Agenda• A bit of history• Actual challenges for Ethernet• Where is Ethernet going ?
3 April 13, 2023
A bit of historyWho is next ?
4 April 13, 2023
Token Ring100VG FDDI ATM/LANE FiberChannelInfiniband
?
10Base 100Base 1000Base 10G CEE
20111970’s
• Cost
• Speed
• Technologies
Remaining/upcoming challenges• Speed : 40G and 100G• Latency : cut-through techniques and Silicon
improvements• Lossless : CEE (2011)• High availability : loop avoidance techniques
TRILL is a proposed standard – proprietary techniques in the meantime
• Server virtualisationApps spread across multiple nodes : low latency/high speed/very large domain
Security/Mgmt/Troubleshooting virtual switches & vNICs : VEPA
Workload mobility : detect/log/adapt configuration/follow the VM
Ability to plum any subnet to any server in any rack : very large domain
5 April 13, 2023
6 April 13, 2023
New Data Center Transformed Network:
VLL2Domain
Core L3
6
InterconnectFabric
Replication
otherVLL2
Large, flat, high-performance domain…
7 April 13, 2023
Core L3
7
IntelligentEdgeSwitches
IntelligentEdgeSwitches
…with exceptional cost/performance,
VLL2Domain
New Data Center Transformed Network:
8 April 13, 2023
Core L3
8
IntelligentEdgeSwitches
IntelligentEdgeSwitches
…that can connect 1000’s of servers in a single domain
VLL2Domain
New Data Center Transformed Network:
9 April 13, 2023
Core L3
9
IntelligentEdgeSwitches
IntelligentEdgeSwitches
…with flexibility to plumb any subnet to any server…
VLL2Domain
New Data Center Transformed Network:
10 April 13, 2023
Core L3
10
IntelligentEdgeSwitches
IntelligentEdgeSwitches
…and move a workload from any server to any server
VLL2Domain
New Data Center Transformed Network:
11 April 13, 2023
Core L3
11
IntelligentEdgeSwitches
…with consolidated, virtual connections to the network
New Data Center Transformed Network:
VLL2Domain
IntelligentEdgeSwitches
12 April 13, 2023
Core L3
12
IntelligentEdgeSwitches
…application delivery control provides a layered service…
New Data Center Transformed Network:
VLL2Domain
IntelligentEdgeSwitches
13 April 13, 2023
Core L3
13
IntelligentEdgeSwitches
…and virtualizes server tiers…
New Data Center Transformed Network:
VLL2Domain
IntelligentEdgeSwitches
14 April 13, 2023
Core L3
14
…Network connections themselves are virtualized…
New Data Center Transformed Network:
DCM
15 April 13, 2023
Core L3
15
…as is the fabric…
New Data Center Transformed Network:
DCM
FabricMgmt
16 April 13, 2023
Core L3
16
…and the entire network is presented as a resource pool
New Data Center Transformed Network:
DCM
FabricMgmt
Service Portal
Service Catalog
Resource Pool (s)
Vision summary• Large, flat, high-performance domain…
• …with exceptional cost/performance
• …that can connect 1000’s of servers in a single domain
• …with flexibility to plumb any subnet to any server…
• …and move a workload from any server to any server
• …with consolidated, virtual connections to the network
• …application delivery control provides a layered service…
• …and virtualizes server tiers…
• …Network connections themselves are virtualized…
• …as is the fabric…
• …and the entire network is presented as a resource pool
17 April 13, 2023
18 April 13, 2023
DC Network Switch Thermal Design: Side-to-side cooling Front-to-back cooling (6600’s)
Cool Aisle
Hot Aisle
Side-cooled switchdraws rising warmair from inside rack
Side-cooled switchdraws re-circulated hotair from inside rack
Extra heat is leakagethat must be moved
Hot airexhaustedinside rack
Cool Aisle
Hot Aisle
F2B cooled switchdraws air directly from the cool aisle
F2B cooled switchexhausts air directlyInto hot aisle
No extra heat is builtup inside the rack
Side-to-side Cooled Switches Front-to-Back Cooled Switches
19 April 13, 2023
10Gb growth at the edge brings new topology approaches
• 10G low-cost connectivity will evolve repeatedly for the next 3 years• Home-runs directly to core switches carry huge optics cost with 10G• Using TOR/Pod-based switches greatly reduces 10G costs
10G Home run approach (up to $4k more per server!)10G Pod-based (6600) approach
= cheap copper cabling= expensive fiber cabling
ExpensivePorts, fixedcapacity
Lower costPorts,
Flexiblegrowth
Expensivefiber
CheapCopper inpods
20 April 13, 2023
HP ProCurve 6600 Switch Series
• Five high-density Gig and 10Gig, data center optimized, 1U top-of-rack switches
• Consistent ProVision ASIC- based switch fabric features and management
• Front to back, reversible airflow
• Highly available, power efficient hardware architecture and software features
20
HP ProCurve 6600-48G Switch Series
HP ProCurve 6600-24XG Switch
HP ProCurve 6600-24G Switch Series
Dramatically reducing complexity and OpEx
21 April 13, 2023
• Automated, policy-based provisioning of network and server resources
• Formalizes common data center workflow activities without organizational disruption
• Eases compliance and troubleshooting in a virtualized, complex environment
• Works with multivendor environments (servers and networks)
21
HP ProCurve Data Center Connection Manager
22 April 13, 2023
Network Team•Provide appropriate connectivity, security, bandwidth•Network level resiliency, load balancing, firewall
Server Team•Provide hardware resources, virtualization, backup and restore •Typically owns application deployment
Storage Team•Provide appropriate storage for application directly or server•RAID and resiliency / backup settings
Compliance Team•Crucial to large DC or specific ‘production’ environments (FSI etc)•Ensures compliance to security, asset management, or regulatory standards
• Manual, reactive, ‘discovery-based’ processes between IT Tech teams• As application provisioning and change volume increases these processes do not scale• Troubleshooting becomes difficult with no centralized information for an application’s total infrastructure requirements
Application Needs Span Technology Team ‘Silos’ in the Data Center
04/13/23 22
Enterprise Applications have requirements across technology silos
23 April 13, 2023
Today’s Automation is Element-Focused
04/13/23
Data CenterNetwork
IntelligentSwitches
IntelligentSwitches
Typically, network elements are plumbed statically with standard configurations
BladeServers
VMs
BladeServers
Then servers are applied to the plumbingvia their own element management. Customizing
network config and server config together is still manual.
Server Pod
23
24 April 13, 2023
Tomorrow’s Automation is Service-Focused
04/13/23 24
Data CenterNetwork
IntelligentSwitches
IntelligentSwitches
IntelligentSwitches
What if the network was presented as an inventory of subscriptions – virtual connections?
Server connection inventory “virtual patch panels”
BladeServers
Server Pod
BladeServers
…and the network access was granted & configured one Server/NIC at a time?
VMs
25 April 13, 2023
federate
DCM Use Case
04/13/23 25
2) Select anavailableconnection
4) Configure Server according to subscription policies
1) Set up policies
Place new connectionsin the inventory
NetworkAdmin
ServerAdmin
DCM
3) Subscribe to the connection
Network Infrastructure(dynamically deployed for each connection)
7) Automate other Network Policies using HP NAS
Subscription,Registration or
IP allocationevent
UCMDB
ComplianceChecking
FaultManagement
CapacityManagement
info
info
info
new server or VM
5) Register Serverusing RADIUS 6) Enforce L3
using DHCPRADIUS / DHCPregistration
Policy enforcementvia RADIUS / DHCP
responses
Policies forRouter, Firewall,Load Balancer,DLP, IDS, etc
Connection Inventory
Conclusion• Ethernet has always won• Still plenty of challenges – not only FCoE• HP is a key player : standards and building
blocks
Technology for better business outcomes
We would like to invite you to join us on stand 610