PHOTO COPY OF ON - GOING CONSTRUCTION OF POWER PLANT PROJECT : Contractor : POWER MANUFACTURING AND MARINE WORKS , INC. ( PMM WORKS , INC. ) Project Name : CONSTRUCTION OF 2 UNITS X 6.9 MW POWER PLANT Location : BARANGAY , APOPONG , GENERAL SANTOS CITY PHILIPPINES Owner : PEAK POWER SOCCSAEGEN , INC. 2
6

JBE PICS COMPLETED PROJECT

Feb 17, 2017

Download

Documents

Jovenal Enson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: JBE PICS COMPLETED PROJECT

PHOTO COPY OF ON - GOING CONSTRUCTION OF POWER PLANT PROJECT:

Contractor : POWER MANUFACTURING AND MARINE WORKS , INC. ( PMM WORKS , INC. )

Project Name : CONSTRUCTION OF 2 UNITS X 6.9 MW POWER PLANT

Location : BARANGAY , APOPONG , GENERAL SANTOS CITY

PHILIPPINES

Owner : PEAK POWER SOCCSAEGEN , INC.

Hauling and transfering of Wartsila Engine from Pier to plant site 1

2

Page 2: JBE PICS COMPLETED PROJECT

Installation of smoke stack structure and Engine silencer

2

2

Page 3: JBE PICS COMPLETED PROJECT

Installation of 6 “ diameter cooling water pipe line from radiator to Engine

Installation of exhaust ducting with sllencer device and intake air duct

3

2

Page 4: JBE PICS COMPLETED PROJECT

Leveling of Engine and Spring base plate :

Leveling and alignment of Wartsila Engine

2

Page 5: JBE PICS COMPLETED PROJECT

2