Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

May 22, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV
Page 2: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV
Page 3: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV
Page 4: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

S T U D I O L A W A N G 40

Page 5: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

S T U D I O L A W A N G 41

Page 6: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

42S T U D I O L A W A N G

Page 7: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

43S T U D I O L A W A N G

Page 8: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

S T U D I O L A W A N G 44

Page 9: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

S T U D I O L A W A N G 46

Page 10: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

S T U D I O L A W A N G 48

Page 11: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

HARGA JUMLAH

NO SATUAN UPAH HARGA

(Rp) (Rp) ( Rp )

a d d e = (c x d)

I PEKERJAAN PENDAHULUAN

1 Pengukuran/Bowplank 88,15 M' 57.474,00 32.850,00 7.962.060,60

2 Penyediaan Air Kerja 1,00 Ls 2.500.000,00 - 2.500.000,00

3 Listrik Kerja 1,00 Ls 3.500.000,00 - 3.500.000,00

SUB JUMLAH PEKERJAAN PENDAHULUAN 13.962.060,60

II PEKERJAAN TANAH

1 Galian Tanah Pondasi 171,89 M3 - 96.750,00 16.630.357,50

2 Galian Pondasi Menerus 32,40 M3 - 96.750,00 3.134.700,00

3 Urugan Tanah Galian Pondasi Tapak 171,89 M3 170.000,00 38.700,00 35.873.443,00

4 Urugan Tanah Galian Pondasi Menerus 32,40 M3 170.000,00 38.700,00 6.761.880,00

5 Timbunan Tanah Bawah Lantai 135,76 M3 170.000,00 38.700,00 28.333.112,00

SUB JUMLAH PEKERJAAN TANAH 90.733.492,50

III PEKERJAAN PONDASI

1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00

2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20

SUB JUMLAH PEKERJAAN PONDASI 9.546.786,20

IV PEKERJAAN BETON BERTULANG

1 Sloof Beton Cor 1:2:3 274.160,00 11.350.635,24

- Beton 41,40 M³

Semen 307,20 Sak 120.000,00 36.863.895,60

Pasir 20,70 M3 350.000,00 7.245.262,50

Kerikil 28,98 M3 670.000,00 19.417.303,50

Air 8.901,32 Liter 100,00 890.132,25

- Besi 5.098,82 Kg 2.286,00 11.655.913,34

besi 16 3.737,96 Kg 13.000,00 48.593.532,00

Besi 10 1.360,86 Kg 13.000,00 17.691.189,53

- Bekesting 276,01 M² 60.060,00 16.577.160,60

Kayu Kelas III 12,42 M3 3.800.000,00 47.197.710,00

Paku 5 - 10 cm 82,80 Kg 25.000,00 2.070.075,00

2 Pondasi Cakar Ayam

- Beton 6,35 M³ 274.160,00 1.741.464,32

Semen 47,13 Sak 120.000,00 5.655.820,80

Pasir 3,18 M3 350.000,00 1.111.600,00

Kerikil 4,45 M3 670.000,00 2.979.088,00

Air 1.365,68 Liter 100,00 136.568,00

- Besi 518,45 Kg 2.286,00 1.185.174,32

Besi 10 518,45 Kg 13.000,00 6.739.836,48

- Bekesting 19,01 M² 60.060,00 1.141.620,48

Kayu Kelas III 0,86 M3 3.800.000,00 3.250.368,00

Paku 5 - 10 cm 5,70 Kg 25.000,00 142.560,00

3 Kolom C2A8 25x80, cor 1:2:3

- Beton 17,15 M³ 274.160,00 4.701.844,00

Semen 127,25 Sak 120.000,00 15.270.360,00

Pasir 8,58 M3 350.000,00 3.001.250,00

Kerikil 12,01 M3 670.000,00 8.043.350,00

Air 3.687,25 Liter 100,00 368.725,00

- Besi 4.434,65 Kg 2.286,00 10.137.603,04

Besi 19 3.807,30 Kg 13.000,00 49.494.900,00

Besi 10 627,35 Kg 13.000,00 8.155.511,00

- Bekesting 180,08 M² 60.060,00 10.815.304,50

Kayu Kelas III 8,10 M3 3.800.000,00 30.792.825,00

Paku 5 - 10 cm 54,02 Kg 25.000,00 1.350.562,50

b c

RENCANA ANGGARAN BIAYAPEMBANGUNAN GEREJA St. MARIA KARUNIA BHAKTI MENGKAIT

PAROKI STELLA MARIS TAREMPA

URAIAN PEKERJAAN BAHAN

Page 12: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

HARGA JUMLAH

NO SATUAN UPAH HARGA

(Rp) (Rp) ( Rp )

a d d e = (c x d)b c

URAIAN PEKERJAAN BAHAN

4 Kolom Praktis, cor 1:2:3

- Beton 1,15 M³ 274.160,00 315.215,46

Semen 8,53 Sak 120.000,00 1.023.737,40

Pasir 0,57 M3 350.000,00 201.206,25

Kerikil 0,80 M3 670.000,00 539.232,75

Air 247,20 Liter 100,00 24.719,63

- Besi 247,02 Kg 2.286,00 564.681,78

Besi 12 181,92 Kg 13.000,00 2.364.908,00

Besi 8 65,10 Kg 13.000,00 846.318,20

- Bekesting 30,66 M² 60.060,00 1.841.439,60

Kayu Kelas III 1,38 M3 3.800.000,00 5.242.860,00

Paku 5 - 10 cm 9,20 Kg 25.000,00 229.950,00

5 Beam B2A6, cor 1:2:3

- Beton 18,00 M³ 274.160,00 4.934.880,00

Semen 133,56 Sak 120.000,00 16.027.200,00

Pasir 9,00 M3 350.000,00 3.150.000,00

Kerikil 12,60 M3 670.000,00 8.442.000,00

Air 3.870,00 Liter 100,00 387.000,00

- Besi 3.077,12 Kg 2.286,00 7.034.296,32

Besi 19 2.397,60 Kg 13.000,00 31.168.800,00

Besi 10 679,52 Kg 13.000,00 8.833.760,00

- Bekesting 174,00 M² 60.060,00 10.450.440,00

Kayu Kelas III 7,83 M3 3.800.000,00 29.754.000,00

Paku 5 - 10 cm 52,20 Kg 25.000,00 1.305.000,00

6 Plat Lantai Utama

- Beton 33,00 M3 274.160,00 9.047.280,00

Semen 244,86 Sak 120.000,00 29.383.200,00

Pasir 16,50 M3 350.000,00 5.775.000,00

Kerikil 23,10 M3 670.000,00 15.477.000,00

Air 7.095,00 Liter 100,00 709.500,00

- Besi wiremesh M8 40,00 lbr 650.000,00 26.000.000,00

- Bekesting 60.060,00 1.981.980,00

Kayu Kelas III 1,32 M3 3.800.000,00 5.016.000,00

Paku 5 - 10 cm 9,90 Kg 25.000,00 247.500,00

7 Plat Lantai Beton Teras 3,12 M3 274.160,00 855.379,20

- Beton

Semen 23,15 Sak 120.000,00 2.778.048,00

Pasir 1,56 M3 350.000,00 546.000,00

Kerikil 2,18 M3 670.000,00 1.463.280,00

Air 670,80 Liter 100,00 67.080,00

- Bekesting 60.060,00 187.387,20

Kayu Kelas III 0,12 M3 3.800.000,00 474.240,00

Paku 5 - 10 cm 0,94 Kg 25.000,00 23.400,00

SUB JUMLAH PEKERJAAN BETON BERTULANG 620.483.064,79

Page 13: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

HARGA JUMLAH

NO SATUAN UPAH HARGA

(Rp) (Rp) ( Rp )

a d d e = (c x d)b c

URAIAN PEKERJAAN BAHAN

V PEKERJAAN KUSEN , PINTU DAN JENDELA

1 Kusen Pintu (P1) 7,00 Bh 1.150.000,00 - 8.050.000,00

2 Kusen Pintu (P2) 7,00 Bh 1.350.000,00 - 9.450.000,00

3 Kusen Pintu Jendela (PJ1) 1,00 Bh 1.200.000,00 - 1.200.000,00

4 Daun Pintu (P1) 7,00 Bh 2.500.000,00 - 17.500.000,00

5 Daun Pintu (P2) 7,00 Bh 2.300.000,00 - 16.100.000,00

6 Daun Jendela (P2) 1,00 Bh 750.000,00 - 750.000,00

SUB JUMLAH PEKERJAAN KUSEN , PINTU DAN JENDELA 53.050.000,00

VI PEKERJAAN DINDING

1 Pasangan Dinding Bata 328,27 M2 - 26.758,00 8.783.848,66

Batu Bata 6.237,13 Bh 5.500,00 - 34.304.215,00

Semen 32,56 Sak 120.000,00 - 3.907.726,08

Pasir 5,91 M3 350.000,00 - 2.068.101,00

2 Plasteran Dinding, Tiang, Balok 656,54 M2 69.300,00 45.498.222,00

Semen 81,94 Sak 120.000,00 - 9.832.343,04

Pasir 15,76 M3 350.000,00 - 5.514.936,00

3 Dinding Calciboard 165,16 M2 - 19.958,00 3.296.263,28

Hollow 4x4 69,37 Btg 52.000,00 - 3.607.094,40

Hollow 2x4 24,77 Btg 50.000,00 - 1.238.700,00

Kalsiboard 59,46 Lbr 75.000,00 - 4.459.320,00

Paku Sekrup 4.129,00 Bh 1.000,00 - 4.129.000,00

4 Dinding Onduclair 41,45 M2 32.567,00 1.349.902,15

Onduclair 39,55 Lbr 150.000,00 5.932.500,00

Paku 1,24 Kg 25.000,00 31.087,50

SUB JUMLAH PEKERJAAN DINDING 133.922.171,61

VII PEKERJAAN RANGKA DAN ATAP

1 Listplank Kayu 16,50 M2 - 52.350,00 863.775,00

Papan Kayu 0,18 M3 3.800.000,00 - 677.160,00

Paku 1,65 Kg 25.000,00 - 41.250,00

2 Atap Onduline Classic Hitam 462,00 M2 - 46.200,00 21.344.400,00

Onduline 243,16 Lbr 210.000,00 - 51.063.157,89

Paku 13,86 Kg 25.000,00 - 346.500,00

3 Atap Onduline Onduclair 44,00 M2 - 46.200,00 2.032.800,00

Onduline 23,16 Lbr 210.000,00 - 4.863.157,89

Paku 1,32 Kg 25.000,00 - 33.000,00

4 Pek. Kuda-Kuda Baja Ringan 506,00 M2 - 125.000,00 63.250.000,00

Baja Ringan 313,72 Btg 120.000,00 - 37.646.400,00

Skrub 14.168,00 Bh 200,00 - 2.833.600,00

V-Reng 2.732,40 M' 11.500,00 - 31.422.600,00

SUB JUMLAH PEKERJAAN RANGKA DAN ATAP 216.417.800,79

VIII PEKERJAAN KUNCI, BESI DAN KACA

1 Kunci Pintu 2,00 Set 375.000,00 - 750.000,00

2 Engsel Pintu 4" 2,00 Psg 35.000,00 - 70.000,00

3 Engsel Jendela 3" 9,00 Psg 30.000,00 - 270.000,00

4 Tolak Angin Jendela 9,00 Set 25.000,00 - 225.000,00

5 Grendel Tanam 8" 1,00 Set 175.000,00 - 175.000,00

6 Grendel Jendela 9,00 Set 45.000,00 - 405.000,00

7 Kaca Jendela 5mm 7,78 M2 320.000,00 - 2.489.600,00

8 Tangan-Tangan Pintu 2,00 Bh 200.000,00 - 400.000,00

9 Penahan Pintu 2,00 Bh 75.000,00 - 150.000,00

10 Tarika Jendela 2,00 Set 15.000,00 - 30.000,00

SUB JUMLAH PEKERJAAN KUNCI, BESI DAN KACA 4.964.600,00

Page 14: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

HARGA JUMLAH

NO SATUAN UPAH HARGA

(Rp) (Rp) ( Rp )

a d d e = (c x d)b c

URAIAN PEKERJAAN BAHAN

IX PEKERJAAN PLAFOND

1 Plafon Kalsiplank 8mm 344,30 M2 23.100,00 7.953.330,00

Plafond Kalsiboard 158,38 Lbr 120.000,00 19.005.360,00

Paku Sekrup 37,87 Kg 35.000,00 1.325.555,00

Hollow 4x4 688,60 Btg 52.000,00 35.807.200,00

Hollow 2x2 1.060,44 Btg 50.000,00 53.022.200,00

2 Plafon dan Rangka GRC 6 mm 40,48 M2 52.810,00 2.137.748,80

Plafond GRC 20,24 Lbr 120.000,00 2.428.800,00

Kayu Kls III 0,49 M3 3.800.000,00 1.845.888,00

Paku 0,81 Kg 25.000,00 20.240,00

3 List Plafon triplek 5 mm 210,00 M' 1.428,57 300.000,00

Triplek 210,00 M' 5.000,00 1.050.000,00

SUB JUMLAH PEKERJAAN PLAFOND 124.896.321,80

X PEKERJAAN LANTAI DAN KERAMIK

1 Urugan pasir di bawah lantai t=10 cm 95,84 M3 350.000,00 33.544.000,00

2 Keramik Lantai 330,00 M3 58.010,00 19.143.300,00

Keramik 30x30 354,00 Ktk 95.000,00 33.630.000,00

Semen 70,80 Sak 120.000,00 8.496.000,00

Pasir Pasang 14,85 M3 350.000,00 5.197.500,00

Semen Warna 495,00 Kg 13.000,00 6.435.000,00

3 Keramik Lantai Kaki lima 3,12 M3 58.010,00 180.991,20

Keramik 20x20 3,12 Ktk 60.000,00 187.200,00

Semen 0,58 Sak 120.000,00 69.638,40

Pasir Pasang 0,06 M3 350.000,00 19.656,00

Semen Warna 4,68 Kg 13.000,00 60.840,00

SUB JUMLAH PEKERJAAN LANTAI DAN KERAMIK 106.964.125,60

XI PEKERJAAN SANITASI

1 Wastafel 1,00 Bh 500.000,00 500.000,00

2 Bak Fibre Glass 1,00 Bh 1.100.000,00 1.100.000,00

3 Kloset Jongkok 1,00 Bh 650.000,00 650.000,00

4 Septictank 1,00 Ls 5.000.000,00 5.000.000,00

SUB JUMLAH PEKERJAAN SANITASI 7.250.000,00

Page 15: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV

HARGA JUMLAH

NO SATUAN UPAH HARGA

(Rp) (Rp) ( Rp )

a d d e = (c x d)b c

URAIAN PEKERJAAN BAHAN

XII PEKERJAAN INSTALASI AIR

1 Kran Air 1,00 Bh 45.000,00 45.000,00

2 Floor Drain 1,00 Bh 50.000,00 50.000,00

3 Pipa PVC Ø 1" air bersih 40,00 M' 15.000,00 600.000,00

4 Pipa PVC Ø 1/2" air bersih 30,00 M' 20.000,00 600.000,00

SUB JUMLAH PEKERJAAN INSTALASI AIR 1.295.000,00

XIII PEKERJAAN MEKANIKAL ELEKTRIKAL

1 Instalasi Listrik 1,00 Ttk 6.000.000,00 6.000.000,00

2 Panel Box 11,00 Ttk 1.500.000,00 16.500.000,00

3 Lampu Downlight 2,00 Ttk 140.000,00 280.000,00

4 Stop Kontak 2,00 Bh 65.000,00 130.000,00

5 Saklar Ganda 2,00 Bh 65.000,00 130.000,00

6 Saklar Tunggal 11,00 Bh 65.000,00 715.000,00

SUB JUMLAH PEKERJAAN MEKANIKAL ELEKTRIKAL 23.755.000,00

XIV PEKERJAAN PENGECATAN

1 Cat Dinding 656,54 M2 15.495,00 10.173.087,30

Plamur 65,65 Kg 45.000,00 2.954.430,00

Cat Dasar 65,65 Kg 50.000,00 3.282.700,00

Cat Penutup 170,70 Kg 55.000,00 9.388.522,00

2 Cat List Plank 2,48 M2 12.240,00 30.355,20

Plamir Kayu 0,37 Kg 35.000,00 13.020,00

Cat Minyak dasar 0,42 Kg 50.000,00 21.080,00

Cat Minyak penutup 0,64 Kg 50.000,00 32.240,00

3 Politur Kusen 16,00 Bh 75.000,00 1.200.000,00

4 Politur Daun Pintu 2,00 Bh 250.000,00 500.000,00

5 Politur Daun Jendela dan Ventilasi 14,00 Bh 150.000,00 2.100.000,00

SUB JUMLAH PEKERJAAN PENGECATAN 29.695.434,50

JUMLAH TOTAL HARGA PEKERJAAN 1.436.951.402,14

Page 16: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV
Page 17: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV
Page 18: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV
Page 19: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV
Page 20: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV
Page 21: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV
Page 22: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV
Page 23: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV
Page 24: Jala Kasih...1 Urugan Pasir Pondasi Tapak 2,59 M3 350.000,00 38.700,00 1.006.733,00 2 Pasangan Batu Kosong Pondasi Menerus 17,64 M3 380.000,00 104.130,00 8.540.053,20 SUB JUMLAH IV