JIGAWA STATE GOVERNMENT DUE PROCESS AND PROJECT MONITORING BUREAU OFFICE OF THE EXECUTIVE GOVERNOR FIRST QUARTER PROJECTS REPORT JANUARY TO MARCH, 2021
JIGAWA STATE GOVERNMENT
DUE PROCESS AND PROJECT MONITORING BUREAU
OFFICE OF THE EXECUTIVE GOVERNOR
FIRST QUARTER PROJECTS REPORT
JANUARY TO MARCH, 2021
WEB: WWW.JIGAWADUEPROCESS.COM
EMAIL: [email protected]
CONTENTS: SECTION (A) - EXECUTIVE SUMMARY
SECTION (B) - CHARTS
SECTION (C) - PRE-CONTRACTS EVALUATIONS JANUARY TO DECEMBER 2020
SECTION (D) - CONTRACTS AWARDED JANUARY TO DECEMBER 2020
SECTION (E) - COMPLETED PROJECTS /ON-GOING PROJECTS
- MINISTRY OF HEALTH
- MINISTRY OF WATER RESOURCES
- MINISTRY OF WORKS AND TRANSPORT
- MINISTRY OF EDUCATION, SCIENCE & TECHNOLOGY
- MINISTRY OF LAND AND HOUSING
- MINISTRY OF COMMERCE
- DUTSE CAPITAL DEVELOPMENT AUTHORITY
- CABINET OFFICE
- MINISTRY OF FINANCE AND ECONOMIC PLANNING
- BINYAMINU USMAN POLYTECHNIC, HADEJIA
- GOVERNMENT HOUSE
- MINISTRY OF INFORMATION, YOUTH AND SPORTS
- MINISTRY OF AGRICULTURE
- MINISTRY OF WOMEN AFFAIRS
- DEPUTY GOVERNOR’S OFFICE
- MINISTRY FOR LOCAL GOVERNMENT
1.00 EXECUTIVE SUMMARY. The first quarter report consists of three sections only namely, pre-contract evaluation, post contract and
contracts awarded from January to March 2021.
In line with the provision of section 4(j) of the Jigawa State Due Process and Project Monitoring Bureau Law
No. 13 of 2019, ‘To provide relevant procurement and budget performance information to interested parties’
the three sections under review in this report are as follows;
2.00 Pre-Contract Evaluation: - The section covers vetting of proposed new projects to be awarded valued at
N3,959,037,938.41 submitted by various Ministries, Departments and Agencies (MDAs) to the Bureau of which
it recommended N4,237,733,060.59 for execution. The process resulted in the increase of N278,695,122.18
against government which is equivalent to 7.03% of the submitted cost.
3.00 Post Contract Evaluation: - The section records both ongoing and completed projects within the
reporting period amounting to N66,910,682,991.51 only out of which N65,068,916,337.26 is carried forward, as
ongoing, from the previous year. It could be recalled that the sum of N78.241 billion only was approved for
Capital expenditure representing 50% of the total approved budget this year.
4.00 Contracts Awarded: - A total of 122No. Contracts were awarded to date amounting to N1,991,595,547.37
only representing 2.5% of the capital budgetary provision for new and ongoing projects (N78.241Billion). Though
the level of performance is not encouraging, considering time lapse (first year report), it is not disturbing taking
into consideration that there is enough time for improvement to achieve, at least, the projected 75% budget
performance by end of the year 2021.
5.00 Observations: - The performance of some capital projects, brought forward from the previous year, is
not encouraging due to time lag in completion. This may be due to funding problems from the contractors not
willing to invest adequately to ensure prompt completion, or due to covid-19 pandemic which resulted in total
lockdown on world economic, thereby resulting in hyperinflation on commodities. Alternatively, it might have
arisen due to government non-approval and payment of the 30% mobilization on new contracts which could
have enhance their performances considerably, though it is not aright but a privilege. The Ministries affected
include Works & Transport, Education, Water Resources, Finance and Cabinet Office.
6.00 Conclusion/Recommendations: - In conclusion the levels of performance of ongoing projects need to be
enhanced by all concerned to ensure that all contracts awarded were completed within reasonable period.
In addition, government should consider revoking contracts delayed un-necessarily, after payment of adequate
mobilization where necessary, or charge liquidated damages on delayed delivery.
The Ministry of Justice should ensure that; a provision for liquidated damages and interest on delayed payment
clauses were inserted in all our agreements to discourage any delay in contracts discharge.
The Council Affairs should be directed to insert/reflect the provision of Performance Bond of 10% of the contract
sum in all award letters being issued to contractors.
Furthermore, more efforts should be made to improve the quantum of contracts awarded through open
competitive process to enable the state record 80% by the end of the year.
Finally, no contractor should be allowed to bid for any contract so long as he has not delivered on previous
contract from the preceding years.
PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIES
JANUARY-MARCH, 2021
FINANCE AGRICULTURE INFORMATION COMMERCE WATER RESOURCES
33,073,215,073.83
8,648,602,784.39
11,115,800,552.55
7,745,329,245.29
873,109,178.58 1,114,089,895.54
WORKS &TRANSPORT
DCDA EDUCATION HEALTH LAND & HOUSING CABINET OFFICE
PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIES
JANUARY-MARCH, 2021
WORKS & TRANSPORT DCDA EDUCATION
HEALTH LAND & HOUSING CABINET OFFICE
17,168,322.96
194,284,715.28
360,764,566.38
920,981,998.06
PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIES
JANUARY-MARCH, 2021
Deputy Governor's Office BU Poly Hadejia Govt. House Min for Local Govt.
Completed, - , 0%
On-going, - , 0%
ANALYSIS OF PROJECTS PERFORMANCE JANUARY-DECEMBER, 2020
Completed On-going
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE
MINISTRY OF HEALTH
1
Proposed Change of Purpose from Consumables for Dialisis to Solar Electric System for
Gabari Comprehensive health Centre (First & Second Quarter 2020 Constituency Projects) 3,700,000.04 3,542,125.00 157,875.04 Min of Health
2
Proposed Construction of staff quarters at the ongoing Construction of Specialist Hospital
Hadejia 115,008,152.50 90,925,732.50 24,082,420.00 Min of Health
3
Proposed Construction of staff quarters at the ongoing Construction of Specialist Hospital
Kazaure 115,008,152.50 90,925,732.50 24,082,420.00 Min of Health
4 Proposed procurement of family planning consumables 7,260,726.50 7,260,726.50 - Min of Health
5 Construction of 100 Beds General Hospital Guri (addional works) 13,558,650.85 14,389,345.98 (830,695.13) Min of Health
6
Proposed upward review on Consultancy fee for the construction of new General Hospital
at Birnin Kudu 31,731,770.03 20,196,881.85 11,534,888.18 Min of Health
7 Proposed Constr. Of Wall fence and Renovation work under constituency at Gumel LGA 19,233,975.57 20,835,496.48 (1,601,520.91) Min of Health
8
Consultancy fee for the supervision of the Construction of 250 Beds Space New Specialist
Hospital Kazaure 19,139,000.17 11,004,973.15 8,134,027.02 Min of Health
9 Proposed Upgrading of Kiyawa PHC to Cottage Hospital 153,275,436.20 182,049,916.00 (28,774,479.80) Min of Health
10 Proposed upgrading of Karkarna Primary Health Care (PHC) to General Hospital 179,617,490.56 199,304,005.40 (19,686,514.84) Min of Health
11 Proposed Upgrading of Maigatari Primary Health Care (PHC) to General; Hospital 152,709,674.83 204,727,223.10 (52,017,548.27) Min of Health
12 Proposed Upgrading of Kiyawa PHC to Cottage Hospital 153,275,436.20 182,049,916.00 (28,774,479.80) Min of Health
13 Proposed renovation/improment of Kanya Babba PHC (Phase II) 168,157,703.61 200,928,997.22 (32,771,293.61) Min of Health
- MINISTRY OF WATER RESOURCES -
14
Rehabilitation of 5No. Water supply schemes at Takwasa magaji da'u Takwasa Mai Gari,
unguwar Naino, lamintani and jarmai in Babura LGA Ringim Zone 434,300.00 404,000.00 30,300.00 Stowa
15
Rehabilitation of 6no. Water Supply Schemes at Kurgun, Kanya Masallaci, Kanya Yamma,
Garin Ganau, Unguwar Shuri and Babura Kofar Fada in Babura LA Ringim Zone 436,500.00 436,500.00 - Stowa
16
Rehabilitation of 7no. Water Supply schemes at Jigawar Arewa, babura Gabas, kankaren
nagona, Kayarda, Wadar Kanawa, Garin Baki and Hammadi in Babura LGA Ringim Zone 374,000.00 374,000.00 - Stowa
1 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE
17
Rehabilitation of 7No. Water supply schemes at Babura Bakin Tasha, Jigawar Dan Ali, Dan
Kano, Giginya, Marken Biki and Carbin Malamai in Babura Lga Zone 518,250.00 518,250.00 - Stowa
18
Rehabilitation of 6no water schemes at Ando, Yanmaulu, Aduware, Garin Goto, Jamus and
Unguwar Gamji in Babura LGA Ringim Zone 412,650.00 412,650.00 - Stowa
19
Proposed rehabilitation and upgrading of motorised Borehole to Solar Powered Borehiole
under (PEWASH Programme) 70,293,158.58 73,447,762.53 (3,154,603.95) Ruwasa
20 Re-Pipeline Recticulations (28.6km) in Kazaure Town (Proposed Change of Purpose) 3,060,000.00 3,060,000.00 - Water Board
21
Upgrading and Conversion of Motorised water supply scheme to solar powered in
Abunabo and gagiya Towns in guri LGA 1,975,000.00 1,975,000.00 - Stowa
22
Upgrading and Conversion of Motorised water supply scheme to solar powered at Aujara
Small Towns 1,560,000.00 1,560,000.00 - Stowa
23
Upgrading and Conversion of Motorised water supply schemes to solar powered at Buji
Gari in Buji LGA 1,420,000.00 1,420,000.00 - Stowa-
MINISTRY OF EDUCATION -
24
Renovation of 2No. Hostel block at GUSS fantai, 2No. Hostel at GUCSS Dutse, Renovation
works at GDSS Wurno, GGUSS Gwaram, GDSS M/Madori and GGSS Sule Tankarkar (Lot-1) 3,588,519.74 3,517,059.74 71,460.00 Min of Educ
25
Constr. Of Hotel Block at SAIS Fatara in Dutse (2020 MOEST 2nd and 3rd Quarter Capital
Project) (Lot-7D) 1,512,842.83 877,161.00 635,681.83 IEB
26 Proposed procurement of Direct image machine and Examination materials 14,850,000.00 16,362,843.75 (1,512,843.75) Legal Ringim
27
Constr. Of 2No. Technical College Fence at Government science and technical College
Birnin Kudu and government Science and technical College Karkarna (2020 MOEST Capital
project) 3,360,831.64 3,205,272.32 155,559.32 Science Board
28 Proposed Constr. Of Front wall fence at biniyaminu Usman Polytechnic Hadejia 140,868,387.00 162,732,013.31 (21,863,626.31) Min of Education
29
Proposed Constr. Of wall fencing at Govt Science Technical College Ringim and day
Science Secondary School Hadejia 95,841,220.48 104,448,979.90 (8,607,759.42) ScienceTech Board
30
Proposed Procurement and Distribution of Learning and Teaching Materials for the
Programme of 81 Remedial Centres and 36 Continuining Education Centre 1,878,600.00 2,206,168.75 (327,568.75) Mass Educ
31
Proposed Payment of Facilitators and Coordinators Allowance for the Programme of 81
Remedial Centres and 36 Continuining Education Centres 52,650,000.00 52,650,000.00 - Mass Educ
32
Proposed Procurement workshop materials and consumables items for 4No. Technical
Colleges 4,856,749.22 4,775,620.31 81,128.91 ScienceTech Board
33
Proposed Procurement of Science Laboratory Equipments Reagents and Food 7 Nutrition
materials for all Science Secondary School Across the State 5,558,010.00 5,740,700.00 (182,690.00) ScienceTech Board34 Proposed subscription of periodicals 1,989,200.00 1,928,800.00 60,400.00 Library Board
2 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE
35 Proposed procurement of Library Equipments 4,999,000.00 6,085,843.75 (1,086,843.75) Library Board
36
Proposed Procurement of Core Text Books for distribution to Newly Established Senior
Secondary Schools Across The state 27,331,000.00 33,937,250.00 (6,606,250.00) Min of Education
37
Proposed Procurement of Science Laboratory Equipments for Distribution to 9No. Centres
of Excellence Core-3 (GGSS Sule Tankarkar, GUSS Roni, GDSS Kaugama, GDSS Danzomo,
GDSS Kiyawa, GDSS Sankara, GDSS Birniwa, GDSS Kiri and Jigacad Bamaina) 81,037,107.92 81,037,107.92 - Min of Education
38
Proposed procurement of Science laboratory equipments for Jigawa State College of
Remedial and Advance Studies Babura 14,082,268.00 14,082,268.00 - Min of Education
39
Proposed Procurement of Science laboratory Equipments for Distribution to 9Number
Senior Secondaryu Schools (GDSS Kila, GDSS Kwalam, GDSS Galamawa, GDSS Sakwaya,
GDSS K/Hausa, GDSS Shagari Quarter Hadejia, GDSS Guri, GDSS Jahun and GDSS Roni) 29,497,284.00 29,497,284.00 - Min of Education
40 Proposed food order for (500) students per week 608,000.00 614,200.00 (6,200.00) Min of Education
41
Proposed External Electrical power supply 33/11KV main Substation (Outdor type) Lot-1
of phase 3 (Supply and installation og 33Kv Main Substation Equipment and Accessories) 49,495,553.18 48,041,124.94 1,454,428.24 SLU
42 Proposed procurement of (500No) 3 Seater desks for all science school Across the state 9,942,190.00 13,706,250.00 (3,764,060.00) ScienceTech Board
43
Submission of Second Quarter 2021 Capital project Proposal (Accreditation Exercise for
and Program) (Kazaure Informatics School). 5,000,000.00 5,000,000.00 - JSIIT
44
Proposed Procurement of ICT gadgets for the Converted 5No. Day Science Secondary
Schools 14,895,972.66 14,211,903.12 684,069.54 ScienceTech Board
45 Proposed Procurement and Distribution of Instructional materials for Nomadic Schools 7,711,100.00 9,992,259.38 (2,281,159.38) Nomadic
46
Proposed Fumigation of 42No. Newly Established Schools Against termite, Bats and avain
Creature Across the state 12,964,500.00 12,728,946.00 235,554.00 Min of Education
47
Proposed procurement of (8,000 Copies) of School Head manual for School Management
in Basic Education project in Jigawa State 20,000,000.00 16,000,000.00 4,000,000.00 SUBEB
48
Proposed Renewal of Internet Service subscription at the University Permanent Site for
the year 2021 (K/Hausa) 13,867,500.00 12,900,000.00 967,500.00 SLU
49
Proposed Construction of wall fence and Adminstrative Blocks at Dangantsaure site
Nomadic School Dutse LGA 13,544,963.37 13,867,855.81 (322,892.44) Min of Education
50 Proposed Subscription of Internet Band Switch for the year 2021 (Kazaure Informatics) 4,518,225.00 4,518,225.00 - JSIIT
51
Proposed procurement of (28,822 Cartons) of Chalk Distribution to Basic Schools Across
the State 46,115,200.00 30,983,650.00 15,131,550.00 SUBEB
-
3 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE
MINISTRY OF LAND & HOUSING -
52 Procurement of SFTAS DLI5 Office Equipments 19,478,034.00 20,780,333.18 (1,302,299.18) Min of Land
53 Procurement of SFTAS DLI5 Field Equipments 5,936,500.00 9,298,078.12 (3,361,578.12) Min of Land
54 Procurement of SFTAS DLI5 Programme Equipment (Project vehicles repairs and Logistics) 17,979,000.00 17,868,600.00 110,400.00 Min of Land
55 Procurement of SFTAS DLI5 Programme Equipment 25,414,534.00 30,078,411.31 (4,663,877.31) Min of Land
MINISTRY OF WORKS & TRANSPORT
56
Proposed Relocation of urban town street light installation affected by the project (Ringim
township road) 21,585,508.00 22,182,148.24 (596,640.24) Min of Works
57
Proposed Relocation of Electrical Installations (KEDCO) Affected by Roads Project (Ringim
township road) 11,998,000.00 11,504,650.00 493,350.00 Min of Works
58 Proposed maintenance of failed section of tasheguwa-Guro Road 148,643,789.44 191,976,106.88 (43,332,317.44) JIRMA
59 Proposed Maintenance of Failed section of Jahun-Tsakuwawa-Gujungu Road 220,879,443.75 247,993,288.59 (27,113,844.84) JIRMA
60 Proposed Maintenance of Gujungu-Hadejia Road 913,681,722.45 913,681,722.45 - JIRMA
61 Proposed Mitigation Measures of Gully Erosion in Jigawar Sarki Dutse LGA (revised scope) 52,480,384.69 87,125,613.75 (34,645,229.06) Min of Works
62 Annual Running cost in respect of Urban Town streetlighting Installations (Year 2021) 221,097,500.00 221,162,400.00 (64,900.00) Min of Works
-
MINISTRY OF WOMEN AFFAIRS -
63
Proposed re-Activation of Existing Solar Streetrlight with Prepared integrated Stand Alone
solar streetlights at Duhuwa and Nisan Marke in Kiyawa and Ringim LGA 9,944,287.50 9,831,412.50 112,875.00 Alternative Energy
- CABINET OFFICE -
64
Proposed Constr/Renovation of Proposed Mobile Police Force Office/residential
Accomodation at Hadejia 57,557,411.12 58,543,556.70 (986,145.58)
Directorate of
Special Serv
65 Proposed Procurement of (5No.) Brand new Toyota Hilux (2020 Model) (Diesel Engine) 104,500,000.00 104,500,000.00 - Special Services
4 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE
- MINISTRY OF INFORMATION -
66
Proposed procurement and Installation of inverter at main Station (MCR) and Supply of
14no. 1 horse power inverter air conditioners (Dutse) 11,852,735.00 11,094,000.00 758,735.00 JTV
67
Proposed procurement and Installation of Virtual Studio Equipments and Nigcomsat
registration for Jigawa State Television Dutse 13,457,562.50 12,373,250.00 1,084,312.50 JTV
-
MINISTRY OF ENVIRONMENT -
68
Proposed production of 2.5 Million Assorted tree seedling for the year 2021 (Supply of
materials) 13,356,250.00 15,259,960.94 (1,903,710.94) Min of Environ
69 Proposed Production of 2.5 Million assorted tree Seedling for the year 2021 (Logistics) 14,623,440.00 9,214,760.00 5,408,680.00 Min of Environ
70 Proposed Construction of Drainage and Culvert Across the State ( Constituency Project) 86,569,442.23 114,693,079.23 (28,123,637.00) Min of Environment
71
Proposed Procurement of items to Be Distributed to the Community Organizations as
Government Support for the Clearance of Type and Other Aquatic weeds Along the
Riverine Areas 8,046,500.00 10,236,015.63 (2,189,515.63) Min of Environment-
GOVERNMENT HOUSE -
72 Upgrading (Conversion) of Lexus LX 570 2012 Model to 2020 Model 9,995,000.00 9,599,750.00 395,250.00 Govt House
- OFFICE OF THE DEPUTY GOVERNOR -
73
Proposed Replacement and Refurbishing of Existing wall security light for both office and
Residence of Deputy Governor 2,661,000.00 2,451,473.00 209,527.00 Dept Govt office-
DIRECTORATE OF ECONOMIC EMPOWEREMENT -
74 Proposed Procurement of (50Unit) of Hijoy Tricycles 39,072,500.00 52,503,671.80 (13,431,171.80)
Directorate
Economic -
MINISTRY OF AGRICULTURE -
75
Proposed Construction of Small scale Abbatoir at Kazaure in Kazaure Constituency (1St
and 2nd Quarter Constituency Projects) 13,176,835.08 13,781,152.84 (604,317.76) Min of Agric
- MINISTRY FOR LOCAL GOVERNMENT -
5 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER JANUARY TO MARCH, 2021Pre-contract Evaluation
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS(N) COST (N) INCREASE
76 Proposed construction of Hadejia Zonal Office 18,400,305.47 20,840,604.22 (2,440,298.75) Auditor Geeneral-
-
MINISTRY OF FINANCE, BUDGET AND ECONOMIC PLANNING - 77 Proposed Implementation of Additional Projects from 2014 MDGs-CGS Saving 1,926,000.00 1,761,000.00 165,000.00 Budget & Eco
- - - - -
TOTAL 3,959,037,938.41 4,237,733,060.59 (278,695,122.18)
6 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021
FIRST QUARTER REPORT
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N)
EXECUTING
MINISTRIES
COMP.
PERIOD
WORKS1 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type at Danfa in Babura constituency (lot20B) JEC/26/2021/VOL.I/17 Gidan adede general engerprises
Ltd3,856,152.12 Min of Education 17 weeks
2 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at karangi,kadirawa and zango in kiyawa
constituency (lot 24)JEC/30/2021/VOL.I/17 Gidan adede general engerprises
Ltd11,457,590.06 Min of Education 19 weeks
3 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at JSS yalo and JASS Dankayyawa
inkaugama constituency (lot 5)JES/7/2021/VOL.I/17 Wajedu Nig Ltd 7,672,304.24 Min of Education 10 weeks
4 1/26/2021 Upgrading and conversion of motorised water supply schemes to solar powered at 6NO, small town
(Chamo,Gambasha,Yabaza,Giginya,Amaryawa and Mamudawa) and construstion of 2NO, new solar
powered water supply scheme at Barandau and Jalomi arewa in Dutse, Birnin kudu, Jahun,Kazaure
and Ringim zones (Lot 1)
JEC/2/2021/VOL.I/7 Sims global reources Nig Ltd 74,008,751.25 Min of Water
Resources4 month
5 1/26/2021 Upgrading and conversion of 2NO, Motorised water supply scheme to solar powered at Abunabo and
Gagiya town in Guri LGA,Hadejia zone (Lot 2)JEC/33/2021/VOL.I/7 Khanadi global links Ltd 44,658,993.75 Min of Water
Resources3 month
6 1/25/2021 Construction of 1 block of 2 classrooms islamiyya SUBEB type each at Malaluwa and Farin Dutse
constituency, Gwaram LGA (lot 8)JEC/11/2021/VOL.I/17 AD2 intergrated technical
services Ltd7,672,304.24 Min of Education 20 weeks
7 1/26/2021 Upgrading and conversion of motorised water supply schemes to solar powered at Aujara town in
Jahun LGA,Jahun zone (Lot 3)JEC/34/2021/VOL.I/7 Khanadi global links Ltd 35,977,777.50 Min of Water
Resources3 month
8 1/22/2021 Construction of 1 block of 2 classrooms islamiyya type each at As-habulkafi, Sheik Buna shagari, Nurul
yaqeel islamiyya, Maman wale quarters and Kwarin manu in Hadejia constituency (Lot 14A)JEC/19/2021/VOL.I/17 AG global services Ltd 15,401,531.28 Min of Education 14 weeks
9 1/22/2021 Construction of 1 block of 2 blocks 6NO. Cubicle toilets, construction of gate and front view fencing at
maje nursey and primary school and IMN school in Hadejia constituency (Lot 14C)JEC/20/2021/VOL.I/17 AG global services Ltd 9,250,000.00 Min of Education 14 weeks
10 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at G/kanawa,Kuzuzumi and Koko in kanya
constituency, Babura LGA (Lot 11)JEC/16/2021/VOL.I/17 Gidan adede general engerprises
Ltd11,508,456.36 Min of Education 15 WEEKS
11 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Autatuwa in bulangu constituency (Lot
4)JEC/6/2021/VOL.I/17 Na bakwai general engerprises
Ltd3,865,152.12 Min of Education 19 weeks
12 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Amanga Gari,Danzomo and
Turkusawa in sule tamkarkar constituency (Lot 16)JEC/21/2021/VOL.I/17 Na bakwai general engerprises
Ltd11,452,590.06 Min of Education 17 Weeks
13 1/25/2021 Construction of 1 block of 3 classrooms islamiyya SUBEB type at Maigatari in garki constituency (Lot
12)JEC/17/2021/VOL.I/17 A.G.M & sons Nig Ltd 10,501,978.85 Min of Education 12 weeks
14 1/25/2021 Completion of 1 block of 2 classrooms islamiyya type each at Karwai and Charkawa in Ringim
constituency (Lot 7A)JEC/9/2021/VOL.I/17 A.G.M & sons Nig Ltd 7,672,974.08 Min of Education 16 weeks
Page 1 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021
JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021
FIRST QUARTER REPORT
15 1/22/2021 Construction of 1 block of 2 classrooms islamiyya type and Completion of 1 block of 4 classrooms at
GGSS K/hausa and Ruba in Kafin Hausa constituency (Lot 23)JEC/29/2021/VOL.I/17 AMM manzo Nig Ltd 4,626,917.43 Min of Education 19 weeks
16 1/25/2021 Completion of classrooms islamiyya type school at Dangyatin in Miga constituency (Lot 1B) JEC/1B/2021/VOL.I/17 AD2 intergrated technical
services Ltd3,164,974.00 Min of Education 14 weeks
17 1/25/2021 Renovation of 1 block of 2 classrooms islamiyya type at Sansani in Miga constituency (Lot 1C) JEC/3/2021/VOL.I/17 Gidan adede general engerprises
Ltd3,277,162.90 Min of Education 14 Weeks
18 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Tsangayar Liman, Uku da sisi and
Chirimbi in Babura constituency (Lot 20A)JEC/25/2021/VOL.I/17 Mufabamex Concept Nig Ltd 11,508,456.36 Min of Education 17 weeks
19 1/26/2021 Construction of 1 block of 2 classrooms islamiyya type each at Zangayan,Malandi,Birniwa,Izala and
Birniwa Day JSS (Staff room) in Birniwa constituency (Lot 26)JEC/32/2021/VOL.I/17 Kafiyama General Enterprices Ltd 15,344,130.32 Min of Education 12 weeks
20 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at GGSS Guri, guri Yamma and Garbagal
in Guri constituency (Lot 3)JEC/5/2021/VOL.I/17 Mugin investiment Nig Ltd 11,452,890.05 Min of Education 19 weeks
21 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Kalgwai,Kadirawa and Zango in Kiyawa
constituency (Lot 25)JEC/31/2021/VOL.I/17 Mugin investiment Nig Ltd 7,672,304.24 Min of Education 12 weeks
22 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Tudun wada, Duhuwa and Saya saya in
Dutse constituency (Lot 10C)JEC/15/2021/VOL.I/17 Mugin investiment Nig Ltd 11,501,819.64 Min of Education 19 weeks
23 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Amaryawa cikin
gari,Takwardawa,Jama'a Zugai,U/Dinya,Dansure Gabas,Mai karauchi,Sankau gari,Tudun Dan
biriri,Gumau and Roni Gari in Roni constituency (Lot 22)
JEC/28/2021/VOL.I/17 Jignaj Global Constructions Ltd 38,361,571.20 Min of Education 16 weeks
24 1/25/2021 Construction of 1 block of 2 classrooms islamiyya type each at Z/Sainawam Gidan Dogon
Faci,Dankawa,Wailare and Kurkyet in Gwiwa constituency (Lot 18)JEC/23/2021/VOL.I/17 Jignaj Global Constructions Ltd 15,304,471.36 Min of Education 14 weeks
25 3/2/2021 Re-surfacing of road parking space/storm gutter drainage at General Hospital jahun JEC/33/2021/VOL.I/6 Sukudai Construction Nig Ltd 13,379,159.41 Min of Health 12 Weeks
26
22/01/2021
Constr.of 1 Block of 2 Classroom Islamiyya type Each at Dakido and Garmaka in Maigatari
Constituency (Lot-19A) JEC/24/2021/VOL.I/17 Pullad Global Consult Ltd 7,672,304.24 Min of Education 17 Weeks
27
22/01/2021
Constr. Of 1 Block of 2 Classrooms Islamiyya Type Each at Wurmawa, Yar Jigawa, Katafila, Darul
Sunnah and Tahsin in Jahun Constituency (Lot-2) JEC/4/2021/VOL.I
Babandoki General Enterprises
Ltd 19,180,162.90 Min of Education 18 Weeks
28
22/01/2021
Constr. Of 1 Block of 3 classrooms Islamiyya Type, Constr. Of 2 Classroom (Rural Type) and Constr. Of
wall fencing and 1 Block Islamiyya at Abubakar Mosques, Ummul-Khair Islamiyya, Aminu Sani
Primary and Zango Constituency Projects Lot-9 JEC/12/2021/VOL.I/17
Babandoki General Enterprises
Ltd 22,774,106.00 Min of Education 11 eeks
29
18/02/2021
Constr. Of 3No. 5 Daily Prayer Mosque (2021 Constituency Project) Lot-2 at Mashagwar majiya,
Akubushin and Kalauri in Auyo Constituency JEC.37/2021/VOL.I/26 Yayarin Tukur Nig Ltd 6,968,835.81 Cabinet Office 12 Weeks
30
18/02/2021
Constr. Of 2No. 5 Daily Prayer Mosque (2021 Constituency Project) Lot-1A at Unik Babba and Unik
Ganik Gana in Auyo Constituency JEC/36/2021/VOL.I/26 Nabakwai General Entr 4,670,665.52 Cabinet Office 12 Weeks
Page 2 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021
JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021
FIRST QUARTER REPORT
31
19/02/2021 Renovation of 2No. Friday Prayer Mosque at Gidan Baki and Jirma in Garki Constituency (Lot-123) JEC/140/2021/VOL.I/13 Jignaj Global Constr Nig Ltd 13,904,254.84 Cabinet Office 12 Weeks
32
18/02/2021
Completion/Renovation of 3No. Friday Prayer Mosque at Nahuce, Garadoo and Harbo sabuwa in
Jahun Constituency (Lot-131) JEC/148/2021/VOL.I/13
Babandoki General Enterprises
Ltd 13,957,671.49 Cabinet Office 12 Weeks
33
18/02/2021
Completion/Renovation of 2No. Friday Prayer Mosque at M. Saidu Izala and Yan Kunama in Jahun
Constituency (Lot-130) JEC/147/2021/VOL.I/13
Babandoki General Enterprises
Ltd 9,952,904.72 Cabinet Office 12 Weeks
34
18/02/2021 Renovation of 2No. Friday Prayer Mosque at Dina and Duju in Jahun Constituency (Lot-129) JEC/146/2021/VOL.I/13
Babandoki General Enterprises
Ltd 6,606,678.07 Cabinet Office 8 weeks
35
18/02/2021
Renovation of 2no. 5 Daily Prayer Mosque at Sule Bakin Tasha and Tsangayar Sule in Sule Tankarkar
Constituency (Lot-82) JEC/106/2021/VOL.I/13 Ngaloma Constr Co. Ltd 6,223,303.28 Cabinet Office 8 weeks
36
18/02/2021
Constr. Of 3No 5Daily Prayer Mosque at K/Arewa, M Musbahu, Marayo and Hannun Giwa in Sule
Tankarkar Constituency Lot-63 JEC/86/2021/VOL.I/13 Ngaloma Constr Co. Ltd 7,019,301.51 Cabinet Office 12 Weeks
37
18/02/2021
Constr. Of 2No 5 Daily Prayer Mosque at Burmanawa and unguwar Liman in Sule Tankarkar
constituency (Lot-65) JEC/88/2021/VOL.I/13 Ngaloma Constr Co. Ltd 4,677,629.32 Cabinet Office 12 Weeks
38
18/02/2021
Constr. Of 3No. 5 Daily Prayer Mosque at Madobi, Tsalle, Jikai and Lageniya in Sule Tankarkar
Constituency (Lot-64) JEC/87/2021/VOL.I/13 Ngaloma Constr Co. Ltd 7,017,211.32 Cabinet Office 12 Weeks
39
18/02/2021
Constr. Of 3No. 5 daily prayer mosqye at Dilima, Sabaru and Gargadin Giwa in Birnin Kudu
Constituency Lot5 JEC/39/2021/VOL.I/26 Nushe Business Res Ltd 7,003,920.00 Cabinet Office 12 Weeks
40
18/02/2021
Completion/Renovation of 1No. Friday Prayer Mosque at Galadimawa in Taura Constituency (Lot
144) JEC/160/2021/VOL.I/13 Nushe Business Res Ltd 2,841,372.17 Cabinet Office 8 weeks
41
18/02/2021
Completion/ Renovation of 2No. Friday Prayer Mosque at Kangal and Malamawar in Taura
Constituency Lot-145 JEC/161/2021/VOL.I/13 Nushe Business Res Ltd 15,715,256.97 Cabinet Office 12 Weeks
42
18/02/2021
Constr. Of 3No. 5 Daily prayer mosque at Dagwaji, Rahaji and Sabuwar Kaura in Birnin Kudu
Constituency Lot-6 JEC/40/2021/VOL./13 Nushe Business Res Ltd 6,886,864.71 Cabinet Office 12 Weeks
43
19/02/2021
Constr. Of 3No. 5 Daily Prayer Mosque at Yafashiya, Dorawa Maiyado and Kafin Zaki in Birnin Kudu
Constituency Lot-07 JEC/41/2021/VOL.I/13 Nushe Business Res Ltd 7,015,043.60 Cabinet Office 12 Weeks
44
19/02/2021
Constr. Of 3No. 5 Daily Prayer Mosque at Barikin Dangiwa, Katsawa and Kauyen Madora in Birnin
Kudu Constituency Lot-8 JEC/42/2021/VOL.I/13 Nushe Business Res Ltd 7,003,293.45 Cabinet Office 12 Weeks
45
19/02/2021
Constr. Of 3No. 5 daily prayer mosque at Tajira Burin Warji and Babaldu in Birnin Kudu Constituency
Lot-11 JEC/44/2021/VOL.I/13 Nushe Business Res Ltd 7,012,453.68 Cabinet Office 12 Weeks
46
19/02/2021
Constr. Of 3No. 5 Daily Prayer Mosque at Lakar Kadanya, Juwan Tudu and Juwan Kwari in Birnin Kudu
Constituency Lot-12 JEC/45/2021/VOL.I/13 Nushe Business Res Ltd 7,006,387.44 Cabinet Office 12 Weeks
47
19/02/2021
Constr. Of 3No. 5 daily Prayer Mosque at Kauyen Gonar Faruku and Birnin Kudu in Birnin Kudu
Constituency Lot-13 JEC/46/2021/VOL.I/13 Nushe Business Res Ltd 4,667,780.76 Cabinet Office 12 Weeks
48
25/01/2021
Constr. Of 1 block of 2 Classrooms Islamiyya type each at Budai sabuwa, Kantamawa and Algama
Ringim Constituency Lot7B JEC/10/2021/VOL.I/17 Nushe Business Res Ltd 11,509,462.02 Cabinet Office 12 Weeks
Page 3 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021
JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021
FIRST QUARTER REPORT
49
25/01/2021
Completion of 1 Block of 3 Classrooms Islamiyya and Constr. Of 1 of 2 Classrooms Subeb Type at
Aujara and Taura Constituency Lot-13 JEC/18/2021/VOL.I/17 Nushe Business Res Ltd 13,976,503.95 Cabinet Office 12 Weeks
50
1/3/2021 Constr. Of 33KV Inter Town Connection (ITC) from Gagarawa Sub-Station to Gujungu Town JEC/184/2021/VOL.I/6 Arrayyan venture Global Ltd 35,959,298.80 Min of Works 12 Weeks
51
4/3/2021
Constr. Of 1 Block of 2 Classrooms Islamiyya type each at Gululu, Nasarawa and Rukumawa in Miga
Constituency (Lot-1) JEC/1B/2021/VOL./17 Loyalty Properties Ltd 11,478,353.53 Min of Education 14 Weeks
5216/03/2021 Constr. Of 250 Capacity theater at college of islamic and legal studies Ringim (Lot-1) JEC/250/2021/VOL.I/7 Ngaloma Construction Ltd 74,864,074.07 Min of Education 24 Weeks
5316/03/2021 Constr. Of 1 Blockof 3 Classroom at college of Islamic and Legal Studies Ringim (Lot-3) JEC/248/2021/VOL.I/7 Pullad Global Consult Ltd 18,419,746.61 Min of Education 12 Weeks
5416/03/2021 Constr. Of lecture Hall at College of Islamic & Legal Studies Ringim (Lot-2) JEC/249/2021/VOL.I/8 A.A. Maikatako Gen Ent Ltd 25,004,616.22 Min of Education 20 Weeks
5517/03/2021 Renovation of A Block at Jigawa State Scholarship Board Headquarters, Dutse JEC/251/2021/VOL.I/7 Panjatan 05 General Entr Ltd 4,941,196.04 Min of Education 4 weeks
GOODS
56 17/02/2021 Procurement of two (2No) Toyota Land Cruiser Jeeps to Government House, Dutse JEC/35A/2021/VOL.I/4 Math Global Invest Nig Ltd 105,000,000.00 Government House 4 Weeks
57 10/3/2021 Supply of Diesel o Urban Town Streetlights Generator at Auyo Court LGA (Lot-1A) JEC/197/2021/VOL.I/17 TSX Global Serv Ltd 14,996,250.00 Min of Local Govt 12 Months
58 10/3/2021 Supply of Diesel to Urban Streetlights Generators at Gantsa Town in Buji LGA (Lot-5) JEC/199/2021/VOL.I/17 TSX Global Serv Ltd 21,494,625.00 Min of Local Govt 12 Months
59 10/3/2021 Supply of Diesel Town Streetlights at Generators at Kazaure Kanti Kazaure LGA (Lot-16B) JEC/200/2021/VOL.I/17 TSX Global Serv Ltd 18,995,250.00 Min of Local Govt 12 Months
60 10/3/2021 Supply of Diesel to Urban Streetlights Generators at Kazaure Yan Makada in Kazaure LGA (Lot-16C) JEC/201/2021/VOL.I/17 TSX Global Serv Ltd 18,495,374.00 Min of Local Govt 12 Months
61 10/3/2021 Supply of Diesel to urban town Streetlights Generator at Babura Motor Park in Babura LGA (Lot-2B) JEC/211/2021/VOL.I/17 TSX Global Serv Ltd 12,996,750.00 Min of Local Govt 12 Months
62 10/3/2021
Supply of Diesel to Urban Town Streetlights Generators at Kazaure Sha'iskawa in kazaure LGA (Lot-
16D) JEC/210/2021/VOL.I/17 TSX Global Serv Ltd 14,996,250.00 Min of Local Govt 12 Months
63 10/3/2021 Supply of diesel to urban streetlights Generator at Garki Secretariat in Garki LGA (Lot-6A) JEC/240/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 17,495,625.00 Min of Local Govt 12 Months
64 10/3/2021
Supply of diesel to urban town streetlights Generators at Birnin Kudu Unity Bank in Birnin Kudu LGA
(Lot-4C) JEC/238/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 15,496,125.00 Min of Local Govt 12 Months
Page 4 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021
JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021
FIRST QUARTER REPORT
65 10/3/2021 Supply of diesel to urban town streetlights Generators at Roni Hospital in Roni LGA (Lot-23A) JEC/239/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 12,996,750.00 Min of Local Govt 12 Months
66 10/3/2021 Supply of Diesel to urban town streetlights Generators at Ringim Kofar fada in Ringim LGA (Lot-22A) JEC/237/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 15,496,125.06 Min of Local Govt 12 Months
67 10/3/2021 Suupply of Diesel to Urban Streetlights Generators at Ringim Galadanchi in Ringim LGA (Lot-22B) JEC/236/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 17,495,625.00 Min of Local Govt 12 Months
68 10/3/2021 Supply of Diesel to Urban Town Streetlights Generators at Garki Kofar fada in Garki LGA (Lot-6B) JEC/235/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 17,495,625.00 Min of Local Govt 12 Months
69 10/3/2021 Supply of Diesel to Urban Streetlights Generators at Taura LGA (Lot-25) JEC/234/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 18,995,250.00 Min of Local Govt 12 Months
70 10/3/2021 Supply of Diesel to Urban Streetlights Generator at Roni cikin Gari Roni LGA (Lot-23B) JEC/232/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 12,996,750.00 Min of Local Govt 12 Months
71 10/3/2021 Supply of diesel to urban streetlights Generator at Ringim EPI in Ringim LGA (Lot-22C) JEC/233/2021/VOL.I/17 I-GEE Eng. Const. Nig Ltd 16,995,750.00 Min of Local Govt 12 Months
72 10/3/2021 Supply of Diesel to Urban town Streetlights Generator at Guri Secretariat in Guri LGA (Lot-9A) JEC/218/2021/VOL.I/17 SAG Nig ltd 15,966,000.00 Min of Local Govt 12 Months
73 10/3/2021 Supply of Diesel to Urban Streetlights Generators at guri market in guri LGA (Lot-9B) JEC/219/2021/VOL.I/17 SAG Nig ltd 15,966,000.00 Min of Local Govt 12 Months
74 10/3/2021
Supply of Diesel to Urban Town Streetlights Generators at kafin hausa Cikin Gari in Kafin hausa LGA
(Lot-15B) JEC/220/2021/VOL.I/17 SAG Nig ltd 15,496,125.00 Min of Local Govt 12 Months
75 10/3/2021 Supply of Diesel to Urban town Streetlights Generators at Miga Town Miga LGA (Lot-21) JEC/198/2021/VOL.I/17 TSX Global Serv Ltd 21,994,500.00 Min of Local Govt 12 Months
76 10/3/2021 Supply of Diesel to urban town streetlights Generators at Gwiwa Town in gwiwa LGA (Lot-11) JEC/192/2021/VOL.I/17 TSX Global Serv Ltd 17,495,625.00 Min of Local Govt 12 Months
77 10/3/2021 Supply of Diesel to Urban Streetlights Generators at babura Kofar Fada in babura LGA (Lot-2A) JEC/193/2021/VOL.I/17 TSX Global Serv Ltd 16,995,750.00 Min of Local Govt 12 Months
78 10/3/2021
Supply of Diesel to Urban Town Streetlights Generatorsn at Birniwa Secretariat in Birninwa LGA (Lot-
3A) JEC/195/2021/VOL.I/17 TSX Global Serv Ltd 13,996,500.00 Min of Local Govt 12 Months
79 10/3/2021 Supply of Diesel to Urban Town Streetlights Generators at jahun Kofar fada in jahun LGA (Lot-13B) JEC/194/2021/VOL.I/17 TSX Global Serv Ltd 16,995,750.00 Min of Local Govt 12 Months
80 22/02/2021 Procurement of 2No. GS4 Luxury vehicles JEC/182/2021/VOL.I/6 CIG Motors Co. Ltd 27,152,500.00 Govt House 2 Weeks
81 10/3/2021 Supply of diesel to urban town streetlights Generator at gwaram New in Gwaram LGA (Lot-10D) JEC/244/2021/VOL.I/17 Pullad Global Consult Ltd 13,496,625.00 Min of Local Govt 12 Months
82 10/3/2021 Supply of Diesel to Urban Town Streetlights Generators at Gwaram Old in Gwaram Lga (Lot-10C) JEC/243/2021/VOL.I/17 Pullad Global Consult Ltd 13,496,625.00 Min of Local Govt 12 Months
83 10/3/2021
Supply of Diesel to Urban Town Streetlights Generators at Gwaram Primary School in Gwaram LGA
(lot-10B) JEC/242/2021/VOL.I/17 Pullad Global Consult Ltd 12,996,750.00 Min of Local Govt 12 Months
84 10/3/2021
Supply of Diesel to Urban Town Streetlights Generators at Gwaram Cikin Gari In Gwaram LGA
(Lot10A) JEC/241/2021/VOL.I/17 Pullad Global Consult Ltd 14,496,375.00 Min of Local Govt 12 Months
85 10/3/2021 Supply of Diesel to Urban streetlights Generators at Bamaina Old in Birnin Kudu Lga (Lot-4E) JEC/191/2021/VOL.I/17 TSX Global Serv Ltd 9,300,000.00 Min of Local Govt 12 Months
86 10/3/2021
Supply of Diesel to Urban Streetlights Generators at Sule Tankarkar Cikin Gari Sule Tankarkar LGA
(Lot24B) JEC/190/2021/VOL.I/17 TSX Global Serv Ltd 11,497,125.00 Min of Local Govt 12 Months
Page 5 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021
JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021
FIRST QUARTER REPORT
87 10/3/2021 Supply of Diesel to urban Streetlights Generator at Gumel Kofar Fada in Gumel LGA (Lot-8A) JEC/189/2021/VOL.I/17 TSX Global Serv Ltd 19,995,000.00 Min of Local Govt 12 Months
88 10/3/2021
Supply of Diesel to urban Streetlights Generators at Malam Madori G/Ganye in Malam Madori LGA
(Lot-19B) JEC/188/2021/VOL.I/17 TSX Global Serv Ltd 18,995,250.00 Min of Local Govt 12 Months
89 10/3/2021 Supply of Diesel to Urban town Streetlights Generators at Bamaina New in Birnin Kudu LGA (Lot-4F) JEC/187/2021/VOL.I/17 TSX Global Serv Ltd 14,996,250.00 Min of Local Govt 12 Months
90 10/3/2021 Supply of Diesel to urban town Streetlights Generator at Birniwa Kasuwa in Birniwa LGA (Lot-3B) JEC/185/2021/VOL.I/17 TSX Global Serv Ltd 21,994,500.00 Min of Local Govt 12 Months
91 10/3/2021 Supply of Diesel to Urban town streetlights Generator at Gagarawa Town in Gagarawa LGA (Lot-7) JEC/186/2021/VOL.I/17 TSX Global Serv Ltd 17,995,500.00 Min of Local Govt 12 Months
92 10/3/2021
Supply of Diesel to Urban town Streetlights Generator at Birnin Kudu Primary School in birnin kudu
Lga (Lot-4B) JEC/216/2021/VOL.I/17 TSX Global Serv Ltd 13,996,500.00 Min of Local Govt 12 Months
93 10/3/2021
Supply of Diesel to Urban town Streetlights Generator at Birnin Kudu Open Theater in Birnin Kudu
LGA (Lot-4D) JEC/215/2021/VOL.I/17 TSX Global Serv Ltd 15,996,000.00 Min of Local Govt 12 Months
94 10/3/2021
Supply of Diesel to Urban town streetlight Generator at Kiri Kasamma G/Wanka in Kiri Kasamma LGA
(Lot-17A) JEC/205/2021/VOL.I/17 TSX Global Serv Ltd 15,496,125.00 Min of Local Govt 12 Months
95 10/3/2021 Supply of Diesel to urban town streetlights Generators at Kazaure Kofar Fada in Kazaure LGA (lot-16A) JEC/204/2021/VOL.I/17 TSX Global Serv Ltd 11,497,125.00 Min of Local Govt 12 Months
96 10/3/2021 Supply of Diesel to Urban town streetlights generator at Kiyawa LGA (Lot-18B) JEC/203/2021/VOL.I/17 TSX Global Serv Ltd 11,997,000.00 Min of Local Govt 12 Months
97 10/3/2021 Supply of Diesel to Urban town streetlights Generator at Jahun Round About in Jahun LGA (lot-13A) JEC/202/2021/VOL.I/17 TSX Global Serv Ltd 16,995,750.00 Min of Local Govt 12 Months
98 10/3/2021
Supply of Diesel to urban town streetlights Generator at hadejia Local Education Authority (L.E.A) in
Hadejia LGA (Lot-12C) JEC/217/2021/VOL.I/17 TSX Global Serv Ltd 18,995,250.00 Min of Local Govt 12 Months
99 10/3/2021
Supply of Diesel to Urban town Streetlights Generators at Karkarna Secretariat Yankwashi LGA (Lot-
26B) JEC/213/2021/VOL.I/17 TSX Global Serv Ltd 12,996,750.00 Min of Local Govt 12 Months
100 10/3/2021
Supply of Diesel to Urban town streetlights Generator at Kiri Kasamma Cikin Garik in Kiri Kasamma
LGA (Lot-17B) JEC/212/2021/VOL.I/17 TSX Global Serv Ltd 15,496,125.00 Min of Local Govt 12 Months
101 10/3/2021
Supply of Diesel to Urban Town Streetlights Generators at Birnin Kudu Jarda in Birnin Kudu LGA (Lot-
4A) JEC/209/2021/VOL.I/17 TSX Global Serv Ltd 15,966,000.00 Min of Local Govt 12 Months
102 10/3/2021
Supply of Diesel to Urban town Streetlights Generator at Karkarna Kofar Fada in Yankwashi LGA (Lot-
26A) JEC/208/2021/VOL.I/17 TSX Global Serv Ltd 11,997,000.00 Min of Local Govt 12 Months
103 10/3/2021
Supply of Diesel to Urban town Streetlights generator at Birnin Kudu Pilot School in Birnin Kudu LGA
(Lot-4G) JEC/207/2021/VOL.I/17 TSX Global Serv Ltd 11,497,124.00 Min of Local Govt 12 Months
104 10/3/2021 Supply of Diesel to Urban Town Streetlights Generator at Hadejia Kofar Fada in Hadejia LGA (Lot-12A) JEC/206/2021/VOL.I/17 TSX Global Serv Ltd 18,995,250.00 Min of Local Govt 12 Months
105 10/3/2021 Supply of Diesel to Urban Town Streetlights Generator at Kiyawa Junction in Kiyawa LGA (Lot-18A) JEC/196/2021/VOL.I/17 TSX Global Serv Ltd 14,996,250.00 Min of Local Govt 12 Months
106 10/3/2021
Supply of Diesel to Urban Town Streetlights Generator at Babura Special Primary in babura LGA (Lot-
2C) JEC/214/2021/VOL.I/17 TSX Global Serv Ltd 14,496,375.00 Min of Local Govt 12 Months
107 10/3/2021
Supply of Diesel to Urban Streetlights of Generator at Kaugama Primary School in kaugama LGA (Lot-
14A) JEC/222/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 11,997,000.00 Min of Local Govt 12 Months
108 10/3/2021 Supply of Diesel to Urban Town Streetlights Generators at Auyo Kofar Fada in Auyo LGA (Lot-1B) JEC/223/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 10,997,250.00 Min of Local Govt 12 Months
Page 6 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021
JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAUCONTRACTS AWARDED JANUARY TO MARCH, 2021
FIRST QUARTER REPORT
109 10/3/2021
Supply of Diesel to urban town Streetlights Generator at Kaugama Secretariat in Kaugama LGA (Lot-
14B) JEC/221/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 13,996,500.00 Min of Local Govt 12 Months
110 10/3/2021
Supply of Diesel to urban town Streetlights generator at Hadejia Malam Madori Road in hadejia LGA
(Lot-12B) JEC/225/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 18,495,375.00 Min of Local Govt 12 Months
111 10/3/2021
Supply of Diesel to Urban Town Streetlights Generator at Malam Madori Kofar Gari in malam Madori
LGA (Lot-19c) JEC/226/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 18,995,250.00 Min of Local Govt 12 Months
112 10/3/2021
Supply of Diesel to urban town streetlights Generator at Kafin Hausa Market in Kafin hausa LGA (Lot-
15A) JEC/227/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 13,996,500.00 Min of Local Govt 12 Months
113 10/3/2021
Supply of Diesel to urban town Streetlights Generator at Maigatari Motor Park in Maigatari LGA (Lot-
20B) JEC/230/2021/VOL.I/17 Watt Electronics Ltd 13,996,500.00 Min of Local Govt 12 Months
114 10/3/2021 Supply of Diesel to Urban town Streetlights generator at Gumel T/Asibiti in Gumel LGA (Lot-8C) JEC/228/2021/VOL.I/17 Watt Electronics Ltd 17,995,500.00 Min of Local Govt 12 Months
115 10/3/2021 Supply of Diesel to Urban town streetlights Generator at Maigatari Kara in Maigatari LGAc(Lot-20A) JEC/229/2021/VOL.I/17 Watt Electronics Ltd 13,996,500.00 Min of Local Govt 12 Months
116 10/3/2021 Supply of Diesel to urban town streetlight Generator at Gumel dantanoma in Gumel LGA (Lot-8B) JEC/231/2021/VOL.I/17 Watt Electronics Ltd 18,995,250.00 Min of Local Govt 12 Months
117 10/3/2021 Supply of Diesel to Urban town streetlights generator at hadejia Makabarta in Hadejia LGA (Lot-12D) JEC/224/2021/VOL.I/17 Alh. Umaru Babandoki Ltd 17,995,500.00 Min of Local Govt 12 Months
SERVICES
118 1/2/2021
Commissioning as consultant for the supervision of the construction of Ringim Township Road
(4.4km) FGPC/136/2012/VOL.I/196 Himma Tech Serv & Co Ltd 16,784,194.48 Min of Works 6 Months
119 1/2/2021 Commissioning as Consultant for the supervision of the rehabilitation of Sara- Gantsa Road JEC/2/2021/VOL.I/72 SIIS Engineering Consult 3,176,149.69 Min of Works 6 Months
120 1/2/2021
Commissioning as consultant for the supervision of the Construction of Sections of Abunabo-
ChapChapNo-Lafiyari-Kadira-Guri Road (Eastern bye-pas phase III Road) (2.4km) JEC/59/2017/VOL.I/78 Curves & Straight Design Ltd 10,483,569.12 Min of Works 16 Months
121 1/2/2021 Commissioning as consultant for the supervision of the rehabilitation of gwaram-Basirka Road (63km) FGPC/223/2018/VOL.I/72 Apex Design & Associates 88,582,945.16 Min of Works 22 Months
122 12/2/2021
Registration of Urban Properties Across the State Under World Bank Supported SFTAS Program (DLI-
5) ( Approval for the engagement of consultant) GHS/9/VOL.I/644 Linx Spatial System Ltd 13,459,000.00 Min of Land 1 Year
1,991,595,547.37TOTAL=
Page 7 C:\Users\BASHIR HASSAN\OneDrive - 新化國中\First Q 2021\AWARDS JANUARY TO MARCH, 2021
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Health
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1
Commissioning/engagement as consultants for the
supervision of construction of new general hospital at
Birnin kudu Design Plus B/Kudu 74,010,950.99 74,010,950.99 73,825,923.61 27/5/2014 10 month 99 On-going
2
General Renov. /Improvement works at Fagam Primary
Health Care Ngaloma Const. Co. Ltd. Gwaram 64,869,057.07 71,417,939.66 64,370,619.95 30/12/2016 12 weeks 86 On-going
3 Constr. Of New 250 Bed Specialist Hospital in Hadejia PHILKO LIMITED Hadejia 1,593,314,294.25 1,894,557,085.99 1,458,779,763.98 11/10/2017 18 months 77 On-going
4
Engagment as Consultant for the supervision of the
Constr. of New Specialist Hospital, Hadejia HAG Eng. Nig. Ltd. Hadejia 67,363,041.01 78,830,914.46 67,290,130.60 19/10/2017 16 months 85 On-going
5 Constr of New General Hospital at Gantsa in Buji LGA Ngaloma Constr Ltd. Buji 465,983,075.70 664,813,704.78 504,306,295.13 12/7/2018 9 months 76 On-going
6 Constr of New General Hospital at Garki Babandoki Gen. Entp. Garki 493,805,327.06 692,635,956.14 508,320,622.25 12/7/2018 12 months 74 On-going
7
Constr of New General Hospital at Guri town,
Headquarters of Guri LGA Retro Constr Ltd. Guri 538,386,262.75 538,386,262.75 471,710,986.43 12/7/2018 12 months 88 On-going
8
Constr of New School of Nursing and Midwifery at
Babura, Headquarters of Babura LGA Gridarch Nig. Ltd. Babura 591,562,261.76 591,562,261.76 525,877,945.18 12/7/2018 12 months 89 On-going
9
Upgrading of sule tankarkar Primary Health Center (PHC)
to a full Pledged general hospital Math Global Invest Ltd S/tankarkar 132,915,319.86 132,915,319.86 129,090,486.22 13/11/2020 8 Weeks 100 Completed
10
Engagement as Consultant for the Supervision of the
Constr. of New General Hospital, Guri AADC Limited Guri 34,870,673.74 34,870,673.74 30,389,792.16 30/8/2018 12 months 87 On-going
11
Engagement as Consultant for the Supervision of the
Constr. of New Specialist Hospital, Kazaure HAG Eng. Consultants Kazaure 78,006,110.10 78,006,110.10 51,531,977.61 10/8/2018 16 months 66 On-going
12 Constr. Of staff quarters at Birnin Kudu General Hospital
Babandoki General
Enterprises Ltd B/Kudu 94,028,008.60 94,028,008.60 84,850,124.97 13/11/2020 6 Weeks 90 On-goiing
13
Re-surfacing of road parking space/storm gutter drainage
at General Hospital jahun
Sukudai Construction Nig Ltd Jahun 13,379,159.41 13,379,159.41 3/2/2021 12 Weeks
Balance C/F 4,242,493,542.30 4,959,414,348.24
1a
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Health
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
Balance B/F 4,242,493,542.30 4,959,414,348.24
14
Engagement as Consultant for the Supervision of the
Constr. of New General Hospital, Gantsa Blue Urban Transnational Buji 33,925,256.47 49,154,984.75 34,568,528.76 10/8/2018 9 months 69 On-going
15
Engagement as Consultant for the Supervision of the
Constr. of New General Hospital, Garki Zeebro Global Resources Garki 34,321,462.71 49,497,067.98 33,842,195.43 10/8/2018 12 months 67 On-going
16 Constr. of New Specialist Hospital at Kazaure Afdin Constr Co. Ltd. Kazaure 1,893,240,056.40 2,089,997,698.90 1,628,253,839.55 5/7/2018 16 months 78 On-going
17
Supply and Installation of Medical equipments to the
newly constructed 31no. BHC across the state. Mashasha Investment Ltd. Across the state 98,065,965.00 98,065,965.00 25/4/2018 20 weeks On-going
18
Consultant for the supervision of the construction of
new school of Nursing and Midwifery at Babura INTERGRAPH CONSULT Babura 50,318,699.92 50,318,699.92 45,584,364.14 24/12/2018 12 months 90 On-going
19
Supply and Installation of Medical equipments to the
newly constructed 31no. BHC across the state. G.M. Sara & Sons Ltd. Across the state 4,129,061.98 4,129,061.98 16/4/2018 6 weeks On-going
20
Supply and Installation of Medical equipments to the
newly constructed 31no. BHC across the state. G.M. Sara & Sons Ltd. Across the state 4,129,061.98 4,129,061.98 16/4/2018 6 weeks On-going
21
Construction of LI block as maternity wing Lot-32 at
Ba'auzini BHC in Kazaure LGA Dangata Memorial Inv. Ltd Kazaure 17,159,889.57 17,159,889.57 17,159,889.57 14/1/2020 20 weeks 100 On-going
22
Engagement of Glalaxy ITT for the Development and
Meintenance Database for Jigawa State Contributory
Healthcare Management Scheme Galaxy ITT Ltd In the state 18,273,817.00 18,273,817.00 30/06/2020 3 years On-going
23
Upgrading Bulangu Cottege Hospital to General Hospital
in Bulangu town Dangata Memorial Inv. Ltd K/Hausa 98,846,893.09 98,846,893.09 98,821,369.20 20/2/2020 16 weeks 100 Completed
Balance C/F 6,494,903,706.42 7,438,987,488.41
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Health
1b
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
Balance B/F 6,494,903,706.42 7,438,987,488.41
24
Constr. Of 906meter Asphalt Overly and Culvert as
External Road, Linking Birnin Kudu General Hospital (Lot-
1) Ganan Constr Co Ltd B/Kudu 101,091,796.18 101,091,796.18 19,419,519.00 19/11/2020 16 Weeks 19 On-goiing
25
Supply and Installation of Hospital Equipment to 20 LI
Blocks Across the State
Babandoki General
Enterprises Ltd in the state 57,178,880.00 57,178,880.00 30/12/2020 8 Weeks On-goiing
26
Commissioning as consultant for the Supervision of the
upgrading of Sule tankarkar Primary Health care to full
pledged General Hospital
Curves & Straights Design
Ltd S/tankarkar 2,326,018.10 2,326,018.10 1,817,539.73 31/12/2020 3 Months 78 On-goiing
27
Commissioning as consultant for the supervision of the
construction of asphalt overlay as road linking the Birnin
Kudu General Hospital
Landbase Engineering
Services Ltd B/Kudu 1,769,106.42 1,769,106.42 31/12/2020 12 Weeks On-goiing
28
Supply and Installation of Hospital Equipment to 15 LI
Blocks Across the State Zaramat Global Company B/Kudu 42,884,160.00 42,884,160.00 30/12/2020 8 Weeks On-goiing
29
Constr. Of 906 Meters asphalt overlay and culverts as
external Road Linking Birnin Kudu General Hospital Ganan Constr. Nig Ltd B/Kudu 101,091,796.18 101,091,796.18 13/11/2020 3 Months On-goiing
Total 6,801,245,463.30 7,745,329,245.29
.
1c
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Health
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Water Resources
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1
Rehab. of Water Supply Schemes across the state at
Gwaram Zone (Water Board) Interworld I & E Gwaram 27,207,315.85 27,207,315.85 25,403,004.38 9/21/2015 12 weeks 89 On-going
2
Constr of 3no. Water Collection points (Lot-26) of
Dunbule kusure and Zago Granitoid Eng Ltd. Yankwashi 3,781,047.00 3,781,047.00 3,781,046.90 8/7/2020 8 weeks 100 Completed
3
Constr. of Hand Pumps Water Supply Schemes (phase II) as
Constituency projects at Yosaro, Dilima/Zaramba and
Mungulo in B/Kudu Constituency. A.A. Aljazeera Agro Properties B/Kudu 1,657,215.00 1,657,215.00 29/3/2017 8 weeks Stalled
4
Constsruction of Hand pumps Water supply schemes (phase
II) as constituency project at Yola, Masanawa, Larabar Gulai,
Katanga Kudu, Dan koli and Dubal in Kiyawa Constituency. DE-MASTBO Kiyawa 3,331,430.00 3,331,430.00 29/03/2017 8 weeks Stalled
5
Construction of Solar Powered Water supply schemes
(Phase II) as constituency Projects at Sabuwar Rafa (Andaza
ward ) in Dutse constituency DE-MASTBO Dutse 6,270,000.00 6,270,000.00 29/03/2017 8 weeks Stalled
6
Constr. Of 4no. Hand pumps Water supply schemes (phase
II) as Constituency projects at Kofar Gidan Liman, Bayan
Gidan Sarkin Bai, Zankuwa fulani and Sabuwar SSS in Garki
Constituency. Taqib Ventures Nig. Ltd. Garki 2,340,000.00 2,340,000.00 21/6/2017 8 weeks Stalled
7
Constr. Of Solar Powered Water Supply Schemes (Phase I) as
Constituency Project at Marma in Kirikasamma Constituency LOYALTY PROPERTIES LTD K/Kasamma 6,943,387.00 6,943,387.00 7/8/2017 8 Weeks Stalled
8
Construction of (1No.) Hand pump water supply Schemes
2017 Constituency Project Phase II (Lot-3) at Tsattiya in
Dutse Constituency Loyalty Properties Ltd Dutse 798,000.00 798,000.00 1/24/2018 8 weeks On-going
9
Construction of 91No.) Solar Powered water supply scheme
2017 constituency Phase II Project (Lot-16) at Gambawa in
Miga Constituency Loyalty Properties Miga 6,968,430.00 6,968,430.00 1/24/2018 8 weeks On-going
10
Constr. Of (1no.) Solar [powered water supply scheme 2017
constituency phase II project (LOT-27) at Gacharam in Guri
Constituency. Limis Brothers & Co. Guri 6,968,430.00 6,968,430.00 24/1/2018 8 weeks On-going
11
Conversion of Motorizied Boreholes to Solar Powered
Water supply at Garki main Station in Garki Local Govt Area. Sims Global Resources Garki 34,070,557.50 34,070,557.50 18,327,487.50 7/2/2018 12 Weeks 52 On-going
BAL. C/F 100,335,812.35 100,335,812.35
2a
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 100,335,812.35 100,335,812.35
12
Constr of (1no.) Solar Powered water supply schemes 2017
constituency phase III projects (Lot-13) at Kangarwa in
Maigatari Constituency Jignaj Global Constr Ltd. Maigatari 6,968,430.00 6,968,430.00 21/3/2018 8 weeks On-going
13
Construction of (9No.) Hand Pumps Water supply scheme
2017 Constituency phase II Projects (Lot-8) at Gidan Iliyasu,
Mai Goro, Falari Burburwa, Zulkiya Kila, Kila by pass, Sara
cikin gari, Kuka manoma, Kafin torto and Fiji in Gwaram
Constituency. A.A. Aljazeera Agro Proc. Gwaram 7,202,791.35 7,202,791.35 5,588,165.61 24/1/2018 8 Weeks 74 On-going
14
Constr of (1no.) Solar Powered Water Supply Scheme
Constituency Projects (2018 phase 1) Lot-7 at
Constituency. Jignaj Global Ltd. 6,023,115.00 6,023,115.00 17/10/2018 8 weeks On-going
15
Constr of Water Collection points constituency projects
(2018 phase III) Lot-22 at Gari kudu, Yarbarewa,
Nabanawa, Garki Arewa, Maizaure, Jangari, Dunguzu,
Gurarraji and Koyama in Garki Constituency. Mugin Invest. Nig. Ltd. Garki 12,588,450.00 12,588,450.00 12,588,450.00 28/2/2020 10 weeks 100 Completed
16
Constr of Hand pump Boreholes as constituency projects
(2018 phase II) Lot-14 at Kanzon Kokori, D/Kyaure
Yamma, Gafaya B., G.Baba Gagare D/Toca, Aguran
Mazana, Dangoli Gabas and Gafaya in Kafin Hausa
Constituency. Alkawakeb Global Concept K/Hausa 5,164,110.00 5,164,110.00 18/12/2018 8 weeks On-going
17
Constr. Of (4no.) Hand pumps water supply Scheme
Consultancy projects (2018 phase) Lot 20 at Fulanin G.
Dunfu in Taura Constituency. Faahm Integrated Resource Taura 2,942,100.00 2,942,100.00 17/10/2018 6 weeks On-going
18
Construction of (1NO.) Hand Pumps Water supply
scheme Constituency projects (2018 Phase I) Lot 18 at
Ban-iyaka in Roni Constituency. HikimaSynergy Gen Entp Nig Roni 733,918.50 733,918.50 17/10/2018 4 weeks On-going
BAL. C/F 141,958,727.20 141,958,727.20
2b
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Water Resources
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 141,958,727.20 141,958,727.20
19
Construction of Block of 2-Classroom Islamiyya (1NO.)
Lot-11 at Jibori in Kirikasamma Constituency. Tosarawa Global Ltd. Kirikasamma 3,097,448.45 3,097,448.45 1/11/2018 4 Weeks On-going
20
Construction of (8NO.) Hand Pumps Water supply
scheme Constituency projects (2018 Phase I) Lot 14 at
Muna, Mundu, Kwagga, Fulanin Hauwa, Jakai Fulani,
Dangaigai, Inguwar Goje and Kadagawa in Kanya Babba
Constituency. Babura Local Government Area. DeeTech Nig Ltd. Babura 5,905,200.00 5,905,200.00 15/10/2018 8 weeks On-going
21
Construction of the (1 No.) Solar Powered Water Supply
Schemes 2018 Constituency Phase III Projects (Lot-18) at
Kaya Jamu in Maigatari Constituency. Alkawakeb Global Concept Maigatari 6,023,115.00 6,023,115.00 23/11/2018 8 weeks On-going
22
Construction of the (1 No.) Solar Powered Water Supply
Schemes Constituency Projects (2018 Phase II) Lot-32 at
Yalwa in Gagarawa Constituency. Farham Intgratred Resources Gagarawa 6,023,115.00 6,023,115.00 23/11/2018 8 weeks On-going
23
Construction of Water Collection Point as Constituency
Projects (2018 Phase II) Lot-32 at Maigatari (2No.)
Maloya, Bosuwa, Galadi, Madana and Jajeri in Maigatari
Constituency. Jag & H Intgrated Services Ltd. Maigatari 7,358,173.38 7,358,173.38 18/12/2018 8 weeks On-going
24
Constr of Hand pump Boreholes as constituency projects
(2018 phase II) Lot-14 at Kanzo kokori, D/kyaure
yamma, Gafaya B, Baba Gagare D/Toca, Aguran mazana,
Dangoli Gabas and Gafaya in K/Hausa Constituency. Alkawakeb Global Concept K/Hausa 5,164,110.00 5,164,110.00 18/12/2018 8 weeks On-going
25
Conversion of (15No.) Hand Pumps to Solar Powered Water
supply Schemes at Babura Yamma, Yangadi, Zuru, Gadi, Dan
Barage, Hayin Buzu, Kuka, Gasakoli, Duzau, Yada, Kaki Zago,
Gatuta Sansami, Kankare tukurkusa and Lamba in Babura
L.G.A. Sims Global Resources Ltd Babura 15,301,125.00 15,301,125.00 8,160,600.00 31/12/2018 10 weeks 53 On-going
BAL. C/F 190,831,014.03 190,831,014.03
2c
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 190,831,014.03 190,831,014.03
26
Conversion of (12No.) Hand Pumps to Solar Powered Water
supply Schemes at Dan Amale, Walawa, Yanmaulu, Unguwar
Ma'aruf, Batali, Kanya Gari, Dankarda, Babura Gabas,
Malamawa, Figi, Dunkumi and Duwala in Babura L.G.A. Sims Global Resources Ltd Babura 12,240,900.00 12,240,900.00 7,140,525.00 31/12/2018 10 weeks 58 On-going
27
Constr of Hand Pump Boreholes Water Supply Schemes
Constituency projects (2019 First Quarter) Lot-8 at mai
dashi, Idi gwamna, unguwar malam, rigar lamido, adiyani
islamiyya, dagana Nato, daba, dirba, rigar malam wuri, yalwa
tsangaya, goni garin una, askandi arinjasko, rigar wakilin
dajjo lafiya, rigar babare, and rigar duka maza in Guri
Constituency AYH Intg. Serv. Ltd Guri 10,331,489.00 10,331,489.00 11/12/2019 8 weeks On-going
28
Conversion of 10No hand Pump Boreholes to Solar in at Uku
da Sisi, Ajjah, Mudirin gadi, Mundu, unguwar Ganji, Kafin
Danyayi, Unguwar gawo, Dabawa, Katirje and Tsadarwa in
Babura Local Government Area Sims Global Res Babura 10,276,880.00 10,276,880.00 8,221,500.00 11/7/2018 8 weeks 76% On-Going
29
Construction of 1No. Solar Powered Water Supply Scheme
at Dora in Garki LGA Ringim Zone Sims Global Resources Ringim 6,023,325.00 6,023,325.00 16/4/2019 8 Weeks On-going
30
Construction of 6No Hand Pump Boreholes water supply
scheme at Yandamo Kulle 2, umarni, Modoji Babba, Fulanin
Riggade, Gidan Hardo Musa ( Fulanin Asayaya) in Sule
Tankarkar Local Government Area and Tamburawa in Kafin
Hausa LGA K-Manu Gen Construction
S/tankarkar +
K/Hausa 4,427,640.00 4,427,640.00 3,680,475.75 8/5/2019 12 weeks 83 On-going
31 Rehab. Of 19no. Water supply schemein Ringim Sims Nig. Ltd. Ringim 17,361,750.00 17,361,750.00 11/10/2019 8 weeks On-going
32
Renov of 2no. Solar Powered water Supply schemes
Contituency project ( 2019 Phase 1) Lot- 24 at Gidan Kudege
and Kurneji in Gwiwa Constituency Jignaj Global Contr Ltd Gwiwa 3,227,700.00 3,227,700.00 11/12/2019 8 weeks On-going
BAL. C/F 254,720,698.03 254,720,698.03
2d
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 254,720,698.03 254,720,698.03
33
Rehabilitation of 3no. Water supply scheme at danzomo,
maitsamiya, and dankumbo in sule tankarkar (gumel zone
2019) Lot-2 capital projects LIMIS Brothers & Co S/Tankarkar 4,628,531.25 4,628,531.25 19/12/2019 4 weeks On-going
34
Consr rof 1NO. Solar Powered Water Supply Scheme Lot-7
at Daki daka in Garki LGA (Ringim zone 2019)-capital project LIMIS Brothers & Co Ringim 6,019,125.00 6,019,125.00 19/12/2019 8 weeks On-going
35
Constr of 1NO. Solar Powered Water Supply Scheme
Constituecy project (2019 Phase 1) Lot-1 at Kafardu in auyo
Constituency Faahm Integrated Ltd Auyo 6,018,915.00 6,018,915.00 23/12/2019 8 weeks On-going
36
Constr of 1NO. Solar Powered Water Supply Scheme
Constituecy project (2019 Phase 1) Lot-44 at alkalawa in
K/hausa Constituency Hambiscons Nig Ltd K/hausa 6,016,920.00 6,016,920.00 6,016,920.00 23/12/2019 8 weeks 100 Completed
37
Constr of 1NO. Solar Powered Water Supply Scheme
Constituecy project (2019 Phase 1) Lot-43 at Kore in K/hausa
Constituency Hambiscons Nig Ltd K/Hausa 6,016,920.00 6,016,920.00 23/12/2019 8 weeks On-going
38
Construction of hand pump boreholes water supply
schemes constituency projects (2019 first quarter) Lot-3 at
kazura, rugar taho, fulanin karanga, fulanin karanga gabas,
fulanin fagi, rugar saga, fulanin diginsa, Gidan Mal Dahiru,
Birniwa U/yamma, rugar idi kulla, rugar haberi, mara,
diginsa, fulanin batu, Umaru mai goro, fulanin mai zariya,
korewa, fulanin kachallari, dargazawa, fulanin kishinde,
gidan amadu, fulanin kazadama and inkibulawa gabas in
birniwa constituency Dabino integ serv Ltd Kaugama 15,492,109.50 15,492,109.50 14/12/2019 12 weeks On-going
39
Construction of solar power water supply scheme
constituncy project (2019 phase I) Lot-32 at Ganbabituwa in
kirikasamma constituency. Dabino Integ Serv. Ltd K/Kasamma 6,017,235.00 6,017,235.00 11/12/2019 8 weeks On-going
40
Constr. of Solar Powered Water Supply Scheme
Constituency Project (2019 PHASE 1) LOT-15 At Dawar Gada
in Maigatari Constituency A.S.Maifata Gen. EntP. Ltd Maigatari 6,015,765.00 6,015,765.00 11/12/2019 8 weeks On-going
BAL. C/F 310,946,218.78 310,946,218.78
2e
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 310,946,218.78 310,946,218.78
41
Constr. of Solar Powered Water Supply Scheme
Constituency Project (2019 PHASE 1) LOT-25 At Fagoji in
Dutse Constituency JAG & H Interg. Service Dutse 6,021,015.00 6,021,015.00 11/12/2019 8 Weeks On-going
42
Constr of Hand Pump Boreholes Water Supply Schemes
Constituency projects (2019 First Quarter) Lot-29 at
gangawa, sabara, ruwan dawa, kulleran, ganwa fulani,
fanisau, tazara sabon gida, tula, majiga, harbo, dina, kamai
gitsira, dogawa gabashi, bayan kotun cikin gari, gundin
sabon gida and yamma in Jahun Constituency Sasco Multi Serv Nig Ltd Jahun 11,791,752.00 11,791,752.00 11/12/2019 14 Weeks On-going
43
Constr of Hand Pump Boreholes Water Supply Schemes
Constituency projects (2019 First Quarter) Lot-12 at sabuwar
jawo (sabaru ward), fulanin ballami (dandi ward), K/Mal. Ali
headmaster (gada ward), K/alta makeri (gada ward) and
makabarta gabas (gada ward) in kazaure Constituency Yanduna Venture Nig Ltd Kazaure 3,686,287.50 3,686,287.50 11/11/2019 8 Weeks On-going
44
Constr. Of 31No. Hand Pump Borehole water supply
schemes (2019 First Quarter Constituency Project) LOT-16 at
G/Tela Kabo Fulanin Dandabino, G/Musa Shanu Fulanin
Tsanfau, Mekekiya Gari, Gidan Haruna Babe, Dungundun
Gari, Fulanin Danmodi, Dangoho Gari, Muku Gari, Maigatari
Albasu, G.A gaiya Fulanin Dantsakuwa, Karangi Gari,
Tsangayar Kirgi, G/Shu'aibu Ajiya Fulanin Kakudi, Dankulli
Gari, Lululu, Zangunan Jeke, Gidan Hardo Yahaya,Gidan
Dashi, G/ Hardo Amadu Fulanin Kukule, Gidan Alh. Dare,
Gidan Hardo Katore Fulanin Dan Marke, Haro Kandir,
Fulanin Barawa, Gidan Mati, Gidan Jikan Banki, Fulanin
Jarimawa, Tashar Hajja, Fulanin Dukuku, Hardo Murnai,
Gidan Bulama Suna and Fulanin Mailefe in Sule Tankarkar
constituency H.M Dangara Ltd S/tankarkar 22,872,730.00 22,872,730.00 21/01/2020 12 weeks On-going
45
Constr. Of 6No Water Collection Points First Quarter, 2019
Constituency Projects at Karkarna Sabon Gari, karkarna Cikin
gari, Dole, Sabuwa, Sada and furji in yankwashi constituency
(Lot-24) Granitoid Engineering Serv Ltd Yankwashi 7,562,094.00 7,562,094.00 17/01/2020 8 weeks On-going
46
Constr. Of 3No Hand Pumps Water Supply Scheme ( Phase I
2019 Constituency Projects) at Yankwashi Fulani, Rauda
Gabas and Dumbule in Yankwashi Constituecy (Lot-17) Granitoid Engineering Serv Ltd Yankwashi 2,213,032.50 2,213,032.50 17/01/2020 8 weeks On-going
BAL. C/F 365,093,129.78 365,093,129.78
2f
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Water Resources
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 365,093,129.78 365,093,129.78
47
Constr. Of 1No. Solar Power Water Supply Scheme (2019
second Quarter Phase II Constituency Project) Lot-30 at
Fagoji in Dutse Contituency loyalty properties ltd Dutse 6,015,765.00 6,015,765.00 14/1/2020 8 Weeks On-going
48
Construction of 3No. Daily Prayer Mosque (2019 first
Quarter Constituency Projects) Lot-5 at dirimowa, kubuna
kulola and dikimba in birniwa Constituecy. Kafiyama Gen. Entp. Td Birniwa 5,884,566.00 5,884,566.00 14/1/2020 8 Weeks On-going
49
Constr. Of 1No. Solar Power Water Supply Scheme (2019
first Quarter Phase I Constituency Project) Lot-3 at
Shabarawa in Maigatari Contituency Limis brothers & co Maigatari 6,012,405.00 6,012,405.00 14/1/2020 8 Weeks On-going
50
Upgrading and conversion of 7 No. Motorised water supply
scheme to solar powered system at danbanki, nagwamitse,
albasu, maimazari, tsangarwa , farin dutse and kwarko in
gumel and birnin kudu zone Lot-1 (2019 capital project)
across the state SIMS Global Resource Ltd State 72,451,698.17 72,451,698.17 68,999,517.30 14/1/2020 8 Weeks 100 Completed
51
Constr. Of 50No Hand pump Boreholes at School of Nursing
Birnin Kudu, Mobile Base (744), Tinubu, Kargo Gidan
Jungodo, Rafin Dinya, Duzau Masallacin Juma'a, Kyambo
Fulani, Gidan Kaboji Leko Zakoki, Gandun sarki, Kauyen
Fulani, Sabon Gari Gidan S/Fawa, Kanawa, Jelawa,
F/Kungurguma, Dabaza, Naira, Jallawa, Kwadage, Yan Lada,
Balarabe, Kalali, Rugar Gwamna, Bulangu Makabarta,
Bulangu bakin Kasuwa, kadage, Kalali, Rugar Gwamna,
Sintali, Kadage, Kayarda Gari, Kayarda Fulani, Rugar Alh.
Mari, Unguwar Sani, Yantuba, Gobirawa Fulani, Gujungurin
FulNI, Burukum Fulani, Rugar gagarawa, Waje gari Muku and
Tudun Yola Across the State. SIMS Global Resource Ltd in the state 36,897,000.00 36,897,000.00 27,303,780.00 22/1/2020 20 weeks 74 On-going
BAL. C/F 492,354,563.95 492,354,563.95
2g
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 492,354,563.95 492,354,563.95
52
Constr of (4no.) Hand pump norehole water supply schemes (2019
second qtr. Constituency project) (Lot-5) at Maibarewa, Digawa
(Karnaya ward), K/Fulani and Kaduwawa in Dutse Farham Syny. Limited Dutse 2,947,896.00 2,947,896.00 2,210,922.00 14/1/2020 8 weeks 75 On-going
53
Upgrading and Conversion of Motorized water supply schemes to
Solar Powered water Supply Schemes in Eight (8No) Small towns of
babura, Garki and Kaugama Lga Sims Global Resources Ltd State 89,056,885.61 89,056,885.61 75,499,652.02 7/7/2020 6 Months 85 On-going
54
Rehabilitation of Eighteen Number (18No.) Small Towns at garki
LGA (Jaya, Rafin Marke, Tagwaye,Kukar mekiya, Garkin magarya
among others Sims Global Resources Ltd Garki 17,676,225.00 17,676,225.00 12,789,000.00 7/7/2020 12 Months 73 On-going
55
Upgrading and Conversion of 12no. Motorized Boreholes to Solar
Powered at Basirka ,… Sims Global Resource Ltd State 173,097,198.75 173,097,198.75 150,174,150.00 26/08/2020 20 weeks 87 On-going
56
Constr of (24no) Hand pumps water supply schemes (2018 phase
III constituency project) (Lot-8) at Nasarawa Mugin Invest. Limited Garki 17,703,000.00 17,703,000.00 16,965,375.00 28/2/2020 20 weeks 95 On-going
57
Water Collection Point at Korewa yamma and gwarga in birniwa
Constituency (2019 2nd Quarter (Lot-23) MU'azu Memorial Gen Merch Birniwa 2,521,958.00 2,521,958.00 2,521,957.99 8/7/2020 8 weeks 100 Completed
58
Constr. Of Hand Pumps Boreholes water supply scheme
Constituency Projects (2019 2nd Quarter) at Dirbe Fulani, Shafawa,
karkarna Gabas, kawaye, Darere and Karkarna Fulani in Yankwashi
Constituency(Lot-21) Granitoid Engineering Ltd Yankwashi 4,422,726.00 4,422,726.00 4,422,726.00 8/7/2020 8 weeks 100 Completed
59
Supply of Water Chemicals to Kazaure Water Treatment Plant
Across the State (Lot-17) Tade Business Resources State 40,392,000.00 40,392,000.00 21/07/2020 12 Weeks On-going
60
Procurement of 136,440 Ltrs of Ago Diesel for Gwiwa, Roni,
Yankwashi and Kazaure Lga Lot-10 Muhabib Nigeria Limited Kazaure 37,521,000.00 37,521,000.00 21/07/2020 12 Months On-going
61
Supply of water treatment chemicals to Birnin Kudu Water
Treatment Plant Across the State Lot-18 Tade Business Resources State 44,550,000.00 44,550,000.00 21/07/2020 12 Months On-going
62
Rehabilitation work at Kazaure Town water supply schemes
(Jekarade, Mohd Ayuba, Gezoji and Ganduli water Stations Sims Global Resources Ltd Kazaure 12,473,590.50 12,473,590.50 27/07/2020 8 weeks On-going
63
Water Collection Points at Kandahar, Lokon Sule wandu (Majema),
Mamman Wale Quarters, Gawon Dogari, Dubantu Kan Gada,
Nasarawa, Bayan Gidan Shinkafa (Nguru Road), Kofar Gari
matsaro, Opp Gidan Alh. Nasalla Gawuna, Atafi, K/Naganda and
Maje Nursery and Primary School in hadejia Constituency (2019
2nd Quarter) Lot-22 Alh. Umaru Babandoki Nig Ltd Hadejia 15,064,014.00 15,064,014.00 10/7/2020 8 weeks On-going
64
Contract for the supply of 600,000 liters of AGO Diesel to Rural
Electricity Board Generators MY Oil Nigeria Limited State 150,000,000.00 150,000,000.00 27/07/2020 12 Months On-going
65
Supply of Services Materials to Stowa Water Schemes Across the
State (Lot-16) Limis Brothers & Co State 56,751,816.00 56,751,816.00 21/07/2020 12 Months On-going
66
Supply of Service Materials to water Board Emirate Water Stations
Across the State Lot-14 Limis Brothers & Co State 21,611,040.00 21,611,040.00 21/07/2020 12 Months On-going
67
Supply of Water Chemicals to Kazaure Water Treatment Plant
Across the State (Lot-17) Tade Business Resources State 40,392,000.00 40,392,000.00 21/07/2020 12 Weeks On-going
BAL. C/F 1,218,535,913.81 1,218,535,913.81
2h
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Water Resources
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 1,218,535,913.81 1,218,535,913.81
68
Constr. Of Hand Pump Boreholes water supply scheme
constituency projects (2019 2nd Quarter) at Unguwar sa'idu,
Fulanin Madaci, Unguwar Shege, unguwar kale,Tafin Sale, Unguwar
gayya, Bata Kasha, Najeri, Galma, Kashin Ganji, Rafin Baka,
Barnawa Gari, Maigora kaya, Chakirawa, Zakoki, Katoro Fulani,
Adnus, Gagarwa Fulani, Fulanin Mai Daraja, Gayya ta Arewa,
Digawar Zogali, Gurum Yamma, Dulawa Tsohuwa, Fulanin
Mashema, (Baushe Yamma) Gorunan Tsohuwa, Fulanin Ufalata
Gabas, Dandagare Gari, Jaftawa, Fulanin Makera, Fulanin Shabaru,
Garke Arwe(Layin Amiru) Sabuwar Unguwa (Layin Dan Bayaro)
Kwarin Fulani, Fulanin Danbarwa, Yarkurshe, Chakurawa, Tumbi,
kafdodo, Kirya, Dan Baraje Gari and Ba'awa in Garki Constituency
Lot-6 MMA Integrated Concept Garki 30,991,275.00 30,991,275.00 14,757,750.00 8/7/2020 16 Weeks 48 On-going
69
Procurement of 319,200Ltrs of Ago Diesel for Sule Tankarkar ,
Maigatari, Gagarawa and Gumel LGA Lot-11 Nushe Business Resources Ltd State 87,780,000.00 87,780,000.00 21/07/2020 12 Months On-going
70
Supply of Service materials to 22 LGA Headquarters Across the
State Lot-15 Limis Brothers & Co State 17,171,484.00 17,171,484.00 21/07/2020 12 Months On-going
71
Rehabilitation of 18No Small Towns water supply schemes at Garki
LGA Sims Global Resource Ltd Garki 17,676,225.00 17,676,225.00 29/06/2020 16 Weeks On-going
72
Rehabilitation of 246no Hand pumps at babura and 146No at garki
LGA M.2 International Ltd Garki 18,548,618.75 18,548,618.75 21/08/20220 24 Weeks On-going
73
Constr. Of Hand Pump Boreholes water supply scheme
constituency project (2019 2nd Quarter) at garin Mati, Bulangu
Unguwa dan Aro, Auduga, Gatasaya, Kira babba Makabarta,
Getere, Suso, Shakato Makabarta, Zango Gari Bakin Kasuwa and
Garin Gami Chiromari in Bulangu constituency Lot-3 Nabakwai General Ent k/Hausa 7,379,400.00 7,379,400.00 7/7/2020 8 Weeks On-going
74
Procurement of 246,600 Ltrs of Ago Diesel for Dutse, Kiyawa,
Jahun and Miga LGA (Lot-6) Areas Safah and Fresh Intern Ltd Across the state 67,815,000.00 67,815,000.00 21/07/2020 12 Months On-going
75 Procurement of 480,000ltrs of Ago Diesel for Dutse Emirate (Lot-1) Safah and Fresh Intern Ltd Dutse 132,000,000.00 132,000,000.00 21/07/2020 12 Months On-going
76
Rehabilitation of 146No hand Pumps at Communuties in Garki LGA
Lot-2 M2 International Ltd Garki 6,202,093.75 6,202,093.75 1/9/2020 6 Weeks On-going
77
Constr. Of Hand Pump Boreholes water supply scheme
constituency projects (2019 2nd Quarter) at Gidan Baro, Rataba,
Gidan Mai Unguwa, Unguwar Gamji, Dan Makeri, ruwaji, Deetech Nig Ltd Babura 8,851,800.00 8,851,800.00 9/11/2020 8 weeks On-going
78
Constr. Of hand pump Boreholes water supply scheme
constituency project (2019 2nd Quarter) at Gawon Dogari, Abuja
Amare, Shabaru, Guducin, Dala, Gawuna Pri Sch, Gagulmari and
Mafichin sarki in Hadejia constituency (Lot-9) Alh Umaru Babandoki Ltd Hadejia 5,903,100.00 5,903,100.00 22/07/2020 8 weeks On-going
79
Constr. Of 7No. New Solar Powered water schemes at Gidan Maje,
Unguwar Shuri, Masko, gangarar Hauware, jan mutum, Waje and
kadi all in Babura Local Govt Area (Ringim Zone) Sims Global Resources Ltd Ringim 43,084,387.50 43,084,387.50 42,082,425.00 17/12/2020 8 Weeks 100 Completed
80
Constr. Of 2No. New Solar powered water schemes at Mudari and
Cirinbin Yamma All in Babura LGA ( Ringim Zone) Sims Global Resources Ltd Babura 12,309,825.00 12,309,825.00 17/12/2020 8 Weeks On-going
BAL. C/F 1,674,249,122.81 1,674,249,122.81
2i
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Water ResourcesPOST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 1,674,249,122.81 1,674,249,122.81
81
Rehabilitation of 60No Solar powered water schemes across the
state at (Maje, balago, kwalele,shatari dun, kwanda, jama'ar isah
kwarin shudi, kwarin shida, and dan fusan, in kiyawa LGA), ( Kudai,
Gorin Zobiya and Yalwa in dutse LGA), ( Sankau, Gwiwa Gari,
Darina and Dabi in Gwiwa LGA), (Gora in roni LGA) (Model
Boarding in kazaure LGA) (Kajaimaran, Gaduwa, daba, abunabo,
Alanjo, Adiyani, Madamuwa, Gayin, Giryo, Musari and yalwan
musari in guri LGA) (Fizar garun Gabas, Dakido, Shayya, kampala,
Makwalla, Kadume, Kwari , Girdo and Garin Magaji in Malam
Madori LGA), ( Kiri Kasamma gari and Madachi in Kiri kasamma
LGA) , (Gatare and atauya in birniwa LGA), (Ayama and Kuka in
Auyo LGA), (Hirin and Jangangari Primary School in BKD LGA),
(Laya, Rungo, Nasarawa, Tsangarwa, Sabuwar Gwaram and
Girajeni in gwaram LGA), (Gubanbiya in Buji LGA), Katije, K/Hausa
and Bulangu in Kafin Hausa LGA), Girtigina in Kaugama LGA), (
Gunka in Jahun LGA) and (Taka Lafiya in Miga LGA) (Lot-3) Arrayan Ventures Global Serv Ltd Miga 58,595,670.00 58,595,670.00 54,507,600.00 17/12/2020 8 Weeks 100 Completed
82
Procurement of 3no 3.0HP Cri Submersible Pump with all Electrical
protection Drives and Rewinding of 3No 11KVA vertical Boosters
CNP-CR-32-64 at Brinin Kudu Pumps Stations Sims Global Resources Ltd B/kudu 5,564,737.50 5,564,737.50 31/12/2020 8 Weeks On-going
83
Overhauling of 350KVA 1no, 100KVA 1No. 60KVA 2no. Generating
Set and Rewinding 8No. Of Flight pumps station at Dutse Sims Global Resources Ltd Dutse 8,639,452.50 8,639,452.50 31/12/2020 8 Weeks On-going
84
Complete Overhauling of 150KVA 1No, 40KVA 1No. Generating set,
Supply and installation of 10HP 2No, 5.5hp3No., 3.0 Hp 1No and
1.5hp 1No.CRI Complete Original Submersible pumps at Gumel
Town Sims Global Resources Ltd Gumel 6,639,871.88 6,639,871.88 31/12/2020 8 Weeks On-going
85
Constr of 6no, Solar powered water supply schemes at Sabon arin
Awaisu, Zango, Jigawar tsaba, Malikawa, Karabe and Nawako in
Miga LGA Arrayan Ventures Global Ltd. Miga 38,775,948.77 38,775,948.77 18,035,325.00 5/11/2020 20 weeks 47 On-going
86
Construction of pipeline distribution network (28.6km) in
Kazaure Town Lot-1 CGC Nigeria Ltd Kazaure 529,952,482.00 529,952,482.00 242,146,838.85 23/12/2019 24 weeks 45 On-going
87
Upgrading and conversion of motorised water supply
schemes to solar powered at 6NO, small town
(Chamo,Gambasha,Yabaza,Giginya,Amaryawa and
Mamudawa) and construstion of 2NO, new solar powered
water supply scheme at Barandau and Jalomi arewa in
Dutse, Birnin kudu, Jahun,Kazaure and Ringim zones (Lot 1)
Sims global reources Nig Ltd Various 74,008,751.25 74,008,751.25 1/26/2021 4 month
88
Upgrading and conversion of 2NO, Motorised water supply
scheme to solar powered at Abunabo and Gagiya town in
Guri LGA,Hadejia zone (Lot 2)
Khanadi global links Ltd Guri + Hadejia 44,658,993.75 44,658,993.75 43,617,000.00 1/26/2021 3 month 100 Completed
TOTAL 2,441,085,030.46 2,441,085,030.46
2j
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Water Resources
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 2,441,085,030.46 2,441,085,030.46
89
Upgrading and conversion of motorised water supply
schemes to solar powered at Aujara town in Jahun
LGA,Jahun zone (Lot 3)
Khanadi global links Ltd Jahun 35,977,777.50 35,977,777.50 35,105,700.00 1/26/2021 12 weeks 100 Completed
90
Rehab. of 7no. Water supply shemes at Jigawar Arewa,
Isabura gabas, Kankaren wagawa, Kayarda, Wadar
kanawa, Garin baki and Hennadi Dansara Int. Services Ltd. Babura 8,580,757.50 8,580,757.50 7,982,100.00 17/12/2020 4 weeks 100 Completed
91
Rehab of 6no. Water supply schemes at Kurguni kanya
masallaci, Kanya yamma, Garin Ganau, Unguwar Shuri
and Babura K/fada Dansara Int. Services Ltd. Babura 10,273,882.50 10,273,882.50 9,557,100.00 17/12/2020 8 weeks 100 Completed
92
Upgrading and conversion of motorised water supply
schemes to solar powered at Buji Gari SIMS Global Ltd. Buji 32,169,375.00 32,169,375.00 31,416,000.00 5/1/2020 12 weeks 100 Completed
93
Constr of 1no. Solar powered water supply schemes
(2019 phase I constituency project) (Lot-25) at Keren in
Dutse JAG & H Ltd. Dutse 6,021,015.00 6,021,015.00 6,021,015.00 3/2/2021 8 weeks 100 Completed
94
Constr of 1no. Solar powered water supply schemes
(2019 phase II constituency project) (Lot-28) at
Kuzoyara Muazu Memorial Ltd. Birniwa 6,022,695.00 6,022,695.00 6,022,695.00 5/2/2020 8 weeks 100 Completed
95
Rehab of 6no. Water supply schemes at Ando, Yan-
maulu, Aduware, Garin Goto, Jamuo and Unguwar
Gunji Dansara Int. Services Ltd. Babura 9,466,826.25 9,466,826.25 8,806,350.00 17/12/2020 8 weeks 100 Completed
96
Rehab of 5no. Water supply schemes at Takwasa,
Magaji dau, Takwasa mai Gari, Unguwar Naino,
Lamintani, and Jarmai Jignaj Global Ltd. Babura 9,578,820.00 9,578,820.00 9,189,600.00 17/12/2020 8 weeks 100 Completed
97
Rehab of 7no. Water supply schemes at Babura Bakin
Tasha, Jigawar Dan-Ali, Bule, Dan kano, Giginya,
Marken biki and Carbin Malamai Jignaj Global Ltd. Babura 11,734,485.00 11,734,485.00 11,459,962.50 17/12/2020 8 weeks 100 Completed
TOTAL 2,570,910,664.21 2,570,910,664.21
2k
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Works and Transport
POST CONTRACT PROJECT EVALUATION
S/N. PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1 Consultancy services for the Constr. of Limawa-Warwade-Jidawa-Sakwaya-Dutse road KAP Civil Eng. Consultants Dutse 57,547,589.11 57,547,589.11 51,132,963.56 11/15/2012 16 months 94 Stalled
2 Constr. of Limawa-Warwade-Jidawa-Sakwaya-Dutse road (33.40km) Boroni Prono & Co. Ltd. Dutse 2,968,551,896.02 2,968,551,896.02 2,611,339,802.95 2/11/2012 14 months 88 Stalled
3
Consultancy Services for the Dualisation of Dutse Gadadin to Police H/qtr.
Dutse HAG Eng. Consultant Dutse 41,044,787.97 41,044,787.97 41,044,787.97 20/8/2013 12 months 100 Completed
4 Consultancy services for the constr. Of T/kance-jamus feeder road UKM Civil Eng. Consultant Babura 21,657,808.87 21,657,808.87 21,657,808.87 2/8/2014 8 Months 60 On-going
5
Commisioning as consultant on the supervision of the construction of 6No. New feeder road
projects across the state OPIQ Consultant Ringim 22,400,354.68 22,600,354.68 21,242,736.09 28/5/2014 8 months 95 On-going
6 Constr. of Township Roads at Maigatari Urban Centre (6.95KM) H&M Nig. LTD Maigatari 1,037,700,121.50 1,037,700,121.50 1,018,413,127.46 17/12/2013 8 Months 100 Completed
7 Constr. of Township Roads at Guri Urban Centre (6.15KM) SKY Tech.& Contr.LTD Guri 1,362,774,826.33 1,362,774,826.33 1,266,547,203.54 17/12/2013 8 Months 93 On-going
8
Commissioning as Consultant on the Supervision of the Constr. of Maigatari Township Road
(6.95KM) Sadiq Eng Ser. LTD Maigatari 64,472,315.43 64,472,315.43 64,466,010.47 19/12/2013 8 Months 100 Completed
9 Commissioning as Consultant on the Constr. Of Roni township roads (5.00KM) EMACS Eng. Consultants Roni 61,195,703.35 61,195,703.35 57,626,153.48 12/31/2013 8 Months 94 On-going
10 Commissioning as Consultant for the Constr. of Hadejia Township roads Global Ecological Hadejia 101,482,637.11 101,482,637.11 95,444,693.15 12/31/2013 16 months 100 Completed
11 Commissioning as Consultant for the Constr. of Guri Township roads Madapad Eng. Ltd. Guri 66,500,604.95 66,500,604.95 58,742,130.61 12/3/2013 12 months 88 On-going
12
Consultant for valuation of the State Govt.'s Investment in Electricity Distribution network
(PHCN) Emirate Consulting Ltd. State 125,000,000.00 125,000,000.00 62,500,000.00 19/6/2013 12 months 50 Stalled
13Electrification of Shakoto-Bulangu (REB) Aima Strong Store Ltd. K/hausa 36,199,059.19 36,199,059.19 29,923,001.66 2/19/2014 6 months 89 On-going
14
Supervision of the construction of JigawarDan-ali-Maitsamiya-Suletankarkar-
Dangwanki-Dankumbo to Matsatsagi (45KM) and construction of Kudai-Ruru-
Dantawuya-Sakwaya Feeder Road (15KM) UKM Civil Eng. S/tankarkar + Dutse 14,172,571.35 14,172,571.35 10,066,755.99 11/4/2017 12 months 71 On-going
15 Constr of Darai-Gilima road (9.5km) lot-2 Alren Const. Co. Ltd. Jahun/Taura 2,492,310,165.97 2,492,310,165.97 2,114,436,744.00 27/4/2018 8 months 84 On-going
16 Constr of Gambara-Waza-Baranda with Spur to yalwa (16.8km) lot-3 Alren Const. Co. Ltd. B/kudu 3,194,083,855.93 3,194,083,855.93 3,119,614,701.90 27/4/2018 10 months 96 On-going
17 Constr of Kaugama township road (6.3km) lot-7 Afdin Constr Co. Ltd. Kaugama 1,333,357,771.41 1,333,357,771.41 1,192,033,432.22 30/4/2018 12 months 89 On-going
18
Commissioning as Consultant for the Supervision of the Constr. of Road
Network at College of Education, Gumel (3.3km) EMACS Eng. Consultants Gumel 11,798,466.27 11,798,466.27 11,298,466.27 7/6/2018 6 months 96 On-going
19
Commission as Consultant for the Supervision of the Construction of Gambara-
Waza-Baranda with a Spur to Yalwa Wuro Associates Eng. Dutse 55,896,467.48 55,896,467.48 53,101,650.00 7/6/2018 10 months 95 On-going
Balance C/F 13,068,147,002.92 13,068,347,002.92
3a
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Works and Transport
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 13,068,147,002.92 13,068,347,002.92
20
Commission as Consultant for the Supervision of the Construction of Access
road from Harbo Sabuwa to Harbon Tsohuwa (1.52km) Powermatrix Eng Jahun 4,218,516.02 4,218,516.02 3,796,664.41 13/6/2018 4 months 90 On-going
21
Rehabilitation of the electrification project at Marke- yalo ITC line in Kaugama
LGA AG Global serv. Nig ltd Kaugama 40,151,533.53 40,151,533.53 38,424,075.54 6/12/2018 12 weeks 96 On-going
22 Construction of 744 - Sabuwar Takur - Yalwawa Road (8.10KM) Lot 7. Retercha Company Ltd Dutse 1,577,371,259.00 1,577,371,259.00 1,573,147,679.77 21/12/2018 10 months 100 Completed
23 Construction of Taura - Garki Road (26.68KM) Lot 2. Alren Constr. Comp. Ltd. Taura + Garki 2,925,979,072.38 2,925,979,072.38 2,650,909,720.05 21/12/2018 16 months 91 On-going
24 Electrification Project at Askandu in Kaugama L.G.A. Nabakwai Gen. Enterp. Kaugama 20,298,933.03 20,298,933.03 18,533,808.41 24/12/2018 12 weeks 90 On-going
25
Consultancy services for the Dualization of Fanisau road to Unity Pentagon
round about in Dutse (11.4km) A.G. & Partners Ltd. Dutse 83,028,671.25 83,028,671.25 44,446,452.75 14/7/2017 50 On-going
26
Commissioning as Consultant for the Supervision of the Constr of Kaugama
Township roads (6.3km) SIIS Eng. Consultants Ltd. Kaugama 23,333,761.00 23,333,761.00 16,333,107.69 1/11/2018 12 m,onths 69 On-going
27
Commissioning as consultant for the Supervision of the Construction of Chai Chai
Tsohuwa township Roads UGS Consultants Dutse 3,949,973.17 3,949,973.17 3,145,475.85 20/3/2019 6 weeks 80 On-going
28
Commissioning as Consultant for the supervision of the Construction of Kaugama -
Malam Madori Feeder Road (19.31km) SIIS Engineering Consult M/Madori 9,112,024.27 9,112,024.27 20/3/2019 6 weeks On-going
29 Supervision of Balago-Auno roads Apex Design Kiyawa + K/hausa 93,126,261.93 93,126,261.93 93,125,719.08 20/3/2019 24 months 100 Completed
30 2019 Rural Electrification Project at Kulawa in Ringim LGA (Lot-9) Ngloma Constr Nig Ltd Ringim 40,761,674.94 40,761,674.94 39,816,674.31 2/10/2019 14 weeks 98 On-going
31 2019 Rural Electrification Project at Kaigamari M/Awaso in K/Hausa LGA (Lot-7) Babandoki Gen Entp. K/Hausa 56,156,069.34 56,156,069.34 55,217,900.43 2/10/2019 14 weeks 98 On-going
32 2019 Rural Electrification Project atTurbus in Maigatari LGA (Lot-8) Babandoki Gen Entp. Maigatari 51,909,858.00 51,909,858.00 50,918,978.25 2/10/2019 14 weeks 98 On-going
33 2019 Rural Electrification Project at Daurawa in Taura LGA (Lot-11) Ngloma Constr Nig Ltd Taura 39,499,187.75 39,499,187.75 37,556,687.75 2/10/2019 14 weeks 98 On-going
34 2019 Rural Electrification Project at Batali in Babura LGA (Lot-14) Ngloma Constr Nig Ltd Babura 87,414,189.61 87,414,189.61 86,226,592.83 2/10/2019 14 weeks 98 On-going
35 2019 Rural Electrification Project at Duwigi in Gwiwa LGA (Lot-13) Babandoki Gen Entp. Gwiwa 45,418,689.70 45,418,689.70 2/10/2019 14 weeks On-going
36 2019 Rural Electrification Project at Walawa in Hadejia LGA (Lot-4) Ngloma Constr Nig Ltd Hadejia 52,780,791.53 52,780,791.53 51,776,621.92 2/10/2019 14 weeks 98 On-going
37
Constr of hadejia township roads (485m) road Network) Additional works) at
Azare road-Adua Mosque-New Motor Park (Road II) PAACHE Constr Ltd. Hadejia 312,270,011.92 312,270,011.92 2/10/2019 16 weeks On-going
38
Supply and Istallation of Stand Alone Solar powered streetlights at Government
Girls Arabic School Babura, Goverbment Girls Unity secondary School Gwaram
and Computer Girls Secondary School Roni Sims Global Resources Gwaram 60,780,300.00 60,780,300.00 4/11/2019 8 weeks On-going
Balance C/F 18,595,707,781.29 18,595,907,781.29
3b
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Works and Transport
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 18,595,707,781.29 18,595,907,781.29
39 Supply of Diesel for Dutse Streetlight Generators Lion & Tiger Business Co Dutse 4,919,240.00 4,919,240.00 2/6/2020 12 months On-going
40 Electrification project (Lot-3) at Unik Babba in Auyo LGA. Khanadi Global Auyo 80,656,221.59 80,656,221.59 73,211,224.05 2/10/2019 16 weeks 91 On-going
41 Constr. of Maigatari-Diginsa-Bursali-Birniwa road (44.7km) phase III Triacta Nig. Ltd. M/madori + Birniwa 6,441,263,494.47 6,441,263,494.47 3,749,163,623.73 1/1/2020 24 months 58 On-going
42 Constr. Of 33Kv Electric Power Lines from Gagarawa Sub-Station to gumel ITC line Ar-rayyan Ventures Nig Ltd Gumel 193,886,152.36 370,318,141.80 262,490,500.92 29/07/2020 4 months 71 On-going
43 Rehabilitation of failed Sections of Birnin Kudu -Kiyawa Road (2.8km) Alren Constr. Co Ltd B/Kudu 182,421,217.94 182,421,217.94 177,627,154.16 19/08/2020 16Weeks 100 Completed
44
Consultancy services for the supervision of Maigatari-Galadi-Girbobo-Diginsa-
Birniwa road project (phase III) (44.7km) Himma Tech. Services Birniwa 101,449,900.00 101,449,900.00 35,507,464.99 1/1/2020 14 months 35 On-going
45 Constr. Of Ringim township roads Phase II (4.4km) (Lot-3) Triacta Nig Ltd Ringim 959,096,941.46 959,096,941.46 21/10/2020 3 Month On-going
46
Constr. Of A Section of Abunabo-ChapChap No-Lafiyari-Kadira-Guri Eastern
Byepass Phase Iii Road (2.4Km) (Lot 2) Triacta Nig Ltd K/kasamma 599,061,092.44 599,061,092.44 21/10/2020 10 Months On-going
47 Rehabilitation of Gwaram - Basirka Road (63km) (Lot-1) Alren Constr Co Ltd Gwaram 5,061,882,580.65 5,061,882,580.65 1,041,439,563.67 21/10/2020 16 Months 20 On-going
48
Supply and Installation of Integrated Stand Alone Solar powerede Street Light
(230 Unit) at Babura Town Arrayyan Ventures Nig Ltd Babura 138,328,312.50 138,328,312.50 134,934,041.32 21/10/2020 3 Month 100 Completed
49 Consultancy services for the supervision of Taura-Garki road project (26.68km) Himma Tech. Services Taura/garki 51,197,948.77 51,197,948.77 46,078,153.89 20/3/2019 24 weeks 90 On-going
50
Supply and Installation of Integrated stand alone solar powered street light (150
Unit) at Hadejia Sims Global Res Ltd Hadejia 90,243,562.50 90,243,562.50 85,323,000.00 21/10/2020 3 Months 100 Completed
51 Rehabilitation of High Tension Line from Gidan Lage to Ringim Town Marb Engineering & Multi Ringim 16,551,061.63 16,551,061.63 15,567,517.31 25/11/2020 3 Months 100 Completed
52
Consultant for the supervision, assessment and Certificate of works for the
construction of 33kv electrical line from gagarawa transmission substation to
gumel Pullad Global Consult Ltd Gumel 6,480,567.48 6,480,567.48 9/11/2020 3 Months On-going
53 Rehabilitation of section of Girimbo-sara-Gantsa road affected by flood H&M Nigeria Ltd Buji 181,494,760.13 181,494,760.13 4/11/2020 12 Weeks On-going
54
Consultancy for the Supervision of the supply and installation of integrated
Standalone Solar powered Street Light at Chai-Cahai (65) Units and Zandam
Nagogo (75) Units Lines and Dimension Nig Ltd Dutse+Gwaram 1,465,681.87 1,465,681.87 17/12/2020 16 weeks On-going
55
Commissioning as Consultant for the Supervision of the Supply and Installation of
Integrated Standalone Solar powered streetlight at Hadejia (150) Units and
Babura (230) Units Pullad Global consult Ltd Babura 4,000,007.87 4,000,007.87 17/12/2020 16 weeks On-going
56
Commissioning as consultants for the supervision of the construction of banquet
hall at Govt House Dutse, Jigawa State Xmatric 369 limited Dutse 3,886,405.16 3,886,405.16 30/12/2020 6 Months On-going
Balance C/F 32,713,992,930.11 32,890,624,919.55
3c
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Works and Transport
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 32,713,992,930.11 32,890,624,919.55
57
Constr. Of 33KV Inter Town Connection (ITC) from Gagarawa Sub-Station
to Gujungu Town Arrayyan venture Global Ltd Gujungu 35,959,298.80 35,959,298.80 1/3/2021 12 Weeks On-going
58
Commissioning as consultant for the supervision of the construction of
Ringim Township Road (4.4km) Himma Tech Serv & Co Ltd Ringim 16,784,194.48 16,784,194.48 1/2/2021 6 Months On-going
59
Commissioning as Consultant for the supervision of the rehabilitation of
Sara- Gantsa Road SIIS Engineering Consult Buji 3,176,149.69 3,176,149.69 1/2/2021 6 Months On-going
60
Commissioning as consultant for the supervision of the Construction of
Sections of Abunabo-ChapChapNo-Lafiyari-Kadira-Guri Road (Eastern bye-
pas phase III Road) (2.4km) Curves & Straight Design Ltd Guri 10,483,569.12 10,483,569.12 1/2/2021 16 Months On-going
61
Commissioning as consultant for the supervision of the rehabilitation of
gwaram-Basirka Road (63km) Apex Design & Associates Gwaram 88,582,945.16 88,582,945.16 25,956,410.23 1/2/2021 22 Months 28 On-going
62
Consultancy Services for 744 housing estate to Sabuwar takur township
road Curves & Straight Design Ltd Dutse 27,603,997.03 27,603,997.03 27,603,997.03 15/4/2019 10 months 100 Completed
TOTAL 32,896,583,084.39 33,073,215,073.83
3d
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1
Constr of 1no. Block of 2-classroom Islamiyya each at Gabari, Fagoji, and
Dugus in Dutse Constituency (Lot-10B) AGM & Sons Dutse 11,452,590.06 11,452,590.06 10,705,538.21 25/01/21 12 weeks 100 Completed
2
Constr of 2no. Technical college fences at GSTC B/Kudu and GSTC
Karkarna Ngaloma Construction Ltd State 89,747,528.80 89,747,528.80 87,654,028.10 2/11/2020 16 weeks 100 Completed
3
Renov of 2no. Nomadic primary schools at Horiya in K/Hausa and
Dankoshe in Buji LGA. AKAM Nig Ltd. State 4,156,615.78 4,156,615.78 3,813,828.63 3/2/2021 8 weeks 100 Completed
4
Constr. of 1No. Block of Sabbatical Lodge, 5No Principal Officers Quarters 3No Blocks 240
Capacity Students Hostels and Construction of Road Network Culvert and Drainages at Jigawa
State University Kafin Hausa (Phase III) Datum Const. Nig. LTD K/Hausa 2,574,587,179.00 2,782,409,740.68 873,397,813.68 28/11/2013 6 Months 34 On-going
5 Construction of Senate Building at Jigawa State University, K/hausa A.G Ferrero K/Hausa 1,698,949,299.60 1,961,397,871.17 1,759,415,903.28 24/7/2014 10 months 90 On-going
6
Renovation of A Block at Jigawa State Scholarship Board Headquarters,
Dutse
Panjatan 05 General Entr
Ltd Dutse 4,941,196.04 4,941,196.04 17/03/2021 4 weeks
On-going
7
Commissioning as Consultant for the Designing and Supervision of (phase II) for the constr.of
Jigawa State University, K/Hausa Design Plus + K/Hausa 158,703,031.78 158,703,031.78 117,453,599.98 12/18/2014 18months 74 On-going
8
Procurement of 1000no. College Tablets, CAMP 1000 students for the period of (5) weeks E-
learning Programme Activities Echo Infotech Solutions H/qtrs. 34,311,150.00 34,311,150.00 28,508,507.50 12/3/2015 2 months 83 Stalled
9
Constr of Block of 2no. Classroom Islamiyya and Constr of 1no. Block of 3-
classroom and 2no. Block of classroom with office (SUBEB Type) 3rd phase
2017 Constituency project (Lot-9) at K/Arewa, Izala Islamiyya and Makarantar
Malam Daura in Ringim Local Govt. Nushe Business Resources Ringim 9,819,350.10 9,819,350.10 5/7/2018 10 weeks On-going
10
Constr of Drainage at Kuburu-Mabuga (Anku) Titin Yahai Qtrs (907m) Hadejia town,
1st Qtrs. 2018 Constituency project Tasi'u Mohammed Hadejia 28,264,601.73 28,264,601.73 17/8/2018 3 months On-going
11
Installation of TDN Line, Substation and 40KVA Gen. at GS&TC Ringim (1st phase
2018 projects) (Lot-30) Yusma Tech Invest. Ringim 11,119,230.57 11,119,230.57 6,006,971.25 12/7/2018 6 months 55 On-going
12
Installation of TDN Line, Substation and 20KVA Gen. at GS&TC B/kudu and
Installation of TDN line at SSS K/Babba (Lot-31) Math Global Concept B/Kudu + Babura 12,717,747.66 12,717,747.66 8,916,752.51 16/7/2018 6 months 67 On-going
13
Feeding of 597 Boarding School students at MBPS/JSS Kazaure & 35 students at Intel
Disability Kazaure in Kazaure LGA (2019 MOEST Capital Projects) Lot-40. Umar Aliyu & Sons Kazaure 23,888,538.40 23,888,538.40 23/12/2020 40 weeks On-going
14
Construction of Block of 2-Classroom Islamiyya (1NO.) Lot-20 at Dunnaka in
Miga Constituency. Amia Integ. Service Nig Ltd. Miga 3,115,779.08 3,115,779.08 1/11/2018 4 Weeks On-going
15
Construction of Block of 2-Classroom Islamiyya (2NO.) Lot-2 at Rakumin Rafa
Constituency. Bulangu Drilling Services 6,968,430.00 6,968,430.00 1/11/2018 10 Weeks On-going
16
Procurement of Workshop materials and consumables items in 4no. Technical
colleges in the state (Lot-4) Allah Abin dogaro Ent Ltd State 5,000,000.00 5,000,000.00 5,000,000.00 3/11/2020 8 Weeks 100 Completed
17
Construction of Block of 2-Classroom Islamiyya (1NO.) 2nd Phaes 2017
Constituency Projects (Lot-16) at Government Arabic Secondry School (G.A.S.S.)
in Sule Tankarkar Constituency. Kairussabah Nig. Ltd. S/tankarkar 3,224,219.90 3,224,219.90 3,078,219.90 1/11/2018 3 Weeks 100 Completed
BAL. C/F 4,680,966,488.50 5,151,237,621.75
4a
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 4,680,966,488.50 5,151,237,621.75
18
Construction of (1N0.) Blocks of 2-classroom Islamiyya school SUBEB typed
2018 phase II constituency projects (Lot -7) atDanmakeri in Ringim
constituency. Mai-Mai Blocks ind. Nig. Ltd Ringim 4,940,040.00 4,940,040.00 1/11/2018 6 weeks On-going
19
Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed 2018
Phase II Constituency Projects (Lot-2) at Majingini and Babban Kambari in
Gumel Constituency. Jag & H Intgrated Services Ltd. Gumel 6,230,703.46 6,230,703.46 6,020,716.06 5/12/2018 8 weeks 100 Completed
20
Construction of (1 No.) Blocks of 3-Classroom, 1-Block of 6-Seater VIP Pit
Latrine and Hand Pump at Govt. Day Arabic Secondary School Birniwa (Lot-1). MWT Real Estate & Gen. Mer. Birniwa 12,639,228.22 12,639,228.22 28/12/2018 3 months On-going
21
Construction of 1-Blocks of 6-Classroom (1st & 2nd Quarter 2018 UBEC/SUBEB
Intervention Project) Lot-5 G/Sarki and Construction of 2-Classrooms with
Office, Staff Room, Meeting Room and Toilet at Ruhogo in Hadejia L.G.A. Step by Step Intergrated Serv Hadejia 31,639,463.50 31,639,463.50 18/11/2018 16 weeks On-going
22
Construction of Blocks of 2-Classroom Islamiyya Typed (2No.) Lot-6 at Tashena
and Kargon Gabas in Malam madori Constituency. Express Innovation Concept M/madori 6,208,148.10 6,208,148.10 5,998,152.30 27/12/2018 6 weeks 100 Completed
23
Construction of (1No.) Blocks of Teachers Lodge 2018 Phase III Constituency
Projects (Lot-25) at Kanya Babba in Kanya Constituency. Deetech Nig. Ltd. Babura 12,701,001.00 12,701,001.00 18/12/2018 12 weeks On-going
24
Construction of (2 No.) Blocks of 2-Classroom Islamiyya School Typed 2018
Phase III Constituency Projects (Lot-24) at Garun Gabas in Malam madori
Constituency. Nabakwai Gen. Enterprises M/madori 3,115,351.08 3,115,351.08 3,010,355.93 18/12/2018 8 weeks 100 Completed
25
Constr of (10no.) block of 2-classroom Islamiyya School typed 2018 phase III
constituency projects (Lot-3) at Gida Dubu, Kargo Yamma, Kudai Yamma, Zobiya,
Tofa, Galadimawa, Katangare, Irwa, Gandun Mazare and Baranda in Dutse
Constituency. Mugin Investment Nig. Ltd. Dutse 31,136,790.83 31,136,790.83 27,095,121.74 24/12/2018 15 weeks 88 On-going
26
Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first quarter phase 2
Constituency projects) Lot-7 at Jauga, Jankawa Yola, Karwai, Wailari and Budai in
Ringim Constituency Marb eng. & Multi service Nig Ltd Ringim 15,576,585.00 15,576,585.00 27/11/2019 8 weeks On-going
27 Procurement and Distribution of Instructional Materials Basic Levels across the State. Ngaloma Constr. Co. Across the state 62,319,731.25 62,319,731.25 28/12/2018 12 weeks On-going
28
Constr of 1no. Block of 2-classroom islamiyya school each Lot-9 (first qtr. Phase II
2019 constituency project) at Ung. Kalgo, Kuda Walawa and Bade Fulani in
Yankwashi Constituency. Granitoids Eng Serv. Ltd. Yankwashi 9,339,771.12 9,339,771.12 11/12/2019 12 weeks On-going
29
Feeding of 1,407 Boarding School students at GGASS Babura in Babura LGA (2019
MOEST Capital Projects) Lot-1. JALGO Integ. Services Ltd. Babura 53,186,214.40 53,186,214.40 23/12/2019 40 weeks On-going
30
Constr of 1no. Block of 3-classrooms each at GDSS Babura, GDSS Galagamma Gumel,
GDSS babura and GDSS Ringim Areawa (2019 Capital projects) Babandoki Gen Entp. Ringim 44,808,022.00 44,808,022.00 3/10/2019 12 weeks On-going
31
Constr of 1no. Block of 3-classrooms each at GDSS Dan Masara, GDSS Jahun, GDSS
Shagari Qtrs Hadejia and GDSS M/madori (2019 Capital projects) Math Global Invest. M/madori 44,808,022.00 44,808,022.00 3/10/2019 12 weeks On-going
32
Renovation of Staff Quarters at College of Education Gumel, Lot-7 (3rd & 4rd Quarter
2019 Capital projects) Babandoki General Entr Gumel 233,513,402.67 233,513,402.67 233,513,402.59 27/11/2019 12 weeks 100 Completed
33
Construction of classrooms Blocks at Jigawa College of Remedial and Advance
Studies(JICORAS) Babura, Lot-4 (3rd & 4rd Quarter 2019 Capital Projects) Babandoki General Entr Babura 120,213,423.86 120,213,423.86 97,990,805.44 27/11/2019 24 weeks 82 On-going
BAL. C/F 5,373,342,386.99 5,843,613,520.24
4b
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 5,373,342,386.99 5,843,613,520.24
34
Renovation of 13No Students Hostels at College of education Gumel, Lot-8 (3rd &b
4rd Quarter 2019 Capital Projects) Babandoki General Entr Gumel 148,840,065.71 148,840,065.71 148,840,065.71 27/11/2019 12 weeks 100 Completed
35
Construction of Hostel Block at Jigawa College of remedial and Advance Studies
(JICORAS) Lot-5 (3rd & 4th Quarter 2019 Capital Projects) Ngaloma Constr Co Ltd K/Hausa 100,763,064.17 100,763,064.17 67,900,433.04 27/11/2019 24 weeks 67 On-going
36
Constr of Hand Pump Boreholes Water Supply Schemes Constituency projects (2019
First Quarter) Lot-9 at Askawa, Kulawa Babare, Achau Boro, Lugga Dashi, Tokai
Arewa, Ung. M. Nagoggo, Damutawa, Gabashi, Rinde fulani, Bakin Kasuwa, Ung. Isah
Yar Jigawa, Gwamfai Sabon Gari, Tsangaya, Kulluru Yammaci, Alikau, Sukullufi, Gidan
Atiku, Makera, Gwamfai, Achau Auyakayi and Likindin Gabashi in Jahun Contituency. Danfatu & sons Nig Ltd Jahun 14,755,650.00 14,755,650.00 11/12/2019 8 weeks On-going
37
Constr of 1no. Block of 2-Classroom islamiyya school each ( 2019 first quarter phase 2
Constituency projects) Lot-13 at Kiri Hawandu, Katarika and Kawari/Gujungu in Taura
Constituency Nushe Bus, Resources Nig Ltd Taura 11,719,771.12 11,719,771.12 27/11/2019 12 weeks On-going
38
Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand Pumps at GDSS
Ringim Arewa, K/Babba, Gujungu, Sakwayya and G/Kuka (2019 Last Quarters MOEST
Capital project Across the state (Lot-1ABCD&E) Ngaloma Constr Nig Ltd Ringim 103,609,125.68 103,609,125.68 103,572,215.93 23/12/2019 12 weeks 100 Completed
39
Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand Pumps at GDSS
Bosuwa, Taura, and Gumel (2019 Last Quarters MOEST Capital project Across the
state (Lot-3AB&C) Babandoki Gen. Enterp Nig Ltd Gumel 104,213,888.67 104,213,888.67 104,183,245.98 23/12/2019 12 weeks 100 Completed
40
Constr of Classes, Laboratories at GDSS Kafin Hausa, Kadira, Shagari, Dakido, Kanti,
Roni, Danmasara, Kudai, Birnin Kudu, Malamadori and Kiyawa (2019 Last Quarters
MOEST Capital project Across the state (Lot-5ABC&D) Sabon Garin yaya Nig Ltd State 106,186,110.20 106,186,110.20 106,124,708.44 27/12/2019 12 weeks 100 Completed
41
Constr of Toilets, Classrooms, Admin Blocks, Laboratories and Hand Pumps at GDSS
Galadi, GDSS Marabusawa, GDSS Dakido (2019 Last Quarters MOEST Capital project
Across the state (Lot-4AB&C) Math Global Invt. Nig Ltd Across the state 104,338,846.77 104,338,846.77 104,324,267.72 27/12/2019 12 weeks 100 Completed
42
Constr of Toilets, Admin Blocks, Laboratories and Wall Fence, 7no. JSQ Eamination
Hall and additional course of Blocks Hand pumps at GDSS Kazaure, Dutse Capital,
Bamaina Academy, Dutse Model and GDSS Jabo (2019 Last Quarters MOEST Capital
project Across the state (Lot-6 ABCDE&F) Pullad Global Consultant Nig Ltd Across the state 109,273,620.31 109,273,620.31 97,664,572.51 27/12/2019 12 weeks 100 Completed
43
Feeding of 2309 Boarding school Students at GGSS Garki in Garki local Govt (2019
MOEST Capital projects) Lot-7 MMZ Garki Gen Constructors Garki 87,276,300.00 87,276,300.00 23/12/2019 40 weeks On-going
44
Feeding of 1,003 Boarding school students at GGSSS Taura in Taura LGA (2019
MOEST Capital projects) Lot-26 Dankwara Maijimina Gen. Entp. Across the state 37,911,714.80 37,911,714.80 23/12/2019 40 weeks On-going
45
Feeding of 433 Boarding school students at GJSSS Guri in Guri LGA (2019 MOEST
Capital projects) Lot-28 Baradugum Gen. Entp. Guri 16,366,540.00 16,366,540.00 23/12/2019 40 weeks On-going
46
Feeding of 970 Boarding school students at GGSS S/tankarkar in S/tankarkar LGA
(2019 MOEST Capital projects) Lot-24 Hassan Habu T. Gen. Entp. S/tankarkar 39,182,001.60 39,182,001.60 23/12/2019 40 weeks On-going
47
Feeding of 790 Boarding school students at GSTC Hadejia in Hadejia LGA (2019
MOEST Capital projects) Lot-12 A.H.M. Global Ventures Hadejia 29,860,672.80 29,860,672.80 23/12/2019 40 weeks On-going
BAL. C/F 6,387,639,758.82 6,857,910,892.07
4c
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 6,387,639,758.82 6,857,910,892.07
48
Constr of Wall fence at Jigawa College of Remedial and Advance Studies (JICORAS)
Babura, Lot-2 (3rd & 4th Qtr. 2019 Capital Projects) Ngaloma Constr. Co. Ltd. Babura 131,969,392.51 131,969,392.51 112,939,334.06 27/11/2019 24 weeks 85 On-going
49
Constr of Admin Block at Jigawa College of Remedial and Advance Studies (JICORAS)
Babura, Lot-1 (3rd & 4th Qtr. 2019 Capital Projects) Ngaloma Constr. Co. Ltd. Babura 83,365,963.69 83,365,963.69 57,579,521.65 27/11/2019 24 weeks 69 On-going
50
Procurement of Science Laboratory equipment for distribution to 9no Science Centre
of Excellence Core-2 Quest Ventures Ltd. Across the state 81,037,103.92 81,037,103.92 24/12/2019 3 weeks On-going
51
Feeding of 1031 Boarding school students at GGASS Danzomo in Sule tankarkar Local
Government Area (2019 MOEST Capital project) Lot-25 Salisu & Isah Gen. Entp. Danzomo 38,969,984.00 38,969,984.00 23/12/2019 40 weeks On-going
52
Feeding of 1,762 Boarding school students at GUSS Maigatari in Maigatari Local
Government Area (2019 MOEST Capital project) Lot-20 Shabarawa Gen. Enterpr Babura 66,600,638.40 66,600,638.40 23/12/2019 40 weeks On-going
53
Feeding of 426 Boarding school students at Science secondary school kanya Babba in
Babura Local Government Area (2019 MOEST Capital project) Lot-41. H.A.U. Gen. enterp. Babura 16,102,084.40 16,102,084.40 23/12/2019 40 weeks On-going
54
Feeding of 635 Boarding school students at MBPS/JSS Ringim in Ringim Local
Government Area (2019 MOEST Capital project) Lot-35 H.A.U. Gen. enterp. Ringim 23,875,921.20 23,875,921.20 23/12/2019 40 weeks On-going
55
Feeding of 3378 Boarding school students at GUSS Ringim in Ringim Local
Government Area (2019 MOEST Capital project) Lot-21. H.A.U. Gen. enterp. Ringim 127,667,604.80 127,667,604.80 23/12/2019 40 weeks On-going
56
Feeding of 761 Boarding school students at SSS Lautai in Gumel Local Government
Area (2019 MOEST Capital project) Lot-8. Bakar Kasa Gen. Enter. Gumel 28,764,521.60 28,764,521.60 23/12/2019 40 weeks On-going
57
Feeding of 1,030 Boarding school students at SAIS Hadejia Local Government Area
(2019 MOEST Capital project) Lot-13 MS Amar & son enterp Hadejia 38,932,269.60 38,932,269.60 23/12/2019 40 weeks On-going
58
Feeding of 753 Boarding school students at GGCSS Roni in Roni Local Government
Area (2019 MOEST Capital project) Lot-23 Talba Gen. Enterp Roni 28,462,134.80 28,462,134.80 23/12/2019 40 weeks On-going
59
Feeding of 1319 Boarding school students at GUSS Roni and 170 tsangaya school
students at Gwiwa in Roni and Gwiwa Local Government Area (2019 MOEST Capital
projects) Lot-22 Adon Sale Bandu Across the state 57,699,603.60 57,699,603.60 23/12/2019 40 weeks On-going
60
Feeding of 1572 Boarding school students at GUSS Fantai and 279 students at school
for deaf in hadejia Local Government Area (2019 MOEST Capital project) Lot-11 Alh. Muhammad Kwalli Gen. Hadejia 69,924,690.40 69,924,690.40 23/12/2019 40 weeks On-going
61
Feeding of 1703 Boarding school students at GUSS Malammadori in Malammadori
Local Government Area (2019 MOEST Capital project) Lot-37 AG Isyaku Gen Ent M/madori 64,366,351.60 64,366,351.60 23/12/2019 40 weeks On-going
62
Feeding of 445 Boarding school students at GSTC Karkarna in Yankwashi Local
Government Area (2019 MOEST Capital project) Lot-27 Malabai Gen Ent Yankwashi 16,820,252.40 16,820,252.40 23/12/2019 40 weeks On-going
63
Feeding of 580 Boarding school students at GJSSS Karkarna in Yankwashi Local
Government Area (2019 MOEST Capital project) Lot-29 Malabai Gen Ent Yankwashi 21,923,025.60 21,923,025.60 23/12/2019 40 weeks On-going
64
Feeding of 635 Boarding school students at MBP/JSS Gumel and 60 Tsangaya school
students at Mai Aduwa in Gumel Local Government Area (2019 MOEST Capital
project) Lot-32 Wangara Agent Gen Ent. Gumel 26,406,169.60 26,406,169.60 23/12/2019 40 weeks On-going
BAL. C/F 7,310,527,470.94 7,780,798,604.19
4d
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 7,310,527,470.94 7,780,798,604.19
65
Feeding of 453 Boarding school students at GSTC Ringim in Ringim Local Government
Area (2019 MOEST Capital project) Lot-36 Maidala Gen. Ent. Ringim 17,122,640.00 17,122,640.00 23/12/2019 40 weeks On-going
66
Feeding of 2,254 Boarding school students at GGUSS Gwaram in Gwaram Local
Government Area (2019 MOEST Capital project) Lot-9 Gobirawa kwari Gen. Ent. Gwaram 84,333,796.80 84,333,796.80 23/12/2019 40 weeks On-going
67
Feeding of 1231 Boarding school students at GGASS birniwa in birniwa Local
Government Area (2019 MOEST Capital project) Lot-4 A.I. Maiso Gen. Ent. Birniwa 46,529,720.00 46,529,720.00 23/12/2019 40 weeks On-going
68
Feeding of 728 Boarding school students at GGJSSS Miga in Miga Local Government
Area (2019 MOEST Capital project) Lot-31 Yusif Garba Miga Gen. Ent. Miga 27,511,020.00 27,511,020.00 23/12/2019 40 weeks On-going
69
Feeding of 1,380 Boarding School students at GUSS Malam Madori LG (MOEST
Capital Projects)LOT-19 SawIra gen enterprises M/madori 52,161,681.60 52,161,681.60 23/12/2019 40 weeks On-going
70
Feeding of 1,122 Boarding School students at GSS Aujara in Jahun LG (MOEST Capital
Projects)LOT-15
Adamu Ibrahim Aujara Gen.
Entp. Jahun 42,687,419.20 42,687,419.20 23/12/2019 40 weeks On-going
71
Feeding of 621 Boarding School students at SAIS Fatara in Dutse LG (MOEST Capital
Projects)LOT-6 Baita Daushanga Gen. Entp. Dutse 23,394,510.80 23,394,510.80 23/12/2019 40 weeks On-going
72
Feeding of 1,233 Boarding School students at MBPS/JSS KILA Gwaram LG (MOEST
Capital Projects)LOT-42 Baita Daushanga Gen. Entp. Gwaram 46,605,328.40 46,605,328.40 23/12/2019 40 weeks On-going
73
Feeding of 882 Boarding School students at GUSS Basirka Gwaram LG (MOEST
Capital Projects)LOT-10 Baita Daushanga Gen. Entp. Gwaram 33,333,159.20 33,333,159.20 23/12/2019 40 weeks On-going
74
Feeding of 554 Boarding School students at MBP/JSS Guri, 58 Tsangaya School
students at Tarabu and 60 Tsangaya School students at Birniwa in Guri and Birniwa
LG (2019 MOEST Capital Projects)LOT-34 GMA Kadira gen. enterprises Guri+Birniwa 25,893,694.00 25,893,694.00 23/12/2019 40 weeks On-going
75
Feeding of 940 Boarding School students at science secondary school (SSS) Kafin
Hausa in Kafin Hausa LG (MOEST Capital Projects)LOT-16 Zango Gen. enterprises K/Hausa 35,530,420.80 35,530,420.80 23/12/2019 40 weeks On-going
76
Feeding of 467 Boarding School students at GSTC Birnin kudu in Birnin kudu LG
(MOEST Capital Projects)LOT-3 Baita Daushanga Gen. Entp. B/kudu 17,651,815.60 17,651,815.60 23/12/2019 40 weeks On-going
77
Feeding of 1,077 Boarding School students at GGASS Kaugama in Kaugama LG
(MOEST Capital Projects)LOT-17 Danbiri Global Ventures Kaugama 40,709,000.80 40,709,000.80 23/12/2019 40 weeks On-going
78
Feeding of 639 Boarding School students at MBPS/JSS Bulangu in Kafin Hausa LG
(MOEST Capital Projects)LOT-33
Hussaini Ahmed bookshop Gen
Entp. K/Hausa 24,027,126.40 24,027,126.40 23/12/2019 40 weeks On-going
79
Feeding of 920 Boarding School students at GGUSS Kazaure in Kazure LG (MOEST
Capital Projects)LOT-18 Haru jika Gen. Entp. Kazaure 34,767,096.00 34,767,096.00 23/12/2019 40 weeks On-going
80
Feeding of 2309 Boarding School students at GGSS Garki in Garki LGA (MOEST
Capital Projects)LOT-7 MMZ Garki Gen Const Garki 87,276,300.00 87,276,300.00 23/12/2019 40 weeks On-going
81
Feeding of 674 Boarding School students at MBPS/JSS Kudai in Dutse LGA (MOEST
Capital Projects)LOT-43 Sabuwar Kuka Gen Enterp Dutse 25,476,067.60 25,476,067.60 23/12/2019 40 weeks On-going
82
Feeding of 788 Boarding School students at GJSSS Aujara in Jahun LGA (2019 MOEST
Capital Projects)LOT-30 Na'ima and Fati Gen. Entp. Jahun 29,785,076.00 29,785,076.00 23/12/2019 40 weeks On-going
83
Constr. Of Gate House and Toilet at Jigawa Colege od Remedial and advance Studies
(JICORAS) Babura, Lot- 3 (3rd and 4th Quarter 2019 Capital Project) Al-sabur Global Nig. Ltd Babura 39,190,677.39 39,190,677.39 19,482,704.06 27/11/2019 24 Weeks 50 On-going
BAL. C/F 8,044,514,021.53 8,514,785,154.78
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
4e
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 8,044,514,021.53 8,514,785,154.78
84
Constr. Of 1No. Block of 2-Laboratories at GGDSS Roni (2nd Quarter 2019
Constituency Project) Lot-1 Manhaf Global Constr Nig Ltd Roni 33,552,607.41 33,552,607.41 24/12/2019 12 weeks On-going
85
Construction of additional block of 3 classrooms each at kondiko, GGASS Binin kudu,
GDSS kwarko, GDSS kiyako, GDSS sabon gari takanebu and GDSS galamawa across
the state Babandoki Gen. Enterp Nig Ltd Across the state 67,198,406.92 67,198,406.92 24/12/2019 12 weeks On-going
86
Feeding of 287 Boarding School students at bamaina academy in birnin kudu LGA
(2019 MOEST Capital Projects)LOT-39 Kabiru na Malam Nig Ltd B/kudu 40,204,006.00 40,204,006.00 23/12/2019 40 weeks On-going
87
Supervision of the construction works at jigawa college of remedials and advance
studies (JICORAS) babura, Lot-6 (3rd and 4th quarters 2019 capital projects) Apex Design & Associates Babura 23,537,374.82 23,537,374.82 13,886,995.39 27/11/2019 24 Weeks 59 On-going
88
Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter Phase II
Constituency Projects) Lot-2 at rukumi in malam madori Constituency. Mai Mai Blocks Ind. Nig. Ltd M/madori 3,473,316.00 3,473,316.00 11/12/2019 8 weeks On-going
89
Constr of 1no. Block of 3-classroom and a toilet at GDSS Chakwaaikwaiwa
and Toilet block at GDSS Kila (Lot-12) Math Global State 15,400,000.00 15,400,000.00 14,248,359.63 3/11/2020 12 weeks 100 Completed
90
Consultancy services for the renovation works at college of Education
Gumel
Curves and Straight Design
Ltd. State 4,601,870.90 4,601,870.90 4,348,768.01 4/12/2020 12 weeks 100 Completed
91
Feeding of 209 Boarding school students at Tsangaya school gantsa in bujiLocal
Government Area (2019 MOEST Capital project) Lot-38 Zai General Ent. Buji 8,762,692.80 8,762,692.80 23/12/2019 40 weeks On-going
92
Feeding of 2,416 Boarding school students at GUCSS Dutse in Dutse Local
Government Area (2019 MOEST Capital project) Lot-35 Zai General Ent. Dutse 91,320,405.20 91,320,405.20 23/12/2019 40 weeks On-going
93
Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first Quarter Phase II
Constituency Projects) Lot-21 at Ung. Kalgo, Kuda Walawa and Bade Fulani in
Yankwashi Constituency. Granitoids Engr Services ltd Yankwashi 9,339,771.12 9,339,771.12 11/12/2019 8 weeks On-going
94
Feeding of 1,696 Boarding school students at GUC Birnin kudu in birnin kudu Local
Government Area (2019 MOEST Capital project) Lot-2 Muduka General Ent. B/kudu 64,105,950.80 64,105,950.80 23/12/2019 40 weeks On-going
95 Constr. Of 3 Classroom and Supply of 51 Sets of Classroom Furniture NBS & Sons Co. Ltd In the state 10,792,974.41 10,792,974.41 29/01/2020 12 Weeks On-going
96
Procurement of Textual Materials Under World Bank Financed Project ( 36,660
textual materials) ( RA 1 Lot-I) Allah Abin Dogara Enter In the state 35,908,470.00 35,908,470.00 3/2/2020 8 Weeks On-going
97
Procurement of Textual Materials Under World Bank Financed project ( 15,818
textual materials) ( RA 2 Lot-1) Math Global Investment In the state 31,288,410.00 31,288,410.00 3/2/2020 8 Weeks On-going
98
Procurement of Textual Materials Under World Bank Financed project (
20,538textual materials) ( RA 1 Lot-2) Math Global Investment In the state 30,103,610.00 30,103,610.00 3/2/2020 8 Weeks On-going
99
Procurement of 15,500 Textual materials under world bank financed project RA-2 Lot-
2 (BESDA) P4R Across the state Babandoki Gen. Entp.Ltd In the state 30,845,000.00 30,845,000.00 3/2/2020 8 Weeks On-going
100
Procurement of 15,500 Textual materials under world bank financed project RA-2 Lot-
5 (BESDA) P4R Across the state Dangata Memorial Inv. Ltd In the state 31,680,600.00 31,680,600.00 3/2/2020 8 Weeks On-going
BAL. C/F 8,576,629,487.91 9,046,900,621.16
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
4f
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 8,576,629,487.91 9,046,900,621.16
101
Procurement of 13,860 Textual materials under world bank financed project RA-2 Lot-
6 (BESDA) P4R Across the stateAl-sabur Global Links In the state 20,388,000.00 20,388,000.00 3/2/2020 8 Weeks On-going
102
Procurement of pricipal/Teachers, Students furniture and constr of classes at GDSS
Harbo/Firji across the state (Lot-2A,B & C) (2019 last Qtr. MOEST capital projects) Trocom Int. Serv. Ltd. in the state 107,391,128.93 107,391,128.93 107,390,608.60 23/12/2019 12 weeks 100 Completed
103
Renovation of 6 Classrooms and Renovation of 4 classrooms at Kaugama Junior
Secondary School and Kachakama in kaugama and Malam Madori Local Government
Areas (Lot-41) Kanti Alheri Building Ltd M/madori 12,598,331.41 12,598,331.41 11/5/2020 10 Weeks On-going
104
Constr. Of 4 Blocks each of 3 Classrooms with office (4No) at gatafa JSS, Mashagwal
JSS, Dingaya and Togai in Auyo, Gwaram and Sule Tankarkar Local Government Areas RGH Star & Sons Nig Ltd Various 56,215,167.44 56,215,167.44 22/04/2020 16 Weeks On-going
105
Constr. Of 1 Block of 2 Classrooms Rural (1No.) and Constr. Of 4 Block each of 3
Classrooms with office (4No) in Dan Ama, Kwarare, S/Fada Ba'auzini JSS and Madabe
in Gumel, Gwiwa, Taura, Kazaure and Buji LGA (Lot-13) Homelux Constr Ltd Various 60,720,969.45 60,720,969.45 20/05/2020 16 Weeks On-going
106
Constr. Of 1 Block of 2 Classrooms (4No) and Construction of 2 Block each of 3
Classrooms Normal (2No) at JSS Ja'e, JSS Sabasru, JSS Gayin, JSS Shakato, JSS U/Jibrin
and JSS Gagaryasa In Kaugama, Kazaure, Kiri Kasamma, Kafin Hausa and Gwaram LGA
(Lot-14) MWT Real Estate & Gen Ltd Various 42,091,061.02 42,091,061.02 8/6/2020 14 weeks On-going
107
Constr. Of 3 Block each of 2 Classrooms Normal, Construction of 2 Bedrooms Rural
(2No) and Construction of 2 bedrooms semi-detached Teachers House (2No) at
K/Gana, Umarni and Kuda in Birnin Kudu, Sule Tankarkar and Yankwashi, Gangarau
and Kurna in Buji and Roni, Aujara JSS and Miga JSSS in Jahun and Miga LGA (Lot-1) Beam Systems Nig Ltd Various 47,836,383.46 47,836,383.46 10/6/2020 14 weeks On-going
108
Constr. Of 8 Block Each of 2 Classrooms with office (8No) at Ajura, Z/Mahauta,
Gangare, Adare, Amanga, Zoto, A/Ashe and Dungundin in garki, Gwiwa, Sule
Tankarkar, Yankwashi and Roni LGA (Lot-9) Muhal Global Concept Ltd Various 55,182,489.84 55,182,489.84 10/6/2020 11 weeks On-going
109
Constr. Of 1 Block of 2 Classrooms with office (1No) and Constr. Of 5 Block each of 3
Classrooms Normal (5No) at Hadiyau, Katika, JSS Hadin, Jangari, Buntusu and
Sakwaya JSS in Auyo, Kiyawa, Kaugama, Garki, Gwiwa and Dutse LGA (Lot-11) A. Barde Global Concept Various 54,154,392.46 54,154,392.46 10/6/2020 15 weeks On-going
110
Renovation of 2 Classrooms, renovation of 2 Classrooms, renovation of 2 Classrooms,
Renovation of 2 Classrooms, Renovation of 2 Classrooms and renovation of 4
Classrooms at matakuwa, Manaba, Auyo, Sabawa, Unik Gana, G/Kuka and Kadowawa
in Kafin Hausa, Auyo and Jahun LGA (Lot-51) Allah Abin Dogaro Nig Ltd Various 21,442,412.67 21,442,412.67 10/6/2020 16 weeks On-going
111
Renovation of 4 Classrooms, Renovation of 2 Classrooms, Renovation of 2
Classrooms, renovation of 2 Classrooms and Renovation of 6 Classrooms at Mezan,
Afarke, Kafin Hausa Sps, Maruko and Afirzina In Kafin Hausa LGA (Lot-37)
Gidan Adede General
Enterprises Ltd K/Hausa 21,432,440.49 21,432,440.49 15/06/2020 20 weeks On-going
112
Constr. Of 3 Blocks each of 3 Classrooms Normal (3No) at Bultuwa, K/wance and
Kwalam Central in Kaugama and Taura LGA (Lot-15)
Gidan Adede General
Enterprises Ltd Kaugama/Taura 26,954,309.99 26,954,309.99 15/06/2020 12 weeks On-going
BAL. C/F 9,103,036,575.07 9,573,307,708.32
4g
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 9,103,036,575.07 9,573,307,708.32
113
Constr. Of 3 Block each of 2 Classrooms Normal (3No) at Guri JSS, Kyarama and
Kiyawa in Guri, Ringim and Kiyawa LGA (Lot-17) Manhaf Global Concept Ltd Various 27,157,832.12 27,157,832.12 16/06/2020 11 weeks On-going
114
Renovation of 2 Classrooms, renovation of 2 Classrooms, renovation of 4 Classrooms,
renovation of 6 Classrooms, Renovation of 2 Classrooms, Renovation of 2
classrooms, renovation of 2 Classroom and renovation of 2 Classrooms at
Hambarawa, amaguwa, A/Ari, JSS Akasan, Kukui, Chakwaikwaiwa, Walawa, Unguwar
Liman and Korama in Ringim, Taura gagarawa and Kiyawa LGA (Lot-40) NBS & Sons Constr Co Ltd Various 21,188,235.76 21,188,235.76 16/06/2020 14 weeks On-going
115
Renovation at Toyawa Primary School and Model Boarding Primary School Guri in
Kafin hausa and guri LGA Lot-47 A.U.T Nigeria Limited K/Hausa+Guri 10,377,823.71 10,377,823.71 14/07/2020 10 Weeks On-going
116 Constr. Of 6 Seater Pit Latrine at GDSS Medu and GDSS Tsakuwawa (Lot 8A) Babandoki Gen Ent Ltd State 6,785,978.50 6,785,978.50 3/11/2020 3 Months On-going
117
Constr. Of Hostel Block at SAIS Fatara in Dutse (2020 Moest 2nd & 3rd Quarter
Projects) Lot-7D Babandoki Gen Ent Ltd Dutse 34,466,575.88 34,466,575.88 32,982,947.29 2/11/2020 3 Months 100 Completed
118
Consultancy services of Islamic Education Bureau (IEB) 2020nd & 3rd Quarter
Projects Curves and Straight Design Various 5,827,600.00 5,827,600.00 17/11/2020 6 Months On-going
119
Commissioning as Consultant for the Supervision of the Construction at the Ministry
of Education Science and Technology Edifice Mega Constr Ltd Dutse 4,165,000.00 4,165,000.00 4,045,256.25 17/11/2020 4 months 100 Completed
120
Constr. Of 1Block of 2 Cllassroom Islamiyya School Each Lot-25 (2019 Second Quarter
Constituency Projects) at rigar Dan Zago, Jigawar Dan Ali and Kunyafa Sabuwa in
babura Constituency Mufabamex Concept Ltd Babura 9,336,165.00 9,336,165.00 2/11/2020 4 months On-going
121
Development of Arabic School at GDASS Babaldu, Kila, Wurno, GGASS Kanya Babba,
Sule tankarkar and Harbo (Lot-9D) Aldan Projects Ltd Various 67,876,675.54 67,876,675.54 58,088,145.84 19/11/2020 3 Months 86 On-going
122
Commissioning as consultant for the supervision of the Construction of 2020 2nd and
3rd Quarter Capital Projects at MOES&T MB Dakata Associate Various 3,505,073.24 3,505,073.24 3,404,302.38 18/11/2020 4 Months 100 Completed
123
Constr of 1no. Block of 2-classroom islamiyya type each at S/garin Goje,
Inuwa Dutse estate, Shimadara, Jiba, Z/Buji, Buji gidan Dugus, Bula kalu,
Kundi, Bitilan Dutsawa Islamiyya, J/Habuba in Dutse Constituency (Lot-
10A) Pullad Global Consult Ltd Dutse 53,658,746.54 53,658,746.54 35,653,652.26 22/01/21 20 Weeks 66 On-going
124 Fumigate the 52No. Boarding Secondary Schools Across the State Essence World Wide Ltd Across the state 5,903,900.00 5,903,900.00 13/11/2020 12 Weeks On-going
125
Approval for the award of contract for the Procurement of protective materials
against covid-19 pandemic in preparation for the re opening of schools in the state Various Companies in the state 362,790,687.00 362,790,687.00 17/11/2020 4 weeks On-going
126 Constr. Of 12No. Junior Staff Quarters and Security Valve wire (Lot-1c) Math Global Invest Ltd Across the state 9,793,129.68 9,793,129.68 3/11/2020 3 Months On-going
127 Renovation works at Govt Unity Secondary School Basirka (Lot-2) Khanadi Global Links Ltd Gwaram 20,189,201.93 20,189,201.93 19,684,527.17 30/12/2020 8 Weeks 100 Completed
128
Renovation of 2No Hostel Block at GUSS fantai, 2No Hostel at GUCSS Dutse,
Renovation works at GDSS Wurno, GGUSS Gwaram, GDSS Madobi and GGSS Sule
Tankarkar (Lot-1)
Babandoki General Enterprises
Ltd Various 79,760,579.67 79,760,579.67 77,688,929.56 30/12/2020 3 Months 100 Completed
BAL. C/F 9,825,819,779.64 10,296,090,912.89
4h
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 9,825,819,779.64 10,296,090,912.89
129
Constr. Of Shape Wall fence at GGASS Danzomo and storm damage at GGASS
babura, GGASS kaugama, GDASS sambo, GDASS jahun,GDASS gagarawa and GDASS
S/Gwaram (Lot-6D) Asasco Nigeria Limited Various 43,985,220.10 43,985,220.10 42,781,563.67 22/12/2020 3 Months 100 Completed
130 Procuremenat of 10,000 Sets of school uniform for girls (Lot-2) Pullad Global consult Ltd Various 32,900,000.00 32,900,000.00 32,900,000.00 30/12/2020 8 Weeks 100 Completed
131 Procuremenat of 10,000 Sets of school uniform for girls (Lot-1) Pullad Global consult Ltd Various 32,900,000.00 32,900,000.00 32,900,000.00 30/12/2020 8 Weeks 100 Completed
132 Procuremenat of 10,000 Sets of school uniform for girls (Lot-3) 313 Textiles Nig Ltd Various 32,900,000.00 32,900,000.00 32,900,000.00 30/12/2020 8 Weeks 100 Completed
133
Renovation of 2no. Block of Classrooms at tsamai Nomadic in Gumel and
S/sara Nomadic in Miga LGA. Gare Investment Ltd. State 3,038,352.38 3,038,352.38 2,736,858.39 24/10/2020 8 weeks 100 Completed
134
Renov of 3no. Nomadic Primary Schools at Muni in Babura, Sawa in
Gwaram and Marina in Auyo LGA. Yadukko Nig. Ltd. State 8,292,759.67 8,292,759.67 7,548,621.69 3/11/2020 12 weeks 100 Completed
135
Procurement of 743,400, 40 Leaves exercise book with special cover, 17=85,850 HB
pencils AD2 integrated Tech Ltd Various 50,644,125.00 50,644,125.00 9/11/2020 8 Weeks On-going
136
Renovation of Classroom Blocks at Damukashe B/Jeji, gadadin Etc in Gwaram,
b/Kudu, and Kiyawa LGAS Dalari Constr Co Ltd Various 16,567,816.64 16,567,816.64 12/11/2020 8 Weeks On-going
137
Renovation of Classroom Block at Kudai, Yangayami, D/Toka e.t.c. in Dutse, Taura and
K/Hausa LGAS Talaku Integ Ltd Various 8,674,243.46 8,674,243.46 8,244,098.10 12/11/2020 8 Weeks 100 Completed
138
Renovation of classroom Block at Bakara, Auno Etc in Auyo, Kiyawa and Maigatari
LGAs
Babandoki General Enterprises
Ltd Various 6,144,536.53 6,144,536.53 5,971,343.05 12/11/2020 8 Weeks 100 Completed
139
Renovation of classroom Block at daguma, Yanyuawai, Gezo in Maigatari and Sule
Tankarkar LGAs Al-Juraj Synergy Ltd Various 18,162,831.36 18,162,831.36 12/11/2020 8 Weeks On-going
140
Renovation of Classroom Block at Badingo, Kura, U/Makaddas, Dorayi Etc in B/Kudu
and Babura LGAs Mugin investment Ltd B/kudu+Babura 29,124,922.00 29,124,922.00 12/11/2020 8 Weeks On-going
141
Increase in Height by 0.5M High of wall fence including barbed wire at Girls Junior
Science Secondary School Miga LGA (Lot-6) Allah Abin dogaro Ent Ltd Miga 6,033,506.29 6,033,506.29 5,724,815.27 12/11/2020 8 Weeks 100 Completed
142
Constr of JSS Science each (Lot-21) (2019 second qtr. Constituency projects) at Garin
Wakili, Busugu, Bareri, Dilmari and Madachi in K/Kasamma LGA. Mai-mai blocks Ltd. K/kasamma 15,546,231.75 15,546,231.75 8,460,803.50 21/01/2020 12 weeks 55 On-going
143 Renov of Windstorm damages at GSS Taura, GSS Roni, and GSTC Hadejia (Lot-1) Math Global Ltd. State 51,000,000.00 51,000,000.00 47,413,371.60 3/11/2020 12 weeks 100 Completed
144
Procurement of 15,500 textual materials under world bank financed project RA-2 Lot-
4 (BESDA) P4R across the state Pullad Global Nig Ltd In the state 30,938,000.00 30,938,000.00 3/2/2020 8 Weeks On-going
145
Procurement of 15,500 textual materials under world bank financed project RA-2 Lot-
3 (BESDA) P4R across the state Pullad Global Nig Ltd In the state 30,938,000.00 30,938,000.00 3/2/2020 8 Weeks On-going
146
Construction of 1 block of 2 classrooms islamiyya type at Danfa in Babura
constituency (lot20B)
Gidan adede general
engerprises Ltd
Babura 3,856,152.12 3,856,152.12 1/25/2021 17 weeks
BAL. C/F 10,247,466,476.94 10,717,737,610.19
4i
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 10,247,466,476.94 10,717,737,610.19
147
Construction of 1 block of 2 classrooms islamiyya type each at
karangi,kadirawa and zango in kiyawa constituency (lot 24)
Gidan Adede General
Enterprises Ltd
Kiyawa 11,457,590.06 11,457,590.06 10,692,825.22 1/25/2021 19 weeks
100
Completed
148
Construction of 1 block of 2 classrooms islamiyya type each at JSS yalo
and JASS Dankayyawa inkaugama constituency (lot 5)
Wajedu Nig Ltd Kaugama 7,672,304.24 7,672,304.24 7,018,126.35 1/25/2021 10 weeks
100
Completed
149
Construction of 1 block of 2 classrooms islamiyya SUBEB type each at
Malaluwa and Farin Dutse constituency, Gwaram LGA (lot 8)
AD2 intergrated technical
services Ltd
Gwaram 7,672,304.24 7,672,304.24 1/25/2021 20 weeks On-going
150
Construction of 1 block of 2 classrooms islamiyya type each at As-
habulkafi, Sheik Buna shagari, Nurul yaqeel islamiyya, Maman wale
quarters and Kwarin manu in Hadejia constituency (Lot 14A)
AG global services Ltd Hadejia 15,401,531.28 15,401,531.28 1/22/2021 14 weeks On-going
151
Construction of 1 block of 2 blocks 6NO. Cubicle toilets, construction of
gate and front view fencing at maje nursey and primary school and IMN
school in Hadejia constituency (Lot 14C)
AG global services Ltd Hadejia 9,250,000.00 9,250,000.00 1/22/2021 14 weeks On-going
152
Construction of 1 block of 2 classrooms islamiyya type each at
G/kanawa,Kuzuzumi and Koko in kanya constituency, Babura LGA (Lot 11)
Gidan adede general
engerprises Ltd
Babura 11,508,456.36 11,508,456.36 1/25/2021 15 WEEKS On-going
153
Construction of 1 block of 2 classrooms islamiyya type each at Autatuwa
in bulangu constituency (Lot 4)
Na bakwai general
engerprises Ltd
K/Hausa 3,865,152.12 3,865,152.12 1/25/2021 19 weeks On-going
154
Construction of 1 block of 2 classrooms islamiyya type each at Amanga
Gari,Danzomo and Turkusawa in sule tamkarkar constituency (Lot 16)
Na bakwai general
engerprises Ltd
S/Tankarkar 11,452,590.06 11,452,590.06 1/25/2021 17 Weeks On-going
155
Construction of 1 block of 3 classrooms islamiyya SUBEB type at
Maigaggafa in Garki constituency (Lot 12)
A.G.M & sons Nig Ltd Garki 10,501,978.85 10,501,978.85 9,769,282.69 1/25/2021 12 weeks
100
Completed
156
Completion of 1 block of 2 classrooms islamiyya type each at Karwai and
Charkawa in Ringim constituency (Lot 7A)
A.G.M & sons Nig Ltd Ringim 7,672,974.08 7,672,974.08 1/25/2021 16 weeks On-going
157
Construction of 1 block of 2 classrooms islamiyya type and Completion of
1 block of 4 classrooms at GGSS K/hausa and Ruba in Kafin Hausa
constituency (Lot 23)
AMM manzo Nig Ltd K/Hausa 4,626,917.43 4,626,917.43 1/22/2021 19 weeks On-going
158
Completion of classrooms islamiyya type school at Dangyatin in Miga
constituency (Lot 1B)
AD2 intergrated technical
services Ltd
Miga 3,164,974.00 3,164,974.00 1/25/2021 14 weeks On-going
159
Renovation of 1 block of 2 classrooms islamiyya type at Sansani in Miga
constituency (Lot 1C)
Gidan adede general
engerprises Ltd
Miga 3,277,162.90 3,277,162.90 1/25/2021 14 Weeks On-going
160
Construction of 1 block of 2 classrooms islamiyya type each at Tsangayar
Liman, Uku da sisi and Chirimbi in Babura constituency (Lot 20A)
Mufabamex Concept Nig
Ltd
Babura 11,508,456.36 11,508,456.36 10,703,909.28 1/25/2021 17 weeks
100
Completed
161
Construction of 1 block of 2 classrooms islamiyya type each at
Zangayan,Malandi,Birniwa,Izala and Birniwa Day JSS (Staff room) in
Birniwa constituency (Lot 26)
Kafiyama General
Enterprices Ltd
Birniwa 15,344,130.32 15,344,130.32 1/26/2021 12 weeks On-going
162
Construction of 1 block of 2 classrooms islamiyya type each at GGSS Guri,
guri Yamma and Garbagal in Guri constituency (Lot 3)
Mugin investiment Nig Ltd Guri 11,452,890.05 11,452,890.05 1/25/2021 19 weeks On-going
BAL. C/F 10,393,295,889.29 10,863,567,022.54
4j
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Education, Science and Technology
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 10,393,295,889.29 10,863,567,022.54
163
Construction of 1 block of 2 classrooms islamiyya type each at
Kalgwai,Kadirawa and Zango in Kiyawa constituency (Lot 25)
Mugin investiment Nig Ltd Kiyawa 7,672,304.24 7,672,304.24 1/25/2021 12 weeks On-going
164
Construction of 1 block of 2 classrooms islamiyya type each at Tudun
wada, Duhuwa and Saya saya in Dutse constituency (Lot 10C)
Mugin investiment Nig Ltd Dutse 11,501,819.64 11,501,819.64 1/25/2021 19 weeks On-going
165
Construction of 1 block of 2 classrooms islamiyya type each at Amaryawa
cikin gari,Takwardawa,Jama'a Zugai,U/Dinya,Dansure Gabas,Mai
karauchi,Sankau gari,Tudun Dan biriri,Gumau and Roni Gari in Roni
constituency (Lot 22)
Jignaj Global Constructions
Ltd
Roni 38,361,571.20 38,361,571.20 1/25/2021 16 weeks On-going
166
Construction of 1 block of 2 classrooms islamiyya type each at
Z/Sainawam Gidan Dogon Faci,Dankawa,Wailare and Kurkyet in Gwiwa
constituency (Lot 18)
Jignaj Global Constructions
Ltd
Gwiwa 15,304,471.36 15,304,471.36 1/25/2021 14 weeks On-going
167
Constr.of 1 Block of 2 Classroom Islamiyya type Each at Dakido and
Garmaka in Maigatari Constituency (Lot-19A) Pullad Global Consult Ltd Maigatari 7,672,304.24 7,672,304.24 7,137,027.19 22/01/2021 17 Weeks 100 Completed
168
Constr. Of 1 Block of 2 Classrooms Islamiyya Type Each at Wurmawa, Yar
Jigawa, Katafila, Darul Sunnah and Tahsin in Jahun Constituency (Lot-2)
Babandoki General
Enterprises Ltd Jahun 19,180,162.90 19,180,162.90 17,842,006.98 22/01/2021 18 Weeks 100 Completed
169
Constr. Of 1 Block of 3 classrooms Islamiyya Type, Constr. Of 2 Classroom
(Rural Type) and Constr. Of wall fencing and 1 Block Islamiyya at Abubakar
Mosques, Ummul-Khair Islamiyya, Aminu Sani Primary and Zango
Constituency Projects Lot-9
Babandoki General
Enterprises Ltd Hadejia 22,774,106.00 22,774,106.00 22/01/2021 11 eeks
On-going
170
Constr. Of 1 Block of 2 Classrooms Islamiyya type each at Gululu,
Nasarawa and Rukumawa in Miga Constituency (Lot-1) Loyalty Properties Ltd Miga 11,478,353.53 11,478,353.53 4/3/2021 14 Weeks
On-going
171
Constr. Of 250 Capacity theater at college of islamic and legal studies
Ringim (Lot-1) Ngaloma Construction Ltd Ringim 74,864,074.07 74,864,074.07 16/03/2021 24 Weeks
On-going
172
Constr. Of 1 Blockof 3 Classroom at college of Islamic and Legal Studies
Ringim (Lot-3) Pullad Global Consult Ltd Ringim 18,419,746.61 18,419,746.61 16/03/2021 12 Weeks
On-going
173 Constr. Of lecture Hall at College of Islamic & Legal Studies Ringim (Lot-2) A.A. Maikatako Gen Ent Ltd Ringim 25,004,616.22 25,004,616.22 16/03/2021 20 Weeks
On-going
TOTAL 10,645,529,419.30 11,115,800,552.55
4k
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Land and Housing
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT (N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1
Construction of (30NO.) Boys Quarters, External Electrification and
Water supply to individual Legislator's Quarters at Disina in Dutse
L.G.A. Gerawa Global Engr. Dutse 812,600,502.00 812,600,502.00 723,720,196.50 17/10/2018 32 weeks 89 On-going
2
Consultancy services for the supervision of the construction of 30no.
Boys Qtrs., Ext. Electrification and Water Supply at Legislative Qtrs.,
Dutse HAG Eng. Ltd. Dutse 47,049,676.58 47,049,676.58 42,948,768.82 9/1/2019 32 weeks 91 On-going
3
Registration of Urban Properties Across the State Under World Bank
Supported SFTAS Program (DLI-5) ( Approval for the engagement of
consultant) Linx Spatial System Ltd in the state 13,459,000.00 13,459,000.00 12/2/2021 12 months On-going
TOTAL 873,109,178.58 873,109,178.58
5
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Commerce
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1
Satellite Geology Map of Jigawa State chad Basin
Area Spatial Geoserve Ltd State 9,600,000.00 9,600,000.00 29/09/2020 16 Weeks On-going
Total 9,600,000.00 9,600,000.00
6
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Dutse Capital Development Authority
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1 Constr. of Dutse township road (15 & 20) Dantata & Sawoe Dutse 760,653,932.06 760,653,932.06 540,282,932.70 20/12/12 16 weeks 73 Stalled
2 Rehab. Of Dutse Township road phase II (10.110km) CGC Nig. Ltd. Dutse 2,129,872,584.00 3,173,304,408.80 2,688,981,022.36 8/11/2012 14 months 82 Stalled
3 Rehab. Of Dutse Township road phase I (1.250km) CGC Nig. Ltd. Dutse 487,164,968.00 972,442,157.57 812,016,426.23 8/11/2012 14 months 83 Stalled
4 Constr. Of Streetlights on Dutse township roads (17.576KM) phase I & II CGC Nig. Limited Dutse 666,041,660.55 666,041,660.55 543,723,853.77 9/9/2013 16 weeks 85 Stalled
5
Constr. Of Access road (1.92KM) at the New House of Assembly Members Qtrs. Disina,
Dutse CGC Nig. Limited Dutse 419,305,302.03 419,305,302.03 303,493,140.29 19/9/2013 5 months 73 Stalled
6 Constr. Of River Re-Alignment project at Dutse, phase 1 (2KM) Dantata & Sawoe Dutse 1,999,219,676.02 1,999,219,676.02 803,044,623.06 26/9/2013 6 months 40 On-going
7 Landscaping and External works at new Jigawa State Broadcasting Complex Dantata & Sawoe Dutse 657,635,647.36 657,635,647.36 457,989,460.07 31/3/2014 6 months 66 Stalled
TOTAL 7,119,893,770.02 8,648,602,784.39
7
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Cabinet Office
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT (N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1 Upgrading and Renovation of Jigawa State Governor's Lodge Kano Anhas Nig. LTD Kano 123,614,216.81 123,614,216.81 97,062,788.87 5/11/2013 9 Months 78 On-going
2
Commissioning as Consultant on the Supervision of the Upgrading and
Renov. of Governor's Lodge Kano Design+ Consultant LTD Kano 10,097,505.90 10,097,505.90 6,555,808.21 19/11/2013 9 Months 75 On-going
3
Constr. of Juma'at Prayer Mosque at Kukuma yamma and Gubabiya
in Buji Constituency. Loyalty Properties Nig. Ldt. Buji 5,613,871.72 5,613,871.72 24/01/2017 6 weeks Stalled
4
Completion/Renovation of 1no. Daily prayer mosques (2019 first
quarter constituency projects) Lot-92 at Turkushawa in Sule
Tankarkar Constituency. Modang Invest. Ltd. S/tankarkar 2,625,238.18 2,625,238.18 17/12/2019 8 weeks On-going
5
Construction of (3NO.) Five Daily Prayer Mosque 2018 Constituency
Projects (Lot-29) at Santerbi Gari, Chakindi Gari and Sule Bakin Titi in
Sule Tankarkar Constituency. Lautai Genaral Investment S/Tankarkar 5,763,123.45 5,763,123.45 3,746,645.70 10/10/2018 6 weeks 60 On-going
6
Construction of District Head Residence 2018 Constituency
projects (Lot 1) at Tsohuwar Gwaram in Gwaraam Constituency A.G.A. Kilawa Nig. Ltd. Gwaraam 55,264,747.00 55,264,747.00 34,611,206.66 10/10/2018 6 weeks 61 On-going
7
Construction of (4NO.) five Daily Prayer Mosques 2018
Constituency Projects (Lot-18) at Zangon Kanya, Alagarno, Luggai
and Tsagaiwal in Bulangu Constituency, Kafin Hausa Local
Government Area. Kawu Nig. Ltd. K/Hausa 7,843,906.50 7,843,906.50 14/11/2018 8 weeks On-going
8
Completion/Renovation of (1NO.) Friday Prayer Mosque 2018
Constituency Projects at Suga Town in Kirikasamma Constituency. Murat Construction Company K/kasamma 8,439,582.90 8,439,582.90 7,559,671.35 14/11/2018 8 weeks 85 On-going
9
Construction of (2NO.) Friday Prayer Mosque 2018 Constituency
Projects (Lot-33) at Dagilibani and Matara Babba in Birniwa
Constituency. Amm Manzo Nig. Ltd. Birniwa 10,008,223.63 10,008,223.63 14/11/2018 12 weeks On-going
10
Construction of the (1 No.) Friday Prayer Mosque (2018 Phase III)
Constituency Projects (Lot-67) at Gada Yamma in Kazaure
Constituency. Yanduna Ventures Nig. Ltd. Kazaure 3,268,000.00 3,268,000.00 23/11/2018 8 weeks On-going
11
Construction of the (1 No.) Friday Prayer Mosque (2018 Phase III)
Constituency Projects (Lot-36) at Jansa in Babura Constituency. Mufabamex Concept Ltd. Babura 1,910,001.00 1,910,001.00 23/11/2018 6 weeks On-going
12
Construction of the (1 No.) Friday Prayer Mosque (2018 Phase III)
Constituency Projects (Lot-35) at Masko in Babura Constituency. Mufabamex Concept Ltd. Babura 3,002,226.00 3,002,226.00 23/11/2018 6 weeks On-going
13
Construction of the (1 No.) Friday Prayer Mosque (2018 Phase III)
Constituency Projects (Lot-46) at Tsigi in Jahun Constituency. Khairussabah Nig. Ltd. Jahun 3,102,667.92 3,102,667.92 23/11/2018 8 weeks On-going
BAL. C/F 240,553,311.01 240,553,311.01
8a
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Cabinet Office
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 240,553,311.01 240,553,311.01
14
Completion/Renovation of (1 No.) Friday Prayer Mosques 2018
Constituency Projects (Lot-57) at Ganji in Fagam Constituency. Kawu Nig. Ltd. Gwaram 11,000,088.92 11,000,088.92 14/11/2018 8 weeks On-going
15
Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase II)
Constituency Projects (Lot-11) atTudun Wada in Hadejia
Constituency. Muhal Global Concept Ltd. Hadejia 2,276,676.25 2,276,676.25 23/11/2018 8 weeks On-going
16
Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase III)
Constituency Projects (Lot-9) at Lafiyan Kondiko in Fagam
Constituency. Ahmed Maidoya & Sons Nig Gwaram 1,960,892.42 1,960,892.42 1,960,892.42 23/11/2018 6 weeks 100 Completed
17
Construction of (1 No.) Five Daily Prayer Mosque (2018 Phase III)
Constituency Projects at Ashura Madaki in Jahun Constituency. Mugin Investment Nig. Ltd. Jahun 1,959,335.00 1,959,335.00 23/11/2018 8 weeks On-going
18
Construction of (2N0.) Blocks of 2-classroom Islamiyya school
typed 2018 phase II constituency projects (Lot -16) at kalasu and
Kukawa in Fagam constituency. Amm Manzo Nig. Ltd Gwaram 6,222,111.00 6,222,111.00 6,012,111.00 23/11/2018 8 weeks 100 Completed
19
Construction of (3N0.) Blocks of 2-classroom Islamiyya school
typed and renovation of teachers lodge 2018 phase II constituency
projects (Lot -20) at sayawa, danbando and kuzunzumi/tsardawa
in kanya babba constituency. Deetech Nig Ltd Babura 14,739,389.96 14,739,389.96 23/11/2018 15 weeks On-going
20
Construction of (1N0.) Blocks of 2-classroom Islamiyya school
typed 2018 phase II constituency projects (Lot -6) at Kwatsatsa in
Roni constituency. Na'ayi Resources Ltd Roni 3,115,354.00 3,115,354.00 23/11/2018 10 weeks On-going
21
Construction of wall fencing and Grave yard (2018 phase III)
constituency projects at U/Tudu A. in Kanya Babba Constituncy. Deetech Nig Ltd Babura 15,576,291.17 15,576,291.17 23/11/2018 8 weeks On-going
22
Construction of N.D.L.E.A office (2018 phase II) constituency
projects (lot -74) at Gumel in Gumel Constituncy. Na-bakwai Enterp. Ltd Gumel 14,701,871.63 14,701,871.63 14,326,081.36 23/11/2018 8 weeks 100 Completed
23
Construction of wall fencing and Grave yard (2018 phase III)
constituency projects (lot -72) at kofar arewa Babura in Babura
Constituncy. mufabamex concept nig ltd Babura 12,752,272.00 12,752,272.00 12,084,523.57 23/11/2018 8 weeks 100 Completed
24
Completion/Renov. Of (1no.)Friday Prayer Mosque (2018 phase
III) Constituency Projects (Lot- ) at Batatsaba in Kazaure
Constituency. Na'ayi Resources Ltd Kazaure 7,821,847.00 7,821,847.00 23/11/2018 6 weeks On-going
25
Construction Of (1no.) five daily Prayer Mosques (2018 phase II)
Constituency Projects (Lot-34) at Gidan alhaji Yakubu in Roni
Constituency. Na'ayi Resources Ltd Roni 1,959,212.85 1,959,212.85 1,959,212.85 23/11/2018 6 weeks 100 Completed
BAL. C/F 334,638,653.21 334,638,653.21
8b
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Cabinet Office
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 334,638,653.21 334,638,653.21
26
Construction Of (3no.) five daily Prayer Mosques (2018 phase III)
Constituency Projects (Lot-31) at Rauda Y/Dutse, Karkarna "A"
and Jama'ar Gabas Fulani in Yankwashi Constituency. Granitoids Eng. Nig. Ltd Yankwashi 5,834,168.55 5,834,168.55 5,582,168.55 23/11/2018 8 weeks 100 Completed
27
Construction Of (3no.) five daily Prayer Mosques (2018 phase III)
Constituency Projects (Lot-29) at G/karfi, Limamai and shinkafi in
Miga Constituency. Tosarawa Global Nig Ltd Miga 5,884,568.55 5,884,568.55 3,755,045.70 23/11/2018 8 weeks 63 On-going
28
Completion of Magahsala/Janazah Preparation Block, Fencing,
Gate, Landscaping of Vicinity, Installation of Overhead Tanks and
Supply of Ghusal Table and Trolley at Dutse General Mosque. Equishare Nig. Ltd Dutse 12,332,148.96 12,332,148.96 2,113,524.61 10/12/2018 8 weeks 16 On-going
29
Construction of (1 No.) Friday Prayer Mosque (2018 Phase III)
Constituency Projects at Kwatamma in Kafin Hausa Constituency. Mugin Investment Nig. Ltd. K/Hausa 3,996,672.02 3,996,672.02 3,989,065.98 11/12/2018 8 weeks 100 Completed
30
Wall Fencing of (1No.) Juma'at Prayer Mosque (2018 Phase III)
Constituency Projects at Wurma Town in Dutse Constituency. H.M. Dangara Ltd. Dutse 2,401,479.28 2,401,479.28 13/12/2018 8 weeks On-going
31
Construction of (3No.) Five Daily Prayer Mosques (2018 Phase III)
Constituency Projects at Shabarun Jere, Mailefe Gari and Kakindi
Tsuru in Sule Tankarkar Constituency. A.A. Aljazeera Agro Proc. S/tankarkar 5,884,568.55 5,884,568.55 23/11/2018 6 weeks On-going
32
Construction of (1No.) Friday Prayer Mosques (2018 Phase III)
Constituency Projects at Chakara in Fagam Constituency. A.A. Aljazeera Agro Proc. Gwaram 5,279,873.00 5,279,873.00 23/12/2018 8 weeks On-going
33
Supply and Installation of Medical equipments to the newly
constructed 31no. BHC across the state. G.M. Sara & Sons Ltd. Across the state 4,129,061.98 4,129,061.98 16/4/2018 6 weeks On-going
34
Partial works (Constr of Main mosque Lower Level Roof Slab) at
K/Hausa Juma'at mosque 2018 2nd Qtr. Constituency project. Shelterdom Nig. Ltd. K/Hausa 24,584,666.85 24,584,666.85 21,637,096.46 14/9/18 24 weeks 100 Completed
35
Completion /Renovation of (4No) Friday prayer Mosques (2018 Phase II
Constituency Projects (lot-61) at Kwalam Wayu, Bardu and Yangayami in Taura
Constituency Babandoki Gen Entr Taura 22,075,259.57 22,075,259.57 16/1/2019 8 weeks On-going
36
Completion/Renovation of Juma'at Prayer Mosques 2017 Constituency Projects
Phase III Remaining Works (Lot-8) at Maje In Taura constituency Nushe Business Resouces Taura 11,793,398.14 11,793,398.14 10,940,373.12 22/1/2019 12 Weeks 100 Completed
37
Construction for the Construction of (1No) Daily Prayer Mosque (2018 Phase III)
Constituency Projects (Lot-46) at Sabon Gari ta Daya and Renovation of Jabarna
juma'at Mosque in Jahun Constituency Khairussabah Nig Ltd Jahun 3,102,667.92 3,102,667.92 22/1/2019 8 weeks On-going
38
Renov/Completion of 2no. Friday prayer mosques (2019 first Quarter
constituency projects) Lot_91 at Danmakama and Dangwanki In Sule
Tankarkar Constituency. A.A Aljazeera Agro Proc. Ltd S/tankarkar 7,331,978.53 7,331,978.53 17/12/2019 8 weeks On-going
39
Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first
quarter phase 2 Constituency projects) Lot-21 Dumbi, Yarchidau and
Gurjiya in Yankwashi Constituency, Yanduna Venture Nig Ltd Yankwashi 9,339,771.12 9,339,771.12 11/12/2019 12 weeks On-going
BAL. C/F 458,608,936.23 458,608,936.23
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Cabinet Office
8c
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Cabinet Office
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 458,608,936.23 458,608,936.23
40
Constr of 1no. Block of 2-classroom islamiyya school each ( 2019 first
quarter phase 2 Constituency projects) Lot-15 at Daba, Tsohuwar
Jawo, Islamiyya Layin Emilalo and Bayan Lawan Yarima in Kazaure
Constituency, Yanduna Venture Nig Ltd Kazaure 12,427,559.12 12,427,559.12 11/12/2019 10 weeks On-going
41
Costraction of 3No. Daily prayer Mosques (2019 first Quarter
constituency projects) Lot- 7 at arobade, mungolo and kwanar
kangire in Birnin Kudu Constituency. Nushe Bus, Resources Ltd B/Kudu 5,874,753.15 5,874,753.15 17/12/2019 8 weeks On-going
42
Construction of 3No. Daily prayer Mosques (2019 first Quarter
constituency projects) Lot- 17 at Kaho, K/Malam Yahya Basirka and
Sabalari in Fagam Constituency, Gwaram Local Government Area. Ramadan Constr Nig Ltd Gwaram 5,877,322.53 5,877,322.53 17/12/2019 8 weeks On-going
43
Constr, of 1No. Block of 2 Classroom islamiyya Each (2019 first
Quarter Phase II Constituency Projects) Lot-5 at Hayatul Islam and
Kabal in Jahun Constituency. Sasco Multi Serv Nig Ltd Jahun 6,218,498.70 6,218,498.70 27/12/2019 9 weeks On-going
44
Construction of 3No. Daily prayer Mosques (2019 first Quarter
constituency projects) Lot- 31 at Daneri, Kanoke and Kota in
Kaugama Constituency. Danfatu & sons Nig Ltd Kaugama 5,884,568.55 5,884,568.55 11/12/2019 8 weeks On-going
45
Constr. Of JSS Science each (2019 first quarter phase II constituency
projects) LOT-17 at Gumel and Garin Barka in Gumel constituency. Farham Synergy con. Ltd Gumel 29,908,200.00 29,908,200.00 11/12/2019 18 Weeks On-going
46
Constr. of Solar Powered Water Supply Scheme Constituency Project
(2019 PHASE 1) LOT-16 At Dangwabro in Maigatari Constituency A.S.Maifata Gen. EntP. Ltd Maigatari 6,015,765.00 6,015,765.00 11/12/2019 8 Weeks On-going
47
Supply of Science Laboratories Equipment for Distribution to Senior
Sec School Across the state (2019 MOEST capital project) Aldan Project Ltd Across the state 29,491,628.72 29,491,628.72 24/12/2019 8 weeks On-going
48
Costr.of 1No. Friday prayer Mosques (2019 first Quarter constituency
projects) Lot- 76 at Ladin kani in mai gatari Constituency. Khairushabah Nig Ltd Maigatari 7,609,184.60 7,609,184.60 17/12/2019 8 Weeks On-going
49
Costr.of 1No. Friday prayer Mosques (2019 first Quarter constituency
projects) Lot- 78 at Jobi in maigatari Constituency. Marb Eng. & Multi serv. Ltd Maigatari 7,720,042.25 7,720,042.25 17/12/2019 8 Weeks On-going
50
Completion /Renovation of 2no. Friday prayer mosques (2019 first
qtrs. Constituency projects) Lot-84 at Buro and Fadi Gurje in Fagam
Constituency. Pullad Global Consultant Gwaram 2,503,688.50 2,503,688.50 17/12/2019 8 weeks On-going
51
Completion/Renovation of 1no. Daily prayer mosques (2019 first
quarter constituency projects) Lot-53 at Sabon Layi K/kudu Iggi in
B/kudu Constituency. Modang Invest. Ltd. B/kudu 1,954,613.85 1,954,613.85 17/12/2019 8 weeks On-going
BAL. C/F 580,094,761.20 580,094,761.20
8d
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Cabinet Office
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 580,094,761.20 580,094,761.20
52
Completion/Renovation of 1no. Daily prayer mosques (2019 first
quarter constituency projects) Lot-92 at Turkushawa in Sule
Tankarkar Constituency. Modang Invest. Ltd. S/tankarkar 2,625,238.18 2,625,238.18 17/12/2019 8 weeks On-going
53
Constr. Of 1 Block of 2 classroom Islamiyya School Each Lot-8 (2019
Second Quarter Constituency Projects) at andaza Gabas, Zakwaro and
Karangi in Kiyawa Constituency Alkayawa Multi services Kiyawa 9,438,765.00 9,438,765.00 21/01/2020 8 weeks On-going
54
Constr. Of 3No Daily Prayer Mosques ( 2019 Second Quarter
Constituency Projects) Lot-35 at Hariyal, madawa Bello and Sharbi in
Kafin Hausa Constituency K-Manu Gen Constr Ltd K/hausa 5,870,869.00 5,870,869.00 14/01/2020 8 weeks On-going
55
Renovation./Completion of 1No Friday Prayer mosque (2019 Second
Quarter constituency Projects) Lot-87 at ayama town in Auyo
Constituency AGM & Sons Nig Ltd Auyo 7,304,876.89 7,304,876.89 14/01/2020 12 weeks On-going
56
Constr. Of 3No. Daily Prayer Mosques (2019 Second Quarter
Constituency Projects) Lot-17 Danmadai Garin Inu and Medu in
Gagarawa Constitueny Farham Synergy Nigeria Ltd Gagarawa 5,865,668.55 5,865,668.55 14/01/2020 8 weeks On-going
57
Constr. Of 1No Friday Prayer Mosque ( 2019 second quarter
Constituency Projects) Lot-70 at Yankifi Quarters Gumel in Gumel
Constituency Farham Synergy Concept K/hausa 24,930,000.00 24,930,000.00 14/01/2020 12 Weeks On-going
58
Construction of 1No. Friday Prayer Mosque (2019 Second Quarter
Constituency Projects) (Lot-82C) at Matsatssagi in Maigatari
Constituecy. Khairussaba Nig Ltd Maigatari 7,844,414.75 7,844,414.75 14/1/2020 12 weeks On-going
59
Construction of 1No. Friday Prayer Mosque (2019 Second Quarter
Constituency Projects) Lot-77B at dumadumun toka in kafin hausa
Constituecy. Danfatu & Sons Nig Ltd K/hausa 10,500,438.70 10,500,438.70 10,425,001.45 14/1/2020 12 weeks 100 Completed
60
Construction of 3No. Daily Prayer Mosques (2019 second Quarter
Constituency Projects) Lot-6 at zigindimi, birniwa tasha and
machinamari in birniwa constituecy. Kafiyama Gen. Entp. Td Birniwa 5,884,566.55 5,884,566.55 14/1/2020 8 Weeks On-going
61
Constr.of Conference Hall at Tsohuwar Gwaram in Gwaram LGA
Constituency Amm Manzo Nig Ltd Gwaram 36,149,877.52 36,149,877.52 12/3/2020 6 Months On-going
62
Completion/Extension of As-Sadiq Juma'at Prayer Mosque (2019
Second Quarter Constituency Project remaining works) Lot-3 at Kanti
Kazaure in Kazaure Constituency Yanduna Ventures Nig Ltd Kazaure 26,489,720.41 26,489,720.41 9/3/2020 8 weeks On-going
63
Constr. Of babura Districts Head House (2019 second Quarter
Constituency project remaining Works) lot-94 at babura in babura
Constituency Mufabamex Concept ltd Babura 21,348,941.20 21,348,941.20 10,554,952.93 9/3/2020 16 Weeks 47 On-going
BAL. C/F 744,348,137.95 744,348,137.95
8e
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Cabinet Office
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 744,348,137.95 744,348,137.95
64
Constr. Of 3no daily Prayer Mosque (2019 Second quarter Constituency project
remaining works) lot-2B at babura tsallake, gari uku and garu in babura
Constituency 313 textile Nig Ltd Babura 5,884,568.55 5,884,568.55 5,632,568.55 9/3/2020 8 weeks 100 Cabinet Office
65
Constr. Of 3no. Daily Prayer Mosques (2019 Second Quarter Constituency
Project remaining Works ) Lot-26 at Rumfa S/Akama, Madabo and Koran malam
in jahun Constituency A.A. Aljazeera Agro Proces Jahun 5,884,568.55 5,884,568.55 9/3/2020 8 weeks On-going
66
Renovation of 1No. Friday Prayer Mosque (2019 Second Quarter Constituency
Project remaining works) Lot-61 at Jansa in Babura Constituency Mufabamex Concept ltd Babura 3,849,107.55 3,849,107.55 9/3/2020 8 weeks On-going
67
Water Collection Points at Dunbule, Kusure and Zango in Yankwashi
Constituency(2019 2nd Quarter) Lot-26) Granitoid Engineering Ltd Yankwashi 3,781,047.00 3,781,047.00 8/7/2020 8 weeks On-going
68
Constr. Of 1No. Friday Prayer Mosque (2019 Second Quarter Constituency
Project reamaining works) Lot-62 at Gumari in Birniwa Constituency Dan Agalan International Ltd Birniwa 10,097,278.53 10,097,278.53 9,946,183.41 9/3/2020 8 weeks 100 Completed
69
Consytr. Of 2No daily Prayer Mosque (2019 Second Quarter Constituency
project remaining Works) Lot-63 at Kusra and Murde Fulani in Yankwashi
Constituency Granitoid Engineering Ltd Yankwashi 3,923,045.70 3,923,045.70 3,755,045.70 9/3/2020 8 weeks 100 Completed
70
Constr. Of 2no Daily prayer Mosques (Phase II 2019 second Quarter
Constituency Project Remaining Works) Lot-31 at Abujan Amare and Kantin
Waje in Hadejia Constituency Tasiu Muhammad Invest Ltd Hadejia 5,879,148.00 5,879,148.00 5,632,218.90 9/3/2020 8 Weeks 100 Completed
71
Constr. Of District Head House (2019 Second Quarter Constituency Project
Remaining Works) Lot… at Jahun Town in jahun Constituency Khairussaba Nig Ltd Jahun 25,682,378.22 25,682,378.22 25,653,028.62 9/3/2020 12 Weeks 100 Completed
72
Constr. Of 2 Classrooms Islamiyya School each Lot-15 (2019 Second Quarter
Constituency Projects) at Mobile base (744) ,Dungulmi and Warwade in Dutse
Constituency Back Bone Global Links Dutse 9,333,382.80 9,333,382.80 21/01/2020 12 Weeks On-going
73 Procurement of three (3No) New Toyota Land Cruiser V8 Jeep 2020 Model Three Stars Motors Ltd Dutse 142,209,600.00 142,209,600.00 16/11/2020 3 Weeks On-going
74
Constr of 1no. Friday prayer mosque (2019 second qtr. Constituency
projects) Lot-84) at Masallacin Malam garba Ramadan Constr. Ltd. M/Madori 13,112,859.73 13,112,859.73 13,063,627.83 14/1/2020 12 weeks 100 Completed
75
Constr. Of 2No 5 Daily Prayer Mosque at Burmanawa and unguwar
Liman in Sule Tankarkar constituency (Lot-65) Ngaloma Constr Co. Ltd S/Tankarkar 4,677,629.32 4,677,629.32 18/02/2021 12 Weeks On-going
76
Constr. Of 3No. 5 Daily Prayer Mosque at Madobi, Tsalle, Jikai and
Lageniya in Sule Tankarkar Constituency (Lot-64) Ngaloma Constr Co. Ltd S/Tankarkar 7,017,211.32 7,017,211.32 18/02/2021 12 Weeks On-going
77
Constr. Of 3No. 5 daily prayer mosqye at Dilima, Sabaru and Gargadin
Giwa in Birnin Kudu Constituency Lot5 Nushe Business Res Ltd B/Kudu 7,003,920.00 7,003,920.00 18/02/2021 12 Weeks On-going
BAL. C/F 992,683,883.22 992,683,883.22
8f
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Cabinet Office
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BAL. B/F 992,683,883.22 992,683,883.22
78
Completion/Renovation of 1No. Friday Prayer Mosque at
Galadimawa in Taura Constituency (Lot 144) Nushe Business Res Ltd Taura 2,841,372.17 2,841,372.17 18/02/2021 8 weeks On-going
79
Completion/ Renovation of 2No. Friday Prayer Mosque at Kangal and
Malamawar in Taura Constituency Lot-145 Nushe Business Res Ltd Taura 15,715,256.97 15,715,256.97 18/02/2021 12 Weeks On-going
80
Constr. Of 3No. 5 Daily prayer mosque at Dagwaji, Rahaji and
Sabuwar Kaura in Birnin Kudu Constituency Lot-6 Nushe Business Res Ltd B/Kudu 6,886,864.71 6,886,864.71 18/02/2021 12 Weeks On-going
81
Constr. Of 3No. 5 Daily Prayer Mosque at Yafashiya, Dorawa Maiyado
and Kafin Zaki in Birnin Kudu Constituency Lot-07 Nushe Business Res Ltd B/Kudu 7,015,043.60 7,015,043.60 19/02/2021 12 Weeks On-going
82
Constr. Of 3No. 5 Daily Prayer Mosque at Barikin Dangiwa, Katsawa
and Kauyen Madora in Birnin Kudu Constituency Lot-8 Nushe Business Res Ltd B/Kudu 7,003,293.45 7,003,293.45 19/02/2021 12 Weeks On-going
83
Constr. Of 3No. 5 daily prayer mosque at Tajira Burin Warji and
Babaldu in Birnin Kudu Constituency Lot-11 Nushe Business Res Ltd B/Kudu 7,012,453.68 7,012,453.68 19/02/2021 12 Weeks On-going
84
Constr. Of 3No. 5 Daily Prayer Mosque at Lakar Kadanya, Juwan Tudu
and Juwan Kwari in Birnin Kudu Constituency Lot-12 Nushe Business Res Ltd B/Kudu 7,006,387.44 7,006,387.44 19/02/2021 12 Weeks On-going
85
Constr. Of 3No. 5 daily Prayer Mosque at Kauyen Gonar Faruku and
Birnin Kudu in Birnin Kudu Constituency Lot-13 Nushe Business Res Ltd B/Kudu 4,667,780.76 4,667,780.76 19/02/2021 12 Weeks On-going
86
Constr. Of 1 block of 2 Classrooms Islamiyya type each at Budai
sabuwa, Kantamawa and Algama Ringim Constituency Lot7B Nushe Business Res Ltd Ringim 11,509,462.02 11,509,462.02 25/01/2021 12 Weeks On-going
87
Completion of 1 Block of 3 Classrooms Islamiyya and Constr. Of 1 of
2 Classrooms Subeb Type at Aujara and Taura Constituency Lot-13 Nushe Business Res Ltd Taura 13,976,503.95 13,976,503.95 25/01/2021 12 Weeks On-going
88
Constr of 1no. Friday Mosque (2019 phase II Constituency project)
(Lot-69) at Kore Sabuwa AMM Manzo Ltd. Gagarawa 10,777,893.36 10,777,893.36 10,722,439.33 14/01/2020 12 Weeks 100 Completed
89
Renov of 1no. Juma'at mosque (phse II 2019 constituency projects)
(Lot-74) at Harbo Tsohuwa Wajedu Nig. Ltd. Jahun 7,844,414.75 7,844,414.75 7,661,986.50 14/12/2020 12 Weeks 100 Completed
90
Constr of 1no. Friday prayer mosque (2019 second qtr. Constituency
projects) (Lot-83) at Tsagwaro Ramadan Nig. Ltd. M/Madori 10,104,285.30 10,104,285.30 9,985,882.46 14/01/2020 12 Weeks 100 Completed
91
Constr of 1no. Friday mosque (2019 phase II constituency projects) at
Garin Malam Ramadan Nig. Ltd. M/Madori 9,045,000.16 9,045,000.16 9,006,735.15 1/9/2020 12 Weeks 100 Completed
TOTAL 1,114,089,895.54 1,114,089,895.54
8g
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Finance
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1
Commission/Engagement as Consultant for the Technical
consultants on Software Dev. Consulting in the state and MDAs.
(IPSAS) Sparklesoft Solutions Ltd. Dutse 19,710,000.00 19,710,000.00 16,753,528.35 10/28/2016 6 months 85
2
Engagement as Consultant to Recover all excess and Cot charges covering the period of April, 2013 to December, 2015 (at 5% commission). Yolight Limited In the state 14/8/2018 3 months
3
Consultancy services fees to deliver World class payment and collection on I.G.R. Ercas Solution Limited In the state 70,016,433.40 24/12/2018
4
Provision of SAAS Software e-Procurement Solution to
Jigawa State Government Zachary De Pian Dutse 179,823,750.00 179,823,750.00 10/12/2020 3 Years
Total 199,533,750.00 199,533,750.00
9
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Finance
REMARKS
On-going
Stalled
On-going
On-going
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Binyaminu Usman Polytechnic, Hadejia
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1
Constr. of Classrooms and Laboratories complex at
Binyaminu Usman Polytechnic, Hadejia. DAD A.E. Nig. Ltd. Hadejia 82,582,274.72 95,359,073.84 86,279,313.69 5/1/2017 24 weeks 90 On-going
2
Completion of Library (phase II) at Binyaminu Usman
Polytechnic, Hadejia. Babandoki Gen. Entp. Ltd. Hadejia 98,925,641.44 98,925,641.44 64,633,291.01 10/11/2020 24 weeks 65 On-going
TOTAL 181,507,916.16 194,284,715.28
10
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
GOVT. HOUSE
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1 Constr. Of Banquet hall at Government House Dutse Jigawa State Ngaloma Constr Comp Nig Ltd Dutse 228,612,066.38 228,612,066.38 9/12/2020 5 Month
On-going
2
Procurement of two (2No) Toyota Land Cruiser Jeeps to Government
House, Dutse Math Global Invest Nig Ltd Dutse 105,000,000.00 105,000,000.00 105,000,000.00 17/02/2021 4 Weeks 100 Completed
3 Procurement of 2No. GS4 Luxury vehicles CIG Motors Co. Ltd in the state 27,152,500.00 27,152,500.00 27,152,500.00 22/02/2021 2 Weeks 100 Completed
Total 360,764,566.38 360,764,566.38
11
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Information
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1
Installation of Solar powered supply at Hadejia, Gumel and
Kazaure Television Booster Stations Sims Global Resources Ltd State 57,072,299.22 57,072,299.22 43,576,401.27 16/07/2020 12 Weeks 77 On-going
Total 57,072,299.22 57,072,299.22
12
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
Ministry of Agriculture
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1
Constr. Of Small Scale Abattoir at Doko Town, Garki LGA
(Constituency Project) Isa Halilu Nig Ltd Garki 10,219,945.22 10,219,945.22 7,882,451.31 17/09/2020 12 Weeks 70 On-going
TOTAL 10,219,945.22 10,219,945.22
.
13
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
DEPUTY GOVERNOR'S OFFICE
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT (N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1
Renovation works and procurement of office
equipment at D/Governor's office Dutse Pullad Global Co. Nig. Ltd. Dutse 17,168,322.96 17,168,322.96 16,769,059.62 25/12/2020 4 weeks 100 Completed
Total 17,168,322.96 17,168,322.96
14 ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
MIN. FOR LOCAL GOVERNMENT
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
1
Supply of Diesel o Urban Town
Streetlights Generator at Auyo Court
LGA (Lot-1A) TSX Global Serv Ltd Auyo 14,996,250.00 14,996,250.00 10/3/2021 12 Months On-going
2
Supply of Diesel to Urban Streetlights
Generators at Gantsa Town in Buji
LGA (Lot-5) TSX Global Serv Ltd Buji 21,494,625.00 21,494,625.00 10/3/2021 12 Months On-going
3
Supply of Diesel Town Streetlights at
Generators at Kazaure Kanti Kazaure
LGA (Lot-16B) TSX Global Serv Ltd Kazaure 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going
4
Supply of Diesel to Urban Streetlights
Generators at Kazaure Yan Makada in
Kazaure LGA (Lot-16C) TSX Global Serv Ltd Kazaure 18,495,374.00 18,495,374.00 10/3/2021 12 Months On-going
5
Supply of Diesel to urban town
Streetlights Generator at Babura
Motor Park in Babura LGA (Lot-2B) TSX Global Serv Ltd Babura 12,996,750.00 12,996,750.00 10/3/2021 12 Months On-going
6
Supply of Diesel to Urban Town
Streetlights Generators at Kazaure
Sha'iskawa in kazaure LGA (Lot-16D) TSX Global Serv Ltd Kazaure 14,996,250.00 14,996,250.00 10/3/2021 12 Months On-going
7
Supply of diesel to urban streetlights
Generator at Garki Secretariat in
Garki LGA (Lot-6A)
I-GEE Eng. Const. Nig
Ltd Garki 17,495,625.00 17,495,625.00 10/3/2021 12 Months On-going
8
Supply of diesel to urban town
streetlights Generators at Birnin Kudu
Unity Bank in Birnin Kudu LGA (Lot-
4C)
I-GEE Eng. Const. Nig
Ltd B/Kudu 15,496,125.00 15,496,125.00 10/3/2021 12 Months On-going
9
Supply of diesel to urban town
streetlights Generators at Roni
Hospital in Roni LGA (Lot-23A)
I-GEE Eng. Const. Nig
Ltd Roni 12,996,750.00 12,996,750.00 10/3/2021 12 Months On-going
10
Supply of Diesel to urban town
streetlights Generators at Ringim
Kofar fada in Ringim LGA (Lot-22A)
I-GEE Eng. Const. Nig
Ltd Ringim 15,496,125.06 15,496,125.06 10/3/2021 12 Months On-going
Balance C/F 163,459,124.06 163,459,124.06
15a
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
MIN. FOR LOCAL GOVERNMENT
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BALANCE B/F 163,459,124.06 163,459,124.06
11
Suupply of Diesel to Urban
Streetlights Generators at Ringim
Galadanchi in Ringim LGA (Lot-22B)
I-GEE Eng. Const. Nig
Ltd Ringim 17,495,625.00 17,495,625.00 10/3/2021 12 Months On-going
12
Supply of Diesel to Urban Town
Streetlights Generators at Garki Kofar
fada in Garki LGA (Lot-6B)
I-GEE Eng. Const. Nig
Ltd Garki 17,495,625.00 17,495,625.00 10/3/2021 12 Months On-going
13
Supply of Diesel to Urban Streetlights
Generators at Taura LGA (Lot-25)
I-GEE Eng. Const. Nig
Ltd Taura 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going
14
Supply of Diesel to Urban Streetlights
Generator at Roni cikin Gari Roni LGA
(Lot-23B)
I-GEE Eng. Const. Nig
Ltd Roni 12,996,750.00 12,996,750.00 10/3/2021 12 Months On-going
15
Supply of diesel to urban streetlights
Generator at Ringim EPI in Ringim LGA
(Lot-22C)
I-GEE Eng. Const. Nig
Ltd Ringim 16,995,750.00 16,995,750.00 10/3/2021 12 Months On-going
16
Supply of Diesel to Urban town
Streetlights Generator at Guri
Secretariat in Guri LGA (Lot-9A) SAG Nig ltd Guri 15,966,000.00 15,966,000.00 10/3/2021 12 Months On-going
17
Supply of Diesel to Urban Streetlights
Generators at guri market in guri LGA
(Lot-9B) SAG Nig ltd Guri 15,966,000.00 15,966,000.00 10/3/2021 12 Months On-going
18
Supply of Diesel to Urban Town
Streetlights Generators at kafin hausa
Cikin Gari in Kafin hausa LGA (Lot-
15B) SAG Nig ltd K/Hausa 15,496,125.00 15,496,125.00 10/3/2021 12 Months On-going
19
Supply of Diesel to Urban town
Streetlights Generators at Miga Town
Miga LGA (Lot-21) TSX Global Serv Ltd Miga 21,994,500.00 21,994,500.00 10/3/2021 12 Months On-going
20
Supply of Diesel to urban town
streetlights Generators at Gwiwa
Town in gwiwa LGA (Lot-11) TSX Global Serv Ltd Gwiwa 17,495,625.00 17,495,625.00 10/3/2021 12 Months On-going
Balance C/F 334,356,374.06 334,356,374.06
15b
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
MIN. FOR LOCAL GOVERNMENT
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BALANCE B/F 334,356,374.06 334,356,374.06
21
Supply of Diesel to Urban Streetlights
Generators at babura Kofar Fada in
babura LGA (Lot-2A) TSX Global Serv Ltd Babura 16,995,750.00 16,995,750.00 10/3/2021 12 Months On-going
22
Supply of Diesel to Urban Town
Streetlights Generatorsn at Birniwa
Secretariat in Birninwa LGA (Lot-3A) TSX Global Serv Ltd Birniwa 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going
23
Supply of Diesel to Urban Town
Streetlights Generators at jahun Kofar
fada in jahun LGA (Lot-13B) TSX Global Serv Ltd Jahun 16,995,750.00 16,995,750.00 10/3/2021 12 Months On-going
24
Supply of diesel to urban town
streetlights Generator at gwaram
New in Gwaram LGA (Lot-10D)
Pullad Global Consult
Ltd Gwaram 13,496,625.00 13,496,625.00 10/3/2021 12 Months On-going
25
Supply of Diesel to Urban Town
Streetlights Generators at Gwaram
Old in Gwaram LGA (Lot-10C)
Pullad Global Consult
Ltd Gwaram 13,496,625.00 13,496,625.00 10/3/2021 12 Months On-going
26
Supply of Diesel to Urban Town
Streetlights Generators at Gwaram
Primary School in Gwaram LGA (lot-
10B)
Pullad Global Consult
Ltd Gwaram 12,996,750.00 12,996,750.00 10/3/2021 12 Months On-going
27
Supply of Diesel to Urban Town
Streetlights Generators at Gwaram
Cikin Gari In Gwaram LGA (Lot10A)
Pullad Global Consult
Ltd Gwaram 14,496,375.00 14,496,375.00 10/3/2021 12 Months On-going
28
Supply of Diesel to Urban streetlights
Generators at Bamaina Old in Birnin
Kudu Lga (Lot-4E) TSX Global Serv Ltd B/Kudu 9,300,000.00 9,300,000.00 10/3/2021 12 Months On-going
29
Supply of Diesel to Urban Streetlights
Generators at Sule Tankarkar Cikin
Gari Sule Tankarkar LGA (Lot24B) TSX Global Serv Ltd S/Tankarkar 11,497,125.00 11,497,125.00 10/3/2021 12 Months On-going
Balance C/F 457,627,874.06 457,627,874.06
15c
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
MIN. FOR LOCAL GOVERNMENT
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BALANCE B/F 457,627,874.06 457,627,874.06
30
Supply of Diesel to urban Streetlights
Generator at Gumel Kofar Fada in
Gumel LGA (Lot-8A) TSX Global Serv Ltd Gumel 19,995,000.00 19,995,000.00 10/3/2021 12 Months On-going
31
Supply of Diesel to urban Streetlights
Generators at Malam Madori
G/Ganye in Malam Madori LGA (Lot-
19B) TSX Global Serv Ltd B/Madori 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going
32
Supply of Diesel to Urban town
Streetlights Generators at Bamaina
New in Birnin Kudu LGA (Lot-4F) TSX Global Serv Ltd B/Kudu 14,996,250.00 14,996,250.00 10/3/2021 12 Months On-going
33
Supply of Diesel to urban town
Streetlights Generator at Birniwa
Kasuwa in Birniwa LGA (Lot-3B) TSX Global Serv Ltd Birniwa 21,994,500.00 21,994,500.00 10/3/2021 12 Months On-going
34
Supply of Diesel to Urban town
streetlights Generator at Gagarawa
Town in Gagarawa LGA (Lot-7) TSX Global Serv Ltd Gagarawa 17,995,500.00 17,995,500.00 10/3/2021 12 Months On-going
35
Supply of Diesel to Urban town
Streetlights Generator at Birnin Kudu
Primary School in birnin kudu Lga (Lot-
4B) TSX Global Serv Ltd B/Kudu 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going
36
Supply of Diesel to Urban town
Streetlights Generator at Birnin Kudu
Open Theater in Birnin Kudu LGA (Lot-
4D) TSX Global Serv Ltd B/Kudu 15,996,000.00 15,996,000.00 10/3/2021 12 Months On-going
37
Supply of Diesel to Urban town
streetlight Generator at Kiri Kasamma
G/Wanka in Kiri Kasamma LGA (Lot-
17A) TSX Global Serv Ltd K/kasamma 15,496,125.00 15,496,125.00 10/3/2021 12 Months On-going
38
Supply of Diesel to urban town
streetlights Generators at Kazaure
Kofar Fada in Kazaure LGA (lot-16A) TSX Global Serv Ltd Kazaure 11,497,125.00 11,497,125.00 10/3/2021 12 Months On-going
Balance C/F 608,590,124.06 608,590,124.06
15d
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
MIN. FOR LOCAL GOVERNMENT
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BALANCE B/F 608,590,124.06 608,590,124.06
39
Supply of Diesel to Urban town
streetlights generator at Kiyawa LGA
(Lot-18B) TSX Global Serv Ltd Kiyawa 11,997,000.00 11,997,000.00 10/3/2021 12 Months On-going
40
Supply of Diesel to Urban town
streetlights Generator at Jahun
Round About in Jahun LGA (lot-13A) TSX Global Serv Ltd Jahun 16,995,750.00 16,995,750.00 10/3/2021 12 Months On-going
41
Supply of Diesel to urban town
streetlights Generator at hadejia Local
Education Authority (L.E.A) in Hadejia
LGA (Lot-12C) TSX Global Serv Ltd Hadejia 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going
42
Supply of Diesel to Urban town
Streetlights Generators at Karkarna
Secretariat Yankwashi LGA (Lot-26B) TSX Global Serv Ltd Yankwashi 12,996,750.00 12,996,750.00 10/3/2021 12 Months On-going
43
Supply of Diesel to Urban town
streetlights Generator at Kiri
Kasamma Cikin Garik in Kiri Kasamma
LGA (Lot-17B) TSX Global Serv Ltd K/kasamma 15,496,125.00 15,496,125.00 10/3/2021 12 Months On-going
44
Supply of Diesel to Urban Town
Streetlights Generators at Birnin Kudu
Jarda in Birnin Kudu LGA (Lot-4A) TSX Global Serv Ltd B/Kudu 15,966,000.00 15,966,000.00 10/3/2021 12 Months On-going
45
Supply of Diesel to Urban town
Streetlights Generator at Karkarna
Kofar Fada in Yankwashi LGA (Lot-
26A) TSX Global Serv Ltd Yankwashi 11,997,000.00 11,997,000.00 10/3/2021 12 Months On-going
46
Supply of Diesel to Urban town
Streetlights generator at Birnin Kudu
Pilot School in Birnin Kudu LGA (Lot-
4G) TSX Global Serv Ltd B/kudu 11,497,124.00 11,497,124.00 10/3/2021 12 Months On-going
Balance C/F 724,531,123.06 724,531,123.06
15e
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
MIN. FOR LOCAL GOVERNMENT
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BALANCE B/F 724,531,123.06 724,531,123.06
47
Supply of Diesel to Urban Town
Streetlights Generator at Hadejia
Kofar Fada in Hadejia LGA (Lot-12A) TSX Global Serv Ltd Hadejia 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going
48
Supply of Diesel to Urban Town
Streetlights Generator at Kiyawa
Junction in Kiyawa LGA (Lot-18A) TSX Global Serv Ltd Kiyawa 14,996,250.00 14,996,250.00 10/3/2021 12 Months On-going
49
Supply of Diesel to Urban Town
Streetlights Generator at Babura
Special Primary in babura LGA (Lot-
2C) TSX Global Serv Ltd Babura 14,496,375.00 14,496,375.00 10/3/2021 12 Months On-going
50
Supply of Diesel to Urban Streetlights
of Generator at Kaugama Primary
School in kaugama LGA (Lot-14A)
Alh. Umaru Babandoki
Ltd Kaugama 11,997,000.00 11,997,000.00 10/3/2021 12 Months On-going
51
Supply of Diesel to Urban Town
Streetlights Generators at Auyo Kofar
Fada in Auyo LGA (Lot-1B)
Alh. Umaru Babandoki
Ltd Auyo 10,997,250.00 10,997,250.00 10/3/2021 12 Months On-going
52
Supply of Diesel to urban town
Streetlights Generator at Kaugama
Secretariat in Kaugama LGA (Lot-14B)
Alh. Umaru Babandoki
Ltd Kaugama 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going
55
Supply of Diesel to urban town
streetlights Generator at Kafin Hausa
Market in Kafin hausa LGA (Lot-15A)
Alh. Umaru Babandoki
Ltd K/Hausa 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going
55
Supply of Diesel to urban town
streetlights Generator at Kafin Hausa
Market in Kafin hausa LGA (Lot-15A)
Alh. Umaru Babandoki
Ltd K/Hausa 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going
56
Supply of Diesel to urban town
Streetlights Generator at Maigatari
Motor Park in Maigatari LGA (Lot-
20B) Watt Electronics Ltd Maigatari 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going
Balance C/F 851,999,248.06 851,999,248.06
15f
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)
JIGAWA STATE DUE PROCESS AND PROJECTS MONITORING BUREAU
FIRST QUARTER REPORT JANUARY TO MARCH, 2021
MIN. FOR LOCAL GOVERNMENT
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VALUE OF COMMENCEMENT COMPL. STATUS REMARKS
(N) CONTRACT SUM (N) CERTIFIED WORK DATE PERIOD IN %
BALANCE B/F 851,999,248.06 851,999,248.06
57
Supply of Diesel to Urban town
Streetlights generator at Gumel
T/Asibiti in Gumel LGA (Lot-8C) Watt Electronics Ltd Gumel 17,995,500.00 17,995,500.00 10/3/2021 12 Months On-going
58
Supply of Diesel to Urban town
streetlights Generator at Maigatari
Kara in Maigatari LGAc(Lot-20A) Watt Electronics Ltd Maigatari 13,996,500.00 13,996,500.00 10/3/2021 12 Months On-going
59
Supply of Diesel to urban town
streetlight Generator at Gumel
dantanoma in Gumel LGA (Lot-8B) Watt Electronics Ltd Gumel 18,995,250.00 18,995,250.00 10/3/2021 12 Months On-going
60
Supply of Diesel to Urban town
streetlights generator at hadejia
Makabarta in Hadejia LGA (Lot-12D)
Alh. Umaru Babandoki
Ltd Hadejia 17,995,500.00 17,995,500.00 10/3/2021 12 Months On-going
Total 920,981,998.06 920,981,998.06
15g
ON-GOING PROJECTS JAN TO MARCH, 2021 (1)