ITU REGIONAL OFFICE FOR AFRICA ITU REGIONAL OFFICE FOR AFRICA OVERVIEW AND ACTIVITIES OVERVIEW AND ACTIVITIES
Mar 27, 2015
ITU REGIONAL OFFICE FOR AFRICAITU REGIONAL OFFICE FOR AFRICA
OVERVIEW AND ACTIVITIESOVERVIEW AND ACTIVITIES
2
TOPICSTOPICS
Presentation of the Regional office for Presentation of the Regional office for AfricaAfrica
Main activitiesMain activities
ITU Projects in AfricaITU Projects in Africa
Activities related to ITU-TActivities related to ITU-T
Actions undertaken with ITU-TActions undertaken with ITU-T
3
PRESENTATION OF AFRICA REGIONPRESENTATION OF AFRICA REGION
Cape Verde Is.
Canary Islands
SWAZILAND
NAMIBIA
LESOTHO
ZIMBABWE
SOUTH AFRICA
EGYPT
ZAMBIA
BOTSWANA
CENTRAL AFRICAN REP
LIBYA
ALGERIA
CAMEROON
COTE D’IVOIRE
MOROCCO
KENYA
ETHIOPIA
SUDAN
TANZANIA
NIGERIA
NIGER
ANGOLA
SIERRA LEONE
GUINEABISSAU
GAMBIA
MAURITANIA
MALI
GABON
EQ. GUINEA
RWANDA
BURUNDI
SENEGAL
CHAD
BURKINA
TUNISIA
ERITREA
LIBERIAGHANA
D.R.CONGO
MAURITIUS
GUINEA
DJIBOUTIBE
NIN
TOG
O
COMOROS
Sao Tome & PrincipeSEYCHELLES
REGIONAL OFFICE FOR AFRICA
Area Representative
Central Africa YAOUNDE
Area Representative
Eastern Africa ADDIS ABABA
Area Representative
Southern Africa HARARE
Area Representative
Western Africa DAKAR
ADDIS ABABA
Senior Advisor
Net. M.D. Central
Senior Advisor
Net. M.D. East / South
Senior Advisor
HRD English
Senior Advisor
HRD
Fr./Port.
Senior Advisor
Net. M.D. West
Project Coordinators
5
MAIN ACTIVITIES - ISMAIN ACTIVITIES - ISAP (AP (IstanbulIstanbul Action Plan) Action Plan) A four-year A four-year (2003-2006) (2003-2006) strategic and working Planstrategic and working Plan
Section II : ActionsSection II : ActionsA. - ISAP Programmes
Prog-1: Regulatory Reform
Prog-2: Technologies and Telecommunication / ICT
network development
Prog-3: e-strategies and e-services/applications
Prog-4: Economics and Finance, including costs and
tariffs,
Prog-5: Human capacity building
Prog-6: Special Programme for LDCs
6
ISISAP (AP (IstanbulIstanbul Action Plan) Action Plan) A four-year A four-year (2003-2006) (2003-2006) strategic and working Planstrategic and working Plan
B. - ActivitiesActivity 1: Statistics and information on telecommunication/ICTsActivity 2: Partnership and promotion
C. – Special initiatives
7
ITU Projects in AfricaITU Projects in Africa
AFRITEL Project : InfrastructureAFRITEL Project : Infrastructure
SRII (Southern Region Information SRII (Southern Region Information Infrastructure). ITU/SADC-SATCCInfrastructure). ITU/SADC-SATCC
INTELCOM-II . ITU/ECOWASINTELCOM-II . ITU/ECOWAS CMTL S.A.CMTL S.A. Seminar and workshop on technical Seminar and workshop on technical
mattersmatters
8
ITU Projects in Africa ITU Projects in Africa (Cntd)(Cntd)
INDAFTEL Project : IndustrializationINDAFTEL Project : Industrialization
Centre of Excellence Project (CoE)Centre of Excellence Project (CoE)Capacity building. ESMT and AFRALTICapacity building. ESMT and AFRALTI
Regulation ProjectRegulation ProjectUEMOA/ ECOWASUEMOA/ ECOWASCEMACCEMACEastern AfricaEastern Africa
9
ITU Projects in Africa ITU Projects in Africa (Cntd)(Cntd)
PILOT ProjectsPILOT Projects
MCT (MCT (Mali, Uganda, Tanzania, Benin, Cap VertMali, Uganda, Tanzania, Benin, Cap Vert))
Telemedicine (Telemedicine (Senegal, Mozambique Guinea, Senegal, Mozambique Guinea, Kenya, Cameroon, EthiopiaKenya, Cameroon, Ethiopia))
E-Commerce (E-Commerce (Burkina, Cameroon, Côte Burkina, Cameroon, Côte d’Ivoire, Mali, Senegal, South Africa, Senegald’Ivoire, Mali, Senegal, South Africa, Senegal))
MCT for Refugees (MCT for Refugees (Tanzania)Tanzania)
10
NEW ProjectNEW Project
ITU SUPPORT TO NEPADITU SUPPORT TO NEPAD
Background : Background : Res 35 of WTDC-02 and Res Res 35 of WTDC-02 and Res PLEN/5 PP- 02PLEN/5 PP- 02
Project phase 1 : Project phase 1 : establish a Project establish a Project Document detailing the investment needed to Document detailing the investment needed to achieve the short and medium terms objectives achieve the short and medium terms objectives relative to telecom and ICTsrelative to telecom and ICTs
Project phase 2 : Project phase 2 : Assist the African countries Assist the African countries in Mobilizing resources and implementing concrete in Mobilizing resources and implementing concrete projects leading to the achievement of the projects leading to the achievement of the objectivesobjectives
11
Activities related to ITU-TActivities related to ITU-T
Promotion of more widespread use of new Promotion of more widespread use of new technical specifications and standards aiming at technical specifications and standards aiming at the development and expansion of Telecom/ICT the development and expansion of Telecom/ICT Network and related servicesNetwork and related services
Provision of information on ITU standards, Provision of information on ITU standards, recommendations, procedures and guidelines for recommendations, procedures and guidelines for the introduction of new technologies and new the introduction of new technologies and new services in the telecommunication/ICTs networksservices in the telecommunication/ICTs networks
12
Actions undertaken within the RegionActions undertaken within the Region
Study Group 12 meeting, October 2001, Study Group 12 meeting, October 2001, Dakar, Senegal.Dakar, Senegal.
workshop on the Quality of Service and workshop on the Quality of Service and Transmission from the user’s point of Transmission from the user’s point of view, in the utilization of the new view, in the utilization of the new network system, October 2001, Dakar, network system, October 2001, Dakar, Senegal.Senegal.
13
Actions undertaken with ITU-T cont’dActions undertaken with ITU-T cont’d
ITU-T seminar on trends in the ITU-T seminar on trends in the telecommunication industry, July 2002, telecommunication industry, July 2002, Kasane, BotswanaKasane, Botswana
Seminar on the impact of Seminar on the impact of Electromagnetic Field emissions on Electromagnetic Field emissions on humans and the environment, humans and the environment, September 2003, Kampala, UgandaSeptember 2003, Kampala, Uganda
14
Participation to ITU-T ActivitesParticipation to ITU-T Activites
Through the delegation of a Member Through the delegation of a Member StateState
As a ITU-T sector memberAs a ITU-T sector member
The participation of Africa region nedd The participation of Africa region nedd to be enhancedto be enhanced
The Regional and area offices are at The Regional and area offices are at your disposal your disposal
15
Thank you very much for Thank you very much for your attentionyour attention
We are here to serve Africa