Rammallah Documentary Center -BOQ- Item Description Unit Qty. Unit Rate Total 1 Preparation Works. 1.1 Preparing of the exiting roof. The unit rate shall include costs of demolishing parts of the existing parapets and around columns steel reinforcement starters, and all the necessary preparatory works for proper connections of the new and old structures,all in accordance with the Engineer instructions. The unit rate shall also include cost of removing the existing services and utilities and making temporary connections for all dismantled electrical and mechanical services to ensure continuous functioning of the exiting building at the lower floors. The price includes removing debris away from the site. JOB 1.0 1.2 Dismantle and remove the existing waterproofing and sloping screed on the existing roof( where needed and as directed by the Engineer) to allow for the new tiling works. M2 50.0 TOTAL CARRIED TO SUMMARY. 1/22
22
Embed
Item Description Unit Qty. Unit Rate Total 1 Preparation ... · Item Description Unit Qty. Unit Rate Total ... lay and arrange hollow concrete blocks 'Grade 35' for ribbed slabs,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Rammallah Documentary Center
-BOQ-
Item Description Unit Qty. Unit Rate Total
1 Preparation Works.
1.1 Preparing of the exiting roof. The unit rate shall include
costs of demolishing parts of the existing parapets and
around columns steel reinforcement starters, and all the
necessary preparatory works for proper connections of the
new and old structures,all in accordance with the Engineer
instructions. The unit rate shall also include cost of
removing the existing services and utilities and making
temporary connections for all dismantled electrical and
mechanical services to ensure continuous functioning of
the exiting building at the lower floors. The price includes
removing debris away from the site.
JOB 1.0
1.2 Dismantle and remove the existing waterproofing and
sloping screed on the existing roof( where needed and as
directed by the Engineer) to allow for the new tiling
works.
M2 50.0
TOTAL CARRIED TO SUMMARY.
1/22
Rammallah Documentary Center
-BOQ-
Item Description Unit Qty. Unit Rate Total
2 CONCRETE WORKS.
Preamble.
Rates of Concrete Works shall include:-
1 All form works and shuttering in any form, shape and
size. Making chamfered and curved edges, allowing for
and making grooves and sleeves and the like; removal of
forms and cleaning of all exposed tie wires and rods;
making good the harmed surfaces and edges and all
surface finishing.
2. Supplying, Casting, vibrating and curing as per
specifications.
3.Approved additives and admixtures.
4. Incurred costs on Concrete Mix Designs, Sample taking,
testing and providing test results certificates, storing and
saving of samples, and preparation of bar bending
schedules and workshops.
5. Supplying of steel reinforcement of any grade, size and
length as detailed in the drawings, storing on site including
cutting, bending and fixing in position and providing all
tying wires, spacers, shop drawings, testing and bar
bending schedules
Measurement shall be only for the seen surfaces of
elements, overlapping and measuring items twice under
separate headings shall not be allowed.
Slabs are measured in meter square from Center line of
external masonry walls.
2.1 Supply and Cast Reinforced Concrete Grade 'B 250' with a
minimum cement content of 300 Kg. per cubic meter for:
a) Reinforced Walls. M3 6.0
2.2 Ditto but B 300 with a minimum cement content of 350
Kg. per cubic meter for Columns, where required.
M3 11.0
2.3 Supply and Cast Reinforced Concrete Grade 'B 250' with a
minimum cement content of 300 Kg. per cubic meter for
suspended slabs. Price to include for projected beams,
other beams projections, and drop beam, canopies supply,
lay and arrange hollow concrete blocks 'Grade 35' for
ribbed slabs, using closed end blocks as required by the
engineer at all ends, edges, openings, services location etc.
The unit rate shall include cost of making the necessary
conections with the slab of the existing stair case for
proper and sound support of the new roof slab; all in
accordance with the engineer's instructions.
a). 31 cm. thick ribbed slabs. M2 145.0
TOTAL CARRIED TO SUMMARY
2/22
Rammallah Documentary Center
-BOQ-
Item Description Unit Qty. Unit Rate Total
3 STONE WORKS.
PREAMBLE.
All Stone works shall be of local white stone of First Choice.
Stone material, size, and texturing shall be in accordance
with detailed drawings and Engineer’s instructions and
approval.
Stones shall be of not less than (5 cm. thick, 25 cm. high
and of length ranging from 1.5 to 3 times the height.)
Stones shall be homogeneous in color and texturing and
free of any defects.
Cutting, shaping and building of stone shall be in straight
angles, no twisting, distortion or uneven sizes shall be
allowed.
All cuttings shall be made using Manual.
Measurement of all types shall be in Meter Square, for the
net dimensions of the vertical plan of the elevations
excluding openings of any area.
No measurement will be made for any recesses,
projections or sides of stone pieces.
Measurement of door and window jambs and reveals,
corner pieces, and the like is not applicable.
No allowances shall be made for stone pieces in any
shape( except for the stone coping)
No allowances or extra rates shall be considered for stone
courses in lintels, overhanging slabs and roof slab courses.
The unit rate shall also include cost of stone pointing.
Taking all the above mentioned into account,
measurement for stone cladding works will follow the
shape of the laded element.
3.1 Supply and build stone walls of 30 cm. thick , to the full
length and height shown in the drawings. Similar to the
existing, the unit rate shall include the following costs:
a) Stone walls with plain concrete cement block backing.
Concrete backing of plain concrete grade B-200 and
cement block Grade 35 (10*20*40 cm) with 2 cm
polystyrene.
M2 85.0
b) Stone walls with plain concrete backing B-200 (30 cm
thick) for the parapet.
M2 25.0
3.2 Ditto but Stone cladding over reinforced concrete
elements. Price to include Concrete filling of plain
concrete Grade B-200, steel mesh and all ancillaries..
M2 20.0
3/22
Rammallah Documentary Center
-BOQ-
Item Description Unit Qty. Unit Rate Total
3.3 Re-Install the dismantled stone coping, from the existing
roof parapet, on the new roof parapet; all as directed by
the engineer.
MR 17.0
3.4 Ditto, but supply and install stone coping similar to the
existing coping).
MR 15.0
TOTAL CARRIED TO SUMMARY
4/22
Rammallah Documentary Center
-BOQ-
Item Description Unit Qty. Unit Rate Total
4 Block Works
The contractor shall, when pricing the rates of this bill,
take into consideration including and allow for the costs or
expenses of all requirements stipulated in the preambles,
drawings and technical specification of the contract.
Pre cast Concrete hollow bearing blocks built in cement
sand mortar (1:3) mix as specified.
Supply and install hollow concrete blocks built with
cement sand mortar (1:3) mix as specified. The unit price
shall include cost of 20cm minimum high concrete lintel
beams (ring beam) above concrete block walls, at
doors/windows level, and at all block walls parameter.
Unit rate shall include cost of steel reinforcement of
4Ф12mm steel bars with Ф 6mm stirrups@20cm c/c.
The price includes painting the first coarse of the block up
to the tile level with Latix Bituminous Emulsion Material
from an approved company.
4.1 7 cm thick for the internal partitions. M2 100.0
4.2 Ditto, but 15 cm thick( where needed as directed by the
engineer)
M2 20.0
Total Carried to main Summary
5/22
Rammallah Documentary Center
-BOQ-
Item Description Unit Qty. Unit Rate Total
5 PLASTERING.
PREAMBLE.
PLASTERING to all areas shall be measured net, including
openings which are less than 0.25 Meter Sq.
The price shall include for running rules , all narrow
widths, for taking out joints on block walls or backing
concrete face for key, for making good to frames around
pipes and other fittings , plastering to jambs and reveals
of openings, side of columns, window sills; all of which
shall be measured as plastering .
Price shall also include Expanded metal lath, angle beads
at all corners and plaster stops at opening edges,
expansion joints, sills, labor, curing, erecting and
dismantling of scaffoldings, additives, pigments and all
incidentals required as specified and / or detailed on the
Drawings .
Two coats of cement and sand plaster over one slurry
coat to walls and ceilings and where required including
metal Lath ,angle beads , plaster stops and all required as
per Specs and drawings .
a. Three coats internal plaster. M2 500.0
b. External plaster for parapet. M2 25.0
TOTAL CARRIED TO SUMMARY
c. Ditto but with four coats and the fourth coat
"shabriss" for external walls , material to include quartz ..
and pigments of approved color and water proofing
additive (sika or equivalent)
M2 30.0
5.1
6/22
Rammallah Documentary Center
-BOQ-
Item Description Unit Qty. Unit Rate Total
6 TILING, FLOORING AND MARBLE WORKS
PREAMBLE.
1.All tilling works ( terrazzo, ceramics and marble ) shall be
measured net in square meters. deducting all opening and
voids more than 0.25 m.s.
2.Skirting shall be measured in leaner meter.
3. Marble works for steps and treads of stairs shall be
measured in linear meter. The tread and the riser shall be
measured as a single unit.
4.Marble works for window sills and other openings shall
be measured in squared meter .
5. Marble works for urinals shall be measured in number.
6. Marble works for stair flight’s skirting shall be measured
in linear meter.
7. Rate shall include preparation of surfaces under tiles,
Finnish to falls and cross falls, special tile peace’s for edges
and the like, tile surface finishing, Plastic spacers. Pointing
and cleaning and all incidental as per specifications.
8. Rates shall include also providing and mounting in place
“School Title Marble Plate” of white clear local marble
policed, finished and engraved.
6.1 Supply, Install and finish Pre-cast Terrazzo Tiles, with
Italian marble chipping # 6.
Price to include, bedding and jointing in cement and sand
mortar, pointing with white cement, required sand fill, and
on site grinding, polishing and cleaning.
a. Size ( 30 x 30 x 2.7 ) cm. M2 125.0
6.2 Ditto but for Terrazzo skirting.
a. Size ( 30 x 7.5 x 1.5 ) cm. MR 125.0
6.3 Supply and Install Porcelain Glazed Wall Tiles, as per
UNDEFA, ROCA make-Spain or equal approved.
Price to include round edges tiles perimeters , cutting ,
patching around the services bedding in cement mortar,
grouting, pointing with white cement and two coats of
plaster . All works shall be in accordance with drawings
and specifications.
Engineer shall approve size and color of tiles which should
be not less than 20 * 20 * 0.4cm
M2 20.0
6.4 Supply and Install Non-Slip Ceramic Floor Tiles.
as per UNDEFA, ROCA make-Spain or equal approved.
Price to include concrete bedding, sand with cement filing
( Grade B-100), pointing with white cement and cleaning
on site .
Size and color shall be approved by Engineer which should
be not less than 20 *20 *0.6 cm .
M2 20.0
7/22
Rammallah Documentary Center
-BOQ-
Item Description Unit Qty. Unit Rate Total
6.5 Supply and Install Local Marble Sills, Thresholds and
Parapet Copping ( 3 cm. thick ).
Set in cement mortar bedding price to include grouting,
polishing of face and seen edges .
a. Window sills Size( 15 - 37.5 x 3 ) cm. to S. Opening. M2 6.0
TOTAL CARRIED TO SUMMARY
8/22
Rammallah Documentary Center
-BOQ-
Item Description Unit Qty. Unit Rate Total
7 CARPENTRY AND JOINERY WORKS
PREAMBLE.
Sizes of carpentry works given in the Bills of Quantities are
finished sizes and shall be as per Drawings.
Sizes of doors and other items mentioned in the Bills of
Quantities shall allow for tolerance to suit the structural
openings shown in the Drawings.
· Wooden doors and pair of doors shall be measured in
number for each structural opening, unless stated
otherwise in the Bills of Quantities.
· Wall protection wooden rubbing rails shall be measured
in linear meter.
Rates for carpentry and joinery work shall include :
a) Shop and coordinated drawings.
b) Frames, architrave, chalk holders and other holders and
20 cm. high “U” shape kick plates.
c) Allowance for plastering and tiling and the like.
d) Cutting and fitting around obstructions, Bedding and
painting.
e) Grounds, blocking and backings.
f) Plugging concrete, block work, and stone work , and
making good.
g) Ironmongery including cylindrical locks, handles,
stoppers, screws, temporary fixing, re-fixing, oiling and
adjusting.
h)The unit rate shall include cost of painting with oil paint,
and all the necessary preparatory works including priming,
putty, for the door panels and frames.
7.1 Supply and Fix Flush Panel Solid Core Doors 4.5 cm Thick
single or double sashes . with ( Frame ). (4.5*10) cm. Edge
strip banding of Hardwood ( Swedish ) , with 5 mm. thick
plywood veneer on both sides, door paneling to be of soft
wood 3.5*3.5 cm. each 2.5 cm. , frames of hardwood (
Swedish) width according to the wall thickness’ and
Allowance of 4 - 6 cm. thickness for plastering and tiling
purposes, emerged in wood preservative before erection
then embedded completely in sand - cement mortar and
completely anchored as per specification .
Architrave of Hardwood ( Swedish ) ( 7*2 )cm price to
include ironmongery, kick plates of stainless steel 20 cm
height U shape both sides, and at the bottom door
stoppers, glass 4 mm thick for vision panel, gaskets
cylindrical Lock (Wally or equal) and painting in three
coats of oil paint in addition to primer coat.
All as per Detailed Drawings.
a. Structural opening size( 100 * 210 ) cm. Type D2. NO 3.0
b. Structural opening size ( 80 * 210 ) cm. Type D 6. NO 3.0