Jack Creek Park Capital Improvement Project Public Information Meeting October 2, 2017 Consultants & Designers, Inc. “Integrating Engineering and Environment” 7455 New Ridge Road, Suite T Phone: (410) 694-9401 Hanover, Maryland 21076 Fax: (410) 694-9405 1
25
Embed
Jack Creek Park Capital Improvement Project - … · Jack Creek Park Capital Improvement Project ... 20 car parking spots ... Jack Creek Park placement area. 20.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Jack Creek Park Capital Improvement Project
Public Information Meeting
October 2, 2017
Consultants & Designers, Inc.“Integrating Engineering and Environment”
7455 New Ridge Road, Suite T Phone: (410) 694-9401Hanover, Maryland 21076 Fax: (410) 694-9405
1
Introduction Office of County Executive Steven R. Schuh
• Michelle Corkadel, Constituent Services Officer
Anne Arundel County Department of Public Works• Masoud Ghatineh, P.E., Project Manager
• Controls shoreline erosion• Provides a productive, natural shoreline• Strategic placement of plants, stone, sand fill and other
structural and organic materials• Implemented through a variety of shoreline protection
methods
10
Shoreline Protection Stone structures provide erosion protection Sand fill provides planting terrace Marsh plantings provide flood protection and habitat
Waterway Access Access shoreline through existing trail Provide ADA compliant surface Incorporate launch area into living shoreline design
15
Waterway Access Parking
• 20 car parking spots (no trailers)• Permeable grass paving
16
Waterway Access Access Road
• Follow existing gravel road• Gravel surface to the parking area• Trail to water will be permeable gravel (ADA compliant)• Controlled access (gate) will remain
17
Dredged Material Placement Place dry material from Idlewilde DMP Site
18
Dredged Material Placement Idlewilde DMP Site primarily used for South County
recreational dredging projects such as:• Parish Creek (Federal and County channels)• Rockhold Creek Jetty • Broadwater Creek• Church Creek• West River, etc…
All materials are tested before dredging• Metals• Pesticides & PCBs• Priority pollutants volatiles & semi-volatiles• Total of 149 parameters
19
Dredged Material Placement Jack Creek Park placement area
20
Dredged Material Placement Place dry material from Idlewilde DMP Site
• 14,000 cubic yards• 3-acre area• Amend soil with lime and fertilizer• Cover with 6 inches of topsoil• Shape to form natural land features• Re-seed with meadow mix
Create small wetlands (rain garden) Restore to existing use and vegetative cover
21
Dredged Material Placement Truck Route
• Idlewilde Road to Snug Harbor Road – ½ mile
22
Dredged Material Placement Example
23
During Placement After
Schedule
Project has been split into two phases
Phase 1: Dredged Material Placement• Under construction – to be completed in 2 months
Phase 2: Living Shoreline & Waterway Access• Design completed• Federal, State and County permitting underway• To be constructed in 12 to 18 months