A Practical Training Presentation ON “ JAIPUR METRO CONSTRUCTION OF PHASE 1B ” Submitted In Practical Fulfillment For The Award of Bachelor Of Technology In CIVIL ENGINEERING 2013-2017 Submitted To: Submitted By: Dr. Sanjay Gaur Vishal Prasad Jaiswal (HOD) (13EMACE094) MAHARISHI ARVIND COLLEGE OF ENGINEERING & RESEARCH CENTRE SIRSI ROAD, JAIPUR RAJASTHAN
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
A
Practical Training Presentation
ON
“ JAIPUR METRO CONSTRUCTION OF PHASE 1B ”
Submitted In Practical Fulfillment For The Award of Bachelor Of Technology In
CIVIL ENGINEERING
2013-2017
Submitted To: Submitted By:
Dr. Sanjay Gaur Vishal Prasad Jaiswal
(HOD) (13EMACE094)
MAHARISHI ARVIND COLLEGE OF ENGINEERING & RESEARCH CENTRE
SIRSI ROAD, JAIPUR
RAJASTHAN
CONTANTS
INTRODUCTION
SAFETY
UNDERGROUND STATION
CUT & COVER METHOD
DIAPHRAGM WALL
CONCOURSE SLAB Reinforcement
PLUNGE COLUMN
SEGMENT
CONSTRUCTION WORK OF TUNNEL BY TBM
INTRODUCTION
Jaipur Metro Rail Corporation Ltd. (JMRC) is a state
owned company that operates the Jaipur metro project.
JMRC is a client in the project of Jaipur metro and
Continental Engineering Corporation (CEC) is the
contractor.
Apart from these two major companies Delhi Metro Rail
Corporation Ltd.(DMRC) Is also serving a major role as
consultant in the Jaipur metro project.
DMRC is a state-central owned company, it is also
involved in the planning and implementation of metro
rail, monorail and high – speed rail projects in India and
abroad.
DMRC has a business development which is in charge of
the consultancy services.
The Jaipur Metro Rail Project are divided into two phases.
PHASE 1 PHASE 2
EAST-WEST CORRIDOR NORTH-SOUTH CORRIDOR
PHASE 1-A (FROM MANSAROVAR TO AMBABARI TO SITAPURA
CHANDPOLE )
PHASE 1-B (FROM CHANDPOLE TO
BADI CHAUPAR)
PROJECT DETAILS
PROJECT NAME:-
Design and construction of tunnel between chandpole and badi
chaupar and underground station by cut and cover method of