IWTP Facility
Jan 15, 2016
IWTP Facility
Holes Drilled for Detailed
Blast
Drilling and Blasting for final grade prior to construction in 2011
Building Foundations
Floor Slab Preparation
Backfill Building Foundations
1st Column Erection
Steel Erection & Roof Girders
Building Ready for Cladding
Inner Skin Complete, Start Exterior Cladding
IWTP Cladded & Roofed
Piping Installation
Mechanical Installation
Equipment Placement
Electrical Control Room
Settling Pond – Wall Liner Application
Wall Liner Application
Settling Pond – Wall Liner Application
Wall Liner 2nd Coat
Settling Pond – Floor Liner Application
Floor Liner 1st Coat
Settling Pond - Complete
Settling Pond & IWTP
IWTP
Settling Pond
Completed IWTP and associated infrastructure
Completed IWTP
Settling Pond
Sludge Pit
Exfiltration Pond
Power Generator & Diesel Fuel Tanks
Portal Creek Diversion