ltd Gumel 6,639,871.88 6,639,871.88 31/12/2020 8 Weeks On-going

85

Constr of 6no, Solar powered water supply schemes at Sabon arin

Awaisu, Zango, Jigawar tsaba, Malikawa, Karabe and Nawako in

Miga LGA Arrayan Ventures Global Ltd. Miga 38,775,948.77 38,775,948.77 18,035,325.00 5/11/2020 20 weeks 47 On-going

86

Construction of pipeline distribution network (28.6km) in

Kazaure Town Lot-1 CGC Nigeria Ltd Kazaure 529,952,482.00 529,952,482.00 242,146,838.85 23/12/2019 24 weeks 45 On-going

87

Upgrading and conversion of motorised water supply

schemes to solar powered at 6NO, small town

(Chamo,Gambasha,Yabaza,Giginya,Amaryawa and

Mamudawa) and construstion of 2NO, new solar powered

water supply scheme at Barandau and Jalomi arewa in

Dutse, Birnin kudu, Jahun,Kazaure and Ringim zones (Lot 1)

Sims global reources Nig Ltd Various 74,008,751.25 74,008,751.25 1/26/2021 4 month

88

Upgrading and conversion of 2NO, Motorised water supply

scheme to solar powered at Abunabo and Gagiya town in

Guri LGA,Hadejia zone (Lot 2)

Khanadi global links Ltd Guri + Hadejia 44,658,993.75 44,658,993.75 43,617,000.00 1/26/2021 3 month 100 Completed

TOTAL 2,441,085,030.46 2,441,085,030.46

2j

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 41: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Water Resources

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 2,441,085,030.46 2,441,085,030.46

89

Upgrading and conversion of motorised water supply

schemes to solar powered at Aujara town in Jahun

LGA,Jahun zone (Lot 3)

Khanadi global links Ltd Jahun 35,977,777.50 35,977,777.50 35,105,700.00 1/26/2021 12 weeks 100 Completed

90

Rehab. of 7no. Water supply shemes at Jigawar Arewa,

Isabura gabas, Kankaren wagawa, Kayarda, Wadar

kanawa, Garin baki and Hennadi Dansara Int. Services Ltd. Babura 8,580,757.50 8,580,757.50 7,982,100.00 17/12/2020 4 weeks 100 Completed

91

Rehab of 6no. Water supply schemes at Kurguni kanya

masallaci, Kanya yamma, Garin Ganau, Unguwar Shuri

and Babura K/fada Dansara Int. Services Ltd. Babura 10,273,882.50 10,273,882.50 9,557,100.00 17/12/2020 8 weeks 100 Completed

92

Upgrading and conversion of motorised water supply

schemes to solar powered at Buji Gari SIMS Global Ltd. Buji 32,169,375.00 32,169,375.00 31,416,000.00 5/1/2020 12 weeks 100 Completed

93

Constr of 1no. Solar powered water supply schemes

(2019 phase I constituency project) (Lot-25) at Keren in

Dutse JAG & H Ltd. Dutse 6,021,015.00 6,021,015.00 6,021,015.00 3/2/2021 8 weeks 100 Completed

94

Constr of 1no. Solar powered water supply schemes

(2019 phase II constituency project) (Lot-28) at

Kuzoyara Muazu Memorial Ltd. Birniwa 6,022,695.00 6,022,695.00 6,022,695.00 5/2/2020 8 weeks 100 Completed

95

Rehab of 6no. Water supply schemes at Ando, Yan-

maulu, Aduware, Garin Goto, Jamuo and Unguwar

Gunji Dansara Int. Services Ltd. Babura 9,466,826.25 9,466,826.25 8,806,350.00 17/12/2020 8 weeks 100 Completed

96

Rehab of 5no. Water supply schemes at Takwasa,

Magaji dau, Takwasa mai Gari, Unguwar Naino,

Lamintani, and Jarmai Jignaj Global Ltd. Babura 9,578,820.00 9,578,820.00 9,189,600.00 17/12/2020 8 weeks 100 Completed

97

Rehab of 7no. Water supply schemes at Babura Bakin

Tasha, Jigawar Dan-Ali, Bule, Dan kano, Giginya,

Marken biki and Carbin Malamai Jignaj Global Ltd. Babura 11,734,485.00 11,734,485.00 11,459,962.50 17/12/2020 8 weeks 100 Completed

TOTAL 2,570,910,664.21 2,570,910,664.21

2k

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 42: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Works and Transport

POST CONTRACT PROJECT EVALUATION

S/N. PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1 Consultancy services for the Constr. of Limawa-Warwade-Jidawa-Sakwaya-Dutse road KAP Civil Eng. Consultants Dutse 57,547,589.11 57,547,589.11 51,132,963.56 11/15/2012 16 months 94 Stalled

2 Constr. of Limawa-Warwade-Jidawa-Sakwaya-Dutse road (33.40km) Boroni Prono & Co. Ltd. Dutse 2,968,551,896.02 2,968,551,896.02 2,611,339,802.95 2/11/2012 14 months 88 Stalled

3

Consultancy Services for the Dualisation of Dutse Gadadin to Police H/qtr.

Dutse HAG Eng. Consultant Dutse 41,044,787.97 41,044,787.97 41,044,787.97 20/8/2013 12 months 100 Completed

4 Consultancy services for the constr. Of T/kance-jamus feeder road UKM Civil Eng. Consultant Babura 21,657,808.87 21,657,808.87 21,657,808.87 2/8/2014 8 Months 60 On-going

5

Commisioning as consultant on the supervision of the construction of 6No. New feeder road

projects across the state OPIQ Consultant Ringim 22,400,354.68 22,600,354.68 21,242,736.09 28/5/2014 8 months 95 On-going

6 Constr. of Township Roads at Maigatari Urban Centre (6.95KM) H&M Nig. LTD Maigatari 1,037,700,121.50 1,037,700,121.50 1,018,413,127.46 17/12/2013 8 Months 100 Completed

7 Constr. of Township Roads at Guri Urban Centre (6.15KM) SKY Tech.& Contr.LTD Guri 1,362,774,826.33 1,362,774,826.33 1,266,547,203.54 17/12/2013 8 Months 93 On-going

8

Commissioning as Consultant on the Supervision of the Constr. of Maigatari Township Road

(6.95KM) Sadiq Eng Ser. LTD Maigatari 64,472,315.43 64,472,315.43 64,466,010.47 19/12/2013 8 Months 100 Completed

9 Commissioning as Consultant on the Constr. Of Roni township roads (5.00KM) EMACS Eng. Consultants Roni 61,195,703.35 61,195,703.35 57,626,153.48 12/31/2013 8 Months 94 On-going

10 Commissioning as Consultant for the Constr. of Hadejia Township roads Global Ecological Hadejia 101,482,637.11 101,482,637.11 95,444,693.15 12/31/2013 16 months 100 Completed

11 Commissioning as Consultant for the Constr. of Guri Township roads Madapad Eng. Ltd. Guri 66,500,604.95 66,500,604.95 58,742,130.61 12/3/2013 12 months 88 On-going

12

Consultant for valuation of the State Govt.'s Investment in Electricity Distribution network

(PHCN) Emirate Consulting Ltd. State 125,000,000.00 125,000,000.00 62,500,000.00 19/6/2013 12 months 50 Stalled

13Electrification of Shakoto-Bulangu (REB) Aima Strong Store Ltd. K/hausa 36,199,059.19 36,199,059.19 29,923,001.66 2/19/2014 6 months 89 On-going

14

Supervision of the construction of JigawarDan-ali-Maitsamiya-Suletankarkar-

Dangwanki-Dankumbo to Matsatsagi (45KM) and construction of Kudai-Ruru-

Dantawuya-Sakwaya Feeder Road (15KM) UKM Civil Eng. S/tankarkar + Dutse 14,172,571.35 14,172,571.35 10,066,755.99 11/4/2017 12 months 71 On-going

15 Constr of Darai-Gilima road (9.5km) lot-2 Alren Const. Co. Ltd. Jahun/Taura 2,492,310,165.97 2,492,310,165.97 2,114,436,744.00 27/4/2018 8 months 84 On-going

16 Constr of Gambara-Waza-Baranda with Spur to yalwa (16.8km) lot-3 Alren Const. Co. Ltd. B/kudu 3,194,083,855.93 3,194,083,855.93 3,119,614,701.90 27/4/2018 10 months 96 On-going

17 Constr of Kaugama township road (6.3km) lot-7 Afdin Constr Co. Ltd. Kaugama 1,333,357,771.41 1,333,357,771.41 1,192,033,432.22 30/4/2018 12 months 89 On-going

18

Commissioning as Consultant for the Supervision of the Constr. of Road

Network at College of Education, Gumel (3.3km) EMACS Eng. Consultants Gumel 11,798,466.27 11,798,466.27 11,298,466.27 7/6/2018 6 months 96 On-going

19

Commission as Consultant for the Supervision of the Construction of Gambara-

Waza-Baranda with a Spur to Yalwa Wuro Associates Eng. Dutse 55,896,467.48 55,896,467.48 53,101,650.00 7/6/2018 10 months 95 On-going

Balance C/F 13,068,147,002.92 13,068,347,002.92

3a

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 43: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Works and Transport

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 13,068,147,002.92 13,068,347,002.92

20

Commission as Consultant for the Supervision of the Construction of Access

road from Harbo Sabuwa to Harbon Tsohuwa (1.52km) Powermatrix Eng Jahun 4,218,516.02 4,218,516.02 3,796,664.41 13/6/2018 4 months 90 On-going

21

Rehabilitation of the electrification project at Marke- yalo ITC line in Kaugama

LGA AG Global serv. Nig ltd Kaugama 40,151,533.53 40,151,533.53 38,424,075.54 6/12/2018 12 weeks 96 On-going

22 Construction of 744 - Sabuwar Takur - Yalwawa Road (8.10KM) Lot 7. Retercha Company Ltd Dutse 1,577,371,259.00 1,577,371,259.00 1,573,147,679.77 21/12/2018 10 months 100 Completed

23 Construction of Taura - Garki Road (26.68KM) Lot 2. Alren Constr. Comp. Ltd. Taura + Garki 2,925,979,072.38 2,925,979,072.38 2,650,909,720.05 21/12/2018 16 months 91 On-going

24 Electrification Project at Askandu in Kaugama L.G.A. Nabakwai Gen. Enterp. Kaugama 20,298,933.03 20,298,933.03 18,533,808.41 24/12/2018 12 weeks 90 On-going

25

Consultancy services for the Dualization of Fanisau road to Unity Pentagon

round about in Dutse (11.4km) A.G. & Partners Ltd. Dutse 83,028,671.25 83,028,671.25 44,446,452.75 14/7/2017 50 On-going

26

Commissioning as Consultant for the Supervision of the Constr of Kaugama

Township roads (6.3km) SIIS Eng. Consultants Ltd. Kaugama 23,333,761.00 23,333,761.00 16,333,107.69 1/11/2018 12 m,onths 69 On-going

27

Commissioning as consultant for the Supervision of the Construction of Chai Chai

Tsohuwa township Roads UGS Consultants Dutse 3,949,973.17 3,949,973.17 3,145,475.85 20/3/2019 6 weeks 80 On-going

28

Commissioning as Consultant for the supervision of the Construction of Kaugama -

Malam Madori Feeder Road (19.31km) SIIS Engineering Consult M/Madori 9,112,024.27 9,112,024.27 20/3/2019 6 weeks On-going

29 Supervision of Balago-Auno roads Apex Design Kiyawa + K/hausa 93,126,261.93 93,126,261.93 93,125,719.08 20/3/2019 24 months 100 Completed

30 2019 Rural Electrification Project at Kulawa in Ringim LGA (Lot-9) Ngloma Constr Nig Ltd Ringim 40,761,674.94 40,761,674.94 39,816,674.31 2/10/2019 14 weeks 98 On-going

31 2019 Rural Electrification Project at Kaigamari M/Awaso in K/Hausa LGA (Lot-7) Babandoki Gen Entp. K/Hausa 56,156,069.34 56,156,069.34 55,217,900.43 2/10/2019 14 weeks 98 On-going

32 2019 Rural Electrification Project atTurbus in Maigatari LGA (Lot-8) Babandoki Gen Entp. Maigatari 51,909,858.00 51,909,858.00 50,918,978.25 2/10/2019 14 weeks 98 On-going

33 2019 Rural Electrification Project at Daurawa in Taura LGA (Lot-11) Ngloma Constr Nig Ltd Taura 39,499,187.75 39,499,187.75 37,556,687.75 2/10/2019 14 weeks 98 On-going

34 2019 Rural Electrification Project at Batali in Babura LGA (Lot-14) Ngloma Constr Nig Ltd Babura 87,414,189.61 87,414,189.61 86,226,592.83 2/10/2019 14 weeks 98 On-going

35 2019 Rural Electrification Project at Duwigi in Gwiwa LGA (Lot-13) Babandoki Gen Entp. Gwiwa 45,418,689.70 45,418,689.70 2/10/2019 14 weeks On-going

36 2019 Rural Electrification Project at Walawa in Hadejia LGA (Lot-4) Ngloma Constr Nig Ltd Hadejia 52,780,791.53 52,780,791.53 51,776,621.92 2/10/2019 14 weeks 98 On-going

37

Constr of hadejia township roads (485m) road Network) Additional works) at

Azare road-Adua Mosque-New Motor Park (Road II) PAACHE Constr Ltd. Hadejia 312,270,011.92 312,270,011.92 2/10/2019 16 weeks On-going

38

Supply and Istallation of Stand Alone Solar powered streetlights at Government

Girls Arabic School Babura, Goverbment Girls Unity secondary School Gwaram

and Computer Girls Secondary School Roni Sims Global Resources Gwaram 60,780,300.00 60,780,300.00 4/11/2019 8 weeks On-going

Balance C/F 18,595,707,781.29 18,595,907,781.29

3b

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 44: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Works and Transport

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 18,595,707,781.29 18,595,907,781.29

39 Supply of Diesel for Dutse Streetlight Generators Lion & Tiger Business Co Dutse 4,919,240.00 4,919,240.00 2/6/2020 12 months On-going

40 Electrification project (Lot-3) at Unik Babba in Auyo LGA. Khanadi Global Auyo 80,656,221.59 80,656,221.59 73,211,224.05 2/10/2019 16 weeks 91 On-going

41 Constr. of Maigatari-Diginsa-Bursali-Birniwa road (44.7km) phase III Triacta Nig. Ltd. M/madori + Birniwa 6,441,263,494.47 6,441,263,494.47 3,749,163,623.73 1/1/2020 24 months 58 On-going

42 Constr. Of 33Kv Electric Power Lines from Gagarawa Sub-Station to gumel ITC line Ar-rayyan Ventures Nig Ltd Gumel 193,886,152.36 370,318,141.80 262,490,500.92 29/07/2020 4 months 71 On-going

43 Rehabilitation of failed Sections of Birnin Kudu -Kiyawa Road (2.8km) Alren Constr. Co Ltd B/Kudu 182,421,217.94 182,421,217.94 177,627,154.16 19/08/2020 16Weeks 100 Completed

44

Consultancy services for the supervision of Maigatari-Galadi-Girbobo-Diginsa-

Birniwa road project (phase III) (44.7km) Himma Tech. Services Birniwa 101,449,900.00 101,449,900.00 35,507,464.99 1/1/2020 14 months 35 On-going

45 Constr. Of Ringim township roads Phase II (4.4km) (Lot-3) Triacta Nig Ltd Ringim 959,096,941.46 959,096,941.46 21/10/2020 3 Month On-going

46

Constr. Of A Section of Abunabo-ChapChap No-Lafiyari-Kadira-Guri Eastern

Byepass Phase Iii Road (2.4Km) (Lot 2) Triacta Nig Ltd K/kasamma 599,061,092.44 599,061,092.44 21/10/2020 10 Months On-going

47 Rehabilitation of Gwaram - Basirka Road (63km) (Lot-1) Alren Constr Co Ltd Gwaram 5,061,882,580.65 5,061,882,580.65 1,041,439,563.67 21/10/2020 16 Months 20 On-going

48

Supply and Installation of Integrated Stand Alone Solar powerede Street Light

(230 Unit) at Babura Town Arrayyan Ventures Nig Ltd Babura 138,328,312.50 138,328,312.50 134,934,041.32 21/10/2020 3 Month 100 Completed

49 Consultancy services for the supervision of Taura-Garki road project (26.68km) Himma Tech. Services Taura/garki 51,197,948.77 51,197,948.77 46,078,153.89 20/3/2019 24 weeks 90 On-going

50

Supply and Installation of Integrated stand alone solar powered street light (150

Unit) at Hadejia Sims Global Res Ltd Hadejia 90,243,562.50 90,243,562.50 85,323,000.00 21/10/2020 3 Months 100 Completed

51 Rehabilitation of High Tension Line from Gidan Lage to Ringim Town Marb Engineering & Multi Ringim 16,551,061.63 16,551,061.63 15,567,517.31 25/11/2020 3 Months 100 Completed

52

Consultant for the supervision, assessment and Certificate of works for the

construction of 33kv electrical line from gagarawa transmission substation to

gumel Pullad Global Consult Ltd Gumel 6,480,567.48 6,480,567.48 9/11/2020 3 Months On-going

53 Rehabilitation of section of Girimbo-sara-Gantsa road affected by flood H&M Nigeria Ltd Buji 181,494,760.13 181,494,760.13 4/11/2020 12 Weeks On-going

54

Consultancy for the Supervision of the supply and installation of integrated

Standalone Solar powered Street Light at Chai-Cahai (65) Units and Zandam

Nagogo (75) Units Lines and Dimension Nig Ltd Dutse+Gwaram 1,465,681.87 1,465,681.87 17/12/2020 16 weeks On-going

55

Commissioning as Consultant for the Supervision of the Supply and Installation of

Integrated Standalone Solar powered streetlight at Hadejia (150) Units and

Babura (230) Units Pullad Global consult Ltd Babura 4,000,007.87 4,000,007.87 17/12/2020 16 weeks On-going

56

Commissioning as consultants for the supervision of the construction of banquet

hall at Govt House Dutse, Jigawa State Xmatric 369 limited Dutse 3,886,405.16 3,886,405.16 30/12/2020 6 Months On-going

Balance C/F 32,713,992,930.11 32,890,624,919.55

3c

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 45: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Works and Transport

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 32,713,992,930.11 32,890,624,919.55

57

Constr. Of 33KV Inter Town Connection (ITC) from Gagarawa Sub-Station

to Gujungu Town Arrayyan venture Global Ltd Gujungu 35,959,298.80 35,959,298.80 1/3/2021 12 Weeks On-going

58

Commissioning as consultant for the supervision of the construction of

Ringim Township Road (4.4km) Himma Tech Serv & Co Ltd Ringim 16,784,194.48 16,784,194.48 1/2/2021 6 Months On-going

59

Commissioning as Consultant for the supervision of the rehabilitation of

Sara- Gantsa Road SIIS Engineering Consult Buji 3,176,149.69 3,176,149.69 1/2/2021 6 Months On-going

60

Commissioning as consultant for the supervision of the Construction of

Sections of Abunabo-ChapChapNo-Lafiyari-Kadira-Guri Road (Eastern bye-

pas phase III Road) (2.4km) Curves & Straight Design Ltd Guri 10,483,569.12 10,483,569.12 1/2/2021 16 Months On-going

61

Commissioning as consultant for the supervision of the rehabilitation of

gwaram-Basirka Road (63km) Apex Design & Associates Gwaram 88,582,945.16 88,582,945.16 25,956,410.23 1/2/2021 22 Months 28 On-going

62

Consultancy Services for 744 housing estate to Sabuwar takur township

road Curves & Straight Design Ltd Dutse 27,603,997.03 27,603,997.03 27,603,997.03 15/4/2019 10 months 100 Completed

TOTAL 32,896,583,084.39 33,073,215,073.83

3d

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 46: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1

Constr of 1no. Block of 2-classroom Islamiyya each at Gabari, Fagoji, and

Dugus in Dutse Constituency (Lot-10B) AGM & Sons Dutse 11,452,590.06 11,452,590.06 10,705,538.21 25/01/21 12 weeks 100 Completed

2

Constr of 2no. Technical college fences at GSTC B/Kudu and GSTC

Karkarna Ngaloma Construction Ltd State 89,747,528.80 89,747,528.80 87,654,028.10 2/11/2020 16 weeks 100 Completed

3

Renov of 2no. Nomadic primary schools at Horiya in K/Hausa and

Dankoshe in Buji LGA. AKAM Nig Ltd. State 4,156,615.78 4,156,615.78 3,813,828.63 3/2/2021 8 weeks 100 Completed

4

Constr. of 1No. Block of Sabbatical Lodge, 5No Principal Officers Quarters 3No Blocks 240

Capacity Students Hostels and Construction of Road Network Culvert and Drainages at Jigawa

State University Kafin Hausa (Phase III) Datum Const. Nig. LTD K/Hausa 2,574,587,179.00 2,782,409,740.68 873,397,813.68 28/11/2013 6 Months 34 On-going

5 Construction of Senate Building at Jigawa State University, K/hausa A.G Ferrero K/Hausa 1,698,949,299.60 1,961,397,871.17 1,759,415,903.28 24/7/2014 10 months 90 On-going

6

Renovation of A Block at Jigawa State Scholarship Board Headquarters,

Dutse

Panjatan 05 General Entr

Ltd Dutse 4,941,196.04 4,941,196.04 17/03/2021 4 weeks

On-going

7

Commissioning as Consultant for the Designing and Supervision of (phase II) for the constr.of

Jigawa State University, K/Hausa Design Plus + K/Hausa 158,703,031.78 158,703,031.78 117,453,599.98 12/18/2014 18months 74 On-going

8

Procurement of 1000no. College Tablets, CAMP 1000 students for the period of (5) weeks E-

learning Programme Activities Echo Infotech Solutions H/qtrs. 34,311,150.00 34,311,150.00 28,508,507.50 12/3/2015 2 months 83 Stalled

9

Constr of Block of 2no. Classroom Islamiyya and Constr of 1no. Block of 3-

classroom and 2no. Block of classroom with office (SUBEB Type) 3rd phase

2017 Constituency project (Lot-9) at K/Arewa, Izala Islamiyya and Makarantar

Malam Daura in Ringim Local Govt. Nushe Business Resources Ringim 9,819,350.10 9,819,350.10 5/7/2018 10 weeks On-going

10

Constr of Drainage at Kuburu-Mabuga (Anku) Titin Yahai Qtrs (907m) Hadejia town,

1st Qtrs. 2018 Constituency project Tasi'u Mohammed Hadejia 28,264,601.73 28,264,601.73 17/8/2018 3 months On-going

11

Installation of TDN Line, Substation and 40KVA Gen. at GS&TC Ringim (1st phase

2018 projects) (Lot-30) Yusma Tech Invest. Ringim 11,119,230.57 11,119,230.57 6,006,971.25 12/7/2018 6 months 55 On-going

12

Installation of TDN Line, Substation and 20KVA Gen. at GS&TC B/kudu and

Installation of TDN line at SSS K/Babba (Lot-31) Math Global Concept B/Kudu + Babura 12,717,747.66 12,717,747.66 8,916,752.51 16/7/2018 6 months 67 On-going

13

Feeding of 597 Boarding School students at MBPS/JSS Kazaure & 35 students at Intel

Disability Kazaure in Kazaure LGA (2019 MOEST Capital Projects) Lot-40. Umar Aliyu & Sons Kazaure 23,888,538.40 23,888,538.40 23/12/2020 40 weeks On-going

14

Construction of Block of 2-Classroom Islamiyya (1NO.) Lot-20 at Dunnaka in

Miga Constituency. Amia Integ. Service Nig Ltd. Miga 3,115,779.08 3,115,779.08 1/11/2018 4 Weeks On-going

15

Construction of Block of 2-Classroom Islamiyya (2NO.) Lot-2 at Rakumin Rafa

Constituency. Bulangu Drilling Services 6,968,430.00 6,968,430.00 1/11/2018 10 Weeks On-going

16

Procurement of Workshop materials and consumables items in 4no. Technical

colleges in the state (Lot-4) Allah Abin dogaro Ent Ltd State 5,000,000.00 5,000,000.00 5,000,000.00 3/11/2020 8 Weeks 100 Completed

17

Construction of Block of 2-Classroom Islamiyya (1NO.) 2nd Phaes 2017

Constituency Projects (Lot-16) at Government Arabic Secondry School (G.A.S.S.)

in Sule Tankarkar Constituency. Kairussabah Nig. Ltd. S/tankarkar 3,224,219.90 3,224,219.90 3,078,219.90 1/11/2018 3 Weeks 100 Completed

BAL. C/F 4,680,966,488.50 5,151,237,621.75

4a

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 47: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 4,680,966,488.50 5,151,237,621.75

18

Construction of (1N0.) Blocks of 2-classroom Islamiyya school SUBEB typed

2018 phase II constituency projects (Lot -7) atDanmakeri in Ringim

constituency. Mai-Mai Blocks ind. Nig. Ltd Ringim 4,940,040.00 4,940,040.00 1/11/2018 6 weeks On-going

19

Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed 2018

Phase II Constituency Projects (Lot-2) at Majingini and Babban Kambari in

Gumel Constituency. Jag & H Intgrated Services Ltd. Gumel 6,230,703.46 6,230,703.46 6,020,716.06 5/12/2018 8 weeks 100 Completed

20

Construction of (1 No.) Blocks of 3-Classroom, 1-Block of 6-Seater VIP Pit

Latrine and Hand Pump at Govt. Day Arabic Secondary School Birniwa (Lot-1). MWT Real Estate & Gen. Mer. Birniwa 12,639,228.22 12,639,228.22 28/12/2018 3 months On-going

21

Construction of 1-Blocks of 6-Classroom (1st & 2nd Quarter 2018 UBEC/SUBEB

Intervention Project) Lot-5 G/Sarki and Construction of 2-Classrooms with

Office, Staff Room, Meeting Room and Toilet at Ruhogo in Hadejia L.G.A. Step by Step Intergrated Serv Hadejia 31,639,463.50 31,639,463.50 18/11/2018 16 weeks On-going

22

Construction of Blocks of 2-Classroom Islamiyya Typed (2No.) Lot-6 at Tashena

and Kargon Gabas in Malam madori Constituency. Express Innovation Concept M/madori 6,208,148.10 6,208,148.10 5,998,152.30 27/12/2018 6 weeks 100 Completed

23

Construction of (1No.) Blocks of Teachers Lodge 2018 Phase III Constituency

Projects (Lot-25) at Kanya Babba in Kanya Constituency. Deetech Nig. Ltd. Babura 12,701,001.00 12,701,001.00 18/12/2018 12 weeks On-going

24

Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed 2018

Phase III Constituency Projects (Lot-24) at Garun Gabas in Malam madori

Constituency. Nabakwai Gen. Enterprises M/madori 3,115,351.08 3,115,351.08 3,010,355.93 18/12/2018 8 weeks 100 Completed

25

Constr of (10no.) block of 2-classroom Islamiyya School typed 2018 phase III

constituency projects (Lot-3) at Gida Dubu, Kargo Yamma, Kudai Yamma, Zobiya,

Tofa, Galadimawa, Katangare, Irwa, Gandun Mazare and Baranda in Dutse

Constituency. Mugin Investment Nig. Ltd. Dutse 31,136,790.83 31,136,790.83 27,095,121.74 24/12/2018 15 weeks 88 On-going

26

Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-7 at Jauga, Jankawa Yola, Karwai, Wailari and Budai in

Ringim Constituency Marb eng. & Multi service Nig Ltd Ringim 15,576,585.00 15,576,585.00 27/11/2019 8 weeks On-going

27 Procurement and Distribution of Instructional Materials Basic Levels across the State. Ngaloma Constr. Co. Across the state 62,319,731.25 62,319,731.25 28/12/2018 12 weeks On-going

28

Constr of 1no. Block of 2-classroom islamiyya school each Lot-9 (first qtr. Phase II

2019 constituency project) at Ung. Kalgo, Kuda Walawa and Bade Fulani in

Yankwashi Constituency. Granitoids Eng Serv. Ltd. Yankwashi 9,339,771.12 9,339,771.12 11/12/2019 12 weeks On-going

29

Feeding of 1,407 Boarding School students at GGASS Babura in Babura LGA (2019

MOEST Capital Projects) Lot-1. JALGO Integ. Services Ltd. Babura 53,186,214.40 53,186,214.40 23/12/2019 40 weeks On-going

30

Constr of 1no. Block of 3-classrooms each at GDSS Babura, GDSS Galagamma Gumel,

GDSS babura and GDSS Ringim Areawa (2019 Capital projects) Babandoki Gen Entp. Ringim 44,808,022.00 44,808,022.00 3/10/2019 12 weeks On-going

31

Constr of 1no. Block of 3-classrooms each at GDSS Dan Masara, GDSS Jahun, GDSS

Shagari Qtrs Hadejia and GDSS M/madori (2019 Capital projects) Math Global Invest. M/madori 44,808,022.00 44,808,022.00 3/10/2019 12 weeks On-going

32

Renovation of Staff Quarters at College of Education Gumel, Lot-7 (3rd & 4rd Quarter

2019 Capital projects) Babandoki General Entr Gumel 233,513,402.67 233,513,402.67 233,513,402.59 27/11/2019 12 weeks 100 Completed

33

Construction of classrooms Blocks at Jigawa College of Remedial and Advance

Studies(JICORAS) Babura, Lot-4 (3rd & 4rd Quarter 2019 Capital Projects) Babandoki General Entr Babura 120,213,423.86 120,213,423.86 97,990,805.44 27/11/2019 24 weeks 82 On-going

BAL. C/F 5,373,342,386.99 5,843,613,520.24

4b

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 48: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 5,373,342,386.99 5,843,613,520.24

34

Renovation of 13No Students Hostels at College of education Gumel, Lot-8 (3rd &b

4rd Quarter 2019 Capital Projects) Babandoki General Entr Gumel 148,840,065.71 148,840,065.71 148,840,065.71 27/11/2019 12 weeks 100 Completed

35

Construction of Hostel Block at Jigawa College of remedial and Advance Studies

(JICORAS) Lot-5 (3rd & 4th Quarter 2019 Capital Projects) Ngaloma Constr Co Ltd K/Hausa 100,763,064.17 100,763,064.17 67,900,433.04 27/11/2019 24 weeks 67 On-going

36

Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019

First Quarter) Lot-9 at Askawa, Kulawa Babare, Achau Boro, Lugga Dashi, Tokai

Arewa, Ung. M. Nagoggo, Damutawa, Gabashi, Rinde fulani, Bakin Kasuwa, Ung. Isah

Yar Jigawa, Gwamfai Sabon Gari, Tsangaya, Kulluru Yammaci, Alikau, Sukullufi, Gidan

Atiku, Makera, Gwamfai, Achau Auyakayi and Likindin Gabashi in Jahun Contituency. Danfatu & sons Nig Ltd Jahun 14,755,650.00 14,755,650.00 11/12/2019 8 weeks On-going

37

Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first quarter phase 2

Constituency projects) Lot-13 at Kiri Hawandu, Katarika and Kawari/Gujungu in Taura

Constituency Nushe Bus, Resources Nig Ltd Taura 11,719,771.12 11,719,771.12 27/11/2019 12 weeks On-going

38

Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand Pumps at GDSS

Ringim Arewa, K/Babba, Gujungu, Sakwayya and G/Kuka (2019 Last Quarters MOEST

Capital project Across the state (Lot-1ABCD&E) Ngaloma Constr Nig Ltd Ringim 103,609,125.68 103,609,125.68 103,572,215.93 23/12/2019 12 weeks 100 Completed

39

Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand Pumps at GDSS

Bosuwa, Taura, and Gumel (2019 Last Quarters MOEST Capital project Across the

state (Lot-3AB&C) Babandoki Gen. Enterp Nig Ltd Gumel 104,213,888.67 104,213,888.67 104,183,245.98 23/12/2019 12 weeks 100 Completed

40

Constr of Classes, Laboratories at GDSS Kafin Hausa, Kadira, Shagari, Dakido, Kanti,

Roni, Danmasara, Kudai, Birnin Kudu, Malamadori and Kiyawa (2019 Last Quarters

MOEST Capital project Across the state (Lot-5ABC&D) Sabon Garin yaya Nig Ltd State 106,186,110.20 106,186,110.20 106,124,708.44 27/12/2019 12 weeks 100 Completed

41

Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand Pumps at GDSS

Galadi, GDSS Marabusawa, GDSS Dakido (2019 Last Quarters MOEST Capital project

Across the state (Lot-4AB&C) Math Global Invt. Nig Ltd Across the state 104,338,846.77 104,338,846.77 104,324,267.72 27/12/2019 12 weeks 100 Completed

42

Constr of Toilets, Admin Blocks, Laboratories and Wall Fence, 7no. JSQ Eamination

Hall and additional course of Blocks Hand pumps at GDSS Kazaure, Dutse Capital,

Bamaina Academy, Dutse Model and GDSS Jabo (2019 Last Quarters MOEST Capital

project Across the state (Lot-6 ABCDE&F) Pullad Global Consultant Nig Ltd Across the state 109,273,620.31 109,273,620.31 97,664,572.51 27/12/2019 12 weeks 100 Completed

43

Feeding of 2309 Boarding school Students at GGSS Garki in Garki local Govt (2019

MOEST Capital projects) Lot-7 MMZ Garki Gen Constructors Garki 87,276,300.00 87,276,300.00 23/12/2019 40 weeks On-going

44

Feeding of 1,003 Boarding school students at GGSSS Taura in Taura LGA (2019

MOEST Capital projects) Lot-26 Dankwara Maijimina Gen. Entp. Across the state 37,911,714.80 37,911,714.80 23/12/2019 40 weeks On-going

45

Feeding of 433 Boarding school students at GJSSS Guri in Guri LGA (2019 MOEST

Capital projects) Lot-28 Baradugum Gen. Entp. Guri 16,366,540.00 16,366,540.00 23/12/2019 40 weeks On-going

46

Feeding of 970 Boarding school students at GGSS S/tankarkar in S/tankarkar LGA

(2019 MOEST Capital projects) Lot-24 Hassan Habu T. Gen. Entp. S/tankarkar 39,182,001.60 39,182,001.60 23/12/2019 40 weeks On-going

47

Feeding of 790 Boarding school students at GSTC Hadejia in Hadejia LGA (2019

MOEST Capital projects) Lot-12 A.H.M. Global Ventures Hadejia 29,860,672.80 29,860,672.80 23/12/2019 40 weeks On-going

BAL. C/F 6,387,639,758.82 6,857,910,892.07

4c

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 49: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 6,387,639,758.82 6,857,910,892.07

48

Constr of Wall fence at Jigawa College of Remedial and Advance Studies (JICORAS)

Babura, Lot-2 (3rd & 4th Qtr. 2019 Capital Projects) Ngaloma Constr. Co. Ltd. Babura 131,969,392.51 131,969,392.51 112,939,334.06 27/11/2019 24 weeks 85 On-going

49

Constr of Admin Block at Jigawa College of Remedial and Advance Studies (JICORAS)

Babura, Lot-1 (3rd & 4th Qtr. 2019 Capital Projects) Ngaloma Constr. Co. Ltd. Babura 83,365,963.69 83,365,963.69 57,579,521.65 27/11/2019 24 weeks 69 On-going

50

Procurement of Science Laboratory equipment for distribution to 9no Science Centre

of Excellence Core-2 Quest Ventures Ltd. Across the state 81,037,103.92 81,037,103.92 24/12/2019 3 weeks On-going

51

Feeding of 1031 Boarding school students at GGASS Danzomo in Sule tankarkar Local

Government Area (2019 MOEST Capital project) Lot-25 Salisu & Isah Gen. Entp. Danzomo 38,969,984.00 38,969,984.00 23/12/2019 40 weeks On-going

52

Feeding of 1,762 Boarding school students at GUSS Maigatari in Maigatari Local

Government Area (2019 MOEST Capital project) Lot-20 Shabarawa Gen. Enterpr Babura 66,600,638.40 66,600,638.40 23/12/2019 40 weeks On-going

53

Feeding of 426 Boarding school students at Science secondary school kanya Babba in

Babura Local Government Area (2019 MOEST Capital project) Lot-41. H.A.U. Gen. enterp. Babura 16,102,084.40 16,102,084.40 23/12/2019 40 weeks On-going

54

Feeding of 635 Boarding school students at MBPS/JSS Ringim in Ringim Local

Government Area (2019 MOEST Capital project) Lot-35 H.A.U. Gen. enterp. Ringim 23,875,921.20 23,875,921.20 23/12/2019 40 weeks On-going

55

Feeding of 3378 Boarding school students at GUSS Ringim in Ringim Local

Government Area (2019 MOEST Capital project) Lot-21. H.A.U. Gen. enterp. Ringim 127,667,604.80 127,667,604.80 23/12/2019 40 weeks On-going

56

Feeding of 761 Boarding school students at SSS Lautai in Gumel Local Government

Area (2019 MOEST Capital project) Lot-8. Bakar Kasa Gen. Enter. Gumel 28,764,521.60 28,764,521.60 23/12/2019 40 weeks On-going

57

Feeding of 1,030 Boarding school students at SAIS Hadejia Local Government Area

(2019 MOEST Capital project) Lot-13 MS Amar & son enterp Hadejia 38,932,269.60 38,932,269.60 23/12/2019 40 weeks On-going

58

Feeding of 753 Boarding school students at GGCSS Roni in Roni Local Government

Area (2019 MOEST Capital project) Lot-23 Talba Gen. Enterp Roni 28,462,134.80 28,462,134.80 23/12/2019 40 weeks On-going

59

Feeding of 1319 Boarding school students at GUSS Roni and 170 tsangaya school

students at Gwiwa in Roni and Gwiwa Local Government Area (2019 MOEST Capital

projects) Lot-22 Adon Sale Bandu Across the state 57,699,603.60 57,699,603.60 23/12/2019 40 weeks On-going

60

Feeding of 1572 Boarding school students at GUSS Fantai and 279 students at school

for deaf in hadejia Local Government Area (2019 MOEST Capital project) Lot-11 Alh. Muhammad Kwalli Gen. Hadejia 69,924,690.40 69,924,690.40 23/12/2019 40 weeks On-going

61

Feeding of 1703 Boarding school students at GUSS Malammadori in Malammadori

Local Government Area (2019 MOEST Capital project) Lot-37 AG Isyaku Gen Ent M/madori 64,366,351.60 64,366,351.60 23/12/2019 40 weeks On-going

62

Feeding of 445 Boarding school students at GSTC Karkarna in Yankwashi Local

Government Area (2019 MOEST Capital project) Lot-27 Malabai Gen Ent Yankwashi 16,820,252.40 16,820,252.40 23/12/2019 40 weeks On-going

63

Feeding of 580 Boarding school students at GJSSS Karkarna in Yankwashi Local

Government Area (2019 MOEST Capital project) Lot-29 Malabai Gen Ent Yankwashi 21,923,025.60 21,923,025.60 23/12/2019 40 weeks On-going

64

Feeding of 635 Boarding school students at MBP/JSS Gumel and 60 Tsangaya school

students at Mai Aduwa in Gumel Local Government Area (2019 MOEST Capital

project) Lot-32 Wangara Agent Gen Ent. Gumel 26,406,169.60 26,406,169.60 23/12/2019 40 weeks On-going

BAL. C/F 7,310,527,470.94 7,780,798,604.19

4d

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 50: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 7,310,527,470.94 7,780,798,604.19

65

Feeding of 453 Boarding school students at GSTC Ringim in Ringim Local Government

Area (2019 MOEST Capital project) Lot-36 Maidala Gen. Ent. Ringim 17,122,640.00 17,122,640.00 23/12/2019 40 weeks On-going

66

Feeding of 2,254 Boarding school students at GGUSS Gwaram in Gwaram Local

Government Area (2019 MOEST Capital project) Lot-9 Gobirawa kwari Gen. Ent. Gwaram 84,333,796.80 84,333,796.80 23/12/2019 40 weeks On-going

67

Feeding of 1231 Boarding school students at GGASS birniwa in birniwa Local

Government Area (2019 MOEST Capital project) Lot-4 A.I. Maiso Gen. Ent. Birniwa 46,529,720.00 46,529,720.00 23/12/2019 40 weeks On-going

68

Feeding of 728 Boarding school students at GGJSSS Miga in Miga Local Government

Area (2019 MOEST Capital project) Lot-31 Yusif Garba Miga Gen. Ent. Miga 27,511,020.00 27,511,020.00 23/12/2019 40 weeks On-going

69

Feeding of 1,380 Boarding School students at GUSS Malam Madori LG (MOEST

Capital Projects)LOT-19 SawIra gen enterprises M/madori 52,161,681.60 52,161,681.60 23/12/2019 40 weeks On-going

70

Feeding of 1,122 Boarding School students at GSS Aujara in Jahun LG (MOEST Capital

Projects)LOT-15

Adamu Ibrahim Aujara Gen.

Entp. Jahun 42,687,419.20 42,687,419.20 23/12/2019 40 weeks On-going

71

Feeding of 621 Boarding School students at SAIS Fatara in Dutse LG (MOEST Capital

Projects)LOT-6 Baita Daushanga Gen. Entp. Dutse 23,394,510.80 23,394,510.80 23/12/2019 40 weeks On-going

72

Feeding of 1,233 Boarding School students at MBPS/JSS KILA Gwaram LG (MOEST

Capital Projects)LOT-42 Baita Daushanga Gen. Entp. Gwaram 46,605,328.40 46,605,328.40 23/12/2019 40 weeks On-going

73

Feeding of 882 Boarding School students at GUSS Basirka Gwaram LG (MOEST

Capital Projects)LOT-10 Baita Daushanga Gen. Entp. Gwaram 33,333,159.20 33,333,159.20 23/12/2019 40 weeks On-going

74

Feeding of 554 Boarding School students at MBP/JSS Guri, 58 Tsangaya School

students at Tarabu and 60 Tsangaya School students at Birniwa in Guri and Birniwa

LG (2019 MOEST Capital Projects)LOT-34 GMA Kadira gen. enterprises Guri+Birniwa 25,893,694.00 25,893,694.00 23/12/2019 40 weeks On-going

75

Feeding of 940 Boarding School students at science secondary school (SSS) Kafin

Hausa in Kafin Hausa LG (MOEST Capital Projects)LOT-16 Zango Gen. enterprises K/Hausa 35,530,420.80 35,530,420.80 23/12/2019 40 weeks On-going

76

Feeding of 467 Boarding School students at GSTC Birnin kudu in Birnin kudu LG

(MOEST Capital Projects)LOT-3 Baita Daushanga Gen. Entp. B/kudu 17,651,815.60 17,651,815.60 23/12/2019 40 weeks On-going

77

Feeding of 1,077 Boarding School students at GGASS Kaugama in Kaugama LG

(MOEST Capital Projects)LOT-17 Danbiri Global Ventures Kaugama 40,709,000.80 40,709,000.80 23/12/2019 40 weeks On-going

78

Feeding of 639 Boarding School students at MBPS/JSS Bulangu in Kafin Hausa LG

(MOEST Capital Projects)LOT-33

Hussaini Ahmed bookshop Gen

Entp. K/Hausa 24,027,126.40 24,027,126.40 23/12/2019 40 weeks On-going

79

Feeding of 920 Boarding School students at GGUSS Kazaure in Kazure LG (MOEST

Capital Projects)LOT-18 Haru jika Gen. Entp. Kazaure 34,767,096.00 34,767,096.00 23/12/2019 40 weeks On-going

80

Feeding of 2309 Boarding School students at GGSS Garki in Garki LGA (MOEST

Capital Projects)LOT-7 MMZ Garki Gen Const Garki 87,276,300.00 87,276,300.00 23/12/2019 40 weeks On-going

81

Feeding of 674 Boarding School students at MBPS/JSS Kudai in Dutse LGA (MOEST

Capital Projects)LOT-43 Sabuwar Kuka Gen Enterp Dutse 25,476,067.60 25,476,067.60 23/12/2019 40 weeks On-going

82

Feeding of 788 Boarding School students at GJSSS Aujara in Jahun LGA (2019 MOEST

Capital Projects)LOT-30 Na'ima and Fati Gen. Entp. Jahun 29,785,076.00 29,785,076.00 23/12/2019 40 weeks On-going

83

Constr. Of Gate House and Toilet at Jigawa Colege od Remedial and advance Studies

(JICORAS) Babura, Lot- 3 (3rd and 4th Quarter 2019 Capital Project) Al-sabur Global Nig. Ltd Babura 39,190,677.39 39,190,677.39 19,482,704.06 27/11/2019 24 Weeks 50 On-going

BAL. C/F 8,044,514,021.53 8,514,785,154.78

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 51: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

4e

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 8,044,514,021.53 8,514,785,154.78

84

Constr. Of 1No. Block of 2-Laboratories at GGDSS Roni (2nd Quarter 2019

Constituency Project) Lot-1 Manhaf Global Constr Nig Ltd Roni 33,552,607.41 33,552,607.41 24/12/2019 12 weeks On-going

85

Construction of additional block of 3 classrooms each at kondiko, GGASS Binin kudu,

GDSS kwarko, GDSS kiyako, GDSS sabon gari takanebu and GDSS galamawa across

the state Babandoki Gen. Enterp Nig Ltd Across the state 67,198,406.92 67,198,406.92 24/12/2019 12 weeks On-going

86

Feeding of 287 Boarding School students at bamaina academy in birnin kudu LGA

(2019 MOEST Capital Projects)LOT-39 Kabiru na Malam Nig Ltd B/kudu 40,204,006.00 40,204,006.00 23/12/2019 40 weeks On-going

87

Supervision of the construction works at jigawa college of remedials and advance

studies (JICORAS) babura, Lot-6 (3rd and 4th quarters 2019 capital projects) Apex Design & Associates Babura 23,537,374.82 23,537,374.82 13,886,995.39 27/11/2019 24 Weeks 59 On-going

88

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter Phase II

Constituency Projects) Lot-2 at rukumi in malam madori Constituency. Mai Mai Blocks Ind. Nig. Ltd M/madori 3,473,316.00 3,473,316.00 11/12/2019 8 weeks On-going

89

Constr of 1no. Block of 3-classroom and a toilet at GDSS Chakwaaikwaiwa

and Toilet block at GDSS Kila (Lot-12) Math Global State 15,400,000.00 15,400,000.00 14,248,359.63 3/11/2020 12 weeks 100 Completed

90

Consultancy services for the renovation works at college of Education

Gumel

Curves and Straight Design

Ltd. State 4,601,870.90 4,601,870.90 4,348,768.01 4/12/2020 12 weeks 100 Completed

91

Feeding of 209 Boarding school students at Tsangaya school gantsa in bujiLocal

Government Area (2019 MOEST Capital project) Lot-38 Zai General Ent. Buji 8,762,692.80 8,762,692.80 23/12/2019 40 weeks On-going

92

Feeding of 2,416 Boarding school students at GUCSS Dutse in Dutse Local

Government Area (2019 MOEST Capital project) Lot-35 Zai General Ent. Dutse 91,320,405.20 91,320,405.20 23/12/2019 40 weeks On-going

93

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter Phase II

Constituency Projects) Lot-21 at Ung. Kalgo, Kuda Walawa and Bade Fulani in

Yankwashi Constituency. Granitoids Engr Services ltd Yankwashi 9,339,771.12 9,339,771.12 11/12/2019 8 weeks On-going

94

Feeding of 1,696 Boarding school students at GUC Birnin kudu in birnin kudu Local

Government Area (2019 MOEST Capital project) Lot-2 Muduka General Ent. B/kudu 64,105,950.80 64,105,950.80 23/12/2019 40 weeks On-going

95 Constr. Of 3 Classroom and Supply of 51 Sets of Classroom Furniture NBS & Sons Co. Ltd In the state 10,792,974.41 10,792,974.41 29/01/2020 12 Weeks On-going

96

Procurement of Textual Materials Under World Bank Financed Project ( 36,660

textual materials) ( RA 1 Lot-I) Allah Abin Dogara Enter In the state 35,908,470.00 35,908,470.00 3/2/2020 8 Weeks On-going

97

Procurement of Textual Materials Under World Bank Financed project ( 15,818

textual materials) ( RA 2 Lot-1) Math Global Investment In the state 31,288,410.00 31,288,410.00 3/2/2020 8 Weeks On-going

98

Procurement of Textual Materials Under World Bank Financed project (

20,538textual materials) ( RA 1 Lot-2) Math Global Investment In the state 30,103,610.00 30,103,610.00 3/2/2020 8 Weeks On-going

99

Procurement of 15,500 Textual materials under world bank financed project RA-2 Lot-

2 (BESDA) P4R Across the state Babandoki Gen. Entp.Ltd In the state 30,845,000.00 30,845,000.00 3/2/2020 8 Weeks On-going

100

Procurement of 15,500 Textual materials under world bank financed project RA-2 Lot-

5 (BESDA) P4R Across the state Dangata Memorial Inv. Ltd In the state 31,680,600.00 31,680,600.00 3/2/2020 8 Weeks On-going

BAL. C/F 8,576,629,487.91 9,046,900,621.16

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 52: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

4f

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 53: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 8,576,629,487.91 9,046,900,621.16

101

Procurement of 13,860 Textual materials under world bank financed project RA-2 Lot-

6 (BESDA) P4R Across the stateAl-sabur Global Links In the state 20,388,000.00 20,388,000.00 3/2/2020 8 Weeks On-going

102

Procurement of pricipal/Teachers, Students furniture and constr of classes at GDSS

Harbo/Firji across the state (Lot-2A,B & C) (2019 last Qtr. MOEST capital projects) Trocom Int. Serv. Ltd. in the state 107,391,128.93 107,391,128.93 107,390,608.60 23/12/2019 12 weeks 100 Completed

103

Renovation of 6 Classrooms and Renovation of 4 classrooms at Kaugama Junior

Secondary School and Kachakama in kaugama and Malam Madori Local Government

Areas (Lot-41) Kanti Alheri Building Ltd M/madori 12,598,331.41 12,598,331.41 11/5/2020 10 Weeks On-going

104

Constr. Of 4 Blocks each of 3 Classrooms with office (4No) at gatafa JSS, Mashagwal

JSS, Dingaya and Togai in Auyo, Gwaram and Sule Tankarkar Local Government Areas RGH Star & Sons Nig Ltd Various 56,215,167.44 56,215,167.44 22/04/2020 16 Weeks On-going

105

Constr. Of 1 Block of 2 Classrooms Rural (1No.) and Constr. Of 4 Block each of 3

Classrooms with office (4No) in Dan Ama, Kwarare, S/Fada Ba'auzini JSS and Madabe

in Gumel, Gwiwa, Taura, Kazaure and Buji LGA (Lot-13) Homelux Constr Ltd Various 60,720,969.45 60,720,969.45 20/05/2020 16 Weeks On-going

106

Constr. Of 1 Block of 2 Classrooms (4No) and Construction of 2 Block each of 3

Classrooms Normal (2No) at JSS Ja'e, JSS Sabasru, JSS Gayin, JSS Shakato, JSS U/Jibrin

and JSS Gagaryasa In Kaugama, Kazaure, Kiri Kasamma, Kafin Hausa and Gwaram LGA

(Lot-14) MWT Real Estate & Gen Ltd Various 42,091,061.02 42,091,061.02 8/6/2020 14 weeks On-going

107

Constr. Of 3 Block each of 2 Classrooms Normal, Construction of 2 Bedrooms Rural

(2No) and Construction of 2 bedrooms semi-detached Teachers House (2No) at

K/Gana, Umarni and Kuda in Birnin Kudu, Sule Tankarkar and Yankwashi, Gangarau

and Kurna in Buji and Roni, Aujara JSS and Miga JSSS in Jahun and Miga LGA (Lot-1) Beam Systems Nig Ltd Various 47,836,383.46 47,836,383.46 10/6/2020 14 weeks On-going

108

Constr. Of 8 Block Each of 2 Classrooms with office (8No) at Ajura, Z/Mahauta,

Gangare, Adare, Amanga, Zoto, A/Ashe and Dungundin in garki, Gwiwa, Sule

Tankarkar, Yankwashi and Roni LGA (Lot-9) Muhal Global Concept Ltd Various 55,182,489.84 55,182,489.84 10/6/2020 11 weeks On-going

109

Constr. Of 1 Block of 2 Classrooms with office (1No) and Constr. Of 5 Block each of 3

Classrooms Normal (5No) at Hadiyau, Katika, JSS Hadin, Jangari, Buntusu and

Sakwaya JSS in Auyo, Kiyawa, Kaugama, Garki, Gwiwa and Dutse LGA (Lot-11) A. Barde Global Concept Various 54,154,392.46 54,154,392.46 10/6/2020 15 weeks On-going

110

Renovation of 2 Classrooms, renovation of 2 Classrooms, renovation of 2 Classrooms,

Renovation of 2 Classrooms, Renovation of 2 Classrooms and renovation of 4

Classrooms at matakuwa, Manaba, Auyo, Sabawa, Unik Gana, G/Kuka and Kadowawa

in Kafin Hausa, Auyo and Jahun LGA (Lot-51) Allah Abin Dogaro Nig Ltd Various 21,442,412.67 21,442,412.67 10/6/2020 16 weeks On-going

111

Renovation of 4 Classrooms, Renovation of 2 Classrooms, Renovation of 2

Classrooms, renovation of 2 Classrooms and Renovation of 6 Classrooms at Mezan,

Afarke, Kafin Hausa Sps, Maruko and Afirzina In Kafin Hausa LGA (Lot-37)

Gidan Adede General

Enterprises Ltd K/Hausa 21,432,440.49 21,432,440.49 15/06/2020 20 weeks On-going

112

Constr. Of 3 Blocks each of 3 Classrooms Normal (3No) at Bultuwa, K/wance and

Kwalam Central in Kaugama and Taura LGA (Lot-15)

Gidan Adede General

Enterprises Ltd Kaugama/Taura 26,954,309.99 26,954,309.99 15/06/2020 12 weeks On-going

BAL. C/F 9,103,036,575.07 9,573,307,708.32

4g

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 54: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 9,103,036,575.07 9,573,307,708.32

113

Constr. Of 3 Block each of 2 Classrooms Normal (3No) at Guri JSS, Kyarama and

Kiyawa in Guri, Ringim and Kiyawa LGA (Lot-17) Manhaf Global Concept Ltd Various 27,157,832.12 27,157,832.12 16/06/2020 11 weeks On-going

114

Renovation of 2 Classrooms, renovation of 2 Classrooms, renovation of 4 Classrooms,

renovation of 6 Classrooms, Renovation of 2 Classrooms, Renovation of 2

classrooms, renovation of 2 Classroom and renovation of 2 Classrooms at

Hambarawa, amaguwa, A/Ari, JSS Akasan, Kukui, Chakwaikwaiwa, Walawa, Unguwar

Liman and Korama in Ringim, Taura gagarawa and Kiyawa LGA (Lot-40) NBS & Sons Constr Co Ltd Various 21,188,235.76 21,188,235.76 16/06/2020 14 weeks On-going

115

Renovation at Toyawa Primary School and Model Boarding Primary School Guri in

Kafin hausa and guri LGA Lot-47 A.U.T Nigeria Limited K/Hausa+Guri 10,377,823.71 10,377,823.71 14/07/2020 10 Weeks On-going

116 Constr. Of 6 Seater Pit Latrine at GDSS Medu and GDSS Tsakuwawa (Lot 8A) Babandoki Gen Ent Ltd State 6,785,978.50 6,785,978.50 3/11/2020 3 Months On-going

117

Constr. Of Hostel Block at SAIS Fatara in Dutse (2020 Moest 2nd & 3rd Quarter

Projects) Lot-7D Babandoki Gen Ent Ltd Dutse 34,466,575.88 34,466,575.88 32,982,947.29 2/11/2020 3 Months 100 Completed

118

Consultancy services of Islamic Education Bureau (IEB) 2020nd & 3rd Quarter

Projects Curves and Straight Design Various 5,827,600.00 5,827,600.00 17/11/2020 6 Months On-going

119

Commissioning as Consultant for the Supervision of the Construction at the Ministry

of Education Science and Technology Edifice Mega Constr Ltd Dutse 4,165,000.00 4,165,000.00 4,045,256.25 17/11/2020 4 months 100 Completed

120

Constr. Of 1Block of 2 Cllassroom Islamiyya School Each Lot-25 (2019 Second Quarter

Constituency Projects) at rigar Dan Zago, Jigawar Dan Ali and Kunyafa Sabuwa in

babura Constituency Mufabamex Concept Ltd Babura 9,336,165.00 9,336,165.00 2/11/2020 4 months On-going

121

Development of Arabic School at GDASS Babaldu, Kila, Wurno, GGASS Kanya Babba,

Sule tankarkar and Harbo (Lot-9D) Aldan Projects Ltd Various 67,876,675.54 67,876,675.54 58,088,145.84 19/11/2020 3 Months 86 On-going

122

Commissioning as consultant for the supervision of the Construction of 2020 2nd and

3rd Quarter Capital Projects at MOES&T MB Dakata Associate Various 3,505,073.24 3,505,073.24 3,404,302.38 18/11/2020 4 Months 100 Completed

123

Constr of 1no. Block of 2-classroom islamiyya type each at S/garin Goje,

Inuwa Dutse estate, Shimadara, Jiba, Z/Buji, Buji gidan Dugus, Bula kalu,

Kundi, Bitilan Dutsawa Islamiyya, J/Habuba in Dutse Constituency (Lot-

10A) Pullad Global Consult Ltd Dutse 53,658,746.54 53,658,746.54 35,653,652.26 22/01/21 20 Weeks 66 On-going

124 Fumigate the 52No. Boarding Secondary Schools Across the State Essence World Wide Ltd Across the state 5,903,900.00 5,903,900.00 13/11/2020 12 Weeks On-going

125

Approval for the award of contract for the Procurement of protective materials

against covid-19 pandemic in preparation for the re opening of schools in the state Various Companies in the state 362,790,687.00 362,790,687.00 17/11/2020 4 weeks On-going

126 Constr. Of 12No. Junior Staff Quarters and Security Valve wire (Lot-1c) Math Global Invest Ltd Across the state 9,793,129.68 9,793,129.68 3/11/2020 3 Months On-going

127 Renovation works at Govt Unity Secondary School Basirka (Lot-2) Khanadi Global Links Ltd Gwaram 20,189,201.93 20,189,201.93 19,684,527.17 30/12/2020 8 Weeks 100 Completed

128

Renovation of 2No Hostel Block at GUSS fantai, 2No Hostel at GUCSS Dutse,

Renovation works at GDSS Wurno, GGUSS Gwaram, GDSS Madobi and GGSS Sule

Tankarkar (Lot-1)

Babandoki General Enterprises

Ltd Various 79,760,579.67 79,760,579.67 77,688,929.56 30/12/2020 3 Months 100 Completed

BAL. C/F 9,825,819,779.64 10,296,090,912.89

4h

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 55: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 9,825,819,779.64 10,296,090,912.89

129

Constr. Of Shape Wall fence at GGASS Danzomo and storm damage at GGASS

babura, GGASS kaugama, GDASS sambo, GDASS jahun,GDASS gagarawa and GDASS

S/Gwaram (Lot-6D) Asasco Nigeria Limited Various 43,985,220.10 43,985,220.10 42,781,563.67 22/12/2020 3 Months 100 Completed

130 Procuremenat of 10,000 Sets of school uniform for girls (Lot-2) Pullad Global consult Ltd Various 32,900,000.00 32,900,000.00 32,900,000.00 30/12/2020 8 Weeks 100 Completed

131 Procuremenat of 10,000 Sets of school uniform for girls (Lot-1) Pullad Global consult Ltd Various 32,900,000.00 32,900,000.00 32,900,000.00 30/12/2020 8 Weeks 100 Completed

132 Procuremenat of 10,000 Sets of school uniform for girls (Lot-3) 313 Textiles Nig Ltd Various 32,900,000.00 32,900,000.00 32,900,000.00 30/12/2020 8 Weeks 100 Completed

133

Renovation of 2no. Block of Classrooms at tsamai Nomadic in Gumel and

S/sara Nomadic in Miga LGA. Gare Investment Ltd. State 3,038,352.38 3,038,352.38 2,736,858.39 24/10/2020 8 weeks 100 Completed

134

Renov of 3no. Nomadic Primary Schools at Muni in Babura, Sawa in

Gwaram and Marina in Auyo LGA. Yadukko Nig. Ltd. State 8,292,759.67 8,292,759.67 7,548,621.69 3/11/2020 12 weeks 100 Completed

135

Procurement of 743,400, 40 Leaves exercise book with special cover, 17=85,850 HB

pencils AD2 integrated Tech Ltd Various 50,644,125.00 50,644,125.00 9/11/2020 8 Weeks On-going

136

Renovation of Classroom Blocks at Damukashe B/Jeji, gadadin Etc in Gwaram,

b/Kudu, and Kiyawa LGAS Dalari Constr Co Ltd Various 16,567,816.64 16,567,816.64 12/11/2020 8 Weeks On-going

137

Renovation of Classroom Block at Kudai, Yangayami, D/Toka e.t.c. in Dutse, Taura and

K/Hausa LGAS Talaku Integ Ltd Various 8,674,243.46 8,674,243.46 8,244,098.10 12/11/2020 8 Weeks 100 Completed

138

Renovation of classroom Block at Bakara, Auno Etc in Auyo, Kiyawa and Maigatari

LGAs

Babandoki General Enterprises

Ltd Various 6,144,536.53 6,144,536.53 5,971,343.05 12/11/2020 8 Weeks 100 Completed

139

Renovation of classroom Block at daguma, Yanyuawai, Gezo in Maigatari and Sule

Tankarkar LGAs Al-Juraj Synergy Ltd Various 18,162,831.36 18,162,831.36 12/11/2020 8 Weeks On-going

140

Renovation of Classroom Block at Badingo, Kura, U/Makaddas, Dorayi Etc in B/Kudu

and Babura LGAs Mugin investment Ltd B/kudu+Babura 29,124,922.00 29,124,922.00 12/11/2020 8 Weeks On-going

141

Increase in Height by 0.5M High of wall fence including barbed wire at Girls Junior

Science Secondary School Miga LGA (Lot-6) Allah Abin dogaro Ent Ltd Miga 6,033,506.29 6,033,506.29 5,724,815.27 12/11/2020 8 Weeks 100 Completed

142

Constr of JSS Science each (Lot-21) (2019 second qtr. Constituency projects) at Garin

Wakili, Busugu, Bareri, Dilmari and Madachi in K/Kasamma LGA. Mai-mai blocks Ltd. K/kasamma 15,546,231.75 15,546,231.75 8,460,803.50 21/01/2020 12 weeks 55 On-going

143 Renov of Windstorm damages at GSS Taura, GSS Roni, and GSTC Hadejia (Lot-1) Math Global Ltd. State 51,000,000.00 51,000,000.00 47,413,371.60 3/11/2020 12 weeks 100 Completed

144

Procurement of 15,500 textual materials under world bank financed project RA-2 Lot-

4 (BESDA) P4R across the state Pullad Global Nig Ltd In the state 30,938,000.00 30,938,000.00 3/2/2020 8 Weeks On-going

145

Procurement of 15,500 textual materials under world bank financed project RA-2 Lot-

3 (BESDA) P4R across the state Pullad Global Nig Ltd In the state 30,938,000.00 30,938,000.00 3/2/2020 8 Weeks On-going

146

Construction of 1 block of 2 classrooms islamiyya type at Danfa in Babura

constituency (lot20B)

Gidan adede general

engerprises Ltd

Babura 3,856,152.12 3,856,152.12 1/25/2021 17 weeks

BAL. C/F 10,247,466,476.94 10,717,737,610.19

4i

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 56: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 10,247,466,476.94 10,717,737,610.19

147

Construction of 1 block of 2 classrooms islamiyya type each at

karangi,kadirawa and zango in kiyawa constituency (lot 24)

Gidan Adede General

Enterprises Ltd

Kiyawa 11,457,590.06 11,457,590.06 10,692,825.22 1/25/2021 19 weeks

100

Completed

148

Construction of 1 block of 2 classrooms islamiyya type each at JSS yalo

and JASS Dankayyawa inkaugama constituency (lot 5)

Wajedu Nig Ltd Kaugama 7,672,304.24 7,672,304.24 7,018,126.35 1/25/2021 10 weeks

100

Completed

149

Construction of 1 block of 2 classrooms islamiyya SUBEB type each at

Malaluwa and Farin Dutse constituency, Gwaram LGA (lot 8)

AD2 intergrated technical

services Ltd

Gwaram 7,672,304.24 7,672,304.24 1/25/2021 20 weeks On-going

150

Construction of 1 block of 2 classrooms islamiyya type each at As-

habulkafi, Sheik Buna shagari, Nurul yaqeel islamiyya, Maman wale

quarters and Kwarin manu in Hadejia constituency (Lot 14A)

AG global services Ltd Hadejia 15,401,531.28 15,401,531.28 1/22/2021 14 weeks On-going

151

Construction of 1 block of 2 blocks 6NO. Cubicle toilets, construction of

gate and front view fencing at maje nursey and primary school and IMN

school in Hadejia constituency (Lot 14C)

AG global services Ltd Hadejia 9,250,000.00 9,250,000.00 1/22/2021 14 weeks On-going

152

Construction of 1 block of 2 classrooms islamiyya type each at

G/kanawa,Kuzuzumi and Koko in kanya constituency, Babura LGA (Lot 11)

Gidan adede general

engerprises Ltd

Babura 11,508,456.36 11,508,456.36 1/25/2021 15 WEEKS On-going

153

Construction of 1 block of 2 classrooms islamiyya type each at Autatuwa

in bulangu constituency (Lot 4)

Na bakwai general

engerprises Ltd

K/Hausa 3,865,152.12 3,865,152.12 1/25/2021 19 weeks On-going

154

Construction of 1 block of 2 classrooms islamiyya type each at Amanga

Gari,Danzomo and Turkusawa in sule tamkarkar constituency (Lot 16)

Na bakwai general

engerprises Ltd

S/Tankarkar 11,452,590.06 11,452,590.06 1/25/2021 17 Weeks On-going

155

Construction of 1 block of 3 classrooms islamiyya SUBEB type at

Maigaggafa in Garki constituency (Lot 12)

A.G.M & sons Nig Ltd Garki 10,501,978.85 10,501,978.85 9,769,282.69 1/25/2021 12 weeks

100

Completed

156

Completion of 1 block of 2 classrooms islamiyya type each at Karwai and

Charkawa in Ringim constituency (Lot 7A)

A.G.M & sons Nig Ltd Ringim 7,672,974.08 7,672,974.08 1/25/2021 16 weeks On-going

157

Construction of 1 block of 2 classrooms islamiyya type and Completion of

1 block of 4 classrooms at GGSS K/hausa and Ruba in Kafin Hausa

constituency (Lot 23)

AMM manzo Nig Ltd K/Hausa 4,626,917.43 4,626,917.43 1/22/2021 19 weeks On-going

158

Completion of classrooms islamiyya type school at Dangyatin in Miga

constituency (Lot 1B)

AD2 intergrated technical

services Ltd

Miga 3,164,974.00 3,164,974.00 1/25/2021 14 weeks On-going

159

Renovation of 1 block of 2 classrooms islamiyya type at Sansani in Miga

constituency (Lot 1C)

Gidan adede general

engerprises Ltd

Miga 3,277,162.90 3,277,162.90 1/25/2021 14 Weeks On-going

160

Construction of 1 block of 2 classrooms islamiyya type each at Tsangayar

Liman, Uku da sisi and Chirimbi in Babura constituency (Lot 20A)

Mufabamex Concept Nig

Ltd

Babura 11,508,456.36 11,508,456.36 10,703,909.28 1/25/2021 17 weeks

100

Completed

161

Construction of 1 block of 2 classrooms islamiyya type each at

Zangayan,Malandi,Birniwa,Izala and Birniwa Day JSS (Staff room) in

Birniwa constituency (Lot 26)

Kafiyama General

Enterprices Ltd

Birniwa 15,344,130.32 15,344,130.32 1/26/2021 12 weeks On-going

162

Construction of 1 block of 2 classrooms islamiyya type each at GGSS Guri,

guri Yamma and Garbagal in Guri constituency (Lot 3)

Mugin investiment Nig Ltd Guri 11,452,890.05 11,452,890.05 1/25/2021 19 weeks On-going

BAL. C/F 10,393,295,889.29 10,863,567,022.54

4j

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 57: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Education, Science and Technology

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 10,393,295,889.29 10,863,567,022.54

163

Construction of 1 block of 2 classrooms islamiyya type each at

Kalgwai,Kadirawa and Zango in Kiyawa constituency (Lot 25)

Mugin investiment Nig Ltd Kiyawa 7,672,304.24 7,672,304.24 1/25/2021 12 weeks On-going

164

Construction of 1 block of 2 classrooms islamiyya type each at Tudun

wada, Duhuwa and Saya saya in Dutse constituency (Lot 10C)

Mugin investiment Nig Ltd Dutse 11,501,819.64 11,501,819.64 1/25/2021 19 weeks On-going

165

Construction of 1 block of 2 classrooms islamiyya type each at Amaryawa

cikin gari,Takwardawa,Jama'a Zugai,U/Dinya,Dansure Gabas,Mai

karauchi,Sankau gari,Tudun Dan biriri,Gumau and Roni Gari in Roni

constituency (Lot 22)

Jignaj Global Constructions

Ltd

Roni 38,361,571.20 38,361,571.20 1/25/2021 16 weeks On-going

166

Construction of 1 block of 2 classrooms islamiyya type each at

Z/Sainawam Gidan Dogon Faci,Dankawa,Wailare and Kurkyet in Gwiwa

constituency (Lot 18)

Jignaj Global Constructions

Ltd

Gwiwa 15,304,471.36 15,304,471.36 1/25/2021 14 weeks On-going

167

Constr.of 1 Block of 2 Classroom Islamiyya type Each at Dakido and

Garmaka in Maigatari Constituency (Lot-19A) Pullad Global Consult Ltd Maigatari 7,672,304.24 7,672,304.24 7,137,027.19 22/01/2021 17 Weeks 100 Completed

168

Constr. Of 1 Block of 2 Classrooms Islamiyya Type Each at Wurmawa, Yar

Jigawa, Katafila, Darul Sunnah and Tahsin in Jahun Constituency (Lot-2)

Babandoki General

Enterprises Ltd Jahun 19,180,162.90 19,180,162.90 17,842,006.98 22/01/2021 18 Weeks 100 Completed

169

Constr. Of 1 Block of 3 classrooms Islamiyya Type, Constr. Of 2 Classroom

(Rural Type) and Constr. Of wall fencing and 1 Block Islamiyya at Abubakar

Mosques, Ummul-Khair Islamiyya, Aminu Sani Primary and Zango

Constituency Projects Lot-9

Babandoki General

Enterprises Ltd Hadejia 22,774,106.00 22,774,106.00 22/01/2021 11 eeks

On-going

170

Constr. Of 1 Block of 2 Classrooms Islamiyya type each at Gululu,

Nasarawa and Rukumawa in Miga Constituency (Lot-1) Loyalty Properties Ltd Miga 11,478,353.53 11,478,353.53 4/3/2021 14 Weeks

On-going

171

Constr. Of 250 Capacity theater at college of islamic and legal studies

Ringim (Lot-1) Ngaloma Construction Ltd Ringim 74,864,074.07 74,864,074.07 16/03/2021 24 Weeks

On-going

172

Constr. Of 1 Blockof 3 Classroom at college of Islamic and Legal Studies

Ringim (Lot-3) Pullad Global Consult Ltd Ringim 18,419,746.61 18,419,746.61 16/03/2021 12 Weeks

On-going

173 Constr. Of lecture Hall at College of Islamic & Legal Studies Ringim (Lot-2) A.A. Maikatako Gen Ent Ltd Ringim 25,004,616.22 25,004,616.22 16/03/2021 20 Weeks

On-going

TOTAL 10,645,529,419.30 11,115,800,552.55

4k

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 58: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Land and Housing

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT (N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1

Construction of (30NO.) Boys Quarters, External Electrification and

Water supply to individual Legislator's Quarters at Disina in Dutse

L.G.A. Gerawa Global Engr. Dutse 812,600,502.00 812,600,502.00 723,720,196.50 17/10/2018 32 weeks 89 On-going

2

Consultancy services for the supervision of the construction of 30no.

Boys Qtrs., Ext. Electrification and Water Supply at Legislative Qtrs.,

Dutse HAG Eng. Ltd. Dutse 47,049,676.58 47,049,676.58 42,948,768.82 9/1/2019 32 weeks 91 On-going

3

Registration of Urban Properties Across the State Under World Bank

Supported SFTAS Program (DLI-5) ( Approval for the engagement of

consultant) Linx Spatial System Ltd in the state 13,459,000.00 13,459,000.00 12/2/2021 12 months On-going

TOTAL 873,109,178.58 873,109,178.58

5

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 59: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Commerce

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1

Satellite Geology Map of Jigawa State chad Basin

Area Spatial Geoserve Ltd State 9,600,000.00 9,600,000.00 29/09/2020 16 Weeks On-going

Total 9,600,000.00 9,600,000.00

6

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 60: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Dutse Capital Development Authority

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1 Constr. of Dutse township road (15 & 20) Dantata & Sawoe Dutse 760,653,932.06 760,653,932.06 540,282,932.70 20/12/12 16 weeks 73 Stalled

2 Rehab. Of Dutse Township road phase II (10.110km) CGC Nig. Ltd. Dutse 2,129,872,584.00 3,173,304,408.80 2,688,981,022.36 8/11/2012 14 months 82 Stalled

3 Rehab. Of Dutse Township road phase I (1.250km) CGC Nig. Ltd. Dutse 487,164,968.00 972,442,157.57 812,016,426.23 8/11/2012 14 months 83 Stalled

4 Constr. Of Streetlights on Dutse township roads (17.576KM) phase I & II CGC Nig. Limited Dutse 666,041,660.55 666,041,660.55 543,723,853.77 9/9/2013 16 weeks 85 Stalled

5

Constr. Of Access road (1.92KM) at the New House of Assembly Members Qtrs. Disina,

Dutse CGC Nig. Limited Dutse 419,305,302.03 419,305,302.03 303,493,140.29 19/9/2013 5 months 73 Stalled

6 Constr. Of River Re-Alignment project at Dutse, phase 1 (2KM) Dantata & Sawoe Dutse 1,999,219,676.02 1,999,219,676.02 803,044,623.06 26/9/2013 6 months 40 On-going

7 Landscaping and External works at new Jigawa State Broadcasting Complex Dantata & Sawoe Dutse 657,635,647.36 657,635,647.36 457,989,460.07 31/3/2014 6 months 66 Stalled

TOTAL 7,119,893,770.02 8,648,602,784.39

7

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 61: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Cabinet Office

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT (N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1 Upgrading and Renovation of Jigawa State Governor's Lodge Kano Anhas Nig. LTD Kano 123,614,216.81 123,614,216.81 97,062,788.87 5/11/2013 9 Months 78 On-going

2

Commissioning as Consultant on the Supervision of the Upgrading and

Renov. of Governor's Lodge Kano Design+ Consultant LTD Kano 10,097,505.90 10,097,505.90 6,555,808.21 19/11/2013 9 Months 75 On-going

3

Constr. of Juma'at Prayer Mosque at Kukuma yamma and Gubabiya

in Buji Constituency. Loyalty Properties Nig. Ldt. Buji 5,613,871.72 5,613,871.72 24/01/2017 6 weeks Stalled

4

Completion/Renovation of 1no. Daily prayer mosques (2019 first

quarter constituency projects) Lot-92 at Turkushawa in Sule

Tankarkar Constituency. Modang Invest. Ltd. S/tankarkar 2,625,238.18 2,625,238.18 17/12/2019 8 weeks On-going

5

Construction of (3NO.) Five Daily Prayer Mosque 2018 Constituency

Projects (Lot-29) at Santerbi Gari, Chakindi Gari and Sule Bakin Titi in

Sule Tankarkar Constituency. Lautai Genaral Investment S/Tankarkar 5,763,123.45 5,763,123.45 3,746,645.70 10/10/2018 6 weeks 60 On-going

6

Construction of District Head Residence 2018 Constituency

projects (Lot 1) at Tsohuwar Gwaram in Gwaraam Constituency A.G.A. Kilawa Nig. Ltd. Gwaraam 55,264,747.00 55,264,747.00 34,611,206.66 10/10/2018 6 weeks 61 On-going

7

Construction of (4NO.) five Daily Prayer Mosques 2018

Constituency Projects (Lot-18) at Zangon Kanya, Alagarno, Luggai

and Tsagaiwal in Bulangu Constituency, Kafin Hausa Local

Government Area. Kawu Nig. Ltd. K/Hausa 7,843,906.50 7,843,906.50 14/11/2018 8 weeks On-going

8

Completion/Renovation of (1NO.) Friday Prayer Mosque 2018

Constituency Projects at Suga Town in Kirikasamma Constituency. Murat Construction Company K/kasamma 8,439,582.90 8,439,582.90 7,559,671.35 14/11/2018 8 weeks 85 On-going

9

Construction of (2NO.) Friday Prayer Mosque 2018 Constituency

Projects (Lot-33) at Dagilibani and Matara Babba in Birniwa

Constituency. Amm Manzo Nig. Ltd. Birniwa 10,008,223.63 10,008,223.63 14/11/2018 12 weeks On-going

10

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase III)

Constituency Projects (Lot-67) at Gada Yamma in Kazaure

Constituency. Yanduna Ventures Nig. Ltd. Kazaure 3,268,000.00 3,268,000.00 23/11/2018 8 weeks On-going

11

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase III)

Constituency Projects (Lot-36) at Jansa in Babura Constituency. Mufabamex Concept Ltd. Babura 1,910,001.00 1,910,001.00 23/11/2018 6 weeks On-going

12

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase III)

Constituency Projects (Lot-35) at Masko in Babura Constituency. Mufabamex Concept Ltd. Babura 3,002,226.00 3,002,226.00 23/11/2018 6 weeks On-going

13

Construction of the (1 No.) Friday Prayer Mosque (2018 Phase III)

Constituency Projects (Lot-46) at Tsigi in Jahun Constituency. Khairussabah Nig. Ltd. Jahun 3,102,667.92 3,102,667.92 23/11/2018 8 weeks On-going

BAL. C/F 240,553,311.01 240,553,311.01

8a

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 62: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Cabinet Office

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 240,553,311.01 240,553,311.01

14

Completion/Renovation of (1 No.) Friday Prayer Mosques 2018

Constituency Projects (Lot-57) at Ganji in Fagam Constituency. Kawu Nig. Ltd. Gwaram 11,000,088.92 11,000,088.92 14/11/2018 8 weeks On-going

15

Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase II)

Constituency Projects (Lot-11) atTudun Wada in Hadejia

Constituency. Muhal Global Concept Ltd. Hadejia 2,276,676.25 2,276,676.25 23/11/2018 8 weeks On-going

16

Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase III)

Constituency Projects (Lot-9) at Lafiyan Kondiko in Fagam

Constituency. Ahmed Maidoya & Sons Nig Gwaram 1,960,892.42 1,960,892.42 1,960,892.42 23/11/2018 6 weeks 100 Completed

17

Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase III)

Constituency Projects at Ashura Madaki in Jahun Constituency. Mugin Investment Nig. Ltd. Jahun 1,959,335.00 1,959,335.00 23/11/2018 8 weeks On-going

18

Construction of (2N0.) Blocks of 2-classroom Islamiyya school

typed 2018 phase II constituency projects (Lot -16) at kalasu and

Kukawa in Fagam constituency. Amm Manzo Nig. Ltd Gwaram 6,222,111.00 6,222,111.00 6,012,111.00 23/11/2018 8 weeks 100 Completed

19

Construction of (3N0.) Blocks of 2-classroom Islamiyya school

typed and renovation of teachers lodge 2018 phase II constituency

projects (Lot -20) at sayawa, danbando and kuzunzumi/tsardawa

in kanya babba constituency. Deetech Nig Ltd Babura 14,739,389.96 14,739,389.96 23/11/2018 15 weeks On-going

20

Construction of (1N0.) Blocks of 2-classroom Islamiyya school

typed 2018 phase II constituency projects (Lot -6) at Kwatsatsa in

Roni constituency. Na'ayi Resources Ltd Roni 3,115,354.00 3,115,354.00 23/11/2018 10 weeks On-going

21

Construction of wall fencing and Grave yard (2018 phase III)

constituency projects at U/Tudu A. in Kanya Babba Constituncy. Deetech Nig Ltd Babura 15,576,291.17 15,576,291.17 23/11/2018 8 weeks On-going

22

Construction of N.D.L.E.A office (2018 phase II) constituency

projects (lot -74) at Gumel in Gumel Constituncy. Na-bakwai Enterp. Ltd Gumel 14,701,871.63 14,701,871.63 14,326,081.36 23/11/2018 8 weeks 100 Completed

23

Construction of wall fencing and Grave yard (2018 phase III)

constituency projects (lot -72) at kofar arewa Babura in Babura

Constituncy. mufabamex concept nig ltd Babura 12,752,272.00 12,752,272.00 12,084,523.57 23/11/2018 8 weeks 100 Completed

24

Completion/Renov. Of (1no.)Friday Prayer Mosque (2018 phase

III) Constituency Projects (Lot- ) at Batatsaba in Kazaure

Constituency. Na'ayi Resources Ltd Kazaure 7,821,847.00 7,821,847.00 23/11/2018 6 weeks On-going

25

Construction Of (1no.) five daily Prayer Mosques (2018 phase II)

Constituency Projects (Lot-34) at Gidan alhaji Yakubu in Roni

Constituency. Na'ayi Resources Ltd Roni 1,959,212.85 1,959,212.85 1,959,212.85 23/11/2018 6 weeks 100 Completed

BAL. C/F 334,638,653.21 334,638,653.21

8b

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 63: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Cabinet Office

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 334,638,653.21 334,638,653.21

26

Construction Of (3no.) five daily Prayer Mosques (2018 phase III)

Constituency Projects (Lot-31) at Rauda Y/Dutse, Karkarna "A"

and Jama'ar Gabas Fulani in Yankwashi Constituency. Granitoids Eng. Nig. Ltd Yankwashi 5,834,168.55 5,834,168.55 5,582,168.55 23/11/2018 8 weeks 100 Completed

27

Construction Of (3no.) five daily Prayer Mosques (2018 phase III)

Constituency Projects (Lot-29) at G/karfi, Limamai and shinkafi in

Miga Constituency. Tosarawa Global Nig Ltd Miga 5,884,568.55 5,884,568.55 3,755,045.70 23/11/2018 8 weeks 63 On-going

28

Completion of Magahsala/Janazah Preparation Block, Fencing,

Gate, Landscaping of Vicinity, Installation of Overhead Tanks and

Supply of Ghusal Table and Trolley at Dutse General Mosque. Equishare Nig. Ltd Dutse 12,332,148.96 12,332,148.96 2,113,524.61 10/12/2018 8 weeks 16 On-going

29

Construction of (1 No.) Friday Prayer Mosque (2018 Phase III)

Constituency Projects at Kwatamma in Kafin Hausa Constituency. Mugin Investment Nig. Ltd. K/Hausa 3,996,672.02 3,996,672.02 3,989,065.98 11/12/2018 8 weeks 100 Completed

30

Wall Fencing of (1No.) Juma'at Prayer Mosque (2018 Phase III)

Constituency Projects at Wurma Town in Dutse Constituency. H.M. Dangara Ltd. Dutse 2,401,479.28 2,401,479.28 13/12/2018 8 weeks On-going

31

Construction of (3No.) Five Daily Prayer Mosques (2018 Phase III)

Constituency Projects at Shabarun Jere, Mailefe Gari and Kakindi

Tsuru in Sule Tankarkar Constituency. A.A. Aljazeera Agro Proc. S/tankarkar 5,884,568.55 5,884,568.55 23/11/2018 6 weeks On-going

32

Construction of (1No.) Friday Prayer Mosques (2018 Phase III)

Constituency Projects at Chakara in Fagam Constituency. A.A. Aljazeera Agro Proc. Gwaram 5,279,873.00 5,279,873.00 23/12/2018 8 weeks On-going

33

Supply and Installation of Medical equipments to the newly

constructed 31no. BHC across the state. G.M. Sara & Sons Ltd. Across the state 4,129,061.98 4,129,061.98 16/4/2018 6 weeks On-going

34

Partial works (Constr of Main mosque Lower Level Roof Slab) at

K/Hausa Juma'at mosque 2018 2nd Qtr. Constituency project. Shelterdom Nig. Ltd. K/Hausa 24,584,666.85 24,584,666.85 21,637,096.46 14/9/18 24 weeks 100 Completed

35

Completion /Renovation of (4No) Friday prayer Mosques (2018 Phase II

Constituency Projects (lot-61) at Kwalam Wayu, Bardu and Yangayami in Taura

Constituency Babandoki Gen Entr Taura 22,075,259.57 22,075,259.57 16/1/2019 8 weeks On-going

36

Completion/Renovation of Juma'at Prayer Mosques 2017 Constituency Projects

Phase III Remaining Works (Lot-8) at Maje In Taura constituency Nushe Business Resouces Taura 11,793,398.14 11,793,398.14 10,940,373.12 22/1/2019 12 Weeks 100 Completed

37

Construction for the Construction of (1No) Daily Prayer Mosque (2018 Phase III)

Constituency Projects (Lot-46) at Sabon Gari ta Daya and Renovation of Jabarna

juma'at Mosque in Jahun Constituency Khairussabah Nig Ltd Jahun 3,102,667.92 3,102,667.92 22/1/2019 8 weeks On-going

38

Renov/Completion of 2no. Friday prayer mosques (2019 first Quarter

constituency projects) Lot_91 at Danmakama and Dangwanki In Sule

Tankarkar Constituency. A.A Aljazeera Agro Proc. Ltd S/tankarkar 7,331,978.53 7,331,978.53 17/12/2019 8 weeks On-going

39

Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first

quarter phase 2 Constituency projects) Lot-21 Dumbi, Yarchidau and

Gurjiya in Yankwashi Constituency, Yanduna Venture Nig Ltd Yankwashi 9,339,771.12 9,339,771.12 11/12/2019 12 weeks On-going

BAL. C/F 458,608,936.23 458,608,936.23

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 64: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Cabinet Office

8c

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 65: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Cabinet Office

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 458,608,936.23 458,608,936.23

40

Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first

quarter phase 2 Constituency projects) Lot-15 at Daba, Tsohuwar

Jawo, Islamiyya Layin Emilalo and Bayan Lawan Yarima in Kazaure

Constituency, Yanduna Venture Nig Ltd Kazaure 12,427,559.12 12,427,559.12 11/12/2019 10 weeks On-going

41

Costraction of 3No. Daily prayer Mosques (2019 first Quarter

constituency projects) Lot- 7 at arobade, mungolo and kwanar

kangire in Birnin Kudu Constituency. Nushe Bus, Resources Ltd B/Kudu 5,874,753.15 5,874,753.15 17/12/2019 8 weeks On-going

42

Construction of 3No. Daily prayer Mosques (2019 first Quarter

constituency projects) Lot- 17 at Kaho, K/Malam Yahya Basirka and

Sabalari in Fagam Constituency, Gwaram Local Government Area. Ramadan Constr Nig Ltd Gwaram 5,877,322.53 5,877,322.53 17/12/2019 8 weeks On-going

43

Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first

Quarter Phase II Constituency Projects) Lot-5 at Hayatul Islam and

Kabal in Jahun Constituency. Sasco Multi Serv Nig Ltd Jahun 6,218,498.70 6,218,498.70 27/12/2019 9 weeks On-going

44

Construction of 3No. Daily prayer Mosques (2019 first Quarter

constituency projects) Lot- 31 at Daneri, Kanoke and Kota in

Kaugama Constituency. Danfatu & sons Nig Ltd Kaugama 5,884,568.55 5,884,568.55 11/12/2019 8 weeks On-going

45

Constr. Of JSS Science each (2019 first quarter phase II constituency

projects) LOT-17 at Gumel and Garin Barka in Gumel constituency. Farham Synergy con. Ltd Gumel 29,908,200.00 29,908,200.00 11/12/2019 18 Weeks On-going

46

Constr. of Solar Powered Water Supply Scheme Constituency Project

(2019 PHASE 1) LOT-16 At Dangwabro in Maigatari Constituency A.S.Maifata Gen. EntP. Ltd Maigatari 6,015,765.00 6,015,765.00 11/12/2019 8 Weeks On-going

47

Supply of Science Laboratories Equipment for Distribution to Senior

Sec School Across the state (2019 MOEST capital project) Aldan Project Ltd Across the state 29,491,628.72 29,491,628.72 24/12/2019 8 weeks On-going

48

Costr.of 1No. Friday prayer Mosques (2019 first Quarter constituency

projects) Lot- 76 at Ladin kani in mai gatari Constituency. Khairushabah Nig Ltd Maigatari 7,609,184.60 7,609,184.60 17/12/2019 8 Weeks On-going

49

Costr.of 1No. Friday prayer Mosques (2019 first Quarter constituency

projects) Lot- 78 at Jobi in maigatari Constituency. Marb Eng. & Multi serv. Ltd Maigatari 7,720,042.25 7,720,042.25 17/12/2019 8 Weeks On-going

50

Completion /Renovation of 2no. Friday prayer mosques (2019 first

qtrs. Constituency projects) Lot-84 at Buro and Fadi Gurje in Fagam

Constituency. Pullad Global Consultant Gwaram 2,503,688.50 2,503,688.50 17/12/2019 8 weeks On-going

51

Completion/Renovation of 1no. Daily prayer mosques (2019 first

quarter constituency projects) Lot-53 at Sabon Layi K/kudu Iggi in

B/kudu Constituency. Modang Invest. Ltd. B/kudu 1,954,613.85 1,954,613.85 17/12/2019 8 weeks On-going

BAL. C/F 580,094,761.20 580,094,761.20

8d

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 66: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Cabinet Office

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 580,094,761.20 580,094,761.20

52

Completion/Renovation of 1no. Daily prayer mosques (2019 first

quarter constituency projects) Lot-92 at Turkushawa in Sule

Tankarkar Constituency. Modang Invest. Ltd. S/tankarkar 2,625,238.18 2,625,238.18 17/12/2019 8 weeks On-going

53

Constr. Of 1 Block of 2 classroom Islamiyya School Each Lot-8 (2019

Second Quarter Constituency Projects) at andaza Gabas, Zakwaro and

Karangi in Kiyawa Constituency Alkayawa Multi services Kiyawa 9,438,765.00 9,438,765.00 21/01/2020 8 weeks On-going

54

Constr. Of 3No Daily Prayer Mosques ( 2019 Second Quarter

Constituency Projects) Lot-35 at Hariyal, madawa Bello and Sharbi in

Kafin Hausa Constituency K-Manu Gen Constr Ltd K/hausa 5,870,869.00 5,870,869.00 14/01/2020 8 weeks On-going

55

Renovation./Completion of 1No Friday Prayer mosque (2019 Second

Quarter constituency Projects) Lot-87 at ayama town in Auyo

Constituency AGM & Sons Nig Ltd Auyo 7,304,876.89 7,304,876.89 14/01/2020 12 weeks On-going

56

Constr. Of 3No. Daily Prayer Mosques (2019 Second Quarter

Constituency Projects) Lot-17 Danmadai Garin Inu and Medu in

Gagarawa Constitueny Farham Synergy Nigeria Ltd Gagarawa 5,865,668.55 5,865,668.55 14/01/2020 8 weeks On-going

57

Constr. Of 1No Friday Prayer Mosque ( 2019 second quarter

Constituency Projects) Lot-70 at Yankifi Quarters Gumel in Gumel

Constituency Farham Synergy Concept K/hausa 24,930,000.00 24,930,000.00 14/01/2020 12 Weeks On-going

58

Construction of 1No. Friday Prayer Mosque (2019 Second Quarter

Constituency Projects) (Lot-82C) at Matsatssagi in Maigatari

Constituecy. Khairussaba Nig Ltd Maigatari 7,844,414.75 7,844,414.75 14/1/2020 12 weeks On-going

59

Construction of 1No. Friday Prayer Mosque (2019 Second Quarter

Constituency Projects) Lot-77B at dumadumun toka in kafin hausa

Constituecy. Danfatu & Sons Nig Ltd K/hausa 10,500,438.70 10,500,438.70 10,425,001.45 14/1/2020 12 weeks 100 Completed

60

Construction of 3No. Daily Prayer Mosques (2019 second Quarter

Constituency Projects) Lot-6 at zigindimi, birniwa tasha and

machinamari in birniwa constituecy. Kafiyama Gen. Entp. Td Birniwa 5,884,566.55 5,884,566.55 14/1/2020 8 Weeks On-going

61

Constr.of Conference Hall at Tsohuwar Gwaram in Gwaram LGA

Constituency Amm Manzo Nig Ltd Gwaram 36,149,877.52 36,149,877.52 12/3/2020 6 Months On-going

62

Completion/Extension of As-Sadiq Juma'at Prayer Mosque (2019

Second Quarter Constituency Project remaining works) Lot-3 at Kanti

Kazaure in Kazaure Constituency Yanduna Ventures Nig Ltd Kazaure 26,489,720.41 26,489,720.41 9/3/2020 8 weeks On-going

63

Constr. Of babura Districts Head House (2019 second Quarter

Constituency project remaining Works) lot-94 at babura in babura

Constituency Mufabamex Concept ltd Babura 21,348,941.20 21,348,941.20 10,554,952.93 9/3/2020 16 Weeks 47 On-going

BAL. C/F 744,348,137.95 744,348,137.95

8e

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 67: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Cabinet Office

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 744,348,137.95 744,348,137.95

64

Constr. Of 3no daily Prayer Mosque (2019 Second quarter Constituency project

remaining works) lot-2B at babura tsallake, gari uku and garu in babura

Constituency 313 textile Nig Ltd Babura 5,884,568.55 5,884,568.55 5,632,568.55 9/3/2020 8 weeks 100 Cabinet Office

65

Constr. Of 3no. Daily Prayer Mosques (2019 Second Quarter Constituency

Project remaining Works ) Lot-26 at Rumfa S/Akama, Madabo and Koran malam

in jahun Constituency A.A. Aljazeera Agro Proces Jahun 5,884,568.55 5,884,568.55 9/3/2020 8 weeks On-going

66

Renovation of 1No. Friday Prayer Mosque (2019 Second Quarter Constituency

Project remaining works) Lot-61 at Jansa in Babura Constituency Mufabamex Concept ltd Babura 3,849,107.55 3,849,107.55 9/3/2020 8 weeks On-going

67

Water Collection Points at Dunbule, Kusure and Zango in Yankwashi

Constituency(2019 2nd Quarter) Lot-26) Granitoid Engineering Ltd Yankwashi 3,781,047.00 3,781,047.00 8/7/2020 8 weeks On-going

68

Constr. Of 1No. Friday Prayer Mosque (2019 Second Quarter Constituency

Project reamaining works) Lot-62 at Gumari in Birniwa Constituency Dan Agalan International Ltd Birniwa 10,097,278.53 10,097,278.53 9,946,183.41 9/3/2020 8 weeks 100 Completed

69

Consytr. Of 2No daily Prayer Mosque (2019 Second Quarter Constituency

project remaining Works) Lot-63 at Kusra and Murde Fulani in Yankwashi

Constituency Granitoid Engineering Ltd Yankwashi 3,923,045.70 3,923,045.70 3,755,045.70 9/3/2020 8 weeks 100 Completed

70

Constr. Of 2no Daily prayer Mosques (Phase II 2019 second Quarter

Constituency Project Remaining Works) Lot-31 at Abujan Amare and Kantin

Waje in Hadejia Constituency Tasiu Muhammad Invest Ltd Hadejia 5,879,148.00 5,879,148.00 5,632,218.90 9/3/2020 8 Weeks 100 Completed

71

Constr. Of District Head House (2019 Second Quarter Constituency Project

Remaining Works) Lot… at Jahun Town in jahun Constituency Khairussaba Nig Ltd Jahun 25,682,378.22 25,682,378.22 25,653,028.62 9/3/2020 12 Weeks 100 Completed

72

Constr. Of 2 Classrooms Islamiyya School each Lot-15 (2019 Second Quarter

Constituency Projects) at Mobile base (744) ,Dungulmi and Warwade in Dutse

Constituency Back Bone Global Links Dutse 9,333,382.80 9,333,382.80 21/01/2020 12 Weeks On-going

73 Procurement of three (3No) New Toyota Land Cruiser V8 Jeep 2020 Model Three Stars Motors Ltd Dutse 142,209,600.00 142,209,600.00 16/11/2020 3 Weeks On-going

74

Constr of 1no. Friday prayer mosque (2019 second qtr. Constituency

projects) Lot-84) at Masallacin Malam garba Ramadan Constr. Ltd. M/Madori 13,112,859.73 13,112,859.73 13,063,627.83 14/1/2020 12 weeks 100 Completed

75

Constr. Of 2No 5 Daily Prayer Mosque at Burmanawa and unguwar

Liman in Sule Tankarkar constituency (Lot-65) Ngaloma Constr Co. Ltd S/Tankarkar 4,677,629.32 4,677,629.32 18/02/2021 12 Weeks On-going

76

Constr. Of 3No. 5 Daily Prayer Mosque at Madobi, Tsalle, Jikai and

Lageniya in Sule Tankarkar Constituency (Lot-64) Ngaloma Constr Co. Ltd S/Tankarkar 7,017,211.32 7,017,211.32 18/02/2021 12 Weeks On-going

77

Constr. Of 3No. 5 daily prayer mosqye at Dilima, Sabaru and Gargadin

Giwa in Birnin Kudu Constituency Lot5 Nushe Business Res Ltd B/Kudu 7,003,920.00 7,003,920.00 18/02/2021 12 Weeks On-going

BAL. C/F 992,683,883.22 992,683,883.22

8f

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 68: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Cabinet Office

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BAL. B/F 992,683,883.22 992,683,883.22

78

Completion/Renovation of 1No. Friday Prayer Mosque at

Galadimawa in Taura Constituency (Lot 144) Nushe Business Res Ltd Taura 2,841,372.17 2,841,372.17 18/02/2021 8 weeks On-going

79

Completion/ Renovation of 2No. Friday Prayer Mosque at Kangal and

Malamawar in Taura Constituency Lot-145 Nushe Business Res Ltd Taura 15,715,256.97 15,715,256.97 18/02/2021 12 Weeks On-going

80

Constr. Of 3No. 5 Daily prayer mosque at Dagwaji, Rahaji and

Sabuwar Kaura in Birnin Kudu Constituency Lot-6 Nushe Business Res Ltd B/Kudu 6,886,864.71 6,886,864.71 18/02/2021 12 Weeks On-going

81

Constr. Of 3No. 5 Daily Prayer Mosque at Yafashiya, Dorawa Maiyado

and Kafin Zaki in Birnin Kudu Constituency Lot-07 Nushe Business Res Ltd B/Kudu 7,015,043.60 7,015,043.60 19/02/2021 12 Weeks On-going

82

Constr. Of 3No. 5 Daily Prayer Mosque at Barikin Dangiwa, Katsawa

and Kauyen Madora in Birnin Kudu Constituency Lot-8 Nushe Business Res Ltd B/Kudu 7,003,293.45 7,003,293.45 19/02/2021 12 Weeks On-going

83

Constr. Of 3No. 5 daily prayer mosque at Tajira Burin Warji and

Babaldu in Birnin Kudu Constituency Lot-11 Nushe Business Res Ltd B/Kudu 7,012,453.68 7,012,453.68 19/02/2021 12 Weeks On-going

84

Constr. Of 3No. 5 Daily Prayer Mosque at Lakar Kadanya, Juwan Tudu

and Juwan Kwari in Birnin Kudu Constituency Lot-12 Nushe Business Res Ltd B/Kudu 7,006,387.44 7,006,387.44 19/02/2021 12 Weeks On-going

85

Constr. Of 3No. 5 daily Prayer Mosque at Kauyen Gonar Faruku and

Birnin Kudu in Birnin Kudu Constituency Lot-13 Nushe Business Res Ltd B/Kudu 4,667,780.76 4,667,780.76 19/02/2021 12 Weeks On-going

86

Constr. Of 1 block of 2 Classrooms Islamiyya type each at Budai

sabuwa, Kantamawa and Algama Ringim Constituency Lot7B Nushe Business Res Ltd Ringim 11,509,462.02 11,509,462.02 25/01/2021 12 Weeks On-going

87

Completion of 1 Block of 3 Classrooms Islamiyya and Constr. Of 1 of

2 Classrooms Subeb Type at Aujara and Taura Constituency Lot-13 Nushe Business Res Ltd Taura 13,976,503.95 13,976,503.95 25/01/2021 12 Weeks On-going

88

Constr of 1no. Friday Mosque (2019 phase II Constituency project)

(Lot-69) at Kore Sabuwa AMM Manzo Ltd. Gagarawa 10,777,893.36 10,777,893.36 10,722,439.33 14/01/2020 12 Weeks 100 Completed

89

Renov of 1no. Juma'at mosque (phse II 2019 constituency projects)

(Lot-74) at Harbo Tsohuwa Wajedu Nig. Ltd. Jahun 7,844,414.75 7,844,414.75 7,661,986.50 14/12/2020 12 Weeks 100 Completed

90

Constr of 1no. Friday prayer mosque (2019 second qtr. Constituency

projects) (Lot-83) at Tsagwaro Ramadan Nig. Ltd. M/Madori 10,104,285.30 10,104,285.30 9,985,882.46 14/01/2020 12 Weeks 100 Completed

91

Constr of 1no. Friday mosque (2019 phase II constituency projects) at

Garin Malam Ramadan Nig. Ltd. M/Madori 9,045,000.16 9,045,000.16 9,006,735.15 1/9/2020 12 Weeks 100 Completed

TOTAL 1,114,089,895.54 1,114,089,895.54

8g

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 69: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Finance

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1

Commission/Engagement as Consultant for the Technical

consultants on Software Dev. Consulting in the state and MDAs.

(IPSAS) Sparklesoft Solutions Ltd. Dutse 19,710,000.00 19,710,000.00 16,753,528.35 10/28/2016 6 months 85

2

Engagement as Consultant to Recover all excess and Cot charges covering the period of April, 2013 to December, 2015 (at 5% commission). Yolight Limited In the state 14/8/2018 3 months

3

Consultancy services fees to deliver World class payment and collection on I.G.R. Ercas Solution Limited In the state 70,016,433.40 24/12/2018

4

Provision of SAAS Software e-Procurement Solution to

Jigawa State Government Zachary De Pian Dutse 179,823,750.00 179,823,750.00 10/12/2020 3 Years

Total 199,533,750.00 199,533,750.00

9

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 70: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Finance

REMARKS

On-going

Stalled

On-going

On-going

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 71: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Binyaminu Usman Polytechnic, Hadejia

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1

Constr. of Classrooms and Laboratories complex at

Binyaminu Usman Polytechnic, Hadejia. DAD A.E. Nig. Ltd. Hadejia 82,582,274.72 95,359,073.84 86,279,313.69 5/1/2017 24 weeks 90 On-going

2

Completion of Library (phase II) at Binyaminu Usman

Polytechnic, Hadejia. Babandoki Gen. Entp. Ltd. Hadejia 98,925,641.44 98,925,641.44 64,633,291.01 10/11/2020 24 weeks 65 On-going

TOTAL 181,507,916.16 194,284,715.28

10

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 72: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

GOVT. HOUSE

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1 Constr. Of Banquet hall at Government House Dutse Jigawa State Ngaloma Constr Comp Nig Ltd Dutse 228,612,066.38 228,612,066.38 9/12/2020 5 Month

On-going

2

Procurement of two (2No) Toyota Land Cruiser Jeeps to Government

House, Dutse Math Global Invest Nig Ltd Dutse 105,000,000.00 105,000,000.00 105,000,000.00 17/02/2021 4 Weeks 100 Completed

3 Procurement of 2No. GS4 Luxury vehicles CIG Motors Co. Ltd in the state 27,152,500.00 27,152,500.00 27,152,500.00 22/02/2021 2 Weeks 100 Completed

Total 360,764,566.38 360,764,566.38

11

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 73: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Information

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1

Installation of Solar powered supply at Hadejia, Gumel and

Kazaure Television Booster Stations Sims Global Resources Ltd State 57,072,299.22 57,072,299.22 43,576,401.27 16/07/2020 12 Weeks 77 On-going

Total 57,072,299.22 57,072,299.22

12

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 74: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

Ministry of Agriculture

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1

Constr. Of Small Scale Abattoir at Doko Town, Garki LGA

(Constituency Project) Isa Halilu Nig Ltd Garki 10,219,945.22 10,219,945.22 7,882,451.31 17/09/2020 12 Weeks 70 On-going

TOTAL 10,219,945.22 10,219,945.22

.

13

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 75: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

DEPUTY GOVERNOR'S OFFICE

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT (N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1

Renovation works and procurement of office

equipment at D/Governor's office Dutse Pullad Global Co. Nig. Ltd. Dutse 17,168,322.96 17,168,322.96 16,769,059.62 25/12/2020 4 weeks 100 Completed

Total 17,168,322.96 17,168,322.96

14 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 76: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

MIN. FOR LOCAL GOVERNMENT

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

1

Supply of Diesel o Urban Town

Streetlights Generator at Auyo Court

LGA (Lot-1A) TSX Global Serv Ltd Auyo 14,996,250.00 14,996,250.00 10/3/2021 12 Months On-going

2

Supply of Diesel to Urban Streetlights

Generators at Gantsa Town in Buji

LGA (Lot-5) TSX Global Serv Ltd Buji 21,494,625.00 21,494,625.00 10/3/2021 12 Months On-going

3

Supply of Diesel Town Streetlights at

Generators at Kazaure Kanti Kazaure

LGA (Lot-16B) TSX Global Serv Ltd Kazaure 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going

4

Supply of Diesel to Urban Streetlights

Generators at Kazaure Yan Makada in

Kazaure LGA (Lot-16C) TSX Global Serv Ltd Kazaure 18,495,374.00 18,495,374.00 10/3/2021 12 Months On-going

5

Supply of Diesel to urban town

Streetlights Generator at Babura

Motor Park in Babura LGA (Lot-2B) TSX Global Serv Ltd Babura 12,996,750.00 12,996,750.00 10/3/2021 12 Months On-going

6

Supply of Diesel to Urban Town

Streetlights Generators at Kazaure

Sha'iskawa in kazaure LGA (Lot-16D) TSX Global Serv Ltd Kazaure 14,996,250.00 14,996,250.00 10/3/2021 12 Months On-going

7

Supply of diesel to urban streetlights

Generator at Garki Secretariat in

Garki LGA (Lot-6A)

I-GEE Eng. Const. Nig

Ltd Garki 17,495,625.00 17,495,625.00 10/3/2021 12 Months On-going

8

Supply of diesel to urban town

streetlights Generators at Birnin Kudu

Unity Bank in Birnin Kudu LGA (Lot-

4C)

I-GEE Eng. Const. Nig

Ltd B/Kudu 15,496,125.00 15,496,125.00 10/3/2021 12 Months On-going

9

Supply of diesel to urban town

streetlights Generators at Roni

Hospital in Roni LGA (Lot-23A)

I-GEE Eng. Const. Nig

Ltd Roni 12,996,750.00 12,996,750.00 10/3/2021 12 Months On-going

10

Supply of Diesel to urban town

streetlights Generators at Ringim

Kofar fada in Ringim LGA (Lot-22A)

I-GEE Eng. Const. Nig

Ltd Ringim 15,496,125.06 15,496,125.06 10/3/2021 12 Months On-going

Balance C/F 163,459,124.06 163,459,124.06

15a

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 77: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

MIN. FOR LOCAL GOVERNMENT

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BALANCE B/F 163,459,124.06 163,459,124.06

11

Suupply of Diesel to Urban

Streetlights Generators at Ringim

Galadanchi in Ringim LGA (Lot-22B)

I-GEE Eng. Const. Nig

Ltd Ringim 17,495,625.00 17,495,625.00 10/3/2021 12 Months On-going

12

Supply of Diesel to Urban Town

Streetlights Generators at Garki Kofar

fada in Garki LGA (Lot-6B)

I-GEE Eng. Const. Nig

Ltd Garki 17,495,625.00 17,495,625.00 10/3/2021 12 Months On-going

13

Supply of Diesel to Urban Streetlights

Generators at Taura LGA (Lot-25)

I-GEE Eng. Const. Nig

Ltd Taura 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going

14

Supply of Diesel to Urban Streetlights

Generator at Roni cikin Gari Roni LGA

(Lot-23B)

I-GEE Eng. Const. Nig

Ltd Roni 12,996,750.00 12,996,750.00 10/3/2021 12 Months On-going

15

Supply of diesel to urban streetlights

Generator at Ringim EPI in Ringim LGA

(Lot-22C)

I-GEE Eng. Const. Nig

Ltd Ringim 16,995,750.00 16,995,750.00 10/3/2021 12 Months On-going

16

Supply of Diesel to Urban town

Streetlights Generator at Guri

Secretariat in Guri LGA (Lot-9A) SAG Nig ltd Guri 15,966,000.00 15,966,000.00 10/3/2021 12 Months On-going

17

Supply of Diesel to Urban Streetlights

Generators at guri market in guri LGA

(Lot-9B) SAG Nig ltd Guri 15,966,000.00 15,966,000.00 10/3/2021 12 Months On-going

18

Supply of Diesel to Urban Town

Streetlights Generators at kafin hausa

Cikin Gari in Kafin hausa LGA (Lot-

15B) SAG Nig ltd K/Hausa 15,496,125.00 15,496,125.00 10/3/2021 12 Months On-going

19

Supply of Diesel to Urban town

Streetlights Generators at Miga Town

Miga LGA (Lot-21) TSX Global Serv Ltd Miga 21,994,500.00 21,994,500.00 10/3/2021 12 Months On-going

20

Supply of Diesel to urban town

streetlights Generators at Gwiwa

Town in gwiwa LGA (Lot-11) TSX Global Serv Ltd Gwiwa 17,495,625.00 17,495,625.00 10/3/2021 12 Months On-going

Balance C/F 334,356,374.06 334,356,374.06

15b

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 78: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

MIN. FOR LOCAL GOVERNMENT

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BALANCE B/F 334,356,374.06 334,356,374.06

21

Supply of Diesel to Urban Streetlights

Generators at babura Kofar Fada in

babura LGA (Lot-2A) TSX Global Serv Ltd Babura 16,995,750.00 16,995,750.00 10/3/2021 12 Months On-going

22

Supply of Diesel to Urban Town

Streetlights Generatorsn at Birniwa

Secretariat in Birninwa LGA (Lot-3A) TSX Global Serv Ltd Birniwa 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going

23

Supply of Diesel to Urban Town

Streetlights Generators at jahun Kofar

fada in jahun LGA (Lot-13B) TSX Global Serv Ltd Jahun 16,995,750.00 16,995,750.00 10/3/2021 12 Months On-going

24

Supply of diesel to urban town

streetlights Generator at gwaram

New in Gwaram LGA (Lot-10D)

Pullad Global Consult

Ltd Gwaram 13,496,625.00 13,496,625.00 10/3/2021 12 Months On-going

25

Supply of Diesel to Urban Town

Streetlights Generators at Gwaram

Old in Gwaram LGA (Lot-10C)

Pullad Global Consult

Ltd Gwaram 13,496,625.00 13,496,625.00 10/3/2021 12 Months On-going

26

Supply of Diesel to Urban Town

Streetlights Generators at Gwaram

Primary School in Gwaram LGA (lot-

10B)

Pullad Global Consult

Ltd Gwaram 12,996,750.00 12,996,750.00 10/3/2021 12 Months On-going

27

Supply of Diesel to Urban Town

Streetlights Generators at Gwaram

Cikin Gari In Gwaram LGA (Lot10A)

Pullad Global Consult

Ltd Gwaram 14,496,375.00 14,496,375.00 10/3/2021 12 Months On-going

28

Supply of Diesel to Urban streetlights

Generators at Bamaina Old in Birnin

Kudu Lga (Lot-4E) TSX Global Serv Ltd B/Kudu 9,300,000.00 9,300,000.00 10/3/2021 12 Months On-going

29

Supply of Diesel to Urban Streetlights

Generators at Sule Tankarkar Cikin

Gari Sule Tankarkar LGA (Lot24B) TSX Global Serv Ltd S/Tankarkar 11,497,125.00 11,497,125.00 10/3/2021 12 Months On-going

Balance C/F 457,627,874.06 457,627,874.06

15c

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 79: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

MIN. FOR LOCAL GOVERNMENT

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BALANCE B/F 457,627,874.06 457,627,874.06

30

Supply of Diesel to urban Streetlights

Generator at Gumel Kofar Fada in

Gumel LGA (Lot-8A) TSX Global Serv Ltd Gumel 19,995,000.00 19,995,000.00 10/3/2021 12 Months On-going

31

Supply of Diesel to urban Streetlights

Generators at Malam Madori

G/Ganye in Malam Madori LGA (Lot-

19B) TSX Global Serv Ltd B/Madori 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going

32

Supply of Diesel to Urban town

Streetlights Generators at Bamaina

New in Birnin Kudu LGA (Lot-4F) TSX Global Serv Ltd B/Kudu 14,996,250.00 14,996,250.00 10/3/2021 12 Months On-going

33

Supply of Diesel to urban town

Streetlights Generator at Birniwa

Kasuwa in Birniwa LGA (Lot-3B) TSX Global Serv Ltd Birniwa 21,994,500.00 21,994,500.00 10/3/2021 12 Months On-going

34

Supply of Diesel to Urban town

streetlights Generator at Gagarawa

Town in Gagarawa LGA (Lot-7) TSX Global Serv Ltd Gagarawa 17,995,500.00 17,995,500.00 10/3/2021 12 Months On-going

35

Supply of Diesel to Urban town

Streetlights Generator at Birnin Kudu

Primary School in birnin kudu Lga (Lot-

4B) TSX Global Serv Ltd B/Kudu 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going

36

Supply of Diesel to Urban town

Streetlights Generator at Birnin Kudu

Open Theater in Birnin Kudu LGA (Lot-

4D) TSX Global Serv Ltd B/Kudu 15,996,000.00 15,996,000.00 10/3/2021 12 Months On-going

37

Supply of Diesel to Urban town

streetlight Generator at Kiri Kasamma

G/Wanka in Kiri Kasamma LGA (Lot-

17A) TSX Global Serv Ltd K/kasamma 15,496,125.00 15,496,125.00 10/3/2021 12 Months On-going

38

Supply of Diesel to urban town

streetlights Generators at Kazaure

Kofar Fada in Kazaure LGA (lot-16A) TSX Global Serv Ltd Kazaure 11,497,125.00 11,497,125.00 10/3/2021 12 Months On-going

Balance C/F 608,590,124.06 608,590,124.06

15d

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 80: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

MIN. FOR LOCAL GOVERNMENT

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BALANCE B/F 608,590,124.06 608,590,124.06

39

Supply of Diesel to Urban town

streetlights generator at Kiyawa LGA

(Lot-18B) TSX Global Serv Ltd Kiyawa 11,997,000.00 11,997,000.00 10/3/2021 12 Months On-going

40

Supply of Diesel to Urban town

streetlights Generator at Jahun

Round About in Jahun LGA (lot-13A) TSX Global Serv Ltd Jahun 16,995,750.00 16,995,750.00 10/3/2021 12 Months On-going

41

Supply of Diesel to urban town

streetlights Generator at hadejia Local

Education Authority (L.E.A) in Hadejia

LGA (Lot-12C) TSX Global Serv Ltd Hadejia 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going

42

Supply of Diesel to Urban town

Streetlights Generators at Karkarna

Secretariat Yankwashi LGA (Lot-26B) TSX Global Serv Ltd Yankwashi 12,996,750.00 12,996,750.00 10/3/2021 12 Months On-going

43

Supply of Diesel to Urban town

streetlights Generator at Kiri

Kasamma Cikin Garik in Kiri Kasamma

LGA (Lot-17B) TSX Global Serv Ltd K/kasamma 15,496,125.00 15,496,125.00 10/3/2021 12 Months On-going

44

Supply of Diesel to Urban Town

Streetlights Generators at Birnin Kudu

Jarda in Birnin Kudu LGA (Lot-4A) TSX Global Serv Ltd B/Kudu 15,966,000.00 15,966,000.00 10/3/2021 12 Months On-going

45

Supply of Diesel to Urban town

Streetlights Generator at Karkarna

Kofar Fada in Yankwashi LGA (Lot-

26A) TSX Global Serv Ltd Yankwashi 11,997,000.00 11,997,000.00 10/3/2021 12 Months On-going

46

Supply of Diesel to Urban town

Streetlights generator at Birnin Kudu

Pilot School in Birnin Kudu LGA (Lot-

4G) TSX Global Serv Ltd B/kudu 11,497,124.00 11,497,124.00 10/3/2021 12 Months On-going

Balance C/F 724,531,123.06 724,531,123.06

15e

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 81: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

MIN. FOR LOCAL GOVERNMENT

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BALANCE B/F 724,531,123.06 724,531,123.06

47

Supply of Diesel to Urban Town

Streetlights Generator at Hadejia

Kofar Fada in Hadejia LGA (Lot-12A) TSX Global Serv Ltd Hadejia 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going

48

Supply of Diesel to Urban Town

Streetlights Generator at Kiyawa

Junction in Kiyawa LGA (Lot-18A) TSX Global Serv Ltd Kiyawa 14,996,250.00 14,996,250.00 10/3/2021 12 Months On-going

49

Supply of Diesel to Urban Town

Streetlights Generator at Babura

Special Primary in babura LGA (Lot-

2C) TSX Global Serv Ltd Babura 14,496,375.00 14,496,375.00 10/3/2021 12 Months On-going

50

Supply of Diesel to Urban Streetlights

of Generator at Kaugama Primary

School in kaugama LGA (Lot-14A)

Alh. Umaru Babandoki

Ltd Kaugama 11,997,000.00 11,997,000.00 10/3/2021 12 Months On-going

51

Supply of Diesel to Urban Town

Streetlights Generators at Auyo Kofar

Fada in Auyo LGA (Lot-1B)

Alh. Umaru Babandoki

Ltd Auyo 10,997,250.00 10,997,250.00 10/3/2021 12 Months On-going

52

Supply of Diesel to urban town

Streetlights Generator at Kaugama

Secretariat in Kaugama LGA (Lot-14B)

Alh. Umaru Babandoki

Ltd Kaugama 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going

55

Supply of Diesel to urban town

streetlights Generator at Kafin Hausa

Market in Kafin hausa LGA (Lot-15A)

Alh. Umaru Babandoki

Ltd K/Hausa 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going

55

Supply of Diesel to urban town

streetlights Generator at Kafin Hausa

Market in Kafin hausa LGA (Lot-15A)

Alh. Umaru Babandoki

Ltd K/Hausa 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going

56

Supply of Diesel to urban town

Streetlights Generator at Maigatari

Motor Park in Maigatari LGA (Lot-

20B) Watt Electronics Ltd Maigatari 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going

Balance C/F 851,999,248.06 851,999,248.06

15f

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)

Page 82: JIGAWA STATE GOVERNMENT

JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU

FIRST QUARTER REPORT JANUARY TO MARCH, 2021

MIN. FOR LOCAL GOVERNMENT

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS

(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %

BALANCE B/F 851,999,248.06 851,999,248.06

57

Supply of Diesel to Urban town

Streetlights generator at Gumel

T/Asibiti in Gumel LGA (Lot-8C) Watt Electronics Ltd Gumel 17,995,500.00 17,995,500.00 10/3/2021 12 Months On-going

58

Supply of Diesel to Urban town

streetlights Generator at Maigatari

Kara in Maigatari LGAc(Lot-20A) Watt Electronics Ltd Maigatari 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going

59

Supply of Diesel to urban town

streetlight Generator at Gumel

dantanoma in Gumel LGA (Lot-8B) Watt Electronics Ltd Gumel 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going

60

Supply of Diesel to Urban town

streetlights generator at hadejia

Makabarta in Hadejia LGA (Lot-12D)

Alh. Umaru Babandoki

Ltd Hadejia 17,995,500.00 17,995,500.00 10/3/2021 12 Months On-going

Total 920,981,998.06 920,981,998.06

15g

ON-GOING PROJECTS JAN TO MARCH, 2021 (1)