DATE PAGE REVISED ON FILE NAME TITLE CABLE PLAN REVOLVING DOOR UNDERFLOOR INSTALLATION PREPARED BY Please enter an “X” in the required elds! 8 j 8 l l l l l n push button outside Disabled push button inside Emergency switch outside j l * l l l l l l SCT optional TPS TPS only with on-site position ·· · · Allow cables to stand at least 6 m from transfer point. ·Cable routing in accordance with VDE 0100 ·Cable routing, connection and initial operation may only be carried out by authorised specialists. ·GEZE will not assume any warranty or provide service if GEZE products are combined with third-party products. ·The wiring diagram is only a schematic representation. The exact routing of the cables must be determined on site. ·All cable and water connections of the hot-air curtain system must be laid by a specialist company on site. j jNYM-J 3 x 1.5 mm² kNYM-J 5 x 1.5 mm² lJE-Y (ST)Y 2 x 2 x 0.8 mm² mJE-Y (ST)Y 10 x 0.8 mm² (max. 20 m) nJE-Y (ST)Y 4 x 2 x 0.6 mm² (max. 20 m) 8 Determine the number of wires on site, cable dimensioning, terminal diameter. * Shielded cable Locking monitoring turnstile revolving door Via building management system DPS+2 control impulses (proviced on site). It must be guaranteed that the revolving door with motor is switched off before the night-time closer opens or closes. Locking monitoring night-time closer Control automatic night-time closer DPS If a thermostat is installed on the canopy, no cable is required Hot-air curtain potential-free signal contact for building management system j Supply line for lighting (optional), on-site switching device Supply line for electric hot-air curtain Supply line for hot water hot-air curtain Supply line for automatic night-time closer Supply line for revolving door drive (mains fuse 10 A on site) Hot-air curtain operating panel(*) l * Final position monitoring night-time closer (number of cables, cables product-specic) Reed contact Automatic night-time closer with dead man's control SCT Project: ……………………………………………………………………………… Order no.: Door type: Revolving door Revolving door control, underoor Hot-air curtain system DPS Room thermostat on the inside Hot-air curtain contact stop Disabled 230 V AC 400 V AC 230 V AC 230 V AC ……………………………………………………………………………… ……………………………………………………………………………… 230 V AC This drawing corresponds to the development status of the drawing date or the last revision. No claims of any kind, including damage claims, can be derived and asserted against GEZE GmbH from use of the drawing. The drawing remains the property of GEZE and is only provided to third parties for use during the contractual period. GEZE is exclusively entitled to all the claims resulting from the drawing. This drawing may not be duplicated nor made accessible to third parties without prior agreement by GEZE. Hot water connection2x ¾ " (inch) (for hot water air curtain) * * 1 of 1
1

j 8 j Revolving door j 230 V AC j - geze.co.uk · j 8 n l l l l l push button outside Disabled push button inside Emergency switch outside j ll l l l l l * SCT optional TPS TPS only

Jul 13, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: j 8 j Revolving door j 230 V AC j - geze.co.uk · j 8 n l l l l l push button outside Disabled push button inside Emergency switch outside j ll l l l l l * SCT optional TPS TPS only

DATE

PAGE

REVISED ON

FILE NAME

TITLE

CABLE PLAN REVOLVING DOOR UNDERFLOOR INSTALLATION

PREPARED BY

Please enter an “X” in the required �elds!

8

j

8

llllln

push buttonoutside

Disabled push button

inside

Emergency

switch outside

j

l *llll l l

SCToptional

TPS TPS

only with on-site position

·�· · · Allow cables to stand at least 6 m from transfer point.

·�Cable routing in accordance with VDE 0100

·�Cable routing, connection and initial operation may only be carried out by authorised specialists.

·�GEZE will not assume any warranty or provide service if GEZE products are combined with third-party products.

·�The wiring diagram is only a schematic representation. The exact routing of the cables must be determined on site.

·�All cable and water connections of the hot-air curtain system must be laid by a specialist company on site.

j

j�NYM-J 3 x 1.5 mm²k�NYM-J 5 x 1.5 mm²l�JE-Y (ST)Y 2 x 2 x 0.8 mm²m�JE-Y (ST)Y 10 x 0.8 mm² (max. 20 m)n�JE-Y (ST)Y 4 x 2 x 0.6 mm² (max. 20 m)

8�Determine the number of wires on site, cable dimensioning, terminal diameter. * Shielded cable

Locking monitoring turnstile revolving door

Via building managem

ent system D

PS+2 control impulses (proviced

on site). It must be guaranteed that the revolving door w

ith motor

is switched off before the night-tim

e closer opens or closes.

Locking monitoring night-tim

e closer

Control autom

atic night-tim

e closer

DPS

If a thermostat is installed on the canopy, no cable is required

Hot-air curtain potential-free signal contact for building m

anagement system

j

Supply line for lighting (optional), on-site switching device

Supply line for electric hot-air curtain

Supply line for hot water hot-air curtain

Supply line for automatic night-time closer

Supply line for revolving door drive (mains fuse 10 A on site)

Hot-air curtain operating panel(*)

l*

Final position monitoring night-tim

e closer (number of cables, cables product-speci�c)

Reedcontact

Automatic night-tim

e closer with dead m

an's control

SCT

Project: ………………………………………………………………………………

Order no.:

Door type:

Revolving door

Revolving door control, under�oor

Hot-air curtain system

DPS Roomthermostat on theinside

Hot-air curtaincontact

stop Disabled

230 V AC

400 V AC

230 V AC

230 V AC

………………………………………………………………………………

………………………………………………………………………………

230 V AC

This drawing corresponds to the development status of the drawing date or the last revision. No claims of any kind, including damage claims, can be derived and asserted against GEZE GmbH from use of the drawing. The drawing remains the property of GEZE and is only provided to third parties for use during the contractual period. GEZE is exclusively entitled to all the claims resulting from the drawing. This drawing may not be duplicated nor made accessible to third parties without prior agreement by GEZE.

Hot water connection 2x ¾ " (inch) (for hot water air curtain)

* *