Islanding System in RSP  An Overview 

Page 2: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 2/22

Islanding Deliberate act of Isolation of a running Unit/s

with compatible loads to save the Unit/s from

tripping when Grid is having unstable

condition.

Page 3: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 3/22

RSP Power System..

Page 4: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 4/22

Islanding Scheme… 

Page 5: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 5/22

Islanding with One unit..

Page 6: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 6/22

Sensing Islanding Condition … 

• At MSDS-II:

 – Single Unit Islanding &

 – Double Unit Islanding

• Relay 1A & 1B connected to HSL Feeder-1

• Relay 2A & 2B connected to HSL Feeder-2 –  MiCOM P341 (Areva Make) numerical relays

• At CPP-II

 – Single Unit followed by Double Unit Islanding• FCX Relay connected to 132kV Islanding Bus CVT

 –  Sensing Under frequency during islanded condition

Page 7: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 7/22

Islanding Conditions … 

• Directional O/C ( E/F) combined with Under 

Voltage

 – Over Current

• Directional Forward ( towards line)

• IEC E Inv, 300A ( Each Feeder), TMS-0.125 –  150A, 0.125 for One Generator / One Feeder condition

 – Under Voltage

• Definite Time

• 52.66 kV ( 70%) Phase- Neutral

• Time Delay- 0 s

Page 8: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 8/22

Islanding Conditions … 

• Reverse Power combined with U/F

 –  Reverse Power 

• Directional Forward ( towards line)

• 28.8MW ( Each Feeder) for 5 Sec

 –  Under Frequency

• 48 Hz for 1.0 Sec

• Pure Under Frequency

 –  47.6 Hz for 300 ms

• Rate of change of Frequency –  1.5 Hz /sec ( +/-)

 –  Time Delay 200 ms

 –  Inhibit band – 49.5 – 50.5 Hz

Page 9: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 9/22

Islanding Conditions … 

• Under Voltage (pure)

 – 60 kV ( 80%) ( Phase to Neutral)

 – Definite Time ; Time delay 1.5 sec

• Over Voltage – 91.2 kV ( 120%) ( Phase to Neutral)

 – Definite Time ; Time delay 2.0 sec

• Voltage Vector shift

 – 10 Degree

Page 10: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 10/22

Sequence Logic … 

1A 1B

2A 2B

OR  d1  b1

d2/d3

d4

CPP-1 CPP-2DU

SU

TRIP HSL FDR-1 & 2

HSL FDR-1 OFF

HSL FDR-2 OFF

AND d5

MSDS-2

RM-2

Page 11: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 11/22

Sequence Logic … 

OR 

d9

d6

RM-1

MSDS-3SU

DU

TRIP

SEC-2 B/C

CPP-1

MSDS-2

d8

CPP-2 U/F

SU

SU

DU

Page 12: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 12/22

Sequence Logic … 

OR 

C21 TRIP MD2 LINE

CPP-2

MSDS-2

C22

CPP-1

FCX

DUAND

U1

U2

DU

DU

AND

AND

RH29

AND

G1 G2

AND

AND

OR 

U1

U2

U1

U2

U2

U1

SU

SUAND

SUU2U1

TRIP B/C

Page 13: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 13/22

Synchronisation… 

Page 14: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 14/22

Evolution … 

CPP-1-GEN

CPP-1-GRID

RM-2

MSDS-3

MSDS-3

CPP-2 MSDS-2

MSDS-2

I nception 

1980 

1987 

1997 

1989-90  RM-1 Gen

RM-1 Grid

33 KV GRID

Page 15: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 15/22

Evolution of Islanding Scheme … 

• Since inception

 –  Isolation from grid at CPP-I and RM-1 through voltage

dependent U/F relays.

• Independent Relays at CPP-1 and RM-1

• 1987

 –  CPP-2 units commissioned

 –  No Islanding scheme was available for CPP-2 units.

• 1989

 –  Single Unit Islanding scheme commissioned• U/F, -dF/dt & U/V isolation provided

 –  Scheme suggested by Consultant (TCE)

 –  Although Double Unit Islanding scheme was provided by consultant, it

was not taken into service.

Page 16: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 16/22

Evolution of Islanding Scheme … 

• 1999

 – Islanding on U/V kept defected.

• To prevent isolation followed by tripping of Islanded unit

during U/V caused by internal faults.

• 2000 – DOC Islanding put into service

• Current feedback to grid combined with Under Voltage

initiated isolation

• Isolation of HSL Fdr- 1&2 at MSDS-II

• IEC SI curve for DOC

 – DU and SU islanding also included in the scheme.

Page 17: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 17/22

Evolution of Islanding Scheme … 

• 2002

 –  Numerical Islanding relay installed at MSDS-2

 – DOC / DEF combined with U/V used for double

unit isolation.

• 2005

 – DOC /DEF combined with U/V implemented for 

Single Unit Islanding also.

• 2006 – Islanding scheme as in service now implemented.

Page 18: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 18/22

Features of Present Scheme… 

• Sensing of all islanding conditions shifted to MSDS-2

( Common Coupling point)• dF/dt rise, Over voltage , Over Frequency, Under 

Voltage and Vector Shift introduced.

• IEC EI characteristics for DOC/ DEF

 –  For in-sensitivity to remote end faults

• Directional O/C & E/F relays introduced in grid sideof HSL fdr.

 –  To prevent tripping in case of grid fault.

• Dynamic relay setting for single Unit/ single Feeder configuration.

• Dedicated Islanding Panel commissioned in MSDS-2

Page 19: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 19/22

Constraints…. 

• Post islanding stability of CPP-2 units is not

satisfactory.

 –  No of failure of Units after successful isolation is very high

 –  Problems attributed to Governing & Excitation system

• System is not designed from islanding perspective

 –  No dedicated load connected to generator bus

 –  All grid faults are terminal faults to CPP-2 generators.

 –  Transmission & Distribution configuration is inadequate in

isolated condition

 –  Multi-point isolation.

Page 20: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 20/22

Constraints…. • Constraints of Islanding Load

 –  Fluctuating Loads have to be shed during islanded condition

 –  Manual estimation islanding loads.

 –  Post islanding load management feature not available

 –  Failure of islanding due to load-starvation

• Failure of islanding due to non-system faults

 –  Complicated Sequence logic

 –  Multiple islanding locations connected by control cabling

 –  CPP-2 unit status and Grid Power status not available in

islanding scheme

Page 21: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 21/22

Constraints… 

• Difficult synchronization process

 –  Synchronization facility not available in Common Coupling

 point ( MSD-2)

 –  Multiple operations required for synchronization.

 –  Multiple asynchronous points• CPP-1 & CPP-2 not running synchronism after 

islanding

 –  Limit on islanding loads even in presence of generation

capability

• Information for Disturbance / Failure analysis not

available

Page 22: Islanding System

7/30/2019 Islanding System

http://slidepdf.com/reader/full/islanding-system 22/22

 Actions… 

• Dedicated control cables between islanding locations

 –  Status of Grid side CB of HSL feeders and CPP-2 unit CBshall be available

 –  No. of interposing relays shall be reduced- Islanding

commands shall be transmitted radially.

• Cable Laying job under progress- completion expected by Mar’07 

• Redundant Islanding relays

 –  Ensure 100% sensing of islanding conditions

• Commissioned in Jun’06 

• Third HSL Feeder to MSDS-3

 –  HSM/LHF can run during islanding(if power is available)

 –  Synchronization shall be easier.

• Job under progress- expected by APR’07