IRESEN Workshop on Sun Building Integrated Photovoltaics 11 February 2014 Sofitel Hotel, Rabat, Morocco Presented on behalf of the Project Consortium by Prof. Abdelfettah BARHDADI Physics of Semiconductors and Solar Energy Research Team Ecole Normale Supérieure, University Mohammed V Agdal, Rabat, Morocco [email protected]
14
Embed
IRESEN Workshop on Sun Building Integrated Photovoltaics 11 February 2014 Sofitel Hotel, Rabat, Morocco IRESEN Workshop on Sun Building Integrated Photovoltaics.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
IRESEN Workshop on Sun Building Integrated Photovoltaics11 February 2014
Sofitel Hotel, Rabat, Morocco
IRESEN Workshop on Sun Building Integrated Photovoltaics11 February 2014
Sofitel Hotel, Rabat, Morocco
Presented on behalf of the Project Consortium by
Prof. Abdelfettah BARHDADI
Physics of Semiconductors and Solar Energy Research TeamEcole Normale Supérieure, University Mohammed V Agdal, Rabat, Morocco
Introduction:Introduction:Pertinence of the project Pertinence of the project
Each PV System has a Productivity which can be defined as the efficiency of this system when operating on site, under real conditions, for a long period (month, year, …)
The Productivity of PV systems is the key factor which determine the success of PV projects.
The good assessment of the Productivity is therefore Very Important for investors' decisions in PV
Establishment of a Reliable Moroccan Productivity Mapping of3 kinds of grid-connected PV power plants (Mono-Si, Poly-Si, a-Si:H)
Global Scope of the ProjectGlobal Scope of the Project
Specific Scopes of the ProjectSpecific Scopes of the Project
1. Direct measurements of the PV energy produced on 20 different Moroccan sites, under real operating conditions, each 15 min, to deduce the monthly and the yearly productivities in each site for each PV system.
2. Propose a simple method for data correction and appropriate extrapolation for all the other sites in Morocco
3. Use experimental data and extrapolation results to perform well calibrated (based on the on-site temperature and irradiation) productivity maps of the 3 grid-connected PV power plants anywhere in Morocco
Implementation of the Project Implementation of the Project
3 grid-connected PV micro-plants, based on 3 different PV technologies, of 2 kWp each, will be installed in 20 high education institutions from 20 different Moroccan cities.
Each institution will host exactly the same PV equipments
PV electricity generated is completely absorbed by the internal network
RJ45
=≈
Établissement
=≈
=≈
2 kWcpoly-Si
2 kWca-Si
2 kWcmono-Si
C
entre de données
Capteurs météo
IP
RJ45
=≈
Établissement
=≈
=≈
2 kWcpoly-Si
2 kWca-Si
2 kWcmono-Si
C
entre de données
Capteurs météo
IP
The 20 Moroccan cities selected for implementing the projectThe 20 Moroccan cities selected for implementing the project
The 20 High Education Institution that will host the PV micro-plants and equipments The 20 High Education Institution that will host the PV micro-plants and equipments
PROPRE.MA is the first R&D Moroccan project involving such large number of High Education
Institutions and Universities in the history of Morocco
7
Representatives of the 20 High Education Institutions and Professional Representatives of the 20 High Education Institutions and Professional PartnerPartner
A group of well skilled researchers and experts in PV technologies are mobilized around the project
8
Work Packages of the ProjectWork Packages of the Project
The PV productivity mappings will be available incomplete (Whole Productivity Map) or partial (Regional Productivity Maps) forms
4- Establishment of the PV productivity mapping for each one of the 3 technologies
The project is structured in 4 WPs:
1- Installation, grid-connection and maintenance of 60 PV stations in 20 different cities
2- Collection, sharing and use of the measurements
3- Data processing and analyses of the extrapolation results
9
The project includes :The project includes :
Coordination InstituteFaculty of Sciences Semlalia
Technical Data of the ProjectTechnical Data of the Project
11
Kick out Meeting : Casablanca 26 – 27 July 2013Kick out Meeting : Casablanca 26 – 27 July 2013
Signature Ceremony of the Agreement (04 February 2013)Signature Ceremony of the Agreement (04 February 2013)
12
Signature Ceremony of the Collaboration Agreement IRESEN – ConsortiumSignature Ceremony of the Collaboration Agreement IRESEN – ConsortiumRabat , 13 December 2013Rabat , 13 December 2013