Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Jul 06, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Jennifer Coker, PE Kennedy/JenksSue Lawrence, City of La Center

Page 2: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Presentation OutlinePresentation OutlineBackgroundRecommended ImprovementsProject Financial SummaryCost-Savings Measures►Design►Construction

Construction Photos Lessons Learned

Page 3: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Project Vicinity

N

Page 4: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

History of La CenterHistory of La Center

Original Treatment Plant, constructed in late 1960s

Treatment Plant, upgraded in 2004

Page 5: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Treatment Plant Location

Existing facility borders:►

Commercial Area►

Bridge►

La Center Bottoms Wetland

Public Amphitheater

Limited room for expansion!

Page 6: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Plant Layout – 2004

Page 7: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Improvements for Growth, Reliability, and Redundancy

Page 8: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Phase 1 Conceptual Layout

Page 9: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Phase 1 Project Financial Summary

Planning Level Estimate $14 Million

Actual Project Cost ($12.8 Million)

Savings $1.2 Million

Anticipated CPU Energy Incentive

$0.32 Million

TOTAL SAVINGS $1.52 Million

Page 10: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Design Phase Cost Savings: MBR Equipment Preselection

MBR: Preselection required to proceed with final design►Variety of MBR Configurations►Space Requirements►Performance/Reliability►Hydraulics►Equipment Footprints

Page 11: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

MBR Preselection

Steps:1.

Facility Planning –

Initiated contact with all vendors; determined planning-level budget, footprint

2.

City began visiting MBR facilities using range of equipment

3.

Preselection

Developed preselection

process; implemented at end of Facility Planning

SELECTION

Page 12: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

SOQ Evaluation Criteria

Overall System Complexity & OperabilityExperience & ReferencesService & SupportCorporate Financial StabilitySystem Warranty & Performance Guarantee

Six SOQs Received:KrugerSiemensParkson

ZenonKochEnviroquip

Page 13: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Flat Sheet Membrane Immersed MBR by KUBOTA/Enviroquip

Page 14: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Team Approach to DesignEnviroquipEnviroquip works with the works with the Owner and Engineer to Owner and Engineer to design a system that fits design a system that fits their needstheir needsRoutine design meetings Routine design meetings Process ModelingProcess ModelingEquipmentEquipment►► Pumps & MixersPumps & Mixers►► BlowersBlowers►► DiffusersDiffusers►► Piping MaterialPiping Material►► InstrumentationInstrumentation

Page 15: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Partnership with Enviroquip

$50,000 Design Fee►Credited towards purchase

Design Changes►Modular Expansion►Use air scrubbing for D.O. Credit

Process Basin Equipment in MBR Scope of Supply►

Pumps, Blowers, Mixers, Valves, Meters, Instruments & Actuators

Page 16: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Design Phase Cost Savings: MBR Pre-Purchase & Assignment

Incorporation of process basin equipment Delivery of Goods►

18 to 20 weeks following approval of submittals

Progress Payments►10% after all review of submittals and shop drawings►90% upon delivery►100% upon completion of special services

Assignment LanguageEstimated Savings 10% of MBR Package

Page 17: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Design Phase Cost Savings: General Contractor Prequalification

Prime Contractor►3 projects at publicly owned WWTPs►Original Contract of $6 million ►Within the past 7 years

Results►Engineer’s Estimate $11.2 million►5 Bidders►McClure and Sons low Bidder $9.6 million

Bonus - Experience at Winlock, WA Enviroquip MBR Plant

Page 18: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Clark Public Utilities Custom Energy Efficiency Program

Analysis- Comparison of a Baseline Design vs. Energy Efficient WWTP DesignCity of La Center - $320,000 in energy efficiency incentive►Pump Assisted Gravity Design►Streamlining of MLE Process►Energy Efficient Blower Selection

Page 19: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Baseline and Proposed Measure Incremental Cost Differences

Baseline Design

Energy Saving Design

Incremental Difference

Energy First Year of Operation

3,823,470 kWh 2,642,380 kWh 1,181,090 kWh

Energy Consumption Incentive @ $0.27/kWh saved

$320,000

Estimated Project Cost

$12.8 Million $13.6 Million $760,000

Project Cost Incentive @ 35% of Incremental Cost

$266,000

Page 20: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Construction Phase Cost Savings: EADOC CM Software

Cost $15,000Estimated Savings $100,000Benefits:► Immediate access with Internet Connection►Required filing as you go►Searchable► Immediate distribution of documents►Saves paper filing and shipping►Document History► Increased Accountability

Page 21: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

EADOC Construction Management Software

Page 22: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Design Phase Cost Savings: Partnership – City/KJ CM Team

Roles and Responsibilities workshopTeam effort►Observation►RFQ review►Construction Solutions

Sue LawrenceWWTP

Superintendant

Bart SteppOwner’s Rep

Jennifer Coker, KJResident Engineer

Page 23: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Project Risk AssessmentRISK SCORE MITIGATION

Concrete High Early Submittal

Wet Weather Impacts Schedule

High Proactively Monitor Schedule

Permit Violation Medium DOE InformedContractor Working

RestrictionsOperator Review of Construction Plans

Differing Conditions Medium Accept Risk, Maintain Sufficient Contingency

Poor Public Perception High Single Point of ContactRestrict Construction on

blackout datesRestrict Contractor Parking

Equipment Lead Times High Proactively Monitor Schedule

Page 24: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Construction Phase Cost Savings: First SAVI Screen in North America

Estimate Screen and Conveyor $493KBid Price SAVI Screen and Conveyor $323KSAVINGS = $170K

Page 25: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

SAVI Screen Factory Testing, Italy

Page 26: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Italy….

Page 27: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Value for Money, SCADA ScreensValue for Money, SCADA Screens Original Plant Overview, Original Plant Overview, 1 of 2 screens1 of 2 screens

Page 28: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

SCADA Plant Overview SCADA Plant Overview

Page 29: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

SCADA MBR BasinSCADA MBR Basin

Page 30: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

SCADA MBR Basin DetailSCADA MBR Basin Detail

Page 31: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Construction Tips Witness of Panel Testing – MBR and Plant PLC► Increased understanding of system for Superintendant►Check of Control Strategy for Engineer►Less chance of incomplete work being shipped

MBR Seeding►Screen all mixed liquor once, not continuously

MBR Stress Testing►Operational Practice Session for wet weather

operations

Page 32: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Construction Begins WWTP June 2009

Page 33: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Construction Phase

Page 34: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

View from the Street

Page 35: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Site from City Park

Page 36: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Headworks and MBR

Page 37: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Process Basin

Page 38: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

MBR

Page 39: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

UV Disinfection & Utility Water

Page 40: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

New Control and Electrical Rooms

Page 41: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Rotary Fan Press

Page 42: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Lessons LearnedMBR Pre-Selection & Contract Assignment►

Process Basin Equipment in MBR Scope Pilot Testing and Pre-Selection of Dewatering EquipmentEnergy Efficiency ApplicationEADOC Installation of First SAVI Screen in North AmericaCM Team Roles and Responsibilities WorkshopGeneral Contractor PrequalificationTeam Effort

Page 43: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Next StepsCPU Energy Consumption Measurement and VerificationFinal Completion November 16, 2010►

Punchlist►

Cleanup►

Record Drawings►

Operations and Maintenance Manuals

City Begins Writing SOPs for the new facility

Page 44: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

AcknowledgementsKennedy/Jenks►

Preston Van Meter, Project Manager►

Tyler Anderson, Staff EngineerCity of La Center►

Jeff Sarvis, City Administrator/Public Works Director►

Bart Stepp Owner’s Representative/City EngineerMcClure and Sons►

Rick Asher, SuperintendentEnviroquip/OVIVOHyperionSAVI/Envirocare

Page 45: Jennifer Coker, PE Kennedy/Jenks Sue Lawrence, City of La … · 2016-07-14 · Tyler Anderson, Staff Engineer 6. City of La Center Jeff Sarvis, City Administrator/Public Works Director

Questions?Jennifer Coker, P.E.Kennedy/Jenks200 SW Market St, Ste 500Portland, OR 97206(503) [email protected]

Sue LawrenceWW System SupervisorCity of La Center419 E. Cedar Ave, Ste A201La Center, WA 98629(360) [email protected]