www.nasa.gov www.bradley. edu International Space Station SARJ Race Ring Damage Simulation and Durability Test For Life Extension Iqbal Shareef, Ph.D., CMfgE, P.E. Bradley University, Peoria, Illinois (309) 677-2981 [email protected]1 Presented at NASA Academy of Aerospace Quality Workshop Cape Canaveral, Florida March 22, 2012
International Space Station SARJ Race Ring Damage Simulation and Durability Test For Life Extension. Presented at NASA Academy of Aerospace Quality Workshop Cape Canaveral, Florida March 22 , 2012. Iqbal Shareef, Ph.D., CMfgE , P.E. Bradley University, Peoria, Illinois (309) 677-2981 - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
www.nasa.govwww.bradley.edu
International Space Station SARJ Race Ring Damage Simulation and Durability Test
• Overview of the International Space Station SARJ(Solar Alpha Rotary Joint)
• SARJ mechanism, tribology and contact mechanics• SARJ degradation and remedy
• Lab experiments to simulate and study the ongoing tribology condition of the SARJ– Goals of the experiments– Description of the test rig and test parameters– Typical test results and insights gained from experiments
• Summary
2
www.nasa.govwww.bradley.edu
• International Space Station (ISS) is a research facility assembled in low Earth orbit. (~220 miles or 354 km from Earth)
• The ISS project is a multi-national effort led by• United States, with partners from Russia,
Canada, the European Union, Japan, and others.• Construction of the ISS began in 1998 and completed in
2011 with operations to continue until at least 2015, and likely 2020+
• ISS is the largest artificial satellite that has ever orbited the Earth, it can be seen with a naked eye
www.nasa.govwww.bradley.edu 4
www.nasa.govwww.bradley.edu
• ISS is much longer than the length of Boeing 777. It is larger than 5BR house, weigh ~ 1 million lbs, and its 16 solar panels generate ~84 kW and cover more than 3 times the US Senate Chamber
• Since First Launch Nov 20, 1998– More than 1.8 billion statute miles on the odometer.– ~10 round trips to the Sun– ~70,000 orbits around the Earth– More than 105 launches to ISS– More than 200 visitors to ISS from 8 different countries– 67 Russian vehicles, 36 space shuttles, 2 European, 1
Japanese– More than 150 Spacewalks
www.nasa.govwww.bradley.edu
International Space StationAs seen from the departing Space Shuttle Atlantis on May 23, 2010
Starboard SARJ
Port SARJ
Pressurized Modules
Sola
r Pa
nels
www.nasa.govwww.bradley.edu 7
Space Station SARJ (Solar Alpha Rotary Joint)
The SARJ is a mechanism and is a structural assembly that transfers electricity from the arrays.
www.nasa.govwww.bradley.edu 8
SARJ Assembly Overview
www.nasa.govwww.bradley.edu
SARJ Race Rings and Rollers - Design Details Affecting the Tribology
gold plated 440C vs nitrided 15-5bare 440C vs nitrided 15-5bare 440C vs nitrided 15-5 with grease
Thrust Force for 3 lubrication conditions and varying
misalignment angle - vacuum ~ 5x10-6 Torr
Axial Force(thrust force)
www.nasa.govwww.bradley.edu 15
Why is Roller Misalignment Important ?( roller tipping )
Case “A”Axial Force = 0
Camber Axis
Case “B”Moderate Axial Force
Case “C”Large Axial Force
Roller
Race Ring
Roller Axis of
Rotation
Roller Roller
Race Ring Race Ring
www.nasa.govwww.bradley.edu 16
Image from NASA/CP-2010-216272 (Almon, Wilkinson, Loewenthal),
Laboratory Observation of Roller Tipping
www.nasa.govwww.bradley.edu
Contact Pressure
17
Contour plot of calculated pressure distribution for SARJ roller and raceway operating with a 4500 N normal load and 800 N axial load
www.nasa.govwww.bradley.edu
Contact Pressure in Vacuum Roller Rig
18
Roller contact simulation and contour plot of calculated pressure distribution in GRC VRR operating with a 780 N normal load
www.nasa.govwww.bradley.edu 19
Condition of the Nitrided RollerAfter the Damage Propagation Test
Loca
tion
1Lo
catio
n 2
www.nasa.govwww.bradley.edu
Profile Inspections of the Nitrided 15-5 Roller at Circumferential Position #4.
20
www.nasa.govwww.bradley.edu 21
NASA GRC Vacuum Roller Rig
www.nasa.govwww.bradley.edu
NASA GRC Vacuum Roller Rig - Schematic
22
drive motor
ferrofluid sealsand bearings
“axial” force/thrust sensor
brake
pivot point for drive motor plate relative to turntable
bedplate
air piston
“normal load”force sensor
vac chamber
turntable
bedplate
bellows drive motor
ferrofluid sealsand bearings
“axial” force/thrust sensor
brake
pivot point for drive motor plate relative to turntable
bedplate
air piston
“normal load”force sensor
vac chamber
turntable
bedplate
bellows
ferrofluid seal and bearing
“axial” force/thrust sensor
brake
drive motor
bedplate
turntable on bearing
load cell for “tangential” force,mounted to turntable
ferrofluid seal and bearing
“axial” force/thrust sensor
brake
drive motor
bedplate
turntable on bearing
load cell for “tangential” force,mounted to turntable
pivot point for drive motor plate relative to turntable
www.nasa.govwww.bradley.edu 23
Use of the NASA GRC Vacuum Roller Rigto Simulate Ongoing Tribology Condition of SARJ
• Certain tribology conditions were matched well material type and manufacturing processes same type of grease able to match Hertz contact pressure misalignment angle of “X” on SARJ matched by ~”2X” angle on VRR
• Certain tribology conditions were not completely matchedX contact passing frequency on VRR ~60X greater compared to SARJX entraining velocities; VRR at 10 rpm ~ 19 mm/sec ; SARJ ~ 1.9 mm/sec
X space radiation, atomic oxygen X residual “atmosphere” in VRR (at 5 x 10-6 Torr)X space thermal conditionsX gravity effects ?
www.nasa.govwww.bradley.edu
Testing Goals / Approach
24
• Keeping in mind the differences of VRR and SARJ, a parametric study was completed to determine relative effects and give qualitative understanding of expected SARJ behavior as grease loses effectiveness
• Parameters were varied systematically
• Rotating speed
• Normal load
• Misalignment angle Volume of grease applied
• 19 “lubrication interval tests” were completed (LIT1 – LIT19)
www.nasa.govwww.bradley.edu
Normal Force, Thrust Force and Ratio of Ft/Fn for LIT 1-9LIT 1
LIT 6LIT 4
LIT 3LIT 2
LIT 5
LIT 7 LIT 8 LIT 9
www.nasa.govwww.bradley.edu
LIT 10
LIT 15LIT 13
LIT 12LIT 11
LIT 14
LIT 16&17 LIT 18 LIT 19
Normal Force, Thrust Force and Ratio of Ft/Fn for LIT 10-19
Start Date, Time and Operator End Date, Time and Operator
Hours Test
No.
Ang
le (D
eg)
Spee
d (R
PM)
Nor
mal
Loa
d (v
)
Bat
ch o
f Gre
ase
Am
ount
of G
reas
e A
pplie
d (G
ram
s)
# of
Cyc
les
Tuesday August 03, 2010 - 11:00 Richard Wednesday August 04, 2010 - 12:00 Richard 25.00 LIT19-1 -1 10 2.5 B 2 15000Wednesday August 04, 2010 - 12:00 Richard Wednesday August 04, 2010 - 14:00 Richard 2.00 BWednesday August 04, 2010 - 14:00 Richard Wednesday August 04, 2010 - 17:00 Iqbal 3.00 LIT19-2 -1 10.26 2.5 B 0 1846Wednesday August 04, 2010 - 17:00 Iqbal Wednesday August 04, 2010 - 21:00 Iqbal 4.00 BWednesday August 04, 2010 - 21:00 Iqbal Thursday August 05, 2010 - 00:00 Richard 3.00 LIT19-3 -1 10.26 2.5 B 0 1846
Thursday August 05, 2010 - 00:00 Richard Thursday August 05, 2010 - 06:00 Richard 6.00 BThursday August 05, 2010 - 06:00 Richard Thursday August 05, 2010 - 09:00 Richard 3.00 LIT19-4 -1 10.26 2.5 B 0 1846Thursday August 05, 2010 - 09:00 Richard Thursday August 05, 2010 - 17:00 Iqbal 8.00 BThursday August 05, 2010 - 17:00 Iqbal Thursday August 05, 2010 - 20:00 Iqbal 3.00 LIT19-5 -1 10.26 2.5 B 0 1846Thursday August 05, 2010 - 20:00 Iqbal Friday August 06, 2010 - 08:00 Richard 12.00 B
Friday August 06, 2010 - 08:00 Richard Friday August 06, 2010 - 11:00 Richard 3.00 LIT19-6 -1 10.26 2.5 B 0 1846Friday August 06, 2010 - 11:00 Richard Friday August 06, 2010 - 13:00 Richard 2.00 BFriday August 06, 2010 - 13:00 Richard Friday August 06, 2010 - 16:00 Iqbal 3.00 LIT19-7 -1 10.26 2.5 B 0 1846Friday August 06, 2010 - 16:00 Iqbal Friday August 06, 2010 - 20:00 Iqbal 4.00 BFriday August 06, 2010 - 20:00 Iqbal Friday August 06, 2010 - 23:00 Richard 3.00 LIT19-8 -1 10.26 2.5 B 0 1846Friday August 06, 2010 - 23:00 Richard Saturday August 07, 2010 - 05:00 Richard 6.00 B
Saturday August 07, 2010 - 05:00 Richard Saturday August 07, 2010 - 08:00 Richard 3.00 LIT19-9 -1 10.26 2.5 B 0 1846Saturday August 07, 2010 - 08:00 Richard Saturday August 07, 2010 - 16:00 Iqbal 8.00 BSaturday August 07, 2010 - 16:00 Iqbal Saturday August 07, 2010 - 19:00 Iqbal 3.00 LIT19-10 -1 10.26 2.5 B 0 1846Saturday August 07, 2010 - 19:00 Iqbal Sunday August 08, 2010 - 07:00 Richard 12.00 B
Sunday August 08, 2010 - 07:00 Richard Sunday August 08, 2010 - 10:00 Richard 3.00 LIT19-11 -1 10.26 2.5 B 0 1846Sunday August 08, 2010 - 10:00 Richard Sunday August 08, 2010 - 12:00 Iqbal 2.00 BSunday August 08, 2010 - 12:00 Iqbal Sunday August 08, 2010 - 15:00 Iqbal 3.00 LIT19-12 -1 10.26 2.5 B 0 1846Sunday August 08, 2010 - 15:00 Iqbal Sunday August 08, 2010 - 19:00 Iqbal 4.00 BSunday August 08, 2010 - 19:00 Iqbal Sunday August 08, 2010 - 22:00 Richard 3.00 LIT19-13 -1 10.26 2.5 B 0 1846Sunday August 08, 2010 - 22:00 Richard Monday August 09, 2010 - 04:00 Richard 6.00 B
Monday August 09, 2010 - 04:00 Richard Monday August 09, 2010 - 07:00 Richard 3.00 LIT19-14 -1 10.26 2.5 B 0 1846Monday August 09, 2010 - 07:00 Richard Monday August 09, 2010 - 15:00 Iqbal 8.00 BMonday August 09, 2010 - 15:00 Iqbal Monday August 09, 2010 - 18:00 Iqbal 3.00 LIT19-15 -1 10.26 2.5 B 0 1846Monday August 09, 2010 - 18:00 Iqbal Tuesday August 10, 2010 - 06:00 Richard 12.00 BTuesday August 10, 2010 - 06:00 Richard Tuesday August 10, 2010 - 09:00 Richard 3.00 LIT19-16 -1 10.26 2.5 B 0 1846Tuesday August 10, 2010 - 09:00 Richard Tuesday August 10, 2010 - 11:00 Richard 2.00 BTuesday August 10, 2010 - 11:00 Richard Tuesday August 10, 2010 - 14:00 Richard 3.00 LIT19-17 -1 10.26 2.5 B 0 1846Tuesday August 10, 2010 - 14:00 Richard Tuesday August 10, 2010 - 18:00 Iqbal 4.00 BTuesday August 10, 2010 - 18:00 Iqbal Tuesday August 10, 2010 - 21:00 Iqbal 3.00 LIT19-18 -1 10.26 2.5 B 0 1846Tuesday August 10, 2010 - 21:00 Iqbal Wednesday August 11, 2010 - 03:00 Richard 6.00 B
Wednesday August 11, 2010 - 03:00 Richard Wednesday August 11, 2010 - 06:00 Richard 3.00 LIT19-19 -1 10.26 2.5 B 0 1846Wednesday August 11, 2010 - 06:00 Richard Wednesday August 11, 2010 - 14:00 Richard 8.00 BWednesday August 11, 2010 - 14:00 Richard Wednesday August 11, 2010 - 17:00 Iqbal 3.00 LIT19-20 -1 10.26 2.5 B 0 1846Wednesday August 11, 2010 - 17:00 Iqbal Thursday August 12, 2010 - 05:00 Richard 12.00 B
Thursday August 12, 2010 - 05:00 Richard Thursday August 12, 2010 - 08:00 Richard 3.00 LIT19-21 -1 10.26 2.5 B 0 1846
A Test Plan to Investigate Influence of “Strategic Pauses” (this required actions at odd hours; special thanks to Mr. Richard Manco)
www.nasa.govwww.bradley.edu 36
Normal, Thrust, Ft/Fn from LIT19
www.nasa.govwww.bradley.edu
Results of the LIT Tests
• During LIT 1-9 the average number cycles for lubricant to become ineffective was 29,200 cycles using first pair of rollers.
• During LIT 10-18 experiments the average number cycles for lubricant to become ineffective was 60,400 cycles.
www.nasa.govwww.bradley.edu
Results of the LIT Tests
• During the LIT1-9 experiments there were more than 885,000 rotations using the first pair of rollers.
• During LIT 10-19 there were more than 850,000 rotations without significant damage to render the rollers functionless.
Note: SARJ makes nearly 96,000 rotations per year.
www.nasa.govwww.bradley.edu 39
Summary
• SARJ was vulnerable to inadequate lubrication• Large friction can produce SARJ roller tipping• Relative effects of operating parameters were studied by test• Loss of lubrication effectiveness was determined from the rise
of the axial force to a critical value• The most influential parameter was the mass of grease applied • “Strategic pauses” were effective to extend lube effectiveness
in the VRR and be an effective strategy for SARJ
www.nasa.govwww.bradley.edu
Acknowledgements
Dr. Alice Smith Professor and Chair of IE at Auburn
Dr. Timothy L. Krantz Scientist S&T Division at NASA GRC
Dr. Phil Abel Asst. Chief, S&T Division at NASA GRC
Dr. Jim Zakrajsek Chief of S&T Division at NASA GRC,
Dr. Richard Johnson Dean College of E&T at Bradley University
40
www.nasa.govwww.bradley.edu 41
www.nasa.govwww.bradley.edu
Back up Slides
42
www.nasa.govwww.bradley.edu 43
Condition of rollers after lab testing to simulate SARJ ring operating with a combination of "tipped" and "not tipped" rollers
Ref: NASA Technical Memorandum, to be published, draft manuscript under review
www.nasa.govwww.bradley.edu
References
• “Investigation Of The Vacuum Tribological Property Of Damaged Surfaces In Presence Of Grease,” 2011 STLE Annual Meeting & Exhibition, Control ID: 980140, Category: Grease, Atlanta GA, May 15-19, 2011. by Timothy Krantz and Iqbal Shareef.
• NASA CP-2010-216272 (Conference Proceedings, includes three reports related to SARJ)
• “Roller Testing to Mimic Damage of the ISS SARJ Ring and Durability Test to Simulate Fifteen Years of SARJ Operation Using the Damaged Surface”; NASA TM (under technical review) by Krantz; Elchert; DellaCorte, Dube and Stanford
•“The ISS SARJ Bearing Failure and Recovery: Technical and Project Management Lessons Learned”; NASA TP (under technical review) by DellaCorte, Krantz, and Dube
44
www.nasa.govwww.bradley.edu 45
Spacewalks to Clean and Lubricate the SARJ Mechanismswere Successful, and Systems are Operating Well
• Will the SARJ mechanism require additional applications of grease ? • Can we expect “warning signs” that the lubrication condition is