PHOTO COPY OF ON - GOING CONSTRUCTION OF POWER PLANT PROJECT : Contractor : POWER MANUFACTURING AND MARINE WORKS , INC. ( PMM WORKS , INC. ) Project Name : CONSTRUCTION OF 2 UNITS X 6.9 MW POWER PLANT Location : BARANGAY , APOPONG , GENERAL SANTOS CITY PHILIPPINES Owner : PEAK POWER SOCCSAEGEN , INC. 2
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PHOTO COPY OF ON - GOING CONSTRUCTION OF POWER PLANT PROJECT:
Contractor : POWER MANUFACTURING AND MARINE WORKS , INC. ( PMM WORKS , INC. )
Project Name : CONSTRUCTION OF 2 UNITS X 6.9 MW POWER PLANT
Location : BARANGAY , APOPONG , GENERAL SANTOS CITY
PHILIPPINES
Owner : PEAK POWER SOCCSAEGEN , INC.
Hauling and transfering of Wartsila Engine from Pier to plant site 1
2
Installation of smoke stack structure and Engine silencer
2
2
Installation of 6 “ diameter cooling water pipe line from radiator to Engine
Installation of exhaust ducting with sllencer device and intake air duct