Top Banner
Jan 29, 2007 LIGO Excomm, G070006-00-R 1 DC READOUT INSTALLATION RF PICKOFF OMC ELECTRONICS Squeezer Pickoff PD MMT1 Tip/Tilt MMT2
6

Jan 29, 2007 LIGO Excomm, G070006-00-R 1 DC READOUT INSTALLATION RF PICKOFF OMC ELECTRONICS Squeezer Pickoff PD MMT1 Tip/Tilt MMT2.

Dec 20, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Jan 29, 2007 LIGO Excomm, G070006-00-R 1 DC READOUT INSTALLATION RF PICKOFF OMC ELECTRONICS Squeezer Pickoff PD MMT1 Tip/Tilt MMT2.

Jan 29, 2007 LIGO Excomm, G070006-00-R 1

DC READOUT INSTALLATION

RF PICKOFF

OMC

ELECTRONICS

Squeezer Pickoff

PD

MMT1

Tip/Tilt

MMT2

Page 2: Jan 29, 2007 LIGO Excomm, G070006-00-R 1 DC READOUT INSTALLATION RF PICKOFF OMC ELECTRONICS Squeezer Pickoff PD MMT1 Tip/Tilt MMT2.

Jan 29, 2007 LIGO Excomm, G070006-00-R 2

DC Readout components

Two in-vac PZT tip-tilt steering mirrors Mode-matching telescope (picomotor focus control) Output Mode cleaner

» Four-mirror design, 48 cm round-trip length» Finesse 190; transmission 95%; loss 0.1% rt» PZT length actuation; dither-lock at ~3 kHz

In-Vacuum Photodetector» 2mm InGaAs diodes, with an amplifier/whitening circuit in a can.» input-referred noise of 6nV/rtHz

PCIX system for digital control» digital lock-in software for controlling 5 DOFs» “oscillator” generated digitally, all-digital dither-lock-in module » Interfaces to existing RFM network» 32 kHz real time control

Page 3: Jan 29, 2007 LIGO Excomm, G070006-00-R 1 DC READOUT INSTALLATION RF PICKOFF OMC ELECTRONICS Squeezer Pickoff PD MMT1 Tip/Tilt MMT2.

Jan 29, 2007 LIGO Excomm, G070006-00-R 3

DC READOUT COMMISIONING

most hardware installed, tested» All PZTs, picos, PDs work as expected. Still QPDs to go.

All software installed, tested» PCIX controls, interfaced successfully with current VME ISC

control system

» Myrinet-RFM bridge runs happily. PCIX Linux framebuilder plays nice with Solaris framebuilder. Multiple AWG/TP systems still have kinks to work out.

OMC Controls version 1.0» All digital demodulation

» OMCL dither locked (dither freq 12kHz, UGF 100Hz)

» OMC ASC dither locked (two tip/tilts, 4 DOFs)– dither freqs ~4,5,6,7 kHz– UGFs 2@20Hz, 2@subHz

Page 4: Jan 29, 2007 LIGO Excomm, G070006-00-R 1 DC READOUT INSTALLATION RF PICKOFF OMC ELECTRONICS Squeezer Pickoff PD MMT1 Tip/Tilt MMT2.

Jan 29, 2007 LIGO Excomm, G070006-00-R 4

DC Readout first DARM noise

101

102

103

104

10-16

10-15

10-14

10-13

10-12

10-11

10-10

10-9

f (Hz)

m/rt

Hz

DARM displacement noise 27 Jan 07

FPMI, DC readout•FPMI •Recycling mirrors mis-aligned

•DARM offset: ~ 70 picometers

(not nec. optimal)

Control Scheme•DARM: OMC Transmission

•MICH: REFLQ•CARM: REFLI (common mode servo)

UP NEXT: •More configurations

•Noise characterization & hunting

Page 5: Jan 29, 2007 LIGO Excomm, G070006-00-R 1 DC READOUT INSTALLATION RF PICKOFF OMC ELECTRONICS Squeezer Pickoff PD MMT1 Tip/Tilt MMT2.

Jan 29, 2007 LIGO Excomm, G070006-00-R 5

OMC mode scan(not yet mode matched!)

carrier TEM00

33 MHz TEM00

33 MHz TEM00

carrier01,10

carrier02,11,20

33 MHz02,11,20

carriern+m=3

carriern+m=4

Page 6: Jan 29, 2007 LIGO Excomm, G070006-00-R 1 DC READOUT INSTALLATION RF PICKOFF OMC ELECTRONICS Squeezer Pickoff PD MMT1 Tip/Tilt MMT2.

Jan 29, 2007 LIGO Excomm, G070006-00-R 6

Next DC readout tests

Done or in progress: Establish lock acquisition

» Control the OMC length» Control steering into OMC (2x2 angular dofs with tip-tilt mirrors)» Determine optimal L- offset (in progress)» Control DARM with DC signal

Measure HOM structure of the AS beam» optimize mode matching (in progress)

NEXT: Characterize and verify noise mechanisms Explore parameter space of offsets, demod phases,

SR detune Noise budget, calibration, noise reduction