Top Banner

of 61

ISO 9001 PPT04

Apr 05, 2018

Download

Documents

Muhammad Khaleq
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/2/2019 ISO 9001 PPT04

    1/61

    Presents an Overview of the

    ISO 9000:2000 Revisionsto the ISO 9000:1994 Standards

    the Move from Conformance to Performance

  • 8/2/2019 ISO 9001 PPT04

    2/61

    Outline

    Why Changes are Needed

    Principles and Approaches Driving the

    Changes

    Clause by Clause Review of NewRequirements

    Transition Guidance

    Audit Implications

  • 8/2/2019 ISO 9001 PPT04

    3/61

    Current ISO 9000 Standards areSuccessful

    Why Change a Good Thing?

    ISO 9000 is the most successful standardin ISO history and is accepted world-wide

    Nearly 400,000 registrations world-wide with

    registrants in over 150 countries from all continents

    Being applied in a wide variety oforganizations

    Over 40 sectors or industry classifications

    - led by: electrical/optical equipment, metal products,construction, machinery, wholesale/retail trade

    - but growing in acceptance by many others, including:engineering, information technology, health/social work,

    utilities, transportation, public administration, education,other services.

  • 8/2/2019 ISO 9001 PPT04

    4/61

    Current ISO 9000Standards Need Revision ...

    Bias Wording/terms biased towards manufacturing

    Problems with the 20 element model

    Difficult for small businesses to adapt

    Flow incompatible with how companies do business

    Incompatible with other models (ISO 14000 EMS e.g.)

    Not sufficiently forward looking Does not smoothly facilitate the move from

    baseline (effective) quality management toperformance excellence models (like MBNQA)required by evolving user and customer needs)

  • 8/2/2019 ISO 9001 PPT04

    5/61

    One World One Quality System

    Current standards contain loopholes

    Too many companies have only sought to meetminimum requirements and then only by twistingthe intent of the existing standards

    There is a growing demand forperformance excellence

    ISO 9001:1994 does not require continual

    improvement

    ISO 9001:2000 is process/performance oriented anddoes require continual improvement of the QMS, butby itself is not viewed as a performance excellence

    model

    ISO 9000 2000 i h

  • 8/2/2019 ISO 9001 PPT04

    6/61

    ISO 9000:2000 is thefoundation for

    Performance Excellence

    Competitive

    Advantage

    Efficient

    Quality Management System

    Effective

    Quality Management System

    Business Vision

    Performance Excellence

    Malcolm Baldrige Criteria

    Performance ImprovementISO 9004:2000

    Baseline Performance:

    ISO 9001:2000

  • 8/2/2019 ISO 9001 PPT04

    7/61

    EXERCISE #1

    List your organizations three most significant challengesor business needs over the next 2-3 years (consider anyexternal changes that will affect your organization):

    1. __________________________________________________________

    2. __________________________________________________________

    3. __________________________________________________________

    What are your organizations goals and objectives?1. __________________________________________________________

    2. __________________________________________________________

    3. __________________________________________________________

    How can you use ISO 9001:2000 to help deal with

    business needs and external challenges?___________________________________________________________

    ___________________________________________________________

    ___________________________________________________________

  • 8/2/2019 ISO 9001 PPT04

    8/61

    ISO 9000:2000 is based on EightQuality Management Principles

    Customer Focus

    Leadership

    Involvement of People

    Process Approach

    System Approach

    Continual Improvement

    Factual Approach to Decision Making

    Mutually Beneficial Supplier Relationships

  • 8/2/2019 ISO 9001 PPT04

    9/61

    Customer Focus

    Organizations depend on theircustomers and therefore should:

    understand current and future customerneeds,

    meet customer requirements, and

    strive to exceed customer expectations.

  • 8/2/2019 ISO 9001 PPT04

    10/61

    Leadership

    Leaders should:

    establish unity of purpose and direction ofthe organization, and

    create and maintain the internal

    environment in which people can becomefully involved in achieving theorganizations objectives.

  • 8/2/2019 ISO 9001 PPT04

    11/61

    Involvement of People

    People at all levels are the essence

    of an organization, and

    their full involvement enables theirabilities to be used for the organizations

    benefit.

  • 8/2/2019 ISO 9001 PPT04

    12/61

    Process Approach

    Organizations need to do more thansimply monitor process outputs,(typically through inspection activities)

    they must also control all processinputs, (people, facilities/equipment,material and methods)

    and, they must establish appropriatecontrols over the transformationactivities (if desired results are to beachieved consistently and efficiently)

  • 8/2/2019 ISO 9001 PPT04

    13/61

    What is a Process?

    Activity that transforms input into output

    ActivityInput Output

    Resources:

    PeopleFacilities/EquipmentMaterialMethods

    Results:

    ProductsServicesPerformance

  • 8/2/2019 ISO 9001 PPT04

    14/61

    How is a Process Managed?

    ActivityInput Output

    Right Resources:

    Qualified PeopleRight Facilities/EquipmentCorrect MaterialsProven Methods

    Desired Results:

    Quality ProductsQuality ServicesCustomer Satisfaction

    Monitor & Measure the Processmake sure the inputs are right, the transformationactivities consistently work, and the desired resultsare achieved, then - improve the process as needed

  • 8/2/2019 ISO 9001 PPT04

    15/61

    How is a Process Measured?

    ActivityInput Output

    Right Resources:Qualified PeopleRight Facilities/EquipmentCorrect MaterialsProven Methods

    Desired Results:Quality ProductsQuality ServicesCustomer Satisfaction

    EfficientNo Waste

    EffectiveDesired Results Achieved

  • 8/2/2019 ISO 9001 PPT04

    16/61

    System Approach

    Organizations must understand asystem is a set of interrelatedprocesses, and

    the output of one process is the input toone or more subsequent processes, so ...

    It is critical to manage the white space(or interface) between processes to ensurethat the overall system is effective

  • 8/2/2019 ISO 9001 PPT04

    17/61

    Continual Improvement

    Continual improvement of the

    organizations overall performanceshould be a permanent objective:

    improvement must be a planned activity ifthe organization desires to improve overallperformance and capabilities.

  • 8/2/2019 ISO 9001 PPT04

    18/61

    Plan Do

    Act CheckQMS

    Results

    Baseline PerformanceImprovement Objective

    Improve Process

    through PDCA Cycle

    Measure/Monitor Results Against Objectives -

    Improve Process and Change QMS as Needed

    to Achieve and Sustain Desired Results

    The QMS must be used forcontinuous improvement ...

  • 8/2/2019 ISO 9001 PPT04

    19/61

    Factual Approach toDecision Making

    Effective decisions are:

    based on the analysis of data andinformation.

  • 8/2/2019 ISO 9001 PPT04

    20/61

    Mutually BeneficialSupplier Relationships

    An organization and its suppliers are

    truly inter-dependent, and

    a mutually beneficial relationship enhancesthe ability of both to create value.

  • 8/2/2019 ISO 9001 PPT04

    21/61

    EXERCISE #2

    Pick one of the eight quality management principles andlist three of the most important actions you think anorganization should take in applying this principle.

    1. __________________________________________________________

    2. __________________________________________________________

    3. __________________________________________________________

    How well does your organization do each of the actionsidentified above?

    1. __________________________________________________________

    2. __________________________________________________________

    3. __________________________________________________________

    What can your organization do to more fully utilize theprinciple?

    1. __________________________________________________________

    2. __________________________________________________________

    3. __________________________________________________________

  • 8/2/2019 ISO 9001 PPT04

    22/61

    The ISO 9000:2000 standardsinclude 3 documents...

    ISO 9000:2000Quality Management Systems -Fundamentals and Vocabulary

    ISO 9004:2000Quality Management Systems -

    Guidelines for Performance Improvements

    ISO 9001:2000Quality Management Systems -

    Requirements

    ISO 9000 2000 t d d

  • 8/2/2019 ISO 9001 PPT04

    23/61

    ISO 9000:2000 standardsreplace many existing ISO

    documents...

    Revises/Replaces:- ISO 8402:1994

    - ISO 9000-1:1994

    ISO 9000:2000Quality Management Systems -

    Fundamentals and Vocabulary

    Revises/Replaces:

    - ISO 9004-1, 9004-2, 9004-3 and 9004-4

    (all previous editions, 1994-1994)

    ISO 9004:2000Quality Management Systems -

    Guidelines for PerformanceImprovements

    Revises/Replaces:- ISO 9001:1994- ISO 9002-1994- ISO 9003:1994

    ISO 9001:2000Quality Management Systems -

    Requirements

  • 8/2/2019 ISO 9001 PPT04

    24/61

    Other ISO documents are alsobeing revised for consistency...

    in Sep 2001 will likely replace:

    - ISO 10011 (for QMS)- ISO 14011 (for EMS)

    ISO 19011the Joint Working Group on

    Auditing Document

    with revisions due out after issuanceof ISO 9000:2000 include:

    - Aerospace: AS 9100

    - Telecommunications: TL 9000

    Other sector specificQuality System

    Requirements Documents

    released in 4th quarter 1999 as a

    harmonized US and Europeanstandard, for these standards:

    - QS 9000 (US)- EAQF (France)- VDA6.1 (Germany)- AVSQ (Italy)

    only ISO/TS 16949 will beupgraded to ISO 9001:2000

    however, ISO has granted

    permission for continued(indefinite) use of QS-9000

    ISO/TS 16949International Automotive Standard -

    Quality System Requirements

  • 8/2/2019 ISO 9001 PPT04

    25/61

    Role of ISO 9000:2000

    Defines quality managementprinciples

    terms and definitions

    fundamentals:- systems approach

    - process approach

    - continual improvement

    ISO 9000:2000 is a normative reference(i.e. part of the requirements), andreplaces:

    ISO 8402:1994 and ISO 9000-1:1994

  • 8/2/2019 ISO 9001 PPT04

    26/61

    Role of ISO 9001:2000

    Specifies quality systemrequirements:

    for achieving customer satisfaction

    applicable to entire enterprise

    note: permissible exclusions (like

    design) are limited to requirements

    within Clause 7 - Product Realization,

    and your registrar must verify theyare not part of your business

    ISO 9001:2000 replaces:ISO 9001/2/3:1994

  • 8/2/2019 ISO 9001 PPT04

    27/61

    Role of ISO 9004:2000

    Provides guidelines for performanceimprovement, based on

    quality management principles and approaches

    defined in ISO 9000, and

    continual improvement of the qualitymanagement system itself

    note: however, ISO 9004 is NOT intended as a

    guideline for implementing or assessingimplementation of ISO 9001 requirements

    ISO 9004:2000 replaces:

    ISO 9004-1, 9004-2, 9004-3 & 9004-4

  • 8/2/2019 ISO 9001 PPT04

    28/61

    ISO 9001 and ISO 9004are the Consistent Pair

    comprised of the following 8 clauses:1. Scope

    2. Normative references (part of the requirements)

    3. Terms and definitions4. Quality management system

    5. Management responsibility

    6. Resource management

    7. Product (and/or service) realization

    8. Measurement, analysis &

    improvement

  • 8/2/2019 ISO 9001 PPT04

    29/61

    Continual Improvement of the

    Quality Management System

    The Process-Based Quality

    Management System

    ManagementResponsibility

    Product

    Realization

    ResourceManagement

    MeasurementAnalysis &

    Improvement

    C

    US

    T

    OM

    E

    R

    REQ

    U

    IR

    E

    ME

    N

    TS

    C

    US

    T

    OM

    E

    R

    SAT

    I

    SF

    A

    CT

    I

    ON

    Product

    Input Output

    i l

  • 8/2/2019 ISO 9001 PPT04

    30/61

    ISO 9001:2000 implementsthe PDCA improvement cycle

    PlanClause 5. Management responsibility -

    everything flows from Management who definethe requirements for the system

    Clause 6. Resource management - fromthese requirements the resources will beidentified and management must ensure they areprovided and applied within the system

    Do

    Clause 7. Product (and/or service)

    realization - the necessary process are

    established and carried out

    SO 900 2000 i l

  • 8/2/2019 ISO 9001 PPT04

    31/61

    ISO 9001:2000 implementsthe PDCA improvement cycle

    CheckClause 8. Measurement, analysis and

    improvement - processes and products will bemonitored and measured against policies,

    objectives and requirements for the product andresults/opportunity for improvement reported

    Act

    Clause 8. Measurement, analysis andimprovement - acting upon data reported in thecheck cycle, improvement actions can be taken -directly, or as an output of the Management

    Review process (Clause 5.6)

    Cl 4 Q li

  • 8/2/2019 ISO 9001 PPT04

    32/61

    Clause 4 - Qualitymanagement system

    4.1 General requirements - New: must defineprocesses to be managed (including out-sourcedprocesses - which typically include design, training,calibration, heat treat, etc.); determine the sequenceand interaction of these processes; determine the

    criteria and methods needed to ensure theseprocesses are effective; and take actions to improvethese processes

    4.2 Documentation requirements - New:

    documentation requirements less prescriptive;however, at a minimum must include a quality manualand the following six documented procedures: Control ofDocuments (Clause 4.2.3), Control of Quality Records (Clause 4.2.4), Internal Audits(Clause 8.2.2), Control of Nonconforming Product (Clause 8.3), Corrective Action(Clause 8.5.2), and Preventive Action (Clause 8.5.3).

  • 8/2/2019 ISO 9001 PPT04

    33/61

    Clause 5 - Managementresponsibility

    5.1 Management commitment - New: topmanagement must demonstrate commitment todevelopment and implementation of the quality

    system and continually improving its effectiveness

    5.2 Customer focus - New: customerrequirements (identified per Clause 7.2.1) must be metwith the aim of enhancing customer satisfaction (a

    perception that must be measured per Clause 8.2.1)

    5.3 Quality policy - New: quality policy mustinclude commitment to meeting requirements andcontinual improvement of the effectiveness of theQMS, provide a framework for establishing/reviewingmeasurable quality objectives; and, quality policy

    must be periodically reviewed for continuing suitability

    Cl 5 M t

  • 8/2/2019 ISO 9001 PPT04

    34/61

    Clause 5 - Managementresponsibility

    5.4 Planning - New: establish measurablequality objectives at relevant functions and levelsin the organization needed to meet productrequirements (identified per Clause 7.1 a); andidentify and plan quality system processes (identified

    per Clause 4.1)

    5.5 Responsibility, authority andcommunication - New: managementrepresentative must promote awareness of

    customer requirements throughout theorganization; internal communications regarding theeffectiveness of the quality system must beestablished

    Cl 5 M t

  • 8/2/2019 ISO 9001 PPT04

    35/61

    Clause 5 - Managementresponsibility

    5.6 Management review - New: evaluate theneed for changes to the quality system (includingpolicy and objectives) by reviewing specified inputs(improvement opportunities)and reporting specifiedoutputs(related management actions and resource

    needs)

    Cl 6 R

  • 8/2/2019 ISO 9001 PPT04

    36/61

    Clause 6 - Resourcemanagement

    6.1 Provision of resources - New: determine

    and provide resources needed to implement andimprove the QMS and address customersatisfaction

    6.2 Human resources - New: determine

    needed competencies, evaluate effectiveness ofactions taken to satisfy competency needs; andensure employees are aware of the importance oftheir activities and how they contribute to achievingquality objectives

    6.3 Infrastructure and 6.4 WorkEnvironment - New: determine and manage theinfrastructure (buildings, workspace, utilities, equipmentand support services), as well as the work

    environment needed to achieve product conformance

  • 8/2/2019 ISO 9001 PPT04

    37/61

    Clause 7 - Product realization

    7.1 Planning of product realization - New:determine measurable quality objectives forcontracts, projects and products

    7.2 Customer-related processes - New: define

    the processes for communicating with thecustomer with regards to product information;inquiries, contracts or order handling, and customerfeedback, including complaints

    7.3 Design and development resources -New: design output to include appropriate informationfor purchasing, production and for service provision

  • 8/2/2019 ISO 9001 PPT04

    38/61

    Clause 7 - Product realization

    7.4 Purchasing - New: establish criteria forsupplier evaluation and selection, and periodic re-evaluation

    7.5 Production and service provision - New:Nothing, essentially the same as requirementscontained in Elements 4.7, 4.8, 4.9, 4.15, and 4.19 ofISO 9001:1994

    7.6 Control of measuring and monitoring

    devices - New: validate software used to verifyproduct

    Cl 8 M t

  • 8/2/2019 ISO 9001 PPT04

    39/61

    Clause 8 - Measurement,analysis and improvement

    8.1 General - New: plan and implementmonitoring, measurement, analysis andimprovement processes

    8.2 Monitoring and measurement - New:

    must measure and monitor customersatisfaction(note: customer satisfaction is anyinformation relating to the customers perception ofthe organizations ability to meet customer

    requirements); internal auditors must now be

    objective and impartial (vice independent); andprocesses used to manage the quality system mustbe measured/monitored to the degree necessary todemonstrate they achieved planned results

    Cl 8 M t

  • 8/2/2019 ISO 9001 PPT04

    40/61

    Clause 8 - Measurement,analysis and improvement

    8.3 Control of nonconforming product -New: Nothing, essentially the same as requirementscontained in Clause 4.13 of ISO 9001:1994)

    8.4 Analysis of data - New: analyze data to

    determine quality system effectiveness and toprovide information on customer satisfaction,supplier performance, product conformance, andprocess/product characteristics and trends used toidentify opportunities for preventive action

    8.5 Improvement - New: must improveeffectiveness of the quality managementsystem(note: accomplish through the use of qualitypolicy, objectives, audit results, analysis of data,corrective/preventive actions, and management review)

    ISO 9000 2000 t d d

  • 8/2/2019 ISO 9001 PPT04

    41/61

    ISO 9000:2000 standardsreleased December 2000

    The final International Standard (IS)was released 15 December 2000 andis available now

    Sector specific schemes are underreview and ISO 9000:2000 basedrevisions will be issued soon:

    Automotive: ISO/TS 16949

    Aerospace: AS 9100

    Telecommunications: TL 9000

    Essentially youll have 3

  • 8/2/2019 ISO 9001 PPT04

    42/61

    Essentially, you ll have 3years to transition to the

    new standards

    Accredited registrations to ISO9001/2/3:1994 may continue for up to3 years (through 12/03)

    Allows transition time for those in progress

    Both new registrations andcontinuations of current registrations

    based on 1994 standards will expireon or before the end of CY 2003

    Allows time for accredited organizations, registrars,and training activities/consultants

    So what should

  • 8/2/2019 ISO 9001 PPT04

    43/61

    So what shouldorganizations do NOW?

    Obtain assistance from qualified sources Obtain/conduct Management and Employee Awareness

    Training, Internal Auditor Training, and ProcessManagement Training

    Obtain/conduct a Gap Analysis

    Obtain guidance from your Registrar

    Obtain their transition plan, including provisions related to

    any sector specific schemes applicable to yourorganization (QS 9000 e.g.)

    Develop/implement your transition plan

  • 8/2/2019 ISO 9001 PPT04

    44/61

    Answers to FAQs ...

    Do I have to change my system?Not at the moment HOWEVER, it would be

    beneficial to look at the new standards as soon aspossible so you can get an idea of what new

    requirements are forthcoming

    Do I have to re-write my documents?

    NO HOWEVER, at a minimum, someadjustments will have to be made to address newrequirements and cross reference quality systemdocumentation to ISO 9001:2000

    Answers to FAQs

  • 8/2/2019 ISO 9001 PPT04

    45/61

    Answers to FAQs(continued) ...

    Will the changes affect my currentregistration / certification?

    Yes. A transition plan will need to be approved byyour registrar and incorporated into their regular audit

    routine

    I am not yet registered. Should Ipursue registration to the 1994

    standards first?Only if timing is an issue either way your

    system design should be based on the new standards consult with your Registrar to discuss options

  • 8/2/2019 ISO 9001 PPT04

    46/61

    The Role of Internal

    Audits has shifted...

    ISO9001

    1994

    Internal auditEffectivenessassessed in

    audit report

    Managementreview

    ISO90012000

    Customersatisfaction

    Managementdetermines

    effectiveness byanalyzing allavailable data

    and information

    Managementreview

    Internal audit

    Other data

  • 8/2/2019 ISO 9001 PPT04

    47/61

    Audit Methodologies ...

    Audit Planning

    Evaluating QMS Documentation

    Conducting Process Audits

    Using Internal Audits to:

    Verify QMS Effectiveness

    Identify Opportunities for Improvement

  • 8/2/2019 ISO 9001 PPT04

    48/61

    Audit Planning

    The Shift to Process Audits

    Element Audits, or Departmental Audits should giveway to process audits - i.e. audit (from start to finish)key processes the organization has defined as critical tomeeting the overall objectives of the organization

    Note: The processes selected, as well as their sequence andinterrelation, must make sense to the organization; however, theymust address all requirements of ISO 9001:2000 and the policyand objectives of the organization.

    Use Internal Audits for Improvement Audit scope should clearly state if/when the purpose of

    the internal audit will go beyond compliance audits andbe used to identify additional opportunities forimprovement

    Evaluating QMS

  • 8/2/2019 ISO 9001 PPT04

    49/61

    Evaluating QMSDocumentation

    Documentation requirements are lessprescriptive

    ISO 9001:2000 only requires a handful of documentedprocedures be in place

    All QMS processes, however, must be controlled by eithera documented procedure or well defined system

    Evaluating System Adequacy

    Assess organizations compliance with documentedprocedures and/or other well defined responsibilitiesassociated with the process under review (conformance)

    Verify that the system is achieving the desired results(performance)

  • 8/2/2019 ISO 9001 PPT04

    50/61

    Conducting Process Audits

    Identify QMS Process Owners

    Tools like Deployment Flowcharts can be invaluablein defining the sequence, interrelationship andresponsibilities associated with QMS Processes

    Evaluate Conformance Tools like our Checklist and Audit Guide can be

    invaluable in verifying that the documented procedureor process complies with ISO 9001:2000 requirements

    Evaluate Performance

    Verify that the organization is collecting and usingprocess performance data to monitor, measure andimprove processes

    Conducting Top

  • 8/2/2019 ISO 9001 PPT04

    51/61

    Conducting TopManagement Interviews

    The expanded role of top managementrequires more time be spent withthem during internal audits to collectevidence of their commitment to:

    Communicating importance of meeting requirements,

    Establishing quality policy and objectives,

    Conducting management reviews, and

    Ensuring availability of necessary resources.

    Interviewing

  • 8/2/2019 ISO 9001 PPT04

    52/61

    InterviewingProcess Owners

    Other managers (i.e. Process Owners)should be interviewed to collect evidencethat:

    Processes and improvement objectives are

    documented and planned, Processes and needed resources are deployed,

    Processes are monitored and measured, and

    Actions are taken, as warranted by analysis of

    process data.

    Note: Auditors should look for evidence that process

    sequence and interrelationships are known

    and interfaces are effectively managed to

    achieve the desired objectives.

  • 8/2/2019 ISO 9001 PPT04

    53/61

    Implications for Auditors

    Opportunities Find the holes as process linkages

    Follow the way the business actually works

    Value-addedauditing

    Challenges Process Audits versus Element Audits

    Fewer procedures

    Less prescriptive requirements for realizationprocesses

  • 8/2/2019 ISO 9001 PPT04

    54/61

    EXERCISE #3

    What are the three most significant changes included inISO 9001:2000?1. __________________________________________________________

    2. __________________________________________________________

    3. __________________________________________________________

    What are the benefits of using internal audit results to aidin assessing effectiveness and the need for improvement?

    1. __________________________________________________________

    2. __________________________________________________________

    3. __________________________________________________________

    How can you use internal audits to enhance employeeawareness and involvement in quality management?

    1. __________________________________________________________

    2. __________________________________________________________

    3. __________________________________________________________

    ISO 9001 2000 t ISO 9001 1994

  • 8/2/2019 ISO 9001 PPT04

    55/61

    ISO 9001:2000 to ISO 9001:1994Mapping

    ISO 9001:2000 ISO 9001:1994

    1. Scope 1

    1.1 General -

    1.2 Permissible Exclusions -

    2. Normative Reference 2

    3. Terms and Definitions 34. Quality Management System -

    4.1 General Requirements 4.2.1

    4.2 Documentation Requirements -

    4.2.1 General 4.5.2, 4.5.3

    4.2.2 Quality Manual 4.2.1

    4.2.3 Control of Documents 4.5

    4.2.4 Control of Quality Records 4.16

    ISO 9001 2000 t ISO 9001 1994

  • 8/2/2019 ISO 9001 PPT04

    56/61

    ISO 9001:2000 to ISO 9001:1994Mapping

    ISO 9001:2000 ISO 9001:1994

    5. Management Responsibility -

    5.1 Management Commitment 4.1, 4.1.2.2, 4.2.1

    5.2 Customer Focus 4.3.2

    5.3 Quality Policy 4.1.1

    5.4 Planning -5.4.1 Quality Objectives 4.1.1, 4.2.1

    5.4.2 Quality Management System Planning 4.2.3

    5.5 Responsibility, Authority, and Communication -

    5.5.1 Responsibility and Authority 4.1.2.1

    5.5.2 Management Representative 4.1.2.3

    5.5.3 Internal Communications -

    5.6 Management Review 4.1.3

    5.6.1 General 4.1.3

    5.6.2 Review Input 4.1.3

    5.6.3 Review Output 4.1.3

    ISO 9001 2000 t ISO 9001 1994

  • 8/2/2019 ISO 9001 PPT04

    57/61

    ISO 9001:2000 to ISO 9001:1994Mapping

    ISO 9001:2000 ISO 9001:1994

    6. Resource Management -

    6.1 Provision of Resources 4.1.2.2

    6.2 Human Resources -

    6.2.1 Assignment of Personnel 4.1.2.2, 4.2.3, 4.18

    6.2.2 Competence, Awareness, and Training 4.186.3 Infrastructure 4.1.2.2, 4.9

    6.4 Work Environment 4.9

    7. Product Realization -

    7.1 Planning of Product Realization 4.2.3, 4.9, 4.10.1

    7.2 Customer-Related Processes -

    7.2.1 Determination of Product Requirements 4.3.2, 4.4.4

    7.2.2 Review of Product Requirements 4.3

    7.2.3 Customer Communication 4.3.2

  • 8/2/2019 ISO 9001 PPT04

    58/61

    ISO 9001 2000 t ISO 9001 1994

  • 8/2/2019 ISO 9001 PPT04

    59/61

    ISO 9001:2000 to ISO 9001:1994Mapping

    ISO 9001:2000 ISO 9001:1994

    7.5 Production and Service Provision -

    7.5.1 Control of Production and Service Provision 4.9, 4.10.3,

    4.15.6, 4.19

    7.5.2 Validation of Special Processes 4.9

    7.5.3 Identification and Traceability 4.8, 4.10.5, 4.127.5.4 Customer Property 4.7

    7.5.5 Preservation of Product 4.15

    7.6 Control of Monitoring and Measuring Devices 4.11

    ISO 9001 2000 t ISO 9001 1994

  • 8/2/2019 ISO 9001 PPT04

    60/61

    ISO 9001:2000 to ISO 9001:1994Mapping

    ISO 9001:2000 ISO 9001:1994

    8. Measurement, Analysis, and Improvement -

    8.1 General 4.10, 4.20.1

    8.2 Monitoring and Measurement -

    8.2.1 Customer Satisfaction -

    8.2.2 Internal Audit 4.178.2.3 Monitoring and Measurement of Processes 4.9, 4.20.1

    8.2.4 Monitoring and Measurement of Product 4.10, 4.20

    8.3 Control of Nonconforming Product 4.13

    8.4 Analysis of Data 4.14, 4.20

    8.5 Improvement -

    8.5.1 Continual Improvement 4.1.3

    8.5.2 Corrective Action 4.14.1, 4.14.2

    8.5.3 Preventive Action 4.14.1, 4.14.3

    Where can I obtain more

  • 8/2/2019 ISO 9001 PPT04

    61/61

    Where can I obtain moreinformation?

    On the world-wide web:ISO web site www.iso.ch

    TC 176 web site www.bsi.org.uk/iso-176-sc2

    ASQ web site www.asq.org

    ISO-ONLINE web site www.isoqual.net

    Other questions?ISO-ONLINE Email: [email protected]

    or call (502) 244-6183