Top Banner
ISO 22000:2005 ISO 22000:2005 標準簡介 標準簡介 經濟部標準檢驗局製作 經濟部標準檢驗局製作
77

ISO 22000:2005 - bsmi.gov.tw · 一、iso 22000範圍及概念 二、iso 22000標準之架構 三、iso 22000標準條文介紹 四、iso 22000與haccp間之對照 五、iso 22000與iso

Jul 11, 2018

Download

Documents

duonghuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • ISO 22000:2005ISO 22000:2005

  • ISO 22000

    ISO 22000

    ISO 22000

    ISO 22000HACCP

    ISO 22000ISO 9001

  • ISO 22000

  • 1)ISO 22000 ISO 90012000

    2)ISO 22000(FSMS)

    3)ISO 22000

    4)ISO 22000HACCP

    5)

  • ,

  • 1)ISO 22000

    1. ISO 220002005Food Safety Management SystemRequirements for any organization in the food chain

    2.ISO 220001)2)3)4)5)6)7)8)

    2)ISO 22000

  • ISO 22000

  • ISO 22000---(1)

    44.14.255.15.25.35.45.55.65.75.8

  • ISO 22000---(2)

    66.16.26.36.477.17.2(PRPs)7.37.4(HA)7.5(OPRPs)7.6 (HACCP plan)

  • ISO 22000---(3)

    7()7.7PRPsHACCP

    7.87.97.1088.18.2(validation)8.38.4(verification)8.5

  • ISO 22000

  • 3.1 food safety/(3.3)

    3.2 food chain1

    2

    3.3 food safety hazard

  • 1 (hazard)(risk)()()ISO/IEC Guide 51

    23

    (:)/

  • 3.4 food safety policy(3.9)

    3.5 end product

    3.6 flow diagram

  • 3.7 control measure3.3

    3.8 prerequisite program(3.2)3.5(PRPs)

    (GAP)(GVP)(GMP)(GHP)(GPP)(GDP)(GTP)

  • 3.9 operational prerequisite programPRPs(3.8)3.3/

    3.10 Critical control point3.3

    3.11 crticial limit3.10

  • 3.12 (monitoring(3.7)

    3.13 correction

    1(3.14)

    2/

    3.14 corrective action12

  • 3.15 validationHACCP(OPRPs)3.9

    3.16 verification

    validationverificationCX/FH 05/37/07 Codex alimentarius commission 12/2004Proposed Draft Guidelines for the Validation of Control Measures

    3.17 updating/

  • ISO 22000(4)-1

    4...4.1(a)

    (b)

    (c)

  • (d)

    4.24.2.1(a)(5.2 )(b)(c)

    ISO 22000(4)-2

  • 4.2.24.2.3

    (a)(b)(c)(d)(e)(f)(g)

    ISO 22000(4)-3

  • 4.2.3

    ISO 22000(4)-4

  • ISO 22000(5)-1

    5.5.1--(Top management) (a)(b)(c)(d)(e)

    5.2--(Top management) (a)

  • (b)(c)(d)( 5.8 )(e)( 5.6 )(f)

    5.3-(Top management) (a)4.1(b)

    ISO 22000(5)-2

  • 5.4--(Top management) (1)5.5(a)( 7.3.2 )(b)(c)(d)

    ISO 22000(5)-3

  • ISO 22000(5)-4

    5.65.6.1(a)(b)()(c)(d)

  • ( 8.5.2 )( 5.8.2 )

    5.6.2

    ISO 22000(5)-5

  • (a)(b)(c)(d)(e)(f)(g)/(h)(i)(j)(k)(l)(m)( 8.5.2 )

    ISO 22000(5)-6

  • 5.7

    5.85.8.1 ( 4.2.3 )

    ISO 22000(5)-7

  • 5.8.2(a)(b)( 8.4.3 ) (c)( 5.6.2 ) (d)( 5.7 )( 7.10.4 )(e) ( 8.5.2 ) (f)( 5.6.1 )(g)

    ISO 22000(5)-8

  • 5.8.3(a)( 4.1 )(b)( 8.5 )(c)( 6.1 )(d)( 5.2 )

    ISO 22000(5)-9

  • ISO 22000(6)-1

    6.6.1

    6.26.2.1

  • 6.2.2(a)(b)(c)

    (d)(a)(b)(c)(e)

    (f)( 5.6 )

    (g)(b)(c)

    ISO 22000(6)-2

  • 6.3

    6.4

    ISO 22000(6)-3

  • ISO 22000(7)-1

    7.7.1(PRPs)(OPRPs)/(HACCP)7.2(PRPs)7.2.1PRPs(a)(b)(c)

  • 7.2.2 (PRPs)(a)(b)(c)(d)

    7.2.3/PRPs((Codex))

    ISO 22000(7)-2

  • ISO 22000(7)-3

    (a)(b)(c)(d)(e)(f)()()()()(g)(h)(i)(j)(k)PRPs( 7.8 )

    PRPs( 7.7 )PRPs

  • ISO 22000(7)-4

    7.3(HA)7.3.17.3.2( 6.2.2 )

  • 7.3.37.3.3.1( 7.4 )(a)(b)(c)(d)(e)(f)(g)/(h)( 7.7)

    ISO 22000(7)-5

  • 7.3.3.2(7.4 )(a)(b)(c)(d)(e)(f)/(g)( 7.7)

    ISO 22000(7)-6

  • 7.3.4( 7.4 )

    ( 7.7)

    7.3.57.3.5.1

    ISO 22000(7)-7

  • (a)(b)(c)(d)(e)7.8

    7.3.5.2/( 7.4 ) ()7.7

    ISO 22000(7)-8

  • ISO 22000(7)-9

    7.4(HA)7.4.17.4.27.4.2.1(a)7.3(b)(c)(d)()

  • 7.4.2.2(a)(b)/(c)

    7.4.2.3

    ISO 22000(7)-10

  • ISO 22000(7)-11

    7.4.3(assessment)( 7.4.2 )

    7.4.47.4.37.3.5.2

  • ISO 22000(7)-12

    (OPRPs)HACCP(a)(b)()(c)(d)(e)(f)(g)(

  • HACCP7.67.5(OPRPs)

    ISO 22000(7)-13

  • ISO 22000(7)-14

    7.5(OPRPs)(OPRPs)(a)( 7.4.4 )(b)( 7.4.4 )(c)(d)( 7.10.17.10.2 )(e)(f)

  • ISO 22000(7)-15

    7.6(HACCP PLAN)7.6.1HACCP(a)CCP( 7.4.4 )(b)( 7.4.4 )(c)( 7.6.3 )(d)( 7.6.4 )(e)( 7.6.5 )(f)(g)

    7.6.2 (CCPs)HA ( 7.4.4 )

  • 7.6.3 (critical limits)----()()/

    ISO 22000(7)-16

  • 7.6.4 CCPsCCPCCP(a)(b)(c)( 8.3 )(d)(e)(f)

    ISO 22000(7)-17

  • 7.6.5 HACCPCCPs( 7.10.2 )( 7.10.3 )

    ISO 22000(7)-18

  • ISO 22000(7)-19

    7.7PRPsHACCP( 7.5 )/HACCP( 7.6 )

    (a)( 7.3.3 )(b)( 7.3.4 )(c)( 7.3.5.1 )(d)( 7.3.5.2 )(e)( 7.3.5.2 )HACCP( 7.6.1 )(7.2 )

  • 7.8 (Verification planing)(a)(PRPs)( 7.2 )(b)( 7.3 )(c)OPRPs( 7.5 )HACCP( 7.6.1 )(d)( 7.4.2 )(e)

    ( 8.4.3 )

    ( 7.4.2 )7.10.3

    ISO 22000(7)-20

  • ISO 22000(7)-21

    7.9

  • ISO 22000(7)-22

    7.107.10.1(corrections)( 7.6.5 )(a)( 7.10.3 )

    (b)7.10.3(OPRPs)7.10.3

  • 7.10.2(corrective actions)(OPRPs)(6.2)(5.4)(7.6.5)(a)()(b)(c)(d)(e)(f)(g)

    ISO 22000(7)-23

  • ISO 22000(7)-24

    7.10.37.10.3.1(a)(b)( 7.4.2 )(c)

    ( 7.10.4 )(withdrawal)(recall)

  • 7.10.3.2 (release)(a)(b)(7.4.2)(c)/

    7.10.3.3(disposition)(a)(b)/

    ISO 22000(7)-25

  • 7.10.4(withdrawals)

    (a)(b)(1)(/)(2)(3)()( 5.8.2 )()

    ISO 22000(7)-26

  • ISO 22000(8)-1

    8.8.1/(verify)(improve)8.2OPRPsHACCP( 8.5.2 )( 3.15 )(a)(b)/( 7.4.4 )(/)//

  • 8.3(a)(b)(c)(d)(e)

    ISO 22000(8)-2

  • 8.4(verification)8.4.1(a)(b)( 8.5.25.8.2 )

    ISO 22000(8)-3

  • 8.4.2( 7.8 ) (a)( 5.67.7 )(b)(7.4)(OPRPs)( 7.5 )HACCP( 7.6.1 )(c)(PRPs)( 7.2 )(d)( 6.2 )

    ISO 22000(8)-4

  • 8.4.3( 8.4.1 )(a)(b)(c)(d)(e)

    ( 5.8.2 )( 8.5.2 )

    ISO 22000(8)-5

  • 8.58.5.1( 5.6 )( 5.8 )( 8.4.1 )( 8.4.2 )( 8.4.3 )( 8.2 )( 7.10.2 )( 8.5.2 )

    ISO 9001ISO 9004ISO 9001

    ISO 22000(8)-6

  • 8.5.2( 7.4 )(OPRPs)( 7.5 )HACCP( 7.6.1 )

    (a)( 5.6 )(b)(c)( 8.4.3 )(d)( 5.8.3 )

    ( 5.8.2 )

    ISO 22000(8)-7

  • ISO 220002005

    ISO 22000

  • ISO 22000HACCP

  • HACCP HACCP ISO 22000:2005

    HACCP 1 7.3.2

    2 7.3.37.3.5.2

    3 7.3.4

    45

    7.3.5.1

    1

    6 7.47.4.2

    7.4.37.4.4

    HACCP ISO 22000:2005

  • PRPsHACCP

    4.27.7

    12

    7

    7.8

    11

    6HACCP

    7.6.5

    10

    5CCP

    7.6.49

    CCP

    4CCP

    7.6.38

    CCP

    3

    7.6.27

    2(CCP)

    ISO 22000HACCP HACCP

  • ISO 22000HACCPHACCPISO 22000(15)

    4.2 5.1 5.2 5.3 5.6.1 +5.6.25.7 5.8 7.4.4

    7.5(OPRP)7.7PRPsHACCP

    7.87.10.38.4.2(

    7.8)8.4.3(

    8.4.2)8.5()

  • ISO 22000ISO 9001

  • ISO 22000ISO 9001ISO 22000ISO 9001(12)

    5.2

    5.5

    5.7

    7.2

    7.3

    7.3.2

    7.4

    7.5 (OPRP)

    7.6 HACCP

    8.2

    8.4.2

    8.4.3

  • 7

    (7)

    1

    (7.3)

    2

    HACCP

    (7.6)

    OPRPs

    (7.5)5

    6

    (8.3)

    +

    (7.10.2)

    8(8.4.1)

    +

    (8.4.2+8.4.3)

    9

    (8.5)

    10

    (7.5)

    4

    (7.4)

    3

    FSMS

    ISO 22004:20051

  • ISO22000ISO22000

    TEL02-23431805 [email protected]://www.bsmi.gov.tw

    IISO22000SO22000

  • END