WWND @ Jamaica WWND @ Jamaica 1 Jan.8, 2009 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa
35

Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

Jan 20, 2018

Download

Documents

Henry Webster

3  s=500 RHIC  Parity Violation Asymmetry Clean flavor separation w/o fragmentation uncertainty (LO)
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

WWND @ JamaicaWWND @ Jamaica 11Jan.8, 2009Jan.8, 2009

Muon Trigger Upgrade at PHENIX

RIKEN/RBRCItaru Nakagawa

Page 2: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

Summary

We are getting very close to be readyready for W production Run!! 2

Page 3: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

3

s=500 GeV @ RHIC

ALW +

= − Δu(x1)d(x2) − Δd(x1)u(x2)u(x1)d(x2) + d(x1)u(x2)

Parity Violation AsymmetryClean flavor separationw/o fragmentation uncertainty

x1 ≠ x2

W ± → e±ν e

W ± → μ ±ν μ

(LO)

Page 4: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

4

Projected Sensitivity @ PHENIX

• Full Detector Simulation

• S/B ~ 3/1 Assumed• 300 pb-1 and 1300

pb-1

Page 5: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

5 5

Current Muon SystemCurrent Muon System

1.Muon Tracking Chambers– 3 stations of Cathode strip

chambers– Each station has multiple

planes for redundancy– Slow read out -> No trigger

2.Muon Identifier– 5 layers of Iarocci tubes in x

and y– 80 cm of steel plate absorber

(total)– Provides trigger p > 2 GeV

St#1

St#2

St#3

MuTr

Same configuration in South

MuID

B

Page 6: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

6

High Momentum Muon TriggerRun11 500 GeV Projection

New TriggerUpgrade

MuIDTrigger

Rate

9 MHz

90 kHz

σtot=60mbL=1.5x1032cm-2s-1

BBCMuID Rejection PowerRP~100

Trigger UpgradeRP ~ 45

2 kHzPHENIX Band Width for Muon

Required Rejection Power

RPtot ~ 4500

1. High Rejection Power2. High Efficiency

W

Page 7: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

7

RPC1

RPC3

r=3.40m

MuTr

(I) 2 dedicated trigger Resistive Plate Chambers (RPC) stations (CMS design): ~ 1 degree pitch in

NSF (Funded)

JSPS (Funded)

(II) MuTr front end electronics

(MuTr-FEE Trigger)

PHENIX Muon Trigger Upgrade

Page 8: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

8

W Trigger System

MuTrFEEB

Trigger

Interaction Region Rack Room

Trigger events with straight track(e.g. strip <= 1)

~10s

Page 9: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

9

W Trigger System

MuTRGADTX

MuTRGMRG

MuTrFEEB

2 planes

5%

95%

Trigger

Trigger

Interaction Region Rack Room

Optical

1.2Gbps

Amp/Discri.Transmit

DataMerge

MuTRG

Trigger events with straight track(e.g. strip <= 1)

Page 10: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

10

W Trigger System

MuTRGADTX

MuTRGMRG

MuTrFEE

Resistive Plate Counter(RPC) (Φ segmented)

B

2 planes

5%

95%

Trigger

Trigger

Interaction Region Rack Room

Optical

1.2Gbps

Amp/Discri.Transmit

DataMerge

MuTRG

RPCFEE

RPC / MuTRG data arealso recorded on disk.

Trigger events with straight track(e.g. strip <= 1)

Page 11: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

11

W Trigger System

MuTRGADTX

MuTRGMRG

Level 1TriggerBoard

MuTrFEE

Resistive Plate Counter(RPC) (Φ segmented)

B

2 planes

5%

95%

Trigger

Trigger

Trigger

Interaction Region Rack Room

Optical

1.2Gbps

Amp/Discri.Transmit

DataMerge

MuTRG

RPCFEE

Trigger events with straight track(e.g. strip <= 1)

RPC / MuTRG data arealso recorded on disk.

Page 12: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

12

W Trigger System

MuTRG

ADTX

MuTRG

MRG

Level 1TriggerBoard

MuTrFEE

Resistive Plate Counter(RPC) (Φ segmented)

B

2 planes

5%

95%

Trigger

Trigger

Trigger

Interaction Region Rack Room

Optical

1.2Gbps

Amp/Discri.Transmit

DataMerge

MuTRG

RPCFEE

Trigger events with straight track(e.g. strip <= 1)

RPC / MuTRG data arealso recorded on disk.

Page 13: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

13

W Trigger System (Final)

MuTRG

ADTX

MuTRG

MRG

Level 1TriggerBoard

MuTrFEE

Resistive Plate Counter(RPC) (Φ segmented)

B

2 planes

5%

95%

Trigger

Trigger

Interaction Region Rack Room

Optical

1.2Gbps

Amp/Discri.Transmit

DataMerge

MuTRG

RPCFEE

Trigger events with straight track(e.g. strip <= 1)

RPC / MuTRG data arealso recorded on disk.

DCM

DCMDCM

Page 14: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

14

W Trigger Instrumentationin RHIC 2009 run

MuTRGMuTRG

PrototypeRPC

Full Installation to North Arm, 1/2 octant installed to SouthDemonstrate performance of RPC and MuTRG with beam of s=500 GeV.

absorber

Page 15: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

15

Page 16: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

16

New MuTRIG-FEE in North Arm

Before Install

2008 Install

Page 17: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

MuTR-FEE Trigger Performance

17

Page 18: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

18MIP

0.05Q

Q

0.95Q

MuTr

MuTrig

Efficiency = MuTr ⊗MuTrig HitsMuTr Hits

Page 19: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

19

B

Track Efficiency = (hit efficiency/station 96%)3 x (vertex cut efficiency)

Page 20: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

MuTRG System Run09 performance

20

•MuID Algorithm•Track Matching w/ MuID•Timing cut w/ RPC•Track Matching w/ RPC•Background Shields•etc ..

Page 21: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

RPC

21

Page 22: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

RPC

22

North RPC3

South RPC3

RPC1

RPC1

RPC3

Fast responseGood intrinsic time

resolutionGood spatial resolution:

typically ~ cmLow cost

Page 23: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

RPC Construction

NPL: RPC-3 Pre-Assembly

PeopleHalf octant testing

Storage

23

Pre-Assembly

Page 24: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

RPC Performance w/ Cosmic

24Cosmic Ray test with stack of 5 detector modules

Page 25: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

Prototype RPC Performance @ Run9

25

μμ

beam BGbeam BG

RPC2RPC3

sigma~5.3ns sigma~4.1ns

track reconstructed eventsnsec23~c

L

Demonstrated Satisfactory Timing Resolution w/ beam!

Page 26: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

26

Road Map to Run11 Production Run

MuTRGMuTRG

PrototypeRPC

Run9

absorber

Page 27: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

27

Road Map to Run11 Production Run

MuTRGMuTRG

RPC3

Run10

Page 28: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

28

Installation to South Muon Arm

• Post Run9 Shutdown• Completed!• Under Commissioning in

Run10 Au-Au Run

Page 29: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

29

RPC3 North Installation (Nov.’09)

Page 30: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

RPC3 North Completed Installation

30

Page 31: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

31

Road Map to Run11 Production Run

MuTRGMuTRG

RPC3

Run11

RPC3

absorber

Page 32: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

32

Final Muon Trigger Configuration

MuTRGMuTRG

RPC3

Run12

RPC3

absorber

RPC1

Page 33: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

33

Summary• Seak Quark Polarization Measurement @ PHENIX via

W-Boson• High Momentum MuTR-FEE Trigger is Competed

Installation and to be Commissioned in Run10• Both MuTr-FEE Trigger and RPC Commissioning

Demonstrated Designed Performances.• More rejection power are expected from

– RPC (Timing & Matching)– MuID Algorithm– Background Shields

PHENIX Muon Arms are getting ready for pp Production at 500 GeV in Run11

Page 34: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

34

Backup Slides

Page 35: Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.

35

LL1 Trigger Readiness

LL1 Board

MuTRG-MRG Boards

• Communication test • LL1 Boards Production Completed• On going ADTX - MRG - LL1 - GL1

chain test now.• New high momentum trigger will be

operated in Run10 for commissioning