Page 1: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

1

Page 2: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

Project Location

2

Page 3: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

Project Organization

• Privately Funded

• Total Investment 1.28 billion USD

• Build, Operate, Transfer Project

• Korean, European and Turkish Bank Loans

• Design Build Construction Contract

• Contractor is JV of Yapi Merkezi (Turkey) and S&K Construction (Korea)

• Detailed Designer is Parsons Brinckerhoff (USA)

3

Page 4: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

Tunnel Long Section

4

Page 5: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Tunnel Cross Section

5

• 12m diameter

• 2 lanes in each direction

• No trucks allowed

• Emergency stairs every 200m

Page 6: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

6

Page 7: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Launch Box

• 40m deep

• 160m long

• Secant piles in soft rock

• Piles in rock

7

Page 8: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Launch Box

8

Page 9: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Launch Box

9

Page 10: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Launch Box

10

Page 11: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Launch Box

11

Page 12: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM

12

• Herrenknecht

• Slurry Machine

• 13.6m diameter

• 1200 tons total weight

Page 13: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Model

13

Page 14: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Model

14

Page 15: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Model

15

Page 16: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Cutterhead

16

• Cutterheadweighs 350 tons

• Cutterhead is hollow

• Cutterheadallows changing of cutting tools under atmospheric pressure

• Trimix setup for divers to repair cutterhead under 11bar water pressure

Page 17: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

Disc Cutter (for Rock)

17

Page 18: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Hollow Cutterhead

• Cutterhead is hollow and allows changing of cutting tools under atmospheric pressure

18

Page 19: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Hollow Cutterhead

19

Page 20: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Front Shield/ Excavation

Chamber

20

Page 21: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM segmental liner vacuum

plate

21

Page 22: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

TBM Tailshield

22

Page 23: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

Segmental Liner Rebar Ladders

23

Page 24: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

Segmental Liner Rebar Ladders

24

Page 25: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

Fusion Welding of Ladders

25

Page 26: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

Allowable Gap At Ring-to-Ring Joints

26

Page 27: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

0.E+00

2.E+05

4.E+05

6.E+05

8.E+05

1.E+06

7+700 7+800 7+900 8+000 8+100 8+200 8+300 8+400 8+500 8+600 8+700 8+800

Forc

e (k

N)

1st Set 2nd Set 3rd Set 4th Set 5th Set 6th Set 7th Set 8th Set Average

0.E+00

2.E+05

4.E+05

6.E+05

8.E+05

1.E+06

7+700 7+800 7+900 8+000 8+100 8+200 8+300 8+400 8+500 8+600 8+700 8+800

Forc

e (k

N)

Average - No Wave Passage Effect Average - Wave Passage European to Asian Average - Wave Passage Asian to European

27

Asian to European

No Wave Pass Effects

European to Asian

No Wave Pass Effects

European to Asian Asian to European

No Seismic Joint (Lower Bound Vs Profile)

Seismic Joints (Lower Bound Vs Profile)

Page 28: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

28

Page 29: ISRTP Presentation Jimmy Thompson Tel Aviv  Jan 2014

29