EILB Services • Project Management Consultancy
• PMBOK (ANSI/PMI 99-001-2008)
• Integration management
• Scope management
• Time management
• Cost management
• Resource management
• Quality management
• Communication management
• Risk management
3
Pre-Order & Post-Order Services
• Solicitiation & purchasing• Commercial services• Expediting• Inspection• Logistic coordination
4
Oil & GasEnergy
Projects
5
South Azadegan Oil Field Development
• Location: Khuzestan Province• Client/Owner: Petroleum
Engineering and Development Company
• Contractor: Jahan pars Group • Estimated budget: 700 MEURO• Duration: 18 Months• Description: Engineering Design,
Procurement, Construction, Installation, Commissioning and Finance of Central Treatment and Export plant (CTEP)
6
Olefin petrochemical
complex• Location: Chahbahar Free-zone• Client/Owner: Sina chemical
industrial development• Estimated budget: 1400 MEURO• Duration: 48 Months• Description: EPC and investment
for the following plants o Gas to Methanolo Methanol to Olefino Olefin to polyolefin (type/grade of PO will be
selected when the conceptual studies be finalized by the consultant)
7
Dehgolan -Miandoab 56 inch
Pipeline• Location: North West Iran• Client/Owner: Iranian Gas
engineering development• Contractor: Jahan Pars Group• Estimated budget: 483 MEURO• Duration: 36 Months• Description: Engineering Design,
Procurement, Construction, Installation , Commissioning and financing of 230 Km length 56 inches Gas Pipeline
8
Sahar Oil Refinery• Location: Qeshm Island• Client/Owner: Sohar Oil Refinery• Estimated budget: 240 MEURO• Duration: 48 Months• Description: EPC for 40,000 BBD
heavy crude oil refinery in Qeshmisland free zone• Products: Gasoline, Gasoil,
Bitumen, Fuel Oil, and LPG
9
Linear Alkyl Benzene Plant
• Location: KoshkuiyehPetrochemical Complex, Kerman province, Centre Iran• Client/Owner: Kerman Pet. Co.• Estimated budget: 600 MEURO• Duration: 48 Months• Description: EPC for LAB plant
with capacity of 150,000 MT/year
10
Jask Crude Oil Tank Terminal
• Location: Jask, Hormozgan Iran• Owner: Atyieh Damavand
Investment Group • Project cost: 263 MEURO• Description: 10 Million barrel fixed
and floating roof tank farm in Hormozgan province
11
Gas Engine Power Plant
• Location: Rasht, Gillan, North Iran• Client/Owner: Ghadir Investment
Co.• Estimated budget: 10 MEURO• Duration: 12 Months• Description: EPC and investment
for 25 MW Gas engine power plant (DG)
12
Gas engine power plant
• Location: Kerman, Iran• Client/Owner: Mahtab Gostar Karmania Company• Estimated budget: 14 MEURO (25 MW)• Duration: 12 Months • Description: EPC and investment for 4X 25 MW Gas engine power
plant (DG) in centre of Iran
13
Jalal Combined Cycle Power Plant
• Location: Tehran, Iran• Client/Owner: Tamin Energy
Development Co.• Estimated budget: 255 MEURO• Duration: 36 Months• Description: Investment in
construction of a 500 MW combined cycle power plant in the field of large scale thermal power plants
14
Wind Power Plant• Location: Nehbandan, Khorasan,
East Iran• Client/Owner: Tamin Energy
Development Co.• Estimated budget: 73 MEURO• Description: Investment in
construction of a 50 MW wind power plant
15
Photovoltaic Power plant
• Location: Kerman province, Centre Iran• Client/Owner: Kerman Chamber of
Commerce• Estimated budget: 1.8 MEURO• Duration: 12 Months• Description: Investment on EPC for
1.2 MW, Photovoltaic power plant in Centre of Iran
16
Water Management&
Civil WorksProjects
17
Water Conveyance from Persian Gulf to
Yazd Province• Location: Yazd, Keman and Hormozgan provinces• Client/Owner: Yazd province water distribution co.• Contractor: Jahan Pars Group• Estimated budget: 1756 MEURO• Duration: 48 Months
• Description: Transporting of 250 million cu. m/yearof water from Persian Gulf to Yazd, construction ofwater desalination unit with capacity of 250 million cu.m /year (Reverse Osmosis Technology)
o Pipeline Length: App.700 Km.o Line Diameter : 2,200 mmo Pipe Material : Steel
18
National Water company projects
No. Description Estimated cost MEURO Investment type
1 EPC and operation of Wastewater treatment plant (70 villages) 123 BOT
2 EPC for Disalination unit in Fars province (3 projects) 73 BOO
3 EPC for Disalination unit in Southern provinces (3 million m3 in two phases) 1756 BOO
4 EPC watre transmission and supply including pumping stations 35 BOT
5 Implementation of NRW projects (35 projects) 175 BOT/ROT
6 Sludge management and construction ofWWTP in large cities 179 BOT
7 Completion of wastewater systems against allocation of effluents in the frame (17 projects) 675 Buyback
8 Construction of small scale treatment plants in the administration buildings of the Ministry of Energy (100 units) 159 Purchase
19
Water Transmission to Gorgan
• Location: Golestan Province, North Iran• Client/Owner: Golestan water
organization• Estimated budget: 35 MEURO
(BOT)• Description: 40 KM water pipeline
to Gorgan including 3 pump stations, desalination unit and tanks
20
Water Transmission project
• Location: Golestan Province, North Iran• Client/Owner: Golestan water
organization• Estimated budget: 75 MEURO
(BOT)• Description: Water transmission to
3 different cities in North of Iran
21
Bandar Abbas-Kerman Free way
• Location: Bandar Abbas to Kerman• Client/Owner: Kerman Alavi
development group• Estimated budget: 900 MEURO• Duration: 48 Months• Description: 356 Km freeway from
south to centre of Iran
22
Agricultural Projects
23
Greenhouse project
• Location: Khuzestan province, South Iran
• Client/Owner: Saba Gol Khuzestan Co.
• Estimated budget: 12 MEURO• Duration: 12 Months• Description: EPC and operation of 10
Hectare modern Greenhouse in Khuzestan province
oProducts: o Decorative flowerso Vegetables
24
Greenhouse Project
• Location: Karaj, North/Centre Iran• Client/Owner: Soil and Water
Company• Estimated budget: 150 MEURO• Duration: 48 Months• Description: EPC and operation of
100 Hectare modern greenhouse in Karaj area, nearby Payam airport in different phases
oProducts: o Decorative Flowerso Tomato, Cucumber and Strawberry
25