ISSUE OF ORC FOR IN Issue of ORC for Inam L centers. This request can be acc and screens are provided below. Category Type B Documents Required 1. Ap 2. 19 3. Fa SLA 90 Work Note: The asterisk (*) denotes m Note: - This service is 2 Step Proces 1. In case of Fresh Application Procedure for Processing the Step1: RDO End: 1) Select “Issue of ORC for depicted in figure 1. NAM LANDS-USER MANUAL-DEPARTM Lands request is applied by the citizen through th cessed by the Department and processed. The p . pplication Form* 954-1955 kasara pahani, 73-74 latest pahani co amily Tree / Relationship with Inamdhar # king days mandatory requirement of documents. # Indicate ss. The Process flow as mentioned below. n Routed as Below Request at Department End: - Inam Lands” service from Application Process MENT END he Meeseva processing steps opies * es Optional. sing. It has been
14
Embed
ISSUE OF ORC FOR INAM LANDS -USER MANUAL-DEPARTMENT … User... · ISSUE OF ORC FOR INAM LANDS Issue of ORC for Inam Lands centers . This request can be accessed by the and screens
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ISSUE OF ORC FOR INAM LANDS
Issue of ORC for Inam Lands
centers. This request can be accessed by the
and screens are provided below.
Category Type B
Documents Required 1. Application Form2. 19543. Family Tree / Relationship with Inamdhar
SLA 90 Working days
Note: The asterisk (*) denotes mandatory requirement of documents.
Note: - This service is 2 Step Process. The Process flow as mentioned below.
1. In case of Fresh Application Routed as Below
Procedure for Processing the
Step1:
RDO End:
1) Select “Issue of ORC for Inam Lands”
depicted in figure 1.
ISSUE OF ORC FOR INAM LANDS-USER MANUAL-DEPARTMENT
Issue of ORC for Inam Lands request is applied by the citizen through the
. This request can be accessed by the Department and processed. The processing steps
and screens are provided below.
Application Form* 2. 1954-1955 kasara pahani, 73-74 latest pahani copies 3. Family Tree / Relationship with Inamdhar #
Working days
The asterisk (*) denotes mandatory requirement of documents. # Indicates Optional
Step Process. The Process flow as mentioned below.
In case of Fresh Application Routed as Below
Request at Department End: -
Issue of ORC for Inam Lands” service from Application Processing
DEPARTMENT END
request is applied by the citizen through the Meeseva
and processed. The processing steps
74 latest pahani copies *
Indicates Optional.
rom Application Processing. It has been
Figure 1: Issue of ORC for Inam Lands
2) After selection of “Issue of ORC for Inam Lands
displayed. It has been depicted in figure 2.
Figure 2: Processing window in
3) Select From date and To date
Note: - Here, to date must be prior to Current date.
Figure 3: S
Issue of ORC for Inam Lands Process link under Application Processing
Issue of ORC for Inam Lands ” link, processing window
It has been depicted in figure 2.
Processing window in Issue of ORC for Inam Lands request screen
o date by using calendar controls as depicted in figure 3.
to date must be prior to Current date.
Figure 3: Selection of dates in processing window
Process link under Application Processing
window will be
request screen
depicted in figure 3.
4) Select “Request Status (either All/Not Viewed/Open, Forwarded to RDO. Forwarded to
MRO etc...)” from request status drop d
NOTE: - Here, At First the Request is in “Not Viewed” Status. Here I am selecting “Not
viewed” request.
Figure 4: Selection of
5) Click “Get Details” button
Figure 5: Get Details button in Processing window
6) All “Not Viewed” Requests are displayed
processed as depicted in figure
Select “Request Status (either All/Not Viewed/Open, Forwarded to RDO. Forwarded to
MRO etc...)” from request status drop down list as depicted in figure 4.
Here, At First the Request is in “Not Viewed” Status. Here I am selecting “Not
Figure 4: Selection of Status in Processing window
utton to display requests as depicted in figure 5.
: Get Details button in Processing window
Requests are displayed. Select the Request which need
depicted in figure 6.
Select “Request Status (either All/Not Viewed/Open, Forwarded to RDO. Forwarded to
Here, At First the Request is in “Not Viewed” Status. Here I am selecting “Not
need to be
Figure 6: Request selection in
7) After selection of the request,
7.
: Request selection in processing window
equest, request details page will be displayed as depicted in figure
depicted in figure
Figure 7: Request details page of
8) RDO Download and Verify Attached Documents
Figure 8: Documents Attached in Issue of ORC for Inam Lands Request Page
: Request details page of Issue of ORC for Inam Lands
RDO Download and Verify Attached Documents as depicted in figure 8.
Figure 8: Documents Attached in Issue of ORC for Inam Lands Request Page
Issue of ORC for Inam Lands
Figure 8: Documents Attached in Issue of ORC for Inam Lands Request Page
9) Enter Remarks and Click
Figure 9: Remarks in
Note: - Forwarded to MRO Message
MRO End:
1) Select “Issue of ORC for Inam Lands
depicted in figure 1.
Figure 1: Issue of ORC for Inam Lands
2) After selection of “Issue of ORC for Inam Lands
displayed. It has been depicted in figure 2.
and Click Forward to MRO as depicted in figure 9.
in Issue of ORC for Inam Lands request details Page
Message displayed. Now Request is at MRO End.
Issue of ORC for Inam Lands ” service from Application Processing
Issue of ORC for Inam Lands Process link under Application Processing
Issue of ORC for Inam Lands ” link, processing window will be
It has been depicted in figure 2.
request details Page
” service from Application Processing. It has been
Process link under Application Processing
” link, processing window will be
Figure 2: Processing window in
3) Select From date and To date
Note: - Here, to date must be prior to Current date.
Figure 3: Selection of dates in processing window
4) Select “Request Status (either All/Not Viewed/Open, Forwarded
RDO etc...)” from request status drop d
NOTE: - Here, At First the Request is in “
“Forwarded by RDO” request.
Figure 4: Selection of Status in Processing window
Figure 2: Processing window in Issue of ORC for Inam Lands request screen
From date and To date by using calendar controls as depicted in figure 3.
Here, to date must be prior to Current date.
Figure 3: Selection of dates in processing window
Select “Request Status (either All/Not Viewed/Open, Forwarded by RDO. Forwarded to
O etc...)” from request status drop down list as depicted in figure 4.
Here, At First the Request is in “Forwarded by RDO” Status. Here I am selecting
Figure 4: Selection of Status in Processing window
request screen
depicted in figure 3.
by RDO. Forwarded to
” Status. Here I am selecting
5) Click “Get Details” button to display requests
Figure 5: Get Details button in Processing window
6) All “Forwarded by RDO” Requests are displayed
processed as depicted in figure 6
Figure 6: Request selection in processing window
7) After selection of the request,
7.
” button to display requests as depicted in figure 5.
: Get Details button in Processing window
” Requests are displayed. Select the Request which need to be
depicted in figure 6.
: Request selection in processing window
After selection of the request, Request details page will be displayed as depicted in figure
Request which need to be
depicted in figure
Figure 7: Request details page of
8) MRO Downloads Verify the Documents
Figure 8: Documents Verification in
Note: - After downloading all Verification/Proceeding documents, MRI &
From MRO for field level enquiry..
: Request details page of Issue of ORC for Inam Lands
Downloads Verify the Documents as depicted in figure 8.
: Documents Verification in Issue of ORC for Inam Lands Request Screen
After downloading all Verification/Proceeding documents, MRI & VRO collect documents
MRO for field level enquiry. After enquiry, then MRI & VRO submitted their report to
Issue of ORC for Inam Lands
Request Screen
VRO collect documents
MRI & VRO submitted their report to MRO
9) After Enquiry, MRO Upload Proceedings
button as depicted in figure 9
Figure 9: Remarks in
Note: - Forwarded to RDO Message displayed. Now Request is at
RDO End:
1) Now RDO login into Meeseva with his/her credentials and select the request same as
above.
2) Now Request is in Forwarded by
3) RDO Download and Verify Attached Documents and
Figure 1: Documents in
4) If RDO wants any additional details then,
SMS as depicted in figure 2.
Figure 2: SMS in Issue of ORC for Inam Lands Request details Page
5) RDO Generates Form2 Notice
Upload Proceedings, Enter Remarks and Click Forward
depicted in figure 9.
: Remarks in Issue of ORC for Inam Lands request details Page
Message displayed. Now Request is at RDO End.
O login into Meeseva with his/her credentials and select the request same as
Forwarded by MRO Status
O Download and Verify Attached Documents and MRO Report as depicted in figure
Documents in Issue of ORC for Inam Lands Request details Page
wants any additional details then, he/she sends SMS to Citizen by Using
2.
Figure 2: SMS in Issue of ORC for Inam Lands Request details Page
Form2 Notice as depicted in figure 3.
Click Forward to RDO
request details Page
O login into Meeseva with his/her credentials and select the request same as
as depicted in figure 1.
Request details Page
sends SMS to Citizen by Using Send
Figure 2: SMS in Issue of ORC for Inam Lands Request details Page
Figure 3: Form 2 Notice in Issue of ORC for Inam Lands Request details Page
6) RDO Enter Updates such as
depicted in figure 4.
Figure 4: Updates in Issue of ORC for Inam Lands Request details Page
7) RDO Take Action either Approve o
Note: - Based on Collector action (either
is generated.
Figure 5: Action Taken in Issue of ORC for Inam Lands request details Page
8) If RDO wants to Approve the Request then he/ she selects Approved button as depicted in
figure 6.
Figure 6: Action Taken in Issue of ORC for Inam Lands request details Page
: Form 2 Notice in Issue of ORC for Inam Lands Request details Page
as Premium Amount, Installments and FROM the DATE
: Updates in Issue of ORC for Inam Lands Request details Page
Take Action either Approve or Reject as depicted in figure 5.
action (either Approve/Reject), status (either Approved or Rejected)
: Action Taken in Issue of ORC for Inam Lands request details Page
If RDO wants to Approve the Request then he/ she selects Approved button as depicted in
Figure 6: Action Taken in Issue of ORC for Inam Lands request details Page
: Form 2 Notice in Issue of ORC for Inam Lands Request details Page
and FROM the DATE as
: Updates in Issue of ORC for Inam Lands Request details Page
Approved or Rejected)
: Action Taken in Issue of ORC for Inam Lands request details Page
If RDO wants to Approve the Request then he/ she selects Approved button as depicted in
Figure 6: Action Taken in Issue of ORC for Inam Lands request details Page
9) RDO Enter Remarks based on Enquiry Report
7.
Figure 7: Remarks in
10) After clicking on “Sign” button, Certificate window will be displayed as
11) Click “OK” button on Certificate as depicted in figure 9
Figure 9: “OK” button selection in Certificate window
based on Enquiry Report and Click Sign button as depicted in fig
: Remarks in Issue of ORC for Inam Lands request details Page
After clicking on “Sign” button, Certificate window will be displayed as depicted in figure 8
Figure 8: Certificate window
ificate as depicted in figure 9.
“OK” button selection in Certificate window
button as depicted in figure
request details Page
depicted in figure 8.
12) After clicking on “OK” button, private exchange key popup will generated
following figure.
13) Now clicking on “OK” button as depicted in following figure.
14) After clicking on “OK” button “
depicted in following figure.
After clicking on “OK” button, private exchange key popup will generated as
Now clicking on “OK” button as depicted in following figure.
After clicking on “OK” button “Issue of ORC for Inam Lands Certificate” is generated
as depicted in
generated as
Note: - Now the request is in Approved status.
Note: - After Approved/Rejected, Customer Received Message. Like you are Request is
Approved/ Rejected.
15) Once the request is approved by be dispatched through courier from franchisee to the citizen’s address if Delivery Type is Speed Post Local/Non Local.
16) If Delivery Type Is Manual, then citizen collect the Certificate from franchisee where he/she applied
Note: - Endorsement Generated In Rejected Case
Now the request is in Approved status.
After Approved/Rejected, Customer Received Message. Like you are Request is
Once the request is approved by RDO, then Issue of ORC for Inam Lands be dispatched through courier from franchisee to the citizen’s address if Delivery Type is Speed Post Local/Non Local. If Delivery Type Is Manual, then citizen collect the Issue of ORC for Inam Lands
from franchisee where he/she applied. Endorsement Generated In Rejected Case.
After Approved/Rejected, Customer Received Message. Like you are Request is
Issue of ORC for Inam Lands Certificate will be dispatched through courier from franchisee to the citizen’s address if Delivery Type is