PROJECT DEVELOPMENT IN HYDRO POWER SECTOR IN INDONESIA www.bne.co.id
Dec 16, 2014
PROJECT DEVELOPMENTIN HYDRO POWER SECTOR IN INDONESIA
www.bne.co.id
about BNE
BNE is a private company that focused on energy development sector in Indonesia.
Activities of BNE founders have began in the early of 2000. As a legal company, it is establihed in June 2010.
Main activities :
1. Consulting ServicesPresenting Project Study for Energy Development Sector including Detail Engineering Design, Project Monitoring, and EPC support
2. Project Management and SupervisingProject Planning, Management, Supervising especially on Hydro Power Project
3. Project Developer and IPP (Independent Power Producer)Special Purpose Company set up to develop and operate Hydro Power Plant
about BNE
Bangun Nusantara Engineering
BNE Hydro Rekayasa
Alam Daya Makmur
• Engineering services• Consulting• Project Management
Bumi Powerindo
IPP Supplier
Representative ofFlovel Energy - India
Hydro Turbine – GeneratorManufacturer
experiences of BNE
Installation and Comissioning 2 x 600 kW
Installation and Comissioning 2 x 500 kW
Installation and Comissioning 2 x 350 kW
E&M Installation and Comissioning
experiences of BNE
Study and Design
Balla HEPP 2 x 350 kW Tecnical Advisor Rante Balla HEPP 2 x 1.5 MW
experiences of BNE, in field study
Preleminary Study Bonto Batu Small Hydro 2 x 50 MW
FS & DED Orya HEPP 2 x 7 MW , PapuaPreleminary Study Rumuku –I HEPP 3 x 35 MW, SulawesiPreleminary Study Rumuku – 2 HEPP 2 x 4 MW, SulawesiDue Diligent Silau 2 HEPP 2 x 4 MW, North SumateraDue Diligent Karai 1, Karai 7, Tobasa, North Sumatera DED Cilaki HEPP 2 x 3,7 MW, West Java
Project on Going of BNE
FS&DED + Project Management Cibatarua HEPP 2 x 3 MW
1. Green Lahat 2 x 4 MW Review DED and Supervision
2. Cibatarua 2 x 3 MW Engineering & Supervision
3. Segara II, 2 x 3 MW + 1 MW Technical Advisory & Installation
4. Ciasem 2 x 1 MWDED and Soil Investigation
5. Due Diligent Sidikalang 2 x 4 MW
6. Preleminary Study for Aceh HEPP Pidie Jaya (10 MW) Bireun (6 MW) Gayo Luwes ( 120 MW)
Project List of BNE, for investment & IPP
KALAPA NUNGGAL HEPP 2 X 1.5 MW, WEST JAVASUKAMAJU - CILAKI HEPP 2 x 1.5 MW, WEST JAVACIKAWUNG HEPP 2 X 0,75 MW, WEST JAVACIBARENO HEPP 2 X 1 MW, BANTENWARUNG BANTEN HEPP 3 X 1.5 MW, BANTENSUKANDEBI HEPP 2 x 4 MW, NORTH SUMATERACISADEA II 2 x 0.75 MW, WEST JAVATORAJA II 3.5 MW, SOUTH SULAWESITORAJA III 2 x 3.5 MW, SOUTH SULAWESIBIAK HEPP 2 x 1.5 MW, PAPUAMALINO HEPP 1 MW , SOUTH SULAWESILAMPUNG I ( 2 x 1.25 MW), LAMPUNGLAMPUNG II ( 2 x 0.5 MW), LAMPUNGLAMPUNG III (2 x 0.75 MW), LAMPUNG
• HYDRO POWER PROJECT PROSPECT
2013 - 2015
• SUKANDEBI 2 x 4 MW
• Project Investment : USD 19 Millions• Debt to Equity Ratio : 70% : 30%• Interest Rate : 12%• Plant Factor : 74%• Grace Periods : 2 years• Loan Periods : 6 years + 2 grace periods• Depreciation : 30 years• Net Present Value : USD 5.1 Millions• Internal Rate of Return : 16.21%• Benefit Cost Ratio : 1.26• Payback Periods : 5,5 years• Return on Investment : 14.3 %• Return on Equity : 35.74%
• CIBARENO HEPP 2 x 1.2 MW
• Project Investment : USD 6 Millions• Debt to Equity Ratio : 70% : 30%• Interest Rate : 12%• Grace Periods : 2 years• Loan Periods : 6 years + 2 grace periods• Depreciation : 30 years• Net Present Value : USD 1 Millions• Internal Rate of Return : 14.23%• Benefit Cost Ratio : 1.16• Payback Periods : 6,4 years
• KALAPA NUNGGAL HEPP 2 x 1.5 MW
• Project Investment : USD 5.6 Millions• Debt to Equity Ratio : 70% : 30%• Interest Rate : 12%• Grace Periods : 2 years• Loan Periods : 6 years + 2 grace periods• Depreciation : 30 years• Net Present Value : USD 2.9 Millions• Internal Rate of Return : 18.65%• Benefit Cost Ratio : 1.48• Payback Periods : 5 years
• CISADEA II HEPP 2 x 0.75 MW
• Project Investment : USD 2.6 Millions• Debt to Equity Ratio : 70% : 30%• Interest Rate : 12%• Grace Periods : 2 years• Loan Periods : 6 years + 2 grace periods• Depreciation : 30 years• Net Present Value : USD 0.6 Millions• Internal Rate of Return : 17.43%• Benefit Cost Ratio : 1.4• Payback Periods : 6 years
• PROJECT INVESTMENT PROFILE
• Average Project Investment : USD 2 Millions/MW• Debt to Equity Ratio : 70% : 30%• Interest Rate : 12%• Grace Periods : 2 years• Loan Periods : 6 years + 2 grace periods• Depreciation : 30 years• Internal Rate of Return : 15% – 19%%• Payback Periods : 6 years• Power Purchase Agreement : 15 years fixed rate
second 15 years adjustment price• Project Status : Built Operate and Owned
• PROJECT INVESTMENT TARGET
2013 - 2015 2015 - 2017 2017 - 2020
TOTAL 20 MW
INVESTMENTUSD 40 Millions
TOTAL 30 MW
INVESTMENTUSD 60 Millions
TOTAL 30 MW
INVESTMENTUSD 60 Millions