TUGAS AKHIR PS-1380 ALTERNATIF DESAIN BASEMENT PADA TANAH LUNAK PADA RENCANA MUSEUM SURAMADU SISI SURABAYA ARI ANGGIA RITONGA NRP 3104 100 061 Dosen Pembimbing Ir. SOEWARNO , M.Eng JURUSAN TEKNIK SIPIL Fakultas Teknik Sipil dan Perencanaan Institut Teknologi Sepuluh Nopember Surabaya 2009
27

ITS Undergraduate 7793 3104100061 Judul

Jun 19, 2015

Download

Documents

ione_barca
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ITS Undergraduate 7793 3104100061 Judul

TUGAS AKHIR PS-1380 ALTERNATIF DESAIN BASEMENT PADA TANAH LUNAK PADA RENCANA MUSEUM SURAMADU SISI SURABAYA ARI ANGGIA RITONGA NRP 3104 100 061 Dosen Pembimbing Ir. SOEWARNO , M.Eng JURUSAN TEKNIK SIPIL Fakultas Teknik Sipil dan Perencanaan Institut Teknologi Sepuluh Nopember Surabaya 2009

Page 2: ITS Undergraduate 7793 3104100061 Judul

TUGAS AKHIR PS-1380 ALTERNATIF DESAIN BASEMENT PADA TANAH LUNAK PADA RENCANA MUSEUM SURAMADU SISI SURABAYA ARI ANGGIA RITONGA NRP 3104 100 061 Dosen Pembimbing Ir. SOEWARNO , M.Eng JURUSAN TEKNIK SIPIL Fakultas Teknik Sipil dan Perencanaan Institut Teknologi Sepuluh Nopember Surabaya 2009

Page 3: ITS Undergraduate 7793 3104100061 Judul

FINAL PROJECT PS-1380 ALTERNATIVE BASEMENT DESIGN AT SOFT SOIL IN MUSEUM SURAMADU FROM SURABAYA SIDE ARI ANGGIA RITONGA NRP 3104 100 061 Lecturer Ir. SOEWARNO , M.Eng CIVIL ENGINEERING DEPARTMENT Faculty of Civil Engineering and Planning Institut Teknologi Sepuluh Nopember Surabaya 2009

Page 4: ITS Undergraduate 7793 3104100061 Judul

iii

LEMBAR PENGESAHAN

ALTERNATIF DESAIN BASEMENT PADA TANAH LUNAK PADA RENCANA MUSEUM SURAMADU SISI SURABAYA

TUGAS AKHIR Diajukan Untuk Memenuhi Salah Satu Syarat Memperoleh Gelar

Sarjana Teknik pada

Bidang Studi Geoteknik Program Studi S-1 Jurusan Teknik Sipil Fakultas Teknik Sipil Dan Perencanaan Institut Teknologi Sepuluh Nopember

Surabaya

OOlleehh :: ARI ANGGIA RITONGA

NRP. 3104 100 061

Disetujui oleh : Pembimbing Tugas Akhir

Ir. Soewarno M.Eng 131.570.372

SURABAYA JULI, 2009

Page 5: ITS Undergraduate 7793 3104100061 Judul

iv

“ Halaman Ini Sengaja Dikosongkan “

Page 6: ITS Undergraduate 7793 3104100061 Judul

v

ALTERNATIF DESAIN BASEMENT PADA TANAH LUNAK PADA RENCANA MUSEUM SURAMADU SISI SURABAYA

Disusun Oleh : Ari Anggia Ritonga

( 3104 100 061 )

Dosen Pembimbing : Ir. Soewarno M.Eng

ABSTRAK

Suramadu merupakan jembatan yang menghubungkan

Surabaya dan Madura. Disamping pembangunan jembatan Suramadu, pemerintah propinsi Jawa Timur juga membangun fasilitas-fasilitas penunjang, Salah satunya adalah museum Suramadu. Museum Suramadu merupakan bangunan empat lantai dan satu lantai sebagai basement yang berada dilokasi sisi Surabaya dimana kondisi tanahnya adalah tanah lunak dengan muka air tinggi. Pembangunan basement biasanya mengalami kendala pada masalah tanah lunak dan air tanah yang tinggi. Tanah yang lunak akan berpengaruh pada perencanaan bukaan tanah untuk basement, karena selain harus memperhitungkan faktor keamanan terhadap bidang longsor gedung sendiri maupun terhadap gedung atau bangunan di sekelilingnya. Jika tidak, gedung disamping akan retak bahkan akan runtuh karena kehilangan daya dukung tanah akibat penggalian.

Page 7: ITS Undergraduate 7793 3104100061 Judul

vi

Tujuan dari tugas akhir ini bertujuan untuk mencari desain optimal dari struktur basement, yang kuat untuk menahan beban akibat struktur atas serta mampu menahan tekanan tanah dan air tanah (up-lift stress) yang berada pada tanah lunak serta memiliki muka air tanah yang tinggi. Untuk mendapatkan desain tersebut awalnya dilakukan dua Alternatif, yaitu Alternatif pertama menggunakan pondasi Tiang Pancang dan Alternatif kedua menggunakan pondasi Bored Pile. Dari perhitungan yang telah dilakukan, dipilih Pondasi Tiang Pancang. Tipe tersebut dipilih karena total biaya konstruksinya yang murah yaitu 18.255.696.402 rupiah dengan kedalaman pemancangan 19 meter.

Kata kunci : Basement, turap, up-lift stress, desain, Tanah Lunak.

Page 8: ITS Undergraduate 7793 3104100061 Judul

vii

ALTERNATIVE BASEMENT DESIGN AT SOFT SOIL IN MUSEUM SURAMADU

FROM SURABAYA SIDE

Compiled by :

Ari Anggia Ritonga ( 3104 100 061 )

Lecturer by :

Ir. Soewarno M.Eng

ABSTRACT

Suramadu is the bridge that connecting Surabaya and

Madura. Beside Suramadu bridge development, Province Goverment East Java also build the program to support bridge facilitiess. One of them are museum suramadu. Museum Suramadu is four floors building with one floor as basement that present in soft soil with high ground water table. The development basement, usually have obstacle experience in soft soil problem and high ground water table. The soft soil influence soil excavation. Because it should concern with the safety factor of its opening and surround building. Otherwise, the building arround the open cut would crack or even collapse consequence losing the support power of the soil. The objective of this Final project is to find the optimum design for structure basement, capable to support the upper structure , soil stress and up lift pressure which that present in soft soil with ground water table. The result of the optimal design, for

Page 9: ITS Undergraduate 7793 3104100061 Judul

viii

beginning two alternative for Basement, the first alternative is use Pile foundation and the second is use Bored Pile Foundation.

The conclusion of design calculation is using Pile foundation. The Pile foundation chosen because have low construction total cost, that is 18.255.696.402 rupiah, with the depth of pile is about 19 meters.

Keyword : Basement, sheet Pile, up-lift stress, design, Soft soil.

Page 10: ITS Undergraduate 7793 3104100061 Judul

ix

KATA PENGANTAR

Puji syukur kepada Tuhan Yang Maha Esa yang telah memampukan dan membimbing saya sehingga dapat menyelesaikan Tugas Akhir berjudul “Alternatif Desain Basement Pada Tanah Lunak Pada Rencana Museum Suramadu Sisi Surabaya”. Pada kesempatan ini saya ingin mengucapkan terima kasih kepada pihak-pihak yang telah membantu dalam penyelesaian Tugas Akhir ini, yaitu:

1. Orang tua dan segenap keluarga yang telah memberikan

dukungan moral, spiritual dan material. 2. Ir. Suwarno, M.Eng Selaku dosen pembimbing yang telah

memberikan bimbingan dan motivasinya sehingga tugas akhir ini dapat diselesaikan dengan baik.

3. Ir. Djoko Irawan, MS. Selaku dosen wali yang selalu sabar menuggu saya lulus.

4. Dr. Ir. Ria Asih Ariyani, M.Eng selaku dosen konsultasi. 5. Seluruh dosen dan karyawan Teknik Sipil ITS. 6. Dosen serta karyawan laboratorium mekanika tanah & batuan

ITS atas bantuan serta kebaikan yang telah diberikan. 7. Saudara seperjuangan S-47, atas semua dukungan, bantuan

kebersamaan dan kenangan yang telah diberikan. 8. Wan Syahfina Yahmi Hsb, Spd yang telah memberikan

semangat serta waktu lebih. 9. Keluarga Besar Gebang Wetan 23 dan 25 C, atas seluruh

bantuannya selama ini. 10. CECC Teknik Sipil ITS yang telah memberikan kami tempat

bernaung yang nyaman. 11. Mas Bas, Pak Tiyok, Pak So, dan Ibu kantin. 12. Semua orang di Lab. Mektan. Pak Umar, Pak Hery, Pak Osias,

Pak Gani, Pak Misran, Pak Sampun, Mery, Mas Titus,semuanya. Terima kasih atas semua bantuan dan kesabarannya

Page 11: ITS Undergraduate 7793 3104100061 Judul

x

13. Semua pihak yang telah membantu. Terima kasih atas segalanya.

Saya menyadari bahwa masih banyak kekurangan pada penyusunan laporan tugas akhir ini. Namun demikian, saya berharap semoga isi laporan ini bisa memberikan manfaat bagi saya dan pembaca.

Akhirnya saya berharap semoga Tugas Akhir ini dapat bermanfaat dan menambah khasanah pengetahuan yang baru bagi para pembaca sekalian.

Surabaya, 01 Juli 2009

Penulis

Page 12: ITS Undergraduate 7793 3104100061 Judul

xi

DAFTAR ISI HALAMAN JUDUL .............................................................. i LEMBAR PENGESAHAN .................................................... iii ABSTRAK ............................................................................. v KATA PENGANTAR ............................................................ ix DAFTAR ISI .......................................................................... xi DAFTAR TABEL .................................................................. xvii DAFTAR GAMBAR ............................................................. xxi BAB I PENDAHULUAN .................................................................. 1 1.1 Latar Belakang ................................................................. 1 1.2. Perumusan Masalah ......................................................... 3 1.3. Batasan Masalah .............................................................. 3 1.4. Tujuan .............................................................................. 4 1.5. Manfaat ............................................................................ 4 BAB II TINJAUAN PUSTAKA ......................................................... 5 2.1. Umum .............................................................................. 5 2.2. Pembebanan dan kombinasi pembebanan struktur .......... 5 2.3. Tekanan tanah kesamping ............................................... 7 2.3.1 Tekanan tanah dalam keadaan diam .............................. 7 2.3.2 Tekanan tanah dalam keadaan diam (at rest) untuk tanah yang terendam air sebagian ................................ 8 2.3.3. Tekanan tanah aktif dan pasif ....................................... 11 2.3.4. Turap ............................................................................ 13 2.4. Pemampatan (penurunan lapisan tanah) .......................... 16 2.4.1. Immediate Settlement ................................................... 17 2.4.2. Penurunan di tepi pondasi ............................................ 18 2.4.3. Penurunan di tengah bentang pondasi .......................... 18 2.4.4. Penurunan dititik absis X ............................................. 18 2.4.5. Pondasi / urugan yang panjang dan H terbatas ............. 19

Page 13: ITS Undergraduate 7793 3104100061 Judul

xii

2.4.6. Untuk tanah berlapis – lapis ........................................ 19 2.4.7. Primary Consolidation Settlement (Scp) ...................... 20 2.5. Pondasi untuk basement .................................................. 24 2.5.1. Daya Dukung Tiang Pancang ....................................... 24 2.5.2. Korelasi antara nilai N dan sifat – sifat atau karakteristik tanah ........................................................... 26 2.5.3. Perhitungan Perhitungan Daya Dukung Tiang Kelompok ..................................................................... 28 2.5.4. Perhitungan Beban Vertikal Ekuivalen ........................ 29 2.5.5. Ketahanan pondasi tiang pancang terhadap gaya lateral ............................................................... 30 2.5.6. Distribusi tekanan tanah untuk perencanaan, tumpuan dan penyangga (peck, 1969) .................................... 33 2.5.7. Pondasi Bore Pile ......................................................... 34 2.6 Pemilihan pondasi dan dinding penahan tanah ................ 36 2.6.1. Kontrol Stabilitas dinding penahan tanah ..................... 36 2.6.2. Tinggi Kritis Tanah ...................................................... 37 2.7. Perhitungan penulangan .................................................. 37 2.8. Perhitungan tiang tarik .................................................... 38 BAB III METODOLOGI ..................................................................... 41 3.1. Bagan alir penyelesaian tugas akhir ................................ 41 BAB IV ANALISA DATA PERENCANAAN .................................... 51 4.1 Data Tanah ....................................................................... 51 4.1.1. Lokasi Data Tanah ........................................................ 51 4.1.2. Perkiraan Lapisan Tanah Dari Drilling Log ................. 51 4.1.3. Konsistensi Lapisan-Lapisan Tanah ............................. 52 4.2. Pemilihan Jenis Pondasi .................................................. 57 4.2.1. Pemilihan Pondasi Berdasarkan Daya Dukung ............ 60 4.2.2. Pemilihan Jenis Tiang .................................................. 61 4.3. Kriteria perencanaan ........................................................ 61 4.3.1 Data bangunan ............................................................... 61

Page 14: ITS Undergraduate 7793 3104100061 Judul

xiii

4.3.2 Data material ................................................................. 61 4.3.3 Perencanaan pembebanan .............................................. 62 4.4. Pemodelan struktur .......................................................... 63 BAB V PERENCANAAN ALTERNATIF DESAIN BASEMENT ........................................................... 67 5.1. Perencanaan Alternatif 1 .................................................. 67 5.1.1. Perencanaan Pondasi Tiang Pancang ........................... 67 5.1.2. Spesifikasi Tiang Pancang ............................................ 73 5.1.3. Kontrol Kekuatan Bahan .............................................. 73 5.1.4. Perhitungan Daya Dukung Grup ................................. 76 5.1.5. Perhitungan Beban Vertikal Ekivalen (Pv) .................. 77 5.1.6. Settlement Pada Pondasi Kelompok ............................. 87 5.1.7. Perhitungan Daya Dukung Uplift Pondasi kelompok .................................................................. 89 5.1.8. Kontrol Uplift pada pondasi kelompok ........................ 95 5.2. Perencanaan Alternatif 2 ................................................. 97 5.2.1. Perencanaan Tiang Bor ................................................ 97 5.2.2. Penulangan Tiang Bor .................................................. 98 5.2.3. Daya Dukung Tiang Bor .............................................. 101 5.2.4. Perhitungan Beban Vertikal Ekivalen (Pv) .................. 110 5.2.5 Daya Dukung Uplift pada Pondasi Bor ......................... 115 5.2.6 Penulangan Poer ........................................................... 119 5.2.7. Kontrol Uplift pada pondasi Bor .................................. 121 5.2.8 Perhitungan Settlement Pada Pondasi Bor .................... 122 5.3. Perhitungan Balok Sloof ................................................. 132 5.4. Perhitungan penulangan balok ........................................ 135 5.5. Perencanaan pelat ............................................................ 137 5.5.1. Perhitungan penulangan pelat akibat beban kerja ................................................................... 140 5.5.2 Perhitungan penulangan pelat akibat Uplift .................. 142 5.6. Perhitungan poer (pile cap) ............................................ 145 5.6.1. Kontrol Geser Pons Pada Poer ..................................... 145 5.6.2. Penulangan Poer .......................................................... 147

Page 15: ITS Undergraduate 7793 3104100061 Judul

xiv

5.7. Dimensi Sheet Pile ......................................................... 150 5.7.1. Perhitungan beban akibat tekanan kesamping .............. 150 5.7.2. Penentuan dimensi sheetpile ....................................... 151 5.8. Perhitungan Dinding Penahan Tanah Basement ............. 157 5.9. Rekapitulasi hasil perencanaan ....................................... 162 5.9.1. Pondasi Tiang Pancang ................................................ 162 5.9.2. Pondasi Bored Pile ....................................................... 162 5.9.3. Balok Sloof ................................................................... 163 5.9.4. Pelat Basement ............................................................. 163 5.9.5. Perhitungan Poer Pondasi ............................................. 164 5.9.5.1. Perhitungan Poer Pondasi Tiang Pancang ................. 164 5.9.5.2. Perhitungan Poer Pondasi Bored Pile ........................ 164 5.9.6. Dimensi Sheet Pile ....................................................... 165 5.9.7. Penulangan Dinding Penahan Tanah ............................ 165 BAB VI METODE PELAKSANAAN ................................................. 167 6.1. Umum .............................................................................. 167 6.2. Pekerjaan Pondasi ............................................................ 168 6.2.1. Produktifitas Pemancangan .......................................... 168 6.2.2. Pelaksanaan pemancangan .......................................... 170 6.2.3. Pondasi Bor .................................................................. 179 6.2.4. Pelaksanaan pengeboran .............................................. 180 6.2.5. Proses Pengeboran ........................................................ 181 6.2.6. Proses Pembersihan Lubang ......................................... 183 6.2.7. Proses Pengecoran ........................................................ 183 6.3. Pekerjaan Pembetonan .................................................... 184 6.3.1. Struktur Bawah ( pondasi) ............................................ 185 6.3.2. Struktur Atas ................................................................ 186 6.4. Pekerjaan Sheet Pile ....................................................... 187 6.4.1. Pelaksanaan pemancangan ........................................... 187 6.5. Pekerjaan pemindahan tanah ( penggalian) ..................... 189 6.5.1. Persiapan ...................................................................... 189 6.5.2. Pelaksanaan .................................................................. 190 6.5.3. Gangguan Air ............................................................... 191

Page 16: ITS Undergraduate 7793 3104100061 Judul

xv

6.5.4. Perbaikan Pekerjaan ..................................................... 191 6.6. Pekerjaan Dewatering ...................................................... 192 6.6.1 Pekerjaan persiapan ...................................................... 192 BAB VII PEMILIHAN ALTERNATIF ................................................ 201 7.1. Analisa dan Evaluasi Perencanaan .................................. 201 7.2. Perhitungan Biaya .......................................................... 201 7.3. Harga Satuan .................................................................. 201 7.4. Analisa Harga Satuan ..................................................... 202 7.5. Rencana Anggaran Biaya ............................................... 211 BAB VIII KESIMPULAN DAN SARAN 8.1. Kesimpulan ...................................................................... 215 8.2. Saran ................................................................................ 215 DAFTAR PUSTAKA ............................................................ xxv LAMPIRAN ........................................................................... 217 BIODATA PENULIS ............................................................ 268

Page 17: ITS Undergraduate 7793 3104100061 Judul

xvi

“ Halaman Ini Sengaja Dikosongkan “

Page 18: ITS Undergraduate 7793 3104100061 Judul

xvii

DAFTAR TABEL Tabel 2.1. Koefisien bentuk Pondasi Cf ................................. 17 Tabel 2.2. Harga Modulus Young .......................................... 17 Tabel 2.3. Harga Angka Poison ............................................... 18 Tabel 2.4. SPT Cohesionless .................................................. 26 Tabel 2.5. Hubungan antara harga SPT, Conus Sondir,

dan Cu untuk tanah lempung dan lanau .................. 27 Tabel 4.1. Rangkuman Data Tanah ........................................ 51 Tabel 4.2. Korelasi Parameter Tanah ..................................... 53 Tabel 4.3. Korelasi Antar Parameter Tanah ........................... 54 Tabel 4.4. Data parameter tanah untuk desain ....................... 56 Tabel 4.5. Data parameter tanah untuk desain. (lanjutan) ...... 56 Tabel 4.6. Alternatif Pondasi dan jenis-jenisnya .................... 58 Tabel 4.7. Alternatif Beberapa bahan tiang ............................ 59 Tabel 5.1. Analisa Pondasi Tiang Pancang ............................ 67 Tabel 5.2. Analisa Pondasi Tiang Pancang.(lanjutan) ............ 68 Tabel 5.3. Hasil Analisa efisiensi tiang grup .......................... 77 Tabel 5.4. Rangkuman hasil analisa struktur tipe A ............... 78 Tabel 5.5. Rangkuman hasil analisa struktur tipe B ............... 79 Tabel 5.6. Rangkuman hasil analisa struktur tipe C ............... 80 Tabel 5.7. Rangkuman hasil analisa struktur tipe D ............... 82 Tabel 5.8. Rangkuman hasil analisa struktur tipe E ............... 83 Tabel 5.9. Rangkuman analisa daya dukung tanah

dan Beban ............................................................. 84 Tabel 5.10. perhitungan settlement ......................................... 86 Tabel 5.11. perhitungan settlement.(lanjutan) ........................ 86 Tabel 5.12. Rangkuman Final Settlement .............................. 87 Tabel 5.13. Kontrol Pondasi terhadap Uplift .......................... 94 Tabel 5.14. Rangkuman beban terhadap pondasi ................... 95 Tabel 5.15. Dimensi Bored Pile ............................................. 96 Tabel 5.16. Rangkuman beban terhadap pondasi ................... 96 Tabel 5.17. Penulangan terhadap gaya geser .......................... 99 Tabel 5.18. Penulangan terhadap gaya geser.(lanjutan) ......... 99 Tabel 5.19. Rangkuman Data tanah ....................................... 100

Page 19: ITS Undergraduate 7793 3104100061 Judul

xviii

Tabel 5.20. Rangkuman hasil analisa struktur untuk tipe A ... 108 Tabel 5.21. Rangkuman hasil analisa struktur untuk tipe B ... 108 Tabel 5.22. Rangkuman hasil analisa struktur untuk tipe C ... 109 Tabel 5.23. Rangkuman hasil analisa struktur untuk tipe D ... 110 Tabel 5.24. Rangkuman hasil analisa struktur untuk tipe E ... 110 Tabel 5.25. Rangkuman Kapasitas Uplift Ijin ........................ 115 Tabel 5.26. Penulangan poer untuk Pondasi Bored Pile. ........ 118 Tabel 5.27. Kontrol Pondasi Bored Pile terhadapat uplift ...... 119 Tabel 5.28. Rangkuman settlement pada Bored Pile .............. 129 Tabel 5.29. Perhitungan settlement menggunakan

PLAXIS3D 1.6 ..................................................... 129 Tabel 5.30. Penulangan Lentur Balok .................................... 133 Tabel 5.31. Penulangan Lentur Balok.(lanjutan) .................... 133 Tabel 5.32. Penulangan Lentur Balok.(lanjutan) .................... 134 Tabel 5.33. Penulangan Lentur Balok.(lanjutan) .................... 134 Tabel 5.34. Penulangan Geser Balok ..................................... 134 Tabel 5.35. Penulangan Geser Balok.(lanjutan) ..................... 134 Tabel 5.36. Penulangan Poer .................................................. 147 Tabel 5.37. Rekapitulasi tiang pancang .................................. 156 Tabel 5.38. Rekapitulasi Bored Pile ....................................... 156 Tabel 5.39. Penulangan Lentur Balok ................................... 157 Tabel 5.40. Penulangan Geser Balok ..................................... 157 Tabel 5.41. Penulangan pelat basement ................................. 157 Tabel 5.42. Penulangan Poer Tiang Pancang ......................... 158 Tabel 5.43. Penulangan Poer Bored Pile ................................ 158 Tabel 5.44. Penulangan Dinding Basement ........................... 159 Tabel 6.1. Jumlah Pukulan sampai Kedalaman rencana ........ 163 Tabel 6.2. Penurunan Muka air berdasarkan variasi r ............ 192 Tabel 7.1 Harga Satuan Pekerjaan ........................................ 197 Tabel 7.2 Harga Satuan Pekerjaan (lanjutan) ......................... 198 Tabel 7.3 Harga Satuan Pekerjaan (lanjutan) .......................... 199 Tabel 7.4 Harga Satuan Pekerjaan (lanjutan) ......................... 200 Tabel 7.5 Harga Satuan Pekerjaan (lanjutan) ......................... 201 Tabel 7.6 Harga Satuan Pekerjaan (lanjutan) ......................... 202

Page 20: ITS Undergraduate 7793 3104100061 Judul

xix

Tabel 7.7 Harga Satuan Pekerjaan Beton Bertulang Alternatif 1 .............................................................. 203

Tabel 7.8 Harga Satuan Pekerjaan Beton Bertulang Alternatif 2 .............................................................. 204

Tabel 7.9 Rencana Anggaran Biaya Alternatif 1 ................... 206 Tabel 7.10 Rencana Anggaran Biaya Alternatif 2 ................. 207 Tabel 7.11 Total Biaya Konstruksi ........................................ 208

Page 21: ITS Undergraduate 7793 3104100061 Judul

xx

“ Halaman Ini Sengaja Dikosongkan “

Page 22: ITS Undergraduate 7793 3104100061 Judul

xxi

DAFTAR GAMBAR

BAB I PENDAHULUAN Gambar 1.1 Layout museum Suramadu ................................ 2 BAB II TINJAUAN PUSTAKA Gambar 2.1. Tekanan tanah tanpa beban luar (sucharge) ....... 7 Gambar 2.2. Tekanan tanah tanpa beban luar/surcharge

dengan kondisi terendam air sebagian .................... 9 Gambar 2.3. Tekanan tanah dengan beban luar/surcharge

dengan terendam air sebagian ................................. 10 Gambar 2.4. Tekanan tanah aktif ........................................... 12 Gambar 2.5. Penetrasi turap kantilever pada lempung ........... 14 Gambar 2.6. Teori dasar immediate settlement ...................... 18 Gambar 2.7. Tanah berlapis lapis ........................................... 20 Gambar 2.8. Harga PH, PH1, PH2 ......................................... 23 Gambar 2.9. Koefisien Variasif untuk Tiang Pancang

yang Menerima Gaya Horizontal ............................ 31 Gambar 2.10. Koefisien Momen Menerima Gaya Lateral

terhadap Kedalaman ................................................ 32 BAB III METODOLOGI Gambar 3.1 Bagan Alir .......................................................... 43 Gambar 3.2. Turap Satu Lapis ................................................ 46 Gambar 3.3. Tiang Bor (a), Tiang Pancang (b) ...................... 48 BAB IV ANALISA DATA PERENCANAAN Gambar 4.1. Kondisi / Data Tanah di Lapangan

(Atas Dasar Harga SPT) .......................................... 52 Gambar 4.2. Pemodelan Struktur Rangka Terbuka

dengan SAP2000v10.0.1 ......................................... 63 Gambar 4.3. Input Beban Merata pada Struktur ..................... 64 Gambar 4.4 Input Beban Hidup pada Struktur ....................... 64 Gambar 4.5. Respon Spektrum Gempa di Zona 3

dengan Tanah Lunak ............................................... 65

Page 23: ITS Undergraduate 7793 3104100061 Judul

xxii

BAB V PERENCANAAN ALTERNATIF DESAIN BASEMENT Gambar 5.1. Daya Dukung Pondasi Tiang pancang ............... 72 Gambar 5.2. Pondasi Tipe A .................................................. 77 Gambar 5.3. Pondasi Tipe B .................................................. 79 Gambar 5.4. Pondasi Tipe C .................................................. 80 Gambar 5.5. Pondasi Tipe D .................................................. 81 Gambar 5.6. Pondasi Tipe E ................................................... 83 Gambar 5.7. Settlement Pondasi Grup ................................... 85 Gambar 5.8. Uplift pada pondasi Tipe A ............................... 88 Gambar 5.9. Uplift pada pondasi Tipe B ................................ 89 Gambar 5.10. Uplift pada pondasi Tipe C .............................. 90 Gambar 5.11. Uplift pada pondasi Tipe D ............................. 91 Gambar 5.12. Uplift pada pondasi Tipe E .............................. 92 Gambar 5.13. Distribusi Uplift akibat air ............................... 93 Gambar 5.14. Elevasi muka air .............................................. 93 Gambar 5.15. Diagram Interaksi pondasi Ø 60 cm ................ 97 Gambar 5.16. Diagram Interaksi pondasi Ø 80 cm ................ 97 Gambar 5.17. Diagram Interaksi pondasi Ø 100 cm .............. 98 Gambar 5.18. Diagram Interaksi pondasi Ø 120 cm .............. 98 Gambar 5.19. Kondisi / Data Tanah di Lapangan

(Atas Dasar Harga SPT) .......................................... 99 Gambar 5.20. Korelasi Nq* terhadap ø, menurut Vasiq ........ 100 Gambar 5.21. Estimasi Daya Dukung Tiang Bor ................... 107 Gambar 5.22. Pondasi terhadap Uplift ................................... 111 Gambar 5.23. Hubungan antara Dr terhadap L/D .................. 112 Gambar 5.24. Distribusi Uplift akibat air ............................... 118 Gambar 5.25. Elevasi muka air .............................................. 118 Gambar 5.26. Flow chart perhitungan balok .......................... 130 Gambar 5.27. Flow chart perhitungan balok.(lanjutan) ......... 131 Gambar 5.28. Flow chart perhitungan Slab ............................ 135 Gambar 5.29. Flow chart perhitungan Slab. (lanjutan) .......... 136 Gambar 5.30. Penampang melintang poer ............................. 144 Gambar 5.31. Analisa Poer Sebagai Kantilever ..................... 144 Gambar 5.32. Tekanan tanah kesamping ............................... 148

Page 24: ITS Undergraduate 7793 3104100061 Judul

xxiii

Gambar 5.33. Tegangan total pada tanah tanah ..................... 149 Gambar 5.34. Bending moments M11 pada turap .................. 149 Gambar 5.35. Turap tipe WRU14 .......................................... 150 Gambar 5.36. Tekanan tanah kesamping pada basement ....... 151 Gambar 5.37. Turap tipe WRU14 .......................................... 159 BAB VI METODE PELAKSANAAN Gambar 6.1. Alat pancang ...................................................... 166 Gambar 6.2. Posisi pengangkatan tiang pancang ................... 167 Gambar 6.3. Crawler crane ..................................................... 167 Gambar 6.4. Alat Bantu Waterpass ........................................ 168 Gambar 6.5. Bagian Tiang Pancang ....................................... 169 Gambar 6.6. Proses Penyambungan Tiang Pancang .............. 170 Gambar 6.7. Hasil KalenderingTiang Pancang Beton ............ 171 Gambar 6.8. Flowchart proses pemancangan ......................... 172 Gambar 6.9. Produktivitas Pengeboran .................................. 173 Gambar 6.10. Flowchart proses Bor Pile ................................ 175 Gambar 6.11. Flow chart pemancangan sheet pile ................. 182 Gambar 6.12. Posisi guide beam dan sheet pile ..................... 183 Gambar 6.13. Skema rencana dewatering .............................. 188

Page 25: ITS Undergraduate 7793 3104100061 Judul

xxiv

“ Halaman Ini Sengaja Dikosongkan “

Page 26: ITS Undergraduate 7793 3104100061 Judul

xxv

DAFTAR LAMPIRAN Lampiran A.1, Data tanah museum suramadu ....................... 217 Lampiran B.1, Daya dukung pondasi Pancang Ø 30 cm ........ 218 Lampiran B.2, Daya dukung pondasi Pancang Ø 40 cm ........ 219 Lampiran B.3, Daya dukung pondasi Pancang Ø 45 cm ........ 220 Lampiran B.4, Daya dukung pondasi Pancang Ø 50 cm ........ 221 Lampiran B.5, Daya dukung pondasi Pancang Ø 60 cm ........ 222 Lampiran B.6, Grafik Variasi Daya Dukung

Pondasi Tiang Pancang ................................ 223 Lampiran C.1, Daya Dukung Pondasi Bor Ø 60 cm .............. 224 Lampiran C.2, Daya Dukung Pondasi Bor Ø 80 cm .............. 225 Lampiran C.3, Daya Dukung Pondasi Bor Ø 100 cm ............ 226 Lampiran C.4, Daya Dukung Pondasi Bor Ø 120 cm ............ 227 Lampiran C.5, Grafik Variasi Daya Dukung Pondasi Bor ..... 228 Lampiran D.1, Output untuk Pondasi Grup Tipe A ............... 229 Lampiran D.2, Output untuk Pondasi Grup Tipe B ................ 230 Lampiran D.3, Output untuk Pondasi Grup Tipe C ................ 230 Lampiran D.4, Output untuk Pondasi Grup Tipe D ............... 231 Lampiran D.5, Output untuk Pondasi Grup Tipe E ................ 231 Lampiran E.1, Settlement pada Pondasi Kelompok A ............ 232 Lampiran E.2, Settlement pada Pondasi Kelompok B ............ 232 Lampiran E.3, Settlement pada Pondasi Kelompok C ............ 232 Lampiran E.4, Settlement pada Pondasi Kelompok D ............ 232 Lampiran E.5, Settlement pada Pondasi Kelompok E ............ 232 Lampiran F, Gambar hasil Tugas Akhir ................................. 237

Page 27: ITS Undergraduate 7793 3104100061 Judul

xxvi

“ Halaman Ini Sengaja Dikosongkan “