IRG‐16‐261‐A Solar Saturn 10 Version T1302 Compression Packages Bid Document 1| Page IRG‐16‐261‐A See the complete Bid Package Documentation before submitting a bid on this material. Documentation items include: A) 4 page list of equipment make, model, serial numbers, design parameters, condition, hours, items included or NOT included B) 36 pages of pictures of the 9 ea. Natural Gas Turbine Compression Packages C) 11 pages of pictures of spare compressors and turbine assembly and other miscellaneous parts D) 9 Solar Turbine Overhaul Reports. One for each unit, approximately 134 pages E) Bid Page Terms and Conditions 1) Bid must be valid for 90 days 2) Equipment removal to occur on an agreed upon schedule and pace. Duration not to exceed 90 days. 3) Seller will need time for internal AFE funding approval for drain, purge, air‐gap and isolation activities from other existing facilities. (Estimated time 90 days before removal can begin) 4) Equipment removal will most likely not begin until 01‐Apr‐17 or later. 5) 10% deposit required at acceptance and balance due within 10 days’ notice that drain, purge, air‐gap and isolation activities are complete and authorization for mobilization to begin dismantlement is approved. 6) Equipment is SOLD as is WHERE is. 7) Who pays for equipment load out, Seller or Buyer, – TBD – Option Dependent 8) Buyer will be responsible for trucking; trailers/vehicles must be suitable for transporting material. 9) Buyer will be responsible to provide all blocking, bracing materials, crating, packing, padding and straps to secure loads. SELLER reserves the right to reject any or all bids. Only the successful bidder will be notified of awards. Deposit payment is by Cashier’s Check or Wire Transfer and due upon receipt of notification of award. All sales will be charged sales tax unless payment for material is accompanied by resale tax exemption certificate. Equipment to be removed from property within agreed upon schedule at buyer’s expense. Seller description of material is based on the best available information. Seller provides no express warranties and/or guarantees as to the quantity, quality, and/or fitness for any use or purpose. Site visits to be coordinated with Dennis Burke (281) 944‐4240. [email protected]Tentative site visit dates are: Week 24 th and/or Week 31 st 4‐Oct. Client is selling 9 ea. Solar Saturn 10 Version T1302 Compression Packages. Location is in East Texas. Original installation was in 1971. Units have been upgraded over the years from Saturn T1001 packages to T1302 packages. The units are set up to currently operate as 3 ea. 2 nd stage units, 3 ea. 3 rd stage units, 3 ea. 4 th stage units. 1st stage is handled by a VRU which gets gas from 0 psia up to about 20 psia. The VRU is NOT included in the sale. It is being retained. All 9 units have upgraded Solar Fuel Systems installed in 2011/2012. 6 of the 9 units have upgraded Solar Turbotronic NEMA Console Panels. Also installed in 2011/2012. The Units were last run in 2013 when they were replaced by compression in the new adjacent LNG plant. Client wants to sell for best recovery value and will entertain multiple purchase scenarios.
57
Embed
IRG 16 261 A Solar Saturn 10 Version T1302 … · IRG‐16‐261‐A Solar Saturn 10 Version T1302 Compression Packages ... 36 pages of pictures of the 9 ea. Natural Gas Turbine Compression
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
IRG‐16‐261‐A Solar Saturn 10 Version T1302 Compression Packages Bid Document
1 | P a g e IRG‐16‐261‐A
See the complete Bid Package Documentation before submitting a bid on this material. Documentation items include:
A) 4 page list of equipment make, model, serial numbers, design parameters, condition, hours, items included or NOT included
B) 36 pages of pictures of the 9 ea. Natural Gas Turbine Compression Packages C) 11 pages of pictures of spare compressors and turbine assembly and other miscellaneous parts D) 9 Solar Turbine Overhaul Reports. One for each unit, approximately 134 pages E) Bid Page
Terms and Conditions 1) Bid must be valid for 90 days 2) Equipment removal to occur on an agreed upon schedule and pace. Duration not to exceed 90 days. 3) Seller will need time for internal AFE funding approval for drain, purge, air‐gap and isolation activities from
other existing facilities. (Estimated time 90 days before removal can begin) 4) Equipment removal will most likely not begin until 01‐Apr‐17 or later. 5) 10% deposit required at acceptance and balance due within 10 days’ notice that drain, purge, air‐gap and
isolation activities are complete and authorization for mobilization to begin dismantlement is approved. 6) Equipment is SOLD as is WHERE is. 7) Who pays for equipment load out, Seller or Buyer, – TBD – Option Dependent 8) Buyer will be responsible for trucking; trailers/vehicles must be suitable for transporting material. 9) Buyer will be responsible to provide all blocking, bracing materials, crating, packing, padding and straps to
secure loads.
SELLER reserves the right to reject any or all bids. Only the successful bidder will be notified of awards. Deposit payment is by Cashier’s Check or Wire Transfer and due upon receipt of notification of award. All sales will be charged sales tax unless payment for material is accompanied by resale tax exemption certificate. Equipment to be removed from property within agreed upon schedule at buyer’s expense. Seller description of material is based on the best available information. Seller provides no express warranties and/or guarantees as to the quantity, quality, and/or fitness for any use or purpose.
Site visits to be coordinated with Dennis Burke (281) 944‐4240. [email protected] Tentative site visit dates are: Week 24th and/or Week 31st 4‐Oct. Client is selling 9 ea. Solar Saturn 10 Version T1302 Compression Packages. Location is in East Texas. Original installation was in 1971. Units have been upgraded over the years from Saturn T1001 packages to T1302 packages. The units are set up to currently operate as 3 ea. 2nd stage units, 3 ea. 3rd stage units, 3 ea. 4th stage units. 1st stage is handled by a VRU which gets gas from 0 psia up to about 20 psia. The VRU is NOT included in the sale. It is being retained. All 9 units have upgraded Solar Fuel Systems installed in 2011/2012. 6 of the 9 units have upgraded Solar Turbotronic NEMA Console Panels. Also installed in 2011/2012. The Units were last run in 2013 when they were replaced by compression in the new adjacent LNG plant. Client wants to sell for best recovery value and will entertain multiple purchase scenarios.
IRG‐16‐261‐A Solar Saturn 10 Version T1302 Compression Packages Bid Document
2 | P a g e IRG‐16‐261‐A
Option 1 Complete purchase of all 9 turbine compression skids – front to back including stainless steel filter boxes, Solar Saturn gas and power turbines, Western gearboxes, York 2nd and 3rd stage compressors, Solar C168 4th stage compressors (Only 2 available – missing 1) and all spares and spare parts. (See Lists). Including Solar Gas Fuel Module Upgrades (All 9 units) and Solar Turbotronic NEMA Consoles (Only 6 remain)
Option 1A Bid Price:$_____________________ Buyer pays for removal and loadout
Option 1B Bid Price:$_____________________ Seller pays for removal and loadout
Option 1C Complete skids front to back like Option 1 but for a quantity less than all 9. Buyer to specify which unit(s) and give pricing for each individual unit to be purchased
Option 1CA Buyer specifies which unit numbers ‐ Buyer pays for removal and loadout
Option 1CB Buyer specifies which unit numbers ‐ Seller pays for removal and loadout
Option 1CA Bid Price BUYER pays for removal and loadout
Option 1CB Bid Price SELLER pays for removal and loadout
Unit #41 $ $
Unit #42 $ $
Unit #43 $ $
Unit #44 $ $
Unit #45 $ $
Unit #46 $ $
Unit #47 $ $
Unit #48 $ $
Unit #49 $ $
Total $ Total $
IRG‐16‐261‐A Solar Saturn 10 Version T1302 Compression Packages Bid Document
3 | P a g e IRG‐16‐261‐A
Option 2 Partial purchase of equipment. Buyer to specify what they want to recover from specific units (41 – 49) and give pricing accordingly for each major component so that bids can be assessed fairly. (al la carte method) A) Unit Number Specific B) Stainless Steel Filter Box C) Solar Saturn gas turbine and power turbine D) Western Gearbox (Units 41 thru 46) E) York 2nd stage on Units 41,42,43 or York 3rd stage on Unit 46 ONLY. York 3rd stage REMOVED on Units 44
and 45 – NOTE: See Spares List. There are 2 ea. refurbished York 3rd stage SPARES. There also are 2 ea. Condition 3 – Unrepaired 2nd stage York compressors
F) Solar C168 4th stage compressor on Units 47 and 49 Only (Only 2 – missing 1 – Unit 48) G) Solar Gas Fuel Module Upgrades (9 units available) H) Solar Turbotronic NEMA Consoles (Only 6 available – Units 44 thru 49)
See bidding matrix on the next pages for Option 2A and 2B
I) Spare Parts: (Seller Loads for Buyer. If material needs to be re‐packaged – Buyer’s cost)
Spare Item No. 12 – Solar Saturn PT Assembly Condition 3 ‐ Location Old Carport $
Spare Item No. 13 ‐ Crate of York Compressor Parts ‐ Location Old Carport $
Spare Item No. 14 ‐ Crate of York Compressor Parts ‐ Location Old Carport $
Total $
Option 2A – for each specified item ‐ Buyer pay for removal and loadout
IRG‐16‐261‐A Solar Saturn 10 Version T1302 Compression Packages Bid Document
4 | P a g e IRG‐16‐261‐A
Unit B) Stainless Steel Filter Box
C) Solar Saturn GT + PT
D) Western Gearbox (41‐46 )
E) York Compressor
F) Solar C168 compressor
G) Solar Gas Fuel M
odule Upgrad
es
H) Solar Tu
rbotronic NEM
A Consoles
#41 $ $ $ $ $
#42 $ $ $ $ $
#43 $ $ $ $ $
#44 $ $ $ $ $
#45 $ $ $ $ $
#46 $ $ $ $ $ $
#47 $ $ $ $ $ $
#48 $ $ $ $ $
#49 $ $ $ $ $ $
See bidding matrix on the next page for Option 2B
Option 2B – for each specified item ‐ Seller pay for removal and loadout
IRG‐16‐261‐A Solar Saturn 10 Version T1302 Compression Packages Bid Document
5 | P a g e IRG‐16‐261‐A
Unit B) Stainless Steel Filter Box
C) Solar Saturn GT + PT
D) Western Gearbox (41‐46 )
E) York Compressor
F) Solar C168 compressor
G) Solar Gas Fuel M
odule Upgrad
es
H) Solar Tu
rbotronic NEM
A Consoles
#41 $ $ $ $ $
#42 $ $ $ $ $
#43 $ $ $ $ $
#44 $ $ $ $ $
#45 $ $ $ $ $
#46 $ $ $ $ $ $
#47 $ $ $ $ $ $
#48 $ $ $ $ $
#49 $ $ $ $ $ $
Option 3 Buyer to make alternate proposal to Seller for consideration. Must contain enough information for Seller to be able to weigh against all other proposals received. Use this page or submit separate letter with any additional bid option proposals or comments regarding your bid.
(Option 3 Continued)
IRG‐16‐261‐A Solar Saturn 10 Version T1302 Compression Packages Bid Document
6 | P a g e IRG‐16‐261‐A
Company
Name
Street Address
City State
Zip Phone
E‐mail
Bid Due Date is November 8, 2016 at 2:00 PM Central Time
All questions concerning this Bid Package should be directed to Dennis K. Burke at (281) 944‐4240 or
Additional Spare ItemsSpare Item No. 12 Power Turbine Spare Item No. 4 o‐Pallet of York Parts ‐ Location Inert Gen. Bldg
Tag N/A Spare Item No. 5 o‐Pallet of York Parts ‐ Location Inert Gen. Bldg
Item PT Assembly Spare Item No. 6 o‐Compressor Wheel Transport Case ‐ Location Inert Gen. Bldg
Type Centrifugal Spare Item No. 8 o‐Crate of York Compressor Parts ‐ Location Old Maintenance Shop
Mfg Solar Spare Item No. 9 o‐Misc York Parts ‐ Location Old Maintenance Shop
Model E919330D92A Spare Item No. 10 o‐Expansion Jts ‐ Location Old Maintenance Shop
SN TUG06‐S3424 Spare Item No. 11 o‐Misc Hoses ‐ Location Old Maintenance Shop
HP Unknown Spare Item No. 13 o‐Crate of York Compressor Parts ‐ Location Old Carport
RPM Unknown Spare Item No. 14 o‐Crate of York Compressor Parts ‐ Location Old Carport
Comments*
o‐Condition 3 ‐ Unrepaired ‐ Location Old Carport
o‐ Two boxes of miscelaneous parts. May be York and or Solar or both. Crate 13 looks "USED".
Spares Available at Plant Location
Page 4 of 4
IRG-16-261-A Solar Saturn 10 Model T1302 Gas Turbines w/ York and Solar Compressors
Offered by Material Management Resources, Inc. Contact: [email protected] Office: 281-944-4240
9 Turbine Compression Packages 3 Groups of 3 ea. 2nd Stage, 3rd Stage and 4th Stage Units 2nd Stage use York Model M426-A6 3rd Stage use York Model 425-B8 4th Stage use Solar Model C168 (Only 2 of the 3 Solar compressor bodies are available) Some spares available, mostly York Compressors and some minor parts
Also have updated Solar Turbotronic Control Panels (on 6 Units, 3 redeployed internally) and Solar Fuel Gas Systems all 9 Units (2011 + 2012 vintage)