Jaguar Land Rover, Castle Bromwich DESIGN AND ERECTION OF ACCESS SCAFFOLDING FOR PAINT SHOP UPGRADE Scaffolding Case Study PROJECT TEAM Client: Jaguar Land Rover Prime Contractor: DURR Scaffolding Contractor: Godiva Access & Scaffolding Value: £100,000 PROJECT OVERVIEW Godiva was responsible for the design and erection of access scaffolding services to enable the two new TAR units to be positioned on the new platform within the JLR Paintshop. A seven metre high scaffolding platform was erected to allow the new TAR units to be manoeuvred through a hole in the Paintshop exterior wall and across scaffolding platforms built above the Paintshop interior. Erection works were undertaken in advance of the weekend shut-down outside normal hours working overnight, in order to minimise disruption to normal Paintshop production. A platform for success
2
Embed
Jaguar Land Rover, Castle Bromwich - Godiva Access and ... · Scaffolding Case Study PROJECT TEAM Client: Jaguar Land Rover Prime Contractor: DURR Scaffolding Contractor: Godiva Access
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Jaguar Land Rover, Castle Bromwich
DESIGN AND ERECTION OF ACCESS SCAFFOLDING FOR PAINT SHOP UPGRADE
PROJECT OVERVIEWGodiva was responsible for the design and erection of access scaffolding services to enable the two new TAR units to be positioned on the new platform within the JLR Paintshop. A seven metre high scaffolding platform was erected to allow the new TAR units to be manoeuvred through a hole in the Paintshop exterior wall and across scaffolding platforms built above the Paintshop interior. Erection works were undertaken in advance of the weekend shut-down outside normal hours working overnight, in order to minimise disruption to normal Paintshop production.
A platform for success
Godiva offers a full turnkey scaffolding service from conception to completion,organising any project from start to finish. Operating 24/7/365 to the highest qualityand audited business processes, Godiva can respond quickly and effectively to anyUK needs. Godiva employs skilled and rigorously trained engineers, supervisors,advanced scaffolders and scaffolders and demands the highest standards of safetyand technical excellence.
Godiva Access & Scaffolding is a trading name of Godiva Environmental Solutions Limited
Leeds:Old Jackson’s Glassworks Simpsons Lane, Knottingley West YorkshireWF11 0HR
T: 01977 808 834
A platform for success
6100mm x 450mm Deep Alloy Lattice Beams
4000mm x 750mm Deep X-Beam 4000mm x 750mm Deep X-Beam 4000mm x 750mm Deep X-Beam 4000mm x 750mm Deep X-Beam 3000mm x 750mm Deep X-Beam
Prior to erection the scaffold contractorand/or principal contractor should check the existing structure toensure the scaffold can be based out and erected as detailedand inform Creator Ltd of any discrepancies.
The design service loads indicatedshould be closely site managed to ensure that only 1 numberof working levels are present at one time. The load conditionsof the scaffold should be clearly identified on the scafftag.
Principal contractor to employ a structuralengineer to ensure the applied loads from the scaffold do notoverload the existing structure. Creator Ltd to be contactedwhere structure is deemed unsafe to support scaffold structure.
The scaffold contractor must ensure thatthe maximum bay size installed are as indicated and should not beexceeded. It is the responsibility of the scaffold contractor toremedy any defects.
Maximum lift heights to be installedas detailed by the scaffold contractor and have a maximumtolerance of ±100mm
Principle contractor to closely site manage,ensure clear signage is installed and where required temporary crashbarriers (TCB) to be installed to prevent collision with the scaffoldstructure
All kentledge to be installed prior to loading of thescaffold structure. All kentledge is to be inspected regularly to ensurethe correct quantity is present.
Principal contractor to employ astructural engineer to ensure the applied loads from thescaffold do not overload the existing strata. Creator Ltdto be contacted where strata is deemed unsafe tosupport scaffold structure.