    1

    UTTAR PRADESH JAL NIGAM

    TENDER

    FOR

    CONSTRUCTION OF R.C.C. OVER HEAD TANK

    CAPACITY 750 KL & 18 M. STAGING UNDER

    NIGOHI

    VILLAGE W/S SCHEME (NRWSP)

    DISTT- SHAHJAHANPUR

    Last Date for sale of tender 16-08-2010Date of Receiving of Tender 17-08-2010

    Date of opening of Tender 18-08-2010

    Cost of Tender Document Rs. 5675.00

    Earnest Money Rs. 50000.00

    Time of Completion 9 Months

    EXECUTIVE ENGINEER

    CONSTRUCTION DIVISION

    U.P. JAL NIGAM, SHAHJAHANPUR

    dk;kZy; vf/kkklh vfHk;urk] fuekZ.k [k.M] m0iz0 ty fuxe]kkgtgkaiqj A

  • 8/9/2019 Ist book

    2/128

    2

    i=kad % 1017@ ,e&17 @ 126 fnukad09-07-2010

    fufonk &lwpuk

    v/;{k] m0iz0 ty fuxe] dh vksj ls kkgtgkaiqj iquxZBu is;ty ;kstuk;w0vkbZ0Mh0,l0,l0,e0Vh0 Hkkx &1 ds vUrZxr ,oa fuxksgh xzke is;ty;kstuk ds vUrZxr

    fuEu dk;ksZa gsrq foHkkx esa fufnZV Js.kh esa iathd`r Bsdsnkjksa lsfnukad 17-08-2010 dh vijkUg

    3-00 cts rd eksgjcan fufonk;sa vkeaf=r dh tkrh gSa] tks fnukad 18-08-2010 dh nksigj

    12-00 cts v/kh{k.k vfHk;Urk ] prqFkZ e.My m0iz0 ty fuxe] cjsyh ds

    dk;kZy; esa

    mifLFkr fufonknkrkvksa vFkok muds }kjk euksfur izfrfuf/k;ksa dhmifLFkfr esa [kksyh

    tk;saxhA fufonk;sa fdlh Hkh dk;Z fnol esa dk;kZy; v/kh{k.k vfHk;Urk ]prqFkZ e.My ] m0iz0

    ty fuxe cjsyh] fuekZ.k [k.M] m0iz0 ty fuxe ] kkgtgkaiqj @ fuekZ.k ][k.M] m0iz0 ty

    fuxe] ihyhHkhr ,oa cnk;wa ls fnukad 16-08-2010 dh vijkUg 5-00 cts rddz; dh tk

    ldrh gSaA

    dz0la0

    dk;Z dk forj.k dk;Z dhykxryk[k :0esa

    /kjksgj/kujkfk:0esa

    fufonk dkewY; oSVlfgr

    dk;Ziw.kZdjus dhvof/k

    1kkgtgkaiqj iquxZBuis;ty ;kstuk;w0vkbZ0Mh0,l0,l0,e0Vh Hkkx& 1 ds ikbi,oa lkbt dh forj.kiz.kkyh] jkbftax esau dkfoNk;k tkuk] tksM+uk]iEi gkml] ckm.Moky ,oaLVkQ DokVZj dk fuek.kZ,oa rRlaca/kh dk;ZA

    60-00 60000-00 :0 5675@& 6 ekg

    2 kkgtgkaiqj iquxZBuis;ty ;kstuk;w0vkbZ0Mh0,l0,l0,e0

  • 8/9/2019 Ist book

    3/128

    3

    Vh Hkkx& 1 ds vUrZxrtksu la[;k&9 esa LVkQDokVZj dk fuekZ.k ,oarRlaca/kh dk;ZA

    20-00 20000-00 :0 2270@& 6 ekg

    3

    fuxksgh xzke is;ty

    ;sktuk ds vUrZxr 750fd0yh0 {kerk ,oa 18ehVj LVsftax ds fkjksifjtykk; dk fuekZ.k ,oarRlaca/kh dk;ZA

    50-00 50000-00 :0 5675@& 6 ekg

    krsZ&

    1& lHkh fufonk,a vxys dk;Z fnol esa dk;kZy; v/kh{k.k vfHk;Urk ]prqFkZ e.My] m0iz0 ty

    fuxe] cjsyh esa [kksyh tk;saxhA

    2& Mkd }kjk fufonk eaxk;s tkus ij 250-00 vfrfjDr Mkd O;; Hkqxrkudjuk gksxk]Mkd }kjk fufonk eaxk;s tkus ij ;fn fufonk Bsdsnkj dks izkIr gksus

    esa foyEc gksrk gS rks;g foHkkx mRrjnk;h ugh gksxkA

    3& /kjksgj /kujkfk tuin kkgtgkaiqj ds Mkd?kj ds ,u0,l0lh0@jkVh;d`r

    cSad dh

    ,e0Mh0vkj0@Vh0Mh0 ikl cqd ds :Ik esa] tks vf/kkklh vfHk;Urk]

    fuekZ.k [k.M] m0iz0 ty

    fuxe] kkgtgkaiqj ds in uke esa cU/kd gksuh pkfg, ,oa fufonk ds

    lkFk i`Fkd fyQkQs esa

    layXu djuk vfuok;Z gSaA /kjksgj /kujkfk layXu u gksus dh nkk

    esa fufonk ij fopkj

    ugh fd;k tk;sxkA

    4& fcuk dksbZ dkj.k crk;s ,d vFkok leLr fufonk;sa fujLr djus dk vf/kdkj

    v/kksgLrk{kjh

    dks lqjf{kr gSaA

    5& lkrZ fufonk;sa ekU; ugh gksxhA

    6& fufonk izi= ds lkFk 100-00 :0 dk LVkEi isij layxu djuk gksxk] ftls

    fufonk fujLr

    gksus dh fLFkfr esa okil ugh fd;k tk;sxkA

  • 8/9/2019 Ist book

    4/128

    4

    7& fufonk;s [kqyus dh frfFk dks vodkk gksus ij vxys dk;Z fnol esa

    fufonk;sa [kksyh

    Tkk;saxhA

    8& fdlh Hkh fookn ds fuLrkj.k gsrq U;k;ikfydk {ks= kkgtgkaiqjgksxkA

    9& dk;Z dh ek=k vko;drkuqlkj ?kVkbZ ;k c

  • 8/9/2019 Ist book

    5/128

    5

    fufonk gsrq egRoiw.kZ krsZ

    1- fufonk v/kksgLrk{kjdrkZ vFkok muds izfrfuf/k;ksa }kjk[kksyh tk;sxhA

    2- fufonk [kqyrs le; Bsdsnkj vFkok muds izfrfuf/k mifLFkr jg

    ldrs gSaA

    3- /kjksgj /kujkfk fu/kkZfjr :Ik esa gh ekU; gksxh fcuk /kjksgj

    /kujkfk dsfufonk ij fopkj ugh fd;k tk;sxkA

    4- Mkd ls fufonk Hkstus ij foyEc dk mRrjnkf;Ro foHkkx dk

    ugh gksxkA

    5- fcuk dkj.k crk;s ,d ;k leLr fufonk,a fujLr djus dk vf/kdkj

    lqjf{kr gSaA

    6- fufonk [kqyus dh frfFk dks vodkk gksus ij nwljs fnu

    fufonk [kksyh tk;sxhA

    7- lkRkZ fufonk fujLr dh tk ldrh gSaA

    8- dk;Z ,d ls vf/kd fufonk nkrkvksa dks ckaVk tk ldrk gSaA

    9- tks QeZ m0iz0 ty fuxe esa iathd`r gS mUgs /kjksgj /kujkfk

    esa NwV mlh voLFkk esa nh tk;sxh tc os bl NwV ds vkk;

    ls iathd`r ekU; lR;izfrfyfi layXu djsA

    10- /kjksgj /kujkfk vyx fyQkQs esa eksgjcan gksuk pkfg,rFkk fufonk ds lkFk vU; fyQkQksa esa j[kk tkuk pkfg,A

    fyQkQs ds ij fufonk la[;k ij uke vafdr gksuk pkfg,A cU/kd

    4 ekg dh vof/k ls de Lohdkj ugh gksxhA /kjksgj jkfk fdlh

    Hkh Mkd?kj dh fMikftV jlhn@,u0,l0lh0 ds :Ik esa

    v/kksgLrk{kjh ds inuke esa cU/kd gksuh pkfg,A

    11- dk;Z fdlh Hkh lhek rd c

  • 8/9/2019 Ist book

    6/128

    6

    12- fufonk ds lkFk :0 100@& ek= /kujkfk dk uke

    tqfMfk;y LVkEi isij ,d :Ik;s ds jlhnh fVdV ij gLrk{kfjr layXu

    djuk vfuok;Z gSa] ftlds vLohd`r gksus dh nkk esa okil

    ugh fd;k tk;sxkA13- fufonknkrk fufonk Mkyus ls iwoZ dk;Z dh

    ifjfLFkfr;ka ] dk;ZLFky ,oa Mkbax dk Hkyh Hkkafr

    fujh{k.k djus ds mijkUr gh fufonk Mkys og mldk

    mRrjnkf;Ro gksxkA

    14- ;fn fdlh Hkh dkj.k fdlh Hkh vkbVe esa fufonk dh

    kSM~;wy ^^th** esa nh x;h ek=k esa dksbZ c

  • 8/9/2019 Ist book

    7/128

    7

    NOTE:

    1. Conditional tender shall not be considered & it shall be

    straightway rejected.

    2. Tender without earnest money shall not be accepted, earnest

    money should be in proper shape. It is must from registered

    contractors also.

    3. 10% security shall be deposited before the agreement.

    EXECUTIVE ENGINEER

    CHECK LIST

    Tenders are advised to check the following points especially

  • 8/9/2019 Ist book

    8/128

    8

    before final dispatch or tender.

    (1) There shall be three envelops named ENVELOP No. 1

    ENVELOP No. 2 and ENVELOP No. 3

    (2) ENVELOP No. 2 shall contain the following documents-

    (i) Earnest money documents in its desired shape.

    (ii) Credential Certificates duly filled.

    (iii) Partnership deed/ firms registration certificate in case of

    registered firm.

    (iv) Power of attorney (if required)

    (v) Agreement on stamp paper of Rs. 100.00.

    (3) ENVELOP No. 3 shall contain tender form duly

    completed in all respects.

    (4) Above envelope, No.2 & 3 shall be kept in large

    envelope No. 1.

    (5) All the ENVELOP No. 1 , 2 & 3 shall bear on the top-

    CONSTRUCTION OF STAFF QUARTER & OTHER

    APPURTUNENT WORKS AT ZONE - 9 UNDER

    SHAHJAHANPUR REORGANISATION WATER SUPPLY

    SCHEME DISTT-SHAHJAHANPUR.

    (6) ENVELOP No. 1 containing ENVELOP No. 2 & 3 shall

    be posted or submitted at the following address.

    (7) If the documents in ENVELOP No. 2 are found

    satisfactory then only the ENVELOP No. 3 Containing

    tender form shall be opened and rate dictated.

    (8) Provision, requirements of tender should be read and

    understood.

    EXECUTIVE ENGINEER

    CONSCTRUCTION DIVISION

    U.P. JAL NIGAM, SHAHJAHANPUR

    1. Name of work CONSTRUCTION OF STAFF

    QUARTER & OTHER

    APPURTUNENT WORKS AT ZONE

    - 9 UNDER SHAHJAHANPUR

  • 8/9/2019 Ist book

    9/128

    9

    REORGANISATION WATER

    SUPPLY SCHEME DISTT-

    SHAHJAHANPUR.

    2. Name of Contractor to whom :

    Tender is issued :

    Mrs. /Mr. :

    S/O :

    3. Postal Address of contractor :

    In which letters are to be :

    Posted :

    4. Cost of tender form received : Rs. 2270.00

    5. Signature of Accountant for :

    Receiving the amount for :

    Cost of tender form and :

    Issuing the tender forms. :

    6. Earnest Money : Rs. 0.20 lacs

    7. Time of execution : 6 (Six) months.

    8. Date of Start :

    9. Date of completion :

    10. .. :

    OFFICE OF THE EXECUTIVE ENGINEER CONSTRUCTION DIVISION

    U.P. JAL NIGAM, SHAHJAHANPUR

    Contractor should state whether they are approved contractors

  • 8/9/2019 Ist book

    10/128

    10

    in the public works department, U.P. Jal Nigam etc and so give class and

    attach copy of the certificate.

    Particulars of various contracts upon which the contractor has

    been for construction of Pipe line work engaged should be entered in the

    form below.

    S. No. Name of

    Department

    Name and

    general

    description

    of contract

    Value Rs. In

    Lacks.

    Period

    and date

    Name of

    Division

    Note: The above particulars should be filed in by each tenderer and

    returned with the tender.

    SIGNATURE OF THE CONTRACTOR

    2. DEFINITIONS AND ABBREVIATION

    2.1 DEFINITIONS

    In this contract, as here, in after defined, the following works and

    expressions shall have the meaning hereby assigned to (except where

    the contract requires otherwise).

  • 8/9/2019 Ist book

    11/128

    11

    2.1.1 Owner means U,P. Jal Nigam, Executive Engineer/Superintending

    Engineer.

    2.1.2 Contractor means the person(s), firm or company whose tender has

    been accepted by the Engineer and who has concluded a contract

    with the Engineer to execute the works included in the tender and

    contract agreement. This includes the Contractor's personal

    representatives, successors and assignees.

    2.1.3 'Sub Contractor' means any person, firm or company other than the

    contractor named in the contract for any part of work included in the

    contract has been subject with the consent in writing of the Engineer,

    and the sub contractor's legal personal representatives, successors

    and permitted assignees.

    2.1.4 'Engineer/Engineer-in-charge' means the Executive Engineer /

    Superintending Engineer who has called for tender and incharge of

    execution of the works and administration of the subordinates who

    assist him in execution of works and administration of Contract. His

    subordinates shall be termed as Executive Engineer, Assistant

    Engineer, Junior Engineer, as the case may be. These subordinates

    shall be Engineer's representatives at the site of work. The Engineer's

    representatives will carry out such duties of the Engineer, like issuing

    of instructions, certificates and orders as are required in the execution

    of the works. Engineer's representative will watch and supervise the

    Works, test and examine the material, equipment, plant and machinery

    and workmanship employed in connection with the works under

    the contract. The Engineer's representatives with the approval of the

    Engineer will have the authority the relieve the contractor of any of its

    obligations under the contract and to order any extra work involving

    delay in the completion of the works and also requiring any extra

    payment to the contract.

    2.1.5 "Department" means the Uttar Pradesh Jal Nigam. The work

  • 8/9/2019 Ist book

    12/128

    12

    department and Ex.En./S.E. and his representatives have been used

    interchangeably at places and means the same i.e. the Engineer or

    his representatives.

    2.1.6 'Work' means all the items of work to be conducted by the contractor,

    provisions of plant land installation of it under the contract, testing,

    commissioning and handing over the same in a complete manner to

    Nagar Palika Parishad for maintenance.

    2.1.7 Contract means promise to execute the works in accordance with the

    conditions of contract, specifications, drawing, schedule, tender,

    the letter of acceptance and the contract agreement.

    2.1.8 Drawing means the drawing referred to in the list of drawing attached

    to the tender and any modification of such drawings approved /issued

    in writing by the Engineer and such other drawings as may from time

    to time be furnished or approved in writing by the Engineer.

    2.1.9 The contract sum means the sum identified in the contract for the

    completion of works as per contract.

    2.1.10Contract price means of the contract sum adjusted to give effect to

    such additions or deductions as are provided for the contract which is

    properly apparitional to the work or plant in question having regard to

    the state condition and location of the plant, the amount of work done

    and all other relevant circumstance in the cost of executing the work.

    21.11 'Contractor's equipment' means all appliances or things of whatsoever

    nature, required for the purpose of completing the works but does not

    include, plant materials or other things intended to form or forming part

    of the work.

    2.1.12'Plant' means machinery apparatus, material, and article of all kinds to

    be provided under the contract other than the contractor's equipment.

    2.1.13'Portion of the work' means a part of the work or section of the work.

    2.1.14'Sections of the work' means the sections into which the works are

    divided for the purposes described and set out in the specifications.

    2.1.15'Specification' means all the specifications and details given in the

    chapter 'Specification Journal of the tender form'.

  • 8/9/2019 Ist book

    13/128

    13

    2.1.16 'Month' means 30 days.

    2.1.17'Day' means calendar day and week means 7 days Monday to

    Sunday.

    2.1.18 Time of completion' means the time as stipulated for completion of

    the work or any section or portion thereof as stated in the contract or

    as extended under clause and shall be calculated from, the date

    specified in the contract. It will be the date when the contract enters

    into force or fulfillment of any obligation as per necessary legal,

    financial or administrative requirements.

    2.1.19'Defect liability period' or maintenance period means the period after

    actual completion of the work during which the contractor will carry the

    full liability to make good to the complete satisfaction o the Engineer,

    any defect in the completed work or any bad work visible or detected

    after wards.

    2.1.20'Cost' means the amount which shall be deemed to include all

    overhead cost whether incurred on or off the site, all taxes, excise

    duties, royalties, etc as applicable on the materials, labour or any other

    item which is required to complete the works.

    2.1.21'Competent 'Authority' means the Engineer next higher to the

    Engineer signing the contract bond that is if Executive Engineer is

    signing the bond then the Superintending Engineer will be competent

    authority and soon.

    2.1.22Approval committee hereto referred as committee means, a

    committee of following officer's of U.P. Jal Nigam nominated by

    Chairman UP. Jal Nigam vide his circular No. 151/PC/Comp-MM

    (Tender Scrutiny Samiti) dated 06-08-2001

    Members of committee.

    (1) Zonal Chief Engineer

    (2) Respective S.E (Civil)

    (3) Respective S.E (E&M)

    (4) Respective Zonal Account Officer

  • 8/9/2019 Ist book

    14/128

    14

    (5) Respective Executive Engineer (Civil)

    2.2 ABBREVIATIONS :

    The abbreviations used in the tender documents or any other

    correspondence will stand the full forms given as under:

    U.P. Jal Nigam Uttar Pradesh Jal Nigam

    M.D. Managing Director

    C.E.(I) Chief Engineer (Lucknow Zone) U.P.

    Jal Nigam, Lucknow.

    S.E. Superintending Engineer, IVth Circle,

    U.P. Jal Nigam, Bareilly.

    Superintending Engineer, 23rd Circle,

    U.P. Jal Nigam, Lucknow.

    Ex. En. Executive Engineer Construction

    Division , U.P. Jal Nigam,

    Shahjahanpur

    Executive Engineer, E&M Division ,

    U.P. Jal Nigam, Bareilly.

    A.E. Assistant Engineer Construction

    Division, U.P. Jal Nigam,

    Shahjahanpur

    Assistant Engineer (E & M) Division,

    U.P. Jal Nigam, Bareilly.

    J.E. Junior Engineer Construction Division ,

    U.P. Jal Nigam, Shahjahanpur

    Junior Engineer (E&M) Division, U.P.

    Jal Nigam, Bareilly.

  • 8/9/2019 Ist book

    15/128

    15

    3. CHECK LIST:

    The contractors are advised to check the following points before final

    dispatch of tender.

    3.1 The tender will be submitted under two separate covers as follows:-

    3.1.1 First envelope will contain (1) Earnest money in desired shape,

    (2) Experience certificate of having completed similar work

    successfully, (3) Notarized copy of Certificate, (5) Notarized

    copy of Sales Tax registration Certificate, (6) Technical offer

    including necessary drawings and designs, (7) Details of their

    technical specifications to be given by the contractor 'C' of the

    contract otherwise technical bid shall be rejected.

    3.1.2 Financial offer in desired shape in other envelope.

  • 8/9/2019 Ist book

    16/128

    16

    3.1.3 The contract includes different nature of Civil, Electrical &

    Mechanical works, hence the contractor should clearly mention

    in his technical offer that how he shall perform the particular

    work or part of work for which he is not registered in Jal Nigam .

    He would clearly mention what agencies he shall employ for

    completing such works. This implies that if the contractor is

    desirous of subletting such part of work, he should clearly

    mention the named & credentials of such agencies, their

    experience & certificates, etc. However, the Tender Approval

    committee will scrutiny this aspect & reserves the right to reject

    the offer on this ground. Such subletting shall be subject to

    approval by Chief Engineer.

    3.2 Scrutiny of the technical offers of all the tenderers will be done by the

    approval committee. The financial offers, of all the successful

    tenderers whose technical offers are found proper & suitable by the

    committee, shall be opened by the Engineer in presence of such

    tenderers after giving a suitable date. Thereafter financial offer shall

    be finalized by committee after scrutiny.

    3.3 Credential certificate should be filled in without hiding any fruitful facts

    on prescribed forms.

    3.4 Partnership Deed/Firm registration certificate in case of registered firm

    should be attached.

    3.4.1 Contractor should be 'A' - Class Registered Contractor, registered in

    U.P. Jal Nigam.

    3.5 In case of signatory is a representative of the firm a registered power

    of attorney should be attached.

  • 8/9/2019 Ist book

    17/128

    17

    3.6 'AGREEMENT on Rs. 1007- Court Stamp Paper with prescribed

    language.

    And

    'VALIDITY1 on Rs. 100/- Court Stamp paper with prescribed language

    of tender form should be attached herewith, failing which tender shall

    not be considered.

    3.7 Provisions, requirement of tender should be carefully read and

    Understood, it will be presumed that the contractor has filled up all the

    entries with full confidence and knowledge.

    3.8 Both envelopes containing tender documents in duplicate duly

    completed shall be posted to reach or put into the tender box on

    due date and time to following address :

    1. Executive Engineer 2. Executive Engineer 3. Executive Engineer

    Const. Division, Const. Division, Const. Division,

    U.P. Jal Nigam, U.P. Jal Nigam, UP. Jal Nigam,

    Shahjahanpur(U.P.) Badaun (U.P.) Pilibhit (U.P.)

    (4) Superintending Engineer,

    IVth Circle, U.P. Jal Nigam,

    Bareilly

  • 8/9/2019 Ist book

    18/128

    18

    NOTICE

    4.1 Sealed Tenders will be received upto 3.00 p.m. on ...................... by

    the Executive Engineer , Construction Division , UP. Jal Nigam,

    Shahjahanpur, Badaun, Pilibhit and S.E. IVth Circle, U.P. Jal Nigam,

    Bareilly for following works CONSTRUCTION OF STAFF QUARTER &

    OTHER APPURTUNENT WORKS AT ZONE - 9 UNDER

    SHAHJAHANPUR REORGANISATION WATER SUPPLY SCHEME,

    DISTT - SHAHJAHANPUR

    4.2 The work shall be completely finished to the satisfaction of the

    Engineer within Six calendar months from the date of the receipt of

    the order to commence the work.

    4.3 The amount of security to be deposited by the Tenderer for the due

    performance of all the conditions of the contract shall be a sum of 10%

    of approved cost of tender including earnest money or Bank

    Guarantee as the case may be which is to be deposited with the Ex.

  • 8/9/2019 Ist book

    19/128

    19

    Engr. Construction Division, UP. Jal Nigam, Shahjahanpur.

    4.4 Blank form of Tenders which is in English and all other particulars

    regarding the proposed contract and nature of security deposit

    required in case of accepted. Tender may be obtained from the offices

    shown in the tender notice issued vide letter No. ..............................

    Dated ............................... every day (except Sunday and other

    holidays) during office hours, the charge in cash for each set of

    complete forms supplied is Rs. 2270 + Rs. 250/- for Postage (if

    desired by post).

    4.5 Each tender must be accompanied by deposit receipt of Rs. 0.20 lacs

    only as earnest money, which should be deposited in a shape of Post

    Office Saving Bank. National Saving Certificates or FDR/CDR duly

    pledged in favour of Executive Engineer, Construction, Division, UP.

    Jal Nigam Shahjahanpur. No cash money shall be accepted and

    tender is likely to be rejected on this account.

    4.6 The tenders from A-class contractor who are registered in U.P. Jal

    Nigam will be received on upto 3.00 p.m. by the Executive

    Engineer or his authorized agent at his office at Construction division,

    U.P. Jal Nigam, Shahjahanpur, Badaun, Pilibhit & IVth Circle Bareilly.

    4.7 Authority reserves right to reject any or all of the Tenders received,

    and no explanation may be demanded of the cause of the rejection of

    his tender by any person making a tender.

    4.8 The deposit of the successful candidate, which accompanies the

    tender, will be forfeited in case he declines to sign the agreement of

    contract and deposit of security within 7 days of being called upon to

    do so after acceptance of his tender.

    4.9 In consideration of U.P. Jal Nigam having treated the tenderer to be

    an eligible person whose tender may be considered, the tenderer shall

    agree to the condition that proposal in response to his invitation shall

    not be withdrawn by the tenderer within three months from the date of

  • 8/9/2019 Ist book

    20/128

    20

    opening of the tender and also the condition that if thereafter the

    tenderer does withdraw his proposal within the said period the earnest

    money deposited by him may be forfeited to the U.P. Jal Nigam in the

    discretion of the later.

    N.B. If a tenderer who is exempted from furnishing earnest money

    withdraws his proposal within the said period he may be in discretion

    of the U.P, Jal Nigam debarred from tendering for a period of one year

    reckoned from the date of opening of the tender.

    For the compliance of the clause an agreement, on Stamp

    Paper worth Rs. 1007- or as applicable is to be submitted by the

    tenderer positively with the tender failing which the tender may likely

    to be rejected. Performa of the aforesaid agreement is given with the

    tender.

    4.10 Tenderes from skilled and experienced contractors or firm who can

    submit proof of having successfully carried out similar work will be

    considered. However, competent authority reserves the right to accept

    or reject the tender on any such ground as to which deems to be fit in

    his opinion entirely to his sole discretion.

    4.11 Tenderers are advised to visit the site of work prior to filling up of

    tender and rates so as to access and have correct knowledge of local

    site Conditions, job works, labour, and quantum of work involved.

    Executive Engineer

    Construction Division

    U.P. Jal Nigam,

    Shahjahanpur.

  • 8/9/2019 Ist book

    21/128

    21

    4. FORMS, DECLARATIONS AND CERTIFICATES

    5.1 Form of Tender

    (To be filled in, signed, witnessed and submitted)From:

    ----------------------------

    ----------------------------

    To,

    The Executive Engineer,

    Construction Division,

    UP. Jal Nigam,

    Shahjahanpur.

    Dear Sir,

    I/We................................. have read the various conditions

    governing the contract for" CONSTRUCTION OF STAFF QUARTER & OTHER

    APPURTUNENT WORKS AT ZONE - 9 UNDER SHAHJAHANPUR

    REORGANISATION WATER SUPPLY SCHEME, DISTT- SHAHJAHANPUR "

  • 8/9/2019 Ist book

    22/128

    22

    The drawing, specification contract conditions and all documents

    forming part of the contract, posses the knowledge of the site conditions,

    availability of materials, labour and local practice. I/We also agree to keep

    my/our this offer valid upto three months from the date of opening of the

    tender.

    5.1.2 I/We agree to complete the works within the period of Six months

    from the date of issue of the work order.

    5.1.3 A sum of Rs. ........................................ (Rs. ................ lacs) towards

    the earnest money is deposited in the form of ................drawn on

    bank .....................dated................... pledged in the name of Ex. En.

    Construction Davison, U.P. Jal Nigam, Shahjahanpur is enclosed.

    5.1.4 The full amount of earnest money shall stand forfeited without any

    prejudice to other rights or reminders if.

    5.1.4.1 I/We do not execute the contract documents within seven days

    from the date of issue of letter or intent from you indicating your

    decision to award the contract to me/us.

    5.1.4.2 I do not commence the work within 10 days of receipt of the

    order to that effect.

    Enclosures: One tender along with enclosures

    Yours Faithfully,

    Place

    Date Signature

    Name

    Witness Address

    1. 2.

  • 8/9/2019 Ist book

    23/128

    23

    5.2 DECLARATION BY THE TENDERER

    (To be entered on Rs. 100/- general stamp)

    TENDER FOR WORKS OF: " CONSTRUCTION OF STAFF QUARTER &

    OTHER APPURTUNENT WORKS AT ZONE

    - 9 UNDER SHAHJAHANPUR

    REORGANISATION WATER SUPPLY

    SCHEME, DISTT- SHAHJAHANPUR

    DECLARATION

    5.2.1 I /We hereby tender for the works specified in the tender all written

    memorandum within the time specified in such memorandum at the

    rates given in the schedule of rates attached herewith and in

    accordance with all said instructions, conditions, schedules,

    specifications and drawing contained in this tender which have been

    inspected at site and understood by me/us and also undertake to

    make written compliance of such other written instruction as may be

    given from time to time for carrying out the said work.

    5.2.2 I/We undertake to abide by the Government/Departmental orders

  • 8/9/2019 Ist book

    24/128

    24

    regarding deduction made in the bills like Income Tax, Trade Tax,

    Security Deposits, agreement stamp and stamp duty.

    5.2.3 I/We undertake to complete the works and hand over the works within

    the stipulated/allotted time for the completion of the works in good

    workman like manner.

    5.2.4 I/We keep the validity of our offer for three months from the date of

    opening of the tender.

    5.2.5 I/We stand guarantee for the repair of the works to full satisfaction of

    the department during the maintenance period of twelve calendar

    months.

    5.2.6 I/We have no doubts or any uncleared ambiguities regarding the

    specifications, details in the drawings, scope of work, and have fully

    understood our responsibilities in executing and completing the works

    to the full satisfaction of the department.

    5.2.7 That I/We do hereby solemnly state that I/We do not intend to migrate

    to any foreign country during the period of the contract and that I/We

    will produce a clearance certificate from the Income/Sales Tax Officer

    at the time of final payment or taking refund at the security deposit if

    demanded.

    5.2.8 I/We have based our tender rates having the full knowledge of the

    statement and facts.

    5.2.9 I/We hereby declare that the complete tender document is in the same

    shape and form and nowhere in the tender have I/We entered any

  • 8/9/2019 Ist book

    25/128

    25

    conditions. If it is found incorrect, my/our earnest money shall be

    forfeited.

    Place ....................

    Signature ................................

    Date ................... Name .....................................

    Address ................................

    1. Witness Sig ...................... 2. Witness Sig ...

    Name .............................. Name.....................................

    Address ......................... Address .....

    5.3 QUALIFICATIONS & CERTIFICATES:

    Tenderers are required to give the following information's about the

    qualifications, without which tender will not be considered.

    5.3.1 REGISTRATION:

    Tenderers from contractor registered Suitable class in U.P. Jal Nigam

    are invited. The details which are to be furnished in the following table:

    S. No. Description of

    Department

    Registration Number &

    Dates and its Validity

    date

    Class & Limit

    of Tender

    Value.

    1

    2

    3

    4

    5

    6

    5.3.2 ORGANISATIONAL STRUCTURE:

    (a) Give a brief over all organizational structure of the firm/

    Company/ individual contractor in the following table:

  • 8/9/2019 Ist book

    26/128

    26

    S. No. Designation of

    employee along

    with the

    Qualifications

    No. Gross pay Their

    Experience

    1

    2

    3

    4

    5

    5.3.3 INCOME TAX CLEARANCE CERTIFICATE

    Tenderer shall enclose certificate copies of latest income tax

    clearance certificate.

    5.3.4 SOLVANCY CERTIFICATE

    Tenderer shall obtain and attach solvency certificate by District

    Magistrate on the prescribed proforma.

    Essential notes for filling different qualification tables

    and certificates.

    1. The above qualifications information and declaration are

    Mandatory obligation on the part of the contractor/ tenderer.

    2. Tenderer must attach proof of all such references and

    statements, failing which their tender are liable to be rejected.

    3. The above particulars are invariably to be filled in by tenderer.

    4. Due weightage will be given to the result of evaluation analysis

    of bids information in the award of the contract.

    5. Stamp duty as applicable shall be paid by the contractor /

    tenderer.

    6. The plant/ equipments, if desired, will be open for inspection of

  • 8/9/2019 Ist book

    27/128

    27

    Jal Nigam representative(s) before making consideration of the

    tender.

    7. All certificates to be submitted should be duly attested by a

    Notary.

    Place :.......................... Signature........................

    Date ............................ Name of Contractor

    Address :.........................

    OFFICE OF THE EXECUTIVE ENGINEER CONSTRUCTION

    DIVISION U.P. JAL NIGAM. SHAHJAHANPUR

    TO BE SUBMITTED ON STAMP PAPER OF RUPEES 100.00

    AGREEMENT

    TENDER INVITED BY : EXECUTIVE ENGINEER,

    CONST. DIVISION, U.P. JAL

    NIGAM, SHAHJAHANPUR.

    TENDER FOR : CONSTRUCTION OF STAFF

    QUARTER & OTHER APPURTUNENT

    WORKS AT ZONE - 9 UNDER

    SHAHJAHANPUR REORGANISATION

    WATER SUPPLY SCHEME, DISTT-SHAHJAHANPUR ."

    TENDER NOTICE No. : Letter No .......

    dated ..................................

    NAME & ADDRESS : .

    OF THE TENDERER : .

  • 8/9/2019 Ist book

    28/128

    28

    .

    The agreement made on .................. day of

    ..................................... between S.E. / Ex. En. of U.P. Jal Nigam

    (hereinafter called 'Jal Nigam') and

    (hereinafter called 'Contractor').

    Whereas, Jal Nigam has caused specifications, drawings, and

    other contract documents to be proposed works and schedule of

    rates, material, etc whereas contractor has offered to perform the

    proposed work in accordance with the terms of contract documents.

    Now therefore in consideration of the mutual convents and

    agreement of the parties herein contained and to be performed,

    contractor hereby agrees to complete the works at the price and in the

    terms and conditions herein contained and Jal Nigam agrees to pay

    him the contract prices provided herein for the fulfillment of the works

    and the performance of the convenient set forth herein.

    The contractor hereby agrees that- In consideration of the U.P.

    Jal Nigam having treated the tenderer/contractor to be an eligible

    person, whose tender may be considered, the tenderer here by

    agrees to the condition that the proposal in response to the above

    invitation shall not be withdrawn within three months from the date of

    opening of tender, also to the conditions that if thereafter the tenderer

    does with draw his proposal within the said period, the earnest money

    deposited by him may be forfeited to the U.P. Jal Nigam are debarred

    from tendering for a period of Nine Months reckoned from the date of

    start of the tender in the discretion of U.P. Jal Nigam.

  • 8/9/2019 Ist book

    29/128

    29

    The further terms and conditions and comments of the

    contracts and set forth in the following parts each of which is attached

    here to and by this reference made a part thereof.

    a. The said tender and appendix thereto.

    b. The conditions of contract and annexure thereto.

    c. The guarantee bond.

    d. The specifications and drawings.

    e. All schedules of the contract.

    f. All extra works, other that the schedule 'G' having relevance

    with the said work shall be done by the contractor on the terms

    and conditions given in tender.

    g. The addenda numbered from .......................... to

    .

    h. The communication numbered from .................. to

    .

    The contractor hereby agrees with the Jal Nigam to execute the works

    in conformity with the provisions of the contract, for which the

    payments shall be made as per conditions of the bond Iby the Jal

    Nigam to the contractor as herein after mentioned.

    Name of work:

    CONSTRUCTION OF STAFF QUARTER & OTHER APPURTUNENT

    WORKS AT ZONE - 9 UNDER SHAHJAHANPUR REORGANISATION

    WATER SUPPLY SCHEME -D1STT- SHAHJAHANPUR

    Contract Value: i. In Figures Rs.......................

    ii. In Words Rs.........................

    'Agreement' has been executed in triplicate on the day and year

    written above.

    For & on behalf of Jal Nigam Contractor

    By ......................................... ...............................

    Signature Signature

    Title Title

  • 8/9/2019 Ist book

    30/128

    30

    Witness Witness

    By ......................................... ...............................

    Name

    Occupation Occupation

    Address Address

    Approved by

    UTTAR PRADESH JAL N1GAM

    Lump-sum-cum-item Rate Contract

    GENERAL RUES AND DIRECTIONS FOR THE GUIDANCE OF

    TENDERERS

    1. All work proposed to be executed will be notified in a form of

    invitation to tender for the same either by posting the said invitation

    or a board hung up in the office of the Executive Engineer, or by

    public advertisement, such invitation to be signed by the Executive

    Engineer.

    The form will contain and set forth the following

    (a) The dates for submitting the tender: . . . . . . . . . . . . . . .

    (b) The time allowed for carrying out the work: ..............Months

    (c) The amount of earnest money to be deposited with the tender.

    It must be early understood that no interest will be payable on

    any earnest money deposited Rs. .......................... only.

    (d) The amount of the security to be deposited by the successful

    tender 10 % of approved cost of tender including earnest

    money in the form of deposit receipt of Scheduled Bank or NSC

  • 8/9/2019 Ist book

    31/128

    31

    or Bank guarantee.

    (e) The percentage, if any to be deducted from bills.

    Copies of the specifications, drawings schedule of rates and

    other documents effecting the work will be opened for

    inspection at the office of the Executive Engineer, Construction

    Division, U.P. Jal Nigam, Shahjahanpur during office hours.

    2. In the event of tender being submitted by a firm it must be signed

    separately by each member thereof, or in the even of absence of any

    partner it must be signed on his behalf by a person holding a power of

    attorney authorizing him to do so or in the case of a Company the

    tender should be executed in the manner and down in the said

    Company's Article of Association.

    3. Receipts for payments made on account of work executed by a firm or

    Company must be signed by some person or persons having authority

    to give actual receipt for such firm or company.

    4. Any person who submits a tender shall fill up the usual printed form

    stating at what stage he is willing to undertake each item or work

    Tenders which propose any alteration in the work specified in he said

    form of invitation to tender, or in the time allowed for carrying out the

    work or which contain any other condition of any sort whatsoever will

    be liable to rejection, tender shall have the name and number of the

    work of which they refer written outside the envelope.

    The printed form mentioned above is obtainable from the office

    of the Executive Engineer , Construction Division, U.P. Jal Nigam ,

    Shahjahanpur upon payment of Rs. + Rs. 250, 00 for postage

    (if required by post).

    5. After scrutiny of technical offer by the Committee, the Engineer or his

  • 8/9/2019 Ist book

    32/128

    32

    duly authorized assistant will fix suitable date and intimate those

    tenderers whose technical offer is found proper and open financial

    offers of tenders in the presence of any tenderer who may be present

    at the time and will enter the amount of the several tenderers in a

    comparative statement in suitable form. In the event of a tender being

    accepted by the committee a receipt for the earnest money forwarded

    therewith shall thereupon be given to the contractor who shall

    thereupon' for the purpose of identification, sign copies of the

    specification and other documents mentioned in rule 9. In the event of

    a tender being rejected the earnest money forwarded with such

    unaccepted tender shall thereupon be returned to the tenderer making

    the same.

    6. The committee shall have the right of rejecting all or any of the tenders

    without giving any reason for the same.

    7. The person or persons whose tender is accepted shall sign an

    agreement embodying the conditions of contract thereto attached

    within 7 days after receiving written notice from the Engineer that his

    tender has been accepted and shall pay for all stamps and legal

    expenses incident thereto and shall deposit in the form of

    deposits of any Scheduled bank or N.S.C. endorsed to the Executive Engineer,

    Construction Division, U.P. Jal Nigam Shahjahanpur a sum amount of

    Rs. 10% of the tenderered cost as security for the due performance of

    the contract. In the event of failure by the said tenderer to sign the

    agreement of contract or to deposit the said security within the period

    mentioned aforesaid, after being called upon to do , the Executive

    Engineer , Construction Division, U.P. Jal Nigam , Shahjahanpur the

    whole amount of the earnest money deposited as aforesaid shall be

    forfeited to the Jal Nigam the transaction affected by the tender shall

    cease and determine.

  • 8/9/2019 Ist book

    33/128

    33

    8. The receipt of an accountant or clerk for any money paid by the

    contractor will not be considered as any acknowledgement of payment

    to the Executive Engineer and the contractor shall be responsible for

    seeing that he procures a receipt signed by the Executive Engineer.

    9. The contract document shall include the following:-

    (i) Agreement and conditions of contract.

    (ii) Specification of work.

    (iii) Schedules of quantities and rates with totals.

    (iv) Drawings.

    10. Canvassing either before or after seals are broken will tender the offer

    the inedible for consideration.

    Date

    The , 200 Executive Engineer

    Construction Division,

    U.P, Jal Nigam,

    Shahjahanpur

  • 8/9/2019 Ist book

    34/128

    34

    UTTAR PRADESH JAL N1GAM

    LUM- SUM -CONTRACT

    TENDER FOR WORKS

    I/We hereby tender for the work specified in the underwritten

    memorandum within the time specified in such memorandum at the

    rates given in the Schedule of Rates hereto attached, and in

    accordance in all respect with the specifications and drawings have

    been prepared by the Executive Engineer of the Construction Division,

    U.P. Jal Nigam , Shahjahanpur and have been inspected and

    understood by me/us and such other written instructions and as may

    be given from time to time for the due carrying out of the said works

    and with such materials as are provided for by and in all other

    respects in accordance with the conditions hereto attached.

    MEMORANDUM

    (a) General Description : Annexed

    (b) Estimated Cost : .............lacs

    (c) Earnest Money : Rs.........................

    (d) Security money (including earnest money) Rs. 10% of

    Approved Tender.

    (e) Time allowed for the work from date of written order to

  • 8/9/2019 Ist book

    35/128

    35

    Commence : ............ calendar months.

    Should this tender be accepted I/We hereby agree to abide by

    and fulfill at the terms and provisions of the said conditions of contract

    annexed there to an within seven (7) days from the time when called

    upon to do so, execute a contract embodying the conditions hereto

    attached and also deposit the said security with the Executive

    Engineer, Construction Division , U.P. Jal Nigam Sahjahanpur for the

    performance of the said contract.

    The sum of Rs. 10% of approved amount has been deposited

    in the form of deposit receipt of Scheduled Bank of N.S.C. or Bank

    Guarantee is herewith forwarded the full amount of which is to be

    absolutely forfeited to the said Managing Director or his successor in

    office should. I/We not when called upon to do so by the Executive

    Engineer, Construction Division, U.P. Jal Nigam , Shahjahanpur within

    7 days to execute the said contract and deposit the full amount of the

    security deposit specified in the above memorandum, and in the even

    of such default the vans action affected by the tender cease and

    determine.

    Dated the Day of 200

    Witness: Contractor

    Address:

    Occupation:

    I hereby accept the accompanying tender on behalf of the

    Managing Director of Uttar Pradesh Jal Nigam subject to the current

  • 8/9/2019 Ist book

    36/128

    36

    financial year's allotment.

    Dated Day 200

    Signature of the officer by who accepted...................

    Designation

    UTTAR PRADESH JAL NIGAM

    Note - This form is not to be filled in by the tenderer

    LUMP-SUM-CUM-ITEM RATE CONTRACT

    FORM OF AGREEMENT

    THIS INDENTURE made the.......................................... day of

    ....................... 200 between

    .

    .

    Hereinafter called the contractor, which expression shall where the

    context so admits or implies be deemed to include his heirs, executors and

    administrators of the one part, and the Managing Director of Uttar Pradesh ,

    Jal Nigam hereinafter called the M.D. which expression shall, where the

    context so admits or implies, be deemed to include his successors in office

    and assigns of the other part, WHEREAS the said M.D. requires the

    execution of certain works for.

    Hereinafter called the said works which said works are more

    particularly described in the drawing and specifications hereto annexed AND

    ALSO requires the provision of necessary material there for the have caused

    the necessary drawings and specifications and schedules of rates to be

    prepared and the contractor has delivered to the said M.D. A Tender for the

  • 8/9/2019 Ist book

    37/128

    37

    execution of the said works of the provision of the said materials AND

    WHEREAS the M.D. has accepted such Tender subject to the provisions and

    Conditions hereto attached. NOW THIS INDENTURE WITNESSETH as

    follows. In consideration of the covenant, for the payment by and on behalf

    of the said JAL NIGAM hereinafter constrained, the contractor hereby

    covenants with the M.D. that he will supply all necessary materials land

    complete and thoroughly sound and work manlike manner and afterwards

    maintain for the requisite period stated in the said conditions all the works set

    out in the said specification and schedule of rates hereto attached, signed, by

    the contractor and as explained in the said drawing hereto attached, and in

    accordance in every respect with the requirements, stipulation and

    conditions, etc. attached.

    In consideration of the covenant by the contractor hereinafter

    contained me said M.D. hereby covenant with the contractor to pay to him for

    the execution, completion and maintenance of work as aforesaid according

    to the rates hereto attached and at the times and in the manner and subject

    to the additions and deductions set out, and declared in the said conditions

    hereto attached.

    It is agreed and declared that all the provision of the said conditions,

    drawing specification and schedules of rates market as in Schedule "G" and

    hereto attached shall be binding upon the Contractor and upon the said M.D.

    as the same has been repeated herein and shall be read as part of these

    presents.

    In witness whereof the parties hereto have affixed their signature

    Dated the Day of 200

    Witness: Contractor

    Witness: Signed on behalf of the M.D. by

    Designation of Officer

  • 8/9/2019 Ist book

    38/128

    38

    Witness:

    Witness:

    UTTAR PRADESH JAL NIGAM

    LUMP-SUM-CUM-ITEM RATE CONTRACT

    CONDITIONS OF CONTRACT

    1. INTERPRETATION:

    In these conditions and in the specifications which are herein attached

    the term. "THE CHEIF ENGINEER" shall mean the Chief Engineer

    (Lucknow Zone) U.P, Jal Nigam , Lucknow.

    The S.E. shall mean the Superintending Engineer, IVth Circle, U.P.

    Jal Nigam Bareilly for civil works and Superintending Engineer, (E/M)

    23rd Circle , U.P. Jal Nigam Lucknow for E/M works or his authorized

    representative hereinafter called Engineer.

    "The EXECUTIVE ENGINEER" shall mean the Executive Engineer,

    Construction Davison, U.P. Jal Nigam, Shahjahanpur for Civil works

    and Executive Engineer , E/M Division, U.P. Jal Nigam, Bareilly for

    E/M works.

    "WORK" or "WORKS" where used in these conditions and

    specifications shall unless there be something either in the subject or context

    repugnant to such construction be construed and taken

    to mean "WORK" by or by virtue of the contract contracted to be

    executed whether temporary or permanent and whether original,

    altered, substituted or additional.

  • 8/9/2019 Ist book

    39/128

    39

    2. TIME OF COMPLETION OF WORKS:

    The time allowed for carrying out the works shall be 6 calendar

    months, shall be strictly observed by the contractor, and shall be

    reckoned from the receipt of the written order to commence the work.

    3. CONTRACTOR'S LIABILITY TO PAY COMPLENSATION:

    The works shall throughout the stipulated period of the contract

    be proceeded with all due diligence (time being deemed to be

    essence of the contract) and the contractor shall pay as compensation

    an amount equal to one percent or such smaller amount as the Chief

    Engineer (whose decision in writing shall be final) may decide. On the

    amount of the estimated cost of the whole work, that is to pay Rs. 1%

    for every day that the works remain uncommented or unfinished after

    the proper dates and further to ensure good progress during the

    execution of the work the contractor shall be bound to complete one

    fourth of the whole time allowed under this contract has elapsed, one

    - half of the works before one-half of such time has elapsed and

    three-fourths of the works before three-fourths of such time has

    elapsed. In the event of the contractor failing to comply with this

    condition he shall be label to pay as (whose decision in writing shall

    be final) may decide on the said estimated cost of the whole work for

    every day that the due quantity of works remain incomplete

    PROVIDED ALWALYS that the entire amount of compensation to be

    paid under the provision of the clause shall not exceed ten percent of

    the estimated cost of the works.

  • 8/9/2019 Ist book

    40/128

    40

    4. RIGHTS OF BREACH OF CONTRACT:

    In any case in which UP. Jal Nigam under any clause or clauses of

    these conditions the contractor shall have rendered himself liable to

    pay compensation amounting to the whole of the security deposit

    whether deducted in one sum or deducted by installment the

    Engineer, on behalf of the M.D. of Jal Nigam, shall have power to

    adopt any of the following course as he may deem best suited to the

    interest of JAL NIGAM.

    (a)To rescind the contract (of which rescission notice in writing to

    contractor under the hand of the Engineer shall be conclusive

    evidence) and in which case the security deposit of the contractor

    together with such sum or sums due to him under this contract

    shall stand forfeited and be absolutely at the disposal of the said

    M.D.

    (b)Determine the contract and call in another contractor or employ daily

    labour to dismantle bad work, if necessary (the bad work to

    be certified by the Engineer whose decision shall be final).and to

    renew and complete the said work land pay the cost of such

    contractor for the daily labour and price of material required for

    such dismantling , renewing and completion out of the said security

    deposit for such sum or sums as may be due to the contractor

    under this contra t and if such cost be more than the amount made

    up of the security money and the sum or sums due to the

    contractor under this contra t, the difference between it and sum

    made by the security money and the balanced due to the

    contractor as aforesaid shall be a debt due from the said contractor

    to the said M.D. In the event of either of the above course being

  • 8/9/2019 Ist book

    41/128

    41

    adopted by the Engineer, the contractor shall have no claim to

    compensation for any loss sustained by him by reasons of his

    having purchased or procured any materials or entered into any

    agreements, or made any advances on account of or with view to

    the execution of the work or the performance of the contract. And

    in case the contract shall be rescinded under the provision

    aforesaid, the contractor shall not be entitled to recover or be paid

    any sum for any work therefore actually performed under this

    contract, unless and until the Engineer shall have certified in

    writing the performance of such work and the value payable in

    respect there of, and he shall only be entitled to be paid the value

    so certified.

    5. NON - EXERCISE OF CONTRACTOR'S LIABILITY TO PAY

    COMPENSATION:

    In any case in which any of the power conferred upon the

    Engineer by Clause 4 hereof, shall have become exercisable and the

    same shall not be exercised, the non-exercise thereof shall not

    constitute a waiver of any the conditions hereof, any such powers

    shall not with standing be exercisable in the event of any future case

    of default by the contractor for which, by any clause or clauses hereto

    be is declared liable to pay compensation amounting to whole of his

    security deposit and the liability of the contractor for past and future

    compensation shall remain unaffected. In the even of the Engineer

    putting in force either of the powers (a) or (b) vested in him under the

    preceding clause, he may, if he so desires, take possession of all or

    any tools, plant, material, and stores in or upon the works the site

    there of or belonging to the contractor or procured by him intended to

    be used for the execution of the work or any part thereof, paying or

    allowing for the same in account at prevailing market rates to be

  • 8/9/2019 Ist book

    42/128

    42

    certified by the Engineer whose certificate thereof shall be final,

    otherwise 'the Engineer may by notice in writing to the contractor or

    his other authorized agent require him to remove such tools, plants,

    materials or stores from the premises ( within a time to be specified in

    such notice and in the event of the contract or failing to comply with

    any such requisition, the Engineer may remove them at the

    contractor's expense or sell them by Auction or private sale on

    account of the contractor and at his risk in all respects, and the

    certificate of the Engineer as to the expense of any such removal, and

    the amount of the proceeds and the expense of any such sale be final

    and the conclusive against the contractor.

    6. EXTENSTION OF TIME:

    If the contractor shall desire an extension of time for completion

    of the work on the ground of his having been unavoidably hindered in

    its execution or any other ground, he shall apply in writing to the

    competent authority through the Engineer within seven days after the

    date of hindrance on account of which he desires such extension as

    aforesaid, and the Engineer shall, if in his opinion (which shall be

    final), reasonable grounds be shown therefore authorize such

    extension of time, if any, as may in his opinion be necessary or

    proper.

    7. ENGINEER'S CERTIFICATE OF COMPLETION:

    On completion of the work the contractor shall be furnished with

    a certificate by the Engineer of such completion, but not such

    certificates shall be given nor shall the work be considered to be

    completed until the works shall have been measured by the Engineer,

    whose measurement shall be binding and conclusive against the

    contractor and the contractor shall have removed from the premises

  • 8/9/2019 Ist book

    43/128

    43

    on which the work has been executed all scaffolding, surplus materials

    and rubbish and cleaned off all dirt and debris in upon or about the

    premises of which he may had possession for the purpose of

    executing the said works, If the contractor shall fall to comply with the

    requirements of this clause as to removal of scaffolding , surplus

    materials and rubbish and be cleaning of all dirt and debris on or

    before the date fixed, for the completion of works the Engineer may at

    the expenses of contractor remove such Scaffolding, surplus material

    and rubbish and dispose of the same as he thinks fit and clean off

    such dirt and debris of all expenses so incurred and shall have no

    claim in respect of any such scaffolding or surplus materials as

    aforesaid except for any sum actually realized by the sale thereof after

    deducting the aforesaid expenses,

    8. PAMENTS:

    On measurements of the work done for the convenience of the

    contractor, interim payments shall ordinarily be made monthly but final

    payment shall not be made until the whole of the work shall have been

    completed and certificate of the completion of the work given,

    provided always that the Engineer may refuse to advance such

    payments if in his opinion the progress of the work or the conduct of

    the contractor is not satisfactory or the contractor has in any other way

    done or neglected to do anything so as to make it doubtful whether the

    works will be completed by him in accordance with the contract. But all

    such interim payments shall be recorded as payments by way of

    advance against the final payments only and as payment of work

    actually done and completed and not regular the requiring of bad

    unsound and imperfect or unskillful works to be removed and taking a

    way or reconstructed or re-erected or be reconsidered as on

    admission of the due performance of the contract or any part thereof

    in any respect of the accruing of any claim, not shall it conclude,

  • 8/9/2019 Ist book

    44/128

    44

    determine or effect in any way the powers of the Engineer under

    these conditions or any of them as to the final settlement and adjustment of

    the account or otherwise or in any otherwise way vary or affect this

    contract. The final bill shall be submitted by the Contractor within one

    month of the date fixed for the completion of the work, otherwise the

    Engineer certificate of the measurements (due notice having given

    before hand to the Contractor of the date of such measurements) and

    of total amount payable for the works accordingly shall be final and

    binding on all parties.

    9. BILL TO BE SUBMITTED ON PRESCRIBED FORM:

    The contractor shall submit all bills on the prescribed forms to

    be had on application at the office of the Ex. En. Construction Division,

    U.P, Jal Nigam , Shahjahanpur and the charges in the bills shall

    always be entered at the rates given in the schedule of rates hereto

    attached , or in the case of an extra work ordered in pursuance of

    these conditions and not mentioned or provided for the Tender, at the

    rates hereinafter to be agreed upon.

    10. STORES SUPPLIED BY GOVERNMENT:

    All materials will be supplied by the contractor; however, on

    written request Engineer may arrange such materials at the cost of

    Contractor. However, this will not be a binding to the Engineer to do

    so. The rates of such materials will be as prevalent in Jal Nigam, thenor as per market rates cost of which be dues to the contractor. All

    materials that may be supplied from the Engineer's store or as may be

    provided by the Executive Engineer (such materials will be charged for

    the prevalent rates as specified by Engineer, shall be used by

    the contractor for the purpose of this contract only ^and the value of the full

  • 8/9/2019 Ist book

    45/128

    45

    quantity of materials so supplied may be set off or deducted from any

    sums then due on thereafter to become due to the contractor under

    this contract or otherwise on against or form the security deposit.

    11. MATERIAL AND PLANT OF CONTRACTOR

    All materials brought by the contractor upon the site of the

    works shall be deemed to be the property of the Managing Director

    and shall not on any account be removed from the site or the works

    during the execution of the works and shall at all times be open to

    inspection by the Engineer or his representative. The Engineer on the

    completion of, the works or upon the stoppage of the works as

    provided for in clause 14 of this contract shall have an option of taking

    over any such unused materials at prevailing market rates, with the

    provision that the price allowed to the contractor shall not exceed the

    amount originally paid by him for the same as he (the Engineer) shall

    desire upon giving a notice in writing under his signature within Seven

    days of the completion of the works to that effect, and all materials notso taken over by the Engineer shall cease to be the property of the

    M.D. and the contractor shall have no claim for compensation on

    account of any such materials as aforesaid which are not so taken

    over by the said Engineer, unused by him (the Contractor) or for any

    wastage in or damage to any such materials.

    12. WORKS TO BE EXECUTED IN ACCORDANCE WITH THE

    SPECIFICATION:

    The contractor shall execute the whole and every part of the

    work in a most substantial and workman like manner both as regards

    to materials and otherwise in every respect in strict accordance with

    the specifications. The contractor shall also confirm exactly and

    faithfully to the drawings and instructions in writing relating to the work

    signed by the Engineer.

  • 8/9/2019 Ist book

    46/128

    46

    13. ALTERATION IN SPECIFICATION AND DRAWINGS:

    The Engineer shall have powers to make any alteration or

    additions to the original specifications, drawing and instructions that

    may appear to him, to be necessary or advisable during the progress

    of the work and the contractor shall be bound to carry out the work in

    accordance with any instruction which may be given to him in writing

    signed by the Engineer and such alterations shall not invalidate this

    contract and any additional work which the contractor may be directed

    to do in the man nor above specified as part of the work shall be

    carried out by the contractor on the same conditions in all respect on

    which he agreed to do the main work, and at the same rates as are

    specified in the Schedule of rates marked, 'G' for the main work. And

    should any alteration necessitate a curtailment of the work described

    in the specifications and shown on the drawings it shall be lawful for

    the Engineer to deduct from the sum of Rs.............................. value of

    this contract as a sum equal to the amount that the curtailed portion of

    the work if carried out would have cost based upon the rates set forthin the schedule of rates marked 'G'. The time for the completion of the

    work shall be extended if applied for by contractor in writing in the

    proportion that the additional work bear to the original contract work

    and the certificate of the Engineer shall be conclusive as to such

    extension. And if the additional work includes any class of work for

    which no rates provided in this contract, then such class of work shall

    be carried out at rates to be agreed upon between the Engineer andcontractor in writing prior to the work being taken in hand. The basis

    for fixing such rates shall ordinarily be the U.P. Jal Nigam erstwhile

    L.S.G.E.D. schedule of rates for the district.

  • 8/9/2019 Ist book

    47/128

    47

    PROVIDED ALWAYS that if the contractor shall commence

    work or incur any expenditure in regard thereto before the rate shall

    have been determined as lastly therein before, mentioned, then and in

    such case he shall only be entitled to be paid in respect of the rates as

    aforesaid according to such rate or rates as shall be fixed by the

    Engineer, In the even of a dispute, the decision of the Chief Engineer,

    U.P. Jal Nigam shall be final.

    14. No compensation for alteration in or reduction of work

    to be carried out:

    If at any time after the commencement of the work the M.D.

    U.P. Nigam or Chief Engineer, U.P. Jal Nigam shall for any reason

    What so ever not require the whole thereof as specified in this contract

    to be carried out, the Engineer shall give notice in writing of the fact to

    the contractor and upon the receipt of such notice in writing the works

    under this contract shall cease and the contractor shall have no claim

    to any payment or compensation whatsoever on account of any profit

    or advantage which he might have derived from the execution of the

    works in full, but which he did not derive in consequence of the full

    amount of the works not having been carried out, neither shall he have

    any claim for compensation by reason of any alterations having been

    made in the original specifications, drawings and instruction which

    shall involve any curtailment of the work as originally contemplated.

    15. ACTION AND COMPENSATION PAYABLE IN CASE OF BAD

    WORK:

    If it shall appear to the Engineer or his subordinate in charge of

    the works that any works has been executed with imperfect or

    unskilled workmanship or with materials of any inferior description or

  • 8/9/2019 Ist book

    48/128

    48

    that any materials or articles provided by the contractor, for the

    execution of the works are unsound or of a quality inferior to that

    contracted for or otherwise not in accordance with the contract, the

    contractor shall on demand in writing from the Engineer specifying the

    work materials or articles complained of forthwith rectify remove

    demolish and reconstruct the work so specified in whole or in part as

    the case may require or as the case may be, remove the material or

    articles so specified and provide other proper and suitable materials or

    articles at his own proper charge and cost, land in the even of his

    falling to do so within a period to be specified by the Engineer in his

    demand aforesaid, then the contractor shall be liable to pay

    compensation at the rate of one percent for such smaller amount as

    the Chief Engineer ( whose decision in writing shall be final) may

    decide , on the amount of the const of the whole work for every day

    not exceeding ten days, while his failure to do shall continue and in

    case of any such failure the Engineer may rectify remove, demolish

    and reconstruct the work, or remove and replace with others the

    materials or articles complained of, as the case may be at the risk and

    expense in ail respect of the contractor and such expenses may be

    deducted from such sum as may be due to the contractor or may

    become due to him and from his security deposit.

    16. WORKS TO BE OPEN TO INSPECTION:

    All works under or in course of execution or executed in

    pursuance of the contract shall at all times be open to the inspection

    of engineer and his subordinate and the contractor shall all times

    during the usual working hours and at the all other times of which

    reasonable notice of the intention of the Engineer or his subordinate to

    visit the works shall have been given to the contractor, either himself

    be present to revive orders and instructions or have a reasonable

  • 8/9/2019 Ist book

    49/128

    49

    agent duly accredited in writing present for the purpose. Orders given

    to the contractor's agent shall be considered to have the same force

    as if they had been given to the contractor himself. Verbal orders shall

    not be considered as binding on either party until they are confirmed

    in writing signed by the Engineer.

    17. NOTICE TO BE GIVEN BEFORE WORK IS COVERED UP:

    The contractor shall give not less than five day's notice in

    writing to the Engineer or his duly authorized assistant in charge of the

    work before covering up. for otherwise placing by beyond the reach of

    measurement any work in order that the same may be measured andcorrect dimensions thereof be taken before the same is so covered up

    or placed beyond the reach of measurement and shall not cover up or

    place beyond the reach of measurement any work without the

    consent in writing of the Engineer or his duly authorized assistant in

    charge of the work, and if any work shall be covered, up or replaced

    beyond the reach of measurement without such notice having been

    given or consent obtained the same shall be uncovered at thecontractors expense, or in default thereof no payment or allowance

    shall be made for such work or the materials with the same was

    executed.

    18. CONTRACTOR LIABLE FOR DAMAGE DONE ANDIMPERFECTION:

    If the contractor or his work people or servants shall break,

    defense, injury or destroy and part of a building, in which they may be

    working or any building, road, fence, enclosure, lad or cultivated

    ground continuous to the premises on which the work of any part of it

    is being or executed, if any damage shall happen to the work, which in

    progress, from any cause whatever or any imperfections become

  • 8/9/2019 Ist book

    50/128

    50

    apparent in it within months after the final certificate of its completion

    shall have been given by the Engineer as aforesaid the contractor

    shall make the same good at his own expense, or in default the

    Engineer may cause the same to be made good by other workman,

    and deduct the expenses (of which the certificate of the Engineer shall

    be final). From any sum that may be then or at any time there after

    may become, due to the contractor or from his security deposit.

    19. CONTRACTOR TO SUPPLY LABOUR. PLANT. LADDRS.

    SCAFFOLDINGS. ETC.

    The contractor shall supply at his own cost all labour skilled andunskilled and all things necessary (except such special things, if any,

    as may, in accordance with the specification, be supplied from the

    Engineer stores), such as plants, tools, appliances, implements,

    ladders, cordage, tackle, scaffolding, shoring, shattering, pumps,

    boilers, fuel, oils, patching, derrick , boring tools, wrenches and power

    as well as all other apparatus and temporary work requisite or proper

    for the proper execution of the works, whether original, altered orsubstituted and whether included in the specifications or other

    documents forming part of the contract or referred to in these

    considerations or not which may be necessary for the purpose of

    satisfying or complying with the requirements of the Engineer as to

    any matter as to which under these conditions he is entitled to be

    satisfied or which he is entitled to require, together with carriage

    therefore to and from the work. The contractor shall also supply

    without charge the requisite number of persons, with the means and

    things necessary for the purpose of setting out the works, and

    counting, weighing and assisting the measurement and examination at

    any time and from time to time of the work done or materials supplied

    by him. Failing his so doing the same may be provided by the

    Engineer at the expense and risk of the contractor and the expenses

    (of which the certificate of the Engineer shall be final) may be

  • 8/9/2019 Ist book

    51/128

    51

    deducted from any money due to the contractor under this contract or

    from his security deposit. The contractor shall also provide at his own

    expense all necessary fencing and light required to protect the public

    from accident, and shall assume all liability for and indemnity against

    all actions or suits arising out of or in connection with the carrying out

    of the works whether such actions are brought by members of the

    public, neighboring owner or workmen employed on works, save only

    actions for permanent interference with casements to which the site

    may be subject at law or in equity or otherwise arising out title of the

    site. The contractor shall in carrying out works conform to the

    Statutory and other legal enactment applicable to them and give all

    notices and pay all fees payable to local authorities and others in

    respect of them. The contractor shall be responsible for the adequacy,

    strength and safety of all shoring, structuring, bonding, curbing,

    brickwork, masonry concrete permanent or temporary, appliances,

    matter and things furnished by him for the purpose of this contract.

    20. FEMALE LABOUR:

    No female labour shall be employed within the limits of a cantonment.

    21. WORKS NOT TO BE SUBLET WITHOUT SANCTION:

    This contract or any part thereof shall not be assigned or sublet

    without the written approval of the Chief Engineer, And if the

    contractor shall assign or sublet his contract or attempt to do so or

    become insolvent commence any insolvency proceedings or make

    any com position with his creditor or attempt to do so or if any bribe,

    gratuity, gift, loan perquisite, reward or a advantage, pecuniary or

    otherwise shall either directly or indirectly be given, promised or

    offered by the contractor or any of his servants or agent to any public

    officer of person in the employ of UP. Jal Nigam in any way relating to

  • 8/9/2019 Ist book

    52/128

    52

    his office of employment , or if any such officer or person shall

    become any way directly or indirectly interacted in the contract, the

    Chief Engineer may thereupon by notice in writing rescind the contract

    and the security deposit shall thereupon stand forfeited and be

    absolutely at the disposal of the said M.D, and the same

    consequences shall ensure as if the contract has been rescinded

    under clause 4 thereof, and in addition the contractor shall not be

    entitled to recover or be paid for any work that has already been

    performed under this contract.

    22. SUM PAYABLE BY WAY OF COMPENSATION:

    All slums payable by way of compensation under any of these

    conditions shall be considered as reasonable compensation to be

    applied to the use of the said Governor without reface to the actual

    loss or damage sustained, and whether or not any damage shall have been

    sustained.

    WORKS TO BE LUNDER DIRECTION OF ENGINEER;

    All works to be executed under the contract shall be executed

    under the direction and subject to the approval in all respect of the

    Engineer for the time being who shall be entitled in direct at what point or

    points and in what manner they are to be commenced and from

    time to time carried on.

    24. DECISION OF CHIEF ENGINEER TO BE FINAL:

    Except where otherwise specified in this contract, the decision

    of the Chief Engineer, U.P. Jal Nigam for the time being shall be final,

    conclusive and binding on all parties to the contract upon all question

  • 8/9/2019 Ist book

    53/128

    53

    relating to the measuring of the specification, drawings and

    instructions herein before mentioned and as to the quality of

    workmanship or materials used on the work, or as to any other

    question, claim, right matter or things whatsoever, in any way arising

    out of relating to, the contract, drawings, specifications, estimate,

    instructions orders or these conditions or otherwise concerning the

    contract, drawing, specifications, estimates instructions under the

    works or the execution, or failure to execute the same whether arising

    during the progress of the work or after the completion of the sooner

    determination thereof the contract.

    25. ACTIONS WHERE NO SPECIFICATION:

    In the case of any class of work of which there is no mention in the

    specification such work shall be carried out in all respect

    in accordance with the instructions and requirements of the Engineer.

    26. CONTRACTOR TO EMPLY COMPETENT AGENT AND FOREMAN:

    During the execution of the works and until the work is taken

    over by the order of the executive Engineer, the contractor shall

    employ competent agent and such foreman as may be necessary for

    the proper execution of the "WORKS" ( and then work is carried on

    day and night there shall be a foreman in charge of each shift) who

    shall be engaged constantly on the works to ensure proper

    management and efficient control.

    27. RECEIPT OF AND POWER AS TO SECURITY MONEY:

    (a) The M.D. has received from the Contractor the sum of Rs. as

    earnest money the receipt of which is hereby acknowledged. This

    said sum together with the sum made up of the ten percent

    including Security deposit described in clause 8 of this contract

  • 8/9/2019 Ist book

    54/128

    54

    shall beheld as security for the performance of all the conditions

    and stipulation of the contract, and the Engineer is empowered to

    deduct from time to time from such security money all or any sum

    or any sums which may become due from the contractor as

    liquidated damages for the breach of any or al the covenants or

    provisions of this contract. If not confirmed under the provisions of

    this contract the security money or such balance thereof as may be

    left after making the deduction of deductions aforementioned will

    be returned to the contractor after twelve months after the final

    certificate of the completions of the works shall have been given by

    the Engineer and after the Engineer shall have satisfied himself

    that all the terms of the contract have been duly and faithfully

    carried out by the contractor.

    (b) Fixed deposits of the State Bank of India, Allahabad Bank and Central Bank

    shall also be accepted as security provided that all

    such fixed deposits receipts must be issued in the name of the

    U.P. Jal Nigam, and that they will be accepted as security and on the

    conditions that Nigam will hold the deposit at the risk of

    depositor and will not be failure of the Bank or to any other clause,

    and that if the security is lost the loss will fall on the depositor who

    will have to deposit fresh security.

    28. COMPENSATION TOWORKMEN:

    (a) In every case in which by virtue of the provision of section 12,

    subsection (i) of the Workmen's Compensation Act, 1993, U.P.

    Jal Nigam is obliged to pay compensation to a workman

    employed by the contractor or by any sub-contractor from him

    in the execution of the said work, U.P Jal Nigam will recover

  • 8/9/2019 Ist book

    55/128

    55

    from the contractor the amount of the compensation so paid,

    and without prejudice to the rights of Government under section

    12 sub section (2) of the said Act, Jal Nigam shall be at liberty

    to recover such amount or any part thereof by deducting it

    either from the earnest money deposited by the contractor or to

    his credit under clause 27 of these conditions or from any other

    sum due by Jal Nigam to the contractor whether under this

    contractor or otherwise.

    (b) Jal Nigam shall not be bound to contest any claim made

    against it under section 12, sub section (i) of the said Act ,

    except on the written request of the contractor and upon his

    given to Jal Nigam full security for all costs for which Jal Nigam

    might become liable inconsequence of contesting the claim.

    29. ARBITRATION CLAUSE:

    In case of any dispute between the contractor and Engineer or

    the consignee, the matter shall be referred to the S.E. for his decision.

    And in case, where the contractor is not satisfied matter shall be

    referred to Chief Engineer whose decision shall be final, conclusive

    and binding on both the parties upon all questions, matters and

    meaning of clause relating to this contract.

    30. RECORD OF HINDRANCE:

    Contractor shall be liable to inform within three days from the

    event of any hindrance in work due to the circumstances beyond his

    control delay in issue of stores with regard to materials needed

    immediately during the progress of work, or hindrance in work by any

    department i.e. P.W.D, Nagar Palika or housing board whose roads

    are to be cut however contractor shall be responsible for applying well

  • 8/9/2019 Ist book

    56/128

    56

    before in advance for permission of road cutting through the Engineer

    Incharge. Delay on his part in applying for permission of road cutting

    shall not entitled him for any extension of time or as justifiable , in the

    opinion of Engineer Incharge. Engineer or his authorized

    representative not below the rank of Assistant Engineer shall receive

    and may allow the record of hindrance, to the extent as considered

    justifiable by Engineer, in the following for prescribed below which will

    become the part of agreement.

    Date of

    start of

    hindrance

    Date of

    end of

    Hindrance

    Nature

    and

    details of

    hindrance

    Remarks and

    recommendation

    Sign. of

    EE

    allowing

    the record

    of

    hindrance

    JE AE DA

    Contractor should note that the above record of hindrance shall

    not untitled him for any claim or increase in rates but shall only verify

    and record his eligibility considerations with regard to extension of

    time if he at all applies.

    31. SAMPLE:

    The contractor shall submit samples of materials supplied as

    required by the Engineer at his own expenses, No extra rates should

  • 8/9/2019 Ist book

    57/128

    57

    be allowed the rates quoted by the contractor should also cover these

    expenses.

    32. TESTING:

    The contractor shall allow in his rates sufficient margin to cover

    the cost of testing of materials and finished work/plant/machinery as

    desired necessary by the Engineer. The materials and finished work/

    plant/machinery shall be got tested by the contractor in accordance

    with the relevant ISS code of practice and to the satisfaction of

    the Engineer.

    33. PAYMENT SCHEDULE:

    The payment shall be made in accordance with the schedule provided

    in Schedule J.

    34. SPECIFICATION OF WORK:

    The specification journal is attached herewith

    Signed by Contractor

    Signed on behalf of the M.D. Uttar Pradesh Jai Nigam

    Designation of Officer

    OFFICE OF THE EXECUTIVE ENGINEER CONSTRUCTION DIVISION

    U.P. JAL NIGAM. SHAHJAHANPUR.

    TENDER FOR WORK DECLARATION

    I/We hereby tender for the work specified in the under

    Memorandum within the time specified. Such Memorandum at the rates

    given in the schedule of rate hereto attached, and in accordance with all

    said specifications and drawings which have been prepared by the

  • 8/9/2019 Ist book

    58/128

    58

    Executive Engineer Construction Division U.P. Jal Nigam, Shahjahanpur

    and have been inspected and understood by me/us and also undertaken

    to make compliance of such other written instruction as may be given

    from time to time for carrying out the said works.

    That I/We do hereby solemnly state that I/We reside in India &

    do not intend to migrate to any other country during the period of the

    contract and that I/We will produce a clearance certificate from the

    Income Tax Officer at the time to final payment or taking refund of the

    security deposit, if demanded.

    Witness................................. Contractor

    ..........

    Date ...................................... Date

    Address................................. Address...

    .. .

    .. .

    Copy of enclosure to G.O. No. G.2-1893/X-916-49, dated 7th

    June, 1960. No person who has retired from Government Services as an

    Engineer Gazetted Officer employed on Engineering or Administrative

    duties in an Engineering Department/Office is not entitled to tender for the

    notified work up to two years from the date of such retirement unless a

    special permission of the Government has been obtained is furnished by

    the contractor, along with this tender. If any contractor is found to have

    violated the aforesaid provision, his tender and the contract , if entered

    into with him shall at option of Chief Engineer ( Lucknow Zone) /

  • 8/9/2019 Ist book

    59/128

    59

    Superintending Engineer IV Circle , U.P. Jal Nigam , Bareilly be liable to

    immediate cancellation in which case his earnest money or the security

    deposit ( as the case may be) shall stand, forfeited, and the Contractor,

    shall have no right to claim any compensation, what so ever, on account

    of the cancellation of his tender or contract.

    SIGNATURE OF CONTRACTOR EXECUTIVE ENGINEER

    DATED :

    ADDRESS

    ..

    .

    OFFICE OF THE EXECUTIVE ENGINEER CONSTRUCTION DIVISION

    U.P. JAL NIGAM. SHAHJAHANPUR

    TO BE SUBMITTED ON STAMP PAPER OF RLUPEES 100.00

    AGREEMENT

    TENDER INVITED BY : EXECUTIVE ENGINEER.CONST.

    : DIVISION, U.P. JAL NIGAM,

    : SHAHJAHANPUR.

    TENDER NOTICE No. : ........................................................

    NAME & ADDRESS OF THE : ..........................................

  • 8/9/2019 Ist book

    60/128

    60

    TENDERER : ..........................................

    ..........................................

    In consideration of the U.P. Jal Nigam, having treated the

    tenderer to be an eligible person whose tender may be considered, thetenderer hereby agrees to the condition that the proposal in response to

    invitation shall not be withdrawn within three months from the date of opening

    of the tender also to the condition that , if thereafter, the tenderer does

    withdraw his proposal within the said period, the earnest money deposited by

    him may be forfeited by U.P. Jal Nigam in the discretion of the later.

    And tenderer hereby also agrees that, if subsequent to the

    submission of his tender the tenderer amends alters or modifies the contentsof his tender which are not acceptable to department, and then the tenderer

    shall, for the purposes of the aforesaid conditions, be deemed to have

    withdrawn his proposal.

    SIGNED THIS DAY OF 200

    WITNESSES:

    1.

    2.

    TENDERER

    DETAILS OF PLANT AND CONSTRUCTION EQUIPMENT/ MACHINERIES

    OWNED/PROPOSED TO BE DEPLOYED BY THE TENDERER

    Details of plan/

    Construction Equipment/

    Machinery with theircapacity

    OWNS Proposed to be

    deployed at this

    contracts

    Tick for

    Yes and

    cross for

    no

    Numbers Tick for