Top Banner
2022-2025
467

Iowa Statewide Transportation Improvement Program

Mar 26, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Iowa Statewide Transportation Improvement Program

2022-2025

Page 2: Iowa Statewide Transportation Improvement Program

Federal and state laws prohibit employment and/or public accommodation discrimination on the basis of age, color, creed, disability, gender

identity, national origin, pregnancy, race, religion, sex, sexual orientation or veteran’s status. If you believe you have been discriminated against,

please contact the Iowa Civil Rights Commission at 800-457-4416 or Iowa Department of Transportation's affirmative action officer. If you need

accommodations because of a disability to access the Iowa Department of Transportation’s services, contact the agency's affirmative action

officer at 800-262-0003.

Page 3: Iowa Statewide Transportation Improvement Program

Index Introduction .......................................................................... 1 Iowa DOT Programming Process ........................................ 2 Local Sponsor Programming Processes ............................... 4 Federal Transit Administration Programming Process ........ . 5 Financial Analysis ................................................................ 5 Public Participation .............................................................. 11 Changing an Approved STIP .............................................. 12

FHWA and FTA Programs FHWA FTA

Statewide projects ................................................ 14 ........ 314 Ames MPO (AAMPO) ......................................... 22 ........ 315 Cedar Rapids MPO (CMPO) .............................. 27 ........ 319 Council Bluffs MPO (MAPA) ............................. 39 ........ 320 Davenport MPO (Bi-State) ................................. 45 ........ 321 Des Moines MPO (DMAMPO) ........................... 53 ........ 322 Dubuque MPO (DMATS) .................................... 70 ........ 325 Iowa City MPO (MPOJC) .................................... 76 ........ 326 Sioux City MPO (SIMPCO) ................................ 81 ........ 330 Waterloo MPO (INRCOG) .................................. 88 ........ 332 RPA 1 (Upper Explorerland)................................ 94 ........ 335 RPA 2 (NIACOG) ................................................ 105 ........ 336 RPA 3 (NW IA Pl and Dev) ................................. 120 ........ 342 RPA 4 (Siouxland Regional) ................................ 134 ........ 344 RPA 5 (MIDAS) .................................................. 148 ........ 346 RPA 6 (Region 6) ................................................. 160 ........ 348 RPA 7 (IA Northland) .......................................... 172 ........ 349 RPA 8 (ECIA) ...................................................... 185 ........ 350 RPA 9 (Bi-State) .................................................. 197 ........ 351 RPA 10 (ECICOG) .............................................. 204 ........ 355 RPA 11 (CIRTPA) ............................................... 218 ........ 359 RPA 12 (Region XII COG) .................................. 235 ........ 362 RPA 13 (SWIPCO) .............................................. 245 ........ 364 RPA 14 (ATURA)................................................ 258 ........ 366 RPA 15 (Area 15)................................................. 265 ........ 369 RPA 16 (SE IA RPC) ........................................... 277 ........ 371 RPA 17 (Chariton Valley) .................................... 289 ........ 372 RPA 18 (MAPA) .................................................. 300

Appendix

Map: District Transportation Planners ............................. 373Map: Iowa’s Public Transit Systems ................................ 374 Advance Construction Conversion Candidates ................ 375 List of 2021 Authorized Projects ...................................... 378 List of 2021 Let Swap Projects ......................................... 427

Introduction

The 2022-2025 Iowa Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by Title 23 and Title 49, United States Code. The STIP is generated to provide the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) a listing of all projects that are candidates for federal aid from the FHWA and FTA for the four federal fiscal years (FFY) 2022-2025. The STIP was approved by FHWA and FTA on Sept. 21, 2021.

The STIP has been produced based on the current federal transportation bill, passed on December 4, 2015, the Fixing America’s Surface Transportation Act (FAST-Act). Under the FAST-Act FHWA federal funding programs include the National Highway Performance Program (NHPP), National Highway Freight Program (NHFP), Surface Transportation Block Grant Program (STBG), Transportation Alternatives Set-Aside (TAP), Congestion Mitigation and Air Quality Improvement Program (CMAQ), Highway Safety Improvement Program (HSIP), Railway-Highway Crossings, State Planning and Research, and Metropolitan Planning.

Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal aid expenditures, and approvals of metropolitan planning organizations’ (MPOs) transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.

The projects identified in the STIP are the result of statewide and regional efforts conducted by the Iowa DOT and each of Iowa’s Regional Planning Affiliations (RPAs) and MPOs. Projects are arranged according to whether the proposed funding is FHWA or FTA based. Projects are further sorted according to the MPO or RPA in which they reside and the individual program by which they are funded. Each entry shows the expected total

1

Page 4: Iowa Statewide Transportation Improvement Program

project cost, federal aid participation, and an item number to facilitate FHWA and FTA reporting.

In addition to projects with a unique location and sorted according to the process noted above some proposed obligations are identified under a broader category of statewide improvements. These entries are subject to alternate project selection processes and are separated and listed first. Examples of statewide programming entries include the DOT’s Railroad Highway program, the Highway Safety Improvement Program Secondary, Emergency Relief projects, and State Planning and Research funding, among others.

Some projects are identified that have no federal aid proposed. These projects have stood the test of Iowa’s statewide and local public participation processes and are candidates for federal aid if additional funds become available or if project schedules require deferral of candidates presently identified for federal participation. However, all projects included in the STIP, regardless of funding source, are expected to be accomplished in the federal fiscal year (FFY) indicated in the STIP.

Inclusion of a project in the STIP does not guarantee federal aid eligibility for the project. Eligibility for federal aid will be determined on a case-by-case basis when project authorization is requested from the FHWA or FTA.

Iowa DOT Programming Process

The Iowa DOT’s programming process is transparent, aligns available tools and plans, and incorporates appropriate and extensive stakeholder input. The major procedural steps include problem statement development, scoping, project advancement, project prioritization, program synthesis, and final programming. It is important to note that this process is also governed by Iowa’s long range transportation planning documents. As such, projects programmed in the Iowa Transportation Improvement Program (Five-Year Program) and STIP are consistent with Iowa’s long range State Transportation Plan – Iowa in Motion 2045, and several other planning documents, as discussed below. A copy of the State Transportation Plan can be found at:

https://iowadot.gov/iowainmotion/iowa-in-motion-home

The FAST Act continued the provisions for performance-based planning and programming (PBPP) that were established in the prior federal

reauthorization act, Moving Ahead for Progress in the 21st Century (MAP-21). The phase-in of federal PBPP requirements has been ongoing over the past several years. Iowa in Motion 2045 was adopted prior to initial state performance targets being developed; these targets will be included in the next update of the plan. Currently, statewide targets have been set for federally-required measures in the areas of safety (all roads), pavement condition (Interstate and non-Interstate National Highway System (NHS)), bridge condition (NHS), system reliability (Interstate and non-Interstate NHS), freight movement (Interstate), and transit asset management (small urban and rural transit systems).

Additional background on performance measures and targets, links to Iowa DOT performance-based plans, and current Iowa DOT performance targets are available at https://iowadot.gov/systems_planning/planning/federal-performance-management-and-asset-management. Discussion below provides an overview of the various performance-based plans and target-setting processes, and their connection to the investments included in the STIP.

Iowa in Motion 2045 established the following vision for Iowa DOT: “A safe and efficient multimodal transportation system that enables the social and economic well-being of all Iowans, provides enhanced access and mobility for people and freight, and accommodates the unique needs of urban and rural areas in an environmentally conscious manner.” The plan focuses on four investment areas, with a heavy emphasis on stewardship:

• Stewardship through maintaining a state of good repair• Modification through rightsizing the system• Optimization through improving operational efficiency and

resiliency• Transformation through increasing mobility and travel choices

Iowa in Motion 2045 includes analysis and strategies for the various modes of transportation in the state. For highways, this includes considerations related to capacity, mobility and safety, freight, condition, operations, and bridges. Pavement and bridge needs are anticipated to be addressed primarily through asset management as described in the Transportation Asset Management Plan (TAMP), which is highlighted below. The STIP helps to address the following identified needs by including investments that implement applicable strategies.

2

Page 5: Iowa Statewide Transportation Improvement Program

• Capacity needs were identified for three interurban interstate corridors and for several Interstate, NHS, and other State routes in urban areas. Strategies to address these needs include targeting investment toward areas anticipated to become congested by 2045, and considering targeting anticipatory investments at locations with potential congestion issues beyond 2045. Strategies include added capacity and/or operational improvements.

• Mobility and safety, or “Super-2” needs, were identified for five U.S. routes across Iowa, all of which are part of the NHS. Strategies to address these needs include targeting investment toward improvements such as wider paved shoulders, turn lanes, passing lanes, limited access, and geometric improvements. These improvements are largely anticipated to be opportunistic, and are likely to occur at spot locations when other pavement, bridge, or safety issues are being addressed.

• The operations analysis focused on prioritizing interstate corridors from an operations perspective, and implementing appropriate transportation system management and operations (TSMO) strategies on those corridors.

The 2019 Strategic Highway Safety Plan (SHSP) includes engineering strategies to help address issues with lane departure crashes and to improve intersections. These improvements are being implemented as appropriate throughout the State’s highway system. Strategies to help prevent lane departures include the installation of countermeasures such as centerline rumble strips, shoulder/edgeline rumble strips, curve delineation, shoulder treatments, and median cable barriers. Strategies to help improve intersections include implementing innovative improvements such as roundabouts, reduced conflict intersections, diverging diamond interchanges, and offset turn lanes; traffic signal modifications; intersection lighting; and bicycle/pedestrian intersection improvements. The HSIP program of projects included in the STIP has been produced based on the strategies contained in the SHSP and the Iowa DOT’s safety performance measure target setting process. Numerous stakeholder groups, including MPOs, participated in the target setting process. Working in partnership with local agencies, investments have been identified and programmed which will construct effective countermeasures to reduce traffic fatalities and serious injuries. Projects chosen for HSIP investment are based on crash history, roadway characteristics, and the existence of an infrastructure countermeasures that can address the types of crashes

present. The Iowa DOT continues to utilize a systemic safety improvement process rather than relying on “hot spot” safety improvements. Pavement and bridge projects on the Interstate System and non-Interstate NHS are determined in alignment with the Transportation Asset Management Plan (TAMP) and the performance target setting process. The TAMP helps connect the vision of Iowa in Motion 2045 with the projects programmed in the Five-Year Program and STIP. The TAMP describes how the existing highway system is managed. Preserving and improving this system is critical for achieving the system vision. The TAMP also connects Iowa in Motion 2045 and system/modal plans to Iowa DOT’s Five-Year Program and the STIP. Iowa in Motion 2045 defines a vision for the transportation system over the next 20 years, while the Five-Year Program and STIP identify specific investments over the next four to five years. The TAMP has a 10-year planning horizon and helps ensure that investments in the Five-Year Program and STIP are consistent with Iowa DOT’s longer-term vision. Pavement and bridge projects are identified and programmed in the STIP in a manner that is consistent with the strategies identified in the TAMP and the target-setting process. Pavement and bridge target setting involved an internal DOT working group and coordination with MPOs and local owners of NHS assets. The methodology used to set targets used current and historical condition and funding data to forecast future conditions. Asset management focuses on performing the right treatment at the right time to optimize investments and outcomes. The TAMP discusses the major investment categories that the Commission allocates funding through. Once the Commission approves the funding for these categories, Iowa DOT recommends the allocation of the funds to specific projects using the processes described in the TAMP. The TAMP includes a 10-year forecast of funding for pavement and bridge stewardship projects, and funding amounts in the STIP generally align with this forecast. The Iowa DOT strives to maintain the bridge inventory in a condition that provides safe and efficient movement of people and freight. Bridges are managed by using a bridge management process with forecasting capabilities to better identify future needs across the entire inventory. The ability to predict bridge needs beyond a short-term time horizon improves the ability to make better decisions today and predict what funding needs are necessary for a stable bridge inventory. Bridge projects are programmed to help meet the desired program outcomes documented in the TAMP.

3

Page 6: Iowa Statewide Transportation Improvement Program

The Iowa DOT works to provide a safe, serviceable, and sustainable roadway system through the use of its pavement management system. The pavement management system will assist program administrators in the selection of economical options for pavement decisions for the construction, reconstruction, rehabilitation, preservation, and maintenance of pavements. The pavement management system will be used to model and predict future pavements conditions based on various funding levels. This analysis will determine the level of funding to maintain the pavement system in a state of good repair. Pavement projects are programmed to help meet the desired program outcomes documented in the TAMP. Projects focused on improving pavement and bridge condition also often help improve system reliability and freight movement. Additional projects focused specifically on improving these areas of system performance are developed in alignment with the target-setting process for related performance measures, and the freight improvement strategies and freight investment plan included in the State Freight Plan. This plan includes a detailed analysis and prioritization of freight bottlenecks, which are locations that should be considered for further study and possibly for future improvements. A detailed analysis was performed to prioritize the bottlenecks based on their value to the overall system, traffic and infrastructure condition, and travel time performance. The process also involved extensive input from State, MPO, RPA, and industry representatives. State projects identified in the freight investment plan and programmed in the STIP were highly-ranked freight bottlenecks. System reliability and freight target setting involved an internal DOT working group and coordination with MPOs. The methodology used to set targets used current and historical data on condition and funding to forecast future condition. The State Freight Plan identifies several strategies that help direct investments made in the STIP. These include:

• Target investment to address mobility issues that impact freight movements.

• Emphasize the Iowa Multimodal Freight Network and utilize designs that are compatible with significant freight movements.

• Right-size the highway system and apply cost-effective solutions to locations with existing and anticipated issues.

Related to asset management and system resilience, 23 CFR Part 667 requires a periodic evaluation of public roads that have been impacted two

or more times since 1997 by a natural or man-made disaster resulting in an emergency or disaster declared by the Governor or the President and had permanent repairs completed using Federal funds. Any such locations that are targeted for projects to be completed with Federal funds would need to consider reasonable alternatives that could:

1) Reduce the need for Federal funds to be expended on emergency repair and reconstruction activities;

2) Better protect public safety and health and the human and natural environment; and

3) Meet transportation needs as described in the relevant and applicable Federal, State, local, and tribal plans and programs.

Iowa DOT completed this evaluation in November 2020 and identified six state-owned locations and two locally-owned locations that appear to meet the review requirements. With the identification of these eight locations, Iowa DOT will continue to utilize its Project Scoping and Prioritization tool to review these locations in the event a project is being developed within one of the eight identified areas. Iowa DOT will also work with the local asset owners to further review these locations and ensure compliance with the regulations in the event of a project in an identified area. Iowa DOT will continue to monitor all identified damage locations for future ER events and communicate within the department and with other system owners whenever new locations are found to meet the requirements set forth in regulation. The culmination of the DOT efforts outlined above is the approval of the DOT Five-Year Program. This document, approved by the Iowa Transportation Commission, incorporates a five-year plan for transportation investments on the highway system and includes various other modal programs. The current Iowa DOT Five-Year Program can be found at: https://iowadot.gov/program_management/Five-Year-Program

Local Sponsor Programming Processes Projects included in the STIP, but not located on the primary system, are identified and programmed through Iowa’s regional transportation planning process. In February 2018 Iowa’s Transportation Commission approved a Federal Aid Swap policy that allows certain locally sponsored projects to swap targeted federal aid dollars for state Primary Road Fund (PRF) dollars. Specifically, the Federal Aid Swap policy applies to STBG,

4

Page 7: Iowa Statewide Transportation Improvement Program

CMAQ, and HSIP funding targeted to locally sponsored projects. Swap funded projects have been included in the STIP document to provide a comprehensive listing of transportation improvements funded through the state of Iowa’s federal aid apportionments and PRF dollars. Iowa’s 18 RPAs and 9 MPOs annually receive targets of federal STBG funding for which they are responsible for programming. These organizations provide input to the STIP by conducting regional transportation planning efforts including project selection for targeted STBG/Swap funding. Projects identified by each agency are local priorities and are consistent with each agency’s long-range transportation plan. In addition to the STBG/Swap funded projects noted above, the STIP also includes county and city bridge projects funded with federal aid and Swap funding. Swap funds are targeted directly to Iowa’s 99 counties for investment in secondary road bridge infrastructure. The Iowa DOT also administers a city bridge program which makes Swap funding available for investment in municipal bridge projects. City and county bridge projects funded with FHWA or Swap funding are included in MPO and RPA TIPs and carried forward to the STIP. A number of additional grant programs are administered by the Iowa DOT which target FHWA and Swap funding to locally sponsored projects. Funding available to local sponsors includes STBG for TAP type projects, CMAQ, NHFP, HSIP, Recreational Trails, and Swap. The projects selected for funding as part of these grant programs are programmed in MPO and RPA TIPs and included in the STIP.

Federal Transit Administration Programming Process In addition to the FHWA program of projects outlined above, the draft STIP includes all projects for which Federal Transit Administration (FTA) funding may be utilized. The transit portion of the STIP was developed by Iowa’s MPOs and RPAs in cooperation with the state’s large urban, small urban, and regional transit systems. Public transit capital projects included in the STIP align with the transit asset management (TAM) planning and target setting processes undertaken by the Iowa DOT, transit agencies, and MPOs. The Iowa DOT establishes a group TAM plan and group targets for all small urban and rural providers while large urban providers establish their own TAM plans and targets. Investments are made in alignment with TAM plans with the intent of

keeping the state’s public transit vehicles and facilities in a state of good repair and meeting transit asset management targets. The Iowa DOT allocates funding for transit rollingstock in accordance with the Public Transit Management System process. In addition, the Iowa DOT awards public transit infrastructure grants in accordance with the project priorities established in Iowa Code chapter 924. Additional state and federal funding sources that can be used by transit agencies for vehicle and facility improvements are outlined in the funding chapter of the Transit Manager’s Handbook. Individual transit agencies determine the use of these sources for capital and operating expenses based on their local needs. Public transit projects included in the STIP align with the transit safety planning and target setting processes undertaken by the transit agencies and MPOs. While the Iowa DOT provided assistance with the development of initial Public Transportation Agency Safety Plans (PTASPs), each large urban transit provider is responsible for implementing its PTASP, which includes transit safety targets. Investments are made in alignment with PTASPs with the intent of keeping the state’s public transit operations, vehicles, and facilities safe and meeting transit safety targets. State and federal funding sources that can be used by transit agencies for operations, vehicles, and facility improvements are outlined in the funding chapter of the Transit Manager’s Handbook. Individual transit agencies determine the use of these sources for capital and operating expenses based on their local needs.

Financial Analysis The STIP identifies federal aid candidates for roadway, transit, and alternative investments for four federal fiscal years. The amount of FHWA funding considered available for the various apportionment (formula) categories are based on projected apportionments for the upcoming four-year period. For the purpose of fiscally constraining the STIP, FFY 2022-2025 federal aid apportionments have been based on FHWA notification N4510.854 – Fiscal Year 2021 Supplementary Tables. Some projects identified for funding from demonstration or other allocation (nonformula) programs are also included in the STIP. These other categories of funds have been programmed within amounts expected to be available from nonformula sources in the year programmed. The table on page 8 shows proposed FHWA funding by appropriation code and year. Although the programmed amounts may exceed annual apportionments funds carried over from earlier years cover any annual

5

Page 8: Iowa Statewide Transportation Improvement Program

deficits. The table also details estimated advance construction (AC) candidate projects and AC conversions. Additional information regarding the Iowa DOT’s use of the AC provision is provided later in the Financial Analysis section of the STIP. The programmed amounts shown in the fiscal constraint table express project costs in year of expenditure (YOE) dollars. The costs were adjusted to account for inflation by individual project sponsors. The AC provision is an important aspect of Iowa DOT’s cash flow management process that cannot be used effectively without the ability to authorize federal aid candidates and costs that exceed the baseline annual federal aid apportionments. The Iowa DOT maintains a “backlog” of AC projects to optimize federal aid as it relates to DOT funding strategies and revenue streams. This is done so the department can accomplish full recovery of obligation authority at an accelerated rate by converting AC projects against new apportionments for work substantially completed, and accomplishing new projects under the AC umbrella. Furthermore, the use of the AC provision offers the department additional security in ensure all federal aid obligation limitation will be obligated in the FFY it becomes available. The State of Iowa plans to continue this strategy by requesting authorization of many of the federal aid projects identified in the STIP as AC candidates and converting previous AC candidates for reimbursement on completed contracts. A listing of authorized AC candidates is maintained by the FHWA and the Iowa DOT and is included in the appendix. Although federal funds do provide a portion of the funding available for the highway construction program they are not the largest funding component for the Iowa DOT. Federal aid funds are an even smaller portion of local governments’ transportation budgets in Iowa. The table on page 9 demonstrates total nonfederal aid revenues estimated to be available for transportation investments within the four-year STIP period. In addition, the STIP includes information illustrating estimated operations and maintenance costs associated with management of the federal aid system. These amounts are shown on page 10. A comparison of the two tables demonstrates that state and local governments have sufficient nonfederal aid revenues available to cover the estimated cost of maintaining and operating the federal aid system. Furthermore, the state and local transportation revenues documented on page 8 demonstrate that the Iowa

DOT and local project sponsors of federal aid projects have sufficient local funding to meet federal aid matching requirements. The transit program identified in the STIP reflects the majority of transit activities in the state of Iowa. The amount available for FTA programs is based on expected allocations that will not be determined until after FFY 2022 has begun. Projected revenues used for programming (shown in the following table) are based on recent experience. Unlike FHWA programs, whereby the Iowa DOT is sponsor for a significant portion of the proposed expenditures, sponsors for transit activities are local governments and/or the service providers. Although some state funds are distributed to support transit activities, administration of the various programs occurs at the local level. Because costs related to transit capital and operating costs are relatively stable, it is unlikely reduced funding levels can be offset by any potential reductions in project costs. If available funds are less than projected, projects will be deferred or additional nonfederal shares will become the responsibility of the local sponsors. If funding is available beyond levels identified, additional expenditures may be rescheduled from the 2020 proposals. As during previous programming periods, a revised program will be submitted to the FTA if actual allocations differ significantly from current estimates.

6

Page 9: Iowa Statewide Transportation Improvement Program

2022-2025 Statewide Transportation Improvement Program

Estimated FTA Program Summary (x $1,000) Name Funding Source FY22 FY23 FY24 FY25

Metropolitan Planning Program 5303 $157 $157 $157 $157

Statewide Planning Program 5304 $20 $20 $50 $0 Urbanized Area Formula Assistance Program 5307 $36,859 $18,199 $20,620 $21,182 New Fixed Guideway Capital Program 5309 $0 $0 $0 $20,000 Seniors and Persons with Disabilities Program 5310 $2,872 $2,333 $2,586 $2,424 Nonurbanized Area Formula Assistance Program 5311 $17,981 $8,799 $8,079 $7,498

Bus and Bus Facilities Program 5339 $110,455 $16,887 $13,716 $10,124 Public Transit Infrastructure Grant Program (PTIG) PTIG $3,869 $700 $0 $80

State Transit Assistance (STA) STA $15,116 $10,942 $10,596 $10,224 Iowa's Clean Air Attainment Program ICAAP $52 $866 $424 $437 Surface Transportation Block Grant Program STBG $3,040 $3,197 $2,645 $1,400

The above information, when considered with the financial information contained on page 8, demonstrates that the 2022-2025 Iowa STIP is fiscally constrained given currently programmed federal aid amounts, estimated AC conversions, balances of contract authority, and estimated apportionments through FFY 2025.

7

Page 10: Iowa Statewide Transportation Improvement Program

APPROX UNOBLIG EST 2022 EST 2023 EST 2024 EST 2025BALANCE EST 2022 APPROX UNOBLIG FEDERAL-AID EST 2023 FEDERAL-AID EST 2024 FEDERAL-AID EST 2025 FEDERAL-AID

8/19/21 APPORTIONMENT BALANCE AUTHORIZATIONS APPORTIONMENT AUTHORIZATIONS APPORTIONMENT AUTHORIZATIONS APPORTIONMENT AUTHORIZATIONSFormula Fund AuthorizationsNational Highway Performance Program 23,361.0 307,873.0 331,234.0 149,585.0 307,873.0 164,414.0 307,873.0 142,981.0 307,873.0 123,251.0Highway Safety Improvement Program 50,428.0 28,117.0 78,545.0 29,345.0 28,117.0 27,546.0 28,117.0 30,276.0 28,117.0 31,176.0Congestion Mitigation Air Quality 8,070.0 11,796.0 19,866.0 19,377.0 11,796.0 11,842.0 11,796.0 11,138.0 11,796.0 11,436.0Metropolitan Planning 0.0 2,126.0 2,126.0 2,126.0 2,126.0 2,126.0 2,126.0 2,126.0 2,126.0 2,126.0Statewide Planning 15,747.0 10,604.0 26,351.0 2,900.0 10,604.0 2,900.0 10,604.0 2,900.0 10,604.0 2,900.0Railroad Highway 16,621.0 5,696.0 22,317.0 0.0 5,696.0 0.0 5,696.0 0.0 5,696.0 0.0STBG Urbanized 26,034.0 17,064.0 43,098.0 13,872.0 17,064.0 21,086.0 17,064.0 8,873.0 17,064.0 17,636.0STBG 5-200k 167.0 29,987.0 30,154.0 23,449.0 29,987.0 22,526.0 29,987.0 25,523.0 29,987.0 28,457.0STBG <5k 3,734.0 31,531.0 35,265.0 26,565.0 31,531.0 28,437.0 31,531.0 27,098.0 31,531.0 22,611.0STBG Off-System Bridge * 824.0 9,285.0 10,109.0 8,822.0 9,285.0 9,136.0 9,285.0 9,000.0 9,285.0 9,752.0STBG Flex 12,411.0 55,009.0 67,420.0 57,269.0 55,009.0 52,700.0 55,009.0 55,360.0 55,009.0 55,198.0TAP Urbanized 2,557.0 1,019.0 3,576.0 3,183.0 1,019.0 1,861.0 1,019.0 500.0 1,019.0 914.0TAP 5-200k 3,228.0 1,792.0 5,020.0 0.0 1,792.0 0.0 1,792.0 0.0 1,792.0 0.0TAP <5k 6,539.0 1,884.0 8,423.0 0.0 1,884.0 0.0 1,884.0 0.0 1,884.0 0.0TAP Flex * 56.0 4,695.0 4,751.0 0.0 4,695.0 0.0 4,695.0 14,000.0 4,695.0 4,572.0Recreational Trails Program 3,720.0 1,374.0 5,094.0 1,432.0 1,374.0 1,374.0 1,374.0 1,374.0 1,374.0 1,374.0National Highway Freight Program 12,701.0 18,162.0 30,863.0 17,807.0 18,162.0 18,162.0 18,162.0 18,162.0 18,162.0 18,162.0TE and SRTS 3,689.0 0.0 3,689.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total 538,014.0 727,901.0 355,732.0 538,014.0 364,110.0 538,014.0 349,311.0 538,014.0 329,565.0

Allocated Fund AutorizationsDemonstration Funds 87,699.0 87,699.0 31,192.0 0.0 25,000.0 0.0 0.0 0.0 0.0Emergency Relief 16,801.0 16,801.0 16,801.0 0.0 0.0 0.0 0.0 0.0 0.0Highway Infrastructure Program 74,444.0 74,444.0 0.0 0.0 0.0 0.0 0.0 0.0Total 47,993.0 25,000.0 0.0 0.0

Advance Construction CandidatesNational Highway Performance Program 232,163.0 125,624.0 204,311.0 220,119.0Statewide Planning 7,704.0 7,704.0 7,704.0 7,704.0Railroad Highway 5,696.0 5,696.0 5,696.0 5,696.0STBG <5k 18,666.0 0.0 5,000.0 0.0Total 264,229.0 139,024.0 222,711.0 233,519.0

Advance Construction ConversionNational Highway Performance Program 168,500.0 155,000.0 170,000.0 180,000.0Statewide Planning 7,704.0 7,704.0 7,704.0 7,704.0Railroad Highway 5,696.0 5,696.0 5,696.0 5,696.0Congestion Mitigation Air Quality 0.0 0.0 0.0 5,000.0STBG <5k 0.0 5,500.0 5,000.0 10,000.0Total 181,900.0 173,900.0 188,400.0 208,400.0

Total Apportioned Funds 538,014.0 538,014.0 538,014.0 538,014.0Total Authorized Formula Funds & AC Conversions 537,632.0 538,010.0 537,711.0 537,965.0

* STBG Off-System Bridge funding transferred to STBG-Flex and will fund STBG eligible activities* TAP Flex funding transferred to STBG-Flex and will fund TAP and STBG eligible activities

ProgramNational Highway Performance Program M001/M0E1/Z001/Z0E1 STBG <5kHighway Safety Improvement Program LS2E/MS3E/ZS30/ZS3E/MS32 STBG Off-System BridgeCongestion Mitigation Air Quality L400/M400/Z400/Z40E STBG FlexMetropolitan Planning Z45E TAP UrbanizedStatewide Planning M55E/ZS50/ZS5E/H560/L560/L56E/M56E/Z560/Z56E TAP 5-200k

TAP <5kTAP Flex M300/Z300

Recreational Trails Program Z940/Z94E TE and SRTS LU10/LU1E/LU1R/LU20/LU2E/LU2R/LU30/LU3E/LU3R/L22E/L22RSTBG Urbanized L230/L23E/M230/Z230/Z23E Demonstration Funds Q920/HY10/HY20/LY10/LY20/LY30/56C0STBG 5-200k M231/M2E1/Z231/Z2E1 Emergency Relief M9V0/M9VE/09VE/ER50/ER80/ER10/ER11/ER12/ER14/ER60National Highway Freight Program Z460/Z46E Highway Infrastructure Program Z918/Z970/Z910/Z919/Z972/Z911/Z920/Z906/Z921/Z908/Z913/Z922

Z233M240/M24E/Z240/Z24EZ301/Z3E1M302/M3E2/Z302/Z3E2

Railroad Highway LS40/LS4E/MS40/MS4E/ZS40/ZS4E/LS4R/MS50/MS5E/ZS50/ZS5E/H260/Q260/L27R

M303/M3E3/Z303/Z3E3

M232/M2E2/Z232/Z2E2/H200/L200/L20E

2022-2025 Statewide Transportation Improvement ProgramFHWA Program Federal-Aid Summary (x $1000)

Appropriation Codes Program Appropriation Codes

8

Page 11: Iowa Statewide Transportation Improvement Program

2022 2023 2024 2025RPA 1 $58,441,067 $59,609,888 $60,802,086 $62,018,128RPA 2 $103,100,949 $107,224,987 $111,513,986 $115,974,546RPA 3 $103,433,274 $107,570,605 $111,873,429 $116,348,366RPA 4 $59,267,208 $61,637,896 $64,103,412 $66,667,549RPA 5 $66,747,089 $68,082,031 $69,443,671 $70,832,545RPA 6 $52,891,865 $53,949,703 $55,028,697 $56,129,271RPA 7 $72,319,492 $73,765,882 $75,241,199 $76,746,023RPA 8 $76,725,014 $78,259,514 $79,824,704 $81,421,198RPA 9 $34,727,441 $36,116,539 $37,561,200 $39,063,648

RPA 10 $105,620,551 $112,564,851 $117,067,444 $124,809,185RPA 11 $126,358,415 $131,412,752 $136,669,262 $142,136,033RPA 12 $55,081,387 $56,183,015 $57,306,675 $58,452,809RPA 13 $34,832,233 $35,528,877 $36,239,455 $36,964,244RPA 14 $35,001,334 $36,401,388 $37,857,444 $39,371,742RPA 15 $55,251,726 $56,356,761 $57,483,896 $58,633,574RPA 16 $53,971,207 $55,590,344 $57,258,054 $58,975,796RPA 17 $38,023,272 $39,544,202 $41,125,971 $42,771,010RPA 18 $49,876,111 $51,891,106 $52,928,928 $53,987,507

Ames MPO $32,173,396 $33,322,445 $34,471,495 $35,620,545Cedar Rapids MPO $108,265,791 $110,431,107 $112,639,729 $114,892,524

Council Bluffs MPO $19,842,369 $20,239,216 $20,644,001 $21,056,881Davenport MPO $69,091,987 $71,855,667 $74,729,893 $77,719,089

Des Moines MPO $318,118,718 $330,843,467 $344,077,205 $357,840,294Dubuque MPO $20,523,169 $20,933,632 $21,352,305 $21,779,351Iowa City MPO $58,358,982 $60,693,341 $63,121,075 $65,645,918Sioux City MPO $52,827,853 $54,940,967 $57,138,606 $59,424,150Waterloo MPO $53,233,222 $54,297,886 $55,383,844 $56,491,521

Iowa DOT $884,000,000 $886,300,000 $892,500,000 $897,000,000Total Statewide $2,798,105,122 $2,865,548,070 $2,935,387,666 $3,008,773,447

Forecasted Non Federal-aid Revenues

9 9

Page 12: Iowa Statewide Transportation Improvement Program

2022 2023 2024 2025RPA 1 $13,779,768 $14,330,959 $14,904,198 $15,500,365RPA 2 $17,870,481 $18,585,300 $19,328,712 $20,101,861RPA 3 $18,117,618 $18,842,323 $19,596,016 $20,379,856RPA 4 $11,294,605 $11,746,390 $12,216,245 $12,704,895RPA 5 $14,559,910 $15,142,306 $15,747,999 $16,377,919RPA 6 $12,056,987 $12,539,267 $13,040,837 $13,562,471RPA 7 $14,667,246 $15,253,936 $15,864,094 $16,498,657RPA 8 $12,969,020 $13,487,781 $14,027,292 $14,588,383RPA 9 $6,444,588 $6,702,372 $6,970,466 $7,249,285RPA 10 $23,163,570 $24,090,113 $25,053,717 $26,055,866RPA 11 $28,155,055 $29,281,257 $30,452,507 $31,670,607RPA 12 $13,975,349 $14,534,362 $15,115,737 $15,720,366RPA 13 $6,287,258 $8,000,767 $8,320,797 $8,653,629RPA 14 $7,775,650 $8,056,676 $8,410,143 $8,746,549RPA 15 $12,478,145 $13,081,271 $13,604,522 $14,148,702RPA 16 $10,810,706 $11,135,027 $11,469,178 $11,813,151RPA 17 $11,265,330 $11,715,943 $12,184,581 $12,671,964RPA 18 $14,605,478 $14,941,404 $15,285,056 $15,636,613Ames MPO $2,713,586 $2,810,500 $2,907,414 $3,004,328Cedar Rapids MPO $6,449,148 $6,707,114 $6,975,399 $7,254,415Council Bluffs MPO $2,440,852 $2,514,078 $2,589,500 $2,667,185Davenport MPO $3,770,566 $3,921,388 $4,078,244 $4,241,373Des Moines MPO $13,657,340 $14,203,634 $14,771,779 $15,362,651Dubuque MPO $1,557,460 $1,619,759 $1,684,549 $1,751,931Iowa City MPO $4,361,339 $4,535,792 $4,717,224 $4,905,913Sioux City MPO $3,562,255 $3,704,745 $3,852,935 $4,007,052Waterloo MPO $4,757,271 $4,947,562 $5,145,465 $5,351,283Iowa DOT $354,000,000 $364,800,000 $376,700,000 $388,500,000Total Statewide $647,546,581 $671,232,027 $695,014,607 $719,127,270

Forecasted Operations and Maintenance Expenditures on Federal-aid System

1010

Page 13: Iowa Statewide Transportation Improvement Program

Public Participation Iowa’s public involvement procedures for federal aid candidates and other investments encourage public participation in development of transportation policy and project selection. Development of the state’s transportation policy is the responsibility of the Iowa Transportation Commission, a citizen board appointed by the governor. Development of the state’s Five-Year Program is subject to the review and approval of the Iowa Transportation Commission. Public meetings provide opportunities for public input directly to the Iowa Transportation Commission on, at a minimum, a monthly basis. Iowa Transportation Commission meetings are periodically held in locations outside the Iowa DOT's central complex to solicit input concerning its programming decisions. The department also maintains planning, field services coordination, and local systems staff at district offices to facilitate public involvement on a daily basis. As noted earlier, the Iowa DOT develops projects based on an overall investment strategy consistent with the state’s long-range plan. Some programs are intended to address specific aspects of the transportation systems, like highway safety or rail crossing signalization. Many projects and programs are developed to address transportation needs within an investment strategy that focuses portions of available funds toward economic development, maintenance and repairs, or system improvements. Many aspects of the programs, such as the railroad crossing improvements, clean air efforts, some bridge replacements, and highway safety have specific selection/ranking processes that have been adopted by the Iowa DOT to guide commitments of funds. Safety is always a foremost consideration. The approximately 114,000 miles of public roads in Iowa are managed by various government agencies. The Iowa DOT holds jurisdiction over those portions of the system designated the Primary Road System (approximately 9,000 miles), which includes interstates. Other rural roadways are the responsibility of the county governments (approximately 90,000 miles). Cities and towns generally retain jurisdiction over roadways within their corporate limits (approximately 14,000 miles). Roadways on federal properties are under jurisdiction of the respective federal agencies, just as those at state-owned facilities are under the jurisdiction of the various state agencies. Similarly, transit programs are administered by governmental agencies, generally on a city or regional basis.

Selection of projects funded by the FHWA and FTA occur at several levels, all subject to public participation requirements. Local programs are coordinated by MPOs in cities with populations greater than 50,000, and by similar organizations representing the “rural” areas called RPAs. In most situations, projects are initiated by sponsors within the MPO/RPA that are directly responsible for revenues required to match federal aid, providing future maintenance and other support, and accomplishing activities that are not selected for federal aid participation. Maps showing locations of the MPOs and RPAs, transit systems, and Iowa DOT district planners are provided in the appendix. Cities, counties, transit services, and interested individuals assist MPOs and RPAs in developing local improvement programs and transportation services. Each planning organization held public forums to consider FHWA and FTA investments within their areas for the years 2021 through 2024. Written comments and emails could also be submitted. Each group considered proposed expenditures and developed priorities for their area. All are also encouraged to review proposals for improvements on the state system and may propose modifications to programmed projects or identify candidates for future consideration. Subsequently, each MPO and RPA generated a draft TIP, held public meetings to record comments concerning the proposed program, and submitted the final TIP to the Iowa DOT for integration into a draft STIP. The Iowa DOT has also implemented public involvement procedures specific to the STIP. After compiling information contained in the Five-Year Program and MPO/RPA TIPs, an electronic copy of the draft STIP was distributed for public review through placement on the Iowa DOT’s website. Additionally, an Iowa DOT news release was distributed notifying media and the public of the STIP availability. Finally, a special meeting to solicit public input concerning the draft STIP from a statewide perspective was held virtually on Aug. 17, 2021. All comments received by the Iowa DOT from STIP or other public participation activities that relate to state-level programming are provided to the Iowa Transportation Commission for consideration during development of the next Iowa TIP. A compilation of all public comments concerning the Iowa DOT’s program will be available during review of the proposed TIP. Comments regarding projects generated at the local level will be used by the respective MPOs and RPAs during development of future TIPs.

11

Page 14: Iowa Statewide Transportation Improvement Program

Changing an Approved STIP Revisions are defined as changes to a TIP/STIP that occur between scheduled annual updates. There are two types of changes that occur under the umbrella of revision. The first is a major revision or “amendment.” The second is a minor revision or “administrative modification.” The Iowa DOT requires that each MPO or RPA adopt these definitions and thresholds, at a minimum, when determining an amendment vs. an administrative modification. Amendment An amendment is a revision that involves a major change to a project included in the TIP/STIP. This includes an addition or deletion of a project, a major change in the amount of programmed federal aid, or a major change in design concept or scope such as a changing of project termini. Administrative Modification A minor revision to a TIP or STIP is an administrative modification. It includes minor changes or project phase costs, minor changes to funding sources of previously included projects, and minor changes to project or project phase initiation dates. Amendment vs. Administrative Modification There are four main components that can be used to determine whether a project change constitutes an amendment or an administrative modification. They include the following.

Project costs: Determination will be made based on the percentage change or dollar amount of change in federal aid. Projects in which the federal aid has been increased by more than 30 percent or total federal aid increases by $2 million or more will require an amendment. Anything less can be processed as an administrative modification. Schedule changes: Changes in schedules to projects that are included in the first four years of the TIP/STIP will be considered administrative modifications. Projects that are added or deleted from the TIP/STIP will be processed as amendments.

Funding sources: Additional federal funding sources to a project will require an amendment. Changes to funding from one source to another will require an administrative modification. Scope changes: Changing project termini will be processed as an amendment. Other examples of changes that require amendment are changing the type of work from an overlay to reconstruction or changing the number of through lanes.

Procedural Requirements for Revisions Amendments are considered major revisions and therefore have more procedural requirements. Requirements for approving an amendment to the STIP include an opportunity for public input, policy board approval of locally sponsored project amendments, and a redemonstration of fiscal constraint of the STIP. Public involvement for all locally sponsored project amendments will occur at the MPO and RPA level. Statewide public review for Iowa DOT project amendments takes place prior to approval of the amendment in the STIP. Iowa DOT sponsored projects within an MPO must go through the MPO’s adopted amendment process, which includes public review and approval by the appropriate boards and committees. When possible, Iowa DOT amendments within an RPA also go through the RPA’s adopted amendment process. However, this is not required, and in some instances Iowa DOT amendments in RPAs are approved based solely on the statewide public review performed by the Iowa DOT. Administrative modifications have simplified procedures that allow more flexibility in the processing of changes. Each RPA and MPO is allowed to approve administrative modifications by seeking board approval or the planning agency may make minor changes administratively if the process to do so has been documented and approved by the appropriate technical and policy boards. Redemonstration of STIP fiscal constraint may be necessary for certain administrative modifications. Fiscal Constraint – Revisions In order to maintain fiscal constraint of the STIP document most revisions to the STIP that add a new project or increases a project’s federal aid amount will require that a corresponding change be made to another

12

Page 15: Iowa Statewide Transportation Improvement Program

programming entry to ensure that the STIP remains fiscally constrained. This requirement pertains to both administrative modifications and amendments to the STIP and is the responsibility of local project sponsors and local planning agencies for locally administered federal aid projects.

13

Page 16: Iowa Statewide Transportation Improvement Program

FHWA Programs

Page 17: Iowa Statewide Transportation Improvement Program

0 20

Iowa Department of Transportation

800 Lincoln Way, Ames, IA 50010

Phone: 515-239-1409

40 80 Miles

r----,

L ___ J Counties

14

Page 18: Iowa Statewide Transportation Improvement Program

RPA 0 / StatewideCMAQ

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

23405

Iowa Department ofTransportation

22002

STP-A-000s()--22-00

Bus Replacement: Large Urban and Rural Areas

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$3,800,000$3,000,000

$3,800,000$3,000,000

$3,800,000$3,000,000

$3,800,000$3,000,000

$15,200,000$12,000,000

25540

Iowa Department ofTransportation

22003

STP-A-000T()--22-00

Iowa Clean Air Attainment Program

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$5,000,000$2,000,000

$2,000,000

$5,000,000$2,000,000

$2,000,000

$5,000,000$2,000,000

$2,000,000

$15,000,000$6,000,000

$6,000,000

ER

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

15055

Iowa Department ofTransportation

22012

ER-000T()--58-00

STATEWIDE: EMERGENCY RELIEF PROGRAMPROJECTS TO BE DETERMINED

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$16,801,000$16,801,000

$16,801,000$16,801,000

15

Page 19: Iowa Statewide Transportation Improvement Program

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

25371

Iowa Department ofTransportation

22014

HSIP-000T()--2H-00

Statewide Interstate Guardrail Repair

Landscaping

FHWA Approved TotalFederal Aid

RegionalSwap

$1,100,000$990,000

$1,120,000$1,008,000

$1,140,000$1,026,000

$1,140,000$1,026,000

$4,500,000$4,050,000

8109

Iowa Department ofTransportation

22015

HSIP-000T()--2H-00

Statewide Railroad Crossings

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$500,000$450,000

$500,000$450,000

$500,000$450,000

$500,000$450,000

$2,000,000$1,800,000

15169

Iowa Department ofTransportation

22016

HSIP-000T()--2H-00

Statewide safety projects including centerline rumble strips,intersection improvements, and pavement markings

Pave, Traffic Signals, Pavement Markings

FHWA Approved TotalFederal Aid

RegionalSwap

$5,000,000$4,500,000

$28,987,000$26,088,300

$32,000,000$28,800,000

$33,000,000$29,700,000

$98,987,000$89,088,300

16

Iowa Department ofTransportation

22013

RRP-000T()--48-00

Railroad Highway Crossing and Surface Repair Programs

Pavement Rehab, Railroad Signals

FHWA Approved TotalFederal Aid

RegionalSwap

$6,328,622$5,695,760

$6,328,622$5,695,760

$6,328,622$5,695,760

$6,328,622$5,695,760

$25,314,488$22,783,040

ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

49733

Iowa Department ofTransportation

ILL-000T()--94-00

Advance Transportation Lifecycle Digital Delivery andDigital Twins in Iowa

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$1,250,000 $1,250,000

49734

Iowa Department ofTransportation

ILL-000T()--94-00

Collection of unpaved road strength modulus values usingvalidated intelligent compaction

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$1,250,000 $1,250,000

16

Page 20: Iowa Statewide Transportation Improvement Program

MISC

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

13250

Iowa Department ofTransportation

22031

MISC-000T()--XX-00

Allocated Funds: Research, Tech, Min Bus, Seatbelt, UseTax, Inv, NCPD, Etc.

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$2,500,000$2,000,000

$2,500,000$2,000,000

$2,500,000$2,000,000

$2,500,000$2,000,000

$10,000,000$8,000,000

45534

U.S. Fish andWildlife Service

22029

MISC-USFWD1R11()--XX-00

Neal Smith National Wildlife Refuge - Trail Rehabilitation

Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$450,000$450,000

$450,000$450,000

45535

U.S. Fish andWildlife Service

22030

MISC-USFWD1R11()--XX-00

DeSoto NWR Southgate Rec Area Rehabilitation

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$830,000$830,000

$830,000$830,000

NHFP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37003

Iowa Department ofTransportation

22032

INHFP-000T()--0F-00

Linking Iowa's Freight Transportation System

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$2,270,200$1,816,200

$2,270,200$1,816,200

$2,270,200$1,816,200

$6,810,600$5,448,600

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

16884

Iowa Department ofTransportation

22035

IM-000T()--13-00

STATEWIDE INTERSTATE SIGNING

Traffic Signs

FHWA Approved TotalFederal Aid

RegionalSwap

$1,000,000$900,000

$1,000,000$900,000

$1,000,000$900,000

$1,000,000$900,000

$4,000,000$3,600,000

16883

Iowa Department ofTransportation

22036

IM-000T()--13-00

STATEWIDE INTERSTATE LIGHTING

Lighting

FHWA Approved TotalFederal Aid

RegionalSwap

$500,000$450,000

$500,000$450,000

$500,000$450,000

$500,000$450,000

$2,000,000$1,800,000

17

Page 21: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38343

Iowa Department ofTransportation

IMN-000T()--0E-00

STATEWIDE INTERSTATE PAVEMENT MAINTENANCE

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$9,500,000 $9,500,000 $9,500,000 $9,500,000 $38,000,000

16885

Iowa Department ofTransportation

NHSN-000T()--2R-00

STATEWIDE INTERSTATE REST AREA MAINTENANCE

Rest Area Improvement

DOT Approved TotalFederal Aid

RegionalSwap

$6,000,000 $6,000,000 $6,000,000 $6,000,000 $24,000,000

8114

Iowa Department ofTransportation

STPN-000S ()--2J-00

Statewide Contract Maintenance

Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$35,850,000 $36,350,000 $36,850,000 $37,350,000 $146,400,000

8112

Iowa Department ofTransportation

STPN-000T ()--2J-00

EMERGENCY - CONTINGENCY - U-STEP/C-STEP & TJRESERVE

Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$6,000,000 $6,000,000 $6,000,000 $6,000,000 $24,000,000

8113

Iowa Department ofTransportation

STPN-000T()--2J-00

STATEWIDE TRAFFIC CONTROL DEVICES

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$10,000,000 $10,000,000 $10,000,000 $10,000,000 $40,000,000

14

Iowa Department ofTransportation

STPN-000T()--2J-00

COOPERATIVE CITY/COUNTY/STATE HIGHWAYRESEARCH

Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$1,750,000 $2,000,000 $2,250,000 $2,500,000 $8,500,000

45526

Iowa Department ofTransportation

STPN-000T()--2J-00

POST LETTING PROJECT COST

Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$20,000,000 $20,000,000 $20,000,000 $20,000,000 $80,000,000

13428

Iowa Department ofTransportation

STPN-000T()--2J-00

STATEWIDE ROADSIDE IMPROVEMENTS

Landscaping

DOT Approved TotalFederal Aid

RegionalSwap

$2,500,000 $2,500,000 $2,500,000 $2,500,000 $10,000,000

3

Iowa Department ofTransportation

STPN-000T()--2J-00

STATEWIDE CONSULTANT SERVICES

Outside Services Engineering

DOT Approved TotalFederal Aid

RegionalSwap

$85,000,000 $85,000,000 $85,000,000 $85,000,000 $340,000,000

18

Page 22: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

33936

Iowa Department ofTransportation

STPN-000T()--2J-00

AMERICANS WITH DISABILITIES ACT

Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$3,000,000 $3,000,000 $3,000,000 $3,000,000 $12,000,000

RTP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36644

Iowa Department ofNatural Resources

22214

NRT-000S(955)--9G-00

Snowmobile Trail Grooming Equipment Purchase

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$300,000$240,000

$300,000$240,000

39451

Iowa Department ofNatural Resources

22213

NRT-000T()--9G-00

On Snow Grooming Equipment

Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$280,000$224,000

$280,000$224,000

48717

Iowa Department ofTransportation

22215

NRT-000T()--9G-00

Support for 2022 Bicycle Summit

Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$7,500$6,000

$7,500$6,000

48718

Iowa Department ofTransportation

22216

NRT-000T()--9G-00

FRT 2022 Committee Expenses

Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$1,250$1,000

$1,250$1,000

38352

Iowa Department ofNatural Resources

22217

NRT-000T(28)--9G-00

Iowa DNR OHV Program - Statewide - Purchase of Mowers

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$74,087$59,087

$74,087$59,087

38353

Iowa Department ofNatural Resources

22218

NRT-000T(29)--9G-00

Iowa DNR OHV Program: Marshall County Nicholson-FordOHV Park: Equipment Maintenance and Storage Building

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$67,712$53,712

$67,712$53,712

40058

Iowa Department ofTransportation

22219

NRT-000T()--9G-00

Federal Recreational Trails Program

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$1,717,704$1,374,000

$1,717,704$1,374,000

$1,717,704$1,374,000

$5,153,112$4,122,000

19

Page 23: Iowa Statewide Transportation Improvement Program

SPR

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

22190

Iowa Department ofTransportation

22223

SPR-000T()--8H-00

SPR; Technology Transfer; DOT Co-op/Intern Program;Management Systems. Snooper Trucks.

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$13,295,056$10,604,000

$13,295,056$10,604,000

$13,295,056$10,604,000

$13,295,056$10,604,000

$53,180,224$42,416,000

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

8252

Iowa Department ofTransportation

22224

STP-000T()--2C-00

Construction Industry Training Program

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$1,000,000$800,000

$1,000,000$800,000

$1,000,000$800,000

$1,000,000$800,000

$4,000,000$3,200,000

8119

Iowa Department ofTransportation

22225

STP-000T()--2C-00

PREVOCATIONAL TRAINING AND DBE SUPPORTSERVICES

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$360,000$288,000

$360,000$288,000

$360,000$288,000

$360,000$288,000

$1,440,000$1,152,000

9662

Iowa Department ofTransportation

22226

TAP-R- 000T()--8T-00

SCENIC BYWAYS PROGRAM - PROJECTSDETERMINED LATER

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$500,000$400,000

$500,000$400,000

$500,000$400,000

$500,000$400,000

$2,000,000$1,600,000

13745

Iowa Department ofTransportation

22228

STP-000T()--2C-00

Non-Interstate Pavement Modernization

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$140,000,000$80,000,000

$145,000,000$85,000,000

$150,000,000$90,000,000

$435,000,000$255,000,000

25541

Iowa Department ofTransportation

22227

TAP-R-000T()--8T-00

Statewide Transportation Alternatives Program: Projects tobe Determined

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$1,250,000$1,000,000

$1,250,000$1,000,000

$1,250,000$1,000,000

$3,750,000$3,000,000

20

Page 24: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45486

Iowa Department ofTransportation

22339

TAP-R-000T(136)--8T-00

Iowa Safe Routes to School Partnership

Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$251,319$201,055

$251,319$201,055

45670

Iowa Department ofTransportation

22337

TAP-R-000T(183)--8T-00

Various: Integrated Roadside Vegetation Management

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$732,546$586,037

$732,546$586,037

45671

Iowa Department ofTransportation

22338

TAP-R-000T(184)--8T-00

Iowa Safe Routes to School Partnership

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$276,312$221,050

$276,312$221,050

38407

Iowa Department ofTransportation

22340

TAP-R-TREE(22)--8T-00

Iowa’s Living Roadways Trails Visioning

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$141,000$113,000

$141,000$113,000

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39497

Iowa Department ofTransportation

HSIP-SWAP-000T()--SJ-00

Statewide HSIP-SWAP Secondary Program

Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$2,000,000

$2,000,000

$2,000,000

$2,000,000

$2,000,000

$2,000,000

$6,000,000

$6,000,000

21

Page 25: Iowa Statewide Transportation Improvement Program

0

Boone

County

Ames Area Metropolitan Planning Organization

515 Clark Avenue, P.O.Box 811, Ames, IA 50010

Phone: 515-239-5165, Fax: 515-239-5142, https://www.cityofames.org

\

2 4 Miles

Story

County

/

�orts � Commercial

- Interstate

- National Highway System

Enhanced - Primary Roads

General Service - Local Roads

El Basic Service

El Local Service Transit rel Regional

[el Large Urban

rel Small Urban

rel Intercity Bus

C[I Amtrak

I Park & Ride

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] MPO Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

22

Page 26: Iowa Statewide Transportation Improvement Program

23

Page 27: Iowa Statewide Transportation Improvement Program

MPO 22 / AAMPOPL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

34214

MPO 22 / AAMPO

22204

RGPL-PA22(RTP)--PL-85

Trans Planning

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$126,575$101,260

$126,575$101,260

$126,575$101,260

$126,575$101,260

$506,300$405,040

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38031

Iowa Department ofTransportation

BRFN-69()--39-85

US69: GRAND AVE IN AMES 0.1 MI N OF LINCOLN WAY

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$238,000 $238,000

45416

Iowa Department ofTransportation

IMN-35()--0E-85

I-35: US 30 AND CO RD E15 INTERCHANGE RAMPS

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$836,000 $836,000

48489

Iowa Department ofTransportation

NHSN-30()--2R-85

US30: EB EXIT RAMP AT US 69 INTERCHANGE IN AMES

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$100,000 $100,000

45391

Iowa Department ofTransportation

IMN-35()--0E-85

I-35: US 30 TO CO RD D59 (SB)

DOT Approved TotalFederal Aid

RegionalSwap

$2,800,000 $2,800,000

24

Page 28: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38304

MPO 22 / AAMPO

22229

RGTR-0155()--ST-85

CyRide: Vehicle Replacement

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$850,000$225,000

$225,000

$850,000$225,000

$225,000

37442

MPO 22 / AAMPO

22230

RGTR-0155()--ST-85

CyRide Vehicle Replacement

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$850,000$225,000

$225,000

$850,000$225,000

$225,000

48395

MPO 22 / AAMPO

22232

RGPL-PA22()--ST-85

Ames MPO Planning: STP Funds for TransportationPlanning (LRTP)

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$500,000$400,000

$400,000

$500,000$400,000

$400,000

45238

MPO 22 / AAMPO

22231

RGTR-0155()--ST-85

CyRide: Vehicle Replacement

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$850,000$225,000

$225,000

$850,000$225,000

$225,000

48396

MPO 22 / AAMPO

22233

RGTR-0155()--ST-85

In the city of Ames, CyRide: Vehicle Replacement

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$850,000$225,000

$225,000

$850,000$225,000

$225,000

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

19249

Ames

22341

TAP-U-0155()--8I-85

In the city of Ames, Ioway Creek: From Skunk River to S.5th St

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$922,000$400,000

$400,000

$922,000$400,000

$400,000

14983

Ames

22342

TAP-U-0155(SE16th)--8I-85

In the city of Ames, Skunk River Trail: From Ioway Creek toEast Lincoln Way

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$521,000$160,000

$160,000

$521,000$160,000

$160,000

DOT Note: Project eligible for FHWA TAP funding

25

Page 29: Iowa Statewide Transportation Improvement Program

SWAP-CMAQ

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48394

Ames

ICAAP-SWAP-0155()--SH-85

In the city of Ames, Second Phase Deployment AmesTraffic Signal Master Plan

Traffic Signals

DOT Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$1,750,000

$1,400,000

$1,750,000

$1,400,00045239

Ames

ICAAP-SWAP-0155(702)--SH-85

In the city of Ames, First Phase Deployment Ames TrafficSignal Master Plan

Traffic Signals

DOT Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$1,470,685

$1,176,548

$1,470,685

$1,176,548

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36919

Ames

STBG-SWAP-0155(705)--SG-85

In the city of Ames, On Cherry Avenue, from E Lincoln WaySouth .4 Miles to Southeast 5th Street,

Grade and Pave

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$2,400,000

$1,890,000

$1,890,000

$2,400,000

$1,890,000

$1,890,00038303

Ames

STBG-SWAP-0155(706)--SG-85

In the city of Ames, On Stange Rd and 24TH ST, fromBlankenburg Dr North .4 Miles to 24th ST and East .8 Milesto RR,

Grade and Pave

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$4,200,000

$1,600,000

$1,600,000

$4,200,000

$1,600,000

$1,600,000

35616

Ames

STBG-SWAP-0155(707)--SG-85

In the city of Ames, On North Dakota Avenue, from OntarioStreet North 0.17 Miles to Union Pacific Railroad Tracks

Pave

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$1,500,000

$900,000

$900,000

$1,500,000

$900,000

$900,00045233

Ames

STBG-SWAP-0155()--SG-85

In the city of Ames, on Lincoln Way, from Dotson Dr to SFranklin Ave

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$2,400,000

$1,686,000

$1,686,000

$2,400,000

$1,686,000

$1,686,00048397

Ames

STBG-SWAP-0155()--SG-85

In the city of Ames, On S 16TH ST, from University Blvd toApple Pl

Pavement Widening

DOT Approved TotalFederal Aid

RegionalSwap

$3,880,000

$2,814,000

$2,814,000

$3,880,000

$2,814,000

$2,814,000

26

Page 30: Iowa Statewide Transportation Improvement Program

Corridor Metropolitan Planning Organization

101 First Street SE, Cedar Rapids, IA 52401

Phone: 319-286-5041, Fax: 319-286-5130, www.corridormpo.com

Benton

County

l

�l ' �L>'

/ ,h

Mar

10

Cedar, .

�orts � Commercial

- Interstate

- National Highway System

El Enhanced - Primary Roads

General Service - Local Roads -+

-Ramps

� -I I 1-t

Fairfax

/

Basic Service

El Local Service Transit rel Regional

-Trails

-+- Railroad

l

Walford l

D;<

N

0 2 4

l

T

8 Miles

Johnson

County

rel Large Urban

rel Small Urban

rel Intercity Bus

C[I Amtrak

I Park & Ride

Rivers

Major Lakes

C] MPO Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

27

Page 31: Iowa Statewide Transportation Improvement Program

28

Page 32: Iowa Statewide Transportation Improvement Program

MPO 23 / CMPOCMAQ

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

6695

Cedar Rapids

22004

STP-A-1187(652)--22-57

In the City of Cedar Rapids, COLLINS RD: C AVEINTERSECTION

Pavement Widening

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$197,000$157,000

$197,000$157,000

PA Note: FA will be used for advanced right-of-way acquisition.

DOT Note: Total grant amount of $1,400,000. $1,243,078.57 already autnorized.

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48579

Iowa Department ofTransportation

22017

HSIPX-30()--3L-57

US30: IN CEDAR RAPIDS, FROM CIC RR TO CEDARRIVER TRAIL

Guardrail

FHWA Approved TotalFederal Aid

RegionalSwap

$750,000$675,000

$750,000$675,000

NHFP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39426

Cedar RapidsAirport Commission

22033

NHFP-CRAC(001)--2F-57

In the City of Cedar Rapids, Air Cargo Logistics Facility atEastern Iowa Airport

Buildings

FHWA Approved

11/16/2020

TotalFederal Aid

RegionalSwap

$1,150,000$925,000

$1,150,000$925,000

29

Page 33: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38070

Iowa Department ofTransportation

22037

IM-380()--13-57

I-380: TOWER TERRACE INTERCHANGE IN HIAWATHA(STATE SHARE)

Grade and Pave, Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$15,779,000$14,201,100

$15,779,000$14,201,100

48523

Iowa Department ofTransportation

22038

NHSX-30()--3H-57

US30: IN CEDAR RAPIDS FROM MORGAN CREEK TOSTONEY POINT RD

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,600,000$2,880,000

$3,600,000$2,880,000

48531

Iowa Department ofTransportation

22039

IM-380()--13-57

I-380: BOYSON RD INTERCHANGE IN HIAWATHA

Grade and Pave, Bridge Replacement, Traffic Signs

FHWA Approved TotalFederal Aid

RegionalSwap

$20,602,000$18,541,800

$20,602,000$18,541,800

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

17107

MPO 23 / CMPO

22205

RGPL-PA23()--PL-00

MPO: Planning Funds

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$449,841$299,841

$374,841$299,841

$374,841$299,841

$374,841$299,841

$1,574,364$1,199,364

30

Page 34: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48603

Iowa Department ofTransportation

IMN-380()--0E-57

I-380: MITIGATION FOR TOWER TERRACE RDINTERCHANGE, BOYSON RD INTERCHANGE ANDMAINLINE I-380

Wetland Mitigation

DOT Approved TotalFederal Aid

RegionalSwap

$31,000 $31,000

48506

Iowa Department ofTransportation

NHSN-922()--2R-57

IA922: IN CEDAR RAPIDS, FROM 6TH ST W TO THECEDAR RIVER

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,800,000 $1,800,000

39284

Iowa Department ofTransportation

BRFN-30()--39-57

US30: UP RR 1.6 MI W OF E JCT US 218 (WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,762,000 $1,762,000

39286

Iowa Department ofTransportation

IMN-380()--0E-57

I-380: SB REST AREA 3.0 MI S OF CEDAR RAPIDS

Grade and Pave, Rest Area Improvement

DOT Approved TotalFederal Aid

RegionalSwap

$4,336,000 $1,891,000 $6,227,000

39287

Iowa Department ofTransportation

IMN-380()--0E-57

I-380: CC RR AND ASH PIT 2.9 MI S OF IA 100 IN CEDARRAPIDS (NB & SB)

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$1,400,000 $1,400,000

45259

Iowa Department ofTransportation

BRFN-30()--39-57

US30: CIC RAILWAY 0.8 MI W OF I-380 IN CEDARRAPIDS (EB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,340,000 $1,340,000

45434

Iowa Department ofTransportation

IMN-380()--0E-57

I-380: BLAIRS FERRY RD 0.6 MI N OF IA 100

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$810,000 $810,000

45295

Iowa Department ofTransportation

IMN-380()--0E-57

I-380: 27TH AVE 1.7 MI N OF US 30

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$444,000 $444,000

48454

Iowa Department ofTransportation

BRFN-100()--39-57

IA100: CENTER POINT RD 0.2 MI E OF I-380

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,210,000 $1,210,000

31

Page 35: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36958

MPO 23 / CMPO

22242

RGTR-PA23()--ST-57

In the City of Marion bus stop improvements located onnon-local roads.

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$394,000$315,000

$315,000

$394,000$315,000

$315,000

38373

MPO 23 / CMPO

22245

RGTR-PA23()--ST-57

Purchase 1 medium-duty 33' replacement ADA paratransitservice bus.

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$216,000$172,000

$172,000

$216,000$172,000

$172,000

PA Note: Replacing bus numbers 2403

38374

MPO 23 / CMPO

22246

RGTR-PA23()--ST-57

CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$1,084,000$866,000

$866,000

$1,084,000$866,000

$866,000

PA Note: Replacing bus numbers 2093 and 2094.

36995

Cedar Rapids

22239

STP-U-1187(796)--70-57

Lindale Trail Ext ph2 from Council St NE along abandonedrailway to 51st St & the CVNT Trail near Hwy 100

Ped/Bike ROW, Ped/Bike Grade &amp; Pave, Ped/BikeMiscellaneous

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$1,190,000$950,000

$950,000

$1,190,000$950,000

$950,000

29791

Marion

22248

STP-U-4775(631)--70-57

10TH ST, Over Indian Creek, from the to be built TowerTerrace Rd South 2.1 M to Boyson Trail north of 8th Ave.

Ped/Bike Grade &amp; Pave, Ped/Bike Structures,Ped/Bike Development

FHWA Approved

7/19/2022

TotalFederal Aid

RegionalSwap

$2,643,000$2,070,000

$2,070,000

$2,643,000$2,070,000

$2,070,000

PA Note: Project authorized for $223,479; total STIP limit 2,294,000.

38368

Cedar Rapids

22250

TAP-U-1187()--8I-57

On EDGEWOOD RD NE,from the north side of theEdgewood Rd Bridge to the ext.trail aprox 1K' north.

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$200,000$160,000

$160,000

$200,000$160,000

$160,000

30992

Cedar Rapids

22236

TAP-U-1187(786)--8I-57

CeMar Cedar Rapids Phase 4-Lindale Connector,MarionCity Limit N to Hwy100 and Lindale Mall Shopping Centers

Ped/Bike ROW, Ped/Bike Grade &amp; Pave, Ped/BikeStructures

FHWA Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,827,000$1,457,000

$1,457,000

$1,827,000$1,457,000

$1,457,000

35691

Cedar Rapids

22251

TAP-U-1187(792)--8I-57

Lindale Trl Ext from existing trail along &under Blairs FerryRd. Along abandoned Rail to Council Street NE

Ped/Bike ROW, Ped/Bike Grade &amp; Pave, Ped/BikeStructures

FHWA Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$2,183,000$1,663,000

$1,663,000

$2,183,000$1,663,000

$1,663,000

32

Page 36: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

PA Note: Project authorized for $139,000 in STBG, total STBG STIP limit is $1,802,000; project authorized for $261,000 in TAP total STIP limit is $261,000.

DOT Note: Project eligible for FHWA TAP funding

25525

Cedar Rapids

22237

TAP-U-1187(793)--8I-57

In the city of Cedar Rapids, On EDGEWOOD RD NE, fromGlass Rd NE to approx 350' S of Blairs Ferry Rd NE

Ped/Bike Grade &amp; Pave, Ped/Bike Structures

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$2,240,000$1,792,000

$1,792,000

$2,240,000$1,792,000

$1,792,000

PA Note: Project has $1,317,000 in STBG and $475,000 in STBG-TAP

38370

Cedar Rapids

22249

TAP-U-1187(811)--8I-57

In the city of Cedar Rapids, On EDGEWOOD RD BridgeNE, widen existing ped bridge to 8' for trail development.

Ped/Bike Structures

FHWA Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$825,000$660,000

$660,000

$825,000$660,000

$660,000

38371

Cedar Rapids

22238

TAP-U-1187(813)--8I-57

W side of WILEY BLVD SW,from 16th Ave to Williams BlvdSW incd all req intersection improvements.

Traffic Signals, Ped/Bike Grade &amp; Pave, Ped/BikeMiscellaneous

FHWA Approved

7/19/2022

TotalFederal Aid

RegionalSwap

$1,715,000$1,372,000

$1,372,000

$1,715,000$1,372,000

$1,372,000

PA Note: Project has $227,000 in TAP and $1,145,000 in STBG

39557

Marion

22257

TAP-U-4775(639)--8I-57

In the city of Marion, From City Limits E under Hwy 100Bridge over Indian Creek to Grand Ave spur

Ped/Bike ROW, Ped/Bike Grade &amp; Pave, Ped/BikeStructures

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$1,905,000$1,216,000

$1,216,000

$1,905,000$1,216,000

$1,216,000

39453

Linn CountyConservation Board

22240

TAP-U-C057()--8I-57

Worcester Rd W to 80th St NW, then N until Ellis Rd thenalong Hwy 100 and abandoned rail ROW to Covington Rd

Ped/Bike ROW, Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$875,000$700,000

$700,000

$2,172,000$709,000

$709,000

$3,047,000$1,409,000

$1,409,000

PA Note: Project has $700,000 of TAP in FFY22 for advanced ROW. Project also has $709,000 of STBG in FFY23.

36938

Linn CountyConservation Board

22241

TAP-U-C057(141)--8I-57

42nd ST N along Preserve Ln to Rock Island Preservealong abandoned rail aprox 250' E of Cedar River

Ped/Bike ROW, Ped/Bike Grade &amp; Pave, Ped/BikeStructures

FHWA Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$908,000$726,000

$726,000

$908,000$726,000

$726,000

38775

MPO 23 / CMPO

22243

RGTR-PA23()--ST-57

CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$1,116,000$893,000

$893,000

$1,116,000$893,000

$893,000

PA Note: Replacing bus numbers 2131 and 2132.

33

Page 37: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39454

MPO 23 / CMPO

22244

RGTR-PA23()--ST-57

Purchase 1 medium-duty 33' replacement ADA paratransitservice bus.

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$215,000$172,000

$172,000

$215,000$172,000

$172,000

PA Note: Replacing bus numbers 875

39455

Cedar Rapids

22234

TAP-U-1187()--8I-57

In the city of Cedar Rapids, Filling sw gaps b/w O & 16 Ave& add bus pads at stops & 4 benches & 2 shelters

Ped/Bike Grade &amp; Pave, Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$554,000$325,000

$325,000

$554,000$325,000

$325,000

36965

Cedar Rapids

22252

TAP-U-1187(801)--8I-57

In the city of Cedar Rapids, Frm Midway Dr along VintonDitch to E Ave alg E Ave to Vinton Dth, to & alg F Ave to 13St

Ped/Bike Grade &amp; Pave, Ped/Bike Structures

FHWA Approved

11/15/2022

TotalFederal Aid

RegionalSwap

$2,052,000$1,467,000

$1,467,000

$2,052,000$1,467,000

$1,467,000

45503

MPO 23 / CMPO

22253

RGTR-PA23()--ST-57

CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$1,116,000$893,000

$893,000

$1,116,000$893,000

$893,000

PA Note: Replacing bus numbers 2133 and 2134

45504

MPO 23 / CMPO

22254

RGTR-PA23()--ST-57

Linn County LIFTS Bus 2024

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$215,000$172,000

$172,000

$215,000$172,000

$172,000

PA Note: Replacing bus number 2876

29793

Cedar Rapids

22235

TAP-U-1187(819)--8I-57

Bowling St from 33rd Ave N to 21st Ave a 10' Trail. From 21st Ave to A Ave on Bowling ST &21st Ave 6' sidewalk &on-st.

Ped/Bike Grade &amp; Pave, Ped/Bike Development

FHWA Approved

11/15/2022

TotalFederal Aid

RegionalSwap

$760,000$608,000

$608,000

$760,000$608,000

$608,000

PA Note: _

DOT Note: Project eligible for FHWA TAP funding

39452

Fairfax

22247

TAP-U-2462()--8I-57

On E CEMETERY RD, from Driftwood Ln E to Fairfax CityLimits

Ped/Bike ROW, Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$1,071,000$857,000

$857,000

$1,071,000$857,000

$857,000

34

Page 38: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45506

Robins

22256

TAP-U-6520()--8I-57

In the city of Robins, On W MAIN ST, from N. Center PointRd SE to the Cedar Valley Nature Trail

Ped/Bike Grading

FHWA Approved TotalFederal Aid

RegionalSwap

$1,075,000$860,000

$860,000

$1,075,000$860,000

$860,000

PA Note: Project has $28,000 TAP in FFY24 and $832,000 STBG in FFY24

48404

MPO 23 / CMPO

22260

RGTR-PA23()--ST-57

Purchase 1 medium-duty 33' replacement ADA paratransitservice bus.

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$220,000$148,000

$148,000

$220,000$148,000

$148,000

48405

MPO 23 / CMPO

22261

RGTR-PA23()--ST-57

CR Transit two Heavy-Duty (35' diesel) Bus Replacements

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$1,149,000$767,000

$767,000

$1,149,000$767,000

$767,000

45505

Cedar Rapids

22255

TAP-U-1187()--8I-57

In the city of Cedar Rapids, On Cottage Grove Ave SE,from CeMar Trail SE to East Post Road

Ped/Bike ROW, Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$2,828,000$1,207,000

$1,207,000

$2,828,000$1,207,000

$1,207,000

48390

Cedar Rapids

22258

TAP-U-1187()--8I-57

In the city of Cedar Rapids, 0.65 miles of 12’ paved trailbtwn 9th Ave SE and Cedar River Trail along old RR grade.

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$1,088,000$164,000

$164,000

$1,088,000$164,000

$164,000

48391

Marion

22259

TAP-U-4775()--8I-57

In the city of Marion, Lucore Rd sidepath connection on Eside, build ped bridge over Indian Creek, to Indian Creek Rd

Ped/Bike Grade &amp; Pave, Ped/Bike Structures

FHWA Approved TotalFederal Aid

RegionalSwap

$842,000$127,000

$127,000

$842,000$127,000

$127,000

35

Page 39: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48392

Cedar Rapids

22344

TAP-U-1187()--8I-57

In the city of Cedar Rapids, Sidewalk along Stoney Pointand crossing F Ave to connect to Jacolyn Dr

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$480,000$240,000

$240,000

$480,000$240,000

$240,000

36964

Cedar Rapids

22343

TAP-U-1187()--8I-57

F Ave NW from 13th St NW to the Cedar River;Along theRiver N to I Ave NW & S to 1st Ave W

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$2,262,000$1,800,000

$1,800,000

$2,262,000$1,800,000

$1,800,000

PA Note: Project includes TAP $56K and STBG $1,744K

DOT Note: Project eligible for FHWA TAP funding

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48715

Cedar Rapids

BHM-SWAP-1187()--SA-57

In the city of Cedar Rapids, On 8TH AVE SW, Over CEDARRIVER, S28 T83 R07

Bridge Replacement - Other

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,000

36

Page 40: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48679

Cedar Rapids

STBG-SWAP-1187()--SG-57

In the city of Cedar Rapids, and Marion, On Tower TerraceRoad, from E of Meadowknolls Rd to Alburnett Rd

Grade and Pave, Ped/Bike Grade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,330,000

$1,064,000

$1,064,000

$1,330,000

$1,064,000

$1,064,000PA Note: Previously TPMS #25545

48680

Cedar Rapids

STBG-SWAP-1187()--SG-57

In the city of Cedar Rapids, On Tower Terrace Road, fromE of C Ave to E of Meadowknolls Rd

Grade and Pave, Ped/Bike Grade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,058,000

$846,000

$846,000

$1,058,000

$846,000

$846,000PA Note: Previously TPMS #25545

48682

Cedar Rapids

STBG-SWAP-1187()--SG-57

In the city of Cedar Rapids, Rndabt at TT Rd NE & C AveNE, on C Ave from Sheffield Dr NE to N of St. Mark’sDriveway

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,579,000

$1,263,000

$1,263,000

$1,579,000

$1,263,000

$1,263,000

PA Note: Previously TPMS #25544

38366

Cedar Rapids

STBG-SWAP-1187(804)--SG-57

In the city of Cedar Rapids, Connect 6th ST at B Ave NW toEllis Blvd and E Ave NW.

Grade and Pave, Ped/Bike Grade &amp; Pave

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$4,690,000

$1,808,000

$1,808,000

$4,690,000

$1,808,000

$1,808,00048681

Cedar Rapids

STBG-SWAP-1187()--SG-57

In the city of Cedar Rapids, On Tower Terrace Road, fromE of C Ave to E of Meadowknolls Rd

Grade and Pave, Ped/Bike Grade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$897,000

$717,000

$717,000

$897,000

$717,000

$717,000PA Note: Previously TPMS #25545

48683

Cedar Rapids

STBG-SWAP-1187()--SG-57

In the city of Cedar Rapids, Rndabt at TT Rd NE & C AveNE, on C Ave from Sheffield Dr NE to N of St. Mark’sDriveway

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$2,172,000

$1,737,000

$1,737,000

$2,172,000

$1,737,000

$1,737,000

PA Note: Previously TPMS #25544

34199

Cedar Rapids

STBG-SWAP-1187(785)--SG-57

On the proposed Tower Terrace rd, construct TowerTerrace from C Ave to Sumerset Ave

Grade and Pave, Sanitary Sewer, Ped/Bike Grade &amp;Pave

DOT Approved

10/18/2022

TotalFederal Aid

RegionalSwap

$2,303,000

$836,000

$836,000

$2,303,000

$836,000

$836,000

37

Page 41: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45508

Marion

STBG-SWAP-4775()--SG-57

In the city of Marion, On 7th Ave, from 12th ST E to 22nd St

Pavement Rehab/Widen, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,480,000

$903,000

$903,000

$2,451,000

$2,391,000

$2,391,000

$7,931,000

$3,294,000

$3,294,000PA Note: Project has $903K STBG in FFY24 for design and $2,391K STBG in FFY25

38

Page 42: Iowa Statewide Transportation Improvement Program

0

Metropolitan Area Planning Agency

2222 Cuming Street, Omaha, NE 68102

Phone: 402-444-6866, Fax: 402-951-6517, www.mapacog.org

I +-_._-I-

Dodge

County

Saunders

County

8 Miles

Washington

County

Cass

County

Pottawattamie

County

Iowa

Mills

County

I

�orts - Interstate

� Commercial - National Highway System

El Enhanced - Primary Roads

El General Service - Local Roads

El Basic Service

El Local Service Transit rel Regional

[el Large Urban

rel Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] MPO Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

39

Page 43: Iowa Statewide Transportation Improvement Program

40

Page 44: Iowa Statewide Transportation Improvement Program

MPO 24 / MAPADEMO

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35678

Council Bluffs

22006

HDP-1642(685)--71-78

In the city of Council Bluffs, On STEVENS ROAD, fromState Orchard Road to Intersection with Norwood Drive S33T75 R43

Right of Way, Outside Services Engineering

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$2,106,810$1,685,490

$441,290

$2,106,810$1,685,490

$441,290

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48580

Iowa Department ofTransportation

22018

IHSIPX-80()--08-78

I-80: FRANKLIN AVE BRIDGES TO CO RD G30INTERCHANGE

Guardrail

FHWA Approved TotalFederal Aid

RegionalSwap

$1,900,000$1,710,000

$1,900,000$1,710,000

41

Page 45: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38153

Iowa Department ofTransportation

22042

IM-80()--13-78

I-80: I-29/80/480 INTERSTATES IN COUNCIL BLUFFS(CBIS) STATE SHARE

Bridge Replacement, Lighting, Traffic Signs

FHWA Approved TotalFederal Aid

RegionalSwap

$60,242,200$54,184,700

$1,768,000

$3,280,000$2,952,000

$1,768,000

$4,180,000$3,762,000

$1,768,000

$67,702,200$60,898,700

$5,304,000

48565

Iowa Department ofTransportation

22043

IM-80()--13-78

I-80: MADISON AVE INTERCHANGE IN COUNCILBLUFFS

Grade and Pave, Bridge Replacement

FHWA Approved TotalFederal Aid

RegionalSwap

$5,000,000$4,500,000

$37,752,000$33,976,800

$1,768,000

$42,752,000$38,476,800

$1,768,000

48592

Iowa Department ofTransportation

22044

IMX-29()--02-78

I-29: CC RR 2.1 MI N OF US 6 IN COUNCIL BLUFFS (SB)

Bridge Rehabilitation, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,038,000$1,834,200

$2,038,000$1,834,200

48597

Iowa Department ofTransportation

22045

IMX-29()--02-78

I-29: 25TH ST 1.0 MI S OF N 16TH ST IN COUNCILBLUFFS (NB & SB)

Bridge Rehabilitation, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,845,000$1,660,500

$1,845,000$1,660,500

45310

Iowa Department ofTransportation

22040

IMX-680()--02-78

I-680: AT W JCT I-29 (EB & WB)

Bridge Deck Overlay

FHWA Approved TotalFederal Aid

RegionalSwap

$1,894,000$1,704,600

$1,894,000$1,704,600

48510

Iowa Department ofTransportation

22041

IMX-80()--02-78

I-80: FRANKLIN AVE TO US 6 IN COUNCIL BLUFFS

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,500,000$3,150,000

$3,500,000$3,150,000

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

29733

MPO 24 / MAPA

22206

RGPL-PA24()--PL-78

UZA of Pottawattamie County including the City of CouncilBluffs

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$144,567$115,567

$144,567$115,567

$144,567$115,567

$144,567$115,567

$578,268$462,268

42

Page 46: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38013

Iowa Department ofTransportation

BRFN-275()--39-78

US275: MISSOURI RIVER IN COUNCIL BLUFFS (STATESHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$57,000 $57,000 $57,000 $57,000 $228,000

38123

Iowa Department ofTransportation

IMN-480()--0E-78

I-480: MISSOURI RIVER IN COUNCIL BLUFFS (STATESHARE)

Bridge Deck Overlay, Bridge Painting, Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$30,000 $3,131,000 $30,000 $30,000 $3,221,000

38124

Iowa Department ofTransportation

IMN-680()--0E-78

I-680: MISSOURI RIVER IN COUNCIL BLUFFS (STATESHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$48,000 $48,000 $48,000 $48,000 $192,000

38118

Iowa Department ofTransportation

IMN-80()--0E-78

I-80: MISSOURI RIVER IN COUNCIL BLUFFS (EB & WB)(STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$42,000 $42,000 $42,000 $42,000 $168,000

48535

Iowa Department ofTransportation

STPN-80()--2J-78

I-80: US 6 IN COUNCIL BLUFFS TO JORDAN CREEK

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000 $1,000,000 $1,000,000 $3,500,000

45270

Iowa Department ofTransportation

IMN-80()--0E-78

I-80: 24TH ST TO INDIAN CREEK IN COUNCIL BLUFFS

Grading

DOT Approved TotalFederal Aid

RegionalSwap

$1,750,000 $1,750,000

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48688

MPO 24 / MAPA

22262

STP-U-PA24()--70-78

Travel demand management planning

Planning Study

FHWA Approved TotalFederal Aid

RegionalSwap

$31,250$25,000

$25,000

$31,250$25,000

$25,000

43

Page 47: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48689

Carter Lake

22346

TAP-T-1142()--8V-78

In the city of Carter Lake, connecting existing trail segmentsas shown in the map

Outside Services Engineering

FHWA Approved TotalFederal Aid

RegionalSwap

$40,000$32,000

$360,000$288,000

$400,000$320,000

35677

Council Bluffs

22345

TAP-T-1642(681)--8V-78

In the city of Council Bluffs, On Railroad Ave, fromKanesville Blvd N 1.03 Miles to Council Bluffs CorporateLimits

Ped/Bike Grade &amp; Pave

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$613,000$490,000

$490,000

$613,000$490,000

$490,000

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

34126

Council Bluffs

STBG-SWAP-1642(686)--SG-78

In the city of Council Bluffs, On S EXPRESSWAY, from I-80N .7 Miles to 21st Avenue

Pavement Rehab, Sanitary Sewer

DOT Approved

5/17/2022

TotalFederal Aid

RegionalSwap

$3,260,815

$3,260,000

$3,260,000

$3,260,815

$3,260,000

$3,260,00025419

Council Bluffs

STBG-SWAP-1642()--SG-78

In the city of Council Bluffs, On W Graham Ave, from HighStreet to Fairmount Ave

Grade and Pave, Sanitary Sewer

DOT Approved TotalFederal Aid

RegionalSwap

$3,006,000

$2,405,000

$2,405,000

$3,006,000

$2,405,000

$2,405,00034125

Council Bluffs

STBG-SWAP-1642()--SG-78

On N 16TH ST, from Avenue G 1 miles to Nash Blvd

Pavement Rehab, Sanitary Sewer

DOT Approved TotalFederal Aid

RegionalSwap

$5,683,000

$4,546,000

$4,546,000

$5,683,000

$4,546,000

$4,546,00036984

Council Bluffs

STBG-SWAP-1642()--SG-78

In the city of Council Bluffs, On Hwy 192, from 21st AvenueNorth 1972 Feet to 16th Avenue

Grade and Pave, Sanitary Sewer

DOT Approved TotalFederal Aid

RegionalSwap

$5,660,000

$4,528,000

$4,528,000

$5,660,000

$4,528,000

$4,528,000

44

Page 48: Iowa Statewide Transportation Improvement Program

6 I

0 2

Bi-State Regional Commission

1504 Third Avenue, Third Floor, Rock Island, IL 61201-8612

Phone: 309-793-6300, Fax: 309-793-6305, www.bistateonline.org

Scott

ave

I I

4 8 Miles

Iowa

�-r�

_,., /, ,, 92 �

( ' ,I' -1

■-■

Rock

· · Island67

Oak,Grove

f

Rock Island

County Illinois )

�orts - Interstate

� Commercial - National Highway System

El Enhanced - Primary Roads

El General Service - Local Roads

-Ramps

-Trails

Basic Service

El Local Service Transit

� ......... m,-... �=:

j rel Regional -+- Railroad

Henry

County

[el Large Urban

rel Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

Rivers

Major Lakes

C] MPO Planning Arear--1 L._ _ _J Counties

City Limits

Urban Area

45

Page 49: Iowa Statewide Transportation Improvement Program

46

Page 50: Iowa Statewide Transportation Improvement Program

MPO 25 / BSRCNHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38155

Iowa Department ofTransportation

22047

IM-NHS-74()--03-82

I-74: IN BETTENDORF AND DAVENPORT (CENTRALSECTION) STATE SHARE

Bridge Replacement, Bridge Removal, Landscaping

FHWA Approved TotalFederal Aid

RegionalSwap

$56,214,000$47,781,900

$56,214,000$47,781,900

45421

Iowa Department ofTransportation

22049

IMX-74()--02-82

I-74: 0.4 MI S OF I-80 TO 0.6 MI S OF US 6/KIMBERLY RDINTERCHANGE (EB/WB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,720,000$3,348,000

$3,720,000$3,348,000

39347

Iowa Department ofTransportation

22052

BRF-461()--38-82

IA461: DUCK CREEK 0.4 MI S OF US 6 IN DAVENPORT(NB)

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$4,454,000$3,563,200

$4,454,000$3,563,200

45432

Iowa Department ofTransportation

22048

BRF-461()--38-82

IA461: DME RR 1.0 MI E OF IA 22 IN DAVENPORT

Bridge Deck Overlay

FHWA Approved TotalFederal Aid

RegionalSwap

$1,867,000$1,493,600

$1,867,000$1,493,600

48420

Iowa Department ofTransportation

22046

BRF-461()--38-82

IA461: DUCK CREEK 0.3 MI S OF US 6 IN DAVENPORT(SB)

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$3,311,000$2,648,800

$3,311,000$2,648,800

48599

Iowa Department ofTransportation

22051

BRF-61()--38-82

US61: 210TH ST 1.1 MI N OF I-80 (RAMP)

Bridge Rehabilitation, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,905,000$1,524,000

$1,905,000$1,524,000

38166

Iowa Department ofTransportation

22050

IMX-80()--02-82

I-80: E OF IA 130 IN DAVENPORT TO CO RD Z30 (EB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$7,151,000$6,435,900

$7,151,000$6,435,900

47

Page 51: Iowa Statewide Transportation Improvement Program

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

16066

MPO 25 / BSRC

22207

RGPL-PA25()--PL-82

Quad Cities Urbanized Area

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$318,660$240,928

$318,660$240,928

$318,660$240,928

$318,660$240,928

$1,274,640$963,712

48

Page 52: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38021

Iowa Department ofTransportation

BRFN-22()--39-82

IA22: DODGE CREEK 1.1 MI S OF CO RD Y48

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$415,000 $415,000

38023

Iowa Department ofTransportation

BRFN-67()--39-82

US67: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$25,000 $25,000 $25,000 $25,000 $100,000

38129

Iowa Department ofTransportation

IMN-74()--0E-82

I-74: MISSISSIPPI RIVER IN BETTENDORF (NB & SB)(STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$50,000 $50,000 $50,000 $50,000 $200,000

38131

Iowa Department ofTransportation

IMN-80()--0E-82

I-80: MISSISSIPPI RIVER IN LE CLAIRE (STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$100,000 $100,000 $100,000 $100,000 $400,000

48528

Iowa Department ofTransportation

NHSN-461()--2R-82

IA461: IN DAVENPORT, FROM 59TH ST TO S OF I-80

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$700,000 $700,000

45278

Iowa Department ofTransportation

NHSN-6()--2R-82

US6: 0.1 MI E OF IA 461 TO W OF ELMORE AVE INDAVENPORT

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$186,000 $186,000

48526

Iowa Department ofTransportation

NHSN-67()--2R-82

US67: FROM 8TH ST TO EWING ST IN LECLAIRE

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$510,000 $510,000

48557

Iowa Department ofTransportation

NHSN-67()--2R-82

US67: IN DAVENPORT, S OF MOUND ST

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$600,000 $600,000

39349

Iowa Department ofTransportation

NHSN-61()--2R-82

US61: N OF I-80 TO S OF WAPSIPINICON RIVER

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$2,891,000 $2,891,000

49

Page 53: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45308

Iowa Department ofTransportation

IMN-280()--0E-82

I-280: EB OVER I-280 WB AT I-80

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$588,000 $588,000

38135

Iowa Department ofTransportation

IMN-280()--0E-82

I-280: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$40,000 $40,000 $80,000

45257

Iowa Department ofTransportation

IMN-80()--0E-82

I-80: UTICA RIDGE RD 3.3 MI E OF US 61

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$155,000 $155,000

45304

Iowa Department ofTransportation

IMN-80()--0E-82

I-80: WISCONSIN AVE 1.4 MI W OF IA 130

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$410,000 $410,000

48610

Iowa Department ofTransportation

IMN-80()--0E-82

I-80: MISSISSIPPI RIVER IN LE CLAIRE (STATE SHARE)

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$10,000 $10,000

50

Page 54: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39350

Iowa Department ofTransportation

22266

STP-67()--2C-82

US67: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)

Bridge Rehabilitation

FHWA Approved TotalFederal Aid

RegionalSwap

$1,000,000$800,000

$1,000,000$800,000

36969

Bettendorf

22265

STP-U-0587(639)--70-82

In the city of Bettendorf, Forest Grove Dr. & Middle Road.

Grade and Pave, Ped/Bike Grade &amp; Pave

FHWA Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$10,500,000$5,181,000

$5,181,000

$10,500,000$5,181,000

$5,181,000

38564

Davenport

22263

STP-U-1827(686)--70-82

On 53rd Street, from Eastern Avenue to Elmore Circle S12TT78N RR03

Grade and Pave

FHWA Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$5,400,000$3,706,878

$3,706,878

$5,400,000$3,706,878

$3,706,878

38024

Iowa Department ofTransportation

22267

STP-67()--2C-82

US67: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)

Bridge Painting

FHWA Approved TotalFederal Aid

RegionalSwap

$3,000,000$2,400,000

$3,000,000$2,400,000

39481

Davenport

22264

STP-U-1827()--70-82

In the city of Davenport, On 3rd & 4th St, from Telegraph Rdto Harrison St,

Pave, Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$9,074,235$7,259,388

$7,259,388

$9,074,235$7,259,388

$7,259,388

STBG-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44724

Davenport

22331

BROS-1827(687)--8J-82

On ELM ST, Over Canadian Pacific RR, from Mound St toEastern Ave S19 T78 R04E

Bridge Replacement

FHWA Approved

12/15/2020

TotalFederal Aid

RegionalSwap

$2,470,525$1,000,000

$2,470,525$1,000,000

51

Page 55: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36970

Davenport

22348

TAP-R-1827(688)--8T-82

On BRADY ST FRONTAGE, Over GOOSE CREEK, from59th St to Existing Path on VMP S12 T78 R03E

Ped/Bike Grade &amp; Pave

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$775,063$530,917

$530,917

$775,063$530,917

$530,917

39480

Eldridge

22349

TAP-T-2290()--8V-82

In the city of Eldridge, On Townsend Farms, from S 5th St.4 Miles to S 1st St

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$356,000$284,800

$284,800

$356,000$284,800

$284,800

39482

Davenport

22347

TAP-T-1827()--8V-82

On Emies Park Ave & Locust St, from Duck Creek Trail atEmeis Park Ave 1 Miles to Wisconsin Ave,

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$654,463$522,770

$522,770

$654,463$522,770

$522,770

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37470

Scott County

BRS-SWAP-C082()--FF-82

On Z30, Over SPENCER CREEK, S6 T78 RE5

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00031021

Scott County

BRS-SWAP-C082(59)--FF-82

On Z30, Over SPENCER CREEK, S8 T78 RE5

Bridge Replacement

DOT Approved

1/17/2024

TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,000

52

Page 56: Iowa Statewide Transportation Improvement Program

I

0

Dallas

2

I

4

Des Moines Area Metropolitan Planning Organization

420 Watson Powell Jr. Parkway, Suite 200, Des Moines, IA 50309

Phone: 515-334-0075, Fax: 515-334-0098, www.dmampo.org

iorts - Interstate

Commercial - National Highway System

(I Enhanced - Primary Roads

(I General Service - Local Roads

(I Basic Service -Ramps

(I Local Service -TrailsTransit

-+- Railroad [el Regional

[el Rivers

Large Urban

[el Major Lakes

_,, ,

, Small Urban

C] MPO Planning Area[el Intercity Bus

r--1

CE! L_ _ _J Counties

Amtrak

I City Limits

Park & Ride Urban Area

53

Page 57: Iowa Statewide Transportation Improvement Program

54

Page 58: Iowa Statewide Transportation Improvement Program

MPO 26 / DMAMPODEMO

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45864

Polk County

22008

HDP-C077()--3C-77

In Polk County, Broadway Avenue from IA - 415 to US 6

Grade and Pave, Traffic Signals, Ped/Bike Grade &amp;Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$39,891,000$25,000,000

$39,891,000$25,000,000

PA Note: Received $25M Build Grant

41343

MPO 26 / DMAMPO

22007

EDP-PA26(001)--7Y-77

On BIRDLAND DR, Over BIRDLAND LAGOON, S35 T79R24

Miscellaneous

FHWA Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$31,937,000$25,550,000

$550,000

$31,937,000$25,550,000

$550,000

55

Page 59: Iowa Statewide Transportation Improvement Program

ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

47352

Altoona

ILL-0132()--93-77

In the city of Altoona, reconstruction of 36th Ave SW andintersection of 36th and 8th St SW

Grade and Pave, Pavement Rehab, Ped/BikeMiscellaneous, Transit Investments

DOT Approved TotalFederal Aid

RegionalSwap

$3,000,000 $3,000,000

47314

Bondurant

ILL-0747()--93-77

In the city of Bondurant, extension of Grant St and 10th St,widening of NE 64th St from NE 78th to S HWY 65

Grade and Pave, Pavement Widening, Bridge New,Ped/Bike Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$26,988,205 $26,988,205

47353

Des Moines

ILL-1945()--93-77

In the city of Des Moines, one to two way conversion of 5th(Cherry to Grand) and Grand Ave (2nd to 5th)

Pavement Rehab, Traffic Signals, Pavement Markings,Traffic Signs, Ped/Bike Miscellaneous, Transit Investments

DOT Approved TotalFederal Aid

RegionalSwap

$1,875,000 $1,875,000

48363

Pleasant Hill

ILL-6102()--93-77

In the city of Pleasant Hill, design and construction ofMartha L Miller Dr NE 60th to NE 70th

Grade and Pave, Outside Services Engineering

DOT Approved TotalFederal Aid

RegionalSwap

$6,215,200 $6,215,200

48362

Urbandale

ILL-7875()--93-77

In the city of Urbandale, pedestrian bridge over I-80/35within half mile west of 86th Street Interchange

Ped/Bike Structures, Ped/Bike Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$2,500,000 $2,500,000

47311

Waukee

ILL-8177()--93-25

In the city of Waukee, from University Ave north 0.34 milesto Waukee Middle School

Grade and Pave, Culvert Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$6,500,000 $6,500,000

47351

West Des Moines

ILL-8260()--93-25

In the city of West Des Moines, pedestrian bridge toconnect Raccoon River Park to Walnut Woods St Park

Ped/Bike Structures, Ped/Bike Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$6,887,000 $6,887,000

47354

West Des Moines

ILL-8260()--93-25

In the city of West Des Moines, reconstruction of Civic MillsPkwy from S 91 Street to S Grand Prairie Pkwy

Pavement Rehab, Ped/Bike Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$9,440,000 $9,440,000

48364

Des MoinesInternational Airport

ILL-DMIA()--94-77

In the Des Moines International Airport, the second and thirdphases of Cowles Drive reconstruction

Grade and Pave, Ped/Bike Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$14,299,058 $14,299,058

56

Page 60: Iowa Statewide Transportation Improvement Program

ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48380

MPO 26 / DMAMPO

ILL-PA26()--94-25

In the City of Waukee, Approximately 3 acres in the I-80West Industrial Park Plat 2

Transit Investments

DOT Approved TotalFederal Aid

RegionalSwap

$11,605,000 $11,605,000

57

Page 61: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38005

Iowa Department ofTransportation

22058

BRF-28()--38-77

IA28: RACCOON RIVER 3.7 MI N OF IA 5 (SB)

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$6,555,000$5,244,000

$6,555,000$5,244,000

39322

Iowa Department ofTransportation

22056

BRF-69()--38-77

US69: FOURMILE CREEK 0.8 MI S OF CO RD F22

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$300,000 $1,314,000$1,051,200

$1,614,000$1,051,200

39323

Iowa Department ofTransportation

22057

BRF-69()--38-77

US69: FOURMILE CREEK 0.3 MI N OF CO RD F22

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$310,000 $1,434,000$1,147,200

$1,744,000$1,147,200

38071

Iowa Department ofTransportation

22060

IM-35()--13-77

I-35: I-80/235 INTERCHANGE NE OF DES MOINES

Grade and Pave, Bridge New, Grading

FHWA Approved TotalFederal Aid

RegionalSwap

$1,103,000$992,700

$45,945,000$41,350,500

$18,058,000$16,346,000

$465,000$418,500

$65,571,000$59,107,700

48504

Iowa Department ofTransportation

22061

IMX-235()--02-77

I-235: HULL AVE IN DES MOINES TO THE NE I-35/80INTERCHANGE

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$2,060,000$1,854,000

$2,060,000$1,854,000

38111

Iowa Department ofTransportation

22053

IM-NHS-35()--03-77

I-35: NE 36TH ST TO N OF IA 210

Grade and Pave, Pave, Grading

FHWA Approved TotalFederal Aid

RegionalSwap

$41,734,200$35,424,150

$10,014,000

$25,824,200$21,900,650

$5,554,650

$65,158,000$55,384,300

$14,473,350

$132,716,400$112,709,100

$30,042,000

45342

Iowa Department ofTransportation

22054

IM-NHS-80()--03-25

I-80: W OF GRAND PRAIRIE PKWY TO E OF JORDANCREEK PKWY

Grade and Pave, Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$16,282,000$13,839,700

$20,053,000$17,045,050

$23,665,000$20,115,250

$60,000,000$51,000,000

45340

Iowa Department ofTransportation

22055

IM-NHS-80()--03-77

I-80: I-35/235 INTERCHANGE NE OF DES MOINES TOUS 65

Bridge Replacement, Grading, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$5,121,000$4,352,850

$21,073,000$17,912,050

$26,194,000$22,264,900

48464

Iowa Department ofTransportation

22059

IM-80()--13-77

I-80: UNIVERSITY AVE TO N OF DOUGLAS AVE

Grade and Pave, Bridge Replacement, Bridge Widening

FHWA Approved TotalFederal Aid

RegionalSwap

$1,800,000$1,620,000

$26,639,000$23,975,100

$28,439,000$25,595,100

58

Page 62: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48539

Iowa Department ofTransportation

22063

IMX-80()--02-77

I-80: WB I-80 RAMP AT W I-35/235 INTERCHANGE

Grade and Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$1,800,000$1,620,000

$1,800,000$1,620,000

45338

Iowa Department ofTransportation

22064

IMX-80()--02-77

I-80: NW 72ND ST 1.0 MI W OF IA 28 (EB & WB)

Bridge Rehabilitation

FHWA Approved TotalFederal Aid

RegionalSwap

$3,320,000$2,988,000

$3,320,000$2,988,000

45343

Iowa Department ofTransportation

22062

NHSX-141()--3H-77

IA141: NW 121ST ST INTERSECTION INCL LOCAL RDCONNECTIONS

Grade and Pave, Traffic Signs, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$8,529,000$6,823,200

$8,529,000$6,823,200

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38361

MPO 26 / DMAMPO

22208

RGPL-PA26()--PL-77

MPO Planning Funding

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$972,321$750,000

$972,321$750,000

$972,321$750,000

$972,321$750,000

$3,889,284$3,000,000

59

Page 63: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38007

Iowa Department ofTransportation

BRFN-69()--39-77

US69: FOURMILE CREEK 0.1 MI S OF CO RD F22

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$301,000 $1,336,000 $1,637,000

39335

Iowa Department ofTransportation

IMN-235()--0E-77

I-235: SW I-35/80 INTERCHANGE TO NE I-35/80INTERCHANGE

Landscaping

DOT Approved TotalFederal Aid

RegionalSwap

$115,000 $115,000 $120,000 $125,000 $475,000

45248

Iowa Department ofTransportation

IMN-235()--0E-77

I-235: SW I-35/80 INTERCHANGE TO NE I-35/80INTERCHANGE

Guardrail

DOT Approved TotalFederal Aid

RegionalSwap

$445,000 $445,000

45247

Iowa Department ofTransportation

IMN-35()--0E-77

I-35: IA 160 INTERCHANGE IN ANKENY NB EXIT RAMP

Traffic Signals

DOT Approved TotalFederal Aid

RegionalSwap

$50,000 $50,000

45249

Iowa Department ofTransportation

IMN-80()--0E-77

I-80: DES MOINES RIVER TO IA 415

Guardrail

DOT Approved TotalFederal Aid

RegionalSwap

$408,000 $408,000

48595

Iowa Department ofTransportation

NHSN-160()--2R-77

IA160: 0.2 MI E OF SW STATE ST IN ANKENY

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$363,000 $363,000

45246

Iowa Department ofTransportation

NHSN-6()--2R-77

US6: HICKMAN RD TO NW 62ND AVE

Traffic Signals

DOT Approved TotalFederal Aid

RegionalSwap

$105,000 $105,000

48588

Iowa Department ofTransportation

NHSN-69()--2R-77

US69: 0.2 MI S OF NE BROADWAY AVE

Grading, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$99,000 $99,000

39327

Iowa Department ofTransportation

BRFN-65()--39-77

US65: SE 64TH AVE 1.0 MI N OF IA 5 (NB & SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,424,000 $1,424,000

60

Page 64: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38247

Iowa Department ofTransportation

NHSN-69()--2R-77

US69: I-80 TO SE 33RD ST IN ANKENY

Erosion Control

DOT Approved TotalFederal Aid

RegionalSwap

$228,000 $228,000

45316

Iowa Department ofTransportation

BRFN-141()--39-77

IA141: IA 44 INTERCHANGE IN GRIMES (EB & WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,110,000 $1,110,000

48423

Iowa Department ofTransportation

IMN-235()--0E-77

I-235: W I-35/80 INTERCHANGE TO 2ND AVE

Grade and Pave, Traffic Signals, Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$5,226,000 $5,226,000

39216

Iowa Department ofTransportation

STPN-80()--2J-25

I-80: US 6/169 INTERCHANGE TO CO RD R22/UTE AVEINTERCHANGE

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$1,850,000 $1,850,000

48601

Iowa Department ofTransportation

IMN-235()--0E-77

I-235: E 6TH ST, E 9TH ST, E 12TH ST, AND US 69 INDES MOINES

Bridge Painting

DOT Approved TotalFederal Aid

RegionalSwap

$2,140,000 $2,140,000

38206

Iowa Department ofTransportation

NHSN-69()--2R-77

US69: DES MOINES RIVER TO N OF MAURY AVE IN DESMOINES (STATE SHARE)

Pavement Widening, Traffic Signals, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$852,000 $852,000

61

Page 65: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

27146

MPO 26 / DMAMPO

22268

RGPL-PA26()--ST-77

Multimodal planning activities to reduce SOV trips, andmaintaining mode choice for MPOs travel demand model

Miscellaneous, Ped/Bike Miscellaneous, TransitInvestments

FHWA Approved TotalFederal Aid

RegionalSwap

$119,000$95,000

$95,000

$119,000$95,000

$95,000

$119,000$95,000

$95,000

$119,000$95,000

$95,000

$476,000$380,000

$380,000

22143

MPO 26 / DMAMPO

22269

RGTR-PA26()--ST-00

DART: Vehicle Purchase

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$2,027,200$1,410,200

$1,410,200

$2,038,000$1,400,000

$1,400,000

$1,693,750$1,355,000

$1,355,000

$1,625,000$1,300,000

$1,300,000

$7,383,950$5,465,200

$5,465,200

27151

Des Moines

22270

TAP-T-1945()--8V-77

In the city of Des Moines, Bill Riley Trail Bridge, OverRaccoon River

Ped/Bike Structures

FHWA Approved TotalFederal Aid

RegionalSwap

$425,000$100,000

$100,000

$425,000$100,000

$100,000

62

Page 66: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

25421

Bondurant

22352

TAP-T-0747(609)--8V-77

In the City of Bondurant, Pedestrian/Bicycle Underpass atUS 65 by Oleson Dr north of Grant St

Ped/Bike Miscellaneous

FHWA Approved

9/21/2021

TotalFederal Aid

RegionalSwap

$3,194,000$1,645,000

$1,029,000

$3,194,000$1,645,000

$1,029,000

DOT Note: This project received a SRTS award of 80,000

45601

Polk CountyConservation Board

22425

TAP-T-C077(234)--8V-77

In Polk County, trail bridge over Beaver Creek

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$2,000,000$400,000

$400,000

$2,000,000$400,000

$400,000

45483

MPO 26 / DMAMPO

22354

TAP-T-PA26()--8V-77

Shelter installation at 16 locations in the metro

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$337,000$200,000

$200,000

$337,000$200,000

$200,000

39392

Ankeny

22351

TAP-T-0187()--8V-77

In the city of Ankeny, Oralabor Trail - SW State StUnderpass

Ped/Bike Structures

FHWA Approved TotalFederal Aid

RegionalSwap

$1,800,000$1,050,000

$1,050,000

$1,800,000$1,050,000

$1,050,000

37835

Des Moines

22350

TAP-T-1945()--8V-77

In the city of Des Moines, Carlisle Trail

Ped/Bike Grading, Ped/Bike Paving

FHWA Approved TotalFederal Aid

RegionalSwap

$2,600,000$1,000,000

$1,000,000

$2,600,000$1,000,000

$1,000,000

45481

Des Moines

22353

TAP-T-1945()--8V-77

In the city of Des Moines, In City of Des Moines, from WRiver Dr to 2nd Ave, along Des Moines River

Ped/Bike Grade &amp; Pave, Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$1,565,000$500,000

$500,000

$1,565,000$500,000

$500,000

48660

Altoona

22357

TAP-T-0132()--8V-77

In the city of Altoona, In the City of Altoon, 36th Ave SWPedestrian and Transit Improvements

Ped/Bike Miscellaneous, Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$164,000$131,200

$131,200

$164,000$131,200

$131,200

48659

Des Moines

22356

TAP-T-1945()--8V-77

In the city of Des Moines, trail connection from Franklin toInter-Urban and Trestle to Trestle Trail

Ped/Bike Grade &amp; Pave, Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$2,300,000$300,000

$300,000

$2,300,000$300,000

$300,000

63

Page 67: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48661

Norwalk

22358

TAP-T-5587()--8V-77

In the city of Norwalk, sidewalk infill gaps on Elm Ave, LewisAve, Main Street

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$125,000$100,000

$100,000

$125,000$100,000

$100,000

48662

Waukee

22359

TAP-T-8177()--8V-25

In the city of Waukee, school and trail improvementsthroughout the City

Railroad Signals, Traffic Signs, Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$166,000$132,800

$132,800

$166,000$132,800

$132,800

48658

Polk CountyConservation Board

22355

TAP-T-C077()--8V-77

In Polk County, trail connection from Polk City to HighTrestle Trail

Ped/Bike Grade &amp; Pave, Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$1,140,000$250,000

$250,000

$1,140,000$250,000

$250,000

SWAP-CMAQ

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48664

Des Moines

ICAAP-SWAP-1945()--SH-77

In the city of Des Moines, update traffic signal operations inentire city

Traffic Signals

DOT Approved TotalFederal Aid

RegionalSwap

$275,000

$220,000

$275,000

$220,00048665

Grimes

ICAAP-SWAP-3125()--SH-25

In the city of Grimes, systems engineering analysis andimplementation of system upgrades

Traffic Signals

DOT Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$1,094,000

$875,200

$1,094,000

$875,20048667

Norwalk

ICAAP-SWAP-5587()--SH-77

In the city of Norwalk, traffic signal system analysis andupgrade

Traffic Signals

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$883,000

$706,400

$883,000

$706,400

64

Page 68: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36678

Polk County

BROS-SWAP-C077(216)--SE-77

On NE Berwick Dr over the UP Railroad, in Sec 5-79-23.0.60 mi N of NE 62 Ave

Bridge Replacement

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$1,400,000

$360,000

$1,400,000

$360,000

65

Page 69: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36673

Carlisle

STBG-SWAP-1105(608)--SG-91

In the city of Carlisle, Scotch Ridge Road and Highway 5intersection south approx. 1,250 feet southwest

Pavement Rehab, Traffic Signals

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$3,249,000

$1,837,000

$1,837,000

$3,249,000

$1,837,000

$1,837,000PA Note: Joint Project with Warren County, TPMS project number 35771

27142

Des Moines

STBG-SWAP-1945(848)--SG-77

In the city of Des Moines, On 2nd Avenue Bridge, Over DesMoines River and Birdland Drive

Bridge Rehabilitation

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$4,000,000

$1,000,000

$2,000,000

$4,000,000

$1,000,000

$2,000,000PA Note: Includes $1,000,000 in SWAP-HBP funding.

27144

Des Moines

STBG-SWAP-1945(852)--SG-77

On Indianola Avenue Reconstruction, from East Army PostRoad to U.S. 69

Pavement Rehab

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$6,250,000

$3,000,000

$3,000,000

$6,250,000

$3,000,000

$3,000,00037833

Des Moines

STBG-SWAP-1945(855)--SG-77

In the city of Des Moines, Intelligent TransportationSystems Upgrade - Phase 2

Traffic Signals

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$15,000,000

$500,000

$500,000

$15,000,000

$500,000

$500,00036675

Des Moines

STBG-SWAP-1945(858)--SG-77

In the city of Des Moines, Walnut Street BridgeReplacement

Bridge Replacement

DOT Approved

6/21/2022

TotalFederal Aid

RegionalSwap

$11,000,000

$3,400,000

$3,400,000

$11,000,000

$3,400,000

$3,400,00037834

Des Moines

STBG-SWAP-1945(859)--SG-77

In the city of Des Moines, Guthrie Avenue ViaductRehabilitation

Pavement Rehab

DOT Approved

12/20/2022

TotalFederal Aid

RegionalSwap

$5,000,000

$2,000,000

$2,000,000

$5,000,000

$2,000,000

$2,000,00037839

Urbandale

STBG-SWAP-7875()--SG-77

In the city of Urbandale, 128th Street Maintenance, DouglasParkway to Aurora Avenue

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$750,000

$750,000

$1,000,000

$750,000

$750,00036681

Urbandale

STBG-SWAP-7875(651)--SG-25

In the city of Urbandale, 170th Street (Alice's Road):Meredith Drive to Waterford Road

Pavement Rehab, Traffic Signals, Pavement Markings

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$7,180,000

$600,000

$600,000

$7,180,000

$600,000

$600,000

66

Page 70: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36679

Polk County

STBG-SWAP-C077(232)--FG-77

On NE FRISK DR, Over Deer Creek N of NE 94 Ave

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$920,000

$543,000

$543,000

$920,000

$543,000

$543,00037444

Polk County

STBG-SWAP-C077(233)--FG-77

On NE 22nd St, from NE 54 Ave 0.5 miles to N of NE 58Ave

Pavement Rehab/Widen

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$3,200,000

$1,750,000

$1,750,000

$3,200,000

$1,750,000

$1,750,00037843

MPO 26 / DMAMPO

STBG-SWAP-PA26()--SG-77

In the City of Des Moines, Douglas/Euclid Avenues fromMerle Hay Road east to just west of E. 14th Street

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$5,000,000

$445,000

$445,000

$5,000,000

$445,000

$445,00039390

Ankeny

STBG-SWAP-0187()--SG-77

In the city of Ankeny, On NE Delaware Ave Widening - NE5th to 18th St

Pavement Widening

DOT Approved TotalFederal Aid

RegionalSwap

$12,150,000

$3,000,000

$3,000,000

$12,150,000

$3,000,000

$3,000,00039435

Des Moines

STBG-SWAP-1945()--SG-29

In the city of Des Moines, Intelligent Transportation SystemPhase 3

Traffic Signals

DOT Approved TotalFederal Aid

RegionalSwap

$12,000,000

$1,000,000

$1,000,000

$12,000,000

$1,000,000

$1,000,00039461

Johnston

STBG-SWAP-3827()--SG-77

In the city of Johnston, On NW 100thStreet, NW 62nd Ave south to 1000 feet north of the NW 54th Avenue

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$10,841,000

$750,000

$750,000

$10,841,000

$750,000

$750,000

39397

Norwalk

STBG-SWAP-5587()--SG-91

In the city of Norwalk, On the intersection of Beardley Stand IA 28 (Sunset Dr)

Pavement Rehab/Widen, Traffic Signals

DOT Approved

12/20/2022

TotalFederal Aid

RegionalSwap

$2,190,000

$700,000

$700,000

$2,190,000

$700,000

$700,00039395

West Des Moines

STBG-SWAP-8260()--SG-77

In the city of West Des Moines, 8th Street Improvementsfrom I-235 South Ramp to Clegg Road

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$4,200,000

$3,000,000

$3,000,000

$4,200,000

$3,000,000

$3,000,00038607

Polk County

STBG-SWAP-C077(BR2444)--SK-77

On NW 86 St, Over LITTLE BEAVER CREEK, 0.50 MI N ofNW 70TH AVE

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,050,000

$600,000

$600,000

$1,050,000

$600,000

$600,000

67

Page 71: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

32581

Polk County

STBG-SWAP-C077(BR6680)--SG-77

On NE 50TH AVE, Over MUD CREEK, 0.65 mi E of NE80TH ST

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$650,000

$300,000

$300,000

$650,000

$300,000

$300,00045479

Altoona

STBG-SWAP-0132()--SG-77

In the city of Altoona, On 8TH ST SW, Over NB US 65, S14T79 R23

Grade and Pave, Ped/Bike Grade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,700,000

$1,500,000

$1,500,000

$1,700,000

$1,500,000

$1,500,00039393

Des Moines

STBG-SWAP-1945()--SG-77

In the city of Des Moines, SE Connector from 30th St to US65

Pavement Rehab/Widen, Bridge New, Ped/BikeMiscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$41,000,000

$11,284,000

$11,284,000

$41,000,000

$11,284,000

$11,284,000

45476

Des Moines

STBG-SWAP-1945()--SG-77

In the city of Des Moines, citywide ITS upgrade Phase 4

Traffic Signals

DOT Approved TotalFederal Aid

RegionalSwap

$12,500,000

$500,000

$500,000

$12,500,000

$500,000

$500,00045474

Polk City

STBG-SWAP-6170()--SG-77

In the city of Polk City, On E NORTHSIDE DR, Over BIGCREEK, S36 T81 R25

Pavement Rehab/Widen, Ped/Bike Grade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,955,000

$893,000

$893,000

$1,955,000

$893,000

$893,00045475

Windsor Heights

STBG-SWAP-8477()--SG-77

In the city of Windsor Heights, 73rd Street from Universityto Hickman

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$10,000,000

$1,500,000

$1,500,000

$10,000,000

$1,500,000

$1,500,00045478

Polk County

STBG-SWAP-C077()--FG-77

In Polk County, On NE 38TH ST, north of NE 108 Ave

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$525,000

$350,000

$350,000

$525,000

$350,000

$350,00040171

Polk County

STBG-SWAP-C077(BR6333)--FG-77

On NE 108TH ST, Over CAMP CREEK, S26 T79 R22

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$860,000

$650,000

$650,000

$860,000

$650,000

$650,00045473

Clive

STBG-SWAP-1425()--SG-77

In the city of Clive, On I 80 W, Over WALNUT CREEK, S32T79 R25

Pavement Rehab/Widen, Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$2,400,000

$2,000,000

$2,000,000

$2,400,000

$2,000,000

$2,000,000

68

Page 72: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45477

Des Moines

STBG-SWAP-1945()--SG-77

In the city of Des Moines, On FLEUR DR, Over RACCOONAND RR, S8 T78 R24

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$3,000,000

$2,000,000

$2,000,000

$3,000,000

$2,000,000

$2,000,00048651

Des Moines

STBG-SWAP-1945()--SG-77

In the city of Des Moines, ITS Upgrade Phase 5

Traffic Signals

DOT Approved TotalFederal Aid

RegionalSwap

$12,000,000

$500,000

$500,000

$12,000,000

$500,000

$500,00048650

Grimes

STBG-SWAP-3125()--SG-25

In the city of Grimes, S11th to 19th Street, SE 19th St fromS James St to 200’ west of Jacob St

Pavement Rehab/Widen, Traffic Signals, Ped/Bike Grade&amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$7,040,000

$500,000

$500,000

$7,040,000

$500,000

$500,000

48649

Urbandale

STBG-SWAP-7875()--SG-77

In the city of Urbandale, Meredith Dr from 86th to 104th St

Pavement Rehab, Ped/Bike Grade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,850,000

$500,000

$500,000

$1,850,000

$500,000

$500,00048656

Polk County

STBG-SWAP-C077()--SG-77

On F 48, Over CAMP CREEK, S23 T79 R22

DOT Approved TotalFederal Aid

RegionalSwap

$800,000

$550,000

$550,000

$800,000

$550,000

$550,00040200

Polk County

STBG-SWAP-C077()--SK-77

On NE 12TH AVE, Over MUD CREEK, S5 T78 R22, apprx0.50 Mi E of NE 88 ST

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$900,000

$600,000

$600,000

$900,000

$600,000

$600,000

69

Page 73: Iowa Statewide Transportation Improvement Program

I

0 1

Dubuque Metro Area Transportation Study

7600 Commerce Park, Dubuque, IA 52002

Phone: 563-556-4166, Fax: 563-556-0348, www.eciatrans.org

Iowa Dubuque

County

I I

2 4 Miles

Wisconsin

Grant

County

Jo Daviess

County

�orts - Interstate

� Commercial - National Highway System

El Enhanced - Primary Roads

El General Service - Local Roads

El Basic Service

El Local Service Transit [el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] MPO Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

70

Page 74: Iowa Statewide Transportation Improvement Program

71

Page 75: Iowa Statewide Transportation Improvement Program

MPO 27 / DMATSDEMO

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

40123

Dubuque County

22009

HDP-C031(110)--3C-31

Improvements to Northwest Arterial/D10/S John DeereRoad

Grade and Pave, Traffic Signals, Right of Way, OutsideServices Engineering, Ped/Bike Grade &amp; Pave

FHWA Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$14,123,443$5,452,023

$4,431,420

$4,431,420

$14,123,443$5,452,023

$4,431,420$4,431,420

DOT Note: Project received 2019 BUILD award

ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48381

Dubuque

ILL-2100()--93-31

In the city of Dubuque, Chaplain Schmitt Island TrailConnection, from 16th Street to Chaplain Schmitt VeteransMemorial

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$890,000 $890,000

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38279

Iowa Department ofTransportation

22065

NHSX-3()--3H-31

IA3: 0.7 MI N OF BOY SCOUT RD TO S OF CO RD C9YIN SAGEVILLE

Grade and Pave, Erosion Control, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$340,000$272,000

$19,853,000$15,882,400

$399,000$319,200

$20,592,000$16,473,600

45377

Iowa Department ofTransportation

22066

BRF-61()--38-31

US61: GRANDVIEW AVE 1.2 MI S OF US 20 IN DUBUQUE

Bridge Replacement

FHWA Approved TotalFederal Aid

RegionalSwap

$1,482,000$1,185,600

$1,482,000$1,185,600

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

13239

MPO 27 / DMATS

22209

RGPL-PA27()--PL-31

MPO Planning: Transportation Planning in DMATS area

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$161,812$108,513

$134,513$108,513

$134,513$108,513

$108,513$108,513

$539,351$434,052

72

Page 76: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37926

Iowa Department ofTransportation

BRFN-20()--39-31

US20: MISSISSIPPI RIVER IN DUBUQUE (STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$70,000 $70,000 $70,000 $70,000 $280,000

37930

Iowa Department ofTransportation

BRFN-61()--39-31

US61: MISSISSIPPI RIVER IN DUBUQUE (STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$20,000 $20,000 $20,000 $20,000 $80,000

37931

Iowa Department ofTransportation

BRFN-61()--39-31

US61: PEOSTA CHANNEL 0.2 MI N OF E 11TH ST INDUBUQUE

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$50,000 $50,000 $55,000 $57,000 $212,000

38228

Iowa Department ofTransportation

NHSN-20()--2R-31

US20: SWISS VALLEY RD SW OF DUBUQUE

Erosion Control

DOT Approved TotalFederal Aid

RegionalSwap

$448,000 $448,000

39233

Iowa Department ofTransportation

STPN-20()--2J-31

US20: MISSISSIPPI RIVER IN DUBUQUE

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$200,000 $200,000

39235

Iowa Department ofTransportation

STPN-61()--2J-31

US61: MISSISSIPPI RIVER IN DUBUQUE

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$200,000 $200,000

45324

Iowa Department ofTransportation

BRFN-20()--39-31

US20: MIDDLE BRANCH CATFISH CREEK & CC RR 0.6MI E OF NW ARTERIAL IN DUBUQUE (EB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$657,000 $657,000

45289

Iowa Department ofTransportation

BRFN-61()--39-31

US61: PEOSTA CHANNEL 0.2 MI N OF E 11TH ST INDUBUQUE

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$10,672,000 $10,672,000

48600

Iowa Department ofTransportation

BRFN-61()--39-31

US61: MISSISSIPPI RIVER IN DUBUQUE (STATE SHARE)

Bridge Painting

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000 $1,000,000

73

Page 77: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

33894

Dubuque

22271

HDP-2100(679)--3C-31

SW Arterial corridor between US 20 to US 151/61, US 20(MP 4.4884 to 6.3816) and US 151/61 (MP 186.334 to7.4998).

Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$11,473,436$578,436

$578,436

$11,473,436$578,436

$578,436

48402

Dubuque

22274

RGPL-2100()--ST-31

In the city of Dubuque, Trailer Mounted PortableChangeable Message Sign

Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$40,000$32,000

$32,000

$40,000$32,000

$32,000

45236

MPO 27 / DMATS

22272

RGPL-PA27()--ST-31

Transportation Planning

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$18,750$15,000

$15,000

$18,750$15,000

$15,000

45237

MPO 27 / DMATS

22273

RGPL-PA27()--ST-31

In the City of Dubuque Study and implement trafficmanagement systems,

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$41,666$33,333

$33,333

$41,666$33,333

$33,333

$83,332$66,666

$66,666

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48705

Dubuque

22362

TAP-U-2100()--8I-31

In the city of Dubuque, On John F Kennedy, from NorthwestArterial S to Asbury Rd

Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$416,257$190,000

$190,000

$416,257$190,000

$190,000

38301

Dubuque

22360

TAP-U-2100(697)--8I-31

On Bee Branch Creek Trail Project Phase 1,

Grade and Pave

FHWA Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$525,000$420,000

$420,000

$525,000$420,000

$420,000

48403

Dubuque CountyConservation Board

22361

TAP-U-C031()--8I-31

On Heritage Trail, from Rupp Hollow Rd W 4 miles toBurtons Furnace Rd

Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$1,500,000$500,000

$500,000

$1,500,000$500,000

$500,000

74

Page 78: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36994

Dubuque

STBG-SWAP-2100()--SG-31

In the city of Dubuque, On Asbury Rd Improvements, fromSt. Ambrose St. to Carter Rd

Traffic Signals

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$400,000

$400,000

$500,000

$400,000

$400,00035228

Dubuque

STBG-SWAP-2100(698)--SG-31

In the city of Dubuque, On University Ave, fromPennsylvania Avenue to Loras Boulevard

Pavement Rehab/Widen, Right of Way, Outside ServicesPlanning, Outside Services Engineering

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$2,691,799

$2,200,000

$2,200,000

$3,953,330

$3,231,046

$3,231,046

$2,604,871

$2,128,954

$2,128,954

$9,250,000

$7,560,000

$7,560,000

39422

Asbury

STBG-SWAP-0252()--SG-31

In the city of Asbury, On Hales Mill Road, from AutumnDrive to Asbury Road

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,600,000

$1,000,000

$1,000,000

$1,600,000

$1,000,000

$1,000,00048706

Dubuque County

STBG-SWAP-C031()--SK-31

On OAKLAND FARMS RD, CATFISH CREEK, from Militaryrd to Whitetop Rd

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$3,000,000

$3,000,000

$3,000,000

$3,000,000

$3,000,000

$3,000,000

75

Page 79: Iowa Statewide Transportation Improvement Program

0

Metropolitan Planning Organization of Johnson County

410 East Washington Street, Iowa City, IA 52240

Phone: 319-356-5230, Fax: 319-356-5217, www.mpojc.org

Johnson

County

2 4 8 Miles

�orts - Interstate

� Commercial - National Highway System

El Enhanced - Primary Roads

El General Service - Local Roads

Basic Service

El Local Service Transit rel Regional

rel Large Urban

rel Small Urban

rel Intercity Bus

C[I Amtrak

I Park & Ride

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] MPO Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

76

Page 80: Iowa Statewide Transportation Improvement Program

77

Page 81: Iowa Statewide Transportation Improvement Program

MPO 28 / MPOJCNHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38068

Iowa Department ofTransportation

22067

NHS-80()--19-52

I-80: I-380/US 218 INTERCHANGE NEAR IOWA CITY(STATE SHARE)

Grade and Pave, Bridge New, Bridge Replacement

FHWA Approved TotalFederal Aid

RegionalSwap

$60,160,000$48,128,000

$12,294,000$9,835,200

$6,133,000$4,906,400

$235,000$188,000

$78,822,000$63,057,600

45303

Iowa Department ofTransportation

22068

IM-80()--13-52

I-80: 1ST AVE INTERCHANGE IN CORALVILLE (STATESHARE)

Grade and Pave, Bridge Replacement, CulvertReplacement

FHWA Approved TotalFederal Aid

RegionalSwap

$22,685,000$20,416,500

$22,685,000$20,416,500

48578

Iowa Department ofTransportation

22070

IM-NHS-380()--03-52

I-380: N OF FOREVERGREEN RD TO N OF PENN ST-SEGMENT 1

Grade and Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$9,700,000$8,245,000

$29,800,000$25,330,000

$39,500,000$33,575,000

39270

Iowa Department ofTransportation

22069

NHSX-1()--3H-52

IA1: E BURLINGTON ST TO N GOVERNOR ST IN IOWACITY (SB) STATE SHARE

Grade and Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$3,240,000$2,592,000

$3,240,000$2,592,000

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39689

MPO 28 / MPOJC

22210

RGPL-JCCOG(RTP)--PL-52

JCCOG: METROPOLITAN PLANNING PL FUNDS

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$214,364$178,637

$214,364$178,637

$214,364$178,637

$214,364$178,637

$857,456$714,548

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39272

Iowa Department ofTransportation

IMN-80()--0E-52

I-80: PRAIRIE DU CHIEN RD NE 1.3 MI W OF IA 1

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$302,000 $302,000

78

Page 82: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36668

Iowa City

22275

STP-U-3715(669)--70-52

In the city of Iowa City, On Benton Street, from MormonTrek Boulevard East to Greenwood Drive

Pavement Rehab

FHWA Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$2,934,739$1,315,860

$1,315,860

$2,934,739$1,315,860

$1,315,860

38309

University Heights

22276

STP-U-7855()--70-52

In the city of University Heights, On Melrose Avenue, fromSunset Street east to east city limits

Pavement Rehab, Lighting, Pavement Markings

FHWA Approved TotalFederal Aid

RegionalSwap

$1,549,936$730,000

$730,000

$1,549,936$730,000

$730,000

39151

Coralville

22277

STP-U-1557()--70-52

In the city of Coralville, On 5th St, from just west of 12th Avewest through 20th Ave intersection

Pavement Rehab/Widen, Landscaping, Ped/Bike Paving

FHWA Approved TotalFederal Aid

RegionalSwap

$3,024,131$1,650,000

$1,650,000

$3,024,131$1,650,000

$1,650,000

39152

Tiffin

22278

STP-U-7662()--70-52

In the city of Tiffin, On North Park Rd, from Hwy 6 north2,000 Feet

Pavement Rehab/Widen, Ped/Bike Grade &amp; Pave,Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$5,661,766$1,200,000

$1,200,000

$5,661,766$1,200,000

$1,200,000

45232

Iowa City

22279

STP-U-3715()--70-52

In the city of Iowa City, on Dodge Street, from BurlingtonStreet north to Governor Street.

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$14,181,200$3,750,000

$3,750,000

$14,181,200$3,750,000

$3,750,000

48400

Coralville

22281

STP-U-1557()--70-52

In the city of Coralville, On US 6 E, Over from Just west ofLowes W to I-80 bridge

Pavement Rehab/Widen, Lighting, Traffic Signals

FHWA Approved TotalFederal Aid

RegionalSwap

$3,105,000$864,560

$864,560

$3,105,000$864,560

$864,560

48401

Iowa City

22282

STP-U-3715()--70-52

In the city of Iowa City, On Taft Avenue, from Lower WestBranch Road S to American Legion Road

Grade and Pave, Ped/Bike Development

FHWA Approved TotalFederal Aid

RegionalSwap

$11,000,000$3,500,000

$3,500,000

$11,000,000$3,500,000

$3,500,000

48399

University Heights

22280

STP-U-7855()--70-52

In the city of University Heights, On Sunset Street, fromMelrose Ave S to Benton Street

Pavement Rehab, Ped/Bike Development

FHWA Approved TotalFederal Aid

RegionalSwap

$481,000$115,440

$115,440

$481,000$115,440

$115,440

79

Page 83: Iowa Statewide Transportation Improvement Program

STBG-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39434

Iowa City

22332

BRM-3715(667)--8N-52

In the city of Iowa City, Gilbert Street bridge, Gilbert Streetbridge over RALSTON CREEK.

Bridge Replacement

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$1,664,000$1,000,000

$1,664,000$1,000,000

39427

Iowa City

22333

BROS-3715(664)--8J-52

In the city of Iowa City, In City of Iowa City, 2nd Avenuebridge, 2nd Avenue bridge over Ralston Creek

Bridge Replacement

FHWA Approved

9/21/2021

TotalFederal Aid

RegionalSwap

$577,200$444,000

$577,200$444,000

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39150

Coralville

22364

TAP-U-1557()--8I-52

In the city of Coralville, On Clear Creek Trail on east side ofCamp Cardinal Blvd, from Hwy 6 S to Tom Harkin Trailhead

Ped/Bike Grade &amp; Pave

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$512,830$212,519

$212,519

$512,830$212,519

$212,519

39149

Iowa City

22363

TAP-U-3715(670)--8I-52

In the city of Iowa City, On Hwy 6 Trail, from FairmeadowsBlvd east to Heinz Rd

Ped/Bike Grade &amp; Pave

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$575,197$438,000

$438,000

$575,197$438,000

$438,000

45234

North Liberty

22365

TAP-U-5557()--8I-52

In the city of North Liberty, on North Liberty Trail, from northof Abraham Drive, north-northwest to Front Street.

Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$1,144,366$648,118

$648,118

$1,144,366$648,118

$648,118

80

Page 84: Iowa Statewide Transportation Improvement Program

South

Dakota

Siouxland Interstate Metropolitan Planning Council

1122 Pierce Street, Sioux City, IA 51105

Phone: 712-279-6286, Fax: 712-279-6920, www.simpco.org

Plymouth

County

Union

County

Dixon

County

0 2

\

Dakota

County

Nebraska

4 8 Miles

Iowa

Woodbury

County

�orts � Commercial

- Interstate

- National Highway System

Enhanced - Primary Roads

General Service - Local Roads

El Basic Service

El Local Service Transit rel Regional

[el Large Urban

rel Small Urban

rel Intercity Bus

C[I Amtrak

I Park & Ride

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] MPO Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

81

Page 85: Iowa Statewide Transportation Improvement Program

82

Page 86: Iowa Statewide Transportation Improvement Program

MPO 29 / SIMPCONHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48525

Iowa Department ofTransportation

22074

NHSX-12()--3H-97

IA12: IN SIOUX CITY, FROM US 20 TO GORDON DRVIADUCT

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$1,810,000$1,448,000

$1,810,000$1,448,000

48435

Iowa Department ofTransportation

22071

NHSX-376()--3H-97

IA376: N OF CUNNINGHAM DR TO N MARTHA ST INSIOUX CITY

Pavement Rehab, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,943,000$1,554,400

$1,943,000$1,554,400

48482

Iowa Department ofTransportation

22073

NHSX-376()--3H-97

IA376: N OF OUTER DR TO FLOYD BLVD IN SIOUX CITY

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$1,191,000$952,800

$1,191,000$952,800

39378

Iowa Department ofTransportation

22072

NHSX-20()--3H-97

US20: US 75/IA 12 IN SIOUX CITY TO LITTLE WHISKEYCR (EB/WB)

Grade and Pave, Pavement Rehab, Erosion Control

FHWA Approved TotalFederal Aid

RegionalSwap

$12,613,000$10,090,400

$12,732,000$10,185,600

$3,800,000$3,040,000

$29,145,000$23,316,000

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

18694

MPO 29 / SIMPCO

22211

RGPL-PA29()--PL-97

RGLPL: SIMPCO: MPO Planning

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$176,673$141,338

$176,673$141,338

$176,673$141,338

$176,673$141,338

$706,692$565,352

83

Page 87: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38048

Iowa Department ofTransportation

BRFN-77()--39-97

US77: MISSOURI RIVER IN SIOUX CITY (STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$36,000 $36,000 $36,000 $36,000 $144,000

38148

Iowa Department ofTransportation

IMN-129()--0E-97

I-129: MISSOURI RIVER IN SIOUX CITY (STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$50,000 $50,000 $50,000 $50,000 $200,000

48575

Iowa Department ofTransportation

NHSN-12()--2R-97

IA12: W 19TH ST INTERSECTION IN SIOUX CITY

Grade and Pave, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$214,000 $214,000

45302

Iowa Department ofTransportation

BRFN-20()--39-97

US20: PROPOSED RD 0.5 MI W OF IA 12 (EB/WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$571,000 $571,000

45296

Iowa Department ofTransportation

BRFN-20()--39-97

US20: SERGEANT RD 2.1 MI W OF IA 12 (EB & WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$446,000 $446,000

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39148

Sergeant Bluff

22366

TAP-R-6890()--8T-97

In the city of Sergeant Bluff, The Loess Hills Scenic Trail(Phase 1) from Barker Park to South Ridge Rd

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$112,500$90,000

$90,000

$424,000$339,200

$339,200

$536,500$429,200

$429,200

84

Page 88: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48379

Sioux City

BHM-SWAP-7057(703)--SA-97

In the city of Sioux City, On DACE AVE, Over OLD FLOYDRIVER CHANNEL

Bridge Rehabilitation

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$2,340,000

$1,000,000

$2,340,000

$1,000,00044954

Woodbury County

BRS-SWAP-C097(146)--FF-97

On D 12, Over CREEK, from Barker Avenue E 0.05 miles inSectiion 7 T89N R46W

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,000

85

Page 89: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36656

Sergeant Bluff

STBG-SWAP-6890(610)--SG-97

In the city of Sergeant Bluff, On First Street, from Port NealRoad to C Street

Pavement Rehab

DOT Approved

2/16/2021

TotalFederal Aid

RegionalSwap

$2,000,000

$1,400,000

$1,400,000

$2,000,000

$1,400,000

$1,400,00037828

Sioux City

STBG-SWAP-7057()--SG-97

In the city of Sioux City, On Dodge Ave, from South RustinSt to South Cecelia St

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,300,000

$1,040,000

$1,040,000

$1,300,000

$1,040,000

$1,040,00038311

Sioux City

STBG-SWAP-7057()--SG-97

In the city of Sioux City, On South Cecelia St, from DodgeAve to Morningside Ave

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$850,000

$117,000

$117,000

$850,000

$117,000

$117,00037829

Sioux City

STBG-SWAP-7057(706)--SG-97

In the city of Sioux City, HMA mill & overlay on HamiltonBlvd from 36th St to city limits and 15th St to 20th St

Pavement Rehab

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,215,000

$972,000

$972,000

$1,215,000

$972,000

$972,00036655

Sioux City

STBG-SWAP-7057(708)--SG-97

In the city of Sioux City, On Stone Park Blvd, from WestClifton St to Broken Kettle Road

Pavement Rehab

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$1,610,000

$1,288,000

$1,288,000

$1,610,000

$1,288,000

$1,288,00032763

Woodbury County

STBG-SWAP-C097(144)--FG-97

On K25, from Relocated Port Neal Road South 1.8 Miles toGelita Plant Entrance, Sec 7 and 18 T87 R47

Pavement Widening, Shoulder Grading, Granular Shoulders

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$2,887,000

$2,125,000

$2,125,000

$2,887,000

$2,125,000

$2,125,00038874

Sioux City

STBG-SWAP-7057()--SG-97

In the city of Sioux City, On Rebecca Street, from West 16thStreet to Villa Avenue

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,539,000

$1,158,000

$1,158,000

$1,539,000

$1,158,000

$1,158,00038873

Sioux City

STBG-SWAP-7057(709)--SG-97

In the city of Sioux City, On South Rustin Street, from LeechAvenue to Dodge Avenue

Pavement Rehab

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$1,759,000

$1,407,000

$1,407,000

$1,759,000

$1,407,000

$1,407,00048367

Sergeant Bluff

STBG-SWAP-6890()--SG-97

In the city of Sergeant Bluff, On First Street, from Farewayentrance to Old Lakeport Road

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$2,760,000

$1,794,000

$1,794,000

$2,760,000

$1,794,000

$1,794,000

86

Page 90: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

47285

Sioux City

STBG-SWAP-7057()--SG-97

In the city of Sioux City, On IA 12 S, Over BACON CREEK

Culvert Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$4,224,400

$2,024,400

$2,024,400

$4,224,400

$2,024,400

$2,024,40047088

Plymouth County

STBG-SWAP-C075(C-80)--SK-75

On C-80, from K22 E 3.5 miles to HWY 75

DOT Approved TotalFederal Aid

RegionalSwap

$1,977,000

$1,500,000

$1,500,000

$1,977,000

$1,500,000

$1,500,000

87

Page 91: Iowa Statewide Transportation Improvement Program

Iowa Northland Regional Council of Governments

229 E. Park Ave, Waterloo, IA 50703

Phone: 319-235-0311, Fax: 319-235-2891, www.inrcog.org

\l)•-------=1------���t----l

� I� =--1-..,.....--1_57

Grund:yCounty

I I

I I

I I

I I

I

6 Hudson

N I I I

0 1 1 2

l

'I

� Waterl · Elk Run Raymond� L'

-��---�s

@� ®'��------"F'

Black Hawk County

�orts - Interstate

� Commercial - National Highway System

El Enhanced - Primary Roads

El General Service - Local Roads

Local Service Transit [el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] MPO Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

88

Page 92: Iowa Statewide Transportation Improvement Program

89

Page 93: Iowa Statewide Transportation Improvement Program

MPO 30 / INRCOGNHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38177

Iowa Department ofTransportation

22075

NHSX-27()--3H-7

IA27: US 20 TO RIDGEWAY AVE IN CEDAR FALLS(NB/SB) (STATE SHARE)

Grade and Pave, Culvert Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$5,228,000$4,182,400

$5,228,000$4,182,400

45382

Iowa Department ofTransportation

22076

NHSX-20()--3H-7

US20: HUDSON RD TO US 63 (EB & WB)

Grade and Pave, Traffic Signs

FHWA Approved TotalFederal Aid

RegionalSwap

$17,321,000$13,856,800

$17,321,000$13,856,800

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

16106

MPO 30 / INRCOG

22212

RGPL-BCHF()--PL-07

Waterloo MPO Planning: PL For Waterloo MPOTransportation Planning

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$237,532$190,025

$237,532$190,025

$237,532$190,025

$237,532$190,025

$950,128$760,100

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45254

Iowa Department ofTransportation

BRFN-63()--39-7

US63: CEDAR RIVER 0.2 MI N OF US 218 IN WATERLOO(NB)

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$1,199,000 $1,199,000

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45240

MPO 30 / INRCOG

22283

STP-U-PA30()--70-07

NE Industrial Access: NEPA

Outside Services Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$625,000$480,000

$480,000

$625,000$480,000

$480,000

90

Page 94: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45045

Cedar Falls

22368

TAP-U-1185(655)--8I-07

On Lake Street Trail, from Central Ave E 0.6 miles toexisting trail

Ped/Bike Grade &amp; Pave

FHWA Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$395,000$302,000

$302,000

$395,000$302,000

$302,000

39133

Waterloo

22367

TAP-U-8155(768)--8I-07

On Cedar River Marina Recreational Trail Enhancements,

Outside Services Engineering, Ped/Bike Grade &amp;Pave, Ped/Bike Miscellaneous

FHWA Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$574,000$459,000

$459,000

$574,000$459,000

$459,000

48386

Waterloo

22369

TAP-U-8155()--8I-07

In the city of Waterloo, On Hess Rd Trail, from Shaulis Rd N0.32 miles to KOA Campground Entrance

Ped/Bike Grade &amp; Pave, Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$189,160$151,328

$151,328

$189,160$151,328

$151,328

SWAP-CMAQ

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45736

Waterloo

ICAAP-SWAP-8155()--SH-07

In the city of Waterloo, On US 63 S, from Donald St S 1.0miles to Newell St S14 T89 R13

Traffic Signals

DOT Approved TotalFederal Aid

RegionalSwap

$145,000

$112,392

$145,000

$112,392

91

Page 95: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37821

Elk Run Heights

STBG-SWAP-2312()--SG-07

In the city of Elk Run Heights, On Lafayette Rd & GilbertvilleRd, from WCL east and southeast 0.65 miles to Amber Ln

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,897,000

$1,200,000

$1,200,000

$1,897,000

$1,200,000

$1,200,00025388

Raymond

STBG-SWAP-6342(601)--SG-07

In the city of Raymond, On Lafayette Rd, from 2750' W ofTaylor Ln E 0.85 miles to 2nd St

Grade and Pave, Outside Services Engineering, Ped/BikeGrade &amp; Pave

DOT Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$3,256,000

$1,230,000

$1,230,000

$3,256,000

$1,230,000

$1,230,000

39136

Waterloo

STBG-SWAP-8155(775)--SG-07

On Hess Rd, from E Shaulis Rd N 0.4 miles to 500' north ofKOA Dr

Grade and Pave, Ped/Bike Grade &amp; Pave

DOT Approved

1/18/2023

TotalFederal Aid

RegionalSwap

$3,327,000

$2,727,000

$2,727,000

$3,327,000

$2,727,000

$2,727,00039139

Cedar Falls

STBG-SWAP-1185(657)--SG-07

In the city of Cedar Falls, On Main St, from 6th St South0.75 Miles to Seerley Blvd

Grade and Pave, Right of Way, Outside ServicesEngineering, Ped/Bike Grade &amp; Pave

DOT Approved

12/20/2022

TotalFederal Aid

RegionalSwap

$3,350,000

$1,500,000

$1,500,000

$4,250,000

$1,400,000

$1,400,000

$7,600,000

$2,900,000

$2,900,000

45241

Evansdale

STBG-SWAP-2432()--SG-07

On Lafayette Rd, from Evans Rd E 1.4 miles to ECL

Pavement Rehab, Outside Services Engineering, Ped/BikePaving, Ped/Bike Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$120,000

$102,000

$102,000

$2,500,000

$1,605,000

$1,605,000

$2,620,000

$1,707,000

$1,707,00036659

Hudson

STBG-SWAP-3577(608)--SG-07

In the city of Hudson, On Butterfield Rd, from Ranchero Rdnorth 0.5 Miles to 500' S of US-20

Outside Services Engineering

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$131,000

$104,000

$104,000

$131,000

$104,000

$104,00039137

Waterloo

STBG-SWAP-8155(776)--SG-07

On Hess Rd, from 500' N of KOA Dr N 0.45 miles to 960' Nof US 20

Grade and Pave, Ped/Bike Grade &amp; Pave

DOT Approved

1/18/2023

TotalFederal Aid

RegionalSwap

$3,840,000

$1,350,000

$1,350,000

$3,840,000

$1,350,000

$1,350,00039138

MPO 30 / INRCOG

STBG-SWAP-PA30()--SG-07

On IA 58, from US 63 North 4.0 Miles to 0.4 mi S ofRanchero Rd

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$563,000

$450,000

$450,000

$563,000

$450,000

$450,00038335

MPO 30 / INRCOG

STBG-SWAP-PA30()--SG-07

IA 27: US 20 TO RIDGEWAY AVE IN CEDAR FALLS (NB &SB)

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$625,000

$500,000

$500,000

$625,000

$500,000

$500,000

92

Page 96: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

PA Note: MPO contribution to TPMS 38177

48388

Waterloo

STBG-SWAP-8155()--SG-07

In the city of Waterloo, On HESS RD, from 960' north of US20 N 0.4 miles to Grimm St

Pavement Rehab/Widen, Ped/Bike Grade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$4,060,000

$2,473,000

$2,473,000

$4,060,000

$2,473,000

$2,473,00034782

Black Hawk County

STBG-SWAP-C007(XXX)--FG-07

On ORANGE RD, from 900 FT EAST OF HAMMOND AVEE 2.5 miles to Hwy 218

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$970,000

$448,000

$448,000

$970,000

$448,000

$448,00048387

MPO 30 / INRCOG

STBG-SWAP-PA30()--SG-07

On US 63 , from US 20 NE 3.5 miles to 0.4 miles south ofUniversity Ave

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$875,000

$700,000

$700,000

$875,000

$700,000

$700,000PA Note: MPO contribution to Iowa DOT project

93

Page 97: Iowa Statewide Transportation Improvement Program

0

RPA 1 - Upper Explorerland Regional Planning Commission

325 Washington Street, Suite A, Decorah, IA 52101

Phone: 563-382-6171, Fax: 563-382-6311, www.uerpc.org

County� 150

____ ..._93_--.. ':J.

20 Miles

�orts � Commercial

El Enhanced

General Service

Basic Service

El Local Service Transit rel Regional

rel Large Urban

rel Small Urban

rel Intercity Bus

C[I Amtrak

I Park & Ride

- Interstate

- National Highway System

- Primary Roads

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

94

Page 98: Iowa Statewide Transportation Improvement Program

95

Page 99: Iowa Statewide Transportation Improvement Program

RPA 1HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48582

Iowa Department ofTransportation

22019

HSIPX-52()--3L-22

US52: MILLVILLE TO GUTTENBERG

Pavement Widening

FHWA Approved TotalFederal Aid

RegionalSwap

$1,250,000$1,125,000

$1,250,000$1,125,000

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48434

Iowa Department ofTransportation

22079

NHSX-52()--3H-96

US52: SCL TO W OF RR IN CASTALIA

Pavement Rehab, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,046,000$836,800

$1,046,000$836,800

48503

Iowa Department ofTransportation

22080

NHSX-52()--3H-96

US52: ECL OF OSSIAN TO CO RD B32 (STATE SHARE)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$1,648,000$1,318,400

$1,648,000$1,318,400

48424

Iowa Department ofTransportation

22078

BRF-3()--38-33

IA3: LITTLE WAPSIPINICON RIVER 0.2 MI W OF CO RDV68

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,994,000$1,595,200

$1,994,000$1,595,200

48629

Iowa Department ofTransportation

22081

BRF-3()--38-33

IA3: MAQUOKETA RIVER 1.7 MI E OF IA 187

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,035,000$1,628,000

$2,035,000$1,628,000

48416

Iowa Department ofTransportation

22077

BRF-76()--38-3

IA76: WATERLOO CREEK 2.2 MI N OF CO RD A26

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,395,000$1,916,000

$2,395,000$1,916,000

96

Page 100: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37912

Iowa Department ofTransportation

BRFN-18()--39-22

US18: MISSISSIPPI RIVER IN MARQUETTE (STATESHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$20,000 $20,000 $20,000 $20,000 $80,000

38045

Iowa Department ofTransportation

BRFN-52()--39-96

US52: UPPER IOWA RIVER 1.8 MI N OF IA 9

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$332,000 $332,000

37876

Iowa Department ofTransportation

BRFN-9()--39-3

IA9: MISSISSIPPI RIVER IN LANSING (STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$20,000 $20,000 $20,000 $20,000 $80,000

48591

Iowa Department ofTransportation

STPN-76()--2J-22

IA76: IN MCGREGOR FROM BUELL AVE TO RIVER ST

Pave, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$4,800,000 $4,800,000

39202

Iowa Department ofTransportation

BRFN-18()--39-22

US18: STREAM 0.6 MI W OF E JCT US 52

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$2,039,000 $2,039,000

39256

Iowa Department ofTransportation

BRFN-9()--39-45

IA9: CRANE CREEK 1.4 MI W OF CO RD V26

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$279,000 $279,000

39255

Iowa Department ofTransportation

BRFN-9()--39-45

IA9: LITTLE WAPSIPINICON RIVER 0.1 MI W OF CO RDV10

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$242,000 $242,000

39257

Iowa Department ofTransportation

BRFN-9()--39-45

IA9: NORTH BRANCH TURKEY RIVER 4.3 MI E OF US 63

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,024,000 $1,024,000

45329

Iowa Department ofTransportation

BRFN-13()--39-22

IA13: VOLGA RIVER 4.1 MI S OF IA 56

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$674,000 $674,000

97

Page 101: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45365

Iowa Department ofTransportation

BRFN-93()--39-33

IA93: STREAM 0.7 MI W OF CO RD V68

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$958,000 $958,000

48583

Iowa Department ofTransportation

STPN-128()--2J-22

IA128: W OF CLAYTON CENTER AND 1.1 MI W OF CORD X41

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$206,000 $206,000

48467

Iowa Department ofTransportation

BRFN-150()--39-33

IA150: VOLGA RIVER 0.2 MI N OF IA 93

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$730,000 $730,000

48574

Iowa Department ofTransportation

BRFN-52()--39-22

US52: TURKEY RIVER IN MILLVILLE

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,320,000 $1,320,000

48469

Iowa Department ofTransportation

BRFN-9()--39-96

IA9: TROUT CREEK 6.1 MI E OF US 52

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$470,000 $470,000

48552

Iowa Department ofTransportation

STPN-13()--2J-22

IA13: 0.05 MI E OF EMPIRE RD AND 0.2 MI SW OF IA 56

DOT Approved TotalFederal Aid

RegionalSwap

$190,000 $190,000

98

Page 102: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

20

RPA 1

22284

RGPL-PA01(RTP)--ST-00

UERPC RPA-1 TRANSPORT PLANNING

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$37,500$30,000

$30,000

$37,500$30,000

$30,000

$43,750$35,000

$35,000

$43,750$35,000

$35,000

$162,500$130,000

$130,000

48625

Iowa Department ofTransportation

22286

STP-76()--2C-3

IA76: CLAYTON CO TO 0.2 MI W OF THE E JCT CO RDX32

Pavement Widening, Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$5,200,000$4,160,000

$5,200,000$4,160,000

45319

Iowa Department ofTransportation

22285

STP-9()--2C-3

IA9: MISSISSIPPI RIVER IN LANSING (STATE SHARE)

Grade and Pave, Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$37,246,000$29,796,800

$37,246,000$29,796,800

STBG-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

4811

Fayette County

22334

BROS-C033(77)--8J-33

On 240TH ST, Over TURNER CREEK, S2 T94 R09

FHWA Approved

11/19/2019

TotalFederal Aid

RegionalSwap

$481,000$1,000

$481,000$1,000

99

Page 103: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38348

Winneshiek CountyConservation Board

22370

TAP-R-C096()--8T-96

Trail Bridge (Phase VII) On Dry Run Trail, Over Dry RunCreek

Ped/Bike Structures

FHWA Approved TotalFederal Aid

RegionalSwap

$665,000$274,000

$274,000

$665,000$274,000

$274,000

32585

Winneshiek CountyConservation Board

22371

TAP-R-C096(148)--8T-96

Trail Bridge (Phase VI) On Dry Run Trail, Over Dry RunCreek

Ped/Bike Structures

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$320,000$116,000

$116,000

$320,000$116,000

$116,000

DOT Note: Project eligible for FHWA TAP funding

39141

Fayette CountyConservation Board

22372

TAP-R-C033()--8T-33

Backbone Trail extension, from Nims Bridge (current trail)along Great River Road (south side) to Juniper Road

Scenic or Historic Hwy., Ped/Bike Paving, Ped/BikeMiscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$1,735,000$171,000

$171,000

$1,735,000$171,000

$171,000

45492

Clayton CountyConservation Board

22373

TAP-R-C022()--8T-22

On South/East side of Iowa 13, from 250th Street 1 miles toGrape Road

Ped/Bike Paving

FHWA Approved TotalFederal Aid

RegionalSwap

$854,233$192,000

$192,000

$854,233$192,000

$192,000

48642

Winneshiek CountyConservation Board

22374

TAP-R-C096()--8T-96

On Dry Run Trail, Over Multiple Drainages

Ped/Bike Structures

FHWA Approved TotalFederal Aid

RegionalSwap

$487,830$180,056

$180,056

$487,830$180,056

$180,056

100

Page 104: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37527

Howard County

BHS-SWAP-C045()--FC-45

On A46, Over Crane Creek, S14 T98 R13

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00038486

Decorah

BRM-SWAP-1867(616)--SD-96

On POLE LINE RD, Over DRAINAGE, S8 T98 R08

Bridge Replacement

DOT Approved

2/16/2021

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00036406

Allamakee County

BROS-SWAP-C003(29R1)--FE-03

On Ellingson Bridge Drive, Over PATTERSON CREEK, S29T99N R06W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$550,000

$162,000

$550,000

$162,00029321

Clayton County

BROS-SWAP-C022(94)--SE-22

On 250TH ST, Over DRY MILL CREEK, in N1/4 S20 T93R04

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00045712

Fayette County

BROS-SWAP-C033()--FE-33

On V 62, Over TRIB TO WAPSIE RIVER, S7 T92 R10

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$81,000

$80,000

$81,000

$80,00045830

Fayette County

BROS-SWAP-C033(145)--SE-33

On H AVE, Over GUNDLACH CR, S13 T91 R08

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$360,000

$280,000

$360,000

$280,00038644

Howard County

BROS-SWAP-C045()--SE-45

On Vale Rd, Over Nichols Creek, S22 T100 R11

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00023616

Winneshiek County

BRS-SWAP-C096(119)--FF-96

On W 20, Over UPPER IOWA RIVER, S6 T98 R08

Bridge Replacement

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$2,600,000

$600,000

$2,600,000

$600,00047235

Clayton County

BROS-SWAP-C022()--SE-22

On 295TH ST, Over STREAM, from Grandview Rd W 0.1miles to Bridge S12 T92 R05

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,000

101

Page 105: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44841

Fayette County

BROS-SWAP-C033()--SE-33

On 190TH ST, Over VOLGA RIVER, S6 T93 R09

DOT Approved TotalFederal Aid

RegionalSwap

$430,000

$350,000

$430,000

$350,00045939

Fayette County

BROS-SWAP-C033()--SE-33

On MAPLE RD, Over CREEK, S25 T95 R09

DOT Approved TotalFederal Aid

RegionalSwap

$380,000

$330,000

$380,000

$330,00038651

Howard County

BROS-SWAP-C045()--SE-45

On 135th St, Over South Branch Turkey River, S11 T98R12

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$540,000

$540,000

$540,000

$540,00037437

Winneshiek County

BROS-SWAP-C096()--FE-96

On 295TH AVE, Over SMALL CREEK, S24 T96 R10

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00045748

Winneshiek County

BROS-SWAP-C096()--SE-96

On 210TH ST, Over CREEK, S2 T97 R09

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00045750

Winneshiek County

BROS-SWAP-C096()--SE-96

On N BEAR RD, Over CREEK, S13 T100 R07

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00044877

Howard County

BRS-SWAP-C045()--FF-45

On V58, Over Nichols Creek, S22 T100 R11

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$550,000

$550,000

$550,000

$550,00037764

Allamakee County

BROS-SWAP-C003(14I1)--SE-03

On Picnic Woods Drive, Over TEEPLE CREEK, Bridge, S14T97N R06W

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00037763

Allamakee County

BROS-SWAP-C003(69)--SE-03

On Suttle Creek Road, Over YELLOW RIVER, Bridge, S18T96N R04W

DOT Approved

12/19/2023

TotalFederal Aid

RegionalSwap

$960,000

$960,000

$960,000

$960,000

102

Page 106: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39035

Clayton County

BROS-SWAP-C022()--SE-22

On Coffee Rd, Over PLUM CREEK, S34 T91 R1

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00036500

Fayette County

BROS-SWAP-C033()--SE-33

On Y AVE, Over SMALL STREAM, S31 T94 R10

DOT Approved TotalFederal Aid

RegionalSwap

$140,000

$60,000

$140,000

$60,00038649

Howard County

BROS-SWAP-C045()--SE-45

On 25th St, Over Staff Creek, S13 T100 R14

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$495,000

$495,000

$495,000

$495,00038653

Howard County

BROS-SWAP-C045()--SE-45

On 180th St, Over Bohemian Creek, S3 T97 R11

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$360,000

$360,000

$360,000

$360,00032136

Winneshiek County

BRS-SWAP-C096(138)--FF-96

On W46, Over YELLOW RIVER, S9 T96 R07

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00044892

Howard County

BROS-SWAP-C045()--FE-45

On 20th St, Over Branch Upper Iowa River, S9 T100 R12

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$270,000

$270,000

$270,000

$270,00018343

Winneshiek County

BROS-SWAP-C096()--SE-96

On Pleasent View Rd., Over Canoe Creek, S33 T99 R7

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$900,000

$900,000

$900,000

$900,00039056

Allamakee County

BRS-SWAP-C003(18K3)--FF-03

On X42(Lansing Harpers Road), Over VILLAGE CREEK,S18 T98N R03W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$960,000

$960,000

$960,000

$960,000

103

Page 107: Iowa Statewide Transportation Improvement Program

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45940

Fayette County

HSIP-SWAP-C033()--FJ-33

On ECHO VLY RD from S Pine Street Southeast two miles

DOT Approved TotalFederal Aid

RegionalSwap

$1,267,000

$362,000

$1,267,000

$362,00044798

Fayette County

HSIP-SWAP-C033(143)--FJ-33

On B44 from W14 to HWY150

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$2,282,000

$512,000

$2,282,000

$512,000

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

29492

Allamakee County

STBG-SWAP-C003(67)--FG-03

On A26, from X20 Intersection 6.3 miles to IA 26

Pavement Rehab

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$4,800,000

$2,800,000

$2,800,000

$4,800,000

$2,800,000

$2,800,00035133

Fayette County

STBG-SWAP-C033(126)--FG-33

On W14, from 60th St to 150th St

Pavement Rehab

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$2,450,000

$2,100,000

$2,100,000

$2,450,000

$2,100,000

$2,100,00039140

Guttenberg

STBG-SWAP-3167()--SG-22

In the city of Guttenberg, On 5th Street, from Haydn Streetnorth .44 Miles to Kosciusko Street

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$431,000

$344,000

$344,000

$431,000

$344,000

$344,00037450

Howard County

STBG-SWAP-C045()--FG-45

On V10, from Hwy 9 North 9.5 Miles to MN Boarder

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$3,325,000

$2,519,000

$2,519,000

$3,325,000

$2,519,000

$2,519,00037438

Winneshiek County

STBG-SWAP-C096(154)--FG-96

On W 14, from Co Rd B16 (Spillville) S 4 miles to City ofFort Atkinson

Pavement Rehab

DOT Approved

12/19/2023

TotalFederal Aid

RegionalSwap

$2,200,000

$2,200,000

$2,200,000

$2,200,000

$2,200,000

$2,200,00045153

Allamakee County

STBG-SWAP-C003(A16 & A11)--FG-03

On A16 from Hwy 76 to MN Line and A11 from Hwy 26 toMN line

DOT Approved TotalFederal Aid

RegionalSwap

$3,200,000

$2,168,000

$2,168,000

$3,200,000

$2,168,000

$2,168,000

104

Page 108: Iowa Statewide Transportation Improvement Program

44

I

0 5

RPA 2 - North Iowa Council of Governments

525 6th Street SW, Mason City, IA 50401

Phone: 641-423-0491, Fax: 641-423-1637, www.niacog.org

20 Miles

Hancock

County

Mitchell

�orts � Commercial

El Enhanced

General Service

Basic Service

El Local Service Transit rel Regional

rel Large Urban

rel Small Urban

rel Intercity Bus

C[I Amtrak

I Park & Ride

- Interstate

- National Highway System

- Primary Roads

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

105

Page 109: Iowa Statewide Transportation Improvement Program

106

Page 110: Iowa Statewide Transportation Improvement Program

RPA 2HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48581

Iowa Department ofTransportation

22020

HSIPX-9()--3L-98

IA9: 1 MI E OF CO RD S56 TO E JCT CO RD T26

Pavement Widening

FHWA Approved TotalFederal Aid

RegionalSwap

$2,570,000$2,313,000

$2,570,000$2,313,000

107

Page 111: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37965

Iowa Department ofTransportation

22085

BRF-169()--38-55

US169: BLACK CAT CREEK 4.2 MI N OF US 18

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,087,000$1,669,600

$2,087,000$1,669,600

37937

Iowa Department ofTransportation

22082

BRF-65()--38-35

US65: BAILEY CREEK 0.8 MI S OF S JCT CO RD C13

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,875,000$2,300,000

$2,875,000$2,300,000

38231

Iowa Department ofTransportation

22086

NHSX-18()--3H-34

US18: US 218/IA 27 INTERSECTION IN FLOYD

Grade and Pave, Bridge New, Erosion Control

FHWA Approved TotalFederal Aid

RegionalSwap

$21,061,000$16,848,800

$418,000$334,400

$21,479,000$17,183,200

DOT Note: Project includes HSIP funds for new bridge

48415

Iowa Department ofTransportation

22083

NHSX-18()--3H-55

US18: 1.65 MI E OF CO RD P64 TO W JCT CO RD R26

Pavement Widening, Pavement Rehab, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$7,682,000$6,145,600

$7,682,000$6,145,600

DOT Note: Project includes RPA contribution of $700,000 as programmed in TPMS 38317

45339

Iowa Department ofTransportation

22084

NHSX-65()--3H-17

US65: 0.1 MI S OF 27TH ST SW TO 6TH ST S IN MASONCITY

Grade and Pave, Traffic Signals, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$14,883,000$11,906,400

$14,883,000$11,906,400

48628

Iowa Department ofTransportation

22088

BRF-65()--38-17

US65: BEAVER DAM CREEK 2.6 MI N OF CO RD C13

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,755,000$2,204,000

$2,755,000$2,204,000

48613

Iowa Department ofTransportation

22087

NHSX-18()--3H-41

US18: E BRANCH IOWA RIVER TO COUNTRY CLUB DRIN GARNER

Pavement Rehab/Widen, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,041,000$1,632,800

$2,041,000$1,632,800

108

Page 112: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37904

Iowa Department ofTransportation

BRFN-122()--39-17

IA122: WILLOW CREEK 4.4 MI E OF I-35 (WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$260,000 $260,000

39387

Iowa Department ofTransportation

BRFN-9()--39-98

IA9: BEAVER CREEK 0.5 MI W OF CO RD S18

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$10,000 $885,000 $895,000

38052

Iowa Department ofTransportation

BRFN-9()--39-98

IA9: I-35 INTERCHANGE

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$927,000 $927,000

38053

Iowa Department ofTransportation

BRFN-9()--39-98

IA9: STREAM 1.3 MI E OF US 65

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$295,000 $295,000

39197

Iowa Department ofTransportation

IMN-35()--0E-17

I-35: 1.0 MI N OF CO RD B35 TO 1.0 MI N OF IA 9

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,210,000 $1,210,000

45355

Iowa Department ofTransportation

BRFN-122()--39-17

IA122: WILLOW CREEK 4.4 MI E OF I-35 (EB)

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $1,204,000 $1,209,000

39194

Iowa Department ofTransportation

BRFN-18()--39-17

US18: UP RR 1.5 MI W OF US 65 (WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$631,000 $631,000

39195

Iowa Department ofTransportation

BRFN-18()--39-17

US18: TRAIL 5.2 MI E OF E JCT I-35 (EB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$550,000 $550,000

39237

Iowa Department ofTransportation

BRFN-3()--39-35

IA3: SQUAW CREEK 0.6 MI E OF US 65 IN HAMPTON

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$321,000 $321,000

109

Page 113: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39199

Iowa Department ofTransportation

BRFN-65()--39-17

US65: CALAMUS CREEK 1.8 MI N OF IA 122 IN MASONCITY

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$304,000 $304,000

39298

Iowa Department ofTransportation

BRFN-9()--39-66

IA9: LITTLE CEDAR RIVER 4.0 MI E OF E JCT US 218

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$391,000 $391,000

39299

Iowa Department ofTransportation

BRFN-9()--39-66

IA9: SOAP CREEK 6.1 MI E OF E JCT US 218

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$236,000 $236,000

39302

Iowa Department ofTransportation

BRFN-9()--39-66

IA9: WAPSIPINICON RIVER 1.5 MI E OF E JCT CO RDT62

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$269,000 $269,000

39301

Iowa Department ofTransportation

BRFN-9()--39-66

IA9: CEDAR RIVER 2.0 MI W OF W JCT US 218

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$408,000 $408,000

39300

Iowa Department ofTransportation

BRFN-9()--39-66

IA9: ROCK CREEK 5.8 MI W OF W JCT US 218

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$215,000 $215,000

39386

Iowa Department ofTransportation

BRFN-9()--39-98

IA9: WILLOW CREEK 0.4 MI W OF I-35

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$215,000 $215,000

39198

Iowa Department ofTransportation

IMN-35()--0E-17

I-35: FRANKLIN CO TO 1.0 MI N OF CO RD B35

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,773,000 $1,773,000

39278

Iowa Department ofTransportation

STPN-15()--2J-55

IA15: LOTTS CREEK 6.3 MI S OF CO RD A42

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,725,000 $1,725,000

110

Page 114: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39376

Iowa Department ofTransportation

STPN-9()--2J-95

IA9: N US 69 INTERSECTION NEAR LELAND

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$40,000 $40,000

45367

Iowa Department ofTransportation

BRFN-14()--39-34

IA14: FLOOD CREEK 3.6 MI S OF CO RD B45

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,833,000 $1,833,000

45251

Iowa Department ofTransportation

BRFN-18()--39-41

US18: W BRANCH IOWA RIVER 0.8 MI E OF CO RD R35

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$715,000 $715,000

45268

Iowa Department ofTransportation

BRFN-18()--39-41

US18: DITCH 2.8 MI E OF CO RD R35

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$692,000 $692,000

45301

Iowa Department ofTransportation

BRFN-218()--39-34

US218: CEDAR RIVER 0.2 MI S OF CO RD B33

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$441,000 $441,000

45330

Iowa Department ofTransportation

BRFN-69()--39-95

US69: PIKE RUN CREEK 0.5 MI N OF N JCT IA 9

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$776,000 $776,000

45433

Iowa Department ofTransportation

IMN-35()--0E-17

I-35: MAIN ST 0.4 MI S OF N JCT US 18 (NB & SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,760,000 $1,760,000

48491

Iowa Department ofTransportation

IMN-35()--0E-17

I-35: 1 MI N OF CO RD B35 TO NCL CLEAR LAKE

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$3,000,000 $3,000,000

45332

Iowa Department ofTransportation

IMN-35()--0E-17

I-35: AT N JCT US 18 (NB & SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,791,000 $1,791,000

111

Page 115: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45334

Iowa Department ofTransportation

IMN-35()--0E-17

I-35: 4TH AVE S 0.6 MI S OF N JCT US 18 (NB & SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,588,000 $1,588,000

45300

Iowa Department ofTransportation

IMN-35()--0E-17

I-35: IMRL RR 0.2 MI S OF N JCT US 18 (NB & SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,443,000 $1,443,000

45400

Iowa Department ofTransportation

IMN-35()--0E-35

I-35: CO RD C47 TO CERRO GORDO CO

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,860,000 $1,860,000

48589

Iowa Department ofTransportation

NHSN-169()--2R-55

US169: 0.1 MI S OF 240TH ST AND 0.1 MI S OF 290THST

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$326,000 $326,000

48585

Iowa Department ofTransportation

NHSN-18()--2R-55

US18: 0.2 MI E OF 175TH AVE

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$170,000 $170,000

48450

Iowa Department ofTransportation

IMN-35()--0E-17

I-35: CO RD B60

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$570,000 $570,000

48470

Iowa Department ofTransportation

IMN-35()--0E-17

I-35: AT CO RD B65

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$814,000 $814,000

48564

Iowa Department ofTransportation

IMN-35()--0E-17

I-35: CO RD B20 3.9 MI N OF N JCT US 18

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$570,000 $570,000

112

Page 116: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38325

Garner

22376

TAP-R-2837(605)--8T-41

In the city of Garner, On Trail, from Country Club Drive W2450 miles to State Street then south across HWY 18.

Ped/Bike Grade &amp; Pave

FHWA Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$316,000$200,000

$200,000

$316,000$200,000

$200,000

48646

Lake Mills

22378

TAP-R-4135()--8T-95

In the city of Lake Mills, Along MAIN ST, in Lake Mills fromTrail W .147 miles to East side of Dollar General driveway

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$87,000$87,000

$87,000

$87,000$87,000

$87,000

45229

Ventura

22377

TAP-R-7967()--8T-17

In Ventura, trail adjacent to lake Street from Macintosh Parkto Venetian Village Bridge

Ped/Bike Development

FHWA Approved TotalFederal Aid

RegionalSwap

$613,432$339,000

$339,000

$613,432$339,000

$339,000

39414

Cerro GordoCountyConservation Board

22375

TAP-R-C017(108)--8T-17

On Prairie Land Trail, from s33 sw 3.1 Miles to the City ofThornton

Ped/Bike Grading

FHWA Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$815,600$598,000

$598,000

$815,600$598,000

$598,000

113

Page 117: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45646

Worth County

BHOS-SWAP-C098(83)--FB-98

On S 34, Over ELK CREEK, S22 T99 R21

Bridge Rehabilitation

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00038737

Franklin County

BROS-SWAP-6940(602)--FE-35

In the city of Sheffield, On South Lincoln Street (S43), OverBAILEYE CREEK, S9 T93 R20

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,000,000

$800,000

$1,000,000

$800,00038736

Franklin County

BROS-SWAP-C035(109)--SE-35

On Indigo Avenue, Over SPRING CR, S21 T92 R21

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$375,000

$375,000

$375,000

$375,00024978

Kossuth County

BRS-SWAP-C055(194)--FF-55

On B55, Over E FORK DES MOINES RIVER, on NLINES31 T95 R28

Bridge Replacement

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00038549

Mitchell County

BRS-SWAP-C066()--FF-66

On T40, Over Unnamed Creek, S30 T100N R16W

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00037060

Winnebago County

BRS-SWAP-C095(81)--FF-95

On R20 (20th Ave), Over BLUE EARTH RIVER, from 440thSt N 0.25 miles to existing structure S9 T99 R26

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00044793

Winnebago County

BRS-SWAP-C095(81)--FF-95

On A42, Over DRAINAGE DITCH, from 70th Ave. W 0.3miles to existing structure S30 T98 R25

Bridge Replacement

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00047301

Franklin County

BHOS-SWAP-C035()--FB-35

On S 43, Over OTTER CREEK, S5 T92 R20

DOT Approved TotalFederal Aid

RegionalSwap

$240,000

$240,000

$240,000

$240,00045647

Worth County

BHOS-SWAP-C098()--SB-98

On 415TH ST, Over DRAINAGE, S26 T99 R20

Culvert New

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,000

114

Page 118: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

47300

Franklin County

BHS-SWAP-C035()--FC-35

On Olive Avenue (S 43), Over SQUAW CREEK, S28 T92R20

DOT Approved TotalFederal Aid

RegionalSwap

$140,000

$140,000

$140,000

$140,0002888

Cerro GordoCounty

BROS-SWAP-C017(35)--SE-17

From Lark 1/4 mile East, Over Dam Creek Section 1 T-90N,R-20W on 160th street

Bridge Replacement

DOT Approved

6/20/2023

TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00036035

Floyd County

BROS-SWAP-C034(104)--SE-34

On VICTORY AVE, Over LITTLE CEDAR, along ELINE S16T96 R15

Bridge Replacement

DOT Approved

1/18/2023

TotalFederal Aid

RegionalSwap

$1,600,000

$1,600,000

$1,600,000

$1,600,00038741

Franklin County

BROS-SWAP-C035()--SE-35

On 40th Street, Over BEAVER CREEK, S26 TT90N RR20

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00036259

Franklin County

BROS-SWAP-C035()--SE-35

On FRANKLIN AVE, Over HARTGRAVE CK, S19 T92 R18

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00045216

Franklin County

BROS-SWAP-C035()--SE-35

On RAIL AVE, Over SMALL STREAM, S14 T91 R20

DOT Approved TotalFederal Aid

RegionalSwap

$270,000

$270,000

$270,000

$270,00010477

Hancock County

BROS-SWAP-C041()--SE-41

On Birch Avenue, Over Lindsey Creek, S30 T97 R26

Bridge Replacement

DOT Approved

2/21/2023

TotalFederal Aid

RegionalSwap

$165,000

$165,000

$165,000

$165,0004917

Hancock County

BROS-SWAP-C041(125)--FE-41

On 225TH ST, from Deer Avenue East approximately 0.9miles, S34 T96 R26

Bridge Replacement

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$525,000

$525,000

$525,000

$525,00029411

Mitchell County

BROS-SWAP-C066(070)--SE-66

On ECHO AVE, Over ROCK CREEK, S23 T98 R18

Bridge Replacement

DOT Approved

2/20/2029

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,000

115

Page 119: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37666

Worth County

BROS-SWAP-C098()--FE-98

On S18, Over STREAM, S3 T98 R22

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00037669

Worth County

BROS-SWAP-C098()--SE-98

On MALLARD AVE, Over DRAINAGE DITCH, S7 T98 R20

Culvert Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00024975

Kossuth County

BRS-SWAP-C055(B671608)--FF-55

P64: W Line 16 Wesley Twp. over PLUM CREEK

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00024976

Kossuth County

BRS-SWAP-C055(B773304)--FF-55

P64: W. Line of 33 Buffalo Twp. over Lidner Creek

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00037655

Floyd County

BROS-SWAP-C034()--SE-34

On 170TH ST, Over FLOOD CREEK, on NLINE S30 T96R17

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00038740

Franklin County

BROS-SWAP-C035()--SE-35

On Vine Avenue, Over N BEAVER CREEK, S15 TT90NRR19

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00037112

Hancock County

BROS-SWAP-C041()--SE-41

On DEER AVE, Over BOONE RIVER, S15 T95 R26

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$275,000

$275,000

$275,000

$275,00045766

Hancock County

BROS-SWAP-C041()--SE-41

On B 40, Over DRAINAGE DITCH 6, S4 T95 R24

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$150,000

$150,000

$150,000

$150,00045658

Mitchell County

BHS-SWAP-C066()--FC-66

On S 70, Over DEER CREEK, S9 T99 R18

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,000

116

Page 120: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39011

Floyd County

BROS-SWAP-C034()--FE-34

On T42, Over CEDAR RIVER, at E1/4 S24 T97N R17W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,600,000

$1,600,000

$1,600,000

$1,600,00036258

Franklin County

BROS-SWAP-C035(100)--SE-35

On THRUSH AVE, Over SMALL STREAM, S29 T93 R19

Bridge Replacement

DOT Approved

1/17/2024

TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00037667

Worth County

BROS-SWAP-C098()--SE-98

On A39, Over Winans Creek, S10 T98 R22

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00040116

Hancock County

BRS-SWAP-C041()--FF-41

On R35, Over W BRANCH IOWA RIVER, S21 T96 R25

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$175,000

$175,000

$175,000

$175,00045659

Mitchell County

BRS-SWAP-C066()--FF-66

On T 62, Over WAPSIPINICON RIVER, S14 T99 R15

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,000

117

Page 121: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38317

RPA 2

STBG-SWAP-()--SG-41

On US HWY 18, from 1.65 Miles East of P64 east to theWest junction of R26

Pavement Rehab/Widen, Pavement Planing

DOT Approved TotalFederal Aid

RegionalSwap

$6,462,000

$700,000

$700,000

$6,462,000

$700,000

$700,00038315

Clear Lake

STBG-SWAP-1372(621)--SG-17

In the city of Clear Lake, On Main Avenue, from 8th StreetEast 0.35 Miles to 14th Street

Grade and Pave

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,987,000

$1,000,000

$1,000,000

$1,987,000

$1,000,000

$1,000,00039563

Hancock County

STBG-SWAP-C041(131)--SG-41

On B20, from Kossuth County Line East 9 Miles to CountyRoad R-35.

Pavement Rehab

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$1,625,000

$1,625,000

$1,625,000

$1,625,000

$1,625,000

$1,625,00036598

Kossuth County

STBG-SWAP-C055(195)--FG-55

On B46, from Kossuth County Route P60 East 6 Miles to IA17

Pavement Rehab

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,000

$1,000,000

$1,000,00039412

Mason City

STBG-SWAP-4822()--SG-17

In the city of Mason City, On ,Winn. Way 4th to Pierce, 12thSt. NE Federal to Kentucky,

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$800,000

$600,000

$600,000

$800,000

$600,000

$600,00048648

Mason City

STBG-SWAP-4822()--SG-17

In the city of Mason City, On 12TH ST NE, Over IdealCREEK, S1 T96 R20

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$800,000

$650,000

$650,000

$800,000

$650,000

$650,00035069

Mitchell County

STBG-SWAP-C066()--FG-66

On S 70, from State Highway 9 9 miles to Highway 105

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,100,000

$1,500,000

$1,500,000

$2,100,000

$1,500,000

$1,500,00036213

Worth County

STBG-SWAP-C098()--FG-98

On S 56, from A 39 N 7.7 miles to Co. 105

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,300,000

$500,000

$500,000

$1,300,000

$500,000

$500,00045514

RPA 2

STBG-SWAP-PA02()--SG-35

On IA 3 E, Over SQUAW CREEK, S34 T92 R19

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$5,400,000

$600,000

$600,000

$5,400,000

$600,000

$600,000

118

Page 122: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45228

Charles City

STBG-SWAP-1242()--SG-34

In Charles City, Main Street from Gilbert St. to Lane St.

DOT Approved TotalFederal Aid

RegionalSwap

$1,200,000

$800,000

$800,000

$1,200,000

$800,000

$800,00037658

Floyd County

STBG-SWAP-C034()--FG-34

On T64,(155th Street & Underwood Ave), from ShadowAveue East and North 7.5 Miles to Mitchell County Line

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,100,000

$1,000,000

$1,000,000

$2,100,000

$1,000,000

$1,000,00039066

Franklin County

STBG-SWAP-C035()--FG-35

On C13 (250th Street), from S25 (Heather Avenue) E 8miles to S43 (Olive Avenue)

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,200,000

$500,000

$500,000

$2,200,000

$500,000

$500,00039022

Kossuth County

STBG-SWAP-C055(A16)--FG-55

On A16, from West County Line East 18 Miles to US 169

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,500,000

$1,250,000

$1,250,000

$2,500,000

$1,250,000

$1,250,00047058

Kossuth County

STBG-SWAP-C055(P30)--FG-55

On P30, from B63 (E Road) N 9 miles to US Highway 18

DOT Approved TotalFederal Aid

RegionalSwap

$1,300,000

$1,300,000

$1,300,000

$1,300,000

$1,300,000

$1,300,00048647

RPA 2

STBG-SWAP-PA02()--SG-55

On US 18, In Kossuth County from ECL Algona E to 0.8miles east of P-60

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$7,300,000

$1,000,000

$1,000,000

$7,300,000

$1,000,000

$1,000,000

119

Page 123: Iowa Statewide Transportation Improvement Program

0

RPA 3 - Northwest Iowa Planning and Development Commission

217 W Fifth Street, P.O. Box 1493, Spencer, IA 51301

Phone: 712-262-7225, Fax: 712-262-7665, www.nwipdc.org

� ........ 9 ----➔,-��-r�r}-_;:;:t;;;::-,.

I I

, 59 Osceola' I

I

6° County1 ickinsori ---- ----------+-------- County� ---

-:-�-,}a�-;----.&��

5 10 20 Miles

r

Clay County

-

I

,Palo Alto 1 County

I I

--- --------- -.---..... --...a.--

Buena Vista County

�orts � Commercial

- Interstate

- National Highway System

El Enhanced - Primary Roads

El General Service

El Basic Service

El Local Service Transit [el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

120

Page 124: Iowa Statewide Transportation Improvement Program

121

Page 125: Iowa Statewide Transportation Improvement Program

RPA 3HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48366

Iowa Department ofTransportation

22021

HSIPX-018-2(129)--3L-71

In Hartley from 8th Ave W to E of 8th Ave E

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$250,000$225,000

$250,000$225,000

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37994

Iowa Department ofTransportation

22089

BRF-18()--38-74

US18: CYLINDER CREEK AT W JCT CO RD N60

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,195,000$956,000

$1,195,000$956,000

38186

Iowa Department ofTransportation

22090

NHSX-71()--3H-30

US71: OKOBOJI GROVE RD IN ARNOLDS PARK TOEAST VIEW AVE

Grade and Pave, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$12,965,000$10,372,000

$12,965,000$10,372,000

39356

Iowa Department ofTransportation

22091

NHSX-75(55)--3H-84

US75: IN SIOUX CENTER (STATE SHARE)

Grade and Pave, Right of Way

FHWA Approved

12/20/2022

TotalFederal Aid

RegionalSwap

$4,300,000$3,440,000

$18,950,000$15,160,000

$23,250,000$18,600,000

122

Page 126: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37910

Iowa Department ofTransportation

BRFN-18()--39-21

US18: LOST ISLAND OUTLET 1.0 MI E OF CO RD M54

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$466,000 $466,000

37995

Iowa Department ofTransportation

BRFN-18()--39-74

US18: W FORK DES MOINES RIVER 2.5 MI E OF W JCTIA 4

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$446,000 $446,000

48436

Iowa Department ofTransportation

NHSN-18()--2R-21

US18: CP RR CROSSING N OF 7TH ST IN SPENCER

Pavement Rehab, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$151,000 $151,000

45298

Iowa Department ofTransportation

NHSN-18()--2R-21

US18: LOST ISLAND OUTLET 1.6 MI E OF CO RD M54

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$333,000 $333,000

48473

Iowa Department ofTransportation

STPN-59()--2J-71

US59: IN PRIMGHAR, FROM THE SCL TO NCL

Patching

DOT Approved TotalFederal Aid

RegionalSwap

$310,000 $310,000

48540

Iowa Department ofTransportation

STPN-7()--2J-11

IA7: IA 110 INTERSECTION IN STORM LAKE

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$900,000 $900,000

38284

Iowa Department ofTransportation

STPN-9()--2J-60

IA9: SOUTH DAKOTA EAST 0.5 MI

Grade and Pave, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$674,000 $674,000

39313

Iowa Department ofTransportation

BRFN-10()--39-71

IA10: MUD CREEK 1.9 MI W OF CO RD L48

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,420,000 $1,420,000

45359

Iowa Department ofTransportation

BRFN-18()--39-74

US18: PRAIRIE CREEK 2.8 MI W OF W JCT IA 15

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $1,483,000 $1,488,000

123

Page 127: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39314

Iowa Department ofTransportation

BRFN-59()--39-71

US59: DRY RUN 0.4 MI N OF N JCT IA 10

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$374,000 $374,000

45312

Iowa Department ofTransportation

BRFN-10()--39-84

IA10: BIG SIOUX RIVER AT SOUTH DAKOTA (STATESHARE)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$985,000 $985,000

45435

Iowa Department ofTransportation

BRFN-3()--39-11

IA3: MAPLE CREEK 0.2 MI W OF CO RD M27

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$491,000 $491,000

45322

Iowa Department ofTransportation

BRFN-3()--39-11

IA3: STREAM 1.2 MI W OF US 71

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$229,000 $229,000

45299

Iowa Department ofTransportation

BRFN-4()--39-74

IA4: DITCH 3.0 MI N OF N JCT US 18

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$303,000 $303,000

48453

Iowa Department ofTransportation

BRFN-10()--39-84

IA10: ORANGE CITY SLOUGH 4.5 MI E OF US 75

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$380,000 $380,000

48444

Iowa Department ofTransportation

BRFN-18()--39-60

US18: BIG SIOUX RIVER AT SOUTH DAKOTA (STATESHARE)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$730,000 $730,000

48468

Iowa Department ofTransportation

BRFN-59()--39-71

US59: BRANCH FLOYD RIVER 1.9 MI N OF N JCT US 18

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$420,000 $420,000

48456

Iowa Department ofTransportation

BRFN-71()--39-30

US71: EAST OKOBOJI LAKE 1.7 MI N OF S JCT IA 9

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$510,000 $510,000

124

Page 128: Iowa Statewide Transportation Improvement Program

RTP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45552

Dickinson CountyBoard ofSupervisors

22220

NRT-C030(062)--9G-30

Starting east of IA Hwy 86 heading west to 193rd Ave inMontgomery

Ped/Bike Grade &amp; Pave

FHWA Approved

5/18/2021

TotalFederal Aid

RegionalSwap

$883,680$221,750

$883,680$221,750

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

141

RPA 3

22288

RGPL-PA03(RTP)--ST-00

NWIPDC - RPA 3: RPA 3 FHWA PLANNING

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$58,000$38,000

$38,000

$48,000$38,000

$38,000

$48,000$38,000

$38,000

$47,500$38,000

$38,000

$201,500$152,000

$152,000

36951

RPA 3

22287

RGTR-PA03()--ST-00

RTA dba/RIDES

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$111,600$89,600

$89,600

$111,600$89,600

$89,600

PA Note: Purchase replacement of 2 minivans

125

Page 129: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39446

Clay County Boardof Supervisors

22380

TAP-U-C021()--8I-21

Along US Highway 71 ROW, from 300th St. N 1.5 Miles toSCL of City of Fostoria

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$729,000$583,000

$583,000

$729,000$583,000

$583,000

39447

Dickinson CountyBoard ofSupervisors

22379

TAP-U-C030()--8I-30

On Former IA & NW RR ROW, from 219th Ave in SpiritLake W 1.6 Miles to Jct. IA Highway 86

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$695,000$180,000

$180,000

$695,000$180,000

$180,000

48701

Clay County Boardof Supervisors

22382

TAP-U-C021()--8I-21

On US 71 N from City of Fostoria N .71 miles to 270th St.

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$458,394$272,000

$272,000

$458,394$272,000

$272,000

48700

Dickinson CountyBoard ofSupervisors

22381

TAP-U-C030()--8I-30

Along US 71 ROW from Clay/Dickinson County line N 1.5miles

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$762,480$272,000

$272,000

$762,480$272,000

$272,000

126

Page 130: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48699

Rock Rapids

BRM-SWAP-6542(607)--SD-60

In the city of Rock Rapids, On N E ST, Over TOM CREEK,S34 T100 R45

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00019653

Lyon County

BROS-SWAP-C060()--FE-60

On K-52, Over Kanaranzi Creek, S22 T100 R45

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,296,000

$1,296,000

$1,296,000

$1,296,00045607

Obrien County

BROS-SWAP-C071(88)--FE-71

On 420th Street, Over WATERMAN CREEK, S23 T95 R39

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00045636

Osceola County

BROS-SWAP-C072(77)--SE-72

On 260TH ST, Over OCHEYDAN RIVER, S34 T98 R39

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,050,000

$825,000

$1,050,000

$825,00045962

Palo Alto County

BROS-SWAP-C074(110)--SE-74

On 570TH AVE, Over STREAM, S1 T95 R31

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00022229

Buena Vista County

BRS-SWAP-C011(100)--FF-11

M36: Over Bluebird Creek NW1/4 S5 T93N R37W

Culvert Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$950,000

$950,000

$950,000

$950,00036271

Lyon County

BRS-SWAP-C060(123)--FF-60

On K 60, Over TOM CREEK, S30 T100 R44

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$668,000

$668,000

$668,000

$668,0008684

Sioux County

BROS-SWAP-6550()--SE-84

On 14TH ST, Over Creamery Creek, S21 T97 R46

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$475,000

$470,000

$475,000

$470,00021407

Buena Vista County

BROS-SWAP-C011(BV95)--SE-11

220TH AVE: Over BR RACCOON RIVER NW1/4 S27 T92NR35W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,000

127

Page 131: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44839

Osceola County

BROS-SWAP-C072()--SE-72

On ORIOLE AVE, Over OTTER CREEK, S31 T99 R41

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00045974

Palo Alto County

BROS-SWAP-C074()--SE-74

On 350TH AVE, Over STREAM, S20 T97 R34

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$340,000

$340,000

$340,000

$340,00012558

Sioux County

BROS-SWAP-C084()--FE-84

On B58 (470th Street), Over W BRANCH FLOYD RIVER,from Grant Ave E approx 0.1 miles, NW-NW 1/4 S17 T94R45

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$448,000

$450,000

$448,000

32321

Sioux County

BROS-SWAP-C084()--FE-84

On Lily Ave.(L22) NW of Hospers, IA, Over NO NAMECREEK, from 380th St S approx .90 miles SW-SW 1/4 S34T96 R43

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$375,000

$373,000

$375,000

$373,000

17855

Sioux County

BROS-SWAP-C084()--FE-84

On 340th Street (B20), SMALL STREAM, from Indian Eapprox 0.40 miles, NE-NW 1/4 S7 T96 R44

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$448,000

$450,000

$448,00026988

Sioux County

BROS-SWAP-C084()--SE-84

On 270th St, from Dogwood Ave E 0.5 mile, S1 T97 R47

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$451,000

$449,000

$451,000

$449,00044919

Lyon County

BRS-SWAP-C060(40Y)--FF-60

On L 26, Over TAFT CREEK, S24 T99 R43

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00044923

Lyon County

BRS-SWAP-C060(65Y)--FF-60

On L 26, Over WEST RAT CREEK, S1 T98 R43

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00036065

Sioux County

BRS-SWAP-C084(170)--FF-84

On 360th Street (B30), Over Rock River, SW-SE 1/4 S16T96 R47

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$3,565,000

$2,058,000

$3,565,000

$2,058,000

128

Page 132: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45132

Lyon County

BHS-SWAP-C060(39W)--FC-60

On K 30, Over MUD CREEK, S4 T98 R46

DOT Approved TotalFederal Aid

RegionalSwap

$150,000

$150,000

$150,000

$150,00045131

Lyon County

BHS-SWAP-C060(51W)--FC-60

On K 42, Over ROCK RIVER, S23 T98 R46

DOT Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00034547

Obrien County

BROS-SWAP-C071(K-20)--SE-71

On Roosevelt Avenue 0.2 Miles South of 420th Street.

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00045968

Palo Alto County

BROS-SWAP-C074()--FE-74

On 460TH ST, Over OLD CHANNEL DES MOINES R, S5T94 R31

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$575,000

$575,000

$575,000

$575,00045975

Palo Alto County

BROS-SWAP-C074()--FE-74

On 460TH ST, Over DD, S12 T94 R31

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00035252

Sioux County

BROS-SWAP-C084()--FE-84

On 280th Street, from NW of Rock Valley from DogwoodAve E approx 3/4 mile NE-NE 1/4 S12 T97 R47

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$447,000

$450,000

$447,00032320

Sioux County

BROS-SWAP-C084()--FE-84

On 470th St.(B58) W. of Ireton, IA, Over Indian Creek, fromDogwood Ave E approx .10 miles NW-NW 1/4 S13 T94 R47

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$362,000

$360,000

$362,000

$360,00012560

Sioux County

BROS-SWAP-C084()--FE-84

290th Street: North of Hull, IA, from Harrison Ave E approx1/4 mile NW 1/4 S15 T97 R45

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$422,000

$419,000

$422,000

$419,00036201

Emmet County

BRS-SWAP-C032()--FF-32

On A 17, Over EF DES MOINES RIVER, S13 T100 R32

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,000

129

Page 133: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45746

Osceola County

BHOS-SWAP-C072()--FB-72

On A 30, Over OCHEYEDAN RIVER, S35 T99 R40

DOT Approved TotalFederal Aid

RegionalSwap

$800,000

$800,000

$800,000

$800,00020201

Osceola County

BRS-SWAP-C072(61)--FF-72

On NORTHWEST BLVD; Over Polly Creek; S12 T99 R42

Bridge Replacement

DOT Approved

3/20/2029

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,000

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38903

Clay County

HSIP-SWAP-C021(149)--FJ-21

On 280th street, from M27 E 9 miles to Hwy 71

Pave

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$2,535,000

$441,000

$2,535,000

$441,000

130

Page 134: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38377

Milford

STBG-SWAP-5057()--SG-30

In the city of Milford, On 13th St., from US Highway 71 west.75 Miles to 213th Ave.

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$4,737,000

$1,657,800

$1,657,800

$4,737,000

$1,657,800

$1,657,80038378

Storm Lake

STBG-SWAP-7422(620)--SG-11

In the city of Storm Lake, On E Richland St., from IndustrySt east 600 Feet to Radio Road

Pavement Rehab

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$252,000

$163,529

$163,529

$252,000

$163,529

$163,52936431

Buena Vista County

STBG-SWAP-C011(116)--FG-11

On M36, Over LITTLE SIOUX RIVER, S5 T93 R37

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$3,014,000

$514,000

$2,094,000

$3,014,000

$514,000

$2,094,00026809

Buena Vista County

STBG-SWAP-C011(BV61)--FG-11

On C49, from US 71 E 6 miles to 190th Ave

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,000,000

$570,000

$570,000

$2,000,000

$570,000

$570,00020702

Lyon County

STBG-SWAP-C060(A18)--FG-60

On A18, from Big Sioux River East to Int of IA 9

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,640,000

$445,000

$445,000

$2,640,000

$445,000

$445,00035938

Palo Alto County

STBG-SWAP-C074(108)--FG-74

On B63, from 535th Ave East Approximately 4 Miles to CityLimits of West Bend

Pavement Rehab/Widen

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$1,280,000

$768,000

$768,000

$1,280,000

$768,000

$768,00036066

Sioux County

STBG-SWAP-C084()--FG-84

On L14 (Kiwi Ave), from IA Hwy #10 W. of Alton S 5 miles toSioux/Plymouth Co. Line

Pavement Rehab/Widen

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,484,000

$800,000

$800,000

$1,484,000

$800,000

$800,00021026

Sioux Center

NHSX-075-3(55)--3H-84

MAIN AVE: widening of Highway 75 (Main Ave.) from 3 to 5lane approx distance 1.4 mi.

Pavement Rehab/Widen

DOT Approved

12/20/2022

TotalFederal Aid

RegionalSwap

$4,066,000

$980,000

$980,000

$4,066,000

$980,000

$980,00038376

Estherville

STBG-SWAP-2417()--SG-32

In the city of Estherville, On S. 1st St., from IA 9 SE .74Miles to IA 4

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$208,000

$208,000

$300,000

$208,000

$208,000

131

Page 135: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39445

Spencer

STBG-SWAP-7170()--SG-21

In the city of Spencer, On E 4th St from 5th Ave E to 10thAve E

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,821,000

$453,000

$453,000

$1,821,000

$453,000

$453,00038904

Clay County

STBG-SWAP-C021()--FG-21

On M27, from B40 North 6.0 Miles to City of Everly

DOT Approved TotalFederal Aid

RegionalSwap

$1,800,000

$900,000

$900,000

$1,800,000

$900,000

$900,00038864

Emmet County

STBG-SWAP-C032()--FG-32

On A20, from Dickinson County Line East 3.4 Miles toCounty Road N26

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$800,000

$472,000

$472,000

$800,000

$472,000

$472,00038631

Palo Alto County

STBG-SWAP-C074()--FG-74

On N28, from Highway 18 South 6 Miles to City of Ayshire

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,800,000

$900,000

$900,000

$1,800,000

$900,000

$900,00037582

Sioux County

STBG-SWAP-C084()--FG-84

On 400th St. (B40), from near 7th Ave. SE in Sioux Centereast approximately 5.5 miles to Jefferson Ave. (K64)

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$2,001,000

$1,080,000

$1,080,000

$2,001,000

$1,080,000

$1,080,00044830

Dickinson County

STBG-SWAP-C030()--FG-30

On M-27, from North of Highway #9 N 1.4 miles to Old RRin Lake Park

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000

$900,000

$900,000

$1,500,000

$900,000

$900,00045027

Lyon County

STBG-SWAP-C060()--FG-60

On K16, from IA 9 N 3 miles to MN State Ln

DOT Approved TotalFederal Aid

RegionalSwap

$1,050,000

$500,000

$500,000

$1,050,000

$500,000

$500,00037714

Lyon County

STBG-SWAP-C060(L14)--FG-60

On L14, from the South George City Limits south 5 Miles tothe Sioux County Line

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,650,000

$825,000

$825,000

$1,650,000

$825,000

$825,00039074

Obrien County

STBG-SWAP-C071()--SG-71

On M-12 Vine Ave., from 320th Street S 6.899 miles to390th Street

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,680,000

$1,008,000

$1,008,000

$1,680,000

$1,008,000

$1,008,000

132

Page 136: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38876

Osceola County

STBG-SWAP-C072(2024)--FG-72

On L32,L40,A22,A30,A34, from L32:HWY9-MNLINE;L40:HWY9-A30; A22:SIBLEY-HWY59; A30:NWBLVD-HWY59; A34:ASHTON-HWY59

Pavement Rehab, Granular Shoulders

DOT Approved TotalFederal Aid

RegionalSwap

$5,160,000

$1,419,000

$1,419,000

$5,160,000

$1,419,000

$1,419,000

39102

Sioux County

STBG-SWAP-C084()--FG-84

On Jackson Avenue (K64), from 400th Street (B40) N 3miles to 370th Street (B30)

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$927,000

$533,000

$533,000

$927,000

$533,000

$533,00048698

Iowa Department ofTransportation

STBG-SWAP-000()--SG-32

On IA Highwy 4 from int of IA 9 in Estherville N to the IA/MNState line

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,961,140

$300,000

$300,000

$2,961,140

$300,000

$300,00048695

Emmetsburg

STBG-SWAP-2395()--SG-74

In the city of Emmetsburg, On N Huron St from int US 18 N1,916 ft to County Rd N48

DOT Approved TotalFederal Aid

RegionalSwap

$550,000

$330,000

$330,000

$550,000

$330,000

$330,00048697

Sheldon

STBG-SWAP-6950()--SG-84

In the city of Sheldon, On WESTERN AVE from int o 16thSt., N .72 miles to int of US HWY 18

Patching

DOT Approved TotalFederal Aid

RegionalSwap

$2,400,000

$748,000

$748,000

$2,400,000

$748,000

$748,00048696

Sioux Center

STBG-SWAP-7055()--SG-84

In the city of Sioux Center, 23 block overlay project on 4thAve., 2nd St SE, 3rd St. NW anbd 2nd Ave.

DOT Approved TotalFederal Aid

RegionalSwap

$957,000

$478,500

$478,500

$957,000

$478,500

$478,50047205

Palo Alto County

STBG-SWAP-C074()--FG-74

On N40, North of 350th St. to B14

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$2,040,000

$1,020,000

$1,020,000

$2,040,000

$1,020,000

$1,020,000

133

Page 137: Iowa Statewide Transportation Improvement Program

I I

0 5 10

RPA 4 - Siouxland Regional Transportation Planning Association

1122 Pierce Street, P.O. Box 1077, Sioux City, IA 51102

Phone: 712-279-6286, Fax: 712-279-6920, www.simpco.org

Siouxland Interstate

Metropolitan Planning

Council (SIMPCO)

I

20 Miles

Plymouth

County

Woodbury

County

Cherokee

County

�orts � Commercial

- Interstate

- National Highway System

El Enhanced - Primary Roads

El General Service

El Basic Service

El Local Service Transit [el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

134

Page 138: Iowa Statewide Transportation Improvement Program

135

Page 139: Iowa Statewide Transportation Improvement Program

RPA 4NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39379

Iowa Department ofTransportation

22095

IMX-29()--02-97

I-29: IA 141 INTERCHANGE

Grade and Pave, Bridge Replacement, Erosion Control

FHWA Approved TotalFederal Aid

RegionalSwap

$200,000$180,000

$13,789,000$12,410,100

$238,000$214,200

$14,227,000$12,804,300

39381

Iowa Department ofTransportation

22098

BRF-20()--38-97

US20: ABANDONED RR 0.1 MI E OF CO RD D25(REMOVE BRIDGE)

Grade and Pave, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,902,000$2,321,600

$2,902,000$2,321,600

38246

Iowa Department ofTransportation

22092

NHSX-75()--3H-75

US75: N OF MAPLE ST IN HINTON TO S OF 2ND ST INMERRILL (NB)

Grade and Pave, Culvert Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$20,147,000$16,117,600

$20,147,000$16,117,600

39318

Iowa Department ofTransportation

22094

NHSX-75()--3H-75

US75: N OF MAPLE ST IN HINTON TO S OF 2ND ST INMERRILL (SB)

Grade and Pave, Culvert Replacement, Erosion Control

FHWA Approved TotalFederal Aid

RegionalSwap

$22,144,000$17,715,200

$357,000$285,600

$22,501,000$18,000,800

48417

Iowa Department ofTransportation

22093

BRF-31()--38-18

IA31: SILVER CREEK 1.0 MI W OF US 59

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,908,000$1,526,400

$1,908,000$1,526,400

48502

Iowa Department ofTransportation

22096

IMX-29()--02-67

I-29: N OF IA 175 TO WOODBURY CO (NB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,599,000$3,239,100

$3,599,000$3,239,100

48533

Iowa Department ofTransportation

22097

IMX-29()--02-67

I-29: 1.5 MI N OF IA 175 TO WOODBURY CO (SB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,693,000$3,323,700

$3,693,000$3,323,700

136

Page 140: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37981

Iowa Department ofTransportation

BRFN-141()--39-67

IA141: MIDDLE SOLDIER RIVER 1.6 MI E OF IA 183

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$377,000 $377,000

37985

Iowa Department ofTransportation

BRFN-175()--39-67

IA175: MAPLE RIVER 1.0 MI W OF E JCT IA 141

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$3,014,000 $3,014,000

37986

Iowa Department ofTransportation

BRFN-175()--39-67

IA175: DITCH 1.9 MI W OF E JCT IA 141

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$259,000 $259,000

37984

Iowa Department ofTransportation

BRFN-175()--39-67

IA175: MISSOURI RIVER E OF DECATUR NEBRASKA(STATE SHARE)

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$74,000 $74,000 $74,000 $74,000 $296,000

37982

Iowa Department ofTransportation

BRFN-175()--39-67

IA175: MISSOURI RIVER E OF DECATUR NEBRASKA(STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$22,000 $22,000 $22,000 $22,000 $88,000

38000

Iowa Department ofTransportation

BRFN-3()--39-75

IA3: MINK CREEK 0.4 MI W OF CO RD K42

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$294,000 $294,000

38047

Iowa Department ofTransportation

BRFN-31()--39-97

IA31: LITTLE SIOUX RIVER 0.8 MI S OF US 20

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$774,000 $774,000

38003

Iowa Department ofTransportation

BRFN-404()--39-75

IA404: FLOYD RIVER 0.4 MI N OF IA 3 (SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$319,000 $319,000

38147

Iowa Department ofTransportation

IMN-29()--0E-97

I-29: CO RD K25 4.7 MI S OF US 20

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$160,000 $160,000

137

Page 141: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48437

Iowa Department ofTransportation

NHSN-3()--2R-18

IA3: IA 143 INTERSECTION

Grade and Pave, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$303,000 $303,000

48455

Iowa Department ofTransportation

NHSN-3()--2R-75

IA3: NEAR 1ST AVE NE IN LE MARS

Pavement Rehab, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$479,000 $479,000

48432

Iowa Department ofTransportation

NHSN-59()--2R-18

US59: LINDEN ST TO S OF IA 3 IN CHEROKEE

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$2,369,000 $2,369,000

48472

Iowa Department ofTransportation

STPN-141()--2J-67

IA141: IN MAPLETON, FROM THE WCL TO ECL

Patching

DOT Approved TotalFederal Aid

RegionalSwap

$715,000 $715,000

45347

Iowa Department ofTransportation

STPN-175()--2J-47

IA175: MAPLE RIVER 1.0 MI E OF BATTLE CREEK

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$281,000 $281,000

48550

Iowa Department ofTransportation

STPN-175()--2J-67

IA175: IN ONAWA, FROM 20TH ST TO 3RD ST

Pavement Widening

DOT Approved TotalFederal Aid

RegionalSwap

$700,000 $700,000

48571

Iowa Department ofTransportation

STPN-175()--2J-67

IA175: I-29 INTERCHANGE

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$276,000 $276,000

39321

Iowa Department ofTransportation

BRFN-140()--39-75

IA140: RATHBURN CREEK 3.3 MI S OF CO RD C38

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$235,000 $235,000

39320

Iowa Department ofTransportation

BRFN-140()--39-75

IA140: CLEAR CREEK 2.8 MI S OF IA 3

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$180,000 $180,000

138

Page 142: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39319

Iowa Department ofTransportation

BRFN-140()--39-75

IA140: W FORK LITTLE SIOUX RIVER 1.5 MI N OF CORD C66

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$531,000 $531,000

39303

Iowa Department ofTransportation

BRFN-175()--39-67

IA175: MCCANDLESS CLEGHORN DITCH 0.6 MI E OF I-29 IN ONAWA

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,496,000 $1,496,000

39305

Iowa Department ofTransportation

BRFN-175()--39-67

IA175: DITCH 3.0 MI E OF CO RD L12

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$816,000 $816,000

39304

Iowa Department ofTransportation

BRFN-175()--39-67

IA175: MAPLE RIVER 3.8 MI E OF CO RD L20

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,050,000 $1,050,000

45282

Iowa Department ofTransportation

STPN-12()--2J-75

IA12: NEAR N JCT CO RD K18

DOT Approved TotalFederal Aid

RegionalSwap

$1,201,000 $1,201,000

45314

Iowa Department ofTransportation

BRFN-31()--39-97

IA31: STREAM 1.9 MI N OF CO RD D30

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$477,000 $477,000

45436

Iowa Department ofTransportation

BRFN-31()--39-97

IA31: STREAM 3.2 MI S OF CO RD D22

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$513,000 $513,000

48568

Iowa Department ofTransportation

BRFN-175()--39-97

IA175: REYNOLDS CREEK 1.6 MI W OF CO RD L37

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$320,000 $320,000

48448

Iowa Department ofTransportation

IMN-29()--0E-67

I-29: CO RD E24 INTERCHANGE

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$640,000 $640,000

139

Page 143: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48609

Iowa Department ofTransportation

NHSN-3()--2R-18

IA3: 1.3 MI E OF US 59 TO 1.8 MI E OF US 59,INCLUDING LITTLE SIOUX RIVER AND OVERFLOWBRIDGES

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $5,000

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37804

RPA 4

22289

RGTR-PA04()--ST-00

One (1) Light Duty Bus, ADA compliant

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$102,400$81,400

$81,400

$102,400$81,400

$81,400

48492

Iowa Department ofTransportation

22292

STP-31()--2C-18

IA31: CO RD C66 IN WASHTA TO US 59

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$6,400,000$5,120,000

$6,400,000$5,120,000

48626

Iowa Department ofTransportation

22293

STP-31()--2C-97

IA31: FROM SCL OTO TO CO RD D22

Pavement Widening, Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$5,360,000$4,550,000

$5,360,000$4,550,000

DOT Note: Project includes STBG and HSIP Funds

48421

Iowa Department ofTransportation

22291

STP-59()--2C-18

US59: N OF IA 3 TO E JCT IA 10

Pavement Widening, Pavement Rehab, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$7,505,000$6,004,000

$7,505,000$6,004,000

DOT Note: Project includes STBG and HSIP funds

218

RPA 4

22290

RGPL-PA04(RTP)--ST-00

SIMPCO - RPA 4: RPA 4 FHWA PLANNING

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$58,500$46,800

$46,800

$58,500$46,800

$46,800

$58,500$46,800

$46,800

$175,500$140,400

$140,400

140

Page 144: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38952

Marcus

22383

TAP-R-4762()--8T-18

In the city of Marcus, Recreational Trail extending from theCity Park around the School and residential areas

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$140,000$140,000

$140,000

$93,100$93,100

$93,100

$89,000$89,000

$89,000

$322,100$322,100

$322,100

141

Page 145: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44804

Cherokee County

BHS-SWAP-C018(86)--FC-18

On C38, Over LITTLE SIOUX RIVER, 0.18 mile E ofCherokee City limits, S35 T92 R40

Bridge Rehabilitation

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00039551

Cherokee

BROS-SWAP-1272(626)--SE-18

In the city of Cherokee, On East Willow Street Bridge overRailroad Creek.

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$646,000

$517,000

$646,000

$517,00037539

Cherokee County

BROS-SWAP-C018(81)--SE-18

On 630th St, Over Silver Creek, 0.23 mile W of theintersection of 630th St and Hwy 59, S22 T90 R40

Bridge Replacement

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$635,000

$635,000

$635,000

$635,00029289

Plymouth County

BROS-SWAP-C075(158)--SE-75

On Diamond Ave, Over indian creek, S10 T93 R48

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$650,000

$650,000

$650,000

$650,00032716

Plymouth County

BROS-SWAP-C075(159)--SE-75

On SHAMROCK AVE, Over deep creek, S15 T93 R43

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,00029291

Plymouth County

BROS-SWAP-C075(161)--FE-75

On K 42, Over CARTER CREEK, S2 T90 R46

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$625,000

$625,000

$625,000

$625,00018344

Woodbury County

BRS-SWAP-C097(147)--FF-97

D12 Over Pierson Creek 0.75 miles east of Mason Avenuein section 9, T89N, R42W

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00047143

Cherokee County

BROS-SWAP-C018()--SE-18

On C AVE, Over SMALL, 0.28 mile S of the intersection of500th St and C Ave, S16 T92 R42

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$169,000

$169,000

$169,000

$169,00045983

Monona County

BROS-SWAP-C067(91)--FE-67

On 220TH ST, Over Rock Creek, S35 T84 R42

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,000

142

Page 146: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35184

Plymouth County

BROS-SWAP-C075(240260)--SE-75

On 160TH ST, Over DEEP CREEK, S2 T92 R44

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00029298

Plymouth County

BROS-SWAP-C075(373407)--SE-75

On Granite Ave, Over broken kettle creek, S34 T93 R47

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00014259

Woodbury County

BROS-SWAP-C097(E-299-1)--FE-97

On CORRECTIONVILLE RD, Over WHISKEY CREEK,from Charles Ave. E 0.1 miles in Section 35 T89N R46W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00044820

Cherokee County

BRS-SWAP-C018()--FF-18

On L 48, Over BEAR CREEK, 0.76 miles N of theintersection of L48 and C16 S15 T93 R41

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$223,000

$223,000

$223,000

$223,00047154

Cherokee County

BROS-SWAP-C018()--SE-18

On 440th St, 0.97 mile W of the intersection of 440th St andY Ave, S14 T93 R39

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$183,000

$183,000

$183,000

$183,00047156

Cherokee County

BROS-SWAP-C018()--SE-18

On 520th St, Over FIDDLE CREEK, 0.45 mile E of theintersection of 520th St and B Ave, S29 T92 R42

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$176,000

$176,000

$176,000

$176,00044813

Cherokee County

BROS-SWAP-C018(79)--SE-18

On Keeline Rd, Over BADGER CREEK, 0.10 mile W of theintersection of 520th St and Keeline Rd S24 T92 R40

Bridge Replacement

DOT Approved

12/19/2023

TotalFederal Aid

RegionalSwap

$141,000

$141,000

$141,000

$141,00038760

Monona County

BROS-SWAP-C067(93)--FE-67

On L37, Over NE Norway Creek, in SW S26 T83 R42

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00038977

Plymouth County

BROS-SWAP-C075(150403)--SE-75

On LYNX AVE, Over plymouth creek, S4 T91N R45W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$550,000

$550,000

$550,000

$550,000

143

Page 147: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38973

Plymouth County

BROS-SWAP-C075(270407)--SE-75

On FIR AVE, Over broken kettle creek, S4 T92N R47W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00044999

Woodbury County

BRS-SWAP-C097(D15)--FF-97

On County Route D12/110th St. over Muddy Creek, 0.8miles east of Eastland Ave. in section 8 T89N R45W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00047166

Cherokee County

BROS-SWAP-C018()--SE-18

On 470th St, Over GREY CREEK, 0.48 mile E of theintersection of 470th St and Highway 59, S34 T93 R40

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$358,000

$358,000

$358,000

$358,00044982

Monona County

BROS-SWAP-C067(94)--FE-67

On Redwood Avenue, Over Elk Creek, S24 T82 R43

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00038918

Monona County

BROS-SWAP-C067(95)--FE-67

On L20, Over Jordan Creek, NE S28 T83 R43

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$825,000

$825,000

$825,000

$825,00036245

Plymouth County

BROS-SWAP-C075(142870)--SE-75

On 260TH ST, Over DRY BRANCH, S28 T91 R44

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00044643

Plymouth County

BROS-SWAP-C075(262690)--SE-75

On 200TH ST, Over W.BRANCH FLOYD RIVER, S26 T92R46

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00036229

Plymouth County

BROS-SWAP-C075(331080)--SE-75

On 110th St, Over deep creek, S3 T93 R43

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00032653

Woodbury County

BROS-SWAP-C097(D42)--SE-97

On 120TH ST, Over MUDDY CREEK, from Eastland Aveeast 0.8 Miles on NLINE S17 T89 R45

Bridge Replacement, Grading, Guardrail

DOT Approved TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,000

144

Page 148: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44822

Cherokee County

BRS-SWAP-C018()--FF-18

On M 25, Over LITTLE MAPLE RIVER, 0.45 mile N of theintersection of C66 and M25 S25 T90 R39

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$540,000

$540,000

$540,000

$540,00045203

Ida County

BRS-SWAP-C047()--FF-47

On D 15, Over UNNAMED CREEK, from Ida/Sac W .04miles to Bridge S25 T89 R39

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,000

145

Page 149: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36643

Cherokee

STBG-SWAP-1272(628)--SG-18

In the city of Cherokee, On Euclid Avenue, from E SpruceStreet to E Bluff Street

Pavement Rehab

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$376,800

$268,800

$268,800

$376,800

$268,800

$268,80036642

Le Mars

STBG-SWAP-4257()--SG-75

In the city of Le Mars, On 12th Street SW, from CentralAvenue to 6th Avenue SW

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$700,200

$465,200

$465,200

$700,200

$465,200

$465,20035396

Le Mars

STBG-SWAP-4257(632)--SG-75

In the city of Le Mars, On Central Ave, from 12th St SE to5th St

Pavement Rehab

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$750,000

$600,000

$600,000

$750,000

$600,000

$600,00039094

Ida County

STBG-SWAP-C047()--FG-47

On D 50, from the intersection of Woodbury Ave and D50 E2 miles to the intersection of D50 and L51

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$1,130,000

$904,000

$904,000

$1,130,000

$904,000

$904,00037319

Monona County

STBG-SWAP-C067(92)--FG-67

On E16, from Mapleton East 5.5 Miles to Woodbury CountyLine

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,450,000

$1,160,000

$1,160,000

$1,450,000

$1,160,000

$1,160,00036249

Plymouth County

STBG-SWAP-C075(49-2023)--FG-75

On K49, from from C38 N 1mile, S27/28 T92 R45

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,244,000

$990,200

$990,200

$1,244,000

$990,200

$990,20045226

Le Mars

STBG-SWAP-4257()--SG-75

In the city of Le Mars, 7th Avenue E (K49) - 18th Street to24th Street

DOT Approved TotalFederal Aid

RegionalSwap

$782,000

$625,600

$625,600

$782,000

$625,600

$625,60047176

Cherokee

STBG-SWAP-1272()--SG-18

In the city of Cherokee, W Main Street from N. 11th Streetto N. 6th Street resurfacing

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$410,000

$328,000

$328,000

$410,000

$328,000

$328,00047178

Le Mars

STBG-SWAP-4257()--SG-75

In the city of Le Mars, 12th Street SE from 2nd Avenue SEto 7th Avenue SE (K49)

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$540,750

$432,600

$432,600

$540,750

$432,600

$432,600

146

Page 150: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

47089

Plymouth County

STBG-SWAP-C075(K-42)--FG-75

On K 42, from Hwy 3 N 6.71 miles to C-12

DOT Approved TotalFederal Aid

RegionalSwap

$3,875,100

$921,100

$921,100

$3,875,100

$921,100

$921,10045042

Woodbury County

STBG-SWAP-C097(K-42)--FG-97

On Dallas Ave/K42, from K45 north approx 5 miles to theeast intersection of D53/280th St.and K42.

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$3,000,000

$1,500,000

$1,500,000

$3,000,000

$1,500,000

$1,500,000

147

Page 151: Iowa Statewide Transportation Improvement Program

RPA 5 - Mid-Iowa Development Association Council of Governments

602 1st Avenue South, Fort Dodge, IA 50501

Phone: 515-576-7183, Fax: 515-576-7184, www.midascog.net

I

Pocahontas i---4 County i

I

I - ---------------1 I I

Calhoun

County

o,...1

....,..N ....... 5----,-1,...1

0 ---,----.-----.-,,. Mi:7

Webster

County

Wright

County

�orts � Commercial

El Enhanced

General Service

Basic Service

El Local Service Transit rel Regional

[el Large Urban

rel Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

- Interstate

- National Highway System

- Primary Roads

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

148

Page 152: Iowa Statewide Transportation Improvement Program

149

Page 153: Iowa Statewide Transportation Improvement Program

RPA 5ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

41363

Hamilton County

ILL-C040(104)--92-40

On R 75, Over CC RR, S27 T89 R23

Bridge Replacement

DOT Approved

7/18/2023

TotalFederal Aid

RegionalSwap

$2,800,000 $2,800,000

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39372

Iowa Department ofTransportation

22099

BRF-926()--38-94

IA926: BUSINESS US 20 OVER DES MOINES RIVER ANDB AVE 1.3 MI N OF S JCT US 169 (WB)

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$12,000 $5,849,000$4,679,200

$5,861,000$4,679,200

39373

Iowa Department ofTransportation

22101

BRF-926()--38-94

IA926: BUSINESS US 20 OVER CN RR AND 7TH ST 1.5MI N OF S JCT US 169 (WB)

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$12,000 $9,103,000$7,282,400

$9,115,000$7,282,400

45356

Iowa Department ofTransportation

22100

BRF-3()--38-76

IA3: BIG CEDAR CREEK 6.3 MI W OF IA 4

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,206,000$964,800

$1,206,000$964,800

150

Page 154: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38054

Iowa Department ofTransportation

BRFN-17()--39-99

IA17: PRAIRIE CREEK 0.9 MI N OF CO RD C26

Bridge Replacement, Wetland Mitigation, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$2,279,000 $2,279,000

38041

Iowa Department ofTransportation

BRFN-7()--39-94

IA7: NORTH LIZARD CREEK 0.5 MI W OF US 169

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$813,000 $813,000

48570

Iowa Department ofTransportation

BRFN-926()--39-94

IA926: DES MOINES RIVER 0.6 MI S OF N JCT US 169 INFORT DODGE

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$1,150,000 $1,150,000

38299

Iowa Department ofTransportation

IMN-69()--0E-99

US69: N OF UP RR TO N JCT CO RD C20

Wetland Mitigation

DOT Approved TotalFederal Aid

RegionalSwap

$105,000 $105,000

48548

Iowa Department ofTransportation

NHSN-169()--2R-94

US169: CN RR 0.5 MI S OF IA 7 IN FORT DODGE

Slope Improvement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000 $400,000

48474

Iowa Department ofTransportation

STPN-175()--2J-40

IA175: US 69 IN JEWELL TO 0.2 MI W OF DELPHI INELLSWORTH

DOT Approved TotalFederal Aid

RegionalSwap

$1,288,000 $1,288,000

39258

Iowa Department ofTransportation

BRFN-169()--39-46

US169: TRULNER CREEK 0.2 MI S OF CO RD C20

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$505,000 $505,000

39375

Iowa Department ofTransportation

BRFN-20()--39-94

US20: CO RD D20 AND UP RR 0.4 MI E OF CO RD D36(EB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,348,000 $1,348,000

39389

Iowa Department ofTransportation

BRFN-69()--39-99

US69: DRAINAGE DITCH 5 3.7 MI S OF IA 3

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$730,000 $730,000

151

Page 155: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39374

Iowa Department ofTransportation

BRFN-7()--39-94

IA7: SOUTH LIZARD CREEK 0.8 MI E OF W JCT CO RDP29

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$634,000 $634,000

45422

Iowa Department ofTransportation

STPN-35()--2J-40

I-35: S OF US 20

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$20,000 $20,000

45326

Iowa Department ofTransportation

BRFN-175()--39-13

IA175: HARDIN CREEK 0.7 MI W OF CO RD P21

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$437,000 $437,000

48441

Iowa Department ofTransportation

BRFN-175()--39-13

IA175: PRAIRIE CREEK 3.0 MI E OF CO RD N28

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$420,000 $420,000

48462

Iowa Department ofTransportation

BRFN-175()--39-13

IA175: LAKE CREEK 2.0 MI W OF CO RD N37

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$510,000 $510,000

48425

Iowa Department ofTransportation

BRFN-175()--39-94

IA175: DITCH #52 0.8 MI E OF CO RD P29

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$570,000 $570,000

48471

Iowa Department ofTransportation

BRFN-926()--39-94

IA926: BUSINESS US 20 OVER DES MOINES RIVER ANDB AVE 1.3 MI N OF S JCT US 169 IN FORT DODGE (EB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$200,000 $200,000

48563

Iowa Department ofTransportation

BRFN-926()--39-94

IA926: BUSINESS US 20 OVER CN RR AND 7TH ST 1.5MI N OF S JCT US 169 IN FORT DODGE (EB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$250,000 $250,000

48461

Iowa Department ofTransportation

IMN-35()--0E-40

I-35: IA 175 INTERCHANGE (NB/SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$500,000 $500,000

152

Page 156: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

280

RPA 5

22294

RGPL-PA05()--ST-94

MIDAS - RPA 5: RPA 5 TRANSPORTATION PLANNING

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$40,000$32,000

$32,000

$43,750$35,000

$35,000

$43,750$35,000

$35,000

$127,500$102,000

$102,000

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38367

Humboldt

22384

TAP-R-3595(609)--8T-46

In the city of Humboldt, On trail from east of eagle ridgedrive east and trail extension in park

Ped/Bike Structures

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$1,370,227$954,181

$954,181

$1,370,227$954,181

$954,181

45489

Hamilton CountyConservation Board

22385

TAP-R-C040()--8T-40

Construct 2 identical observation decks on both side of theexisting JewEllsworth Trail to include benches.

Ped/Bike Miscellaneous

FHWA Approved TotalFederal Aid

RegionalSwap

$103,681$82,160

$82,160

$103,681$82,160

$82,160

48685

Fort Dodge

22386

TAP-U-2690()--8I-94

In the city of Fort Dodge, On N 22ND ST

Ped/Bike Structures

FHWA Approved TotalFederal Aid

RegionalSwap

$680,000$500,000

$500,000

$680,000$500,000

$500,000

153

Page 157: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36996

Fort Dodge

BROS-SWAP-2690(631)--SE-94

On HIGHLAND PARK AVE, Over OVER UP RR, S29 T89R28

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,200,000

$1,000,000

$1,200,000

$1,000,00037728

Calhoun County

BROS-SWAP-C013()--FE-13

On 310th Street (D46), Over Drainage Ditch, from N.W.Cor. Sec.23 East 0.2 Miles, along NLINE S23 T87N R31W

Bridge Replacement

DOT Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$250,000

$249,000

$250,000

$249,00020429

Hamilton County

BROS-SWAP-C040(102)--SE-40

On XIRCUS AVE, Over Long Dick Creek, S22 T86 R23

Bridge Replacement

DOT Approved

7/20/2021

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00026825

Hamilton County

BROS-SWAP-C040(103)--SE-40

On TOLLMAN AVE, Over TRIB TO SKUNK, S12 T86 R24

Bridge Replacement

DOT Approved

7/20/2021

TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00035219

Humboldt County

BROS-SWAP-C046(74)--SE-46

On Washington Ave., from NW corner Section 26 NorwayTwp S 0.6 miles S26 T91N R27W

Bridge Replacement

DOT Approved

1/20/2021

TotalFederal Aid

RegionalSwap

$125,000

$120,000

$125,000

$120,00027098

Humboldt County

BROS-SWAP-C046(82)--SE-46

On Lone Tree Road, Over Beaver Creek, from N cornerSW 0.8 miles S32 T91N R28W

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00047198

Calhoun County

BROS-SWAP-C076(70)--SE-76

On 160TH ST, Over SOUTH BRANCH LIZARD, from NWcorner Sec. 3 E 0.6 miles S3 T89 R31

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$249,000

$250,000

$249,00029480

Pocahontas County

BROS-SWAP-C076(70)--SE-76

On 160th St (Cal) / 640th St (Poc) Over South Br Lizard, S3T89 R31 (Cal) / S34 T90 R31 (Poc)

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$328,000

$325,000

$328,000

$325,00032250

Webster County

BROS-SWAP-C094(128)--FE-94

On D68, Over Lost Grove Creek, along NLINE S34 T86R29

Bridge Replacement

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,000

154

Page 158: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

47118

Wright County

BRS-SWAP-8550()--FF-99

In the city of Woolstock, On 330TH ST, Over EAGLECREEK, S31 T90 R25

DOT Approved TotalFederal Aid

RegionalSwap

$1,250,000

$1,250,000

$1,250,000

$1,250,00047062

Pocahontas County

BRS-SWAP-C076(73)--FF-76

On C 49, Over LIZARD CK DD #53, S31 T91 R31

Bridge New-CCS

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$685,000

$680,000

$685,000

$680,00037044

Wright County

BRS-SWAP-C099(100)--FF-99

On R75, Over Sheldon Creek, at Ctr S27 T90 R23

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00029443

Calhoun County

BROS-SWAP-C013()--SE-13

On 160th St., Over DD181 Big Cedar Creek, from NEcorner of Sec. 4 West 0.4 Miles, on NLINE S04 T89 R34

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$325,000

$324,000

$325,000

$324,00036486

Hamilton County

BROS-SWAP-C040()--SE-40

On 350TH ST, Over BRANCH OF D.D. JOHNSON NO. 9,S10 T86 R26

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$175,000

$175,000

$175,000

$175,00037344

Hamilton County

BROS-SWAP-C040()--SE-40

On 390th St., Over SQUAW CREEK, NW S32 T86 R25

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$550,000

$550,000

$550,000

$550,00038558

Humboldt County

BROS-SWAP-C046()--SE-46

On HAWAII AVENUE, Over DD HK JT2, from NWCORNER S 0.8 miles S8 T93N R29

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$275,000

$270,000

$275,000

$270,00035340

Pocahontas County

BROS-SWAP-C076()--SE-76

On 470TH ST, Over CROOKED CREEK, S9 T92 R31

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$503,000

$500,000

$503,000

$500,00034320

Hamilton County

BRS-SWAP-C040()--FF-40

On R-75, from 180th Street North approximately 0.1 miles,S10, T89, R23

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,000

155

Page 159: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36518

Wright County

BRS-SWAP-C099()--FF-99

On R59, Over WHEELER CREEK, on WLINE S20 T91 R23

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00047211

Calhoun County

BHOS-SWAP-C013()--SB-13

On Eagle Ave, Over DD, from NW Cor. Sec. 11 S 0.6 milesS11 T89N R36W

DOT Approved TotalFederal Aid

RegionalSwap

$100,000

$99,000

$100,000

$99,00045102

Calhoun County

BROS-SWAP-C013()--SE-13

On 280TH ST, Over DD. NO 31, S6 T87 R31

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$399,000

$400,000

$399,00019451

Calhoun County

BROS-SWAP-C013(LO-2760)--SE-13

On 320TH ST, Over Purgatory Creek, from NW Cor Sec 27East 0.7 Miles, along NLINE S27 T87 R32

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$399,000

$400,000

$399,00038809

Hamilton County

BROS-SWAP-C040()--FE-40

On 250th St., Over Branch of South Skunk River (D.D. #4:Castner-Williams-Askland), in NW S23 T88N R24W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$175,000

$175,000

$175,000

$175,00038810

Hamilton County

BROS-SWAP-C040()--SE-40

On 260th St., Over Branch of South Skunk River, in NWS25 T88N R24W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$175,000

$175,000

$175,000

$175,00038715

Humboldt County

BROS-SWAP-C046()--SE-46

On Iowa Avenue, Over drainage ditch, from C49 S 0.7 milesto H. Web. Jt 1-10 Crossing S33 T91 R29

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$125,000

$120,000

$125,000

$120,00037779

Pocahontas County

BROS-SWAP-C076(S33Ced)--SE-76

On 640th St / 160Th St, Over BIG CEDAR CR DD 181,between S33 T90 R34 and S4 T89 R34

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$328,000

$325,000

$328,000

$325,00047216

Calhoun County

BROS-SWAP-C013()--FE-13

On Valley Ave, Over DD 83, from NW Cor. Sec. 17 E S11T87 N R31 W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$399,000

$400,000

$399,000

156

Page 160: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45103

Calhoun County

BROS-SWAP-C013()--SE-13

On 210TH ST, Over LAKE CREEK, S26 T89 R32

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$249,000

$250,000

$249,00012449

Calhoun County

BROS-SWAP-C013(78)--SE-13

On 380th Street , Over Purgatory Creek, from NW cornerof Sec. 30 E 0.7 miles S30 T86N R32W

Bridge Replacement

DOT Approved

6/20/2023

TotalFederal Aid

RegionalSwap

$380,000

$378,000

$380,000

$378,00037352

Hamilton County

BROS-SWAP-C040()--SE-40

On 310TH ST, Over Main Branch of Mud Lake DD #71, NWS21 T87 R24

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$425,000

$425,000

$425,000

$425,00044660

Webster County

BROS-SWAP-C094(971804)--FE-94

On P63 over Holiday Creek S18 T89 R27

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00038884

Wright County

BROS-SWAP-C099()--SE-99

On Taylor Ave, Over Luicks Creek, in S31 TT93N RR23W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00038701

Webster County

BRS-SWAP-C094(802009)--FF-94

On P29, Over DRAINAGE DITCH, along WLINE S20 T88NR30W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00037263

Webster County

BRS-SWAP-C094(900121)--FF-94

On P29 (Fairbanks Ave) over Lizard Creek S01 T89 R30

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$960,000

$960,000

$960,000

$960,00038690

Webster County

BRS-SWAP-C094(901213)--FF-94

On P29 (Fairbanks Ave) over W Branch Lizard Creek S12T89 R30

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$960,000

$960,000

$960,000

$960,000

157

Page 161: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38369

Fort Dodge

STBG-SWAP-2690(636)--SG-94

In the city of Fort Dodge, On 3rd Ave NW/Hawkeye Ave,from Northwest Des Moines River Bridge east to east of 6thSt NW

Miscellaneous

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$3,536,000

$1,900,000

$1,900,000

$3,536,000

$1,900,000

$1,900,000

47204

Calhoun County

STBG-SWAP-C013(D36)--FG-13

On 270th Street (D36), from East Corporate Line RockwellCity E 11 miles to Webster County Line

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$4,635,000

$1,000,000

$1,000,000

$4,635,000

$1,000,000

$1,000,00037777

Pocahontas County

STBG-SWAP-C076(C-49)--FG-76

On C-49, from the Buena Vista County line east 12 Miles toHwy 4

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,503,000

$1,500,000

$1,500,000

$2,503,000

$1,500,000

$1,500,00035186

Webster County

STBG-SWAP-C094(D14)--FG-94

On D14 (170th Street), from P56 (Nelson Avenue) east 8Miles to P71 (Vincent Avenue)

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$3,500,000

$3,050,000

$3,050,000

$3,500,000

$3,050,000

$3,050,00045488

Humboldt

STBG-SWAP-3595()--SG-46

Rehabilitation of Sumner Avenue from the intersection of13th St SW East to the Humboldt city limits.

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$900,000

$900,000

$900,000

$900,000

$900,000

$900,00045452

Thor

STBG-SWAP-7637()--SG-46

In the city of Thor: Dean St approx .25 miles east of P66

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$130,000

$130,000

$130,000

$130,000

$130,000

$130,00039045

Calhoun County

STBG-SWAP-C013()--FG-13

On N28 Dakota Ave, from Ia Hwy 175 North 11.5 Miles toD36 255th St.

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$5,000,000

$2,000,000

$2,000,000

$5,000,000

$2,000,000

$2,000,00038561

Humboldt County

STBG-SWAP-C046()--FG-46

On P66, from US Hwy 3 N 5.5 Miles to C26

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,400,000

$1,000,000

$1,000,000

$1,400,000

$1,000,000

$1,000,00048684

Webster City

STBG-SWAP-8212()--SG-40

In the city of Webster City, On Beach Street, from SecondStreet S .7 miles to 400' South of Ohio Street

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,180,000

$850,000

$850,000

$1,180,000

$850,000

$850,000

158

Page 162: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

47042

Wright County

STBG-SWAP-C099()--SG-99

On R33 and C54, from Hwy 3 South 5 miles then east 10miles to Hwy 69.

DOT Approved TotalFederal Aid

RegionalSwap

$2,200,000

$1,632,492

$1,632,492

$2,200,000

$1,632,492

$1,632,492

159

Page 163: Iowa Statewide Transportation Improvement Program

0 5 10

RPA 6 - Region 6 Resource Partners

903 East Main St, Suite A, Marshalltown, IA 50158

Phone: 641-752-0717, Fax: 641-752-9857, www.region6resources.org

(INRCOG)

Tama

County

______ § _____________ _

r

Dorts

Commercial

(I Enhanced

(I General Service

(I Basic Service

(I Local ServiceTransit

[el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

CE! Amtrak

I Park & Ride

- Interstate

- National Highway System

- Primary Roads

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1

L_ _ _J Counties

City Limits

Urban Area

160

Page 164: Iowa Statewide Transportation Improvement Program

161

Page 165: Iowa Statewide Transportation Improvement Program

RPA 6HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48438

Iowa Department ofTransportation

22022

HSIPX-330()--3L-64

IA330: N OF US 30 TO SCL OF ALBION

Pavement Widening

FHWA Approved TotalFederal Aid

RegionalSwap

$990,000$891,000

$990,000$891,000

162

Page 166: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38154

Iowa Department ofTransportation

22106

IM-NHS-80()--03-79

I-80: 1.0 MI W OF IA 146 TO 2.0 MI E OF IA 146

Grade and Pave, Bridge Replacement, Erosion Control

FHWA Approved TotalFederal Aid

RegionalSwap

$17,070,000$14,509,500

$328,000$278,800

$17,398,000$14,788,300

45389

Iowa Department ofTransportation

22107

IMX-80()--02-79

I-80: 1.0 MI E OF US 63 TO E OF IOWA CO

FHWA Approved TotalFederal Aid

RegionalSwap

$2,396,000$2,156,400

$2,396,000$2,156,400

48623

Iowa Department ofTransportation

22110

NHSX-14()--3H-64

IA14: IOWA RIVER BRIDGE IN MARSHALLTOWN TO CORD E18

Pavement Widening, Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$5,406,000$4,324,800

$5,406,000$4,324,800

DOT Note: Project includes NHPP and HSIP funds

38249

Iowa Department ofTransportation

22103

NHSX-30()--3H-86

US30: W OF IA 21 TO 11TH AVE DR

Grade and Pave, Bridge New, Culvert Replacement

FHWA Approved TotalFederal Aid

RegionalSwap

$16,412,000$13,129,600

$16,412,000$13,129,600

38250

Iowa Department ofTransportation

22104

NHSX-30()--3H-86

US30: TAMA BYPASS TO W OF IA 21

Culvert Extension, Grading, Erosion Control

FHWA Approved TotalFederal Aid

RegionalSwap

$5,122,000$4,097,600

$328,000$262,400

$5,450,000$4,360,000

48495

Iowa Department ofTransportation

22108

NHSX-63()--3H-86

US63: 0.5 MI S OF IA 96 TO SCL TRAER

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$4,501,000$3,600,800

$4,501,000$3,600,800

48522

Iowa Department ofTransportation

22109

NHSX-63()--3H-86

US63: N OF WOLFE CREEK IN TRAER TO 0.5 MI S OF IA58

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$6,200,000$4,960,000

$6,200,000$4,960,000

45341

Iowa Department ofTransportation

22105

NHSX-63()--3H-79

US63: W JCT US 6 TO SCL TAMA

Grade and Pave, Pavement Rehab, Erosion Control

FHWA Approved TotalFederal Aid

RegionalSwap

$10,820,000$8,656,000

$358,000$286,400

$11,178,000$8,942,400

163

Page 167: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48422

Iowa Department ofTransportation

22102

NHSX-63()--3H-86

US63: NCL TOLEDO TO N OF CO RD E29

Grade and Pave, Traffic Signs, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$20,000$16,000

$8,062,000$6,449,600

$8,082,000$6,465,600

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38015

Iowa Department ofTransportation

BRFN-6()--39-79

US6: ROCK CREEK 0.7 MI E OF W JCT IA 21

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$234,000 $234,000

48590

Iowa Department ofTransportation

STPN-146()--2J-79

IA146: 0.7 MI N OF NCL GRINNELL

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$152,000 $152,000

39360

Iowa Department ofTransportation

BRFN-63()--39-86

US63: WOLF CREEK 0.3 MI N OF IA 8 IN TRAER

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$822,000 $822,000

48460

Iowa Department ofTransportation

BRFN-65()--39-42

US65: UP RR 2.1 MI W OF IA 57

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$200,000 $200,000

RTP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48406

Marshalltown

22221

NRT-4797()--9G-64

In the city of Marshalltown, On Iowa River's Edge Trail,starting at Radio Tower Road and going Northwest 1.78miles

Grade and Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$375,000$300,000

$375,000$300,000

164

Page 168: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48519

Iowa Department ofTransportation

22296

STP-21()--2C-79

IA21: S OF I-80 TO US 6

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$1,800,000$1,440,000

$1,800,000$1,440,000

48532

Iowa Department ofTransportation

22297

STP-96()--2C-86

IA96: 0.4 MI W OF US 63 TO US 63

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$300,000$240,000

$300,000$240,000

319

RPA 6

22295

RGPL-PA06(RTP)--ST-00

RSPC - RPA 6: RPA 6 TRANSPORTATION PLANNING

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$25,000$20,000

$20,000

$25,000$20,000

$20,000

$25,000$20,000

$20,000

$75,000$60,000

$60,000

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35405

Grinnell

22387

TAP-U-3127()--8I-79

On Grinnell Trail, from SE corner of Industrial Ave & Ia Hwy146 south 1.21 Miles to NE corner of Stagecoach Rd

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$420,000$336,000

$336,000

$420,000$336,000

$336,000

DOT Note: Project eligible for FHWA TAP funding

34112

Marshalltown

22388

TAP-U-4797(625)--8I-64

In the city of Marshalltown, On Iowa River Trail, from Bridge#2 1 Miles to Bridge #5

Ped/Bike Structures

FHWA Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$683,750$547,000

$547,000

$683,750$547,000

$547,000

DOT Note: Project eligible for FHWA TAP funding

37613

Marshall County

22389

TAP-U-C064()--8I-64

Paving Bike Trail Int's at 233rd St,238th St,242nd St,250thSt, Jessup Av,265th St,Ingram Av,Hart Av,Glick Av

Ped/Bike Paving

FHWA Approved TotalFederal Aid

RegionalSwap

$180,000$144,000

$144,000

$180,000$144,000

$144,000

165

Page 169: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38364

Traer

BROS-SWAP-7710(604)--SE-86

In the city of Traer, On 1st Street, Over Coon Creek

Bridge Replacement

DOT Approved

9/21/2021

TotalFederal Aid

RegionalSwap

$740,000

$592,000

$740,000

$592,00045114

Marshall County

BROS-SWAP-C064()--SE-64

On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17

Culvert Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$125,000

$125,000

$125,000

$125,00045115

Marshall County

BROS-SWAP-C064()--SE-64

On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17

Culvert Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$125,000

$125,000

$125,000

$125,00045125

Tama County

BROS-SWAP-C064()--SE-86

On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17

DOT Approved TotalFederal Aid

RegionalSwap

$125,000

$125,000

$125,000

$125,00045127

Tama County

BROS-SWAP-C064()--SE-86

On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17

DOT Approved TotalFederal Aid

RegionalSwap

$125,000

$125,000

$125,000

$125,00012250

Marshall County

BROS-SWAP-C064(115)--SE-64

On JESSUP AVE, Over MINERVA CREEK, Near N 1/4corner of S3 T84 R19

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,300,000

$1,300,000

$1,300,000

$1,300,00013588

Poweshiek County

BROS-SWAP-C079(53)--FE-79

On 80th St., Over A Small Stream, S20 T81 R15

DOT Approved

8/17/2021

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00013586

Poweshiek County

BROS-SWAP-C079(57)--SE-79

On 370TH AVE, Over STONY CREEK, S10 T80 R14

Bridge Replacement

DOT Approved

8/17/2021

TotalFederal Aid

RegionalSwap

$950,000

$950,000

$950,000

$950,00035288

Tama County

BROS-SWAP-C086(102)--SE-86

On P AVE, Over NORTH WALNUT CREEK, from 400thStreet North 0.75 Miles, S33 T82 R14

Bridge Replacement

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$800,000

$800,000

$800,000

$800,000

166

Page 170: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45095

Tama County

BROS-SWAP-C086(103)--FE-86

On B AVE, Over SUGAR CREEK, S17 T84 R16

DOT Approved

8/17/2021

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00036418

Tama County

BROS-SWAP-C086(99)--SE-86

On K AVE, Over NORTH WALNUT CREEK, from 400th St.North 1500 Feet, S35 T82 R15

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00032615

Hardin County

BRS-SWAP-0077(601)--FF-42

In the city of Alden, On Main St. Alden, Over Iowa River, inS18 T89 R21

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,400,000

$1,000,000

$1,400,000

$1,000,00036262

Hardin County

BRS-SWAP-C042(108)--FF-42

On S57, Over Honey Creek, from 305th St. South 0.2 Miles,S15 T86 R20

Bridge Replacement

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00039040

Poweshiek County

BRS-SWAP-C079(64)--FF-79

On V18, Over Big Bear Creek, S14 T80N R14W

Bridge Replacement

DOT Approved

7/19/2022

TotalFederal Aid

RegionalSwap

$1,200,000

$1,200,000

$1,200,000

$1,200,00037808

Poweshiek County

BHS-SWAP-C079(62)--FC-79

On F57, Over BUCK CREEK, S8 T78 R15

Bridge Rehabilitation

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00039003

Hardin County

BROS-SWAP-C042()--FE-42

On T Avenue, Over HONEY CREEK, S30 T86N R19

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00035995

Marshall County

BROS-SWAP-C064()--FE-64

On 1000 mile of Gerhart Ave, Over Mud Creek, in NW S6T85 R19

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00021779

Marshall County

BROS-SWAP-C064()--SE-64

On 140TH ST, Over MINERVA CREEK, from Durham AveE 0.02 miles S27 T85 R20

Bridge Replacement

DOT Approved

2/21/2023

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,000

167

Page 171: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

34679

Poweshiek County

BROS-SWAP-C079()--FE-79

On 520TH AVE, Near the NW Corner of S28 T78N R13W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00034677

Poweshiek County

BROS-SWAP-C079()--SE-79

On 155TH ST, Over Dugout Creek, S16 T79 R14

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00039070

Tama County

BROS-SWAP-C086()--FE-86

On G Avenue, Near the W 1/4 Corner of S24 T84N R16W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00029486

Poweshiek County

BRS-SWAP-C079()--FF-79

On F29, Over Small Stream, S23 T80 R13

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00039065

Tama County

BRS-SWAP-C086()--FF-86

On E 44, Over TROUBLESOME CREEK, S14 T83N R13W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00033877

Tama County

BRS-SWAP-C086()--FF-86

On Business 30, Over Deer Creek, S21 T83 R15

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,0009136

Marshall County

BROS-SWAP-C064()--SE-64

On 3100 MILE OF WALLACE AVE, Over Brush Creek, from310th St S 0.9 miles S22 T82 R17

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00035994

Marshall County

BROS-SWAP-C064()--SE-64

On 1000 mile of Langford Ave, Over Dowd Creek, S1 T85R19

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00045106

Poweshiek County

BROS-SWAP-C079()--SE-79

On 460TH AVE, Over BUCK CREEK, S27 T79 R16

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,000

168

Page 172: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45107

Poweshiek County

BROS-SWAP-C079()--SE-79

On 100TH ST, Over N ENGLISH RIVER, S15 T79 R15

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00029489

Poweshiek County

BROS-SWAP-C079(56)--SE-79

On 140th Street, Over Walnut Creek, S17 T81 R14

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00045092

Tama County

BROS-SWAP-C086()--FE-86

On S AVE, Over BRANCH WOLF CREEK, S6 T85 R13

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00039072

Tama County

BROS-SWAP-C086()--SE-86

On 220th Street, Over SIMPSON CREEK, S6 T84N R13

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00039068

Tama County

BROS-SWAP-C086()--SE-86

On E Avenue, Over BRANCH WOLF CREEK, S26 T86NR16W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00039069

Tama County

BROS-SWAP-C086()--SE-86

On F Avenue, Over BRANCH WOLF CREEK, S25 T86NR16W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00039071

Tama County

BROS-SWAP-C086()--SE-86

On P Avenue, Over BRANCH COON CREEK, S15 T85NR14W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00032544

Hardin County

BRS-SWAP-C042(16075)--FF-42

On S62, Over Small Stream, from D55 South 0.5 Miles, inSE S5 T86 R19

Culvert Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$275,000

$275,000

$275,000

$275,00039004

Hardin County

BROS-SWAP-C042(5139)--FE-42

On H Avenue, Over SOUTH FORK IOWA RIVER, alongWLINE S18 T88N R21W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,000

169

Page 173: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35992

Marshall County

BROS-SWAP-C064()--FE-64

On 2900 mile of Oaks Ave, Over South Timber Creek, atSW S9 T82 R18

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00032257

Marshall County

BROS-SWAP-C064()--SE-64

On 2900 Mile of Taylor Ave, Over Snipe Creek, S7 T82 R17

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,0005500

Marshall County

BROS-SWAP-C064(86)--SE-64

On Taylor Ave., Over Lutes Creek, from 300th St N 0.14miles S7 T82 R17

Bridge Replacement

DOT Approved

12/19/2023

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00045096

Tama County

BROS-SWAP-C086()--SE-86

On II AVE, Over RICHLAND CREEK, S21 T82 R15

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,000

170

Page 174: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35412

Ackley

STBG-SWAP-0015()--SG-42

In the city of Ackley, On Butler Street, from 3rd Ave north .3Miles to Park Avenue

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$125,000

$100,000

$100,000

$125,000

$100,000

$100,00038915

Marshall County

STBG-SWAP-C064()--FG-64

On E63, from Story Co Line E 5 miles to IA Hwy 330

Pavement Rehab

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,800,000

$1,500,000

$1,500,000

$1,800,000

$1,500,000

$1,500,00045044

Tama County

STBG-SWAP-C086()--FG-86

On T47, from E27 to IA96

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$2,500,000

$1,000,000

$1,000,000

$2,500,000

$1,000,000

$1,000,00045060

Alden

STBG-SWAP-0077()--SG-42

On Main Street, Over from D20 NE .53 miles to Iowa RiverBridge S18 T89 R21

DOT Approved TotalFederal Aid

RegionalSwap

$198,000

$198,000

$198,000

$198,000

$198,000

$198,00045064

Marshalltown

STBG-SWAP-4797()--SG-64

On HIGHLAND ACRES RD, from Lincoln Way 1.2 miles toMain Street S5 T83 R18

DOT Approved TotalFederal Aid

RegionalSwap

$4,875,000

$3,900,000

$3,900,000

$4,875,000

$3,900,000

$3,900,00038882

Marshall County

STBG-SWAP-C064()--FG-64

On E 29, from Story Co Line E 7.5 miles to Hopkins Ave

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,250,000

$1,000,000

$1,000,000

$2,250,000

$1,000,000

$1,000,00045899

Poweshiek County

STBG-SWAP-C079()--FG-79

On F29, from IA21 E to V36

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000

$1,200,000

$1,200,000

$1,500,000

$1,200,000

$1,200,000

171

Page 175: Iowa Statewide Transportation Improvement Program

0

Butler County

RPA 7 - Iowa Northland Regional Transportation Authority

229 East Park Avenue, Waterloo, IA 50703

Phone: 319-235-0311, Fax: 319-235-2891, www.inrcog.org

Chickasa� s3

County\

l �.,.I � Commercial

�--_,...,;;;;..._,�-�---;r,--:at\� El Enhanced

El General Service

El Basic Service

El Local Service

Transit

Buchanan County

--+

[el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

- Interstate

- National Highway System

- Primary Roads

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Area

r--1

L_ _ _J Counties

City Limits

Urban Area

172

Page 176: Iowa Statewide Transportation Improvement Program

173

Page 177: Iowa Statewide Transportation Improvement Program

RPA 7ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

34610

Buchanan County

ILL-C010()--92-10

On V62, Over WAPSIPINICON RIVER, from D-16 north 0.5Miles to Bridge

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$3,000,000 $3,000,000

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38159

Iowa Department ofTransportation

22111

IMX-380()--02-7

I-380: BUCHANAN CO TO 0.2 MI S OF E JCT US 20 (SB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$7,211,000$6,489,900

$7,211,000$6,489,900

39180

Iowa Department ofTransportation

22112

NHSX-218()--3H-9

US218: CEDAR RIVER IN JANESVILLE TO IA 116 INWAVERLY

Grade and Pave, Bridge Replacement, Grading

FHWA Approved TotalFederal Aid

RegionalSwap

$5,650,000$4,520,000

$14,214,000$11,371,200

$21,894,000$17,515,200

$41,758,000$33,406,400

39177

Iowa Department ofTransportation

22114

BRF-3()--38-9

IA3: CEDAR RIVER 3.7 MI E OF US 218 IN WAVERLY

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$7,672,000$6,137,600

$7,672,000$6,137,600

45383

Iowa Department ofTransportation

22113

BRF-14()--38-38

IA14: BLACK HAWK CREEK 1.5 MI S OF S JCT CO RDD35

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,442,000$1,953,600

$2,442,000$1,953,600

174

Page 178: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37890

Iowa Department ofTransportation

BRFN-188()--39-12

IA188: STREAM 1.9 MI N OF CO RD C33

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$235,000 $235,000

45357

Iowa Department ofTransportation

BRFN-18()--39-19

US18: WINTERS LAKE OVERFLOW 2.9 MI E OF CO RDT76

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $1,695,000 $1,700,000

45291

Iowa Department ofTransportation

BRFN-218()--39-7

US218: MUD CREEK 0.9 MI N OF CO RD D46

Bridge Deck Overlay, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$2,000 $1,075,000 $1,077,000

45363

Iowa Department ofTransportation

BRFN-3()--39-12

IA3: HARTGRAVES CREEK OVERFLOW 0.5 MI W OF CORD T16

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $1,059,000 $1,064,000

39184

Iowa Department ofTransportation

BRFN-57()--39-12

IA57: DITCH 2.1 MI E OF E JCT IA 14

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,460,000 $1,460,000

37889

Iowa Department ofTransportation

BRFN-57()--39-12

IA57: GRAN CREEK 0.5 MI E OF CO RD T19

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$751,000 $751,000

45360

Iowa Department ofTransportation

BRFN-63()--39-9

US63: CRANE CREEK 1.5 MI S OF IA 188 (SB)

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $3,602,000 $3,607,000

45317

Iowa Department ofTransportation

BRFN-20()--39-10

US20: IA 150 INTERCHANGE IN INDEPENDENCE (EB &WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$552,000 $552,000

45292

Iowa Department ofTransportation

BRFN-20()--39-10

US20: CO RD W45 3.4 MI W OF IA 187

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$851,000 $851,000

175

Page 179: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45297

Iowa Department ofTransportation

BRFN-20()--39-10

US20: WAPSIPINICON RIVER 1.5 MI E OF IA 150 (EB &WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$629,000 $629,000

48556

Iowa Department ofTransportation

IMN-380()--0E-10

I-380: NB WEIGH STATION 1.5 MI N OF CO RD D48

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,050,000 $1,050,000

48569

Iowa Department ofTransportation

BRFN-14()--39-12

IA14: STREAM 1.0 MI N OF CO RD C23

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$570,000 $570,000

48632

Iowa Department ofTransportation

BRFN-14()--39-38

IA14: WOLF CREEK 0.8 MI N FO CO RD D67

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,031,000 $1,031,000

48631

Iowa Department ofTransportation

BRFN-175()--39-38

IA175: MUNNS CREEK 0.8 MI E OF CO RD T47

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$806,000 $806,000

48458

Iowa Department ofTransportation

BRFN-18()--39-19

US18: WAPSIPINICON RIVER 0.1 MI E OF CO RD V14

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$930,000 $930,000

48554

Iowa Department ofTransportation

IMN-380()--0E-10

I-380: SB WEIGH STATION 3.5 MI N OF CO RD D48

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,097,000 $1,097,000

176

Page 180: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

1403

RPA 7

22298

RGPL--PA07(RTP)--ST-00

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$50,000$40,000

$40,000

$50,000$40,000

$40,000

$50,000$40,000

$40,000

$50,000$40,000

$40,000

$200,000$160,000

$160,000

45058

RPA 7

22300

RGTR-PA07()--ST-00

Replace one light duty bus

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$85,000$68,000

$68,000

$85,000$68,000

$68,000

20948

RPA 7

22299

STP-U-PA07()--70-10

On IA 150, from I-380 north 28 Miles to Oelwein city limits

Planning Study

FHWA Approved TotalFederal Aid

RegionalSwap

$200,000$100,000

$100,000

$200,000$100,000

$100,000

PA Note: Planning Study

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39128

Waverly

22390

TAP-U-8190(638)--8I-09

In the city of Waverly, On 10th Ave SW, from Heritage Wayeast 0.5 Miles to 16th St SW

Ped/Bike Grade &amp; Pave

FHWA Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$235,000$184,000

$184,000

$235,000$184,000

$184,000

48383

Black Hawk CountyConservation Board

22391

TAP-U-C007()--8I-07

On Cedar Valley Nature Trail, Over Miller Creek, from MillerCreek Rd S 0.2 miles to structure S3 T87 R12

Bridge Rehabilitation

FHWA Approved TotalFederal Aid

RegionalSwap

$282,286$210,000

$210,000

$282,286$210,000

$210,000

45024

Buchanan County

22392

TAP-U-C010()--8I-10

On Taylor's Ford Bridge, Over WAPSIPINICON RIVER,from 262nd St 0.8 miles to structure S32 T88 R08

Historic Preservation, Ped/Bike Structures

FHWA Approved TotalFederal Aid

RegionalSwap

$350,000$184,000

$184,000

$350,000$184,000

$184,000

177

Page 181: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

20207

Butler County

BHS-SWAP-C012(P05T10)--FC-12

On T55, Over WEST FORK CEDAR RIVER, from 280thStreet South 2600 Feet to Bridge

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00033908

Sumner

BROS-SWAP-7490(601)--SE-09

In the city of Sumner, On 3rd St, Over Drainage, from NDivision St west 0.1 miles to bridge

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$773,000

$773,000

$773,000

$773,0008508

Bremer County

BROS-SWAP-C009(53)--SE-9

On KILLDEER AVE, Over QUARTER SECTION RUN, S35T91 R13

Bridge Replacement

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$575,000

$575,000

$575,000

$575,0009951

Bremer County

BROS-SWAP-C009(87)--SE-9

On MIDWAY AVE, Over CRANE CREEK, S7 T92 R12

Bridge Replacement

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00036522

Chickasaw County

BROS-SWAP-C019(107)--FE-19

On KENWOOD AVE, Over EAST WAPSIPINICON RIVER,on WLINE S24 T96 R13

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00045072

Grundy County

BROS-SWAP-C038(122)--SE-38

On 160TH ST, Over SOUTH FORK BEAVER CREEK, fromI Ave W 0.1 miles S6 T88 R17

Bridge Replacement

DOT Approved

10/19/2021

TotalFederal Aid

RegionalSwap

$880,000

$880,000

$880,000

$880,00030990

Butler County

BRS-SWAP-C012(113)--FF-12

On T55, Over OVERFLOW W FORK CEDAR RIV, from280th Street South 1800 Feet to Bridge

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,250,000

$1,250,000

$1,250,000

$1,250,00045079

Grundy County

BRS-SWAP-C038(126)--FF-38

On T 47, Over MOSQUITO CREEK, from Tama Rd N 0.2miles S33 T87 R16

Culvert Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$301,000

$300,000

$301,000

$300,00032354

Grundy County

BHOS-SWAP-C038()--FB-38

On T37, Over Minnehaha Creek, S13 T87 R17

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,000

178

Page 182: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37170

Butler County

BHS-SWAP-C012(K08W10)--FC-12

On T25, Over WEST FORK CEDAR RIVER, from 245thStreet N 0.7 miles to Bridge

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00048694

Sumner

BROS-SWAP-7490()--SE-09

In the city of Sumner, On S DIVISION ST, Over LITTLEWAPSIPINICON RIVER, from IA 93 S 0.3 miles to structure

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,361,000

$1,000,000

$1,361,000

$1,000,000PA Note: Updated funding type from BHOS to BROS

12749

Butler County

BROS-SWAP-C012(B30W10)--SE-12

On MARSH AVE, from 135th St. S 0.7 miles to Bridge

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00040191

Butler County

BROS-SWAP-C012(K22W30)--SE-12

On JAY AVE, Over SMALL STREAM, from 260th Street N0.6 miles to Bridge

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00037171

Butler County

BROS-SWAP-C012(M28W10)--SE-12

On CEDAR AVE, Over BEAVER CREEK, from 335th StreetN 0.6 miles to Bridge

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00037708

Chickasaw County

BROS-SWAP-C019()--SE-19

On ODESSA AVE, Over EAST WAPSIPINICON RIVER, atS1/4 S9 T95 R12

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,100,000

$1,100,000

$1,100,000

$1,100,00037709

Chickasaw County

BROS-SWAP-C019()--SE-19

On 180TH ST, Over CRANE CREEK RIVER, S32 T96 R11

Bridge Replacement

DOT Approved

1/18/2023

TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,00032326

Grundy County

BROS-SWAP-C038(125)--SE-38

On R Ave, Over the North Fork of Black Hawk Creek, NWS36 T89 R16

Bridge Replacement

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00044898

Black Hawk County

BRS-SWAP-C007(XXX)--FF-07

On Poyner Rd (D38), Over INDIAN CREEK, S25 T88 R12

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$650,000

$650,000

$650,000

$650,000

179

Page 183: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38994

Bremer County

BRS-SWAP-C009()--FF-09

On C50, Over CRANE CREEK, S21 TT91N RR12

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,00027164

Bremer County

BROS-SWAP-C009(L-9-118)--SE-09

On 240TH ST, Over CREEK, S17 T91 R14

Bridge Replacement

DOT Approved

7/23/2018

TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00037121

Buchanan County

BROS-SWAP-C010()--SE-10

On 150TH ST, Over OTTER CR, from Indiana Ave. west0.1 Miles to Bridge, S32 T90 R09

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$990,000

$990,000

$990,000

$990,00044774

Butler County

BROS-SWAP-C012(C14T10)--SE-12

On KIPLING AVE, Over COLD WATER CREEK, from 120thStreet S 0.15 miles to Bridge

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00036307

Butler County

BROS-SWAP-C012(H03N10)--SE-12

On 160 ST, Over STREAM, from Vail Ave E 0.2 miles toBridge

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00038951

Chickasaw County

BROS-SWAP-C033()--FE-33

On York Avenue, Over SMALL STREAM, on WLINE S31T94N R10W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00036646

Grundy County

BROS-SWAP-C038()--SE-38

On 280TH ST, Over Creek, from the Hardin Co. line east0.3 Miles to a un-named stream, N1/4 S6 T86 R18

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$275,000

$275,000

$275,000

$275,00036648

Grundy County

BROS-SWAP-C038(C13)--SE-38

On G AVE, Over N FORK OF BEAVER CREEK, from 140thSt north 0.5 Miles to the North fork of Beaver Creek, S19T89 R17

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$625,000

$625,000

$625,000

$625,000

37697

Grundy County

BROS-SWAP-C038(D10)--SE-38

On 120TH ST, Over MIDDLE FORK BEAVER CREEK, S18T89 R18

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$395,000

$395,000

$395,000

$395,000

180

Page 184: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

34854

Grundy County

BROS-SWAP-C038(K02)--SE-38

On 225TH ST, Over BRANCH BLACKHAWK CREEK, fromL Ave west 0.4 Miles to K-2, at Ctr S3 T87 R17

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$675,000

$675,000

$675,000

$675,00037463

Black Hawk County

BRS-SWAP-C007(XXX)--FF-07

On Eagle Road (D46), Over MILLER CREEK, on NLINES24 T87 R13

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$675,000

$675,000

$675,000

$675,00038950

Chickasaw County

BRS-SWAP-C019()--FF-19

On B28 (140th Street), Over LITTLE WAPSIPINICONRIVER, on SLINE S6 T96N R13W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,400,000

$1,400,000

$1,400,000

$1,400,00037127

Buchanan County

BRM-SWAP-0807()--SD-10

On D48, Over LIME CREEK, from Brandon East .25 Milesto Lime Creek Bridge, S27 T87 R10

DOT Approved TotalFederal Aid

RegionalSwap

$1,525,000

$1,525,000

$1,525,000

$1,525,00044621

Bremer County

BROS-SWAP-C009(L-3-125)--FE-09

On 310TH ST, Over E.FK WAPSIPINICON RIVER, S3 T93R12

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00015384

Butler County

BROS-SWAP-C012(M19W10)--SE-12

On Franklin Ave., Over SMALL STREAM, from 320th St. N0.4 miles to Bridge

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00044608

Butler County

BROS-SWAP-C012(M7W10)--SE-12

On FRANKLIN AVE, Over SMALL STREAM, from 300th STN 0.2 miles to Bridge

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00037174

Butler County

BROS-SWAP-C012(N03W10)--SE-12

On JAY AVE, Over SMALL STREAM, from 290th Street N0.5 miles to Bridge

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00040184

Butler County

BROS-SWAP-C012(N24W10)--SE-12

On LIBERTY AVE, Over BEAVER CREEK, 0.2 miles toBridge

DOT Approved TotalFederal Aid

RegionalSwap

$900,000

$900,000

$900,000

$900,000

181

Page 185: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44927

Chickasaw County

BROS-SWAP-C019()--FE-19

On 310TH ST, Over E.FK WAPSIPINICON RIVER, S34T94N R12W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00019177

Grundy County

BROS-SWAP-C038(C5)--SE-38

I Ave: From 120th St north 1/8mi to an un-named stream

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00037703

Grundy County

BROS-SWAP-C038(E01)--SE-38

On 160TH St from H Ave east 0.3mi to the South Fork ofBeaver Creek, near the N1/4 S1 T88 R18

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$975,000

$975,000

$975,000

$975,00036649

Grundy County

BROS-SWAP-C038(G10)--SE-38

On P AVE, Over BLACK HAWK CREEK, from D25 north 0.9Miles to to Black Hawk Creek, S16 T88 R16

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00036650

Grundy County

BROS-SWAP-C038(H11)--SE-38

On T AVE, Over BRANCH BLACK HAWK CREEK, S18 T88R15

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$525,000

$525,000

$525,000

$525,000

182

Page 186: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37826

Readlyn

STBG-SWAP-6345()--SG-09

In the city of Readlyn, On Main St, from 4th St south 0.22Miles to 1st St

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,061,000

$531,000

$531,000

$1,061,000

$531,000

$531,00034783

Black Hawk County

STBG-SWAP-C007(165)--FG-07

On D46 Eagle Road, from V37 Dysart Road East to Hwy218

Pavement Rehab

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$1,400,000

$800,000

$800,000

$1,400,000

$800,000

$800,00034434

Butler County

STBG-SWAP-C012(121)--FG-12

On T47 from Hwy 57 N 12 miles to Hwy 3

Pavement Rehab

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$2,975,000

$1,000,000

$1,000,000

$2,975,000

$1,000,000

$1,000,00039131

Janesville

STBG-SWAP-3792(602)--SG-09

In the city of Janesville, On 7th St, Over Cedar River, fromMain St West 0.1 Miles to Bridge

Bridge Replacement

DOT Approved

10/18/2022

TotalFederal Aid

RegionalSwap

$5,700,000

$500,000

$1,500,000

$5,700,000

$500,000

$1,500,000PA Note: Project includes $2M from the Iowa DOT as programmed in TPMS 39180

39132

Nashua

STBG-SWAP-5375()--SG-19

In the city of Nashua, On Greeley St, from Panama StSouth 0.35 Miles to 0.1 mi S of Livingston St

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,301,000

$500,000

$500,000

$1,301,000

$500,000

$500,00035024

Bremer County

STBG-SWAP-C009(L-10-121)--FG-09

On C50, from East Corporate Limits of Janesville East 3.5Miles to V25

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$900,000

$600,000

$600,000

$900,000

$600,000

$600,00034855

Grundy County

STBG-SWAP-C038()--FG-38

On D67, from IA 14 W 5 miles to the county line

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,925,000

$819,000

$819,000

$1,925,000

$819,000

$819,00040124

Buchanan County

STBG-SWAP-C010()--FG-10

On W35, from D22 to Quasqueton

DOT Approved TotalFederal Aid

RegionalSwap

$3,150,000

$1,721,000

$1,721,000

$3,150,000

$1,721,000

$1,721,00036494

Chickasaw County

STBG-SWAP-C019()--FG-19

V18 from Highway 18 N 8.5 miles to South City Limits of AltaVista

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$3,300,000

$1,147,000

$1,147,000

$3,300,000

$1,147,000

$1,147,000

183

Page 187: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44769

Butler County

STBG-SWAP-C012(T16 Dumont)--FG-12

On T16, from Hwy 3 N 6 miles to C23

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000

$800,000

$800,000

$1,500,000

$800,000

$800,00047063

Grundy County

STBG-SWAP-C038(T47)--FG-38

On T 47, from Marshall County N 3.9 miles to IA175 S3 T86R16

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,200,000

$800,000

$800,000

$1,200,000

$800,000

$800,00048385

RPA 7

STBG-SWAP-PA07()--SG-07

On US 218, from La Porte City limits N 5.7 miles to SchrockRd

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$962,500

$770,000

$770,000

$962,500

$770,000

$770,000PA Note: RPA contribution to Iowa DOT project

184

Page 188: Iowa Statewide Transportation Improvement Program

(

RPA 8 - Regional Planning Affiliation 8

7600 Commerce Park, Dubuque, IA 52002

Phone: 563-556-4166, Fax: 563-556-0348, www.eciatrans.org

Delaware 38

County

-+

10 20Miles --i_

Jackson

County

Air orts

Commercial

El Enhanced

- Interstate

- National Highway System

- Primary Roads

El General Service Local Roads

El Basic Service - Ramps

El Local Service - Trails

Transit

[el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Area

r--1

L_ _ _J Counties

City Limits

Urban Area

185

Page 189: Iowa Statewide Transportation Improvement Program

186

Page 190: Iowa Statewide Transportation Improvement Program

RPA 8DEMO

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44681

Clinton County

22010

HDP-C023(124)--6B-23

On 220th Street, from Y-70 to Z-24 double chip seal withmicrosurface

FHWA Approved

8/17/2021

TotalFederal Aid

RegionalSwap

$550,000$440,000

$550,000$440,000

PA Note: Project awarded AID Demonstration funds

ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48370

De Witt

ILL-1855()--93-23

In the city of De Witt, INDUSTRIAL STREET EXTENSION

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$4,351,500 $4,351,500

48369

Dyersville

ILL-2160()--93-31

In the city of Dyersville, On 1ST ST SW, Over SMALLSTREAM

Pavement Widening, Bridge New

DOT Approved TotalFederal Aid

RegionalSwap

$19,900,000 $19,900,000

36188

Clinton County

ILL-C023()--92-23

On Y-68 over Wapsi backwater,S31,T81,R4E

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,375,000 $1,375,000

187

Page 191: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37916

Iowa Department ofTransportation

22120

BRF-30()--38-23

US30: UP RR 5.8 MI E OF S JCT US 61 (EB & WB)

Bridge Deck Overlay

FHWA Approved TotalFederal Aid

RegionalSwap

$2,158,000$1,726,400

$2,158,000$1,726,400

DOT Note: Project includes repurposed earmark funds from IA161

48514

Iowa Department ofTransportation

22121

NHSX-20()--3H-28

US20: MAQUOKETA RIVER TO E OF IA 38

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$1,800,000$1,440,000

$1,800,000$1,440,000

38255

Iowa Department ofTransportation

22123

NHSX-3()--3H-31

IA3: E JCT PFEILER RD TO 0.7 MI N OF BOY SCOUT RD

Grade and Pave, Erosion Control, Traffic Signs

FHWA Approved TotalFederal Aid

RegionalSwap

$11,778,000$9,422,400

$343,000$274,400

$12,121,000$9,696,800

48515

Iowa Department ofTransportation

22122

NHSX-61()--3H-31

US61: 0.3 MI N OF CO RD D41 TO LAKE ELEANOR RD

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$4,155,000$3,324,000

$4,155,000$3,324,000

DOT Note: Project includes repurposed earmark funding (IA148) of $145,053.24

48413

Iowa Department ofTransportation

22116

BRF-30()--38-23

US30: UP RR 0.6 MI E OF CO RD Y4E

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$5,000$4,000

$5,009,000$4,007,200

$5,014,000$4,011,200

39204

Iowa Department ofTransportation

22118

BRF-30()--38-23

US30: WAPSIPINICON RIVER 1.5 MI E OF CO RD Y4E

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$6,000$4,800

$5,238,000$4,190,400

$5,244,000$4,195,200

45273

Iowa Department ofTransportation

22124

NHSX-13()--3H-28

IA13: HONEY CREEK 0.2 MI N OF CO RD D13 TO S JCTIA 3

Grade and Pave, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$16,149,000$12,919,200

$16,149,000$12,919,200

48412

Iowa Department ofTransportation

22115

BRF-136()--38-23

IA136: DITCH 8.6 MI N OF US 61

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$964,000$771,200

$964,000$771,200

188

Page 192: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48426

Iowa Department ofTransportation

22117

BRF-136()--38-23

IA136: ELWOOD CREEK 3.1 MI W OF US 61

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,908,000$1,526,400

$1,908,000$1,526,400

48429

Iowa Department ofTransportation

22119

BRF-136()--38-23

IA136: BRANCH PRAIRIE CREEK 1.2 MI N OF US 61

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$964,000$771,200

$964,000$771,200

48615

Iowa Department ofTransportation

22125

BRF-136()--38-23

IA136: BRANCH PRAIRIE CREEK 1.9 MI N OF US 61

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$964,000$771,200

$964,000$771,200

48635

Iowa Department ofTransportation

22127

BRF-136()--38-23

IA136: BRANCH PRAIRIE CREEK 4.0 MI N OF US 61

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$964,000$771,200

$964,000$771,200

48627

Iowa Department ofTransportation

22126

BRF-20()--38-31

US20: MIDDLE BRANCH CATFISH CREEK & CC RR 0.6MI E OF NW ARTERIAL IN DUBUQUE (WB)

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$4,012,000$3,209,600

$4,012,000$3,209,600

189

Page 193: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37917

Iowa Department ofTransportation

BRFN-136()--39-23

IA136: MISSISSIPPI RIVER IN CLINTON (STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$40,000 $40,000 $40,000 $40,000 $160,000

37915

Iowa Department ofTransportation

BRFN-30()--39-23

US30: MISSISSIPPI RIVER IN CLINTON (STATE SHARE)

Bridge Rehabilitation, Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$1,025,000 $25,000 $25,000 $25,000 $1,100,000

37952

Iowa Department ofTransportation

BRFN-52()--39-49

US52: MISSISSIPPI RIVER IN SABULA (STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$25,000 $25,000 $25,000 $25,000 $100,000

48553

Iowa Department ofTransportation

NHSN-67()--2R-23

US67: IN CLINTON, ON 3RD ST AND 4TH ST

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$298,000 $298,000

48507

Iowa Department ofTransportation

STPN-52()--2J-49

US52: IN THE CITY OF BELLEVUE

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$616,000 $616,000

39209

Iowa Department ofTransportation

BRFN-136()--39-23

IA136: DEEP CREEK 0.2 MI S OF CO RD Z2E

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$401,000 $401,000

39206

Iowa Department ofTransportation

BRFN-30()--39-23

US30: AMES CREEK 3.5 MI E OF E JCT US 61 (EB & WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$965,000 $965,000

39207

Iowa Department ofTransportation

BRFN-61()--39-23

US61: N JCT US 30 IN DE WITT (NB & SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,632,000 $1,632,000

39263

Iowa Department ofTransportation

BRFN-64()--39-49

IA64: STREAM 0.1 MI W OF CO RD E29

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$298,000 $298,000

190

Page 194: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39262

Iowa Department ofTransportation

BRFN-64()--39-49

IA64: PRAIRIE CREEK 0.4 MI E OF IA 62

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$742,000 $742,000

39208

Iowa Department ofTransportation

STPN-136()--2J-23

IA136: MISSISSIPPI RIVER IN CLINTON

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$100,000 $100,000

39205

Iowa Department ofTransportation

STPN-30()--2J-23

US30: MISSISSIPPI RIVER IN CLINTON

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$150,000 $150,000

45327

Iowa Department ofTransportation

BRFN-20()--39-28

US20: BRANCH PLUM CREEK 5.0 MI E OF IA 38 (EB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$150,000 $150,000

45337

Iowa Department ofTransportation

BRFN-20()--39-31

US20: N FORK MAQUOKETA RIVER 0.5 MI W OF IA 136(EB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$368,000 $368,000

45305

Iowa Department ofTransportation

BRFN-20()--39-31

US20: IA 136 IN DYERSVILLE (EB & WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$561,000 $561,000

45307

Iowa Department ofTransportation

BRFN-20()--39-31

US20: CO RD Y17 IN EPWORTH (EB & WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$386,000 $386,000

45335

Iowa Department ofTransportation

BRFN-20()--39-31

US20: CO RD Y13 IN FARLEY (EB & WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$366,000 $366,000

45318

Iowa Department ofTransportation

BRFN-30()--39-23

US30: SILVER CREEK 0.7 MI E OF W JCT US 61 IN DEWITT (EB & WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,571,000 $1,571,000

191

Page 195: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48442

Iowa Department ofTransportation

BRFN-136()--39-23

IA136: MISSISSIPPI RIVER IN CLINTON (STATE SHARE)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000 $1,000,000

48457

Iowa Department ofTransportation

BRFN-61()--39-49

US61: TARECOD CREEK 1.4 MI N OF CO RD E17 (NB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$350,000 $350,000

39259

Iowa Department ofTransportation

STPN-52()--2J-49

US52: MISSISSIPPI RIVER BRIDGE TO N OF SABULA

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$25,830,000 $25,830,000

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

478

RPA 8

22301

RGPL-PA08(RTP)--ST-00

On ECIA Transportation Planning

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$65,300$52,300

$52,300

$65,300$52,300

$52,300

$65,300$52,300

$52,300

$65,300$52,300

$52,300

$261,200$209,200

$209,200

48486

Iowa Department ofTransportation

22302

STP-38()--2C-28

IA38: N OF HOPKINTON TO DELHI

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,016,000$2,412,800

$3,016,000$2,412,800

48496

Iowa Department ofTransportation

22303

STP-38()--2C-28

IA38: NCL OF DELHI TO CO RD D22

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$2,000,000$1,600,000

$2,000,000$1,600,000

192

Page 196: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45515

Dyersville

22393

TAP-R-2160(617)--8T-31

Heritage Trail Paving and Trailhead Improvements: From11th ST SE to Heritage Trail

Ped/Bike Grade &amp; Pave, Ped/Bike Structures

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$750,000$242,111

$242,111

$750,000$242,111

$242,111

45516

Maquoketa

22394

TAP-U-4742(621)--8I-49

In the city of Maquoketa, On ALLEN ST, S25 T84 R02Efrom E Summit St to 200 th Ave

Ped/Bike Grade &amp; Pave, Ped/Bike Miscellaneous

FHWA Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$577,952$242,111

$242,111

$577,952$242,111

$242,111

193

Page 197: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

47215

Clinton County

BHOS-SWAP-C023(130)--FB-23

On 235th Street over Wapsi backwater, S12,T81,R1

DOT Approved

5/17/2022

TotalFederal Aid

RegionalSwap

$1,500,000

$500,000

$1,500,000

$1,500,000

$500,000

$1,500,00036143

Clinton County

BHS-SWAP-C023(118)--FC-23

On Y52, Over DRAINAGE DITCH 5, S1 T80 RE2

Bridge Deck Overlay

DOT Approved

7/20/2021

TotalFederal Aid

RegionalSwap

$230,000

$230,000

$230,000

$230,00047197

Jackson County

BRM-SWAP-4742(621)--SD-49

On Y 53, Over PRAIRIE CREEK, S30 T84 R03E

DOT Approved TotalFederal Aid

RegionalSwap

$528,000

$528,000

$528,000

$528,00035332

Jackson County

BROS-SWAP-C049(82)--FE-49

On 475th Avenue, Bridge over Unnamed creek, S35 T86R5E

Bridge Replacement

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00035157

Clinton County

BROS-SWAP-C023()--SE-23

On 250 AVE, Over BLACK CREEK, S27 T82 RE3

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00037337

Delaware County

BROS-SWAP-C028()--SE-28

On 130th Avenue, in NW S15 T89N R6W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00037302

Dubuque County

BROS-SWAP-C031()--FE-31

On Clear Creek Road, in W1/4 S14 T90N R2W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00036548

Jackson County

BROS-SWAP-C049(86)--SE-49

On 49th Street, Over Creek, S18 T84 R1

Bridge Replacement

DOT Approved

12/20/2022

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00044755

Delaware County

BROS-SWAP-C028()--SE-28

On 140th Street, Over Routherford Branch, S24 T90N R5W

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,000

194

Page 198: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37304

Dubuque County

BROS-SWAP-C031()--FE-31

On Graf Road, in NE S20 T89N R1E

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00037106

Dubuque County

BROS-SWAP-C031()--SE-31

On Fishpond Road, S3 T88N R1W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00037751

Jackson County

BROS-SWAP-C049()--FE-49

On 17th Street, Over Elk Creek, S33 T84N R6E

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00036148

Clinton County

BHS-SWAP-C023()--FC-23

On Y4E, Over YANKEE RUN CREEK, S15 T81 RE1

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00044756

Delaware County

BROS-SWAP-C028()--SE-28

On 215th Avenue, Over Unnamed Stream, S24 T87N R5W

DOT Approved TotalFederal Aid

RegionalSwap

$225,000

$225,000

$225,000

$225,00039021

Jackson County

BROS-SWAP-C049()--FE-49

On 362nd Avenue (Z15), Over Duck creek, S25 T86 R4E

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$650,000

$650,000

$650,000

$650,000

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36146

Clinton County

HSIP-SWAP-C023(129)--FJ-23

Z-40 from E-50 to Hwy 64 in Miles

Pavement Rehab

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,200,000

$200,000

$1,200,000

$200,000

195

Page 199: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48368

Camanche

STBG-SWAP-1040(610)--SG-23

In the city of Camanche, US Highway 67 & 7th AveRoundabout

Pave

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$896,400

$100,000

$100,000

$896,400

$100,000

$100,00035633

Clinton

STBG-SWAP-1415(634)--SG-23

In the city of Clinton, On Manufacturing Drive , from BluffBlvd to Rail road tracks

Pavement Rehab

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$3,900,000

$3,900,000

$3,900,000

$3,900,000

$3,900,000

$3,900,00044629

Delaware County

STBG-SWAP-C028()--FG-28

On Robinson Road (W63), from Linn County Line N 4.7miles

DOT Approved TotalFederal Aid

RegionalSwap

$2,499,342

$1,499,342

$1,499,342

$2,499,342

$1,499,342

$1,499,34245816

Clinton County

STBG-SWAP-C023()--FG-23

On F 12,from Z-24 E 5.0 miles to Z-36

DOT Approved TotalFederal Aid

RegionalSwap

$2,835,000

$1,185,000

$1,185,000

$2,835,000

$1,185,000

$1,185,00037309

Dubuque County

STBG-SWAP-C031()--FG-31

On Higginsport Road from Hwy 151 east 5.87 miles toMoloney Road

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,042,528

$1,492,528

$1,492,528

$2,042,528

$1,492,528

$1,492,52835330

Jackson County

STBG-SWAP-C049()--FG-49

On Z34 (435th Ave), from Preston N 5 miles to MaquoketaRiver

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,700,000

$900,000

$900,000

$1,700,000

$900,000

$900,000

196

Page 200: Iowa Statewide Transportation Improvement Program

N

0

RPA 9 - Bi-State Regional Commission

1504 Third Avenue, Third Floor, Rock Island, IL 61201-8612Phone: 309-793-6300, Fax: 309-793-6305, www.bistateonline.org

Muscatine 38

County

/

5 10

@]

20 Miles

Scott

County

Bi-State Regional

Commission (BSRC)

- Interstate

Commercial -National Highway System

- Primary Roads

(I General Service Local Roads

(I Basic Service -Ramps

(I Local Service -Trails

Transit -+- Railroad

[el Regional

[el Rivers

Large Urban

[el Major Lakes

Small Urban

[el C] RPA Planning Area

Intercity Bus r--1

CE! L_ _ _J Counties

Amtrak

I City Limits

Park & Ride Urban Area

197

Page 201: Iowa Statewide Transportation Improvement Program

198

Page 202: Iowa Statewide Transportation Improvement Program

RPA 9ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35837

Scott County

ILL-C082(65)--92-82

On Y68, Over WAPSI RIVER OVERFLOW, S31 T81 RE4

Bridge Replacement

DOT Approved

2/21/2023

TotalFederal Aid

RegionalSwap

$1,375,000 $1,375,000

199

Page 203: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37990

Iowa Department ofTransportation

BRFN-6()--39-70

US6: SUGAR CREEK 2.3 MI W OF IA 38

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$184,000 $184,000

37991

Iowa Department ofTransportation

BRFN-92()--39-70

IA92: MISSISSIPPI RIVER IN MUSCATINE (STATESHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$50,000 $50,000 $50,000 $50,000 $200,000

48498

Iowa Department ofTransportation

STPN-6()--2J-70

US6: ECL OF WEST LIBERTY TO IA 38

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$600,000 $600,000

48576

Iowa Department ofTransportation

STPN-6()--2J-70

US6: NEAR NOBLE AVE 2.9 MI E OF CO RD X46

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$117,000 $117,000

39309

Iowa Department ofTransportation

BRFN-6()--39-70

US6: IAIS RR 1.2 MI E OF IA 38

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$513,000 $513,000

39310

Iowa Department ofTransportation

BRFN-6()--39-70

US6: SUGAR CREEK 1.7 MI W OF W JCT IA 38

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$855,000 $855,000

45311

Iowa Department ofTransportation

BRFN-22()--39-70

IA22: WAPSINONOC CREEK 1.6 MI E OF W JCT IA 70

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$386,000 $386,000

45252

Iowa Department ofTransportation

BRFN-92()--39-70

IA92: MISSISSIPPI RIVER IN MUSCATINE (STATESHARE)

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$200,000 $200,000

200

Page 204: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

533

RPA 9

22304

RGPL-PA09(RTP)--ST-00

Region 9

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$25,132$10,000

$10,000

$17,566$10,000

$10,000

$17,566$10,000

$10,000

$10,000$10,000

$10,000

$70,264$40,000

$40,000

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39494

Long Grove

22395

TAP-R-4497()--8T-82

In the city of Long Grove, On 1st St, from E Grove Rd N0.60 Miles to Long Grove Corporate Limits

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$480,000$384,000

$384,000

$480,000$384,000

$384,000

201

Page 205: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

32310

Muscatine County

BROS-SWAP-C070(70)--SE-70

On YORK AVENUE, Over Mud Creek, Near E 1/4 Corner,S2 T78 R1E

Bridge Replacement

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00037447

Muscatine County

BROS-SWAP-C070()--SE-70

On 150TH STREET, Near S 1/4 Corner, S30 T78N R1W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$340,000

$340,000

$340,000

$340,00037452

Muscatine County

BROS-SWAP-C070()--SE-70

On HOLLY AVENUE, Near NW Corner SW-SW, S20 T78NR3W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$365,000

$365,000

$365,000

$365,00031024

Scott County

BRS-SWAP-C082()--FF-82

On Y4E, Over Tributary to Rock Creek, S3 T80 RE1

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00044842

Muscatine County

BROS-SWAP-C070( )--SE-70

On N ISETT AVE, Over MOSQUITO CREEK, Near NECorner, S27 T78 R02

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$540,000

$540,000

$540,000

$540,00036077

Muscatine County

BROS-SWAP-C070(71)--SE-70

On TROLLEY AVENUE, Near SE Corner NE-NE, S27 T77R1W

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$540,000

$540,000

$540,000

$540,00039015

Muscatine County

BROS-SWAP-C070()--FE-70

On 120TH STREET F65, Near NE Corner SW-NE, S16 T78R1E

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00039014

Muscatine County

BROS-SWAP-C070()--SE-70

On 135TH STREET, Near W 1/4 Corner, S22 T78 R1E

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$270,000

$270,000

$270,000

$270,000

202

Page 206: Iowa Statewide Transportation Improvement Program

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

47291

Scott County

HSIP-SWAP-C082()--FJ-82

Intersection of Y40 and Hwy 130

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$76,000

$76,000

$76,000

$76,000

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35023

Muscatine County

STBG-SWAP-C070()--FG-70

On OLD HWY 927 F58, from Durant Corp. to Walcott Corp.

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$2,500,000

$2,100,000

$2,100,000

$2,500,000

$2,100,000

$2,100,00035835

Scott County

STBG-SWAP-C082()--FG-82

On F58, from Y40 W 6 miles to 14th Ave

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$2,600,000

$2,600,000

$2,600,000

$2,600,000

$2,600,000

$2,600,000

203

Page 207: Iowa Statewide Transportation Improvement Program

RPA 10 - East Central Iowa Council of Governments

700 16th St, Suite 301, Cedar Rapids, IA 52402

Phone: 319-365-9941, Fax: 319-365-9981, www.ecicog.org

� N

I

0 5 10

Iowa

) I

20 Miles

:,

Corridor Metropolitan

Planning Organization

(CMPO)

6

r

iorts - Interstate

Commercial - National Highway System

(I Enhanced - Primary Roads

(I General Service Local Roads

(I Basic Service -Ramps

(I Local Service -TrailsTransit

-+- Railroad [el Regional

[el Rivers

Large Urban

[el Major Lakes

Small Urban C] RPA Planning Area

[el Intercity Busr--1

CE! L_ _ _J Counties

Amtrak

I City Limits

Park & Ride Urban Area

204

Page 208: Iowa Statewide Transportation Improvement Program

205

Page 209: Iowa Statewide Transportation Improvement Program

RPA 10HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48440

Iowa Department ofTransportation

22023

HSIPX-149()--3L-48

IA149: IN WILLIAMSBURG, FROM OLD MAN'S CREEKTO HAWKEYE DR

Pavement Widening

FHWA Approved TotalFederal Aid

RegionalSwap

$251,000$225,900

$251,000$225,900

38055

Iowa Department ofTransportation

22024

HSIPX-150()--3L-6

IA150: CURVE W OF URBANA NEAR 31ST AVE AND55TH ST

Grade and Pave, Erosion Control, Lighting

FHWA Approved TotalFederal Aid

RegionalSwap

$2,952,000$2,656,800

$164,000 $3,116,000$2,656,800

ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45851

Jones County

ILL-C053(92)--92-53

On LANDIS RD, Over WAPSIPINICON RIVER, S20 T84R03

Bridge New

DOT Approved

10/18/2022

TotalFederal Aid

RegionalSwap

$2,750,000 $2,750,000

7274

Washington County

ILL-C092(57)--92-92

On W21, Over SKUNK RIVER, S10 T74 R09

Bridge Replacement

DOT Approved

11/15/2022

TotalFederal Aid

RegionalSwap

$6,500,000 $6,500,000

45143

Benton County

ILL-C006()--92-06

On D 65, Over CEDAR RIVER, S6 T86 R10

DOT Approved TotalFederal Aid

RegionalSwap

$2,000,000 $2,000,000

47306

Benton County

ILL-C006()--92-06

On V 40, Over BUCKEYE CREEK, S22 T82 R12

DOT Approved TotalFederal Aid

RegionalSwap

$300,000 $300,000

206

Page 210: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38151

Iowa Department ofTransportation

22130

IM-NHS-80()--03-52

I-80: 1.5 MI E OF IA 1 TO 0.5 MI E OF CO RD X30

Grade and Pave, Pave, Grading

FHWA Approved TotalFederal Aid

RegionalSwap

$39,538,000$33,607,300

$7,052,000$5,994,200

$20,063,000$17,053,550

$20,748,000$17,635,800

$87,401,000$74,290,850

38216

Iowa Department ofTransportation

22128

NHSX-30()--3H-6

US30: 11TH AVE DR TO W JCT US 218

Grade and Pave, Bridge New, Culvert Replacement

FHWA Approved TotalFederal Aid

RegionalSwap

$46,003,000$36,802,400

$26,127,000$20,901,600

$227,000$181,600

$72,357,000$57,885,600

39171

Iowa Department ofTransportation

22134

BRF-218()--38-6

US218: ABANDONED RR 2.6 MI N OF N JCT US 30(REMOVE BRIDGE)

Grade and Pave, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,380,000$1,104,000

$1,380,000$1,104,000

38168

Iowa Department ofTransportation

22133

IM-NHS-80()--03-16

I-80: E OF THE CEDAR RIVER TO W OF CO RD Y26

Grade and Pave, Bridge Replacement, Traffic Signs

FHWA Approved TotalFederal Aid

RegionalSwap

$19,580,000$16,643,000

$19,580,000$16,643,000

38214

Iowa Department ofTransportation

22129

NHSX-92()--3H-92

IA92: E OF US 218 TO IA 70 IN COLUMBUS JUNCTION

Grade and Pave, Culvert Replacement, Wetland Mitigation

FHWA Approved TotalFederal Aid

RegionalSwap

$22,234,000$17,787,200

$267,000$213,600

$22,501,000$18,000,800

39173

Iowa Department ofTransportation

22131

IMX-380()--02-6

I-380: IA 150 TO BLACK HAWK CO (SB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$9,845,000$8,860,500

$9,845,000$8,860,500

39172

Iowa Department ofTransportation

22132

IMX-380()--02-6

I-380: IA 150 TO BLACK HAWK CO (NB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$9,421,000$8,478,900

$9,421,000$8,478,900

48596

Iowa Department ofTransportation

22135

BRF-136()--38-53

IA136: MAQUOKETA RIVER 2.5 MI N OF CO RD E17

Bridge Rehabilitation, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,285,000$1,828,000

$2,285,000$1,828,000

48621

Iowa Department ofTransportation

22136

NHSX-30()--3H-16

US30: ECL LISBON TO WCL MECHANICSVILLE

Pavement Widening, Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,500,000$2,800,000

$3,500,000$2,800,000

207

Page 211: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37962

Iowa Department ofTransportation

BRFN-136()--39-53

IA136: STREAM 0.2 MI N OF CO RD E45

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,339,000 $1,339,000

38039

Iowa Department ofTransportation

BRFN-218()--39-92

US218: N FORK LONG CREEK 1.0 MI S OF IA 92 (NB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$337,000 $337,000

38101

Iowa Department ofTransportation

IMN-380()--0E-52

I-380: CO RD F12 INTERCHANGE

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$450,000 $450,000

38100

Iowa Department ofTransportation

IMN-80()--0E-52

I-80: EAGLE AVE 6.1 MI W OF I-380

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$293,000 $293,000

48478

Iowa Department ofTransportation

NHSN-1()--2R-52

IA1: 0.4 MI TO 0.8 MI N OF CO RD F52

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$175,000 $175,000

45271

Iowa Department ofTransportation

NHSN-1()--2R-52

IA1: 1.7 MI N OF I-80

Grading, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$110,000 $110,000

38197

Iowa Department ofTransportation

NHSN-1()--2R-53

IA1: LINN CO TO US 151 AT VARIOUS LOCATIONS

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$2,015,000 $599,000 $2,614,000

48584

Iowa Department ofTransportation

NHSN-1()--2R-92

IA1: 0.25 MI W OF BRIGHTON

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$372,000 $372,000

48511

Iowa Department ofTransportation

NHSN-151()--2R-53

US151: OLD DUBUQUE RD INTERSECTION 0.95 MI NOF IA 64

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$350,000 $350,000

208

Page 212: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48509

Iowa Department ofTransportation

STPN-38()--2J-53

IA38: US 151 TO EAST 9TH ST IN MONTICELLO

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,250,000 $1,250,000

48481

Iowa Department ofTransportation

STPN-64()--2J-53

IA64: W JCT IA 136 TO E JCT IA 136 IN WYOMING

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$241,000 $241,000

39174

Iowa Department ofTransportation

BRFN-150()--39-6

IA150: CEDAR RIVER 1.0 MI S OF CO RD E16

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,163,000 $1,163,000

45368

Iowa Department ofTransportation

BRFN-150()--39-6

IA150: PRAIRIE CREEK 1.8 MI N OF CO RD V71

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $501,000 $506,000

39193

Iowa Department ofTransportation

IMN-80()--0E-16

I-80: CO RD Y26 AND CO RD Y30 INTERCHANGERAMPS

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,486,000 $1,486,000

39285

Iowa Department ofTransportation

STPN-30()--2J-57

US30: IA 1 INTERCHANGE IN MOUNT VERNON

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$110,000 $110,000

38176

Iowa Department ofTransportation

STPN-30()--2J-6

US30: W JCT US 218 INTERCHANGE

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$120,000 $120,000

45385

Iowa Department ofTransportation

BRFN-151()--39-53

US151: KITTY CREEK 1.1 MI S OF CO RD X44 (SB)

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,214,000 $1,214,000

45364

Iowa Department ofTransportation

BRFN-218()--39-6

US218: STREAM 0.1 MI E OF CO RD V61

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$746,000 $746,000

209

Page 213: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39271

Iowa Department ofTransportation

BRFN-6()--39-52

US6: BUFFALO CREEK 4.9 MI E OF CO RD W38

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$422,000 $422,000

48605

Iowa Department ofTransportation

IMN-380()--0E-52

I-380: N OF US 6 TO 1.25 MI N OF FOREVERGREEN RD

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$90,000 $90,000

45315

Iowa Department ofTransportation

IMN-80()--0E-16

I-80: W IA 38/CO RD X54 (MOSCOW RD)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$859,000 $859,000

45349

Iowa Department ofTransportation

IMN-80()--0E-48

I-80: EB REST AREA NEAR VICTOR

Grade and Pave, Lighting, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$7,898,000 $7,898,000

48465

Iowa Department ofTransportation

BRFN-13()--39-57

IA13: WAPSIPINICON RIVER IN CENTRAL CITY

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,520,000 $1,520,000

48562

Iowa Department ofTransportation

BRFN-136()--39-53

IA136: LITTLE BEAR CREEK 0.8 MI N OF IA 64

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$260,000 $260,000

48612

Iowa Department ofTransportation

BRFN-151()--39-53

US151: WAPSIPINICON RIVER 1.4 MI S OF IA 64 (NB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,270,000 $1,270,000

48447

Iowa Department ofTransportation

BRFN-30()--39-57

US30: CIC RR SPUR 0.8 MI W OF E JCT US 218 (EB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$800,000 $800,000

48449

Iowa Department ofTransportation

IMN-380()--0E-6

I-380: IA 150 INTERCHANGE (NB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$830,000 $830,000

210

Page 214: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48608

Iowa Department ofTransportation

NHSN-30()--2R-16

US30: WCL MECHANICSVILLE TO WCL STANWOOD

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$400,000 $400,000

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

16834

RPA 10

22305

RGPL-PA10()--ST-00

Region 10-ECICOG: Region 10 Planning

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$211,250$169,000

$169,000

$111,250$89,000

$89,000

$115,000$92,000

$92,000

$120,000$96,000

$96,000

$557,500$446,000

$446,000

48624

Iowa Department ofTransportation

22306

STP-136()--2C-53

IA136: MAQUOKETA RIVER TO CASCADE

Pavement Widening, Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,746,000$3,157,000

$3,746,000$3,157,000

DOT Note: Project includes STBG and HSIP funds.

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39441

Johnson CountyConservation Board

22396

TAP-U-C052(124)--8I-52

On Clear Creek Trail, from Half Moon Ave 2.5 miles to FWKent Park

Ped/Bike Development

FHWA Approved

1/22/2031

TotalFederal Aid

RegionalSwap

$750,000$587,260

$587,260

$750,000$587,260

$587,260

48691

Linn CountyConservation Board

22397

TAP-U-C057()--8I-57

from Secrist Rd. Parking Lot NE 1.2 miles to Paralta Rd.

Ped/Bike Paving, Ped/Bike Structures

FHWA Approved TotalFederal Aid

RegionalSwap

$600,000$130,893

$130,893

$600,000$130,893

$130,893

39443

Linn CountyConservation Board

22426

TAP-U-C057(147)--8I-57

On Grant Wood Trail, from Oxley Road .113 miles toSecrist Rd, and then approx. 2935 feet East

Ped/Bike Paving, Ped/Bike Structures

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$1,410,087$634,087

$634,087

$1,410,087$634,087

$634,087

211

Page 215: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48714

Shellsburg

BRM-SWAP-6962(606)--SD-06

In the city of Shellsburg, On Sells St, Over BEAR CREEK,S14 T84 R09

Work Not Assigned

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00045528

Williamsburg

BRM-SWAP-8427(602)--SD-48

In the city of Williamsburg, On STATE ST, Over OLD MANSCREEK, S10 T79 R10

Bridge Rehabilitation

DOT Approved

1/20/2021

TotalFederal Aid

RegionalSwap

$1,697,250

$305,548

$1,305,548

$1,697,250

$305,548

$1,305,54848712

Coggon

BROS-SWAP-1452(601)--SE-57

In the city of Coggon, On N 3RD ST, Over BUFFALOCREEK, S3 T86 R06

Work Not Assigned

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$1,433,000

$1,000,000

$1,433,000

$1,000,00021820

Benton County

BROS-SWAP-C006()--FE-06

On W14, Over BR LITTLE BEAR CREEK, S14 T83 R10

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00032448

Benton County

BROS-SWAP-C006(109)--FE-06

On E24, Over SPRING CREEK, S24 T85 R09

Bridge Replacement

DOT Approved

9/21/2021

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00012273

Benton County

BROS-SWAP-C006(119)--SE-06

On 75 ST, Over BR PRAIRIE CK, S10 T82 R09

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$325,000

$325,000

$325,000

$325,00036374

Cedar County

BROS-SWAP-C016(113)--FE-16

On F51-Old Muscatine Road, Over OTTER CREEK, S25T79 R02

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00035920

Iowa County

BROS-SWAP-C048(92)--SE-48

On 125th St, Over Honey Creek, S14 T81 R12

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00016421

Washington County

BROS-SWAP-C092(115)--SE-92

On Juniper Avenue, Over SMALL STREAM, S27 T74 R08

Culvert Replacement

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,000

212

Page 216: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36609

Benton County

BRS-SWAP-C006()--FF-06

On E44, Over BEAR CREEK, S13 T83 R10

Culvert Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00029496

Benton County

BRS-SWAP-C006(108)--FF-06

On D65, Over SPRING CREEK, S20 T86 R11

Grade and Pave, Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00049731

Lowden

BROS-SWAP-4555()--SE-16

In the city of Lowden, On 8TH ST, Over DRAINAGE, S35T82 R01

Work Not Assigned

DOT Approved TotalFederal Aid

RegionalSwap

$370,000

$370,000

$370,000

$370,00018445

Benton County

BROS-SWAP-C006()--FE-06

On Benton-Linn Rd, Over Prairie Creek, S7 T82 R8

DOT Approved TotalFederal Aid

RegionalSwap

$375,000

$375,000

$375,000

$375,00036612

Benton County

BROS-SWAP-C006()--SE-06

On 69 ST, Over Little Bear Creek, S8 T83 R09

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00032447

Benton County

BROS-SWAP-C006()--SE-06

On 32 AVE DR, Over BR PRAIRIE CK, S11 T82 R09

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00025041

Benton County

BROS-SWAP-C006()--SE-06

On 16 AVE, Over SPRING CK, S30 T86 R11

DOT Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00038669

Cedar County

BROS-SWAP-C016()--SE-16

On Taylor Ave., Over SUGAR CREEK, S29 T80 R01

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00047221

Iowa County

BROS-SWAP-C048()--SE-48

On 200TH ST, Over CLEAR CREEK, S28 T80 R09

DOT Approved TotalFederal Aid

RegionalSwap

$530,000

$530,000

$530,000

$530,000

213

Page 217: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39061

Johnson County

BROS-SWAP-C052()--SE-52

On 520TH ST SW, Over DEER CREEK, S20 T78 R08

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$800,000

$800,000

$800,000

$800,00035287

Benton County

BROS-SWAP-C006()--FE-06

On 78th St, Over BR PRAIRIE CK, S19 T82 R10

DOT Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00035346

Benton County

BROS-SWAP-C006()--FE-06

On 63rd ST, Over MUD CREEK, S12 T84 R11

DOT Approved TotalFederal Aid

RegionalSwap

$275,000

$275,000

$275,000

$275,00010708

Benton County

BROS-SWAP-C006()--SE-06

On 32 AVE DR, Over BRANCH PRAIRIE CREEK, S11 T82R09

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00032728

Benton County

BROS-SWAP-C006()--SE-06

On 63 ST, Over OPPOSSUM CREEK, S11 T84 R10

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,0001801

Benton County

BROS-SWAP-C006(xx)--SE-06

55th ST: Over Pratt Creek, S36 T86 R11

DOT Approved TotalFederal Aid

RegionalSwap

$425,000

$425,000

$425,000

$425,00044627

Cedar County

BROS-SWAP-C016()--FE-16

On F 51, Over ELKHORN CREEK (LITTLE), S28 T79 R01

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00014732

Benton County

BRS-SWAP-C006()--FF-06

On V 66, Over MUD CREEK, S21 T84 R11

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00016422

Washington County

BRS-SWAP-C092(73)--FF-92

On W64, Over Long Creek, S22 T75 R6

Bridge Replacement

DOT Approved

11/21/2023

TotalFederal Aid

RegionalSwap

$850,000

$850,000

$850,000

$850,000

214

Page 218: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45137

Benton County

BROS-SWAP-C006()--FE-06

On E 16, Over PRAIRIE CREEK, S10 T85 R10

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00032705

Benton County

BROS-SWAP-C006()--SE-06

On 21 AVE DR, Over MUD CREEK, S13 T84 R11

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$375,000

$375,000

$375,000

$375,00032633

Cedar County

BROS-SWAP-C016()--SE-16

On GREEN RD, Over ROCK RUN CR, S8 T80 R03

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00032343

Iowa County

BROS-SWAP-C048(Li-4058)--FE-48

On E Ave, 0.5 miles south of 273rd St, S35 T79 R12

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00018444

Benton County

BROS-SWAP-C057(BR 1912)--SE-57

On LINN BENTON RD, Over BEAR CR, S18 T84 R08

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00038963

Washington County

BROS-SWAP-C092()--FE-92

On 110TH ST, Over DEER CREEK, S10 T77 R08

Bridge Replacement, Grading

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00021440

Benton County

BRS-SWAP-C006()--FF-06

On V 61, Over SMALL STREAM, S6 T85 R10

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,000

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45952

Washington County

HSIP-SWAP-C092()--FJ-92

On W61, from G36 north to Riverside city limits,approximately 13.1 miles

Miscellaneous

DOT Approved TotalFederal Aid

RegionalSwap

$98,000

$88,000

$98,000

$88,000

215

Page 219: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48693

Anamosa

STBG-SWAP-0165(606)--SG-53

In the city of Anamosa, the extension of Old Dubuque Rd, toParham Drive

Grade and Pave

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$1,900,000

$1,326,000

$1,326,000

$1,900,000

$1,326,000

$1,326,00035664

Urbana

STBG-SWAP-7872(605)--SG-06

In the city of Urbana, On Hutton Drive, from at Hwy 150intersection

Pavement Widening

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$527,400

$246,400

$246,400

$527,400

$246,400

$246,40048692

Washington

STBG-SWAP-8140(613)--SG-92

In the city of Washington, On LEXINGTON BLVD, fromNorth D Avenue W 1.79 miles to west of City Limits

Pavement Rehab

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$849,779

$849,779

$849,779

$849,779

$849,779

$849,779PA Note: This City project is tied to County project FM-CO92()--55-92.

45009

Iowa County

STBG-SWAP-C048(91)--FG-48

V44; I-80 South to 240th St

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$1,100,000

$1,100,000

$1,100,000

$1,100,000

$1,100,000

$1,100,00036530

Johnson County

STBG-SWAP-C052(120)--FG-52

On F44 (Herbert Hoover Highway), from 0.9 mile East ofWapsi to 0.2 mile West of Johnson Cedar Road

Grade and Pave

DOT Approved

8/17/2021

TotalFederal Aid

RegionalSwap

$4,438,000

$2,738,000

$2,738,000

$4,438,000

$2,738,000

$2,738,00035762

Jones County

STBG-SWAP-C053(90)--FG-53

On CO RD E34, from 400' south of 230TH AVE to City ofAnamosa Corporate Limits

Pave

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,750,000

$1,250,000

$1,250,000

$1,750,000

$1,250,000

$1,250,00038580

Iowa County

STBG-SWAP-C048()--FG-48

On V66, from 240th N 4 miles to 200th St

DOT Approved TotalFederal Aid

RegionalSwap

$2,000,000

$1,500,000

$1,500,000

$2,000,000

$1,500,000

$1,500,00036441

Linn County

STBG-SWAP-C057(D62)--FG-57

On WALKER RD, from BETTY'S GROVE RD (W35) 4.7miles to TROY MILLS RD (W45)

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$2,208,000

$2,208,000

$2,208,000

$2,208,000

$2,208,000

$2,208,00032702

Benton County

STBG-SWAP-C006()--FG-06

On E22, from Hwy 218 west 4.5 Miles to Near Garrison

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,000,000

$1,600,000

$1,600,000

$2,000,000

$1,600,000

$1,600,000

216

Page 220: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35908

Cedar County

STBG-SWAP-C016()--FG-16

On X54, from Muscatine County Line North 3.5 Miles toInterstate 80

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000

$1,145,000

$1,145,000

$1,500,000

$1,145,000

$1,145,00045219

Johnson County

STBG-SWAP-C052()--FG-52

On F67 (540th St SW), from County Line to Calkins Ave

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$2,200,000

$1,925,000

$1,925,000

$2,200,000

$1,925,000

$1,925,00037467

Jones County

STBG-SWAP-C053(C-929)--FG-53

On CO RD E28, from CO RD X28 to Buffalo Creek Bridge

Pave, Pavement Widening

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,000

$1,500,000

$1,500,00037742

Linn County

STBG-SWAP-C057(145)--FG-57

On BURNETT STATION RD, from CITY OF ALBURNETTto HWY 13

Pave

DOT Approved

1/22/2025

TotalFederal Aid

RegionalSwap

$1,375,000

$1,300,000

$1,300,000

$1,375,000

$1,300,000

$1,300,000

217

Page 221: Iowa Statewide Transportation Improvement Program

0 5 10

RPA 11 - Central Iowa Regional Transportation Planning Alliance

420 Watson Powell Jr. Parkway, Suite 200, Des Moines, IA 50309

Phone: 515-334-0075, Fax: 515-334-0098, www.dmampo.org/cirtpa

Des Moines Area

MPO (DMAMPO)

Jasper

County H

163

I

�orts � Commercial

- Interstate

- National Highway SystemEl Enhanced - Primary Roads

(S General Service

El Basic Service

(S Local Service Transit [el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L._ _ _J Counties

City Limits

Urban Area

218

Page 222: Iowa Statewide Transportation Improvement Program

219

Page 223: Iowa Statewide Transportation Improvement Program

RPA 11HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48551

Iowa Department ofTransportation

22025

HSIPX-69()--3L-85

US69: CO RD E57 INTERSECTION

Pavement Widening

FHWA Approved TotalFederal Aid

RegionalSwap

$400,000$360,000

$400,000$360,000

MISC

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48393

Jasper CountyConservation Board

22011

FLAP-C050()--7L-50

From Commerce Drive in Prairie City to NE 116th Streetnear Mitchellville

Ped/Bike Grade &amp; Pave

FHWA Approved

3/21/2023

TotalFederal Aid

RegionalSwap

$1,800,000$300,000

$1,800,000$300,000

DOT Note: Project received FLAP funds

220

Page 224: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37885

Iowa Department ofTransportation

22148

BRF-210()--38-8

IA210: DES MOINES RIVER 0.3 MI E OF CO RD E62

Bridge Rehabilitation

FHWA Approved TotalFederal Aid

RegionalSwap

$3,500,000$2,800,000

$3,500,000$2,800,000

38066

Iowa Department ofTransportation

22137

IM-80()--13-25

I-80: US 6/169 IN DE SOTO TO CO RD R16

Grade and Pave, Pave, Bridge Replacement

FHWA Approved TotalFederal Aid

RegionalSwap

$18,037,000$16,233,300

$10,221,000$9,198,900

$24,445,000$22,000,500

$239,000$215,100

$52,942,000$47,647,800

38150

Iowa Department ofTransportation

22143

IM-NHS-80()--03-50

I-80: NORTH SKUNK RIVER 2.1 MI E OF IA 224

Grade and Pave, Bridge Replacement, Erosion Control

FHWA Approved TotalFederal Aid

RegionalSwap

$11,558,000$9,824,300

$377,000 $11,935,000$9,824,300

45390

Iowa Department ofTransportation

22144

IMX-80()--02-50

I-80: 2.6 MI E OF CO RD S27 TO 0.8 MI E OF IA 14 (EB)

FHWA Approved TotalFederal Aid

RegionalSwap

$1,700,000$1,530,000

$1,700,000$1,530,000

45388

Iowa Department ofTransportation

22145

IMX-80()--02-50

I-80: 2.6 MI E OF CO RD S27 TO 1.3 MI E OF CO RD T14(WB)

FHWA Approved TotalFederal Aid

RegionalSwap

$2,100,000$1,890,000

$2,100,000$1,890,000

48620

Iowa Department ofTransportation

22151

NHSX-169()--3H-25

US169: S OF N RACCOON RIVER OVERFLOW TO IA 44

Pavement Widening, Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,754,000$3,098,200

$3,754,000$3,098,200

DOT Note: Project includes NHPP and HSIP funds

48501

Iowa Department ofTransportation

22146

NHSX-30()--3H-8

US30: 0.5 MI E OF IA 17 TO 230TH ST

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$1,351,000$1,080,800

$1,351,000$1,080,800

39357

Iowa Department ofTransportation

22147

NHSX-30()--3H-85

US30: CO RD S14 IN NEVADA

Grade and Pave, Bridge New, Traffic Signs

FHWA Approved TotalFederal Aid

RegionalSwap

$6,000 $5,958,000$4,766,400

$5,964,000$4,766,400

221

Page 225: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48418

Iowa Department ofTransportation

22139

BRF-5()--38-91

IA5: SOUTH RIVER 0.2 MI N OF CO RD S31 (NB)

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$10,000 $3,807,000$3,045,600

$3,817,000$3,045,600

39367

Iowa Department ofTransportation

22141

IM-NHS-35()--03-91

I-35: N OF IA 92 TO S OF NORTH RIVER (SB)

Grade and Pave, Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$16,553,000$14,070,050

$16,553,000$14,070,050

38248

Iowa Department ofTransportation

22138

NHSX-30()--3H-85

US30: 0.5 MI E OF I-35 TO E OF 590TH AVE

Pave, Grading, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$16,572,000$13,257,600

$11,412,000$9,129,600

$358,000 $28,342,000$22,387,200

45366

Iowa Department ofTransportation

22140

BRF-14()--38-63

IA14: BRUSH CREEK 0.2 MI S OF CO RD G28

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$4,019,000$3,215,200

$4,019,000$3,215,200

45361

Iowa Department ofTransportation

22150

BRF-65()--38-91

US65: OTTER CREEK 1.6 MI S OF CO RD G58

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,524,000$2,019,200

$2,524,000$2,019,200

45386

Iowa Department ofTransportation

22142

BRF-69()--38-85

US69: WALNUT CREEK 0.2 MI N OF CO RD E57

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,110,000$1,688,000

$2,110,000$1,688,000

48604

Iowa Department ofTransportation

22149

BRF-14()--38-63

IA14: DES MOINES RIVER 1.2 MI N OF CO RD G40

Bridge Deck Overlay

FHWA Approved TotalFederal Aid

RegionalSwap

$8,860,000$7,088,000

$8,860,000$7,088,000

48634

Iowa Department ofTransportation

22152

BRF-30()--38-85

US30: SOUTH SKUNK RIVER 1.2 MI W OF I-35 (EB & WB)

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$13,025,000$10,420,000

$13,025,000$10,420,000

222

Page 226: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37957

Iowa Department ofTransportation

BRFN-117()--39-50

IA117: SQUAW CREEK 1.7 MI N OF CO RD S6G

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$469,000 $469,000

37975

Iowa Department ofTransportation

BRFN-169()--39-61

US169: NORTH RIVER 3.5 MI N OF N JCT IA 92

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$329,000 $329,000

37955

Iowa Department ofTransportation

BRFN-6()--39-50

US6: DITCH 0.2 MI E OF CO RD T12

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$614,000 $614,000

38006

Iowa Department ofTransportation

BRFN-65()--39-77

US65: SKUNK RIVER 7.6 MI N OF I-80 (NB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$427,000 $427,000

38141

Iowa Department ofTransportation

IMN-35()--0E-91

I-35: CO RD G64 INTERCHANGE

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$415,000 $415,000

38142

Iowa Department ofTransportation

IMN-35()--0E-91

I-35: CO RD G50 INTERCHANGE 4.7 MI S OF IA 92

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$383,000 $383,000

45392

Iowa Department ofTransportation

IMN-80()--0E-50

I-80: CO RD T14 AND IA 224 INTERCHANGE RAMPS

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,600,000 $1,600,000

48558

Iowa Department ofTransportation

NHSN-163()--2R-63

IA163: 198TH AVE INTERSECTION

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$154,000 $154,000

38185

Iowa Department ofTransportation

NHSN-6()--2R-25

US6: S OF 302ND PL TO GREENWOOD HILLS DR INADEL (STATE SHARE)

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$1,092,000 $1,092,000

223

Page 227: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48542

Iowa Department ofTransportation

NHSN-6()--2R-50

US6: 0.5 MI N OF I-80 IN NEWTON

Grading

DOT Approved TotalFederal Aid

RegionalSwap

$55,000 $55,000

48560

Iowa Department ofTransportation

STPN-117()--2J-50

IA117: SOUTH SKUNK RIVER NORTH 1000 FT

Ditch Improvement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$452,000 $452,000

48544

Iowa Department ofTransportation

STPN-6()--2J-50

US6: 0.6 MI W OF POWESHIEK CO

Grading

DOT Approved TotalFederal Aid

RegionalSwap

$40,000 $40,000

48545

Iowa Department ofTransportation

STPN-6()--2J-50

US6: 0.7 MI W OF IA 224

Grading

DOT Approved TotalFederal Aid

RegionalSwap

$56,000 $56,000

39265

Iowa Department ofTransportation

BRFN-14()--39-50

IA14: ALLOWAY CREEK 1.6 MI S OF IA 224

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$2,468,000 $2,468,000

39294

Iowa Department ofTransportation

BRFN-5()--39-63

IA5: S JCT IA 92

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,674,000 $1,674,000

39368

Iowa Department ofTransportation

BRFN-5()--39-91

IA5: COAL CREEK 0.8 MI N OF IA 316 (NB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$670,000 $670,000

48476

Iowa Department ofTransportation

IMN-80()--0E-50

I-80: 0.5 MI E OF CO RD T14 (SPEEDWAY DR) TO 0.5 MIE OF IA 224

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000 $1,500,000

38180

Iowa Department ofTransportation

NHSN-30()--2R-8

US30: CO RD R18 INTERSECTION

Grade and Pave, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$2,013,000 $2,013,000

224

Page 228: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45431

Iowa Department ofTransportation

BRFN-92()--39-63

IA92: OLD HIGHWAY 92 3.9 MI E OF E JCT IA 5

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,111,000 $1,111,000

45309

Iowa Department ofTransportation

IMN-80()--0E-50

I-80: CHERRY CREEK 1.2 MI W OF IA 14 (EB & WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$727,000 $727,000

45344

Iowa Department ofTransportation

NHSN-169()--2R-25

US169: S OF N RACCOON RIVER 1.4 MI N OF US 6

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$46,000 $46,000

48466

Iowa Department ofTransportation

BRFN-316()--39-63

IA316: NS AND BNSF RR 2.5 MI N OF IA 5

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$640,000 $640,000

48411

Iowa Department ofTransportation

BRFN-5()--39-63

IA5: WALNUT CREEK 0.9 MI N OF CO RD G76

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,413,000 $1,413,000

48463

Iowa Department ofTransportation

BRFN-5()--39-63

IA5: WHITE BREAST CREEK 2.7 MI N OF IA 14 (NB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,140,000 $1,140,000

225

Page 229: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36937

RPA 11

22307

RGPL-PA11()--ST-00

HIRTA: Vehicle Purchase

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$128,392$102,714

$102,714

$124,795$99,836

$99,836

$253,187$202,550

$202,550

48479

Iowa Department ofTransportation

22308

STP-117()--2C-50

IA117: N OF E 2ND ST IN PRAIRIE CITY TO CO RD F48IN COLFAX

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$2,500,000$2,000,000

$2,500,000$2,000,000

38272

Iowa Department ofTransportation

22309

STP-17()--2C-8

IA17: 0.5 MI N OF US 30 TO 3.0 MI N (STATE SHARE)

Pave, Erosion Control, Traffic Signs

FHWA Approved TotalFederal Aid

RegionalSwap

$4,955,000$3,964,000

$200,000 $5,155,000$3,964,000

STBG-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

32547

Dallas County

22335

BROS-C025(113)--8J-25

On 170th St, Over Slough Creek, on the south line of S27T81 R27, Beaver Township

Bridge Replacement

FHWA Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$300,000$240,000

$300,000$240,000

226

Page 230: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39404

Boone CountyConservation Board

22399

TAP-R-C008(086)--8T-08

High Trestle to City of Boone Trail - Phase 1

Ped/Bike Grade &amp; Pave, Ped/Bike Miscellaneous

FHWA Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$418,000$100,000

$100,000

$418,000$100,000

$100,000

45520

Dallas CountyConservation Board

22404

TAP-R-C025(123)--8T-25

RRVT Bridge Improvements Phase 2 - Bridge S OverMOSQUITO CREEK, S34 T79 R29

Ped/Bike Structures

FHWA Approved

8/16/2022

TotalFederal Aid

RegionalSwap

$462,500$250,000

$250,000

$462,500$250,000

$250,000

39406

Milo

22398

TAP-R-5087()--8T-91

In the city of Milo, Multi-use Path Project - From SoutheastWarren Elementary School to Centennial Park

Ped/Bike Grade &amp; Pave

FHWA Approved

11/15/2022

TotalFederal Aid

RegionalSwap

$370,000$230,000

$230,000

$370,000$230,000

$230,000

39399

Dallas CountyConservation Board

22401

TAP-R-C025(117)--8T-25

RRVT Bridge Improvements Phase 3 - Bridge D

Ped/Bike Structures

FHWA Approved

10/18/2022

TotalFederal Aid

RegionalSwap

$462,500$250,000

$250,000

$462,500$250,000

$250,000

39483

Adel

22400

TAP-U-0035()--8I-25

In the city of Adel, Adel Recrational Trails

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$519,000$180,000

$180,000

$519,000$180,000

$180,000

45467

Adel

22402

TAP-R-0035()--8T-25

In the city of Adel, School and Raccoon River Valley TrailConnection

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$635,000$125,000

$125,000

$635,000$125,000

$125,000

45468

Pleasantville

22403

TAP-R-6125()--8T-63

In the City of Pleasantville, Highway 5 Trail Project

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$320,000$150,000

$150,000

$320,000$150,000

$150,000

48677

Story CountyConservation Board

22405

TAP-U-C085()--8I-85

HOINT: From the South Skunk River Scenic Bridge toCounty Road 610th Aveue

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$674,000$250,000

$250,000

$674,000$250,000

$250,000

227

Page 231: Iowa Statewide Transportation Improvement Program

SWAP-CMAQ

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45465

Boone County

ICAAP-SWAP-C008()--FH-08

On R AVE, S23 T84 R26

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,578,000

$800,000

$2,578,000

$800,000PA Note: Letting in conjunction with an Iowa DOT project STP-17-2(24) 2C-08

228

Page 232: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35884

Boone County

BROS-SWAP-C008(78)--FE-08

On J AVE, OVER UP RR, S27 T84 R27

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00036286

Dallas County

BROS-SWAP-C025(119)--SE-25

On 270th Street, Over Panther Creek, on the south line ofS15, T79N, R28W, Colfax Township

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$600,000

$590,000

$600,000

$590,00032498

Madison County

BROS-SWAP-C061()--FE-61

On R21, Over BRANCH TO CLANTON CREEK, at S1 T74R27

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00044730

Marion County

BROS-SWAP-C063(138)--SE-63

On STORY DR, Over ENGLISH CREEK, from 103rd to94th S16 T74 R20

Bridge Replacement

DOT Approved

10/19/2021

TotalFederal Aid

RegionalSwap

$800,000

$800,000

$800,000

$800,00037566

Madison County

BRS-SWAP-2215(601)--FF-61

On R21 (PERU RD), Over CLANTON CREEK, S12 T74R27

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,800,000

$360,000

$1,800,000

$360,00037567

Madison County

BRS-SWAP-C061(115)--FF-61

On R35 (BEV. PARK RD.), Over CLANTON CREEK, S12T75 R26

Bridge Replacement

DOT Approved

8/17/2021

TotalFederal Aid

RegionalSwap

$2,200,000

$700,000

$2,200,000

$700,00032218

Jasper County

BHS-SWAP-C050()--FC-50

On County Road F48, Over Small Stream, along WLINES10 T79 R21

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00047106

Dallas County

BROS-SWAP-C025(B-67)--SE-25

On IVY PL, Over FROG CREEK, S16 T81 R28

Bridge New

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00032516

Dallas County

BROS-SWAP-C025(E-44)--SE-25

On B Avenue, Over Mosquito Creek, on the east line of S6,T80, R29, Lincoln Township

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$620,000

$600,000

$620,000

$600,000

229

Page 233: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

16565

Jasper County

BROS-SWAP-C050( )--SE-50

N 75th Ave W: Over Clear Creek

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$375,000

$375,000

$375,000

$375,00037408

Jasper County

BROS-SWAP-C050()--FE-50

On S 44th Ave, Over SMALL STREAM, on NLINE S16 T79R19

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$550,000

$550,000

$550,000

$550,00038753

Jasper County

BROS-SWAP-C050()--SE-50

On Eagle St, Over INDIAN CREEK, in SW Corner of S27TT81N RR21W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00038606

Polk County

BROS-SWAP-C077(BR9150)--SE-77

ON SE 48TH AVE, IN THE NW 1/4 SEC 28-78-22, 0.98 MI.EAST OF SE POWERS DRIVE

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00032507

Story County

BROS-SWAP-C085(162)--FE-85

On 150th St., Over Skunk River, NLINE S31 T85 R23

Bridge Replacement

DOT Approved

11/15/2022

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00027021

Jasper County

BRS-SWAP-C050(116)--FF-50

On County Road F48, Over Squaw Creek, on the west sideof W 116th St S S11 T79 R21

Bridge Replacement

DOT Approved

12/20/2022

TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,00032336

Marion County

BRS-SWAP-C063(T15)--FF-63

On T15, Over BNSF RR AND STREAM, from 165th toLisbon Dr.

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$2,750,000

$2,750,000

$2,750,000

$2,750,00047104

Dallas County

BROS-SWAP-C025(N-61)--SE-25

On 365TH ST, Over BEAR CREEK, S32 T78 R28

Culvert New

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00037298

Story County

BROS-SWAP-C085()--FE-85

On 530th Ave., Over Ballard Creek, on WLINE S15 T82R24

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,000

230

Page 234: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

32791

Warren County

BROS-SWAP-C091(M2009)--SE-91

On 20TH AVE, Over PAINTER CREEK, S20 T75 R25

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00020595

Madison County

BRS-SWAP-C061()--FF-61

On P53, Over NORTH RIVER, S10 T76 R29

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,200,000

$1,200,000

$1,200,000

$1,200,00047114

Dallas County

BHS-SWAP-C025(N-60)--FC-25

On F 60, Over PANTHER CREEK, S5 T78 R28

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00040161

Boone County

BROS-SWAP-C008(xx)--SE-08

On 310TH ST, Over LITTLE BEAVER CREEK, S18 T82R27

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00040162

Boone County

BROS-SWAP-C008(xx)--SE-8

On 140TH ST, Over MONTGOMERY CREEK, S25 T85R26

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00044737

Marion County

BROS-SWAP-C063(168th)--SE-63

On 168TH PL, Over Cedar Creek, from Vermont to MonroeCo. Line S27 T74 R19

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00037572

Madison County

BRS-SWAP-C061()--FF-61

On R35 (BEV. PARK RD.), Over MIDDLE RIVER, at SWS25 T76 R26

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$2,500,000

$2,500,000

$2,500,000

$2,500,000

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

8948

Dallas County

HSIP-SWAP-C025(A-31)--FJ-25

On P-46, from Highway 141 N 2.0 miles to Greene Co.,Dallas Township

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$2,000,000

$240,000

$676,000

$2,000,000

$240,000

$676,000

231

Page 235: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48675

Boone

STBG-SWAP-0750()--SG-08

In the city of Boone, On W Park Ave approx. 750 ft W ofWestwood Blvd to S Marion St approx. 1,000 ft S ofMadison St

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000

$725,000

$725,000

$1,500,000

$725,000

$725,000

45451

Indianola

STBG-SWAP-3680()--SG-91

In the city of Indianola, East Hillcrest Avenue from NorthJefferson Way to North 14th Street

Grade and Pave, Traffic Signals

DOT Approved TotalFederal Aid

RegionalSwap

$4,522,600

$3,105,000

$3,105,000

$4,522,600

$3,105,000

$3,105,00029505

Newton

STBG-SWAP-5482(622)--SG-50

In the city of Newton, Union Drive Reconstruction, fromaprox 520ft S of N 4th Avenue to aprox 80ft N of N 19thAvenue

Pavement Rehab

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$2,800,000

$2,800,000

$2,800,000

$2,800,000

$2,800,000

$2,800,000

35889

Boone County

STBG-SWAP-C008()--FG-8

On E26, approximately .58 miles west and .50 miles east ofthe Des Moines River

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,000

$600,000

$600,00045720

Boone County

STBG-SWAP-C008()--SK-08

On X AVE, Over ONION CREEK, S25 T84 R25

DOT Approved

8/16/2022

TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,000

$400,000

$400,00010913

Madison County

STBG-SWAP-C061()--FG-61

On G61 (MACKSBURG RD), from ADAIR/MADISONCOUNTY LINE EAST 6 Miles to FIELDSTONE AVE.

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,500,000

$2,500,000

$2,500,000

$2,500,000

$2,500,000

$2,500,00044729

Marion County

STBG-SWAP-C063(141)--FG-63

On G 76, from IA 5 to Van Buren Dr. S11 T74 R19

Pavement Rehab

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,000

$350,000

$350,00036012

Story County

STBG-SWAP-C085(164)--FG-85

On R38, from Slater City Limits north 8.0 Miles

Pavement Rehab

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$2,400,000

$2,400,000

$2,400,000

$2,400,000

$2,400,000

$2,400,00048644

Pella

STBG-SWAP-5947()--SG-63

In the city of Pella, - Washington Street and Fifield RoadIntersection

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$450,000

$450,000

$500,000

$450,000

$450,000

232

Page 236: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39163

Perry

STBG-SWAP-5970()--SG-25

In the city of Perry, Willis Avenue Overlay from 3rd to 16thStreet

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$539,000

$539,000

$539,000

$539,000

$539,000

$539,00038624

Boone County

STBG-SWAP-C008(xx)--FG-08

On E 18, Over BLUFF CREEK, on NLINE S20 T85N R27W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$620,000

$620,000

$620,000

$620,000

$620,000

$620,00038825

Marion County

STBG-SWAP-C063()--FG-63

On McKimber and on S. Attica Rd. both from IA 5/92 toKnoxville Corp. Limit, and on 110th from IA 5/92 toMcKimber

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,000

$600,000

$600,000

40160

Boone County

STBG-SWAP-C008()--SK-08

On L RD, Over TRIB. OF DES MOINES RIVER, S14 T85R27

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,000

$350,000

$350,00037454

Dallas County

STBG-SWAP-C025(H-43)--FG-25

On R22, from Highway 44 N 5 miles to F31, GrantTownship

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,750,000

$800,000

$800,000

$2,750,000

$800,000

$800,00044747

Polk County

STBG-SWAP-C077(NE 42 St)--SG-77

On NE 42 St, from NE 150th Ave N 2 miles to NE 166th Ave

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,000

$350,000

$350,00041362

Story County

STBG-SWAP-C085(E29)--FG-85

On E29, from 700' west of 570th Ave. E 9.2 miles to 660thAve.

DOT Approved TotalFederal Aid

RegionalSwap

$1,800,000

$1,800,000

$1,800,000

$1,800,000

$1,800,000

$1,800,00036930

Pella

STBG-SWAP-5947()--SG-63

In the city of Pella, Oskaloosa St, from SE 16 to 240 St(Eagle Lane) including the intersection approx. 300 ft

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,650,000

$1,650,000

$1,650,000

$1,650,000

$1,650,000

$1,650,00044738

Marion County

STBG-SWAP-C063(OL)--FG-63

On G28 from IA 14 to Pella CL, T14 from Jasper Co. toPella CL, T17 from Old Hwy 92 to IA 5, S45 from G76 toLucas Co.

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$5,100,000

$1,600,000

$1,600,000

$5,100,000

$1,600,000

$1,600,000

233

Page 237: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

40174

Polk County

STBG-SWAP-C077()--FG-77

On SE 6TH AVE, from SE 92 St to SE Camp Dr, 2.70 miles

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$459,000

$459,000

$459,000

$459,000

$459,000

$459,000

234

Page 238: Iowa Statewide Transportation Improvement Program

RPA 12 - Region XII Council of Governments

1009 East Anthony Street, P.O. Box 768, Carroll, IA 51401

Phone: 712-792-9914, Fax: 712-792-1751, www.region12cog.org

\.

i i

Audubon! I County I

Gutherie County

�orts � Commercial

- Interstate

- National Highway System

El Enhanced - Primary Roads

El General Service

El Basic Service

El Local Service Transit [el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

235

Page 239: Iowa Statewide Transportation Improvement Program

236

Page 240: Iowa Statewide Transportation Improvement Program

RPA 12NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39242

Iowa Department ofTransportation

22153

BRF-144()--38-37

IA144: EAST BUTTRICK CREEK 6.7 MI S OF IA 175

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,365,000$1,092,000

$1,365,000$1,092,000

45266

Iowa Department ofTransportation

22154

BRF-30()--38-24

US30: EAST BOYER RIVER 0.4 MI E OF W JCT US 59(EB & WB)

Bridge Rehabilitation

FHWA Approved TotalFederal Aid

RegionalSwap

$1,578,000$1,262,400

$1,578,000$1,262,400

48637

Iowa Department ofTransportation

22156

BRF-30()--38-14

US30: STORM CREEK 2.5 MI W OF CO RD N41

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,465,000$1,172,000

$1,465,000$1,172,000

48616

Iowa Department ofTransportation

22155

BRF-30()--38-24

US30: BOYER RIVER 0.8 MI E OF CO RD M14

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,665,000$1,332,000

$1,665,000$1,332,000

237

Page 241: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37941

Iowa Department ofTransportation

BRFN-144()--39-37

IA144: EAST BUTTRICK CREEK 4.0 MI S OF IA 175

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$896,000 $896,000

39211

Iowa Department ofTransportation

NHSN-59()--2R-24

US59: N OF CO RD E59 TO N OF CO RD E53

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,041,000 $1,041,000

39212

Iowa Department ofTransportation

STPN-141()--2J-24

IA141: 2.8 MI E OF CO RD M36

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$451,000 $451,000

48497

Iowa Department ofTransportation

STPN-175()--2J-81

IA175: IA 471 INTERSECTION INCLUDING 0.3 MI N ONIA 471

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,105,000 $1,105,000

38208

Iowa Department ofTransportation

STPN-20()--2J-81

US20: W OF ADAMS AVE TO US 71

Wetland Mitigation

DOT Approved TotalFederal Aid

RegionalSwap

$171,000 $171,000

48521

Iowa Department ofTransportation

STPN-471()--2J-81

IA471: CO RD D36 INTERSECTION

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$558,000 $558,000

39185

Iowa Department ofTransportation

BRFN-141()--39-14

IA141: WEST NISHNABOTNA RIVER IN MANNING

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$347,000 $347,000

39213

Iowa Department ofTransportation

BRFN-141()--39-24

IA141: EAST SOLDIER RIVER 0.1 MI W OF CO RD L51

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$605,000 $605,000

39210

Iowa Department ofTransportation

BRFN-30()--39-24

US30: ROCKY RUN CREEK 4.5 MI W OF CO RD M55

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,481,000 $1,481,000

238

Page 242: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38019

Iowa Department ofTransportation

BRFN-39()--39-81

IA39: PORTER CREEK 2.4 MI S OF CO RD D59

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$904,000 $904,000

45376

Iowa Department ofTransportation

BRFN-59()--39-24

US59: COON CREEK 2.1 MI S OF US 30

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $1,894,000 $1,899,000

48431

Iowa Department ofTransportation

BRFN-471()--39-81

IA471: DITCH 0.2 MI N OF CO RD D36

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $330,000 $335,000

48566

Iowa Department ofTransportation

BRFN-25()--39-39

IA25: BRUSHY CREEK 3.2 MI N OF IA 44

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$780,000 $780,000

48614

Iowa Department ofTransportation

BRFN-59()--39-24

US59: SOLDIER RIVER 2.9 MI S OF CO RD E16

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$520,000 $520,000

48618

Iowa Department ofTransportation

BRFN-71()--39-5

US71: STREAM 1.1 MI N OF CO RD F65

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$865,000 $865,000

239

Page 243: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35649

RPA 12

22310

RGPL-PA12()--ST-14

Regional Transportation Planning

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$100,000$80,000

$80,000

$100,000$80,000

$80,000

$100,000$80,000

$80,000

$100,000$80,000

$80,000

$400,000$320,000

$320,000

48708

RPA 12

22314

RGTR-PA12()--ST-37

Video Surveillance Equipment at Satellite Transit Facilities

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$4,020$3,216

$3,216

$4,020$3,216

$3,216

48499

Iowa Department ofTransportation

22311

STP-144()--2C-37

IA144: 230TH ST IN GRAND JUNCTION TO NCL DANA

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$2,014,000$1,611,200

$2,014,000$1,611,200

48622

Iowa Department ofTransportation

22312

STP-44()--2C-39

IA44: ECL OF GUTHRIE CENTER TO WCL OF PANORA

Pavement Widening, Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,454,000$2,865,000

$3,454,000$2,865,000

DOT Note: Project includes STPG and HSIP funds

48707

Iowa Department ofTransportation

22313

STP-IA39()--2C-24

On IA 39 N, from Deloit N to Odebolt

Pavement Rehab/Widen

FHWA Approved TotalFederal Aid

RegionalSwap

$10,350,000$960,000

$960,000

$10,350,000$960,000

$960,000

240

Page 244: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45509

Audubon

22406

TAP-R-0300(604)--8T-05

In the city of Audubon, On Audubon Rec Center Link Trail,0.32 miles S28 T80 R35

Ped/Bike Paving

FHWA Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$140,000$112,000

$70,000

$140,000$112,000

$70,000

PA Note: $70,000 in Regional STBG - TAP Funds $42,000 in Statewide STBG-TAP SRTS Funds.

45511

Stuart

22408

TAP-R-7457(606)--8T-39

In the city of Stuart, On N 2ND ST, to West Central ValleySchool S33 T78 R30

Ped/Bike Grade &amp; Pave

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$270,000$216,000

$135,000

$270,000$216,000

$135,000

PA Note: $135,000 in Regional STBG-TAP $81,000 in Statewide STBG-TAP SRTS Program

45510

Wall Lake

22407

TAP-U-8065()--8I-81

On Wall Lake Trail , 1.0 miles S17 T86 R36

Ped/Bike Grade &amp; Pave

FHWA Approved

6/21/2022

TotalFederal Aid

RegionalSwap

$250,000$200,000

$200,000

$250,000$200,000

$200,000

48702

Denison

22409

TAP-U-1920()--8I-24

In the city of Denison, On 8TH AVE N

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$337,000$200,000

$200,000

$337,000$200,000

$200,000

48703

Sac CountyConservation Board

22410

TAP-U-C081()--8I-81

On Sauk Rail Trail

Ped/Bike Paving

FHWA Approved TotalFederal Aid

RegionalSwap

$250,000$200,000

$200,000

$250,000$200,000

$200,000

241

Page 245: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

47153

Audubon

BROS-SWAP-0300(603)--SE-05

In the city of Audubon, On N DIVISION ST, Over BLUEGRASS CREEK, S20 T80 R35

Bridge Replacement

DOT Approved

10/19/2021

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00039562

Casey

BROS-SWAP-1152(602)--SE-39

In the city of Casey, On Thomas Street, Over Middle River

Bridge Replacement

DOT Approved

6/21/2022

TotalFederal Aid

RegionalSwap

$675,000

$540,000

$675,000

$540,00047255

Carroll County

BROS-SWAP-C014(169)--SE-14

On 280TH ST, Over FIELD STREAM, S4 T82 R35

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00044864

Crawford County

BROS-SWAP-C024(128)--SE-24

On H Ave crossing East Boyer River, North Line Section 11Westside Twp.

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00036451

Sac County

BROS-SWAP-C081(79)--SE-81

On IRA AVE, Over STREAM, from 0.40 miles South of280th St S5 T87 R37

Culvert New

DOT Approved

10/19/2021

TotalFederal Aid

RegionalSwap

$180,000

$180,000

$180,000

$180,00036468

Sac County

BROS-SWAP-C081(80)--FE-81

On N14 (Union Ave), Over DD 19, 0.80 Miles South of190th Ave (D15), SW S23 T89 R35

Bridge Replacement

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$325,000

$325,000

$325,000

$325,00036465

Sac County

BROS-SWAP-C081(BV-3660)--SE-81

On 270TH ST, Over INDIAN CREEK, from 0.60 miles Eastof Mace Ave. S36 T88 R37

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00036458

Sac County

BROS-SWAP-C081(JA-3230)--SE-81

On 270TH ST, Over SMALL STREAM, 0.30 miles East ofOtter Ave, NW S32 T88 R36

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00036463

Sac County

BRS-SWAP-C081(81)--FF-81

On D54 or 355th St, Over DD #60, 0.05 miles West of OtterAve.

Bridge Replacement

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,000

242

Page 246: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36459

Sac County

BROS-SWAP-C081(78)--FE-81

On XAVIER AVE, Over RACCOON RIVER, from 0.20 milesSouth of 335th St. S35 T87 R35

Bridge Replacement

DOT Approved

9/20/2022

TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,00036455

Sac County

BROS-SWAP-C081(CO-0109)--SE-81

On GARD AVE, Over SMALL STREAM, from 0.90 milessouth of 220th Street S1 T88 R38

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$160,000

$160,000

$160,000

$160,00038541

Crawford County

BRS-SWAP-C024(129)--FF-24

On Co Rd L51, Over Soldier River, WLINE S13 T84 R41

DOT Approved

1/18/2023

TotalFederal Aid

RegionalSwap

$800,000

$800,000

$800,000

$800,00038947

Audubon County

BROS-SWAP-C005()--SE-05

On 240th St., Over Creek, in NE S16 T79N R34W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00045645

Crawford County

BROS-SWAP-C024()--SE-24

On U AVE, Over W. FK W.NISHNABOTNA RIVER, S11 T82R38

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00037457

Sac County

BROS-SWAP-C081(77)--FE-81

On D 54, Over RACCOON RIVER, S11 T86 R35

Bridge Replacement

DOT Approved

9/17/2024

TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,00047072

Sac County

BROS-SWAP-C081(CO-1803)--SE-81

On BUCHANAN AVE, Over SMALL STREAM, S18 T88 R38

DOT Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00037458

Sac County

BROS-SWAP-C081(ED-0290)--SE-81

On 160th St., Over Un-named creek, 0.90 miles east of IraAve, on the Sac / BV Co. Line, NE S2 T89N R37W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00035304

Greene County

BROS-SWAP-C037(80)--FE-37

On P14, Over RACCOON RIVER, on WLINE S3 T83 R31

Bridge Replacement

DOT Approved

2/18/2025

TotalFederal Aid

RegionalSwap

$2,500,000

$2,500,000

$2,500,000

$2,500,000

243

Page 247: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36469

Sac County

BROS-SWAP-C081(LE-1504)--FE-81

On M55 (Karr Ave), Over UNNAMED CREEK, 0.40 milesSouth of D59 (360th St.), NW S15 T86 R37

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00044846

Crawford County

BRS-SWAP-C024(BR47-30)--FF-24

On Co Rd M55 over the East Boyer River, near the centerof Section 30 Westside Twp.

DOT Approved TotalFederal Aid

RegionalSwap

$850,000

$850,000

$850,000

$850,000

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37622

Guthrie County

STBG-SWAP-C039(98)--FG-39

On F32, from Guthrie Center approx 14 miles to N46

Pavement Rehab

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$4,000,000

$1,000,000

$1,000,000

$4,000,000

$1,000,000

$1,000,00037676

Audubon County

STBG-SWAP-C005()--FG-05

On F32, from Co. Hwy M66 E 7.2 miles to US Hwy 71

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$3,000,000

$900,000

$900,000

$3,000,000

$900,000

$900,00037659

Greene County

STBG-SWAP-C037(81)--FG-37

On E57, from P-14 East 4.469 Miles to HWY-4

Pavement Rehab/Widen

DOT Approved

1/18/2023

TotalFederal Aid

RegionalSwap

$2,550,000

$2,040,000

$2,040,000

$2,550,000

$2,040,000

$2,040,00038804

Sac County

STBG-SWAP-C081(N28-PCC)--FG-81

On N28, from Lytton-D36 S 11.6 miles to IA 175

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$5,000,000

$2,000,000

$2,000,000

$5,000,000

$2,000,000

$2,000,000

244

Page 248: Iowa Statewide Transportation Improvement Program

0

RPA 13 - Southwest Iowa Planning Council

1501 Southwest 7th Street, Atlantic, IA 50022

Phone: 712-243-4196, Fax: 712-243-3458, www.swipco.org

Omaha - Council Bluffs

Metropolitan Area

Planning Agency

(MAPA)

5 10

Fremont County

48

Montgo���r 48 County

71

Cass County

148

�orts � Commercial

- Interstate

- National Highway System

El Enhanced - Primary Roads

El General Service

El Basic Service

El Local Service Transit [el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

245

Page 249: Iowa Statewide Transportation Improvement Program

246

Page 250: Iowa Statewide Transportation Improvement Program

RPA 13ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45185

Page County

ILL-C073()--92-73

On N14 from 280th St (J53) north to IA 2; and on "J Road"from 130th St (J20) north and west to US 71

DOT Approved TotalFederal Aid

RegionalSwap

$2,500,000 $2,500,000

247

Page 251: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37865

Iowa Department ofTransportation

22157

BRF-59()--38-73

US59: EAST NISHNABOTNA RIVER 1.0 MI N OF IA 48

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$40,000 $6,173,000$4,938,400

$6,213,000$4,938,400

38077

Iowa Department ofTransportation

22159

IMX-080()--02-15

I-80: 0.7 MI W OF US 71 TO ADAIR CO LINE (EB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$4,865,000$4,378,500

$4,865,000$4,378,500

38079

Iowa Department ofTransportation

22160

IMX-80()--02-15

I-80: POTTAWATTAMIE CO TO E OF IA 173 (WB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$1,401,000$1,260,900

$1,401,000$1,260,900

48414

Iowa Department ofTransportation

22158

NHSX-2()--3H-36

IA2: HORSE CREEK TO I-29

Culvert New, Grading, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$3,510,000$2,808,000

$3,510,000$2,808,000

39186

Iowa Department ofTransportation

22162

BRF-92()--38-15

IA92: SEVENMILE CREEK 1.7 MI W OF W JCT US 71

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,174,000$1,739,200

$2,174,000$1,739,200

45354

Iowa Department ofTransportation

22161

BRF-2()--38-36

IA2: DITCH 3.1 MI E OF I-29

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$5,061,000$4,048,800

$5,061,000$4,048,800

48630

Iowa Department ofTransportation

22163

BRF-2()--38-36

IA2: STREAM 3.9 MI E OF I-29

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$5,332,000$4,265,600

$5,332,000$4,265,600

45384

Iowa Department ofTransportation

22164

BRF-2()--38-36

IA2: DITCH 2.8 MI E OF I-29

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$5,321,000$4,256,800

$5,321,000$4,256,800

45350

Iowa Department ofTransportation

22165

NHSX-34()--3H-69

US34: W OF IA 48 TO CO RD H34

Grade and Pave, Lighting, Traffic Signals

FHWA Approved TotalFederal Aid

RegionalSwap

$12,901,000$10,320,800

$12,901,000$10,320,800

248

Page 252: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37938

Iowa Department ofTransportation

BRFN-2()--39-36

IA2: MISSOURI RIVER E OF NEBRASKA CITY (STATESHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$21,000 $21,000 $21,000 $21,000 $84,000

37988

Iowa Department ofTransportation

BRFN-34()--39-69

US34: WEST NODAWAY RIVER 0.3 MI W OF US 71 (EB &WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,296,000 $1,296,000

37894

Iowa Department ofTransportation

BRFN-6()--39-15

US6: INDIAN CREEK 0.4 MI E OF IA 48

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$442,000 $442,000

37897

Iowa Department ofTransportation

BRFN-83()--39-15

IA83: EAST NISHNABOTNA RIVER 1.1 MI W OF W JCTUS 6

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$431,000 $431,000

38087

Iowa Department ofTransportation

IMN-29()--0E-36

I-29: MISSOURI TO 1.0 MI S OF IA 2 (NB)

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$678,000 $678,000

38086

Iowa Department ofTransportation

IMN-29()--0E-36

I-29: MAIN DITCH #6 0.4 MI S OF IA 333 (NB & SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,725,000 $1,725,000

39188

Iowa Department ofTransportation

IMN-80()--0E-15

I-80: 570TH ST 2.0 MI W OF IA 173 (EB & WB)

Grade and Pave, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $2,558,000 $2,563,000

45346

Iowa Department ofTransportation

NHSN-34()--2R-69

US34: WEST NODAWAY RIVER 0.3 MI W OF US 71 (EB)

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,170,000 $1,170,000

39308

Iowa Department ofTransportation

BRFN-34()--39-69

US34: MIDDLE NODAWAY RIVER 3.0 MI E OF US 71

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$638,000 $638,000

249

Page 253: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39187

Iowa Department ofTransportation

BRFN-6()--39-15

US6: EAST NISHNABOTNA RIVER 2.6 MI E OF IA 48

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$817,000 $817,000

38088

Iowa Department ofTransportation

IMN-29()--0E-36

I-29: 1.5 MI N OF CO RD L31 TO 1.0 MI N OF CO RD J18(SB)

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,291,000 $1,291,000

45313

Iowa Department ofTransportation

BRFN-2()--39-36

IA2: FISHER CREEK 2.2 MI W OF US 59

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$659,000 $659,000

45290

Iowa Department ofTransportation

IMN-29()--0E-36

I-29: ABANDONED RR 1.6 MI S OF IA 2 (SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$701,000 $701,000

45264

Iowa Department ofTransportation

IMN-80()--0E-15

I-80: 770TH ST 1.9 MI E OF IA 148 (EB & WB)

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$1,555,000 $1,555,000

48598

Iowa Department ofTransportation

IMN-80()--0E-15

I-80: IA 148 INTERCHANGE

Bridge Rehabilitation, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $1,270,000 $1,275,000

48611

Iowa Department ofTransportation

BRFN-34()--39-69

US34: TARKIO RIVER 0.7 MI W OF CO RD M63

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$450,000 $450,000

48572

Iowa Department ofTransportation

IMN-29()--0E-36

I-29: 200TH ST 5.4 MI N OF IA 2

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$710,000 $710,000

48520

Iowa Department ofTransportation

IMN-80()--0E-15

I-80: POTTAWATTAMIE CO TO 0.3 MI W OF CO RD G30(VAR LOC)

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$4,375,000 $4,375,000

250

Page 254: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

791

RPA 13

22315

RGPL-PA13(RTP)--ST-00

SW IA 4/SWIPCO: RPA 13 TRANSPORTATION PLANNING

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$10,000$8,000

$8,000

$10,000$8,000

$8,000

$10,000$8,000

$8,000

$10,000$8,000

$8,000

$40,000$32,000

$32,000

48484

Iowa Department ofTransportation

22316

STP-275()--2C-36

US275: N OF COLORADO AVE IN HAMBURG TO N OF SJCT IA 2

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$2,863,000$2,290,400

$2,863,000$2,290,400

48488

Iowa Department ofTransportation

22317

STP-275()--2C-36

US275: MISSOURI STATE LINE TO N OF COLORADOAVE IN HAMBURG

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$1,643,000$1,314,400

$1,643,000$1,314,400

STBG-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45182

Page County

22336

BRS-C073(139)--60-73

On D Ave (M41), Over East Nishnabotna River, S23 T70R39

FHWA Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$2,500,000$2,000,000

$500,000

$2,500,000$2,000,000

$500,000

251

Page 255: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48653

Stanton

22413

TAP-R-7262()--8T-69

In the city of Stanton, From Prospect Street to old RRcorridor to 225th St.

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$244,435$100,000

$100,000

$244,435$100,000

$100,000

48652

Clarinda

22412

TAP-U-1332()--8I-73

In the city of Clarinda, On E. Washington St., from North 6thSt. .328 miles to N. 11th St.

Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$290,369$100,000

$100,000

$290,369$100,000

$100,000

38394

Shenandoah

22411

TAP-U-6965(616)--8I-73

In the city of Shenandoah, On Ferguson Ave.

Ped/Bike Structures

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$118,000$88,000

$88,000

$118,000$88,000

$88,000

252

Page 256: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36178

Cass County

BROS-SWAP-C015(73)--FE-15

On Boston Road, Over Creek, from Olive Street East 0.1Miles, on NLINE S9 T77 R36

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00045590

Cass County

BROS-SWAP-C015(74)--SE-15

On 730th Street 0.2 miles south of White Pole Road

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,00045702

MontgomeryCounty

BROS-SWAP-C069()--FE-69

On H 20, Over WEST NODAWAY, S21 T73 R36

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,00045704

MontgomeryCounty

BROS-SWAP-C069()--FE-69

On H 20, Over TARKIO CREEK TRIB, S23 T73 R37

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$425,000

$425,000

$425,000

$425,00038525

MontgomeryCounty

BROS-SWAP-C069()--SE-69

On 180th St, Over LITTLE TARKIO CREEK, S14 T72N R37

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$295,000

$295,000

$295,000

$295,00036170

Cass County

BROS-SWAP-C015(68)--SE-15

On 680th Street, Over West Nodaway River, BetweenVictoria Road Intersections, on WLINE S16 T74 R35

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,00039013

Cass County

BROS-SWAP-C015(75)--FE-15

On 610th Street, Over Creek, from Oxford Road North 0.6Miles to Bridge #182, in NW S8 T75N R36W

Bridge Replacement

DOT Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00035856

MontgomeryCounty

BROS-SWAP-C069()--FE-69

On L Avenue (M59), Over BNSF RR, on WLINE S31 T72R37

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00038812

MontgomeryCounty

BROS-SWAP-C069()--SE-69

On W Avenue, Over Tributary to Nodaway River, fromCass Co line south 0.3 Miles, on WLINE S1 T73 R36

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,000

253

Page 257: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45183

Page County

BROS-SWAP-C073()--FE-73

On M 32, Over STREAM, S8 T67 R39

DOT Approved TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00045609

Page County

BROS-SWAP-C073(141)--FE-73

On 150th Street, Over East Nishnabotna River, S27 T70R39

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$2,250,000

$2,250,000

$2,250,000

$2,250,00024823

Fremont County

BRS-SWAP-C036()--FF-36

On J18, Over WALNUT CREEK, S13 T70 R40

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$900,000

$900,000

$900,000

$900,00045184

Page County

BRS-SWAP-C073(140)--FF-73

On J 53, Over BUCHANAN CREEK, S11 T67 R36

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,200,000

$1,200,000

$1,200,000

$1,200,00038802

Cass County

BROS-SWAP-C015(250)--FE-15

On 710th Street, Over Creek, on WLINE S1 T76N R35W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00034494

Cass County

BROS-SWAP-C015(BR 269)--FE-15

On 660th Street, from Jackson Rd South 3/8 Miles, at S19T76 R35

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00037146

MontgomeryCounty

BROS-SWAP-C069()--FE-69

On L Avenue, Over Trib. to Little Tarkio Creek, from 230thSt South .1 Miles, on WLINE S7 T71 R37

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$320,000

$320,000

$320,000

$320,00037144

MontgomeryCounty

BROS-SWAP-C069()--FE-69

On M65 (Q Ave), Over BNSF RR, on WLINE S12 T71 R37

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00039058

Page County

BROS-SWAP-C073()--FE-73

On F Ave, Over unnamed tributary of West Tarkio Creek, inS13 T68 R39

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,000

254

Page 258: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

7118

Cass County

BRS-SWAP-C015(46)--FF-15

On Highland Road (G-30), Over Indian Creek, from 555thSt West 1/2 Miles, at S5 T76 R37

Bridge Replacement

DOT Approved

7/19/2022

TotalFederal Aid

RegionalSwap

$1,200,000

$1,200,000

$1,200,000

$1,200,00031035

MontgomeryCounty

BRS-SWAP-C069(63)--FF-69

On H54, Over Tributary to Tarkio Creek, on NLINE S33T71 R37

Bridge Replacement

DOT Approved

7/18/2023

TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00010891

Cass County

BROS-SWAP-C015(210)--SE-15

Bridge 210 - On Nishna Valley Road, Over INDIAN CREEK,from Hwy 48 West 1/2 Miles, at S8 T75 R37

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$640,000

$640,000

$640,000

$640,00037689

Cass County

BROS-SWAP-C015(401)--SE-15

On Crooked Creek Road, Over Troublesome Creek, fromBoston Road South 0.9 Miles to Troublesome Creek, in S12T77 R35

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,000

45585

Cass County

BROS-SWAP-C015(Br168)--SE-15

On Quincy Road, Over Hoyt's Branch, from East C.L. ofCumberland E 0.1 miles S27 T75 R35

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00045710

MontgomeryCounty

BROS-SWAP-C069()--SE-69

On G AVE, Over LOCAL CREEK, S17 T72 R38

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00036638

Page County

BROS-SWAP-C073()--FE-73

On M 58, Over SNAKE CREEK, S31 T69 R37

DOT Approved TotalFederal Aid

RegionalSwap

$800,000

$800,000

$800,000

$800,00037542

Fremont County

BRS-SWAP-C036()--FF-36

On L44 (Bluff Road), Over COOPER CREEK, in NE S7 T68R42

Grade and Pave, Bridge New

DOT Approved TotalFederal Aid

RegionalSwap

$1,100,000

$1,100,000

$1,100,000

$1,100,000

255

Page 259: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48645

Red Oak

STBG-SWAP-6360(622)--SG-69

In the city of Red Oak, On Eastern Avenue, from ForestAvenue S .25 miles to Summit St.

DOT Approved

6/21/2022

TotalFederal Aid

RegionalSwap

$530,000

$330,000

$330,000

$530,000

$330,000

$330,00048389

Shenandoah

STBG-SWAP-6965(617)--SG-73

In the city of Shenandoah, On N. Center St. and W. NishnaRd.

Pavement Rehab

DOT Approved

10/19/2021

TotalFederal Aid

RegionalSwap

$1,033,000

$573,760

$573,760

$1,033,000

$573,760

$573,760PA Note: This project is actually three different streets. Two are STBG eligible. I marked both in the map but only one came up in the description. The two federal functional classified routes are N.Center St. from W. Sheridan Ave. to Ferguson Ave. and W. Nishna Rd. from Fremont St. to Anna Crose Highway. The local route is W. Thomas Ave. from US 59 to Railroad St. and is not markedon the map.

29201

Fremont County

STBG-SWAP-C036()--FG-36

On J18, from M16 East 4.0 Miles to 410th Ave

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,400,000

$1,400,000

$1,400,000

$1,400,000

$1,400,000

$1,400,00032471

Page County

STBG-SWAP-C073(142)--FG-73

On O Avenue (M63), from IA 2 north 11 Miles to Page/Montgomery County Line

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$3,000,000

$3,000,000

$3,000,000

$3,000,000

$3,000,000

$3,000,00036169

Cass County

STBG-SWAP-C015(N-28)--FG-15

On 690th Street, from Iowa HWY 92 North 10.2 Miles toIowa HWY 83

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,250,000

$750,000

$750,000

$2,250,000

$750,000

$750,00026730

MontgomeryCounty

STBG-SWAP-C069(65)--FG-69

On H 34, from Bridge Over RED OAK CREEK, 1.75 miles

Pavement Rehab

DOT Approved

11/15/2022

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,000

$450,000

$450,00048643

Atlantic

STBG-SWAP-0285()--SG-15

In the city of Atlantic, On West 22nd St. from 7th St. to PalmStreet., from West E .77 miles

DOT Approved TotalFederal Aid

RegionalSwap

$1,376,627

$1,068,821

$1,068,821

$1,376,627

$1,068,821

$1,068,82137525

Fremont County

STBG-SWAP-C036()--FG-36

On J18, from 410th Ave. E 1.043 miles to U.S Hwy 59

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$800,000

$640,000

$640,000

$800,000

$640,000

$640,000

256

Page 260: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45582

Cass County

STBG-SWAP-C015(G-30)--FG-15

On G 30, from Pott. County Line E 5.5 miles to 0.6 mileseast of 585th St.

DOT Approved TotalFederal Aid

RegionalSwap

$2,500,000

$2,500,000

$2,500,000

$2,500,000

$2,500,000

$2,500,00038717

MontgomeryCounty

STBG-SWAP-C069()--FG-69

On M63, from Page County Line North 5 Miles to StantonCity Limits

Pavement Rehab, Granular Shoulders

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,000

$1,000,000

$1,000,00047350

Page County

STBG-SWAP-C073()--FG-73

On J53 from 265th St easterly to Taylor County line and onJ55 from Teak Ave easterly to Taylor County line

DOT Approved TotalFederal Aid

RegionalSwap

$2,400,000

$1,400,000

$1,400,000

$2,400,000

$1,400,000

$1,400,000

257

Page 261: Iowa Statewide Transportation Improvement Program

L

0 5

/

10

RPA 14 -ATURA Transportation Planning Affiliation

101 East Montgomery Street, Creston, IA 50801

P hone: 641-782-8491, Fax: 641-782-8492, www.sicog.org

92

Adair County'

.-,.----..-----(

�orts � Commercial

- Interstate

- National Highway SystemUnion

County El Enhanced - Primary Roads

Taylor County

.. , Ringgold County

El General Service

El Basic Service

El Local Service Transit [el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

258

Page 262: Iowa Statewide Transportation Improvement Program

259

Page 263: Iowa Statewide Transportation Improvement Program

RPA 14NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45362

Iowa Department ofTransportation

22166

BRF-92()--38-1

IA92: W FORK NODAWAY RIVER 1.6 MI E OF CO RD N51

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$5,000$4,000

$4,274,000$3,419,200

$4,279,000$3,423,200

48518

Iowa Department ofTransportation

22167

IMX-80()--02-1

I-80: CASS CO TO IA 25 (WB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$8,586,000$7,727,400

$8,586,000$7,727,400

260

Page 264: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37872

Iowa Department ofTransportation

BRFN-25()--39-1

IA25: I-80 INTERCHANGE

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$333,000 $333,000

39345

Iowa Department ofTransportation

BRFN-169()--39-80

US169: STREAM 0.1 MI N OF MISSOURI

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$997,000 $997,000

39362

Iowa Department ofTransportation

BRFN-169()--39-88

US169: ABANDONED RR 2.8 MI N OF N JCT US 34(REMOVE BRIDGE)

Grade and Pave, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,403,000 $1,403,000

45325

Iowa Department ofTransportation

BRFN-148()--39-87

IA148: MIDDLE BRANCH 102 RIVER 2.8 MI S OF CO RDJ20

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$580,000 $580,000

45331

Iowa Department ofTransportation

BRFN-34()--39-88

US34: FOUR MILE CREEK 2.0 MI E OF E JCT US 169

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$936,000 $936,000

48445

Iowa Department ofTransportation

BRFN-92()--39-1

IA92: GRAND RIVER 1.0 MI W OF CO RD P28

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$490,000 $490,000

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

19871

RPA 14

22318

RGPL-PA14(FY15)--ST-0

RPA 14: Transportation Planning ATURA RPA 14

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$87,513$25,289

$25,289

$87,513$25,289

$25,289

$87,513$25,289

$25,289

$87,513$25,289

$25,289

$350,052$101,156

$101,156

261

Page 265: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45231

Corning

22414

TAP-R-1590(604)--8T-02

In the city of Corning, Hull Street, from Hull Street BridgeReplace NW 0.32 miles to School Sports Complex S34 T72R34

FHWA Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$200,000$160,000

$160,000

$200,000$160,000

$160,000

PA Note: Project received Regional STBG funding AND Regional TAP Funding. Actual Regional STBG Funding: $40,000; Actual Regional TAP Funding: $120,000.

262

Page 266: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44924

Ringgold County

BHS-SWAP-C080()--FC-80

On J 23, Over PLATTE RIVER, S34 T70 R31

Bridge Approach Repair, Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00045594

Taylor County

BRS-SWAP-C087(68)--FF-87

On J 35, Over Small Stream, S26 T69 R34

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$650,000

$650,000

$650,000

$650,00045663

Adair County

BROS-SWAP-C001(118)--SE-01

On BROWN AVE, Over NODAWAY RIVER, S32 T74 R33

DOT Approved

10/18/2022

TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,00045074

Union County

BROS-SWAP-C088()--SE-88

On JOSHUA AVE, Over THREE MILE CREEK, from H17 N1.4 miles S10 T73 R30

Bridge Replacement, Bridge Removal

DOT Approved TotalFederal Aid

RegionalSwap

$528,000

$528,000

$528,000

$528,00023439

Ringgold County

BRS-SWAP-C080()--FF-80

On P27, Over Old Railroad ROW, S14 T68 R31

Bridge Removal

DOT Approved TotalFederal Aid

RegionalSwap

$430,000

$430,000

$430,000

$430,00034578

Ringgold County

BHS-SWAP-C080()--FC-80

On J55, Over W FORK GRAND RIVER, N S15 T67 R31

Bridge Approach Repair, Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,00045075

Union County

BROS-SWAP-C088()--SE-88

On CHERRY ST RD, Over SMALL STREAM, from 205th StS 1.3 miles S31 T72 R30

Bridge Replacement, Bridge Removal

DOT Approved TotalFederal Aid

RegionalSwap

$370,000

$370,000

$370,000

$370,00034368

Adams County

BRS-SWAP-C002()--FF-02

On 150th St., Over East Nodaway River, S28 T72N R33W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00039121

Ringgold County

BRS-SWAP-C080()--FF-80

On P14, Over unknown stream, S30 T68 R31

Culvert Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$440,000

$440,000

$440,000

$440,000

263

Page 267: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38949

Adams County

BROS-SWAP-C002()--SE-02

On 110th Street, Over STREAM, from West Stream bankE-W 500 Feet to East Stream Bank, along NLINE S12 T73NR34W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$340,000

$340,000

$340,000

$340,000

44944

Ringgold County

BRS-SWAP-C080()--FF-80

On P33, Over W.FK GRAND RIVER, S6 T69 R30

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,460,000

$1,460,000

$1,460,000

$1,460,000

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

40141

Bedford

STBG-SWAP-0487(604)--SG-87

On State St, from Bedford Coroporate Limits N .32 miles toMain St S26 T68 R34

DOT Approved

2/16/2021

TotalFederal Aid

RegionalSwap

$110,000

$110,000

$110,000

$110,000

$110,000

$110,00037223

Union County

STBG-SWAP-C088()--FG-88

On OSAGE ST, from US Highway 34 north 0.5 Miles toAdams Street

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,000

$700,000

$700,00039079

Union County

STBG-SWAP-C088()--FG-88

On P27, from Ringgold-Union Street N 5.3 Miles

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$4,240,000

$2,120,000

$2,120,000

$4,240,000

$2,120,000

$2,120,00037776

Taylor County

STBG-SWAP-C087(60)--FG-87

On J35, Over WEST 102 RIVER, on NLINE S36 T69 R35

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,200,000

$1,200,000

$1,200,000

$1,200,000

$1,200,000

$1,200,00035834

Ringgold County

STBG-SWAP-C080()--FG-80

On County Highway P27, from US Highway 169 North 7.2Miles to State Highway 2

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,700,000

$2,000,000

$2,000,000

$2,700,000

$2,000,000

$2,000,000

264

Page 268: Iowa Statewide Transportation Improvement Program

0 5 10

RPA 15 - Area 15 Regional Planning Commission

224 East Second Street, P.O. Box 1110, Ottumwa, IA 52501

Phone: 641-684-6551, Fax: 641-684-4894, www.area15rpc.com

Mahaska

County 92 ,_,_�--�::---._

149 Keokuk

Van Buren

County

�orts � Commercial

- Interstate

- National Highway System

El Enhanced - Primary Roads

El General Service

El Basic Service

El Local Service Transit [el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

265

Page 269: Iowa Statewide Transportation Improvement Program

266

Page 270: Iowa Statewide Transportation Improvement Program

RPA 15HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48439

Iowa Department ofTransportation

22026

HSIPX-1()--3L-89

IA1: 0.6 MI S OF BIRMINGHAM TO 227TH ST / SCLFAIRFIELD

Pavement Widening

FHWA Approved TotalFederal Aid

RegionalSwap

$1,650,000$1,485,000

$1,650,000$1,485,000

ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45501

Oskaloosa

ILL-5780()--93-62

PEL/PA Planning Study for SE (IA 163 to IA 92) and NE (IA92 to US 63) connectors around Oskaloosa.

Trans Planning

DOT Approved TotalFederal Aid

RegionalSwap

$950,000 $950,000

267

Page 271: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37963

Iowa Department ofTransportation

22175

BRF-78()--38-54

IA78: DME RR 8.8 MI E OF IA 149

Bridge Replacement, Wetland Mitigation, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$8,016,000$6,412,800

$8,016,000$6,412,800

37977

Iowa Department ofTransportation

22174

BRF-92()--38-62

IA92: NORTH SKUNK RIVER 2.6 MI E OF E JCT CO RDV13

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$5,931,000$4,744,800

$5,931,000$4,744,800

39363

Iowa Department ofTransportation

22169

BRF-1()--38-89

IA1: LITTLE LICK CREEK 1.2 MI N OF S JCT IA 16

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$3,829,000$3,063,200

$3,829,000$3,063,200

39365

Iowa Department ofTransportation

22172

BRF-63()--38-90

US63: VILLAGE CREEK 3.1 MI S OF US 34

Bridge Widening

FHWA Approved TotalFederal Aid

RegionalSwap

$2,095,000$1,676,000

$2,095,000$1,676,000

39293

Iowa Department ofTransportation

22168

NHSX-63()--3H-62

US63: NW BYPASS OF OSKALOOSA

Bridge New, Grading, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$5,900,000$4,720,000

$24,821,000$19,856,800

$1,722,000$1,377,600

$32,443,000$25,954,400

39364

Iowa Department ofTransportation

22173

NHSX-63()--3H-90

US63: LITTLE SOAP CREEK 1.9 MILES N OF DAVIS CO

Bridge Rehabilitation, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,942,000$1,553,600

$1,942,000$1,553,600

45267

Iowa Department ofTransportation

22170

BRF-34()--38-90

US34: BNSF RR 1.2 E OF W JCT US 63 IN OTTUMWA(EB & WB)

Bridge Rehabilitation

FHWA Approved TotalFederal Aid

RegionalSwap

$2,994,000$2,395,200

$2,994,000$2,395,200

45256

Iowa Department ofTransportation

22171

BRF-2()--38-89

IA2: FOX RIVER 1.5 MI E OF CO RD V64

Bridge Rehabilitation

FHWA Approved TotalFederal Aid

RegionalSwap

$1,269,000$1,015,200

$1,269,000$1,015,200

268

Page 272: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37960

Iowa Department ofTransportation

BRFN-1()--39-51

IA1: MIDDLE WALNUT CREEK 3.1 MI S OF S JCT IA 78

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$340,000 $340,000

38033

Iowa Department ofTransportation

BRFN-34()--39-90

US34: BEAR CREEK 1.2 MI W OF CO RD H35

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$489,000 $489,000

38034

Iowa Department ofTransportation

BRFN-34()--39-90

US34: BARDELL ST 0.5 MI E OF IA 149 IN OTTUMWA(WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$262,000 $262,000

39269

Iowa Department ofTransportation

BRFN-1()--39-51

IA1: BIG CEDAR CREEK 2.8 MI S OF US 34

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$519,000 $519,000

39292

Iowa Department ofTransportation

BRFN-23()--39-62

IA23: TRIBUTARY OF CEDAR CREEK 0.8 MI N OF CORD T67

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$906,000 $906,000

39366

Iowa Department ofTransportation

BRFN-34()--39-90

US34: SOUTH AVERY CREEK 0.7 MI E OF CO RD T61

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$645,000 $645,000

39275

Iowa Department ofTransportation

BRFN-78()--39-54

IA78: RICHLAND CREEK 5.8 MI E OF IA 149

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$848,000 $848,000

36939

Fairfield

NHSN-001-2(35)--2R-51

In the city of Fairfield, On Highway 1/South Main, fromFillmore Ave 0.53 miles to 300 ft S of Libertyville Rd

Pavement Widening, Ped/Bike Paving

DOT Approved

11/15/2022

TotalFederal Aid

RegionalSwap

$900,001

$320,000

$320,000

$900,001

$320,000

$320,000PA Note: $240,000 STBG already programmed and reimbursed on PE, $320,000 should be debited as TAP. DOT funding is programmed as TPMS #38195.

38195

Iowa Department ofTransportation

NHSN-1()--2R-51

IA1: S OF LIBERTYVILLE RD TO FILLMORE AVE INFAIRFIELD

Pavement Widening

DOT Approved TotalFederal Aid

RegionalSwap

$3,500,000 $3,500,000

269

Page 273: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48586

Iowa Department ofTransportation

NHSN-34()--2R-51

US34: 0.3 MI E OF BUS 34 TO 0.4 MI E OF UMBER AVE(VAR LOC)

Slope Improvement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$497,000 $497,000

38198

Iowa Department ofTransportation

NHSN-92()--2R-54

IA92: IA 21 AND CO RD V33 INTERSECTIONS

Grade and Pave, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,169,000 $5,169,000

48443

Iowa Department ofTransportation

BRFN-92()--39-54

IA92: GERMAN CREEK 3.0 MI E OF E JCT IA 149

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$260,000 $260,000

RTP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45551

Mahaska County

22222

NRT-C062(097)--9G-62

At Bluff Creek OHV Park, 1625 325th Street, S19 T74 R16

Bridge Replacement

FHWA Approved TotalFederal Aid

RegionalSwap

$408,200$326,560

$408,200$326,560

270

Page 274: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

881

RPA 15

22319

RGPL-PA15(RTP)--ST-00

RPA 15: RPA 15 TRANSPORTATION PLANNING

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$25,000$20,000

$20,000

$25,000$20,000

$20,000

48508

Iowa Department ofTransportation

22320

STP-149()--2C-54

IA149: IA 22 TO IOWA CO

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$2,500,000$2,000,000

$2,500,000$2,000,000

48619

Iowa Department ofTransportation

22321

STP-149()--2C-90

IA149: N OF W WOODLAND AVE IN OTTUMWA TO 1.1MI N OF US 63

Pavement Widening, Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$4,450,000$3,560,000

$4,450,000$3,560,000

DOT Note: Project includes STBG and HSIP funds

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48687

Van Buren CountyConservation Board

22415

TAP-U-C089(100)--8I-89

Along Eagle Dr, from J40 N 2.5 miles S23 T69 R10

Miscellaneous

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$268,000$208,000

$208,000

$268,000$208,000

$208,000

271

Page 275: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48704

Fairfield

BHM-SWAP-2465()--SA-51

In the city of Fairfield, On BUSINESS 34 SIGNED RTE,Over WEST CROW CREEK, S30 T72 R09

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00045800

Wapello County

BHS-SWAP-C090()--FC-90

On H 21 (POWER PLANT ROAD), Over MIDDLE AVERYCREEK, S26 T73 R15

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$100,000

$100,000

$100,000

$100,00045801

Wapello County

BHS-SWAP-C090()--FC-90

On H 21 (POWER PLANT ROAD), Over Rail Road, S26T73 R15

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$100,000

$100,000

$100,000

$100,00037786

Jefferson County

BROS-SWAP-4650(601)--SE-51

On 175TH ST, Over CREEK, S9 T72 R10

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$425,000

$340,000

$425,000

$340,00036349

Jefferson County

BROS-SWAP-C051()--SE-51

On GRASSTREE AVE, Over EAST BRANCH LICK CREEK,S30 T71 R10 BRIDGE REPLACEMENT

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$570,000

$570,000

$570,000

$570,00036337

Jefferson County

BROS-SWAP-C051(81)--FE-51

On CEDAR AVE, Over ROCK CREEK, S4 T71 R11

Bridge Replacement

DOT Approved

6/21/2022

TotalFederal Aid

RegionalSwap

$675,000

$675,000

$675,000

$675,00034366

Mahaska County

BROS-SWAP-C062(99)--FE-62

On 335'th Street, Over Cedar Creek, in NW S34 T74NR14W

Bridge Replacement

DOT Approved

8/17/2021

TotalFederal Aid

RegionalSwap

$850,000

$850,000

$850,000

$850,00044763

Van Buren County

BROS-SWAP-C089()--SE-89

On 197TH RD, Over WILDCAT CREEK, S19 T69 R10

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00029230

Wapello County

BROS-SWAP-C090(100)--SE-90

On 15th Street, Over Brush Creek, S32 T71 R14

Bridge Replacement

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,000

272

Page 276: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

12637

Wapello County

BRS-SWAP-C090()--FF-90

On H 31 (Bladensburg Road), Over JORDAN CREEK, S17T72 R12

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00036350

Jefferson County

BROS-SWAP-C051()--SE-51

On 148TH ST, Over CREEK, S30 T73 R11

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$570,000

$570,000

$570,000

$570,00044744

Van Buren County

BROS-SWAP-C089()--SE-89

On ROBIN AVE, Over Bear Creek, S01 T68 R09

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00044762

Van Buren County

BROS-SWAP-C089()--SE-89

On 210TH ST, Over TRIB COATES CR, S31 T69 R08

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$150,000

$150,000

$150,000

$150,00034990

Wapello County

BROS-SWAP-C090()--FE-90

On Whiskey Ridge, Over Middle Avery Creek, SW S6 T72R15

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00034991

Wapello County

BROS-SWAP-C090()--SE-90

On 200th Avenue, Over Brush Creek, S26 T71 R15

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00036333

Jefferson County

BRS-SWAP-C051(72)--FF-51

On H43 Libertyville RD, Over BIG CEDAR CREEK, S3 T71R10

DOT Approved

12/20/2022

TotalFederal Aid

RegionalSwap

$2,200,000

$2,200,000

$2,200,000

$2,200,00040091

Mahaska County

BRS-SWAP-C062()--FF-62

On G 29, Including Bridge Number 236910 Over N SKUNKRIVER and Overflow Bridge Number 236920, S10 T76NR14

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$3,250,000

$3,250,000

$3,250,000

$3,250,000

36346

Jefferson County

BHOS-SWAP-C051()--FB-51

On CARNATION BLVD, Over CREEK, S22 T72 R11

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$260,000

$260,000

$260,000

$260,000

273

Page 277: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45699

Mahaska County

BHOS-SWAP-C062()--FB-62

On G 15, Over BUCKLEY CREEK(MIDDLE BR), S9 T77R17

DOT Approved TotalFederal Aid

RegionalSwap

$800,000

$800,000

$800,000

$800,00037797

Jefferson County

BROS-SWAP-C051()--FE-51

On BUCKEYE AVE, Over COMPETINE CREEK, S5 T72R11

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$580,000

$580,000

$580,000

$580,00038928

Wapello County

BROS-SWAP-C090()--SE-90

On Soap Creek Road, Over LITTLE SOAP CREEK, S18T71N R14W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00034989

Wapello County

BROS-SWAP-C090()--SE-90

On 180th Ave, Over Little Soap Creek, NE S19 T71 R14

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00047307

Jefferson County

BRS-SWAP-C051()--FF-51

On W 30, Over CEDAR CREEK, S36 T71 R09

DOT Approved TotalFederal Aid

RegionalSwap

$2,100,000

$2,100,000

$2,100,000

$2,100,00038927

Wapello County

BRS-SWAP-C090()--FF-90

On Lake Rd, Over VILLAGE CREEK, NW S10 T71N R14W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00036351

Jefferson County

BROS-SWAP-C051()--SE-51

On IRIS AVE, Over MITCHELL CREEK, S16 T72 R10

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$486,000

$486,000

$486,000

$486,00045175

Jefferson County

BROS-SWAP-C051()--SE-51

On CEDAR AVE, Over BRANCH ROCK CREEK, S33 T72R11

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00044743

Van Buren County

BROS-SWAP-C089()--SE-89

On 180th St, approximately 1/2 mile east of Peach Ave,east 1/2 mile over unnamed stream and Coppers creek

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$375,000

$375,000

$375,000

$375,000

274

Page 278: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44767

Van Buren County

BROS-SWAP-C089()--SE-89

On 235TH RD, Over REEDS CREEK, S11 T68 R08

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00038930

Wapello County

BROS-SWAP-C090()--SE-90

On 110TH AVE, Over LITTLE SOAP CREEK, S33 T71NR13W

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00045065

Wapello County

BROS-SWAP-C090()--SE-90

On 240TH AVE, Over Unnamed tributary to Little SoapCreek, S20 T71 R15

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00045067

Wapello County

BROS-SWAP-C090()--SE-90

On RICHLAND RD, Over MENNEIKA CREEK, S17 T73R14

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00045693

Mahaska County

BRS-SWAP-C062()--FF-62

On T 67, Over CEDAR CREEK, S24 T74 R15

DOT Approved TotalFederal Aid

RegionalSwap

$800,000

$800,000

$800,000

$800,000

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44745

Van Buren County

HSIP-SWAP-C089(99)--FJ-89

Intersections of Hwy 2 and V56, V64, Gold Ave., W20, W40;W40 and J40; V56 and J40; and Hwy 16 and V64, W30,W40

Pavement Rehab

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$93,900

$88,900

$93,900

$88,900

45859

Wapello County

HSIP-SWAP-C090(101)--FJ-90

On Various Paved Farm To Market Routes, 25 miles

Pavement Markings

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$414,000

$289,000

$414,000

$289,000

275

Page 279: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45142

Jefferson County

STBG-SWAP-C051(82)--FG-51

On H 43, ,from Pine Jack St S 1.4 miles to Libertyville Rd

Pavement Rehab

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$430,000

$430,000

$430,000

$430,000

$430,000

$430,00044764

Van Buren County

STBG-SWAP-C089()--FG-89

On J 40, from Davis County Line 5.7 miles to V64

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,900,000

$1,900,000

$1,900,000

$1,900,000

$1,900,000

$1,900,00039430

Ottumwa

STBG-SWAP-5825()--SG-90

In the city of Ottumwa, On Mary Street, from Ferry StreetWest 0.70 to Shaul Avenue

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$2,197,128

$2,055,354

$2,055,354

$2,197,128

$2,055,354

$2,055,35445491

Oskaloosa

STBG-SWAP-5780()--SG-62

On South 7th Street, S19 T75 R15

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,400,000

$1,400,000

$1,400,000

$1,400,000

$1,400,000

$1,400,00045057

Wapello County

STBG-SWAP-C090()--FG-90

On 87TH ST, from 220th Ave. W 3.0 miles to 194th Avenue

Pavement Widening, Culvert Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$2,300,000

$2,000,000

$2,000,000

$2,300,000

$2,000,000

$2,000,000

276

Page 280: Iowa Statewide Transportation Improvement Program

I I

0 5 10

RPA 16 - Southeast Iowa Regional Planning Commission

211 North Gear Avenue, Suite 100, West Burlington, IA 52655

Phone: 319-753-5107, Fax: 319-754-4763, www.seirpc.com

�orts � Commercial

- Interstate

- National Highway System

El Enhanced - Primary Roads

I

20 Miles

El General Service

El Basic Service

El Local Service Transit [el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

277

Page 281: Iowa Statewide Transportation Improvement Program

278

Page 282: Iowa Statewide Transportation Improvement Program

RPA 16HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48446

Iowa Department ofTransportation

22027

HSIPX-78()--3L-58

IA78: ECL MORNING SUN TO US 61

Pavement Widening

FHWA Approved TotalFederal Aid

RegionalSwap

$400,000$360,000

$400,000$360,000

ILL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44833

Des Moines County

ILL-C029(91)--92-29

On 40TH AVE, Over HAWKEYE DOLBEE CHANNEL, S20T72 R01

DOT Approved

11/15/2022

TotalFederal Aid

RegionalSwap

$2,000,000 $2,000,000

NHFP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39425

Mount Pleasant

22034

NHFP-5292(626)--2F-44

In the city of Mount Pleasant, BJRY Transload Building

Buildings, Outside Services Engineering

FHWA Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$670,000$536,000

$670,000$536,000

279

Page 283: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37972

Iowa Department ofTransportation

22180

BRF-78()--38-58

IA78: HONEY CREEK 1.8 MI W OF US 61

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,105,000$1,684,000

$2,105,000$1,684,000

38226

Iowa Department ofTransportation

22176

NHSX-61()--3H-29

US61: S OF 210TH ST TO N OF MEDIAPOLIS

Pave, Bridge New, Grading

FHWA Approved TotalFederal Aid

RegionalSwap

$12,356,000$9,884,800

$29,792,000$23,833,600

$1,398,000$1,118,400

$43,546,000$34,836,800

39230

Iowa Department ofTransportation

22177

NHSX-61()--3H-29

US61: N OF MEDIAPOLIS TO 0.5 MI N OF IA 78

Bridge New, Culvert New, Grading

FHWA Approved TotalFederal Aid

RegionalSwap

$2,400,000$1,920,000

$22,481,000$17,984,800

$3,194,000$2,555,200

$28,075,000$22,460,000

37968

Iowa Department ofTransportation

22179

BRF-136()--38-56

IA136: MISSISSIPPI RIVER IN KEOKUK (STATE SHARE)

Bridge Deck Overlay

FHWA Approved TotalFederal Aid

RegionalSwap

$5,000,000$4,000,000

$5,000,000$4,000,000

48419

Iowa Department ofTransportation

22178

BRF-218()--38-44

US218: SOUTH FISH CREEK 0.7 MI N OF CO RD J20(NB)

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,037,000$1,629,600

$2,037,000$1,629,600

280

Page 284: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37969

Iowa Department ofTransportation

BRFN-136()--39-56

IA136: MISSISSIPPI RIVER IN KEOKUK (STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$20,000 $20,000 $20,000 $20,000 $80,000

37924

Iowa Department ofTransportation

BRFN-34()--39-29

US34: MISSISSIPPI RIVER IN BURLINGTON (STATESHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$50,000 $50,000 $50,000 $50,000 $200,000

37973

Iowa Department ofTransportation

BRFN-92()--39-58

IA92: LITTLE INDIAN CREEK 1.9 MI W OF S JCT US 61

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$425,000 $425,000

45380

Iowa Department ofTransportation

NHSN-218()--2R-56

US218: NB ON RAMP TO IA 27

Grade and Pave, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$406,000 $406,000

38225

Iowa Department ofTransportation

NHSN-61()--2R-29

US61: MEMORIAL PARK RD IN BURLINGTON TO S OF210TH ST

Pavement Rehab, Erosion Control

DOT Approved TotalFederal Aid

RegionalSwap

$2,669,000 $2,669,000

48529

Iowa Department ofTransportation

NHSN-61()--2R-56

US61: KEOKUK TO N JCT US 218

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$663,000 $663,000

45358

Iowa Department ofTransportation

BRFN-218()--39-44

US218: NORTH FISH CREEK 1.1 MI N OF CO RD J20(NB)

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,000 $3,188,000 $3,193,000

39227

Iowa Department ofTransportation

BRFN-34()--39-29

US34: N CENTRAL AVE IN BURLINGTON

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,307,000 $1,307,000

45379

Iowa Department ofTransportation

STPN-2()--2J-56

IA2: 3.5 MI E OF CO RD J56

Slope Improvement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$322,000 $322,000

281

Page 285: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45260

Iowa Department ofTransportation

BRFN-136()--39-56

IA136: SOAP CREEK AND BNSF RR 1.8 MI E OF US 61 INKEOKUK

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,414,000 $1,414,000

45265

Iowa Department ofTransportation

BRFN-34()--39-29

US34: WB RAMP TO US 34 0.4 MI W OF IL INBURLINGTON

Bridge Rehabilitation, Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,398,000 $1,476,000 $2,874,000

45333

Iowa Department ofTransportation

BRFN-34()--39-29

US34: 8TH ST 1.8 MI E OF US 61 IN BURLINGTON

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$546,000 $546,000

45263

Iowa Department ofTransportation

BRFN-34()--39-29

US34: CURRAN ST 0.8 MI E OF US 61 IN BURLINGTON

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$925,000 $925,000

48541

Iowa Department ofTransportation

NHSN-218()--2R-56

US218: WEIGH STATION S OF CO RD J38/130TH ST

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$277,000 $277,000

48451

Iowa Department ofTransportation

BRFN-34()--39-29

US34: W BURLINGTON AVE 0.5 MI W OF US 61 (EB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$640,000 $640,000

48593

Iowa Department ofTransportation

BRFN-34()--39-29

US34: W BURLINGTON AVE 0.5 MI W OF US 61 (WB)

Bridge Rehabilitation, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$325,000 $325,000

48459

Iowa Department ofTransportation

BRFN-61()--39-29

US61: US 34 IN BURLINGTON

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,270,000 $1,270,000

48427

Iowa Department ofTransportation

BRFN-78()--39-44

IA78: STREAM 0.3 MI W OF E JCT CO RD W66

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$964,000 $964,000

282

Page 286: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48606

Iowa Department ofTransportation

NHSN-61()--2R-29

US61: BRANCH SMITH CREEK 1.0 MI S OF LOUISA CO

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$15,000 $15,000

48607

Iowa Department ofTransportation

NHSN-61()--2R-58

US61: 0.5 MI N OF IA 78 TO 2.0 MI S OF IA 92

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$5,800,000 $5,800,000

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

949

RPA 16

22322

RGPL-PA16(RTP)--ST-00

SEIRPC: RPA 16 TRANSPORTATION PLANNING

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$197,434$141,924

$141,924

$197,434$141,924

$141,924

$197,434$141,924

$141,924

$197,434$141,924

$141,924

$789,736$567,696

$567,696

48493

Iowa Department ofTransportation

22324

STP-78()--2C-44

IA78: WINFIELD TO US 61

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$8,138,000$6,510,400

$8,138,000$6,510,400

48517

Iowa Department ofTransportation

22325

STP-78()--2C-44

IA78: 130TH ST/JAMES AVE INTERSECTION TOWINFIELD

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$900,000$720,000

$900,000$720,000

39156

SEIBUS

22323

RGTR-SEIBUS()--ST-29

SEIBUS: Purchase of two Light Duty ADA Buses

Transit Investments

FHWA Approved TotalFederal Aid

RegionalSwap

$158,000$126,400

$126,400

$158,000$126,400

$126,400

283

Page 287: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

25472

Houghton

22416

TAP-R-3562(601)--8T-56

In the city of Houghton, Loop trail starting and ending atBentler Street and south city limits, 1.2 miles in length

Outside Services Engineering, Ped/Bike ROW, Ped/BikeGrade &amp; Pave

FHWA Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$166,286$133,028

$133,028

$166,286$133,028

$133,028

PA Note: PE consultant previously authorized $28,000 in Federal Aid (original FA amount was $146,628)

DOT Note: Project eligible for FHWA TAP funding

34170

Louisa County

22421

TAP-R-C058(060)--8T-58

145th Street from 500 ft E of west C J city limits west toX17, then south to 110 ft W of Mulberry St in Columbus City

Shoulder Grading, Ped/Bike Paving

FHWA Approved

8/18/2020

TotalFederal Aid

RegionalSwap

$225,000$133,229

$133,229

$225,000$133,229

$133,229

39157

Burlington

22418

TAP-U-0977(652)--8I-29

In the city of Burlington, trail along West Ave from RooseveltAve east to Terrace Dr

Traffic Signals, Pavement Markings, Ped/Bike Grade &amp;Pave

FHWA Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$277,334$217,613

$217,613

$277,334$217,613

$217,613

PA Note: PE consultant previously authorized $21,267 in Federal Aid (original FA amount was $238,880).

18682

Burlington

22417

TAP-U-0977(654)--8I-29

In the city of Burlington, Flint River Trail, on Bluff Road fromCash Street south to approx. 200 ft S of 8th St

Ped/Bike Grade &amp; Pave, Ped/Bike Miscellaneous,Ped/Bike Development

FHWA Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$515,000$300,000

$300,000

$515,000$300,000

$300,000

DOT Note: Project eligible for FHWA TAP funding

48641

West Burlington

22420

TAP-R-8255()--8T-29

In the city of West Burlington, trail along S Gear Ave south0.6 mi. from W Huston St to US 34 SE Ramp

Bridge Deck Overlay, Outside Services Engineering,Ped/Bike Grade &amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$890,496$275,357

$275,357

$890,496$275,357

$275,357

45448

Keokuk

22419

TAP-U-3942()--8I-56

In the city of Keokuk, trail along Mississippi River fromVictory Park S 1.0 mi. to boat launch

Subdrains, Outside Services Engineering, Ped/Bike Grade&amp; Pave

FHWA Approved TotalFederal Aid

RegionalSwap

$1,182,370$347,534

$347,534

$1,182,370$347,534

$347,534

284

Page 288: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39409

Fort Madison

BROS-SWAP-2697(630)--SE-56

In the city of Fort Madison, On AVENUE F, Over FRENCHCREEK

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$1,090,000

$870,000

$1,090,000

$870,00045482

Fort Madison

BROS-SWAP-2697(634)--SE-56

In the City of Fort Madison, On 27TH ST, Over DRYCREEK

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$1,090,000

$870,000

$1,090,000

$870,00025009

Lee County

BROS-SWAP-C056(111)--FE-56

On 140th Ave, Over Little Sugar Creek, from 210th St north0.7 Miles; S26 T68N R7W

Bridge Replacement

DOT Approved

9/20/2022

TotalFederal Aid

RegionalSwap

$501,000

$500,000

$501,000

$500,00012810

Des Moines County

BRS-SWAP-C029(86)--FF-29

On DMC Hwy 99 , Over Dry Branch Creek, S17 T70 R2

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$1,350,000

$1,100,000

$1,350,000

$1,100,00044805

Henry County

BROS-SWAP-C044(173)--SE-44

On IOWA AVE, Over BRANCH FISH CREEK, S16, T-70N,R-6W

DOT Approved TotalFederal Aid

RegionalSwap

$610,000

$600,000

$610,000

$600,00037155

Lee County

BROS-SWAP-C056()--SE-56

On 265TH AVE, Over tributary to Devil's Creek, from ChalkRidge Rd N 500 Feet; NW1/4 S26 T68 R05

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$351,000

$350,000

$351,000

$350,00012784

Des Moines County

BHOS-SWAP-C029(FR14)--FB-29

On North Gear Avenue, Over Flint Creek, S23 T70 R3

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00035119

Des Moines County

BROS-SWAP-C029(FR11)--FE-29

Upper Flint Road Bridge, Over Knotty Creek, S24, T70,R3W

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00037154

Lee County

BROS-SWAP-C056()--FE-56

On BELFAST RD, Over MONK CREEK, from 140th Aveeast 4300 Feet, in NE1/4 S2 T66 R07

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$551,000

$550,000

$551,000

$550,000

285

Page 289: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

3508

Lee County

BROS-SWAP-C056(63)--FE-56

On Chalk Ridge Rd, Over Devil's Creek, from 265th Aveeast 220 Feet; NW1/4 S26 T68 R5

Bridge Replacement

DOT Approved

1/18/2023

TotalFederal Aid

RegionalSwap

$1,401,000

$1,400,000

$1,401,000

$1,400,00038943

Des Moines County

BHS-SWAP-C029(PG27)--FC-29

On Danville Road Bridge, Over Flint Creek, S22 T71 R4

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00045936

Henry County

BHS-SWAP-C044(199)--FC-44

On X 23, Over SKUNK RIVER, S28, T-70N, R-5W

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$260,000

$250,000

$260,000

$250,00048654

Burlington

BRM-SWAP-0977()--SD-29

In the city of Burlington, on S MAIN ST, over DRAINAGE

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$8,000,000

$1,000,000

$8,000,000

$1,000,00045122

Lee County

BROS-SWAP-C056()--SE-56

On 115TH ST, Over HELL HOLLOW CREEK, S12 T69 R05

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$501,000

$500,000

$501,000

$500,000

286

Page 290: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36915

Burlington

STBG-SWAP-0977()--SG-29

In the City of Burlington, On WASHINGTON ST, from FrontStreet W to approximately 100 feet east of Hawkeye Street

Grade and Pave, Outside Services Engineering, Ped/BikeGrade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$4,500,000

$867,275

$867,275

$4,500,000

$867,275

$867,275

38314

Burlington

STBG-SWAP-0977(656)--SG-29

In the city of Burlington, On 9TH ST, from Angular St S toSouth St, and on MADISON AVE, from South St S to SunsetAve

Grade and Pave, Outside Services Engineering, Ped/BikeGrade &amp; Pave

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,866,512

$420,469

$420,469

$1,866,512

$420,469

$420,469

38312

Fort Madison

STBG-SWAP-2697()--SG-56

In the city of Fort Madison, On AVE L, from 20th St. W to30th St.

Pavement Rehab, Outside Services Engineering, Ped/BikeGrade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,560,000

$780,000

$780,000

$1,560,000

$780,000

$780,000

35391

Fort Madison

STBG-SWAP-2697(636)--SG-56

In the city of Fort Madison, On AVE H, from 10th St west to18th St

Grade and Pave, Outside Services Engineering, Ped/BikeGrade &amp; Pave

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$4,182,800

$1,246,179

$1,246,179

$4,182,800

$1,246,179

$1,246,179

36954

West Burlington

STBG-SWAP-8255(609)--SG-29

In the city of West Burlington, On MT PLEASANT ST, fromSouth Gear Avenue west to US 34 Exit Ramp E ofinterchange

Pavement Rehab, Outside Services Engineering

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$1,290,000

$374,637

$374,637

$1,290,000

$374,637

$374,637

32640

Louisa County

STBG-SWAP-C058(62)--FG-58

On X17, From G62 to Philadelphia St, 6.1 Miles and On CoHwy. 305, From X43 to Hwy 61 1.6 Miles

Pavement Rehab

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$2,057,000

$1,481,440

$1,481,440

$2,057,000

$1,481,440

$1,481,44039155

Burlington

STBG-SWAP-0977()--SG-29

In the city of Burlington, On AGENCY ST, from Melrose Ct Eto Curran St

Grade and Pave, Outside Services Engineering, Ped/BikeGrade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,597,523

$1,302,635

$1,302,635

$1,597,523

$1,302,635

$1,302,635

PA Note: Project includes approx. 50' of sidewalk improvements to the east, north, and south from the Curran Street intersection, plus an additional 300' of sidewalk to the north along Curran Street.

32282

Henry County

STBG-SWAP-C044(W55 South)--FG-44

On W55, from 235th Street south to J20 in Salem

DOT Approved TotalFederal Aid

RegionalSwap

$2,800,000

$1,426,423

$1,426,423

$2,800,000

$1,426,423

$1,426,423

287

Page 291: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45447

Burlington

STBG-SWAP-0977()--SG-29

In the city of Burlington, on SUMMER ST, from Harrison AveS to Koestner St

Grade and Pave, Outside Services Engineering, Ped/BikeGrade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$2,912,002

$1,176,159

$1,176,159

$2,912,002

$1,176,159

$1,176,159

45116

Lee County

STBG-SWAP-C056()--FG-56

On J40, from US 218 / Hwy 27 E 5.9 miles to West PointCorp Limits

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,212,000

$1,408,177

$1,408,177

$2,212,000

$1,408,177

$1,408,17748640

Fort Madison

STBG-SWAP-2697()--SG-56

In the city of Fort Madison, On AVE L, from 30th St W to35th St, and on AVE O from 36th St W to 41st St

Pavement Rehab, Outside Services Engineering, Ped/BikeGrade &amp; Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,998,000

$1,263,879

$1,263,879

$1,998,000

$1,263,879

$1,263,879

24843

Des Moines County

STBG-SWAP-C029(DMC99)--FG-29

On X99, from Burlington CL to Meeker's Landing Road

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$3,500,000

$1,491,135

$1,491,135

$3,500,000

$1,491,135

$1,491,135

288

Page 292: Iowa Statewide Transportation Improvement Program

..

RPA 17 - Chariton Valley Planning and Development

308 North 12th Street, Centerville, IA 52544

Phone: 641-437-4359, Fax: 641-437-1161, www.charitonvalleyplanning.com

!I

-�-·---

I I I I

.--- i ayne f ppanoo

ount

(

�I I I

�orts � Commercial

- Interstate

- National Highway System

El Enhanced - Primary Roads

El General Service

El Basic Service

Local Roads

-Ramps

II _Jc!.,......:......::::.:::.:::J..L. __ ...J. __ .:.J_....,1.�...;,---..a..-"'--.....,. __1

El Local Service � Transit

-Trails

I I I I I

0 5 10 20 Miles

[el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

C[I Amtrak

I Park & Ride

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1 L_ _ _J Counties

City Limits

Urban Area

289

Page 293: Iowa Statewide Transportation Improvement Program

290

Page 294: Iowa Statewide Transportation Improvement Program

RPA 17FM

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38623

Wayne County

FM-C093(94)--55-93

On J-46, from S-40 E 3 miles to 190th Street, T68 R21

Pave

DOT Approved

8/16/2022

TotalFederal Aid

RegionalSwap

$1,750,000 $1,750,000

291

Page 295: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37974

Iowa Department ofTransportation

22185

BRF-34()--38-59

US34: STREAM 2.1 MI E OF E JCT US 65

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,162,000$1,729,600

$2,162,000$1,729,600

48500

Iowa Department ofTransportation

22184

NHSX-34()--3H-68

US34: ALBIA TO WAPELLO CO LINE

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,277,000$2,621,600

$3,277,000$2,621,600

48433

Iowa Department ofTransportation

22182

NHSX-65()--3H-93

US65: IA 2 TO LUCAS CO LINE

Pavement Rehab, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$3,402,000$2,721,600

$3,402,000$2,721,600

39168

Iowa Department ofTransportation

22181

BRF-5()--38-4

IA5: COOPER CREEK 1.5 MI N OF IA 2

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,707,000$2,165,600

$2,707,000$2,165,600

37883

Iowa Department ofTransportation

22186

BRF-5()--38-4

IA5: NORTH CREEK 2.6 MI S OF CO RD T20

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$4,726,000$3,780,800

$4,726,000$3,780,800

39218

Iowa Department ofTransportation

22187

BRF-63()--38-26

US63: FOX RIVER 2.1 MI N OF IA 2

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$6,000 $3,485,000$2,788,000

$3,491,000$2,788,000

39370

Iowa Department ofTransportation

22183

BRF-65()--38-93

US65: CALEB CREEK 2.0 MI S OF CO RD J46

Bridge Replacement

FHWA Approved TotalFederal Aid

RegionalSwap

$2,573,000$2,058,400

$2,573,000$2,058,400

292

Page 296: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37880

Iowa Department ofTransportation

BRFN-2()--39-4

IA2: WALNUT CREEK 0.8 MI E OF CO RD S70

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$253,000 $253,000

38083

Iowa Department ofTransportation

IMN-35()--0E-27

I-35: MISSOURI TO POLK CO

Guardrail

DOT Approved TotalFederal Aid

RegionalSwap

$100,000 $100,000 $100,000 $100,000 $400,000

48512

Iowa Department ofTransportation

NHSN-5()--2R-68

IA5: 3RD AVE TO RR CROSSING IN ALBIA

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$300,000 $300,000

45369

Iowa Department ofTransportation

NHSN-65()--2R-93

US65: STREAM 0.3 MI N OF CO RD J54

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$471,000 $471,000

48638

Iowa Department ofTransportation

STPN-69()--2J-20

US69: WHITE BREAST CREEK TO JUST N OF OSCEOLASCL

Ditch Improvement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$2,000 $210,000 $212,000

39290

Iowa Department ofTransportation

BRFN-34()--39-59

US34: LITTLE WHITE BREAST CREEK 2.5 MI W OF CORD S56

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$312,000 $312,000

39307

Iowa Department ofTransportation

BRFN-34()--39-68

US34: BNSF RR 4.5 MI W OF IA 5

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$443,000 $443,000

39200

Iowa Department ofTransportation

IMN-35()--0E-20

I-35: 0.5 MI N OF US 34 TO WARREN CO (NB)

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$3,923,000 $3,923,000

48555

Iowa Department ofTransportation

IMN-35()--0E-20

I-35: NB WEIGH STATION 1.2 MI N OF CO RD H45

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,130,000 $1,130,000

293

Page 297: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39220

Iowa Department ofTransportation

IMN-35()--0E-27

I-35: 310TH ST 2.5 MI S OF US 69 (NB & SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$937,000 $937,000

48547

Iowa Department ofTransportation

NHSN-34()--2R-68

US34: 0.5 MI E OF CO RD S70 AND APPROX 1 MI W OFCO RD T19

Slope Improvement

DOT Approved TotalFederal Aid

RegionalSwap

$120,000 $120,000

45423

Iowa Department ofTransportation

STPN-63()--2J-26

US63: N FABIUS CREEK 2.6 MI N OF MISSOURI

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$20,000 $20,000

45294

Iowa Department ofTransportation

BRFN-2()--39-93

IA2: JACKSON CREEK 3.8 MI W OF CO RD S56

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$769,000 $769,000

45412

Iowa Department ofTransportation

IMN-35()--0E-20

I-35: 0.5 MI N OF US 34 TO WARREN CO (SB)

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,204,000 $2,204,000

48561

Iowa Department ofTransportation

BRFN-2()--39-27

IA2: MCGRUDER CREEK 1.5 MI E OF E JCT US 69

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$190,000 $190,000

48430

Iowa Department ofTransportation

BRFN-63()--39-26

US63: NORTH CHEQUEST CREEK 2.6 MI N OF CO RDJ3T

Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,007,000 $1,007,000

48587

Iowa Department ofTransportation

BRFN-63()--39-26

US63: MIDDLE CHEQUEST CREEK 0.2 MI N OF 180THST

Bridge Widening, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$955,000 $955,000

48573

Iowa Department ofTransportation

IMN-35()--0E-27

I-35: CO RD R30 1.0 MI S OF IA 2

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$684,000 $684,000

294

Page 298: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

1001

RPA 17

22326

RGPL-PA17(RTP)--ST-00

RPA 17: RPA 17 TRANSPORTATION PLANNING

Trans Planning

FHWA Approved TotalFederal Aid

RegionalSwap

$82,000$66,000

$66,000

$82,000$66,000

$66,000

$82,000$66,000

$66,000

$82,000$66,000

$66,000

$328,000$264,000

$264,000

48487

Iowa Department ofTransportation

22327

STP-69()--2C-27

US69: MISSOURI STATE LINE TO 0.25 MI E OF I-35

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$2,333,000$1,866,400

$2,333,000$1,866,400

295

Page 299: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45738

Decatur County

BHS-SWAP-C027(85)--FC-27

On J 20, Over Long Creek, S32 T70 R26

Bridge Rehabilitation

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$375,000

$375,000

$375,000

$375,00045737

Decatur County

BHS-SWAP-C027(86)--FC-27

On J 20, Over GRAND RIVER, S34 T70 R27

Bridge Rehabilitation

DOT Approved

12/21/2021

TotalFederal Aid

RegionalSwap

$375,000

$375,000

$375,000

$375,00037665

Lucas County

BROS-SWAP-C059(64)--FE-59

On 530TH ST, Over NORTH CEDAR CREEK, S27/34 T73R20

Bridge Replacement

DOT Approved

11/16/2021

TotalFederal Aid

RegionalSwap

$725,000

$725,000

$725,000

$725,00037362

Wayne County

BROS-SWAP-C093(101)--FE-93

On J-44, Over Jackson Creek, S1 T68 R21

Bridge Replacement

DOT Approved

3/21/2023

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00017227

Wayne County

BROS-SWAP-CO93(85)--FE-93

On Birch Rd, Over Locust Creek, S22 T67 R20

Bridge Replacement

DOT Approved

5/15/2029

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00026792

Monroe County

BRS-SWAP-C068(76)--FF-68

On H27, 165th St., Over Abandoned Railroad, from 677thAve West Approx 700 Feet to Bridge, in S1 T72 R17

Bridge Removal

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$875,000

$875,000

$875,000

$875,00026793

Monroe County

BRS-SWAP-C068(77)--FF-68

On H27, 165th st, Over BNSF RR, from 685th Ave WestApprox .1 Miles to said Bridge, in S6 T72 R16

Bridge Replacement

DOT Approved

1/19/2022

TotalFederal Aid

RegionalSwap

$2,875,000

$2,875,000

$2,875,000

$2,875,00038783

Decatur County

BHS-SWAP-C027(77)--FC-27

On J66, Over Weldon River, S22 T67 R24

Bridge Deck Overlay

DOT Approved

10/18/2022

TotalFederal Aid

RegionalSwap

$691,200

$691,200

$691,200

$691,20045626

Appanoose County

BROS-SWAP-C004()--SE-04

On 135TH AVE, Over COAL CREEK, from 524th St S 0.9miles to bridge S10 T68 R19

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,000

296

Page 300: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

44776

Clarke County

BROS-SWAP-C020(123)--FE-20

On PACIFIC ST, Over OTTER CREEK, S17 T73 R24

Bridge Replacement

DOT Approved

1/18/2023

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,0006407

Clarke County

BROS-SWAP-C020(124)--FE-20

On KANSAS ST, Over S SQUAW CREEK, S15 T72 R26

Bridge Replacement

DOT Approved

1/18/2023

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00047090

Clarke County

BROS-SWAP-C020(126)--FE-20

On HOOVER ST, Over WHITE BREAST CREEK, S26 T72R26

Bridge Replacement

DOT Approved

1/18/2023

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00047091

Clarke County

BROS-SWAP-C020(127)--SE-20

On WYOMING ST, Over Creek, S6 T73 R24

Bridge Replacement

DOT Approved

1/18/2023

TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,0008899

Clarke County

BROS-SWAP-C020(67)--SE-20

SCOTT STREET: .25 MI. W. OF 195TH AVE. ON SCOTTST.

Bridge Replacement

DOT Approved

11/15/2022

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00040228

Decatur County

BROS-SWAP-C027(87)--FE-27

On J 48, Over Unnamed Tributary to Grand River, S16 T68R26

Bridge Replacement

DOT Approved

11/15/2022

TotalFederal Aid

RegionalSwap

$650,000

$650,000

$650,000

$650,0001040

Lucas County

BROS-SWAP-C059(28)--FE-59

On H 50, Over UP RR, S21 T71 R21

Bridge Replacement

DOT Approved

6/20/2023

TotalFederal Aid

RegionalSwap

$2,250,000

$1,500,000

$2,250,000

$1,500,00045553

Davis County

BRS-SWAP-C026(125)--FF-26

On J 15, Over SOAP CREEK, S7 T70 R12

DOT Approved

5/17/2022

TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,00039597

Appanoose County

BROS-SWAP-C004()--FE-04

On 110th Ave, Over Walnut Creek, from IA 2 South 1.1Miles, on WLINE S32 T69 R19

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,000

297

Page 301: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37195

Davis County

BROS-SWAP-C026(117)--SE-26

On Ice Ave, 0.9 miles South of 260th St

Bridge Replacement

DOT Approved

5/17/2022

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00037673

Lucas County

BROS-SWAP-C059(66)--SE-59

On 220TH AVE, Over WOLF CREEK, in the SE1/4 S25 T71R22

Bridge Replacement

DOT Approved

11/21/2023

TotalFederal Aid

RegionalSwap

$360,000

$360,000

$360,000

$360,00038781

Decatur County

BRS-SWAP-C027(81)--FF-27

On J66, Over Little River, in SE S13 T67 R25

Bridge Replacement

DOT Approved

12/20/2022

TotalFederal Aid

RegionalSwap

$1,100,000

$1,100,000

$1,100,000

$1,100,00045630

Appanoose County

BROS-SWAP-C004()--SE-04

On 150TH AVE, Over WALNUT CREEK, from IA 2 N 0.8miles to bridge S25 T69 R19

DOT Approved TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,00020715

Decatur County

BROS-SWAP-C027()--FE-27

On J 67, over Shane Creek, S20 T67 R27

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$550,000

$550,000

$550,000

$550,00045069

Monroe County

BROS-SWAP-C068()--SE-68

On 595TH AVE, Over CREEK, from 265th St S .03 miles toSaid Bridge S27 T71 R18

DOT Approved TotalFederal Aid

RegionalSwap

$150,000

$150,000

$150,000

$150,00037363

Wayne County

BROS-SWAP-CO93(97)--SE-93

On 245th St, Over Walnut Creek, S36 T69 R20

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00040112

Davis County

BRS-SWAP-C026()--FF-26

On V 17, Over SMALL STREAM, S19 T70 R14

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,000

298

Page 302: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

17484

Lucas County

STBG-SWAP-C059(51)--FG-59

On H20, from Iowa Highway 14 East 0.93 miles to the westUPRR ROW in Williamson

Pavement Rehab/Widen

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$500,000

$226,000

$226,000

$500,000

$226,000

$226,00045211

Lucas County

STBG-SWAP-C059(71)--FG-59

H30 from 490th St N on 215th Ave 0.5 & E on 495th St 1.75miles to Iowa Hwy 14, and On H32 from S23 E 2.10 miles

Pavement Rehab/Widen

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$2,430,000

$1,300,000

$1,300,000

$2,430,000

$1,300,000

$1,300,00037629

Monroe County

STBG-SWAP-C068()--FG-68

On S-70 S from State Hwy 34 2 miles to end of asphalt &H32 from State Hwy 5 W 3.75 miles to 586th Ave

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,000

$750,000

$750,00039511

Appanoose County

STBG-SWAP-C004()--FG-04

On S70, from J5T North 7.8 Miles to Monroe County Line

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$1,250,000

$1,250,000

$1,250,000

$1,250,000

$1,250,000

$1,250,00039512

Appanoose County

STBG-SWAP-C004()--FG-04

On J5T, from 195th Ave North & East 1 Miles to J29

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,000

$250,000

$250,00045055

Monroe County

STBG-SWAP-C068()--SG-68

On T 61, from State Hwy 137 S 1 miles to 170th St

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,000

$1,000,000

$1,000,00038780

Decatur County

STBG-SWAP-C027(J66)--FG-27

On J 66, from HWY 69 SE 6.9 miles to Missouri State Line

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$4,108,500

$1,100,000

$1,100,000

$4,108,500

$1,100,000

$1,100,000

299

Page 303: Iowa Statewide Transportation Improvement Program

I

RPA 18 - MAPA Transportation Planning Affiliation

2222 Cuming Street, Omaha, NE 68102

Phone: 402-444-6866, Fax: 402-342-0949, www.mapacog.org

I

Omaha - Council Bluffs

Metropolitan Area

Planning Agency

(MAPA)

ttawatta

Count

Shelby

County

iorts

Commercial

(I Enhanced

(I General Service

(I Basic Service

(I Local ServiceTransit

[el Regional

[el Large Urban

[el Small Urban

[el Intercity Bus

CE! Amtrak

I Park & Ride

- Interstate

- National Highway System

- Primary Roads

Local Roads

-Ramps

-Trails

-+- Railroad

Rivers

Major Lakes

C] RPA Planning Arear--1

L_ _ _J Counties

City Limits

0 5

I

10 20 Miles Urban Area

300

Page 304: Iowa Statewide Transportation Improvement Program

301

Page 305: Iowa Statewide Transportation Improvement Program

RPA 18HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48549

Iowa Department ofTransportation

22028

HSIPX-34()--3L-65

US34: CO RD L55 INTERSECTION

Pavement Widening

FHWA Approved TotalFederal Aid

RegionalSwap

$906,000$815,400

$906,000$815,400

302

Page 306: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

39338

Iowa Department ofTransportation

22188

BRF-59()--38-78

US59: E BRANCH W NISHNABOTNA RIVER 1.0 MI S OFIA 83

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$6,000 $3,713,000$2,970,400

$3,719,000$2,970,400

38116

Iowa Department ofTransportation

22189

IMX-29()--02-78

I-29: DITCH 1.6 MI S OF I-880

Bridge Replacement

FHWA Approved TotalFederal Aid

RegionalSwap

$953,000$857,700

$953,000$857,700

38117

Iowa Department ofTransportation

22190

IMX-29()--02-78

I-29: DITCH 0.5 MI S OF I-880

Bridge Replacement

FHWA Approved TotalFederal Aid

RegionalSwap

$1,713,000$1,541,700

$1,713,000$1,541,700

38115

Iowa Department ofTransportation

22191

IMX-29()--02-78

I-29: DITCH 2.4 MI S OF I-880

Bridge Replacement, Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$2,600,000$2,340,000

$2,600,000$2,340,000

38164

Iowa Department ofTransportation

22198

IMX-29()--02-78

I-29: CO RD G12 0.4 MI N OF I-880

Grade and Pave, Bridge Replacement, Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$3,600,000$3,240,000

$3,600,000$3,240,000

48505

Iowa Department ofTransportation

22194

IMX-80()--02-78

I-80: 0.4 MI E OF I-880 TO 0.1 MI W OF SILVER CREEKBRIDGE (EB & WB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$2,521,000$2,268,900

$2,521,000$2,268,900

38122

Iowa Department ofTransportation

22196

IMX-80()--02-78

I-80: W NISHNABOTNA RIVER TO 1.0 MI E OF RESTAREA (WB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$1,727,000$1,554,300

$1,727,000$1,554,300

48534

Iowa Department ofTransportation

22199

IMX-80()--02-78

I-80: 0.1 MI W OF SILVER CREEK BRIDGE TO CASS CO(EB/WB)

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,863,000$3,476,700

$3,863,000$3,476,700

48480

Iowa Department ofTransportation

22193

NHSX-34()--3H-65

US34: 0.1 MI E OF US 275 TO BNSF BRIDGE 0.9 MI E OFCO RD L55

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$1,151,000$920,800

$1,151,000$920,800

303

Page 307: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48516

Iowa Department ofTransportation

22195

NHSX-59()--3H-65

US59: US 34 TO CO RD H12

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$3,246,000$2,596,800

$3,246,000$2,596,800

45306

Iowa Department ofTransportation

22192

IMX-80()--02-78

I-80: IDLEWOOD RD 4.6 MI E OF US 6 (EB & WB)

Bridge Deck Overlay

FHWA Approved TotalFederal Aid

RegionalSwap

$1,360,000$1,224,000

$1,360,000$1,224,000

45244

Iowa Department ofTransportation

22197

NHSX-30()--3H-43

US30: MISSOURI VALLEY BYPASS

Culvert New, Grading, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$6,800,000$5,440,000

$60,282,200$48,159,200

$67,082,200$53,599,200

48617

Iowa Department ofTransportation

22201

BRF-30()--38-43

US30: STREAM 3.4 MI E OF IA 44

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$1,028,000$822,400

$1,028,000$822,400

48633

Iowa Department ofTransportation

22202

BRF-59()--38-78

US59: AT JCT IA 92

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$2,545,000$2,036,000

$2,545,000$2,036,000

48636

Iowa Department ofTransportation

22203

IMX-29()--02-43

I-29: OLD SOLDIER RIVER DITCH 4.0 MI S OF IA 127(NB/SB)

Bridge Replacement, Right of Way

FHWA Approved TotalFederal Aid

RegionalSwap

$4,069,000$3,662,100

$4,069,000$3,662,100

39339

Iowa Department ofTransportation

22200

IMX-80()--02-78

I-80: KEG CREEK 0.8 MI E OF CO RD L66 (EB & WB)

Bridge Rehabilitation

FHWA Approved TotalFederal Aid

RegionalSwap

$5,080,000$4,572,000

$5,080,000$4,572,000

304

Page 308: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

37947

Iowa Department ofTransportation

BRFN-30()--39-43

US30: MISSOURI RIVER E OF BLAIR NEBRASKA (STATESHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$35,000 $35,000 $35,000 $35,000 $140,000

37948

Iowa Department ofTransportation

BRFN-30()--39-43

US30: STREAM 2.3 MI E OF CO RD F32

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$1,319,000 $1,319,000

37979

Iowa Department ofTransportation

BRFN-34()--39-65

US34: MISSOURI RIVER N OF PLATTSMOUTHNEBRASKA (STATE SHARE)

Bridge Cleaning

DOT Approved TotalFederal Aid

RegionalSwap

$45,000 $45,000 $45,000 $45,000 $180,000

38010

Iowa Department ofTransportation

BRFN-59()--39-78

US59: I-80 INTERCHANGE AT AVOCA (NB & SB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$647,000 $647,000

38008

Iowa Department ofTransportation

BRFN-59()--39-78

US59: STREAM 2.4 MI N OF IA 92

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$138,000 $138,000

38012

Iowa Department ofTransportation

BRFN-92()--39-78

IA92: JORDAN CREEK 3.5 MI E OF US 59

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$359,000 $359,000

38108

Iowa Department ofTransportation

IMN-29()--0E-65

I-29: REST AREA N OF US 34 (NB)

Rest Area Improvement

DOT Approved TotalFederal Aid

RegionalSwap

$3,971,000 $3,971,000

38121

Iowa Department ofTransportation

IMN-80()--0E-78

I-80: CO RD M16 INTERCHANGE AT SHELBY

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$272,000 $272,000

48543

Iowa Department ofTransportation

IMN-80()--0E-78

I-80: REST AREAS 1 MI N OF CO RD G30 N OFUNDERWOOD

Grading

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000 $1,500,000

305

Page 309: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48559

Iowa Department ofTransportation

IMN-80()--0E-78

I-80: WB WEIGH STATION 4.1 MI E OF US 59

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$1,238,000 $1,238,000

48483

Iowa Department ofTransportation

STPN-183()--2J-43

IA183: CO RD F20 IN PISGAH TO OAK ST INMOORHEAD

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$593,000 $593,000

48594

Iowa Department ofTransportation

STPN-275()--2J-65

US275: 0.3 MI S OF CO RD H40

Culvert Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$408,000 $408,000

39249

Iowa Department ofTransportation

BRFN-127()--39-43

IA127: STEER CREEK 0.5 MI E OF IA 183

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$740,000 $740,000

39248

Iowa Department ofTransportation

BRFN-30()--39-43

US30: MISSOURI RIVER E OF BLAIR NEBRASKA (STATESHARE)

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$125,000 $125,000

37949

Iowa Department ofTransportation

BRFN-30()--39-43

US30: WILSON DITCH 2.1 MI W OF I-29

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$888,000 $888,000

39355

Iowa Department ofTransportation

BRFN-44()--39-83

IA44: MOSQUITO CREEK 0.3 MI E OF IA 191

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$1,102,000 $1,102,000

39340

Iowa Department ofTransportation

BRFN-92()--39-78

IA92: GRAYBILL CREEK 1.2 MI E OF E JCT US 59

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$573,000 $573,000

45250

Iowa Department ofTransportation

IMN-880()--0E-78

I-880: MOSQUITO CREEK 0.5 MI E OF IA 191 (WB)

Bridge Rehabilitation

DOT Approved TotalFederal Aid

RegionalSwap

$1,000,000 $1,000,000

306

Page 310: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

45424

Iowa Department ofTransportation

STPN-29()--2J-43

I-29: LITTLE SIOUX RIVER N OF CO RD F20

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$120,000 $120,000

45293

Iowa Department ofTransportation

BRFN-92()--39-78

IA92: SILVER CREEK 2.8 MI E OF TREYNOR

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$598,000 $598,000

48428

Iowa Department ofTransportation

BRFN-92()--39-78

IA92: INDIAN CREEK 0.7 MI W OF CO RD M47

Bridge Replacement, Right of Way

DOT Approved TotalFederal Aid

RegionalSwap

$766,000 $766,000

48452

Iowa Department ofTransportation

IMN-80()--0E-78

I-80: CO RD G30 INTERCHANGE

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$800,000 $800,000

48475

Iowa Department ofTransportation

IMN-80()--0E-78

I-80: 0.4 MI E OF I-880 TO 0.1 MI W OF SILVER CREEKBRIDGE (WB)

DOT Approved TotalFederal Aid

RegionalSwap

$1,312,000 $1,312,000

48546

Iowa Department ofTransportation

IMN-80()--0E-78

I-80: WB REST AREA 1.0 MI N OF CO RD G30 N OFUNDERWOOD

Rest Area Improvement

DOT Approved TotalFederal Aid

RegionalSwap

$4,150,000 $4,150,000

48567

Iowa Department ofTransportation

IMN-80()--0E-78

I-80: MCPHERSON AVE 1.6 MI W OF US 6 (WB)

Bridge Deck Overlay

DOT Approved TotalFederal Aid

RegionalSwap

$660,000 $660,000

48577

Iowa Department ofTransportation

IMN-80()--0E-78

I-80: ABANDONED RR 3.0 MI E OF I-880 (BRIDGEREMOVAL EB & WB)

Grade and Pave

DOT Approved TotalFederal Aid

RegionalSwap

$4,472,000 $4,472,000

48536

Iowa Department ofTransportation

STPN-34()--2J-65

US34: MISSOURI RIVER N OF PLATTSMOUTHNEBRASKA

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$300,000 $300,000

307

Page 311: Iowa Statewide Transportation Improvement Program

PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48537

Iowa Department ofTransportation

STPN-680()--2J-78

I-680: MISSOURI RIVER 3.1 MI W OF I-29

Traffic Signs

DOT Approved TotalFederal Aid

RegionalSwap

$400,000 $400,000

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

48527

Iowa Department ofTransportation

22330

STP-173()--2C-83

IA173: CASS CO LINE TO 0.25 MI S OF CO RD F58 INELK HORN

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$2,637,000$2,109,600

$2,637,000$2,109,600

48477

Iowa Department ofTransportation

22328

STP-191()--2C-83

IA191: HARRISON CO TO IA 44

FHWA Approved TotalFederal Aid

RegionalSwap

$1,144,000$915,200

$1,144,000$915,200

48524

Iowa Department ofTransportation

22329

STP-92()--2C-78

IA92: TREYNOR TO CARSON

Pavement Rehab

FHWA Approved TotalFederal Aid

RegionalSwap

$5,498,000$4,398,400

$5,498,000$4,398,400

308

Page 312: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

26699

PottawattamieCountyConservation Board

22422

TAP-R-C078(184)--8T-78

On Railroad Highway, from Council Bluffs N 27 Miles toNeola and Crescent

Ped/Bike Miscellaneous, Ped/Bike Development

FHWA Approved

1/21/2026

TotalFederal Aid

RegionalSwap

$936,000$200,000

$200,000

$936,000$200,000

$200,000

DOT Note: Project eligible for FHWA TAP funding.

39439

Glenwood

22424

TAP-T-2955()--8V-65

In the city of Glenwood, On East Sharp Street walking/biketrail, from Vine Street to Lake Drive

Ped/Bike Paving

FHWA Approved TotalFederal Aid

RegionalSwap

$141,000$113,000

$113,000

$141,000$113,000

$113,000

38389

Glenwood

22423

TAP-U-2955()--8I-65

In the city of Glenwood, On Pedestrian trail south of ESharp Street in Glenwood Lake Park for 2.5 Miles

Ped/Bike Grade &amp; Pave, Ped/Bike Structures,Ped/Bike Development

FHWA Approved TotalFederal Aid

RegionalSwap

$1,255,000$72,000

$72,000

$1,255,000$72,000

$72,000

309

Page 313: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38477

Harlan

BROS-SWAP-3275(604)--SE-83

On North 7th Street, Over Small Stream.

Bridge Replacement

DOT Approved

12/15/2020

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00037119

Harrison County

BROS-SWAP-C043(90)--SE-43

On PARKER TRL, Over BOYER RIVER, S4 T79 R42

Bridge Replacement

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,415,000

$1,400,000

$1,415,000

$1,400,00032804

Mills County

BROS-SWAP-C065(115)--FE-65

On Paddock Ave, Over Local Creek, in NE S21 T71 R43

Bridge Replacement

DOT Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00045569

Harrison County

BRS-SWAP-C043(89)--FF-43

On F 50, Over ALLEN CREEK, S35 T79 R44

Bridge Replacement

DOT Approved

10/19/2021

TotalFederal Aid

RegionalSwap

$660,000

$650,000

$660,000

$650,00032693

Harrison County

BROS-SWAP-C043(Cass2)--SE-43

On VIENNA AVE, Over PIGEON CREEK, from 220th St. S0.3 miles S1 T79 R41

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00035284

Mills County

BROS-SWAP-C065()--SE-65

On 400th Street, Over Indian Creek, on ELINE S27 T72R40

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00018229

PottawattamieCounty

BROS-SWAP-C078(177)--SE-78

On 210TH ST, Over PIGEON CREEK, S27 T77 R43

Bridge Replacement

DOT Approved

4/19/2022

TotalFederal Aid

RegionalSwap

$1,200,000

$1,200,000

$1,200,000

$1,200,00020363

Mills County

BHOS-SWAP-C065(84)--FB-65

On M 21, Over FARM CREEK, S15 T73 R40

Bridge Rehabilitation

DOT Approved

12/20/2022

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00045577

Harrison County

BRS-SWAP-C043(Mog3)--FF-43

On K 45, Over STREAM, from Eden Ave N 0.1 miles S13T80 R45

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$310,000

$310,000

$310,000

$310,000

310

Page 314: Iowa Statewide Transportation Improvement Program

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

36497

Harrison County

BROS-SWAP-C043(SJ10)--SE-43

On Canal St. Over WILLOW RIVER, from Kenton Ave W0.1 miles S21 T78 R44

Bridge Replacement

DOT Approved TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00013048

PottawattamieCounty

BRS-SWAP-C078()--FF-78

On G 18, Over BNSF RR, S19 T77 R41

Bridge Removal

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,000

311

Page 315: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

35296

Mills County

STBG-SWAP-C065(114)--FG-65

On L55, from H20 N 3.1 miles to Dobney Avenue

Pavement Rehab

DOT Approved

3/15/2022

TotalFederal Aid

RegionalSwap

$1,800,000

$400,000

$400,000

$1,800,000

$400,000

$400,00021847

PottawattamieCounty

STBG-SWAP-C078(205)--FG-78

On M 47, from Highway 6 N 5 miles to G30

Pavement Rehab, Patching

DOT Approved

2/15/2022

TotalFederal Aid

RegionalSwap

$1,900,000

$1,000,000

$1,000,000

$1,900,000

$1,000,000

$1,000,00037436

Harrison County

STBG-SWAP-C043(L16)--FG-43

On L16, from Willow Creek N 6.6 Miles to Monona CountyLine

Pave, Granular Shoulders

DOT Approved TotalFederal Aid

RegionalSwap

$1,200,000

$1,200,000

$1,200,000

$1,200,000

$1,200,000

$1,200,00035289

Mills County

STBG-SWAP-C065()--FG-65

On Gaston Ave. , from 245th Street East 4.0 Miles to 287thStreet

Pavement Rehab/Widen

DOT Approved TotalFederal Aid

RegionalSwap

$1,500,000

$500,000

$500,000

$1,500,000

$500,000

$500,00044761

Harrison County

STBG-SWAP-C043(F66)--FG-43

On F-66 (335th Street), from Seward Ave E 4 miles to Hwy191

Pave

DOT Approved TotalFederal Aid

RegionalSwap

$360,000

$145,000

$145,000

$360,000

$145,000

$145,00035293

Mills County

STBG-SWAP-C065()--FG-65

On L-63, Over SILVER CREEK, from Malvern City LimitsSouth 7 miles to Fremont County Line

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,000,000

$1,250,000

$1,250,000

$2,000,000

$1,250,000

$1,250,00045729

Harrison County

STBG-SWAP-C043(L20s)--FG-43

On L-20, Under CPRR, from Pott Co. N 3.4 miles to UP RRXING

DOT Approved TotalFederal Aid

RegionalSwap

$964,000

$884,000

$884,000

$964,000

$884,000

$884,00035291

Mills County

STBG-SWAP-C065()--FG-65

On L-31, from Jenkins Ave. N 1.5 miles to HWY U.S.34

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$320,000

$320,000

$320,000

$320,000

$320,000

$320,00032566

PottawattamieCounty

STBG-SWAP-C078()--FG-78

On G30, from Mosquito Creek Bridge East 8 Miles to L66

Pavement Rehab, Patching, Pavement Planing

DOT Approved TotalFederal Aid

RegionalSwap

$1,925,000

$325,000

$325,000

$1,925,000

$325,000

$325,000

312

Page 316: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2022 2023 2024 2025 Totals

38726

Shelby County

STBG-SWAP-C083()--FG-83

On M-16, from City Limits of Shelby, Iowa 14 miles toCounty Road F-32

Pavement Rehab

DOT Approved TotalFederal Aid

RegionalSwap

$2,000,000

$1,800,000

$1,800,000

$2,000,000

$1,800,000

$1,800,000

313

Page 317: Iowa Statewide Transportation Improvement Program

FTA Programs

Page 318: Iowa Statewide Transportation Improvement Program

RPA-00 / Statewide (4 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5311 OPT 4978 Interregional Express Bus (IRXB) Total 1,787,289 Operations FA 1,429,831 Other SA 357,458

5311 OPT 6519 Intercity Bus Assistance Program Total 6,448,053 Operations FA 2,149,351 Other SA

5311 OPT 6520 RTAP Program Total 240,024 Operations FA 240,024 Other SA

STA OPT 6521 Urban Fellowships Total 150,000 Operations FA Other SA 150,000

314

Page 319: Iowa Statewide Transportation Improvement Program

MPO-22 / AAMPO (51 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

PTIG Ames 6493 HVAC Phase III - Tire Shop, Paint/Body Shop, Bus Vehicle Exhaust Total 510,618 Capital FA Rehabilitation SA 408,494

5307 Ames 6495 Miscellaneous Equipment (Chargers & Dispensers) Total 300,000 Operations FA 240,000 Other SA

5307 Ames 6496 Bus Storage Rehabilitation Total 54,986 Capital FA 43,989 Rehabilitation SA

5307 Ames 6511 West Ames Service Modifications (Yr. 3) Total 400,465 Operations FA 320,372 Expansion SA

5307 Ames 6512 Cherry Night Service (Yr. 2) Total 41,930 Operations FA 33,544 Expansion SA

5307 Ames 6513 Lilac Midday Service (Yr. 2) Total 39,569 Operations FA 31,655 Expansion SA

5307 Ames 6514 Brown Night Service (Year 2) Total 37,480 Operations FA 29,984 Expansion SA

5310 Ames 6488 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 07654 SA

5310 Ames 6489 Conversion Van Total 63,261 Capital FA 53,772 Replacement Unit #: 07655 SA

5310 Ames 6490 Infotainment LED Signage Total 44,634 Capital FA 35,707 Expansion SA

STA, 5307 Ames 914 General Operations Total 12,540,004 13,041,604 13,563,268 14,105,798Operations FA 7,000,000 2,700,000 2,800,000 2,900,000Misc SA 869,019 900,000 900,000 900,000

5339 Ames 3314 Maintenance Facility Expansion Total 3,500,000 6,250,000 Capital FA 2,800,000 5,000,000 Expansion SA

5339 Ames 4661 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09075 SA

5339 Ames 4663 Heavy Duty Bus (40-42 ft.) Total 517,615 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973 Replacement Unit #: 00954 SA

5339 Ames 4664 Heavy Duty Bus (40-42 ft.) Total 517,615 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973 Replacement Unit #: 00953 SA

315

Page 320: Iowa Statewide Transportation Improvement Program

MPO-22 / AAMPO (51 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Ames 4665 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09072 SA

5339 Ames 4666 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09074 SA

5339 Ames 5097 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09070 SA

5339 Ames 5098 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09071 SA

5339 Ames 5099 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09077 SA

5339 Ames 5555 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09073 SA

5339 Ames 5563 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09076 SA

5339 Ames 5564 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital Diesel, UFRC, Low Floor, BioDiesel, Electric FA 739,500 Replacement Unit #: 00950 SA

5339 Ames 5565 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital Diesel, UFRC, Low Floor, BioDiesel, Electric FA 739,500 Replacement Unit #: 00952 SA

5339 Ames 5566 Heavy Duty Articulated Bus Total 568,750 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 483,438 Replacement Unit #: 00951 SA

5339 Ames 5567 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel, Electric FA 739,500 Replacement Unit #: 00949 SA

5307 Ames 5568 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital UFRC, Low Floor, Electric FA 739,500 Replacement Unit #: 00504 SA

5307 Ames 5569 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital Diesel, UFRC, Low Floor, BioDiesel, Electric FA 739,500 Replacement Unit #: 00501 SA

STP Ames 5575 Heavy Duty Articulated Bus Total 281,250 281,250 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 225,000 225,000 Expansion SA

5310 Ames 6012 Annunciator Annual Service Fees Total 142,116 95,000 95,000 95,000Operations FA 113,693 76,000 76,000 76,000Misc SA

316

Page 321: Iowa Statewide Transportation Improvement Program

MPO-22 / AAMPO (51 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Ames 6015 Heavy Duty Articulated Bus Total 568,750 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 483,438 Replacement Unit #: 00502 SA

5307 Ames 6016 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital UFRC, VSS, Low Floor, Electric FA 739,500 Replacement Unit #: 00503 SA

5339 Ames 6017 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 00188 SA

5339 Ames 6018 Heavy Duty Bus (40-42 ft.) Total 512,709 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 00186 SA

5339 Ames 6019 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 00189 SA

5339 Ames 6020 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 00187 SA

5310 Ames 919 Contracted Paratransit Service Total 162,500 162,500 162,500Capital FA 130,000 130,000 130,000Misc SA

5310 Ames 920 Associated Transit Improvements Total 50,000 50,000 50,000Capital FA 40,000 40,000 40,000Replacement SA

5339 Ames 6022 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00418 SA

5339 Ames 6469 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00419 SA

5339 Ames 6470 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00420 SA

5339 Ames 6471 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00421 SA

5339 Ames 6472 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00422 SA

5339 Ames 6473 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00423 SA

5339 Ames 6474 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00424 SA

317

Page 322: Iowa Statewide Transportation Improvement Program

MPO-22 / AAMPO (51 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Ames 6475 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00425 SA

5339 Ames 6476 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00429 SA

5339 Ames 6477 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00430 SA

5339 Ames 6478 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00431 SA

5339 Ames 6479 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00432 SA

STP Ames 6480 Heavy Duty Bus (40-42 ft.) Total 281,250 Capital Diesel, UFRC, VSS, Low Floor, Electric FA 225,000 Other SA

318

Page 323: Iowa Statewide Transportation Improvement Program

MPO-23 / CMPO (10 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STA, 5307,5310

Cedar Rapids 960 General Ops./Maint./Admin. Total 10,440,000 10,490,000 10,540,000 10,590,000Operations FA 3,150,000 3,150,000 3,150,000 3,150,000Misc SA 690,000 690,000 690,000 690,000

STP Cedar Rapids 4986 CR Transit - Purchase 2 Heavy-Duty (35' diesel) Replacing bus #s 2093 &2094

Total 1,142,000

Capital FA 767,000 Replacement SA

STP Cedar Rapids 4987 CR Transit - 1 medium-duty 32' ADA paratransit bus; Replacing bus#2403 Total 220,000 Capital FA 148,000 Replacement SA

STP Cedar Rapids 5322 CR Transit - Purchase 2 Heavy-duty buses Replacing bus #s 2131 & 2132 Total 1,116,000 Capital FA 893,000 Other SA

STP Cedar Rapids 5323 CR Transit - Purchase 1 medium-duty bus; Replacing bus#2875 Total 215,000 Capital FA 172,000 Replacement SA

STP MPO-23 5639 Edgewood Road Transit Stops and Sidewalk Total 554,000 Capital FA 325,000 Expansion SA

STP Cedar Rapids 5872 CR Transit - 1 medium-duty 32' ADA paratransit bus - Replacing bus#2876 Total 215,000 Capital FA 172,000 Replacement SA

STP Cedar Rapids 5873 CR Transit - Purchase 2 Heavy-duty replacement buses - bus #s 2133 &2134

Total 1,116,000

Capital FA 893,000 Replacement SA

5307 Cedar Rapids 6228 Medium Duty Bus (29-32 ft.) Total 215,000Capital Diesel FA 172,000Replacement SA

5307 Cedar Rapids 6229 Heavy Duty Bus (35-39 ft.) Total 1,116,000Capital FA 893,000Replacement SA

319

Page 324: Iowa Statewide Transportation Improvement Program

MPO-24 / MAPA (7 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5310 Region 13 / SWITA 5666 Non-ADA Standard Minivan Total 38,750 Capital Low Floor FA 31,000 Expansion SA

STA, 5307 Council Bluffs 3036 General Operations Maint./Admin Total 1,152,000 1,152,000 1,152,000 Operations FA 273,000 273,000 273,000 Other SA 175,000 175,000 175,000

5310 Council Bluffs 3796 Council Bluffs Special Transit Service (STS) Contracting Total 89,040 175,000 175,000 160,000Capital FA 44,520 87,500 87,500 80,000Other SA

5310 Council Bluffs 6085 Light Duty Bus (158" wb) Total 84,000 Capital Low Floor FA 67,200 Replacement Unit #: AG3 SA

5310 Council Bluffs 6086 Light Duty Bus (158" wb) Total 84,000 Capital Low Floor FA 67,200 Replacement Unit #: AG2A SA

5310 Council Bluffs 6087 Light Duty Bus (158" wb) Total 92,500 Capital Low Floor FA 74,000 Replacement Unit #: AG8 SA

5310 Council Bluffs 6549 Light Duty Bus (158" wb) Total 92,500 Capital FA 74,000 Replacement SA

320

Page 325: Iowa Statewide Transportation Improvement Program

MPO-25 / BSRC (14 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STA, 5307 BMTA 985 General Operations Total 819,545 844,132 869,456 895,540Operations FA 131,127 135,061 139,113 143,286Misc SA 204,304 201,790 199,771 215,857

5307 BMTA 987 Preventative Maintenance Total 186,718 192,320 198,090 204,032Capital FA 149,374 153,856 158,472 163,226Replacement SA

5307 BMTA 993 Transit Planning Total 33,951 34,969 36,018 37,099Planning FA 27,161 27,976 28,815 29,679Misc SA

STA, 5307,5310

BMTA 3787 ADA Operations Total 249,829 257,948 266,332 274,987Operations FA 199,863 206,358 213,066 219,990Other SA 49,966 51,590 53,266 54,997

5307 BMTA 5657 ADP Software Total 16,000 16,000 16,000 16,000Capital FA 12,800 12,800 12,800 12,800Misc SA

STA, 5307 Davenport 979 General Operations Total 5,135,817 5,135,817 5,135,817 5,135,817Operations FA 850,000 850,000 850,000 850,000Misc SA 500,000 500,000 500,000 500,000

5307 Davenport 980 Preventative Maintenance Total 792,227 792,227 792,227 792,227Capital FA 530,000 530,000 530,000 530,000Replacement SA

5310 Davenport 981 ADA Paratransit Assistance Total 622,854 622,854 622,854 622,854Operations FA 115,000 115,000 115,000 115,000Misc SA

5307 Davenport 2595 Bus Amenities Total 60,000 60,000 60,000 60,000Capital FA 48,000 48,000 48,000 48,000Expansion SA

5310 Davenport 3022 JARC Projects Total 152,982 152,982 152,982 152,982Operations FA Other SA

5303 MPO-25 2203 MPO Transit Planning Total 76,246 76,246 76,246 76,246Planning FA 60,997 60,997 60,997 60,997Other SA

5339 Davenport 6539 Bus Shelters Total 150,000 Capital FA 120,000 Expansion SA

5339 BMTA 6079 Bus Replacement Total 439,040 Capital FA 373,184 Replacement SA

5307, 5339 Davenport 6540 Heavy Duty Bus (35-39 ft.) Total 1,700,000 1,700,000Capital FA 1,360,000 1,360,000Replacement SA

321

Page 326: Iowa Statewide Transportation Improvement Program

MPO-26 / DMAMPO (34 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5307 Des Moines DART 1027 Security/Safety Improvements at Facilities Total 200,000 10,000 Capital FA 160,000 8,000 Replacement SA

5307 Des Moines DART 1042 Support Vehicles Total 185,000 425,000 Capital FA 148,000 340,000 Replacement SA

ICAAP Des Moines DART 6499 Route 17 Extension to Bondurant Total 65,335 67,295 13,460 Operations FA 52,267 53,835 Expansion SA

5307 Des Moines DART 6501 Support Equipment Total 110,000 Capital FA 88,000 Replacement SA

5307 Des Moines DART 6502 Radio System Replacement Total 763,125 363,125 Capital FA 610,500 290,500 Replacement SA

5307 Des Moines DART 6504 Safety/Security Improvements for Fleet - Operator Barriers Total 1,200,000 Capital FA 960,000 Expansion SA

STA Des Moines DART 995 General Operations/Maintenance/Administration Total 2,343,131 2,389,994 2,437,794 2,486,550Operations FA Misc SA 1,874,505 1,911,995 1,950,235 1,989,240

5311 Des Moines DART 996 Operations for Rural Services Total 26,260 26,786 27,322 27,870Operations FA 13,130 13,393 13,661 13,935Misc SA

5310 Des Moines DART 997 Subcontracted Paratransit Operations Total 50,000 112,500 152,500 168,750Operations FA 40,000 90,000 122,000 135,000Misc SA

5307 Des Moines DART 1020 Preventive Maintenance Total 3,437,500 3,437,500 3,437,500 3,437,500Operations FA 2,750,000 2,750,000 2,750,000 2,750,000Misc SA

5307 Des Moines DART 1021 ADA Paratransit Total 593,750 593,750 593,750 593,750Operations FA 475,000 475,000 475,000 475,000Misc SA

5307 Des Moines DART 1024 Admin and Maint. Facility Engineering and Design Total 50,000 25,000 10,000 10,000Capital FA 40,000 20,000 8,000 8,000Replacement SA

5307 Des Moines DART 1026 Facility Renovations Total 82,500 147,500 10,000 10,000Capital FA 66,000 118,000 8,000 8,000Replacement SA

5307 Des Moines DART 2480 Twenty Lease Buses - 20 (2015 Lease) Total 845,000 845,000 845,000 845,000Capital FA 676,000 676,000 676,000 676,000Replacement SA

5307 Des Moines DART 2482 Computer Software Total 200,000 10,000 10,000 10,000Capital FA 160,000 8,000 8,000 8,000Replacement SA

322

Page 327: Iowa Statewide Transportation Improvement Program

MPO-26 / DMAMPO (34 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5307 Des Moines DART 1028 Shop and Garage Equipment Total 125,000 25,000 25,000 25,000Capital FA 100,000 20,000 20,000 20,000Replacement SA

5307 Des Moines DART 1029 Miscellaneous Equipment Total 10,000 10,000 10,000 10,000Capital FA 8,000 8,000 8,000 8,000Replacement SA

5307 Des Moines DART 1030 Computer Hardware Total 60,000 61,250 70,000 40,000Capital FA 48,000 49,000 56,000 32,000Replacement SA

STP, 5307,5310

Des Moines DART 1032 Associated Transit Improvements Total 677,030 234,375 217,500 375,000Capital FA 541,624 187,500 174,000 300,000Replacement SA

PTIG, 5339,5307

Des Moines DART 5115 New Maintenance & Operations Facility Total 20,120,000 2,443,750 1,625,000 Capital FA 15,496,000 1,455,000 1,300,000 Replacement SA 600,000 500,000

STP, 5307 Des Moines DART 5673 Four Heavy-Duty Articulated Buses w/Surv. & AVL Total 3,952,001 Capital FA 3,271,063 Replacement SA

5310 Des Moines DART 6506 Microtransit Operating Total 92,000 94,000 96,000 Operations FA 46,000 47,000 48,000 Other SA

5310, 5307 Des Moines DART 6508 Two less than 30' Buses w/Surv., Fareboxes & AVL Total 281,216 Capital FA 239,034 Replacement SA

5307, 5310 Des Moines DART 6507 Four Less Than 30' Buses w/Surv., Fareboxes & AVL Total 584,929 Capital FA 497,190 Replacement SA

5307 Des Moines DART 6503 Mobile Ticketing Platform Total 25,000 Capital FA 20,000 Replacement SA

STP, 5307,5339

Des Moines DART 4762 Six to Seven Heavy-Duty Buses w/Surv. & AVL Total 3,405,538 4,241,252 4,410,902Capital FA 2,807,207 3,520,377 3,661,767Replacement SA

ICAAP Des Moines DART 3120 Express Service Improvements Total 206,000 212,180 218,546Operations FA 164,800 169,744 174,836Expansion SA

5307 Des Moines DART 1046 RideShare Vehicles (Repl/Exp) Total 720,000 675,000 701,250Capital FA 576,000 540,000 561,000Replacement SA

ICAAP Des Moines DART 1049 Park & Ride Lot Total 500,000 Capital FA 400,000 Expansion SA

ICAAP Des Moines DART 1756 Local Routes Service Improvements Total 309,000 318,270 327,819Operations FA 247,200 254,616 262,255Expansion SA

323

Page 328: Iowa Statewide Transportation Improvement Program

MPO-26 / DMAMPO (34 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5307 Des Moines DART 6536 Mobility on Demand Total 62,500 62,500Capital FA 50,000 50,000Other SA

5307, 5310 Des Moines DART 4292 Six Less Than 30' Buses w/Surv., Fareboxes & AVL Total 912,489 948,989Capital FA 775,616 806,641Replacement SA

5307 Des Moines DART 6505 One 40' Heavy-Duty Electric Bus W/Surv., Farebox & AVL Total 950,000Capital FA 760,000Replacement SA

5309 Des Moines DART 3867 Enhanced Corridors Total 25,000,000Capital FA 20,000,000Expansion SA

324

Page 329: Iowa Statewide Transportation Improvement Program

MPO-27 / DMATS (3 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5307 Dubuque 6523 5307 FTA Formula Funding Total 2,585,504 Operations FA 1,292,752 Other SA

5310 Dubuque 6524 5310 Preventative Maintenance Total 76,746 Operations FA 61,397 Other SA

STA Dubuque 6525 STA Operating Funding Total 655,308 Operations FA Other SA 327,654

325

Page 330: Iowa Statewide Transportation Improvement Program

MPO-28 / MPOJC (50 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STA, 5307,5310

CAMBUS 6440 General operations/maintenance/administration/planning Total 4,219,849 Operations FA 822,687 Misc SA 805,666

5339 CAMBUS 6441 In-ground hoist system Total 120,000 Capital FA 96,000 Expansion SA

5339 CAMBUS 6442 Associated capital bus maintenance (spare parts) Total 200,000 Capital FA 160,000 Replacement SA

5339 CAMBUS 6443 6 replacement passenger shelters Total 90,000 Capital FA 72,000 Replacement SA

5339 CAMBUS 6444 Forklift for maintenance Total 60,000 Capital FA 48,000 Replacement SA

5339 CAMBUS 6445 Expansion and upgrade of maintenance facility Total 5,250,000 Capital FA 4,200,000 Replacement SA

5339 CAMBUS 6446 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 11 SA

5339, 5310 CAMBUS 6447 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 12 SA

5339 CAMBUS 6448 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 94 SA

5339 CAMBUS 6449 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 95 SA

5339 CAMBUS 6450 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 96 SA

5339 CAMBUS 6451 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 97 SA

5339 CAMBUS 6452 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 98 SA

5339 CAMBUS 6453 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 99 SA

5339 CAMBUS 6454 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 100 SA

326

Page 331: Iowa Statewide Transportation Improvement Program

MPO-28 / MPOJC (50 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 CAMBUS 6455 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 101 SA

5339 CAMBUS 6456 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 102 SA

5339 CAMBUS 6457 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 103 SA

5339 CAMBUS 6458 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 104 SA

5339 CAMBUS 6459 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 105 SA

5310 Coralville 6408 Contract services for persons with special needs Total 334,800 Operations FA 32,664 Misc SA

5339 Coralville 6409 Associated capital bus maintenance (spare parts) Total 75,000 Capital FA 60,000 Misc SA

5339 Coralville 6411 Design and construction of Intermodal Transportation Center/Phase II Total 10,500,000 Capital FA 8,400,000 Expansion SA

5339 Coralville 6412 Construct new Transit Facility/Phase II Total 1,500,000 Capital FA 1,200,000 Expansion SA

5339 Coralville 6414 Two passenger shelters and associated improvements Total 14,000 Capital FA 11,200 Replacement SA

5339 Coralville 6415 Three passenger shelters and associated improvements Total 21,000 Capital FA 16,800 Expansion SA

5339 Coralville 6416 Shop equipment for transit maintenance (armature lathe, misc) Total 75,000 Operations FA 60,000 Other SA

5339 Coralville 6417 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 108 SA

5339 Coralville 6418 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 109 SA

5339 Coralville 6419 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 110 SA

327

Page 332: Iowa Statewide Transportation Improvement Program

MPO-28 / MPOJC (50 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Coralville 6420 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 111 SA

5339 Coralville 6421 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 112 SA

5339 Coralville 6422 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Expansion SA

5339 Coralville 6423 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Expansion SA

5339 Coralville 6424 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Expansion SA

5339 Coralville 6425 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Expansion SA

5339 Coralville 6426 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Expansion SA

5339 Coralville 6427 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Expansion SA

5339 Coralville 6428 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Expansion SA

STA, 5307 Coralville 6231 General Operations/Maintenance/Administration/Planning Total 2,070,641 Operations FA 550,000 Misc SA 304,111

STA, 5307 Iowa City 6226 General operations/maintenance/administrative/planning Total 8,660,631 Operations FA 1,900,000 Misc SA 554,905

5310 Iowa City 6227 Contracted services for people with special needs Total 1,800,000 Operations FA 119,186 Misc SA

5339 Iowa City 6430 Passenger shelters and associated improvements Total 50,000 Capital FA 40,000 Expansion SA

5339 Iowa City 6431 Associated capital bus maintenance (spare parts) Total 338,000 Capital FA 270,400 Replacement SA

5339 Iowa City 6432 New transit maintenance/bus storage facility Total 20,000,000 Capital FA 16,000,000 Replacement SA

328

Page 333: Iowa Statewide Transportation Improvement Program

MPO-28 / MPOJC (50 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Iowa City 6433 Heavy Duty Bus (40-42 ft.) Total 1,089,539 Capital UFRC, VSS, Low Floor, Electric FA 926,108 Replacement Unit #: 656 SA

5339 Iowa City 6434 Heavy Duty Bus (40-42 ft.) Total 1,089,539 Capital UFRC, VSS, Low Floor, Electric FA 926,108 Replacement Unit #: 658 SA

5339 Iowa City 6435 Heavy Duty Bus (40-42 ft.) Total 1,089,539 Capital UFRC, VSS, Low Floor, Electric FA 926,108 Replacement Unit #: 660 SA

5339 Iowa City 6436 Heavy Duty Bus (40-42 ft.) Total 1,089,539 Capital UFRC, VSS, Low Floor, Electric FA 926,108 Replacement Unit #: 661 SA

5339 Iowa City 6439 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 810 SA

329

Page 334: Iowa Statewide Transportation Improvement Program

MPO-29 / SIMPCO (28 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5311 MPO-29 1313 FTA Planning Total 54,089 54,089 54,089 54,089Planning FA 43,271 43,271 43,271 43,271Misc SA

5310 Sioux City 6265 Capital projects & Svc exceeding ADA Requirements, & Sat. SSC Rides Total 17,898 Capital FA 14,318 Other SA

STA Sioux City 6266 MLK structural rehabilitation, concrete sealing, and concrete repairs Total 75,000 Capital FA Rehabilitation SA 60,000

PTIG, 5339 Sioux City 6267 Replacement of Transit Maintenance & Storage Facility - NEW BUILDING Total 10,000,000 Capital FA 7,520,000 Replacement SA 600,000

STA, 5307 Sioux City 6268 Governor's apportionment for 5307 from IA, NE, & SD plus Iowa STA Total 3,762,249 Operations FA 1,694,749 Other SA 371,751

PTIG, 5307 Sioux City 6344 MLK Boiler and Chiller Equipment repairs and replacement Total 40,000 Capital FA 8,000 Rehabilitation SA 24,000

STA, PTIG,5307

Sioux City 6345 MLK Heat Pump replacements - five (5) units Total 85,000 Capital FA 68,000 Replacement SA

PTIG, 5339 Sioux City 6346 Transit Garage remodeling - battery electric buses & charging stations Total 50,000 Capital FA 45,000 Rehabilitation SA

STA, 5307 Sioux City 6347 New Project Total 50,000 Capital FA 40,000 Replacement Unit #: 1303 -F350 Service Truck SA

5307 Sioux City 6348 Consultant to review op. system - recommend updates/new tech Total 60,000 Operations FA 48,000 Other SA

5307 Sioux City 6350 New Project Total 65,000 Capital FA 52,000 Replacement Unit #: 1304 F450 Service Truck SA

5339, 5307 Sioux City 6352 Heavy Duty Bus (30-34 ft.) Total 900,000 Capital UFRC, VSS, Low Floor, Electric FA 765,000 Replacement Unit #: 1324 Electric Replacement SA

5339, 5307 Sioux City 6353 Medium Duty Bus (29-32 ft.) Total 900,000 Capital UFRC, VSS, Low Floor, Electric FA 765,000 Replacement Unit #: 1325 Electric Replacement SA

5339, 5307 Sioux City 6354 New Project Total 900,000 Capital UFRC, VSS, Low Floor, Electric FA 765,000 Replacement Unit #: 1326 Electric Replacement SA

5307 Sioux City 6355 Heavy Duty Bus (35-39 ft.) Total 497,149 Capital Diesel, UFRC, VSS, Low Floor FA 422,577 Replacement Unit #: 1331 SA

330

Page 335: Iowa Statewide Transportation Improvement Program

MPO-29 / SIMPCO (28 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339, 5307 Sioux City 6356 Heavy Duty Bus (30-34 ft.) Total 900,000 Capital UFRC, VSS, Low Floor, Electric FA 765,000 Replacement Unit #: 1332 Electric Replacement SA

5339, 5307 Sioux City 6357 Heavy Duty Bus (35-39 ft.) Total 900,000 Capital UFRC, VSS, Low Floor, Electric FA 765,000 Replacement Unit #: 1338 Electric Replacement SA

5307 Sioux City 6358 Heavy Duty Bus (35-39 ft.) Total 497,149 Capital Diesel, UFRC, VSS, Low Floor FA 422,577 Replacement Unit #: 1339 SA

5307, 5339 Sioux City 6359 Heavy Duty Bus (35-39 ft.) Total 497,149 Capital Diesel, UFRC, VSS, Low Floor FA 422,577 Replacement Unit #: 1340 SA

5307, 5339 Sioux City 6360 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital Diesel, UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 1341 SA

5307 Sioux City 6361 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital Diesel, UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 1352 SA

5307 Sioux City 6362 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital Diesel, UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 1353 SA

5307 Sioux City 6363 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital Diesel, UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 1354 SA

PTIG, 5307 Sioux City 6364 Replacement Bus Wash Equipment for Transit Garage Total 300,000 Capital FA Replacement SA 240,000

PTIG, 5339,5307

Sioux City 6365 Electric Infrastructure Remodeling of Transit Garage for Electric Bus Fleet Total 50,000 Capital FA Rehabilitation SA 40,000

PTIG, 5307,5339

Sioux City 6366 Replacement automatic sliding doors for MLK Total 40,000 Capital FA Replacement SA 32,000

PTIG, 5339,5307

Sioux City 6367 Install two electric vehicle charging stations in Transit Garage Total 136,000 Capital FA 108,800 Other SA

5310 Sioux City 6515 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1355 SA

331

Page 336: Iowa Statewide Transportation Improvement Program

MPO-30 / INRCOG (40 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Waterloo MET 6304 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS FA 168,512 Replacement Unit #: 512 SA

5339 Waterloo MET 6307 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 503 SA

5339 Waterloo MET 6308 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 702 SA

5339 Waterloo MET 6309 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 412 SA

5339 Waterloo MET 6310 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 902 SA

5339 Waterloo MET 6311 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 901 SA

5339 Waterloo MET 6312 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 116 SA

5339 Waterloo MET 6313 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 216 SA

5339 Waterloo MET 6314 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 301 SA

5339 Waterloo MET 6315 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 415 SA

5339 Waterloo MET 6316 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 515 SA

5339 Waterloo MET 6317 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 615 SA

5339 Waterloo MET 6328 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 210D SA

5339 Waterloo MET 6329 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 310D SA

5339 Waterloo MET 6330 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 903 SA

332

Page 337: Iowa Statewide Transportation Improvement Program

MPO-30 / INRCOG (40 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Waterloo MET 6331 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 110 SA

5307 Waterloo MET 1168 General Operations/Maintenance/Administration/Planning Total 5,400,000 5,600,000 6,000,000 6,600,000Operations FA 2,700,000 2,800,000 3,000,000 3,300,000Misc SA

5303, 5303 Waterloo MET 2128 Planning Total 120,000 120,000 120,000 120,000Planning FA 96,000 96,000 96,000 96,000Other SA

5310 Waterloo MET 2278 Preventative Maintenance Total 94,000 94,000 94,000 94,000Capital FA 75,200 75,200 75,200 75,200Other SA

STA Waterloo MET 2279 State Transit Operating Total 340,000 345,000 375,000 405,000Operations FA Other SA 340,000 345,000 375,000 405,000

5339 Waterloo MET 4324 Heavy Duty Bus (35-39 ft.) Total 497,149 Capital Diesel, UFRC, VSS, Low Floor FA 422,577 Replacement Unit #: 410 SA

5339 Waterloo MET 4325 Heavy Duty Bus (35-39 ft.) Total 497,149 Capital Diesel, UFRC, VSS, Low Floor FA 422,577 Replacement Unit #: 510D SA

5339 Waterloo MET 5848 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 218 SA

5339 Waterloo MET 5849 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS FA 168,512 Replacement Unit #: 315 SA

5339 Waterloo MET 5850 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS FA 168,512 Replacement Unit #: 117 SA

5339 Waterloo MET 5279 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS FA 168,512 Replacement Unit #: 115 SA

5339 Waterloo MET 5280 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS FA 168,512 Replacement Unit #: 215 SA

5339 Waterloo MET 5277 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 212 SA

5339 Waterloo MET 5278 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 312 SA

5339 Waterloo MET 6333 Heavy Duty Bus (30-34 ft.) Total 479,300 Capital Diesel, UFRC, VSS, Low Floor FA 407,405 Replacement Unit #: 113 SA

333

Page 338: Iowa Statewide Transportation Improvement Program

MPO-30 / INRCOG (40 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Waterloo MET 6335 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 112 SA

5339 Waterloo MET 5854 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 120 SA

5339 Waterloo MET 5702 Heavy Duty Bus (30-34 ft.) Total 495,268 Capital Diesel, UFRC, VSS, Low Floor FA 420,978 Replacement Unit #: 114 SA

5339 Waterloo MET 6320 Heavy Duty Bus (35-39 ft.) Total 495,268 Capital Diesel, UFRC, VSS FA 420,978 Replacement Unit #: 214 SA

5339 Waterloo MET 6321 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Replacement Unit #: 320 SA

5339 Waterloo MET 6322 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Replacement Unit #: 420 SA

5339 Waterloo MET 6323 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Replacement Unit #: 520 SA

5339 Waterloo MET 6324 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Expansion Unit #: 620 SA

5339 Waterloo MET 6325 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Replacement Unit #: 720 SA

5339 Waterloo MET 6326 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Replacement Unit #: 820 SA

334

Page 339: Iowa Statewide Transportation Improvement Program

RPA-01 (12 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STA, PTIG,5311

Region 1 /NEICAC-Transit

4179 General Operations/Maintenance/Administration Total 1,140,000 1,151,000 Operations FA 690,000 700,000 Other SA 450,000 451,000

5339 Region 1 /NEICAC-Transit

4639 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 12052 SA

5339 Region 1 /NEICAC-Transit

4642 Light Duty Bus (176" wb) Total 93,700 Capital VSS FA 79,645 Replacement Unit #: 10185 SA

5339 Region 1 /NEICAC-Transit

4644 Light Duty Bus (176" wb) Total 93,700 Capital VSS FA 79,645 Replacement Unit #: 10187 SA

5339 Region 1 /NEICAC-Transit

4645 Minivan Total 53,500 Capital VSS FA 45,475 Replacement Unit #: 12053 SA

5339 Region 1 /NEICAC-Transit

4646 Minivan Total 53,500 Capital VSS FA 45,475 Replacement Unit #: 12054 SA

5339 Region 1 /NEICAC-Transit

4649 Light Duty Bus (176" wb) Total 93,700 Capital VSS FA 79,645 Replacement Unit #: 11184 SA

5339 Region 1 /NEICAC-Transit

4651 Light Duty Bus (176" wb) Total 93,700 Capital VSS FA 79,645 Replacement Unit #: 12186 SA

5339 Region 1 /NEICAC-Transit

4652 Light Duty Bus (176" wb) Total 93,700 Capital VSS FA 79,645 Replacement Unit #: 12187 SA

5339 Region 1 /NEICAC-Transit

4653 Minivan Total 53,500 Capital VSS FA 45,475 Replacement Unit #: 14054 SA

5339 Region 1 /NEICAC-Transit

4654 Minivan Total 53,500 Capital VSS FA 45,475 Replacement Unit #: 14055 SA

PTIG Region 1 /NEICAC-Transit

1220 Maintenance Facility HVAC Upgrade Total 100,000Capital FA Rehabilitation SA 80,000

335

Page 340: Iowa Statewide Transportation Improvement Program

RPA-02 (83 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STA, 5311 Mason City 4697 General Operations Total 1,581,060 1,648,738 1,698,200 Operations FA 625,542 664,555 684,492 Other SA 329,976 339,875 350,071

STA, 5311,5310

Region 2 / NIARTS 1238 General Operations/Maintenance/Administration Total 2,639,425 3,087,082 3,241,436 3,338,678Operations FA 778,296 859,257 902,220 929,286Misc SA 486,912 499,968 524,966 540,715

5339 Region 2 / NIARTS 2816 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: D074 SA

5339 Region 2 / NIARTS 2824 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D067 SA

5339 Region 2 / NIARTS 4863 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: M006 SA

5339 Region 2 / NIARTS 4865 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: T001 SA

5339 Region 2 / NIARTS 4867 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D073 SA

5339 Region 2 / NIARTS 4868 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 1001 SA

5339 Region 2 / NIARTS 4869 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 1002 SA

5339 Region 2 / NIARTS 6232 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 9010 SA

5339 Region 2 / NIARTS 6233 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 9015 SA

5339 Region 2 / NIARTS 6235 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: B019 SA

5339 Region 2 / NIARTS 6236 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: B021 SA

5339 Region 2 / NIARTS 6237 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D069 SA

5339 Region 2 / NIARTS 6238 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D070 SA

336

Page 341: Iowa Statewide Transportation Improvement Program

RPA-02 (83 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 2 / NIARTS 6239 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D071 SA

5339 Region 2 / NIARTS 6240 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D076 SA

5339 Region 2 / NIARTS 6241 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D077 SA

5339 Region 2 / NIARTS 6242 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D078 SA

5339 Region 2 / NIARTS 6243 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D079 SA

5339 Region 2 / NIARTS 6245 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: U003 SA

5339 Region 2 / NIARTS 6246 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: W005 SA

5339 Mason City 4876 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 49 SA

5339 Mason City 4877 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 50 SA

5339 Region 2 / NIARTS 6105 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D084 SA

5339 Region 2 / NIARTS 6106 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: B018 SA

5339 Region 2 / NIARTS 6107 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D089 SA

5339 Region 2 / NIARTS 6108 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: B020 SA

5339 Region 2 / NIARTS 6109 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D088 SA

5339 Region 2 / NIARTS 6110 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D090 SA

337

Page 342: Iowa Statewide Transportation Improvement Program

RPA-02 (83 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 2 / NIARTS 6111 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D081 SA

5339 Region 2 / NIARTS 6112 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D083 SA

5339 Region 2 / NIARTS 6113 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D087 SA

5339 Region 2 / NIARTS 6114 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D082 SA

5339 Region 2 / NIARTS 6115 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: E009 SA

5339 Region 2 / NIARTS 6116 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D092 SA

5339 Region 2 / NIARTS 6117 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: E010 SA

5339 Region 2 / NIARTS 6118 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D091 SA

5339 Region 2 / NIARTS 6119 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: E011 SA

5339 Region 2 / NIARTS 6120 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D086 SA

5339 Region 2 / NIARTS 6121 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D093 SA

5339 Region 2 / NIARTS 6122 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: U004 SA

5339 Region 2 / NIARTS 6123 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D094 SA

5339 Region 2 / NIARTS 6124 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D096 SA

5339 Region 2 / NIARTS 6125 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D095 SA

338

Page 343: Iowa Statewide Transportation Improvement Program

RPA-02 (83 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

PTIG Region 2 / NIARTS 6252 Replace facility insulation and inner panels Total 250,000 Capital FA Replacement SA 200,000

5339 Region 2 / NIARTS 6234 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 9022 SA

5339 Mason City 4878 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 51 SA

5339 Mason City 4879 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 52 SA

5339 Mason City 4880 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 53 SA

5339 Mason City 4881 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 54 SA

5339 Mason City 4882 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 55 SA

5339 Mason City 5430 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 56 SA

5339 Region 2 / NIARTS 6126 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: B022 SA

5339 Region 2 / NIARTS 6127 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D085 SA

5339 Region 2 / NIARTS 6128 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 8011 SA

5339 Region 2 / NIARTS 6129 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 8010 SA

5339 Region 2 / NIARTS 6130 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 4008 SA

5339 Region 2 / NIARTS 6131 Light Duty Bus (158" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: B023 SA

5339 Region 2 / NIARTS 6132 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 6007 SA

339

Page 344: Iowa Statewide Transportation Improvement Program

RPA-02 (83 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 2 / NIARTS 6133 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 5003 SA

5339 Region 2 / NIARTS 6134 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: A006 SA

5339 Region 2 / NIARTS 6135 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: G020 SA

5339 Region 2 / NIARTS 6136 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 9024 SA

5339 Region 2 / NIARTS 6137 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: S027 SA

5339 Region 2 / NIARTS 6138 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: S029 SA

5339 Region 2 / NIARTS 6139 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: S028 SA

5339 Region 2 / NIARTS 6140 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: S026 SA

5339 Region 2 / NIARTS 6141 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: 2009 SA

5339 Region 2 / NIARTS 6142 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: G021 SA

5339 Region 2 / NIARTS 6143 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: A007 SA

5339 Region 2 / NIARTS 6144 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: M007 SA

5339 Region 2 / NIARTS 6145 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: D097 SA

5339 Region 2 / NIARTS 6146 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: W006 SA

5339 Region 2 / NIARTS 6147 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: G023 SA

340

Page 345: Iowa Statewide Transportation Improvement Program

RPA-02 (83 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 2 / NIARTS 6148 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: G022 SA

5339 Region 2 / NIARTS 6149 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: T002 SA

5339 Region 2 / NIARTS 6150 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: D098 SA

5339 Region 2 / NIARTS 6247 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: 9025 SA

5339 Region 2 / NIARTS 6248 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: B024 SA

5339 Region 2 / NIARTS 6249 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: E012 SA

5339 Region 2 / NIARTS 6250 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: E013 SA

5339 Region 2 / NIARTS 6251 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: E014 SA

341

Page 346: Iowa Statewide Transportation Improvement Program

RPA-03 (24 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STA, STP,5311

Region 3 / RIDES 2890 General Operations/Maintenance/Administation Total 3,140,000 3,300,000 3,150,000 Operations FA 640,000 750,000 650,000 Misc SA 500,000 550,000 500,000

5339 Region 3 / RIDES 6004 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 0923 SA

5339 Region 3 / RIDES 6007 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 0920 SA

5339 Region 3 / RIDES 6009 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 0914 SA

5339 Region 3 / RIDES 4884 Light Duty Bus (158" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 0926 SA

5339 Region 3 / RIDES 4885 Light Duty Bus (176" wb) Total 103,500 Capital VSS FA 87,975 Replacement Unit #: 0917 SA

5339 Region 3 / RIDES 4886 Light Duty Bus (158" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 0931 SA

5339 Region 3 / RIDES 4887 Minivan Total 58,000 Capital VSS FA 49,300 Replacement Unit #: 1201 SA

5339 Region 3 / RIDES 4888 Light Duty Bus (176" wb) Total 103,500 Capital VSS FA 87,975 Replacement Unit #: 0915 SA

5339 Region 3 / RIDES 5420 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1501 SA

5339 Region 3 / RIDES 5421 Light Duty Bus (158" wb) Total 91,100 Capital VSS FA 77,435 Replacement Unit #: 1602 SA

5339 Region 3 / RIDES 5422 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1704 SA

5339 Region 3 / RIDES 5423 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1703 SA

5339 Region 3 / RIDES 5424 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1702 SA

5339 Region 3 / RIDES 5425 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1701 SA

342

Page 347: Iowa Statewide Transportation Improvement Program

RPA-03 (24 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 3 / RIDES 5426 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1700 SA

5339 Region 3 / RIDES 5427 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1801 SA

STA, 5311 Region 3 / RIDES 6337 Operations/Maintenance/Administration Total 3,700,000Operations FA 700,000Misc SA 500,000

5339 Region 3 / RIDES 6338 Light Duty Bus (158" wb) Total 96,280Capital VSS FA 81,838Replacement Unit #: 1802 SA

5339 Region 3 / RIDES 6339 Light Duty Bus (158" wb) Total 96,280Capital VSS FA 81,838Replacement Unit #: 1805 SA

5339 Region 3 / RIDES 6340 Light Duty Bus (158" wb) Total 96,280Capital VSS FA 81,838Replacement Unit #: 1087 SA

5339 Region 3 / RIDES 6341 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 1806 SA

5339 Region 3 / RIDES 6342 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 1808 SA

5339 Region 3 / RIDES 6343 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 1813 SA

343

Page 348: Iowa Statewide Transportation Improvement Program

RPA-04 (18 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STP Region 4 / SRTS 5128 Light Duty Bus (176" wb) with vss Total 102,000 Capital FA 86,700 Expansion SA

5339 Region 4 / SRTS 5894 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7560 SA

5339 Region 4 / SRTS 5895 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7561 SA

5339 Region 4 / SRTS 5896 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7562 SA

5311 Region 4 / SRTS 6271 FTA operating 5310\5311 formula Total 982,468 982,468 982,468 982,468Operations FA 491,234 491,234 491,234 491,234Other SA

STA Region 4 / SRTS 6272 STA state operating Total 460,043 460,043 460,043 460,043Operations FA Other SA 460,043 460,043 460,043 460,043

5339 Region 4 / SRTS 6274 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7550A SA

5339 Region 4 / SRTS 6275 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7555A SA

5339 Region 4 / SRTS 6276 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7556 SA

5339 Region 4 / SRTS 6277 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7557 SA

5339 Region 4 / SRTS 6278 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7558 SA

5339 Region 4 / SRTS 6279 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7559 SA

5311 RPA-04 2132 FTA Planning Total 30,418 30,418 30,418 31,024Planning FA 24,335 24,335 24,335 24,819Misc SA

5339 Region 4 / SRTS 5902 Light Duty Bus (176" wb) Total 102,500 Capital VSS FA 87,125 Replacement Unit #: 7563 SA

5339 Region 4 / SRTS 5903 Light Duty Bus (176" wb) Total 102,500 Capital VSS FA 87,125 Replacement Unit #: 7564 SA

344

Page 349: Iowa Statewide Transportation Improvement Program

RPA-04 (18 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 4 / SRTS 5904 Light Duty Bus (176" wb) Total 102,500 Capital VSS FA 87,125 Replacement Unit #: 7565 SA

5339 Region 4 / SRTS 5905 Light Duty Bus (176" wb) Total 102,500 Capital VSS FA 87,125 Replacement Unit #: 7566 SA

STP Region 4 / SRTS 6273 New Bus Wash system for new SRTS building Total 102,500 Capital FA 82,000 Expansion SA

345

Page 350: Iowa Statewide Transportation Improvement Program

RPA-05 (21 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Fort Dodge 6396 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: FD64 SA

5339 Fort Dodge 6398 Medium Duty Bus (29-32 ft.) Total 210,920 Capital Diesel, UFRC, VSS FA 179,282 Replacement Unit #: FD60 SA

STA, 5311 Fort Dodge 1331 General Operations/Maintenance/Administration Total 628,584 653,727 679,877 707,072Operations FA 381,102 396,346 412,200 428,688Misc SA 247,482 257,381 267,677 278,384

5311 Fort Dodge 3261 Intercity Bus Marketing Funds Total 9,400 9,400 9,400 9,400Operations FA 7,500 7,500 7,500 7,500Misc SA

STA, 5311 Region 5 / MIDAS 1314 General Operations/Maintenance/Administration Total 736,898 766,374 797,029 828,910Operations FA 349,052 363,014 377,535 392,636Misc SA 387,846 403,360 419,494 436,274

5307 Region 5 / MIDAS 1350 RPA Transportation Planning Total 34,526 35,907 37,343 38,837Planning FA 27,621 28,726 29,875 31,070Misc SA

PTIG Region 5 / MIDAS 6404 Pathfinders Facility 602 1st Ave S Total 890,000 Capital FA Other SA 600,000

5339 Region 5 / MIDAS 6460 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 10-3 SA

5339 Region 5 / MIDAS 6461 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 09-3 SA

5339 Fort Dodge 6397 Light Duty Bus (158" wb) Total 107,411 Capital UFRC, VSS FA 91,299 Replacement Unit #: FD63 SA

5339 Fort Dodge 6399 Light Duty Bus (176" wb) Total 113,360 Capital UFRC, VSS FA 96,356 Replacement Unit #: FD62 SA

5339 Region 5 / MIDAS 6462 Light Duty Bus (176" wb) Total 106,080 Capital VSS FA 90,168 Replacement Unit #: 09-7 SA

5339 Region 5 / MIDAS 6463 Light Duty Bus (176" wb) Total 106,080 Capital VSS FA 90,168 Replacement Unit #: 09-4 SA

5339 Fort Dodge 6400 Light Duty Bus (176" wb) Total 117,894 Capital UFRC, VSS FA 100,210 Replacement Unit #: FD66 SA

5339 Fort Dodge 6401 Light Duty Bus (176" wb) Total 117,894 Capital UFRC, VSS FA 100,210 Replacement Unit #: FD67 SA

346

Page 351: Iowa Statewide Transportation Improvement Program

RPA-05 (21 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 5 / MIDAS 6464 Light Duty Bus (176" wb) Total 110,323 Capital VSS FA 93,775 Replacement Unit #: 09-8 SA

5339 Region 5 / MIDAS 6465 Light Duty Bus (158" wb) Total 104,137 Capital VSS FA 85,516 Replacement Unit #: 10-1 SA

5339 Fort Dodge 6402 Light Duty Bus (176" wb) Total 122,610Capital UFRC, VSS FA 104,219Replacement Unit #: FD70 SA

5339 Fort Dodge 6403 Light Duty Bus (176" wb) Total 122,610Capital UFRC, VSS FA 104,219Replacement Unit #: FD68 SA

5339 Region 5 / MIDAS 6466 Light Duty Bus (158" wb) Total 108,302Capital VSS FA 92,057Replacement Unit #: 08-4 SA

5339 Region 5 / MIDAS 6467 Light Duty Bus (158" wb) Total 108,302Capital VSS FA 92,057Replacement Unit #: 10-2 SA

347

Page 352: Iowa Statewide Transportation Improvement Program

RPA-06 (7 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STA, 5311 Marshalltown 2134 General Operations/Maintenance/Administration Total 778,649 784,000 790,000 797,000Operations FA 211,603 213,000 215,000 217,000Other SA 192,046 195,000 198,000 200,000

STA, 5311 Region 6 /PeopleRides

1280 General Operations/Maintenance/Administration Total 1,050,000 1,100,000 1,150,000 1,163,000Operations FA 174,150 176,000 178,000 180,000Misc SA 253,851 257,000 260,000 263,000

5339 Region 6 /PeopleRides

5077 Conversion Van Total 57,920 Capital FA 49,232 Replacement Unit #: 412 SA

5339 Region 6 /PeopleRides

5505 Light Duty Bus (158" wb) Total 90,280 Capital FA 76,738 Replacement Unit #: 312 SA

5339 Region 6 /PeopleRides

5998 Conversion Van Total 57,920 Capital FA 49,232 Replacement Unit #: 214 SA

5339 Region 6 /PeopleRides

5999 Conversion Van Total 57,920 Capital FA 49,232 Replacement Unit #: 114A SA

5339 Region 6 /PeopleRides

6468 Light Duty Bus (158" wb) Total 90,280Capital FA 76,738Replacement Unit #: 115 SA

348

Page 353: Iowa Statewide Transportation Improvement Program

RPA-07 (13 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STA, 5311 Region 7 / INRTC 1377 General Operations/Maintenance/Administration Total 1,186,670 1,210,404 1,223,639 688,495Operations FA 320,253 326,658 333,191 339,855Misc SA 328,531 335,102 341,804 348,640

5339 Region 7 / INRTC 3498 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1001 SA

5311 Region 7 / INRTC 3500 RPA Transportation Planning Total 39,000 39,000 39,000 39,000Planning FA 31,200 31,200 31,200 31,200Misc SA

5339 Region 7 / INRTC 3860 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1401 SA

5339 Region 7 / INRTC 3861 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1402 SA

5339 Region 7 / INRTC 6200 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1201 SA

5339 Region 7 / INRTC 5282 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1601 SA

5339 Region 7 / INRTC 5707 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: V061 SA

5339 Region 7 / INRTC 5283 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1801 SA

5339 Region 7 / INRTC 5284 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1802 SA

5339 Region 7 / INRTC 5693 Light Duty Bus (176" wb) Total 100,000Capital VSS FA 85,000Replacement Unit #: 1901 SA

5339 Region 7 / INRTC 5705 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 1701 SA

5339 Region 7 / INRTC 5706 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 1702 SA

349

Page 354: Iowa Statewide Transportation Improvement Program

RPA-08 (5 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STA, 5311 Clinton 6406 Light Duty Bus (158" wb) Total 96,280 Capital VSS, Low Floor FA 81,838 Replacement Unit #: 1256 SA

5339, 5311 Clinton 6410 Light Duty Bus (176" wb) Total 109,000 Capital UFRC, VSS, Low Floor, Hybrid FA 92,650 Replacement Unit #: 1255 SA

STA, 5311 Clinton 6413 Operations Total 2,011,934 Operations FA 735,394 Other SA 276,190

STA, 5311 Region 8 / RTA 4406 Operations Total 647,212 Operations FA 314,928 Other SA 332,284

5339 Region 8 / RTA 4831 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 4484 SA

350

Page 355: Iowa Statewide Transportation Improvement Program

RPA-09 (53 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5304 RPA-09 1484 Transit Planning Total 25,328 25,328 55,328 Planning FA 20,262 20,262 50,262 Misc SA

STA, 5311 Muscatine 4174 Transit Operations Total 1,139,900 1,174,097 1,209,300 1,245,600Operations FA 512,150 461,700 475,500 485,700Other SA 275,126 272,500 280,600 291,900

5339 Muscatine 5132 Light Duty Bus (176" wb) Total 109,800 Capital UFRC, VSS FA 93,330 Replacement Unit #: 253 SA

5339 Muscatine 5133 Light Duty Bus (176" wb) Total 109,800 Capital UFRC, VSS FA 93,330 Replacement Unit #: 254 SA

5311 Muscatine 6516 Automatic Drive Through Wash Bay Total 657,900 Capital FA 422,559 Expansion SA

5339 Region 9 / RBT 6492 Bus Garage Total 5,700,000 Capital FA 4,560,000 Expansion SA

STA, 5311 Region 9 / RBT 1425 General Operations/Maintenance/Administration Total 3,989,639 3,989,639 3,989,639 3,989,639Operations FA 356,389 356,389 356,389 356,389Misc SA 373,085 373,085 373,085 373,085

5339 Region 9 / RBT 4366 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 747 SA

5339 Region 9 / RBT 4367 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 745 SA

5339 Region 9 / RBT 4368 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 772 SA

5339 Region 9 / RBT 4369 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 773 SA

5339 Region 9 / RBT 4370 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 774 SA

5339 Region 9 / RBT 4908 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 901 SA

5339 Muscatine 5577 Light Duty Bus (176" wb) Total 113,100 Capital UFRC, VSS FA 96,135 Replacement Unit #: 255 SA

5339 Muscatine 5578 Conversion Van Total 68,110 Capital UFRC, VSS FA 57,894 Replacement Unit #: 256 SA

351

Page 356: Iowa Statewide Transportation Improvement Program

RPA-09 (53 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Muscatine 5579 Light Duty Bus (158" wb) Total 107,200 Capital UFRC, VSS FA 91,120 Replacement Unit #: 257 SA

5339 Region 9 / RBT 4909 Light Duty Bus (158" wb) Total 98,988 Capital VSS FA 84,140 Replacement Unit #: 998 SA

5339 Region 9 / RBT 4910 Light Duty Bus (158" wb) Total 98,988 Capital VSS FA 84,140 Replacement Unit #: 999 SA

5339 Region 9 / RBT 5414 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 200 SA

5339 Region 9 / RBT 5415 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 201 SA

5339 Region 9 / RBT 5416 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 202 SA

5339 Region 9 / RBT 5417 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 241 SA

5339 Region 9 / RBT 5418 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 242 SA

5339 Region 9 / RBT 5419 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 243 SA

5339 Muscatine 6041 Light Duty Bus (158" wb) Total 110,400 Capital UFRC, VSS FA 93,840 Replacement Unit #: 258 SA

5339 Muscatine 6042 Light Duty Bus (176" wb) Total 116,400 Capital UFRC, VSS FA 98,940 Replacement Unit #: 259 SA

5339 Region 9 / RBT 5742 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 812 SA

5339 Region 9 / RBT 5743 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 813 SA

5339 Region 9 / RBT 5744 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 814 SA

5339 Region 9 / RBT 5745 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 815 SA

352

Page 357: Iowa Statewide Transportation Improvement Program

RPA-09 (53 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 9 / RBT 5746 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 817 SA

5339 Region 9 / RBT 5747 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 818 SA

5339 Region 9 / RBT 5748 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 819 SA

5339 Region 9 / RBT 5749 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 821 SA

5339 Region 9 / RBT 5750 Light Duty Bus (176" wb) Total 107,846 Capital VSS FA 91,669 Replacement Unit #: 820 SA

5339 Region 9 / RBT 5751 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 825 SA

5339 Region 9 / RBT 5752 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 826 SA

5339 Region 9 / RBT 5753 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 828 SA

5339 Region 9 / RBT 5754 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 829 SA

5339 Region 9 / RBT 5755 Light Duty Bus (176" wb) Total 107,846 Capital VSS FA 91,669 Replacement Unit #: 827 SA

5339 Muscatine 6517 Light Duty Bus (176" wb) Total 119,900Capital UFRC, VSS FA 101,915Replacement Unit #: 260 SA

5339 Muscatine 6518 Light Duty Bus (158" wb) Total 128,751Capital UFRC, VSS, Low Floor FA 109,438Replacement Unit #: 261 SA

5339 Region 9 / RBT 6170 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 946 SA

5339 Region 9 / RBT 6185 Light Duty Bus (176" wb) Total 110,902Capital VSS FA 94,267Replacement Unit #: 914 SA

5339 Region 9 / RBT 6203 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 933 SA

353

Page 358: Iowa Statewide Transportation Improvement Program

RPA-09 (53 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 9 / RBT 6204 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 937 SA

5339 Region 9 / RBT 6205 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 945 SA

5339 Region 9 / RBT 6206 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 944 SA

5339 Region 9 / RBT 6207 Light Duty Bus (176" wb) Total 110,902Capital VSS FA 94,267Replacement Unit #: 915 SA

5339 Region 9 / RBT 6208 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 940 SA

5339 Region 9 / RBT 6188 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 932 SA

5339 Region 9 / RBT 6189 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 934 SA

5339 Region 9 / RBT 6192 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 936 SA

354

Page 359: Iowa Statewide Transportation Improvement Program

RPA-10 (58 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5311 Region 10 / ECICOG 1485 General Operations/Maintenance/Administration Total 2,719,200 2,719,200 2,719,200 2,719,200Operations FA 650,000 650,000 650,000 650,000Misc SA

5311 Region 10 / ECICOG 1540 RPA Transportation Planning Total 175,000 175,000 175,000 175,000Planning FA 140,000 140,000 140,000 140,000Misc SA

5310 Region 10 / ECICOG 3576 General Operations/Maintenance/Contracted Service Total 1,480,800 1,480,800 1,480,800 1,480,800Operations FA 354,000 354,000 354,000 354,000Other SA

5339 Region 10 / ECICOG 4972 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 219 SA

5339 Region 10 / ECICOG 4977 Light Duty Bus (138" wb) Total 92,050 Capital VSS FA 78,243 Replacement Unit #: 487 SA

5339 Region 10 / ECICOG 5456 Light Duty Bus (138" wb) Total 92,050 Capital VSS FA 78,243 Replacement Unit #: 401 SA

5339 Region 10 / ECICOG 6290 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 331 SA

5339 Region 10 / ECICOG 6280 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 343 SA

5339 Region 10 / ECICOG 6281 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 344 SA

5339 Region 10 / ECICOG 6282 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 342 SA

5339 Region 10 / ECICOG 6283 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 341 SA

5339 Region 10 / ECICOG 6284 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 246 SA

5339 Region 10 / ECICOG 6292 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 310 SA

5339 Region 10 / ECICOG 6293 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 218 SA

5339 Region 10 / ECICOG 6294 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 308 SA

355

Page 360: Iowa Statewide Transportation Improvement Program

RPA-10 (58 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 10 / ECICOG 6295 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 309 SA

5339 Region 10 / ECICOG 6296 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 400 SA

5339 Region 10 / ECICOG 6253 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 482 SA

5339 Region 10 / ECICOG 6254 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 483 SA

5339 Region 10 / ECICOG 6255 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 484 SA

5339 Region 10 / ECICOG 6256 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 485 SA

5339 Region 10 / ECICOG 6257 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 486 SA

5339 Region 10 / ECICOG 6261 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 47L SA

PTIG Region 10 / ECICOG 6336 Expansion and Remodel Bus Storage Building Washington Iowa Total 590,570 Capital FA Other SA 472,456

5339 Region 10 / ECICOG 5446 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 488 SA

5339 Region 10 / ECICOG 5448 Medium Duty Bus (29-32 ft.) Total 192,800 Capital VSS FA 163,880 Replacement Unit #: 267 SA

5339 Region 10 / ECICOG 5449 Medium Duty Bus (29-32 ft.) Total 192,800 Capital VSS FA 163,880 Replacement Unit #: 266 SA

5339 Region 10 / ECICOG 5450 Medium Duty Bus (29-32 ft.) Total 192,800 Capital VSS FA 163,880 Replacement Unit #: 265 SA

5339 Region 10 / ECICOG 5451 Medium Duty Bus (29-32 ft.) Total 192,800 Capital VSS FA 163,880 Replacement Unit #: 264 SA

5339 Region 10 / ECICOG 5454 Light Duty Bus (176" wb) Total 90,500 Capital Low Floor FA 76,925 Replacement Unit #: 333 SA

356

Page 361: Iowa Statewide Transportation Improvement Program

RPA-10 (58 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 10 / ECICOG 5455 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 311 SA

5339 Region 10 / ECICOG 6289 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 332 SA

5339 Region 10 / ECICOG 5452 Light Duty Bus (138" wb) Total 89,000 Capital VSS FA 75,650 Replacement Unit #: 345 SA

5339 Region 10 / ECICOG 5453 Light Duty Bus (138" wb) Total 89,000 Capital VSS FA 75,650 Replacement Unit #: 346 SA

5339 Region 10 / ECICOG 5771 Light Duty Bus (158" wb) Total 91,100 Capital VSS FA 77,435 Replacement Unit #: 402 SA

5339 Region 10 / ECICOG 5776 Light Duty Bus (158" wb) Total 91,100 Capital VSS FA 77,435 Replacement Unit #: 312 SA

5339 Region 10 / ECICOG 5777 Light Duty Bus (158" wb) Total 91,100 Capital VSS FA 77,435 Replacement Unit #: 313 SA

5339 Region 10 / ECICOG 5782 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 335 SA

5339 Region 10 / ECICOG 5783 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 336 SA

5339 Region 10 / ECICOG 5784 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 337 SA

5339 Region 10 / ECICOG 5789 Light Duty Bus (138" wb) Total 89,000 Capital VSS FA 75,650 Replacement Unit #: 347 SA

5339 Region 10 / ECICOG 5797 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 268 SA

5339 Region 10 / ECICOG 5798 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 269 SA

5339 Region 10 / ECICOG 5808 Light Duty Bus (158" wb) Total 91,100 Capital VSS FA 77,435 Replacement Unit #: 489 SA

5339 Region 10 / ECICOG 5809 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 490 SA

357

Page 362: Iowa Statewide Transportation Improvement Program

RPA-10 (58 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 10 / ECICOG 6262 Medium Duty Bus (29-32 ft.) Total 203,920Capital VSS FA 173,332Replacement Unit #: 350 SA

5339 Region 10 / ECICOG 6263 Medium Duty Bus (29-32 ft.) Total 203,920Capital VSS FA 173,332Replacement Unit #: 351 SA

5339 Region 10 / ECICOG 6258 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 491 SA

5339 Region 10 / ECICOG 6259 Light Duty Bus (158" wb) Total 96,280Capital VSS FA 81,838Replacement Unit #: 492 SA

5339 Region 10 / ECICOG 6260 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 493 SA

5339 Region 10 / ECICOG 6297 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 403 SA

5339 Region 10 / ECICOG 6298 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 404 SA

5339 Region 10 / ECICOG 6299 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 405 SA

5339 Region 10 / ECICOG 6285 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 348 SA

5339 Region 10 / ECICOG 6286 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 349 SA

5339 Region 10 / ECICOG 6287 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 440 SA

5339 Region 10 / ECICOG 6288 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 338 SA

5339 Region 10 / ECICOG 6291 Minivan Total 55,689Capital Low Floor FA 47,336Replacement Unit #: 316 SA

358

Page 363: Iowa Statewide Transportation Improvement Program

RPA-11 (42 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 11 / HIRTA 6209 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1141 SA

STA, 5311 Region 11 / HIRTA 6210 Day to Day Operations/Adm Total 1,412,919 Operations FA 835,879 Other SA 577,040

5339 Region 11 / HIRTA 6212 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1142 SA

5339 Region 11 / HIRTA 6213 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 3323 SA

5339 Region 11 / HIRTA 6214 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5516 SA

5339 Region 11 / HIRTA 6215 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 5519 SA

PTIG Region 11 / HIRTA 6541 Boone Bus Parking Total 275,000 Capital FA Expansion SA 220,000

STP Region 11 / HIRTA 6542 Conversion Van Total 60,420 Capital VSS, Hybrid FA 51,357 Expansion SA

5339 Region 11 / HIRTA 6543 HIRTA Admin / Bus Facility Total 9,000,000 Capital FA 7,200,000 Expansion SA

5339 Region 11 / HIRTA 4452 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 3326 SA

5339 Region 11 / HIRTA 4460 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 3325 SA

5339 Region 11 / HIRTA 4463 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 8727 SA

STP Region 11 / HIRTA 5157 Conversion Van Total 60,420 Capital VSS, Hybrid FA 51,357 Expansion SA

5339 Region 11 / HIRTA 5977 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 1143 SA

5339 Region 11 / HIRTA 5992 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 6526 SA

359

Page 364: Iowa Statewide Transportation Improvement Program

RPA-11 (42 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 11 / HIRTA 6216 Light Duty Bus (158" wb) Total 90,280 Capital FA 76,738 Replacement Unit #: 3329 SA

5339 Region 11 / HIRTA 6217 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1144 SA

5339 Region 11 / HIRTA 6218 Light Duty Bus (176" wb) Total 96,040 Capital FA 81,600 Replacement Unit #: 2227 SA

5339 Region 11 / HIRTA 3242 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 2228 SA

5339 Region 11 / HIRTA 4442 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1146 SA

5339 Region 11 / HIRTA 4445 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1149 SA

5339 Region 11 / HIRTA 5980 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1147 SA

5339 Region 11 / HIRTA 5983 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 3328 SA

5339 Region 11 / HIRTA 5986 Minivan Total 56,564 Capital VSS FA 48,080 Replacement Unit #: 3330 SA

5339 Region 11 / HIRTA 5987 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 4420 SA

STP Region 11 / HIRTA 6061 Conversion Van Total 58,727 Capital UFRC, VSS FA 49,918 Expansion SA

STP Region 11 / HIRTA 6062 Conversion Van Total 58,727 Capital UFRC, VSS FA 49,918 Expansion SA

5339 Region 11 / HIRTA 4448 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 2229 SA

5339 Region 11 / HIRTA 5989 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5521 SA

5339 Region 11 / HIRTA 5990 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5523 SA

360

Page 365: Iowa Statewide Transportation Improvement Program

RPA-11 (42 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 11 / HIRTA 5991 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5522 SA

5339 Region 11 / HIRTA 4446 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1150 SA

5339 Region 11 / HIRTA 4444 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1148 SA

5339 Region 11 / HIRTA 5988 Light Duty Bus (176" wb) Total 131,120 Capital VSS, Low Floor FA 111,452 Replacement Unit #: 4422 SA

5339 Region 11 / HIRTA 5979 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 1145 SA

5339 Region 11 / HIRTA 4450 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 2231 SA

5339 Region 11 / HIRTA 6219 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 2230 SA

5339 Region 11 / HIRTA 6220 Minivan Total 55,689Capital FA 47,336Replacement Unit #: 4419 SA

5339 Region 11 / HIRTA 5993 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 8725 SA

5339 Region 11 / HIRTA 5994 Light Duty Bus (138" wb) Total 94,050Capital VSS FA 79,943Replacement Unit #: 8728 SA

5339 Region 11 / HIRTA 5995 Light Duty Bus (158" wb) Total 96,280Capital VSS FA 81,838Replacement Unit #: 8729 SA

5339 Region 11 / HIRTA 6063 Non-ADA LD bus (176" wb) Total 156,000Capital UFRC, VSS, Low Floor FA 124,800Expansion SA

361

Page 366: Iowa Statewide Transportation Improvement Program

RPA-12 (24 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STA, 5311 Region 12 / WITS 1585 Operations/Maintenance/Administration Total 2,512,549 2,525,000 2,535,000 2,535,000Operations FA 704,673 715,000 720,000 720,000Misc SA 467,876 410,000 415,000 415,000

5311 Region 12 / WITS 1599 RPA Transportation Planning Total 32,878 32,000 32,000 32,000Planning FA 26,302 25,600 25,600 25,600Misc SA

5339 Region 12 / WITS 5359 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1101 SA

5339 Region 12 / WITS 5360 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1102 SA

5339 Region 12 / WITS 5362 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1007 SA

5339 Region 12 / WITS 5364 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1201 SA

5339 Region 12 / WITS 5884 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 1502 SA

5339 Region 12 / WITS 5358 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: JJ03 SA

5339 Region 12 / WITS 5363 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: JJ02 SA

5339 Region 12 / WITS 5361 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 0901 SA

5339 Region 12 / WITS 5885 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 1504 SA

5339 Region 12 / WITS 5886 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 1402 SA

5339 Region 12 / WITS 5365 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1301 SA

5339 Region 12 / WITS 5366 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1302 SA

5339 Region 12 / WITS 6387 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 1501 SA

362

Page 367: Iowa Statewide Transportation Improvement Program

RPA-12 (24 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 12 / WITS 6388 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1103 SA

5339 Region 12 / WITS 6389 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1104 SA

5339 Region 12 / WITS 5367 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: JJ04 SA

5339 Region 12 / WITS 5887 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 1401 SA

5339 Region 12 / WITS 6390 Conversion Van Total 60,420Capital VSS FA 51,357Replacement Unit #: 1505 SA

5339 Region 12 / WITS 6391 Conversion Van Total 60,420Capital VSS FA 51,357Replacement Unit #: 1507 SA

5339 Region 12 / WITS 6392 Conversion Van Total 60,420Capital VSS FA 51,357Replacement Unit #: 1508 SA

5339 Region 12 / WITS 6393 Conversion Van Total 60,420Capital VSS FA 51,357Replacement Unit #: 1601 SA

5339 Region 12 / WITS 6394 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 1506 SA

363

Page 368: Iowa Statewide Transportation Improvement Program

RPA-13 (21 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

PTIG Region 13 / SWITA 6544 Bus barn expansion project Total 630,260 Capital FA Expansion SA 504,208

5311 Region 13 / SWITA 6545 New Project Total 2,611,180 Operations FA 2,611,180 Other SA

5339 Region 13 / SWITA 6386 Minivan Total 55,689 Capital FA 47,336 Replacement Unit #: 1014 SA

5339 Region 13 / SWITA 6368 Light Duty Bus (138" wb) Total 88,049 Capital FA 74,842 Replacement Unit #: 904 SA

5339 Region 13 / SWITA 6369 Light Duty Bus (138" wb) Total 88,049 Capital FA 74,842 Replacement Unit #: 0905 SA

5339 Region 13 / SWITA 6370 Light Duty Bus (138" wb) Total 88,049 Capital FA 74,842 Replacement Unit #: 0906 SA

5339 Region 13 / SWITA 6371 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1009 SA

5339 Region 13 / SWITA 6372 Light Duty Bus (138" wb) Total 88,049 Capital FA 74,842 Replacement Unit #: 0907 SA

5339 Region 13 / SWITA 6373 Light Duty Bus (138" wb) Total 88,049 Capital FA 74,842 Replacement Unit #: 0908 SA

5339 Region 13 / SWITA 6374 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1003 SA

5339 Region 13 / SWITA 6375 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1007 SA

5339 Region 13 / SWITA 6376 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1016 SA

5339 Region 13 / SWITA 6377 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1201 SA

5339 Region 13 / SWITA 6378 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1202 SA

5339 Region 13 / SWITA 6379 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1203 SA

364

Page 369: Iowa Statewide Transportation Improvement Program

RPA-13 (21 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 13 / SWITA 6380 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1301 SA

5339 Region 13 / SWITA 6381 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1302 SA

5339 Region 13 / SWITA 6382 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1303 SA

5339 Region 13 / SWITA 6383 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1304 SA

5339 Region 13 / SWITA 6384 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1305 SA

5339 Region 13 / SWITA 6385 Minivan Total 55,689 Capital FA 47,336 Replacement Unit #: 1013 SA

365

Page 370: Iowa Statewide Transportation Improvement Program

RPA-14 (34 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 14 / SIT 6198 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 25B SA

STA, 5311 Region 14 / SIT 6187 General Operations-Southern Iowa Trolley Total 788,207 Operations FA 411,004 Other SA 377,203

5339 Region 14 / SIT 2746 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 21-S SA

5339 Region 14 / SIT 2750 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: S-18 SA

5339 Region 14 / SIT 3245 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 22-S SA

5339 Region 14 / SIT 3248 Minivan Total 58,191 Capital VSS FA 49,462 Replacement Unit #: 24-S SA

5339 Region 14 / SIT 3249 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: S-26 SA

5339 Region 14 / SIT 3250 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: S-27 SA

5339 Region 14 / SIT 3771 Minivan Total 60,418 Capital VSS FA 51,355 Replacement Unit #: 28-S SA

5339 Region 14 / SIT 3246 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 23-S SA

5339 Region 14 / SIT 4139 Conversion Van Total 62,737 Capital VSS FA 53,326 Replacement Unit #: 29S SA

5339 Region 14 / SIT 4138 Light Duty Bus (176" wb) Total 107,834 Capital VSS FA 91,659 Replacement Unit #: 101 SA

5339 Region 14 / SIT 4629 Light Duty Bus (176" wb) Total 107,834 Capital VSS FA 91,659 Replacement Unit #: 102 SA

5339 Region 14 / SIT 4630 Light Duty Bus (176" wb) Total 107,834 Capital VSS FA 91,659 Replacement Unit #: 103 SA

5339 Region 14 / SIT 4631 Light Duty Bus (176" wb) Total 107,834 Capital VSS FA 91,659 Replacement Unit #: 104 SA

366

Page 371: Iowa Statewide Transportation Improvement Program

RPA-14 (34 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 14 / SIT 5333 Light Duty Bus (176" wb) Total 107,834 Capital VSS FA 91,659 Replacement Unit #: 105 SA

5339 Region 14 / SIT 6546 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 36-S SA

5339 Region 14 / SIT 6547 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 37-S SA

5339 Region 14 / SIT 6548 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 38-S SA

5339 Region 14 / SIT 6199 Light Duty Bus (158" wb) Total 121,386Capital VSS FA 105,553Replacement Unit #: 112 SA

5339 Region 14 / SIT 6193 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 34-S SA

5339 Region 14 / SIT 6194 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 35-S SA

5339 Region 14 / SIT 6195 Light Duty Bus (176" wb) Total 111,987Capital VSS FA 95,189Replacement Unit #: 110 SA

5339 Region 14 / SIT 6196 Light Duty Bus (176" wb) Total 111,987Capital VSS FA 95,189Replacement Unit #: 111 SA

5339 Region 14 / SIT 6197 Light Duty Bus (158" wb) Total 105,553Capital VSS FA 89,720Replacement Unit #: 113 SA

5339 Region 14 / SIT 6186 Light Duty Bus (138" wb) Total 101,545Capital VSS FA 86,313Replacement Unit #: 109 SA

5339 Region 14 / SIT 5334 Light Duty Bus (176" wb) Total 111,987Capital VSS FA 95,189Replacement Unit #: 106 SA

5339 Region 14 / SIT 5335 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 30-S SA

5339 Region 14 / SIT 5336 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 31-S SA

5339 Region 14 / SIT 5337 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 32-S SA

367

Page 372: Iowa Statewide Transportation Improvement Program

RPA-14 (34 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 14 / SIT 5338 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 33-S SA

5339 Region 14 / SIT 5716 Light Duty Bus (176" wb) Total 111,987Capital VSS FA 95,189Replacement Unit #: 108 SA

5339 Region 14 / SIT 5332 Light Duty Bus (176" wb) Total 111,987Capital VSS FA 95,189Replacement Unit #: 107 SA

5339 Region 14 / SIT 2330 Transit Facility Total 2,400,000Capital FA 2,000,000Other SA

368

Page 373: Iowa Statewide Transportation Improvement Program

RPA-15 (17 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

STA, 5311 Region 15 / 10-15Transit

1721 General Operations/Maintenance/Administration Total 3,674,260 3,500,000 3,500,000 3,500,000Operations FA 1,070,833 1,000,000 1,000,000 1,000,000Misc SA 603,427 500,000 500,000 500,000

STA, 5311 Region 15 / 10-15Transit

6055 General Operations/Maintenance/Administration FIXED ROUTE Total 665,392 600,000 600,000 600,000Operations FA 386,730 350,000 350,000 350,000Other SA 228,662 200,000 200,000 200,000

5339 Region 15 / 10-15Transit

6065 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 153 SA

5339 Region 15 / 10-15Transit

6066 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 154 SA

5339 Region 15 / 10-15Transit

6067 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 155 SA

5339 Region 15 / 10-15Transit

6068 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 157 SA

5339 Region 15 / 10-15Transit

6069 Light Duty Bus (176" wb) Total 97,200 Capital VSS FA 82,620 Replacement Unit #: 161 SA

5339 Region 15 / 10-15Transit

6070 Light Duty Bus (176" wb) Total 97,200 Capital VSS FA 82,620 Replacement Unit #: 165 SA

PTIG Region 15 / 10-15Transit

6529 Purchase Land and Create a Transfer Stn for Fixed Rt Total 1,250,000 Capital FA Expansion SA 600,000

5339 Region 15 / 10-15Transit

6071 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 162 SA

5339 Region 15 / 10-15Transit

6072 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 163 SA

5339 Region 15 / 10-15Transit

6073 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 164 SA

5339 Region 15 / 10-15Transit

6074 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 166 SA

5339 Region 15 / 10-15Transit

6075 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 167 SA

5339 Region 15 / 10-15Transit

6076 Medium Duty Bus (29-32 ft.) Total 196,249 Capital VSS FA 166,812 Replacement Unit #: 169A SA

369

Page 374: Iowa Statewide Transportation Improvement Program

RPA-15 (17 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Region 15 / 10-15Transit

6077 Medium Duty Bus (29-32 ft.) Total 196,249 Capital VSS FA 166,812 Replacement Unit #: 169B SA

5339 Region 15 / 10-15Transit

6078 Light Duty Bus (176" wb) Total 97,200 Capital VSS FA 82,620 Replacement Unit #: 168 SA

370

Page 375: Iowa Statewide Transportation Improvement Program

RPA-16 (14 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5339 Burlington 6201 Medium Duty Bus (29-32 ft.) Total 210,920 Capital UFRC, VSS FA 179,282 Replacement Unit #: 730 SA

STA, 5311 Burlington 1670 General Operations/Maintenance/Administration Total 1,207,900 1,207,900 1,207,900 1,207,900Operations FA 469,017 469,017 469,017 469,017Misc SA 275,919 275,919 275,919 275,919

5339 Burlington 6172 Medium Duty Bus (29-32 ft.) Total 210,920 Capital UFRC, VSS FA 179,282 Replacement Unit #: 722 SA

5339 Burlington 6173 Light Duty Bus (176" wb) Total 109,000 Capital UFRC, VSS FA 92,650 Replacement Unit #: 732 SA

5339 Burlington 6176 Medium Duty Bus (29-32 ft.) Total 210,920 Capital UFRC, VSS FA 179,282 Replacement Unit #: 731 SA

5339 Burlington 6177 Medium Duty Bus (29-32 ft.) Total 210,920 Capital UFRC, VSS FA 179,282 Replacement Unit #: 729 SA

5339 Region 16 / SEIBUS 6179 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 121 SA

5339 Region 16 / SEIBUS 6180 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 122 SA

5339 Region 16 / SEIBUS 6181 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 111 SA

STA, 5339 Region 16 / SEIBUS 6182 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS, Low Floor FA 168,512 Replacement Unit #: 953 SA 29,737

5339 Region 16 / SEIBUS 6183 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 021 SA

5339 Region 16 / SEIBUS 6184 Light Duty Bus (176" wb) Total 102,000 Capital VSS, Low Floor FA 86,700 Replacement Unit #: 112 SA

STA, 5311 Region 16 / SEIBUS 1675 General Operations/Maintenance/Administration Total 1,329,651 1,329,651 1,329,651 1,329,651Operations FA 367,306 367,306 367,306 367,306Misc SA 386,135 386,135 386,135 386,135

5311 RPA-16 1694 RPA Transportation Planning Total 32,629 32,629 32,629 32,629Planning FA 26,104 26,104 26,104 26,104Misc SA

371

Page 376: Iowa Statewide Transportation Improvement Program

RPA-17 (1 Projects)Fund Sponsor Transit #

Expense ClassProject Type

Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25

5311 RPA-17 1702 RPA Transportation Planning Total 37,500 37,500 37,500 37,500Planning FA 37,500 37,500 37,500 37,500Misc SA

372

Page 377: Iowa Statewide Transportation Improvement Program

Appendix

Page 378: Iowa Statewide Transportation Improvement Program

temmE

neirB'O yalC otlA olaP

htuomylP atsiV aneuB

llahsraM

noyL nosnikciD

xuoiS

tdlobmuH

radeC

aloecsO

nanahcuB

notgnihsaW

eeL

yrneH

asiuoL

enitacsuM

ttocS

kukoeK

neruB naVsivaD

nosreffeJollepaWeornoM

esoonappA

sacuLekralC

rutaceD

noinU

dloggniRrolyaT

smadAyremogtnoMslliM

eimattawattoP ssaC riadA

nosirraH yblehS

anonoM drofwarC

nobuduA

llorraC eneerG

yrubdooW adI caS

htussoK ogabenniW htroW

kcocnaH odroG orreC

thgirW nilknarF reltuB

nuohlaCretsbeW

notlimaH nidraH

enooB yrotS

eirhtuG sallaD kloP

nosidaM nerraW noiraM

enyaW

aksahaM

keihsewoPrepsaJ awoI nosnhoJ

noskcaJsenoJnniLnotneBamaT

erawaleDkwaH kcalBydnurG

remerB

etteyaF notyalC

dyolF wasakcihC

llehctiM drawoH keihsenniW eekamallA

euqubuD

tnomerF egaP

notnilC

senioM seD

eekorehC

Hector Torres-Cacho205 E. 227th StFairfield, IA 52556641-469-4007Fax: 641-472-3622

Catherine Cutler5455 Kirkwood Blvd. SWCedar Rapids, IA 52404319-364-0235Fax: 319-364-9614

Krista Billhorn428 43rd St. SWMason City, IA 50401641-422-9447Fax: 641-422-9457

Andy Loonan1020 S. Fourth St.Ames, IA 50010515-239-1996Fax: 515-239-1472

Dakin Schultz2800 Gordon DriveP.O. Box 987Sioux City, IA 51102712-274-5837Fax: 712-276-2822

Scott Suhr2210 E. Seventh St.Atlantic, IA 50022712-243-7627Fax: 712-243-6788

District Transportation Planners’ Areas of ResponsibilityMetropolitan Planning Organizations and Regional Planning Affiliations January 2020

Northwest IowaPlanning and Development

Commission

Siouxland RegionalTransportation Planning

Association

MAPA RuralTransportation Planning

Affiliation

Southwest IowaPlanning Council

ATURATransportation Planning

Affiliation

Region XIICouncil of Governments

MIDASCouncil of Governments

North Iowa AreaCouncil of Governments

Central Iowa RegionalTransportation

Planning Alliance

Region 6 Resource Partners

Iowa NorthlandRegional Transportation

Authority

Upper ExplorerlandRegional Planning

Commission

East CentralIntergovernmental

Association

East Central IowaCouncil of Governments

Bi-StateRegional Commission

Southeast IowaRegional

Planning Commission

Area XVRegional

Planning Commission

Chariton ValleyTransportation

Planning Affiliation

Sioux City

Omaha/Council Bluffs

Des Moines

Ames

Iowa City

WaterlooDubuque

Cedar Rapids

Davenport/Rock Island

Transportation Districts

Metropolitan Planning Organizations

Regional Planning Affiliations

23

4

5

6

7

8

9

10

11

12

13 14 1516

17

18

1

satnohacoP

Sam Shea5455 Kirkwood Blvd. SWCedar Rapids, IA 52404319-286-4907Fax: 319-364-9614

23

4 5

61

373

Page 379: Iowa Statewide Transportation Improvement Program

www.masoncity.net/pview.aspx?id=18070&catid=477

www.cityofottumwa.com/departments/transit

www.midascog.net/transit/dart

www.ci.marshalltown.ia.us/static/departments/works/transit.php

www.muscatineiowa.gov/index.aspx?NID=75

www.ci.clinton.ia.us/html/MTA.html

www.burlingtoniowa.org/publicworks/bus.html

www.nwiarides.org/

www.swipco.org

www.riverbendtransit.org

www.region12cog.org/western_iowa_public_transit/public_transit.asp

www.southerniowatrolley.org

www.ridehirta.com

www.simpco.org/srts/

www.midascog.net/transit/region-v

www.r2bus.org

www.1015transit.com

www.region6planning.org

www.seirpc.com/seibus/route.html

www.ecicog.org/ecitransit

www.inrcog.org/rtc.htm

www.rta8.org/

www.neicac.org/transport.html

www.cityofdubuque.org/thejule

www.cyride.com

www.icgov.org/default/?id=1515

www.uiowa.edu/~cambus

www.coralville.org/index.aspx?nid=80

www.cedar-rapids.org/transit/

www.mettransit.orgwww.sioux-city.org/transit

www.ridedart.com

www.bettendorf.org/department/?fDD=22-0

www.yellowandblueforyou.com

www.cityofdavenportiowa.com/department/division.php?structureid=420

13

12

4

3

5

14

2

15

11

10

1

16

9

6

7

8

Iowa's Public Transit System

4 Transit Systems in urbanized areas > 200,000 population8 Transit Systems in urbanized areas 50,000 to 200,000 population7 Transit Systems in small urban areas < 50,000 population16 Regional Transit Systems

374

Page 380: Iowa Statewide Transportation Improvement Program

Advance Construction Projects - STIP Number 22001

Pottawattamie BRF-6-1(114)--38-78 $72,574

Johnson STP-A-006-7(90)--22-52 $1,534,519 Webster STP-A-2690(632)--22-94 $161,962Polk STP-A-6102(614)--22-77 $39,577

Fremont ER-029-1(126)0--06-36 $2,693,035 Mills ER-034-1(123)--28-65 $1,351,074Fremont ER-029-1(129)2--06-36 $1,046,427 Muscatine ER-061-4(111)--28-70 $72,844Fremont ER-029-1(132)22--06-36 $180,530 O Brien ER-010-2(41)--28-71 $410,254Fremont ER-029-1(138)25--06-36 $51,034 Pottawattamie ER-029-4(126)57--06-78 $505,366Fremont ER-029-1(139)13--06-36 $46,087 Pottawattamie ER-680-1(186)0--06-78 $1,656,324Fremont ER-C036(80)--58-36 $588,735 Pottawattamie ER-680-1(187)0--06-78 $2,897,608Fremont ER-C036(81)--58-36 $2,109,944 Pottawattamie ER-680-1(188)0--06-78 $41,558Fremont ER-C036(85)--58-36 $540,478 Ringgold ER-C080(78)--58-80 $501,978Fremont ER-C036(87)--58-36 $825,153 Statewide ER-000-T(176)--28-00 $92,560Linn ER-030-7(216)--28-57 $154,864 Statewide ER-000-T(177)--28-00 $192,942Linn ER-380-6(454)18--06-57 $29,375 Warren ER-065-3(85)--28-91 $66,540Linn ER-380-6(455)17--06-57 $414,383 Washington ER-001-4(57)--28-92 $1,823Mills ER-034-1(118)--28-65 $24,290 Woodbury ER-C097(145)--58-97 $86,266

Pottawattamie IHSIPX-080-1(494)44--08-78 $565,572

Adair IMX-080-2(256)86--02-01 $2,579,400 Dubuque NHSX-20-9(185)--3H-31 $60,273Appanoose NHSX-005-1(79)--3H-04 $6,539,682 Fayette NHSX-018-8(46)--3H-33 $3,900,426Benton NHSX-150-2(26)--3H-06 $3,418,382 Floyd NHSX-218-9(140)--3H-34 $1,116,000Benton NHSX-150-2(28)--3H-06 $2,372,161 Harrison NHSX-030-1(171)--3H-43 $3,197,554Benton NHSX-030-6(185)--3H-06 $180,178 Harrison NHSX-030-1(190)--3H-43 $2,439,983Benton NHSX-030-6(182)--3H-06 $2,068,000 Jasper IMX-080-5(343)174--02-50 $6,304,658Benton NHSX-030-6(184)--3H-06 $660,000 Jasper IMX-80-5(334)174--02-50 $23,214Benton NHSX-030-6(225)--3H-06 $411,200 Johnson IM-380-6(319)2--13-52 $182,096Black Hawk NHSX-020-6(72)--3H-07 $11,467,606 Johnson NHS-080-6(330)239--11-52 $3,169,455Black Hawk NHSX-020-6(83)--3H-07 $49,423 Johnson NHS-080-6(333)239--11-52 $6,750,035Black Hawk IMX-380-7(130)55--02-07 $6,489,900 Johnson NHS-080-6(337)239--11-52 $3,941,988Bremer NHSX-218-8(141)--3H-09 $3,172,800 Johnson NHS-080-6(340)239--11-52 $6,147,790Butler NHSX-003-5(85)--3H-12 $2,760,173 Johnson NHS-080-6(343)239--11-52 $5,502,394Chickasaw NHSX-218-9(139)--3H-19 $2,801,600 Johnson NHS-080-6(346)239--11-52 $5,766,035Des Moines NHSX-061-2(73)--3H-29 $345,901 Johnson NHS-080-6(348)239--11-52 $6,181,588Des Moines NHSX-061-2(93)--3H-29 $2,006,723 Johnson NHS-080-6(351)239--11-52 $2,982,932Dubuque NHSX-020-9(253)--3H-31 $2,208,354 Johnson NHS-080-6(356)239--11-52 $2,627,819Dubuque NHSX-20-9(183)--3H-31 $20,888,062 Johnson NHS-080-6(358)239--11-52 $6,133,892Dubuque NHSX-20-9(184)--3H-31 $132,156 Johnson NHS-080-6(360)239--11-52 $7,746,345

Bridge Program

Congestion Mitigation and Air Quality

Emergency Relief Program

Highway Safety Improvement Program

National Highway Performance Program

375

Page 381: Iowa Statewide Transportation Improvement Program

Advance Construction Projects - STIP Number 22001

Johnson NHS-080-6(372)239--11-52 $36,809,516 Pottawattamie IM-29-3(71)54--13-78 $3,056,549Johnson NHS-080-6(393)239--11-52 $296,620 Pottawattamie IM-29-3(73)54--13-78 $4,302,081Johnson NHS-080-6(403)239--11-52 $4,529,232 Pottawattamie IM-29-3(74)54--13-78 $4,963,227Johnson NHS-080-6(404)239--11-52 $3,646,991 Pottawattamie IM-480-1(166)0--13-78 $4,769,379Johnson NHS-080-6(440)239--11-52 $520,348 Pottawattamie IM-480-1(167)0--13-78 $3,846,569Johnson IM-080-7(116)249--13-52 $2,447,684 Poweshiek IM-080-5(357)182--13-79 $136,245Johnson IM-080-7(117)248--13-52 $122,889 Poweshiek IM-080-5(358)182--13-79 $70,453Johnson IM-080-7(157)249--13-52 $117,091 Poweshiek IM-NHS-080-5(356)182--03-79 $7,728,639Johnson IM-080-7(166)249--13-52 $8,525,867 Scott IM-074-1(278)5--13-82 $1,285,702Keokuk NHSX-092-8(40)--3H-54 $3,204,105 Scott IM-074-1(279)5--13-82 $8,044,258Linn NHSX-151-3(169)--3H-57 $53,499 Scott IM-NHS-074-1(197)5--03-82 $10,841,772Linn NHSX-151-3(170)--3H-57 $1,993,198 Scott IM-NHS-074-1(198)5--03-82 $12,488,551Mills NHSX-534-1(91)--3H-65 $1,243,549 Scott IM-NHS-074-1(200)5--03-82 $29,094,067Polk IMX-035-4(296)88--02-77 $5,026,306 Scott IM-NHS-074-1(206)5--03-82 $6,633,687Pottawattamie IM-NHS-80-1(408)--03-78 $4,100,335 Scott IMX-280-8(169)8--02-82 $4,385,000Pottawattamie NHSX-059-3(46)--3H-78 $2,324,330 Scott IMX-280-8(162)8--02-82 $13,253,850Pottawattamie IM-029-3(192)54--13-78 $14,764,719 Tama NHSX-030-6(236)--3H-86 $2,929,430Pottawattamie IM-029-3(193)54--13-78 $17,735,583 Tama NHSX-30-6(192)-3H-86 $190,829Pottawattamie IM-029-3(218)53--13-78 $3,206,268 Tama NHSX-030-6(234)--3H-86 $456,000Pottawattamie IM-029-3(219)53--13-78 $2,463,143 Tama NHSX-030-6(235)--3H-86 $256,800Pottawattamie IM-029-3(220)53--13-78 $5,916,405 Tama NHSX-030-6(240)--3H-86 $9,793,600Pottawattamie IM-0293(221)54--13-78 $14,598,284 Tama NHSX-030-6(241)--3H-86 $154,400Pottawattamie IM-029-3(222)54--13-78 $7,033,281 Tama NHSX-030-6(242)--3H-86 $42,400Pottawattamie IM-29-3(70)53--13-78 $1,976,918 Tama NHSX-030-6(256)--3H-86 $3,384,800Pottawattamie IM-029-3(183)53--13-78 $1,961,292 Warren IM-035-2(430)61--13-91 $1,050,250Pottawattamie IM-029-3(184)53--13-78 $1,918,959 Warren IM-035-2(451)61--13-91 $6,211Pottawattamie IM-029-3(232)53--13-78 $255,719 Warren IM-NHS-035-2(429)61-03-91 $6,396,096Pottawattamie IM-NHS-029-3(68)53--03-78 $4,546,680 Wayne NHSX-065-1(36)--3H-93 $2,720,000Pottawattamie IM-NHS-29-3(141)53-03-78 $26,297,330 Winneshiek NHSX-150-5(9)--3H-96 $2,933,264Pottawattamie IM-NHS-29-3(142)53-03-78 $4,833,703 Woodbury IMX-029-6(302)127--02-97 2557800

Statewide RRP-RR01(214)--8A-00 $315,000 Statewide RRP-RR05(216)--8A-00 $292,500Statewide RRP-RR01(215)--8A-00 $252,000 Statewide RRP-RR06(214)--8A-00 $315,000Statewide RRP-RR01(216)--8A-00 $450,000 Statewide RRP-RR03(207)--8A-00 $374,400Statewide RRP-RR02(208)--8A-00 $9,360 Statewide RRP-RR01(209)--8A-00 $374,400Statewide RRP-RR02(214)--8A-00 $369,000 Statewide RRP-RR02(202)--8A-00 $336,960Statewide RRP-RR02(215)--8A-00 $270,000 Statewide RRP-RR02(207)--8A-00 $327,600Statewide RRP-RR02(216)--8A-00 $369,000 Statewide RRP-RR02(212)--8A-00 $327,600Statewide RRP-RR03(214)--8A-00 $369,000 Statewide RRP-RR03(208)--8A-00 $257,400Statewide RRP-RR03(215)--8A-00 $157,500 Statewide RRP-RR04(207)--8A-00 $279,000Statewide RRP-RR03(216)--8A-00 $360,000 Statewide RRP-RR04(208)--8A-00 $234,900Statewide RRP-RR04(214)--8A-00 $369,000 Statewide RRP-RR05(208)--8A-00 $234,000Statewide RRP-RR04(216)--8A-00 $427,500 Statewide RRP-RR06(208)--8A-00 $374,400Statewide RRP-RR05(214)--8A-00 $270,000

Rail-Highway Crossing Program

National Highway Performance Program

376

Page 382: Iowa Statewide Transportation Improvement Program

Advance Construction Projects - STIP Number 22001

Statewide RRP-RR02(190)--8A-00 $3,000 Statewide SPR-PL20(056)-8H-00 $962,687Statewide SPR-RE20(056)-8H-00 $1,072,517 Statewide SPR-PL21(057)--8H-00 $4,172,994Statewide SPR-RE21(057)--8H-00 $460,659 Statewide SPR-PL22(058)--8H-00 $5,866,766Statewide SPR-PL19(055)--8H-00 $44,790

Boone STP-017-2(23)--2C-08 $2,757,361 Pottawattamie STP-092-1(72)--2C-78 $1,981,285Clinton STP-067-2(65)--2C-23 $2,195,742 Sioux STP-010-1(81)--2C-84 $4,297,638Crawford STP-141-3(74)--2C-24 $5,461,486 Statewide RRP-RR00(213)--8A-00 $7,500Jones STP-064-1(27)--2C-53 $2,279,848 Statewide STP-000-T(168)-2C-00 $75,681Keokuk STP-021-1(42)--2C-54 $3,280,687 Statewide STP-00JT(178)--2C-00 $288,000Lee BRF-002-9(32)--38-56 $2,141,989 Statewide STP-CCT(17)--2C-00 $50,000Mills STP-275-2(23)--2C-65 $2,151,180 Story STP-065-5(37)--2C-85 $5,789,286Polk ITS-035-4(216)92-25-77 $161,778 Webster STP-175-6(37)--2C-94 $4,333,050Pottawattamie BRF-92-1(64)--38-78 $196,240 Wright STP-017-4(46)--2C-99 $1,936,042

Statewide Planning and Research

Surface Transportation Block Grant Program

377

Page 383: Iowa Statewide Transportation Improvement Program

List of Authorized Projects - Federal Aid

Page 384: Iowa Statewide Transportation Improvement Program

RPA 0 / StatewideCMAQ

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

23405

Iowa Department ofTransportation

21157

STP-A-000s()--22-00

Bus Replacement: Large Urban and Rural Areas

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$3,800,000$3,000,000

$3,800,000$3,000,000

$3,800,000$3,000,000

$3,800,000$3,000,000

$15,200,000$12,000,000

ER

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

15055

Iowa Department ofTransportation

21158

ER-000T()--58-00

STATEWIDE: EMERGENCY RELIEF PROGRAMPROJECTS TO BE DETERMINED

Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$19,189,000$19,189,000

$19,189,000$19,189,000

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

8109

Iowa Department ofTransportation

21163

HSIP-000T()--2H-00

Statewide Railroad Crossings

Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$500,000$450,000

$500,000$450,000

$500,000$450,000

$500,000$450,000

$2,000,000$1,800,000

15169

Iowa Department ofTransportation

21164

HSIP-000T()--2H-00

Statewide safety projects including centerline rumble strips,intersection improvements, and pavement markings

Pave, Traffic Signals, Pavement Markings

Authorized TotalFederal Aid

RegionalSwap

$1,250,000$1,125,000

$20,166,000$18,149,400

$25,000,000$22,500,000

$25,000,000$22,500,000

$71,416,000$64,274,400

25371

Iowa Department ofTransportation

21162

HSIP-000T(865)--2H-00

Statewide Interstate Guardrail Repair

Landscaping

Authorized TotalFederal Aid

RegionalSwap

$865,000$778,500

$865,000$778,500

$865,000$778,500

$865,000$778,500

$3,460,000$3,114,000

16

Iowa Department ofTransportation

21159

RRP-000T()--48-00

Railroad Highway Crossing and Surface Repair Programs

Pavement Rehab, Railroad Signals

Authorized TotalFederal Aid

RegionalSwap

$6,329,257$5,696,331

$6,329,257$5,696,331

$6,329,257$5,696,331

$6,329,257$5,696,331

$25,317,028$22,785,324

378

Page 385: Iowa Statewide Transportation Improvement Program

MISC

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

13250

Iowa Department ofTransportation

21160

MISC-000T()--XX-00

Allocated Funds: Research, Tech, Min Bus, Seatbelt, UseTax, Inv, NCPD, Etc.

Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$2,500,000$2,000,000

$2,500,000$2,000,000

$2,500,000$2,000,000

$2,500,000$2,000,000

$10,000,000$8,000,000

22190

Iowa Department ofTransportation

21165

MISC-000T()--XX-00

SPR; Technology Transfer; DOT Co-op/Intern Program;Management Systems. Snooper Trucks.

Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$13,455,283$10,764,227

$13,455,283$10,764,227

$13,455,283$10,764,227

$13,455,283$10,764,227

$53,821,132$43,056,908

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

16884

Iowa Department ofTransportation

21167

IM-000T()--13-00

STATEWIDE INTERSTATE SIGNING

Traffic Signs

Authorized TotalFederal Aid

RegionalSwap

$1,000,000$900,000

$1,000,000$900,000

$1,000,000$900,000

$1,000,000$900,000

$4,000,000$3,600,000

16883

Iowa Department ofTransportation

21168

IM-000T()--13-00

STATEWIDE INTERSTATE LIGHTING

Lighting

Authorized TotalFederal Aid

RegionalSwap

$500,000$450,000

$500,000$450,000

$500,000$450,000

$500,000$450,000

$2,000,000$1,800,000

RTP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45523

Iowa Department ofTransportation

21155

NRT-000T(170)--9G-00

Support for 2021 Bicycle Summit

Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$8,000$6,000

$8,000$6,000

379

Page 386: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

8252

Iowa Department ofTransportation

21169

STP-000T()--2C-00

Construction Industry Training Program

Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$1,000,000$800,000

$1,000,000$800,000

$1,000,000$800,000

$1,000,000$800,000

$4,000,000$3,200,000

8119

Iowa Department ofTransportation

21170

STP-000T()--2C-00

PREVOCATIONAL TRAINING AND DBE SUPPORTSERVICES

Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$360,000$288,000

$360,000$288,000

$360,000$288,000

$360,000$288,000

$1,440,000$1,152,000

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

44754

University ofNorthern Iowa

21153

TAP-R-000T(137)--8T-00

UNI Integrated Roadside Vegetation Management

Landscaping

Authorized TotalFederal Aid

RegionalSwap

$676,750$541,400

$676,750$541,400

45792

Iowa Department ofTransportation

21448

TAP-R-000T(185)--8T-00

2021-2022 Iowa Bicycle Map Printing

Ped/Bike Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$55,000$44,000

$55,000$44,000

DOT Note: Project to be authorized using TE funds.

380

Page 387: Iowa Statewide Transportation Improvement Program

MPO 22 / AAMPOCMAQ

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

48676

MPO 22 / AAMPO

21456

STP-A-0155()--86-85

In the city of Ames, CyRide: Transit Operations for #6Brown, #11 Cherry, #12 Lilac, West Ames

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$519,446$415,555

$519,446$415,555

45554

MPO 22 / AAMPO

21421

STP-A-PA22()--86-85

CyRide: Transit Operations for #6 Brown, #11 Cherry, #12Lilac, West Ames (#1 Red, #11 Cherry, #7 Purple)

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$540,456$432,363

$540,456$432,363

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

34214

MPO 22 / AAMPO

21002

RGPL-PA22(RTP)--PL-85

Trans Planning

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$126,897$101,897

$126,897$101,897

$126,897$101,897

$126,897$101,897

$507,588$407,588

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36918

MPO 22 / AAMPO

21005

RGTR-0155()--ST-85

CyRide: Vehicle Replacement

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$850,000$225,000

$225,000

$850,000$225,000

$225,000

381

Page 388: Iowa Statewide Transportation Improvement Program

MPO 23 / CMPONHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

37860

Iowa Department ofTransportation

21038

BRF-30()--38-57

US30: CEDAR RIVER 0.5 MI W OF E JCT US 151 (EB)

Bridge Replacement, Traffic Signs

Authorized TotalFederal Aid

RegionalSwap

$11,258,000$9,006,400

$11,258,000$9,006,400

38070

Iowa Department ofTransportation

21037

IM-380-6()--13-57

I-380: TOWER TERRACE INTERCHANGE IN HIAWATHA(STATE SHARE)

Grade and Pave, Bridge Replacement, Traffic Signs

Authorized TotalFederal Aid

RegionalSwap

$17,545,000$15,790,500

$17,545,000$15,790,500

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

17107

MPO 23 / CMPO

21027

RGPL-PA23()--PL-00

MPO: Planning Funds

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$374,841$299,841

$374,841$299,841

$374,841$299,841

$374,841$299,841

$1,499,364$1,199,364

382

Page 389: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36956

MPO 23 / CMPO

21022

RGTR-PA23()--ST-57

CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$1,032,000$825,000

$825,000

$1,032,000$825,000

$825,000

PA Note: Replacing bus numbers 2091 and 2092.

36957

MPO 23 / CMPO

21023

RGTR-PA23()--ST-57

Purchase 1 medium-duty 33' replacement ADA paratransitservice bus.

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$205,000$164,000

$164,000

$205,000$164,000

$164,000

PA Note: Replacing bus numbers 2402

37075

Cedar Rapids

21044

TAP-U-1187(799)--8I-57

In the city of Cedar Rapids, FromCherryHill Pk,to Sharon Lnalong Gordon Ave,Cherokee Pk to Midway Dr

Ped/Bike ROW, Ped/Bike Grade &amp; Pave

Authorized

9/21/2021

TotalFederal Aid

RegionalSwap

$2,742,000$2,193,000

$2,193,000

$2,742,000$2,193,000

$2,193,000

PA Note: Project has $1,442,000 in STBG and $751,000 in TAP.

35692

Marion

21032

TAP-U-4775(635)--8I-57

In the city of Marion, 10TH AVE,Construct 10' side paths inROW on N&S sides of street from 35th St to Eagleview Dr

Ped/Bike Grade &amp; Pave

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$3,537,000$2,830,000

$2,830,000

$3,537,000$2,830,000

$2,830,000

PA Note: Project has $2,583,000 in STBG and $247,000 in TAP.

39556

Marion

21043

TAP-U-4775(638)--8I-57

In the city of Marion, From E side of Indian Creek Bridgeover Marion Bvld E to 7th St

Ped/Bike Grade &amp; Pave, Ped/Bike Structures

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$1,812,000$1,450,000

$1,450,000

$1,812,000$1,450,000

$1,450,000

383

Page 390: Iowa Statewide Transportation Improvement Program

MPO 24 / MAPACHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

44990

Council Bluffs

21442

BRM-CHBP-1642(683)--NB-78

On N BROADWAY, Over INDIAN CREEK, from SpencerAvenue to 100ft North of Indian Creek S19 T75 R43

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$2,300,260$1,256,260

$1,044,000

$2,300,260$1,256,260

$1,044,000

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38153

Iowa Department ofTransportation

21048

IM-NHS-I-80()--03-78

I-80: I-29/80/480 INTERSTATES IN COUNCIL BLUFFS(CBIS) STATE SHARE

Grade and Pave, Bridge Replacement, Traffic Signs

Authorized TotalFederal Aid

RegionalSwap

$227,000,000$192,950,000

$138,740,000$124,866,000

$4,183,000$3,764,700

$4,588,000$4,129,200

$374,511,000$325,709,900

DOT Note: Project includes 2021 and 2022 NHFP funding.

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

29733

MPO 24 / MAPA

21046

RGPL-PA24()--PL-78

UZA of Pottawattamie County including the City of CouncilBluffs

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$148,567$115,567

$148,567$115,567

$148,567$115,567

$148,567$115,567

$594,268$462,268

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45410

Iowa Department ofTransportation

21049

STP-92()--2C-78

IA92: HARRY LANGDON BLVD IN COUNCIL BLUFFS TO0.3 MI E OF STATE ORCHARD RD

Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$2,861,000$2,288,800

$2,861,000$2,288,800

384

Page 391: Iowa Statewide Transportation Improvement Program

MPO 25 / BSRCNHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38167

Iowa Department ofTransportation

21058

IMX-280()--02-82

I-280: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)

Bridge Rehabilitation

Authorized TotalFederal Aid

RegionalSwap

$17,000,000$15,300,000

$17,000,000$15,300,000

38136

Iowa Department ofTransportation

21059

IMX-I-280()--02-82

I-280: W OF IA 22 TO MISSISSIPPI RIVER (EB & WB)

Grade and Pave

Authorized TotalFederal Aid

RegionalSwap

$6,036,274$5,432,646

$6,036,274$5,432,646

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

16066

MPO 25 / BSRC

21054

RGPL-PA25()--PL-82

Quad Cities Urbanized Area

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$318,660$240,928

$318,660$240,928

$318,660$240,928

$318,660$240,928

$1,274,640$963,712

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36969

Bettendorf

21055

STP-U-0587(639)--70-82

On FRST GRV DR, from International Dr to Middle Rd

Grade and Pave, Ped/Bike Grade &amp; Pave

Authorized

1/19/2022

TotalFederal Aid

RegionalSwap

$6,630,000$5,181,000

$5,181,000

$6,630,000$5,181,000

$5,181,000

DOT Note: PE authorized for $829,791

STBG-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

44724

Davenport

21061

BROS-1827(687)--8J-82

On ELM ST, Over Canadian Pacific RR, from Mound St toEastern Ave S19 T78 R04E

Bridge Replacement

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$2,470,525$1,000,000

$2,470,525$1,000,000

385

Page 392: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39479

Eldridge

21433

TAP-T-2290(614)--8V-82

In the city of Eldridge, On E LeClaire Rd, from N 16th Ave .5Miles to Scott Park Rd,

Ped/Bike Grade &amp; Pave

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$559,200$447,200

$447,200

$559,200$447,200

$447,200

386

Page 393: Iowa Statewide Transportation Improvement Program

MPO 26 / DMAMPOCHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36680

Polk County

21065

BRS-CHBP-C077(228)--GB-77

On NE 82ND AVE 0.10 miles W of NE 109 St,

Bridge Replacement

Authorized

9/21/2021

TotalFederal Aid

RegionalSwap

$1,610,060$710,060

$900,000

$900,000

$1,610,060$710,060

$900,000$900,000

CMAQ

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39415

MPO 26 / DMAMPO

21073

STP-A-PA26()--86-77

Dart: Euclid/Douglas Ave Crosstown (Route 50) - Yr 3

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$392,186$313,749

$392,186$313,749

48668

MPO 26 / DMAMPO

21458

STP-A-PA26()--86-77

DART's Route #17 Extension from Altoona to Bondurant

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$63,432$50,745

$63,432$50,745

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39326

Iowa Department ofTransportation

21426

IM-I-35()--13-77

I-35: S OF NE 54TH AVE TO 0.5 MI S OF E 1ST ST INANKENY

Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$3,935,000$3,541,000

$3,935,000$3,541,000

47127

Iowa Department ofTransportation

21455

IMX-080-4(94)140--02-77

W US 65 INTERCHANGE EASTBOUND EXIT RAMP

Pave

Authorized TotalFederal Aid

RegionalSwap

$775,000$697,500

$775,000$697,500

387

Page 394: Iowa Statewide Transportation Improvement Program

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38361

MPO 26 / DMAMPO

21063

RGPL-PA26()--PL-77

MPO Planning Funding

Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$985,059$758,809

$985,059$758,809

$985,059$758,809

$985,059$758,809

$3,940,236$3,035,236

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39464

West Des Moines

21412

RGPL-8260()--ST-77

In the city of West Des Moines, University Avenue CorridorMaster Plan

Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$150,000$100,000

$100,000

$150,000$100,000

$100,000

45512

MPO 26 / DMAMPO

21089

RGPL-PA26()--ST-00

Pavement data collection

Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$300,000$250,000

$250,000

$300,000$250,000

$250,000

27146

MPO 26 / DMAMPO

21062

RGPL-PA26()--ST-77

Transportation Management Association

Miscellaneous, Ped/Bike Miscellaneous, TransitInvestments

Authorized TotalFederal Aid

RegionalSwap

$119,000$95,000

$95,000

$119,000$95,000

$95,000

$119,000$95,000

$95,000

$119,000$95,000

$95,000

$476,000$380,000

$380,000

22143

MPO 26 / DMAMPO

21064

RGTR-PA26()--ST-00

DART: Vehicle Purchase

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$1,680,000$1,400,000

$1,400,000

$2,027,200$1,410,200

$1,410,200

$2,038,000$1,400,000

$1,400,000

$1,693,750$1,355,000

$1,355,000

$7,438,950$5,565,200

$5,565,200

35369

Ankeny

21069

TAP-T-0187(640)--8V-77

In the City of Ankeny, High TrestleTrail Extension SEMagazine Road to 750' south of center line of SE OralaborRoad

Ped/Bike Grade &amp; Pave

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$2,160,000$700,000

$700,000

$2,160,000$700,000

$700,000

PA Note: $100K of STBG Funding, $600K of TAP Funding

35375

Norwalk

21088

TAP-T-5587(604)--8V-91

In the city of Norwalk, a pedestrian bridge over an inlet toLake Colechester on Beardsley Street.

Ped/Bike Grade &amp; Pave

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$500,000$100,000

$100,000

$500,000$100,000

$100,000

388

Page 395: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45480

Clive

21074

TAP-T-1425(628)--8V-25

In the city of Clive, Clive Aquatic Center, and Campbell Park

Ped/Bike Miscellaneous

Authorized

1/22/2031

TotalFederal Aid

RegionalSwap

$204,000$170,000

$170,000

$204,000$170,000

$170,000

PA Note: In the city of Clive, Clive Aquatic Center, and Campbell Park and purchase of e-Bikes for BCycle fleet

36682

Warren County

21071

TAP-U-C091(131)--8I-91

Palomino Parkway to East County Line Road includingSuncrest Drive, and Pilmer Dr

Ped/Bike ROW, Ped/Bike Grade &amp; Pave

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$240,000$192,000

$192,000

$240,000$192,000

$192,000

389

Page 396: Iowa Statewide Transportation Improvement Program

MPO 27 / DMATSPL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

13239

MPO 27 / DMATS

21091

RGPL-PA27()--PL-31

MPO Planning: Transportation Planning in DMATS area

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$136,495$109,196

$135,196$109,196

$135,196$109,196

$135,196$109,196

$542,083$436,784

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45236

MPO 27 / DMATS

21097

RGPL-PA27()--ST-31

Transportation Planning

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$18,750$15,000

$15,000

$18,750$15,000

$15,000

$37,500$30,000

$30,000

45237

MPO 27 / DMATS

21098

RGPL-PA27()--ST-31

In the City of Dubuque Study and implement trafficmanagement systems,

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$41,666$33,333

$33,333

$41,666$33,333

$33,333

$41,666$33,333

$33,333

$124,998$99,999

$99,999

390

Page 397: Iowa Statewide Transportation Improvement Program

MPO 28 / MPOJCNHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38069

Iowa Department ofTransportation

21124

IM-380()--13-52

I-380: W FOREVERGREEN RD INTERCHANGE 2.0 MI NOF I-80 IN TIFFIN (STATE SHARE)

Traffic Signals

Authorized TotalFederal Aid

RegionalSwap

$400,000$360,000

$400,000$360,000

38068

Iowa Department ofTransportation

21122

NHS-I-80()--19-52

I-80: I-380/US 218 INTERCHANGE NEAR IOWA CITY(STATE SHARE)

Grade and Pave, Bridge New, Bridge Replacement

Authorized TotalFederal Aid

RegionalSwap

$207,565,000$173,430,250

$60,061,000$48,048,800

$14,029,000$11,223,200

$4,629,000$3,703,200

$286,284,000$236,405,450

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39689

MPO 28 / MPOJC

21118

RGPL-JCCOG(RTP)--PL-52

JCCOG: METROPOLITAN PLANNING PL FUNDS

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$267,761$179,761

$223,761$179,761

$223,761$179,761

$223,761$179,761

$939,044$719,044

391

Page 398: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

33922

Iowa City

21105

STP-U-3715(666)--70-52

In the city of Iowa City, On American Legion Road, fromScott Boulevard east 1.1 Miles to Taft Avenue

Grade and Pave

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$9,152,000$3,608,000

$3,608,000

$9,152,000$3,608,000

$3,608,000

PA Note: Project #33923 funding in FYFY20 moved back to FY21. Map was corrected to match project description on December 29, 2020.

33923

Iowa City

21109

STP-U-3715(668)--70-52

On IWV Road, from Hebl Ave east 1.5 Miles to Hwy 218,and Hebl Ave from IC Landfill to IWV

Grade and Pave

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$3,517,280$930,000

$930,000

$3,517,280$930,000

$930,000

PA Note: Awarded $930,000 in STP funds. These funds will be used in the MPOJC eligible segment between Hwy 218 and Hurt Road. Project funding was moved from FY20 to FY21 to allow fundingin project #33922 to move up to FY20. Amended FY20 TIP on May 27, 2020 to add water main between IWV Road and Iowa City Landfill. Amended FY21 TIP on November 18, 2020 to add watermain between IWV Road and Iowa City Landfill.

38310

North Liberty

21102

STP-U-5557(622)--70-52

In the city of North Liberty, On Ranshaw Way, from ZellerStreet south to Hawkeye Drive

Pavement Rehab/Widen, Lighting, Ped/Bike Structures

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$6,697,600$2,576,000

$2,576,000

$6,697,600$2,576,000

$2,576,000

DOT Note: Project has been approved for the use of Advance Construction. Reimbursement can begin in FFY 2022.

STBG-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39427

Iowa City

21108

BROS-3715(664)--8J-52

In City of Iowa City, 2nd Avenue bridge, 2nd Avenue bridgeover Ralston Creek

Bridge Replacement

Authorized

9/21/2021

TotalFederal Aid

RegionalSwap

$577,200$444,000

$577,200$444,000

392

Page 399: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

33926

Coralville

21114

TAP-U-1557(646)--8I-52

In the city of Coralville, On Coralville Iowa River Trail, fromRocky Shore Drive northwest .5 Miles to Clear Creek

Ped/Bike Grade &amp; Pave

Authorized

8/18/2020

TotalFederal Aid

RegionalSwap

$924,560$613,000

$613,000

$924,560$613,000

$613,000

DOT Note: Project eligible for FHWA TAP funding

33925

Tiffin

21115

TAP-U-7662(614)--8I-52

In the city of Tiffin, On Tiffin Clear Creek trail Phase 6, fromKimberlite Street south .1 Miles to Brown Street

Ped/Bike Grade &amp; Pave

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$228,800$102,000

$102,000

$228,800$102,000

$102,000

DOT Note: Project eligible for FHWA TAP funding

393

Page 400: Iowa Statewide Transportation Improvement Program

MPO 29 / SIMPCOPL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

18694

MPO 29 / SIMPCO

21126

RGPL-PA29(RTP)--PL-97

RGLPL: SIMPCO: MPO Planning

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$270,991$142,228

$270,991$142,228

$270,991$142,228

$270,991$142,228

$1,083,964$568,912

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

19720

Sioux City

21450

STP-ES-7057(672)--8I-97

In the city of Sioux City, Milwaukee Railroad Shops HistoricDistrict, Railroad and Museum Trail Improvements

Historic Preservation, Ped/Bike Grade &amp; Pave

Authorized

10/19/2021

TotalFederal Aid

RegionalSwap

$563,000$450,000

$563,000$450,000

36933

Sioux City

21127

TAP-U-7057(700)--8I-97

On Big Sioux/Highway 12 Trail, from Big Sioux River toHighway 12

Ped/Bike Grade &amp; Pave

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$600,000$300,000

$600,000$300,000

DOT Note: Project eligible for FHWA TAP funding. Funding from part of 2010 Statewide TE award

394

Page 401: Iowa Statewide Transportation Improvement Program

MPO 30 / INRCOGNHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38218

Iowa Department ofTransportation

21144

NHSX-20()--3H-7

US20: US 63 TO IA 21 IN WATERLOO (EB & WB)

Grade and Pave, Traffic Signs

Authorized TotalFederal Aid

RegionalSwap

$16,561,000$13,248,800

$16,561,000$13,248,800

PL

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

16106

MPO 30 / INRCOG

21130

RGPL-PA30()--PL-07

Waterloo MPO Planning: PL For Waterloo MPOTransportation Planning

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$239,025$191,220

$239,025$191,220

$239,025$191,220

$239,025$191,220

$956,100$764,880

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45454

MPO 30 / INRCOG

21141

RGPL-PA30()--ST-07

MPO-wide Iowa Pavement Management Program data

Outside Services Planning

Authorized TotalFederal Aid

RegionalSwap

$78,000$78,000

$78,000

$78,000$78,000

$78,000

37824

Cedar Falls

21136

TAP-U-1185(654)--8I-07

In the city of Cedar Falls, On Union Rd Trail, from W 12th Stsouth 1.0 Miles to W 27th St

Ped/Bike Grade &amp; Pave

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$375,000$300,000

$300,000

$375,000$300,000

$300,000

39420

Waterloo

21440

TAP-U-8155(773)--8I-07

On US 63, from Parker St S 1.7 miles to Washington St

Outside Services Engineering

Authorized

1/22/2031

TotalFederal Aid

RegionalSwap

$435,890$198,832

$198,832

$435,890$198,832

$198,832

PA Note: Total STIP limit is $348,712.

395

Page 402: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39135

Elk Run Heights

21135

TAP-U-2312(604)--8I-07

In the city of Elk Run Heights, On Mayor's Park, west ofMcCoy Rd and south of Lafayette Rd

Ped/Bike Grade &amp; Pave, Ped/Bike Structures,Ped/Bike Miscellaneous

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$536,000$428,000

$428,000

$536,000$428,000

$428,000

35359

Waterloo

21133

TAP-U-8155(766)--8I-07

In the city of Waterloo, On Shaulis Rd Trail, from CedarTerrace Dr E 0.7 miles to Cedar Valley Nature Trail

Ped/Bike Grade &amp; Pave

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$593,000$474,000

$474,000

$593,000$474,000

$474,000

DOT Note: Project eligible for FHWA TAP funding

39134

Waterloo

21134

TAP-U-8155(767)--8I-07

In the city of Waterloo, On Park Ave, from Franklin St South0.75 Miles to US 218 SB

Ped/Bike Structures, Ped/Bike Miscellaneous

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$172,000$137,000

$137,000

$172,000$137,000

$137,000

39421

Waterloo

21132

TAP-U-8155(774)--8I-07

In the city of Waterloo, On US 63, from Parker St S 1.7miles to Washington St

Landscaping, Ped/Bike Grade &amp; Pave, Ped/BikeMiscellaneous

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$2,069,500$1,587,466

$1,110,528

$2,069,500$1,587,466

$1,110,528

PA Note: $476,938 in old TE funds. Project has both MPO TAP and STBG funds.

DOT Note: Project to be authorized using only Transportation Enhancement funds.

396

Page 403: Iowa Statewide Transportation Improvement Program

RPA 1CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38489

Elkader

21425

BHM-CHBP-2315(607)--NA-22

In the city of Elkader, On Bridge Street, Over Turkey River

Bridge Rehabilitation

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$1,491,580$491,580

$1,000,000

$1,491,580$491,580

$1,000,00035080

Allamakee County

21181

BRS-CHBP-C003(63)--GB-03

On B25, Over Cota Creek, S23 T97N R03W

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$700,340$382,340

$318,000

$700,340$382,340

$318,00029473

Howard County

21185

BRS-CHBP-C045(88)--GB-45

On V10, Over Staff Creek

Bridge Replacement

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$500,000$273,100

$226,900

$500,000$273,100

$226,900

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45443

Iowa Department ofTransportation

21187

HSIP-IA150()--2H-96

IA150: FAYETTE CO TO SCL OF CALMAR

Pavement Widening, Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$5,410,000$4,328,000

$5,410,000$4,328,000

DOT Note: Project includes 3R and HSIP funds.

45284

Iowa Department ofTransportation

21188

HSIPX-IA150()--3L-33

IA150: HALL ST IN WEST UNION TO WINNESHIEK CO

Pavement Widening

Authorized TotalFederal Aid

RegionalSwap

$1,600,000$1,440,000

$1,600,000$1,440,000

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

20

RPA 1

21184

RGPL-PA01(RTP)--ST-00

UERPC RPA-1 TRANSPORT PLANNING

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$37,500$30,000

$30,000

$37,500$30,000

$30,000

$37,500$30,000

$30,000

$43,750$35,000

$35,000

$156,250$125,000

$125,000

397

Page 404: Iowa Statewide Transportation Improvement Program

RPA 2CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

29446

Kossuth County

21334

BROSCHBP-C055(189)--GA-55

On B14, Over E FORK DES MOINES RIVER, near NE S12T97 R29, Burt Township

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$518,480$218,480

$300,000

$518,480$218,480

$300,00034608

Worth County

21330

BROSCHBP-C098(79)--GA-98

On A39, Over STREAM, S8 T98 R21

Bridge Replacement

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$325,000$177,515

$147,485

$325,000$177,515

$147,48534712

Franklin County

21329

BRS-CHBP-C035(102)--GB-35

On S41, Over DD NO. 6, from 80th Street North 1 Miles to90th Street

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$650,000$355,030

$294,970

$650,000$355,030

$294,9707371

Kossuth County

21335

BRS-CHBP-C055(176)--GB-55

A42: N Line 19, Greenwood Twp.E FORK DES MOINESRIVER

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$518,480$218,480

$300,000

$518,480$218,480

$300,00037681

Mitchell County

21327

BRS-CHBP-C066(78)--GB-66

On S70, Over ROCK CREEK, S8 T98 R18

Bridge Replacement

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$350,000$191,170

$158,830

$350,000$191,170

$158,830

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

48581

Iowa Department ofTransportation

21459

HSIPX-9()--3L-98

IA9: 1 MI E OF CO RD S56 TO E JCT CO RD T26

Pavement Widening

Authorized TotalFederal Aid

RegionalSwap

$2,570,000$2,313,000

$2,570,000$2,313,000

45398

Iowa Department ofTransportation

21340

HSIPX-US18()--3L-34

US18: E OF CEDAR RIVER RR IN CHARLES CITY TOLITTLE CEDAR RIVER (STATE SHARE)

Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$3,417,000$3,075,300

$3,417,000$3,075,300

398

Page 405: Iowa Statewide Transportation Improvement Program

NHFP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38423

Iowa NorthernRailway Company

21341

NHFP-INRC(001)--2F-00

In the city of Garner, On Iowa Northern Railway

Miscellaneous

Authorized

9/21/2021

TotalFederal Aid

RegionalSwap

$1,390,068$1,112,068

$1,390,068$1,112,068

DOT Note: Project authorized for ROW $60,960.

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38231

Iowa Department ofTransportation

21337

NHSX-018-6()--3H-34

US18: US 218/IA 27 INTERSECTION IN FLOYD

Grade and Pave, Bridge New, Right of Way

Authorized TotalFederal Aid

RegionalSwap

$21,846,000$17,476,800

$436,000$348,800

$22,282,000$17,825,600

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

73

RPA 2

21328

RGPL-PA02(RTP)--ST-00

NIACOG: RPA 2 TRANSPORTATION PLANNING

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$30,000$25,000

$25,000

$70,000$56,000

$56,000

$70,000$56,000

$56,000

$70,000$56,000

$56,000

$240,000$193,000

$193,000

399

Page 406: Iowa Statewide Transportation Improvement Program

RPA 3CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36416

Dickinson County

21342

BROSCHBP-C030(59)--GA-30

On A 18, Over LITTLE SIOUX RIVER, S32 T100 R37

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$750,000$382,340

$367,660

$750,000$382,340

$367,66035314

Lyon County

21434

BROSCHBP-C060(124)--NC-60

On BIRCH AVE, Over KLONDIKE CREEK,

Bridge New

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$600,000$382,240

$217,760

$600,000$382,240

$217,76036566

Osceola County

21436

BROSCHBP-C072(76)--NC-72

On OLIVE AVE, Over POLLY CREEK, WLINE S13 T99 R42

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$350,000$191,170

$158,830

$350,000$191,170

$158,830

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45321

Iowa Department ofTransportation

21347

HSIP-IA10()--2H-84

IA10: IA 12 IN HAWARDEN TO US 75

Pavement Widening, Pavement Rehab, Right of Way

Authorized TotalFederal Aid

RegionalSwap

$7,427,000$5,941,600

$7,427,000$5,941,600

DOT Note: Project includes 3R and HSIP funding.

45283

Iowa Department ofTransportation

21350

HSIPX-10()--3L-84

IA10: IA 12 IN HAWARDEN TO NEAR OHIO AVE

Pavement Widening

Authorized TotalFederal Aid

RegionalSwap

$893,000$803,700

$893,000$803,700

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

37993

Iowa Department ofTransportation

21348

BRF-59()--38-71

US59: ABANDONED RR 0.9 MI S OF CO RD B40(REMOVE BRIDGE)

Grade and Pave, Right of Way

Authorized TotalFederal Aid

RegionalSwap

$3,189,000$2,551,200

$3,189,000$2,551,200

400

Page 407: Iowa Statewide Transportation Improvement Program

RTP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45552

Dickinson CountyBoard ofSupervisors

21423

NRT-C030(062)--9G-30

Starting east of IA Hwy 86 heading west to 193rd Ave inMontgomery

Ped/Bike Grade &amp; Pave

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$883,680$221,750

$883,680$221,750

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36951

RPA 3

21344

RGTR-PA03()--ST-00

RTA dba/RIDES

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$111,600$89,600

$89,600

$111,600$89,600

$89,600

PA Note: Purchase replacement of 2 minivans

401

Page 408: Iowa Statewide Transportation Improvement Program

RPA 4CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

12827

Woodbury County

21360

BROSCHBP-C097(141)--GA-97

O'Brien Ave.: From D38 to 210th Street in section 36-88-43over Wright Creek

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$1,100,000$600,820

$499,180

$1,100,000$600,820

$499,18033890

Woodbury County

21354

BRS-CHBP-C097(139)--GB-97

On K 64, Over DRAINAGE, from 160th St N 0.1 miles in S3T88 R45

Bridge Approach Repair, Bridge Replacement, Guardrail

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$850,000$464,270

$385,730

$850,000$464,270

$385,730

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38001

Iowa Department ofTransportation

21359

BRF-12()--38-75

IA12: INDIAN CREEK 4.0 MI N OF CO RD C16

Bridge Replacement, Right of Way

Authorized TotalFederal Aid

RegionalSwap

$2,355,000$1,884,000

$2,355,000$1,884,000

402

Page 409: Iowa Statewide Transportation Improvement Program

RPA 5CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

2806

Webster County

21367

BROSCHBP-C094(124)--NC-94

On Mining Boulevard, Over Unnamed Creek, in NE1/4 S18T88 R28

Bridge Replacement

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$100,000$54,620

$45,380

$100,000$54,620

$45,38032243

Webster County

21366

BROSCHBP-C094(125)--NC-94

On 120TH ST, Over Bass Creek, along NLINE S14 T90R29

Bridge Replacement

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$130,000$71,006

$130,000$71,006

36553

Calhoun County

21365

BRS-CHBP-C013(98)--GB-13

On 270th Street (D36), Over Lake Creek, from NW cornerSec. 32 East 0.2 Miles, along NLINE S32 T88N R32W

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$690,410$300,410

$389,000

$690,410$300,410

$389,000

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45444

Iowa Department ofTransportation

21368

HSIP-IA17()--2H-99

IA17: HAMILTON CO TO SCL OF EAGLE GROVE

Pavement Widening, Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$3,483,000$2,790,000

$3,483,000$2,790,000

DOT Note: Project includes 3R and HSIP funds.

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45418

Iowa Department ofTransportation

21370

STP-175()--2C-94

IA175: ECL OF LOHRVILLE TO GOWRIE

Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$4,494,000$3,595,200

$4,494,000$3,595,200

403

Page 410: Iowa Statewide Transportation Improvement Program

RPA 6CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

35106

Marshall County

21382

BROSCHBP-C064(134)--NC-64

On In 2500 Mile of 260th St, Over North Timber Creek, S23T83 R18

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$600,000$327,720

$272,280

$600,000$327,720

$272,28037809

Poweshiek County

21374

BRS-CHBP-C079(060)--GB-79

On F62, Over SUGAR CREEK, S7 T78 R16

Bridge Replacement

Authorized

9/21/2021

TotalFederal Aid

RegionalSwap

$850,000$464,270

$385,730

$850,000$464,270

$385,730

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45286

Iowa Department ofTransportation

21387

HSIPX-20()--3L-42

US20: E OF US 65 TO 2.0 MI E OF CO RD S56 (VARLOC)

Pavement Widening

Authorized TotalFederal Aid

RegionalSwap

$2,215,000$1,993,500

$2,215,000$1,993,500

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38154

Iowa Department ofTransportation

21385

IM-NHS-80()--03-79

I-80: 1.0 MI W OF IA 146 TO 2.0 MI E OF IA 146

Grade and Pave, Pave, Bridge Replacement

Authorized TotalFederal Aid

RegionalSwap

$8,524,000$7,245,400

$16,960,000$14,416,000

$358,000$304,300

$25,842,000$21,965,700

RTP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36931

Hardin CountyBoard ofSupervisors

21380

NRT-C042(87)--9G-42

On Iowa River Trail, from Bridge 19 south 9.3 Miles toBridge 25

Bridge Rehabilitation, Culvert Replacement

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$618,000$494,000

$247,000

$618,000$494,000

$247,000

PA Note: admistrative map changes 05/10/2021

404

Page 411: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36302

RPA 6

21375

STP-U-PA06()--70-64

Purchase 1 expansion non-accessible minivan

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$53,000$42,000

$42,000

$53,000$42,000

$42,000

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39485

Hardin CountyBoard ofSupervisors

21379

TAP-R-C042(104)--8T-42

On the Iowa River's Edge Trail, starting at 12th Avenue inEldora and ending NE of 1304 S River Road in SteamboatRock

Ped/Bike Grade &amp; Pave

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$1,130,000$570,000

$145,000

$1,130,000$570,000

$145,000

405

Page 412: Iowa Statewide Transportation Improvement Program

RPA 7CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

16345

Bremer County

21392

BROSCHBP-C009(84)--NC-09

On GRAND AVE, Over STREAM, S18 T91 R13

Culvert Replacement

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$581,088$131,088

$450,000

$581,088$131,088

$450,00037638

Bremer County

21391

BRS-CHBP-C009(82)--GB-09

On V14, Over HORTON CREEK, on WLINE S23 T93 R14

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$726,036$426,036

$300,000

$726,036$426,036

$300,00037534

Chickasaw County

21390

BRS-CHBP-C019(105)--GB-19

On V48 (Quinlan Ave), Over EAST FORK WAPSIPINICON,S1/4 S13 T94 R12

Bridge Replacement

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$600,000$327,720

$272,280

$600,000$327,720

$272,28032353

Grundy County

21393

BRS-CHBP-C038(114)--GB-38

On D35, Over tributary of Black Hawk Creek, Ctr S34 T88R15

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$450,000$245,790

$450,000$245,790

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

48365

Iowa Department ofTransportation

21451

HSIPX-063-8(69)--3L-19

2 Lane to 4 Lane Transition N of New Hampton

Lighting

Authorized TotalFederal Aid

RegionalSwap

$42,000$37,800

$42,000$37,800

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45419

Iowa Department ofTransportation

21401

NHSX-3()--3H-12

IA3: W JCT IA 14 TO IA 188

Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$4,062,000$3,249,600

$4,062,000$3,249,600

406

Page 413: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

1403

RPA 7

21388

RGPL--PA07(RTP)--ST-00

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$50,000$40,000

$40,000

$50,000$40,000

$40,000

$50,000$40,000

$40,000

$50,000$40,000

$40,000

$200,000$160,000

$160,000

407

Page 414: Iowa Statewide Transportation Improvement Program

RPA 8DEMO

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

44681

Clinton County

21449

HDP-C023(124)--6B-23

On 220th Street, from Y-70 to Z-24 double chip seal withmicrosurface

Authorized

8/17/2021

TotalFederal Aid

RegionalSwap

$550,000$440,000

$550,000$440,000

DOT Note: Project awarded AID Demonstration funds

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45438

Iowa Department ofTransportation

21405

HSIP-IA136()--2H-31

IA136: CC RR IN DYERSVILLE TO IA 3 IN LUXEMBURG

Pavement Widening, Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$4,845,000$3,876,000

$4,845,000$3,876,000

DOT Note: Project includes 3R and HSIP funds.

45442

Iowa Department ofTransportation

21404

HSIP-US67()--2H-23

US67: 37TH AVE N IN CLINTON TO CO RD E50

Pavement Widening, Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$4,700,000$3,870,000

$4,700,000$3,870,000

DOT Note: Project includes 3R and HSIP funds.

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

478

RPA 8

21402

RGPL-PA08(RTP)--ST-00

On ECIA Transportation Planning

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$90,375$72,300

$72,300

$65,300$52,300

$52,300

$65,300$52,300

$52,300

$65,300$52,300

$52,300

$286,275$229,200

$229,200

408

Page 415: Iowa Statewide Transportation Improvement Program

RPA 9STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

533

RPA 9

21411

RGPL-PA09(RTP)--ST-00

Region 9

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$17,566$10,000

$10,000

$17,566$10,000

$10,000

$17,566$10,000

$10,000

$17,566$10,000

$10,000

$70,264$40,000

$40,000

409

Page 416: Iowa Statewide Transportation Improvement Program

RPA 10CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

20727

Benton County

21414

BROSCHBP-C006(110)--GA-06

24 AVE DR: Over Bear Creek

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$725,000$395,995

$329,005

$725,000$395,995

$329,00532445

Benton County

21415

BROSCHBP-C006(116)--GA-06

On 22nd Ave, Over PRATT CREEK, S36 T86 R11

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$500,000$273,100

$226,900

$500,000$273,100

$226,90037778

Benton County

21416

BROSCHBP-C006(117)--NC-06

On 30 AVE DR, Over BR OPOSSUM CK, S33 T85 R09

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$400,000$218,480

$181,520

$400,000$218,480

$181,52035353

Johnson County

21194

BROSCHBP-C052(123)--NC-52

On BLACK HAWK AVE, Over BR CLEAR CR, S20 T80 R08

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$775,000$273,100

$501,900

$775,000$273,100

$501,9002745

Benton County

21413

BRS-CHBP-C006(115)--GB-06

On V-44, Over Br Prairie Creek, at WLINE S6 T82 R11

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$300,000$163,860

$136,140

$300,000$163,860

$136,140

410

Page 417: Iowa Statewide Transportation Improvement Program

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45439

Iowa Department ofTransportation

21201

HSIP-IA150()--2H-06

IA150: VINTON TO I-380

Pavement Widening, Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$5,622,600$4,723,800

$5,622,600$4,723,800

DOT Note: Project includes 3R and HSIP funds.

45437

Iowa Department ofTransportation

21200

HSIP-IA150()--2H-06

IA150: I-380 TO INDEPENDENCE

Pavement Widening, Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$6,500,000$5,184,000

$6,500,000$5,184,000

DOT Note: Project includes 3R and HSIP funds.

45285

Iowa Department ofTransportation

21202

HSIPX-IA22()--3L-92

IA22: 9TH ST IN KALONA TO E OF BOISE ST INRIVERSIDE

Pavement Widening

Authorized TotalFederal Aid

RegionalSwap

$2,600,000$2,340,000

$2,600,000$2,340,000

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38151

Iowa Department ofTransportation

21196

IM-NHS-80()--03-52

I-80: 1.5 MI E OF IA 1 TO 0.5 MI E OF CO RD X30

Grade and Pave, Pave, Grading

Authorized TotalFederal Aid

RegionalSwap

$38,211,000$32,479,350

$28,619,000$24,326,150

$41,946,000$35,654,100

$15,295,000$13,000,750

$124,071,000$105,460,350

38216

Iowa Department ofTransportation

21197

NHSX-030-6()--3H-06

US30: 11TH AVE DR TO W JCT US 218

Grade and Pave, Bridge New, Right of Way

Authorized TotalFederal Aid

RegionalSwap

$63,192,000$50,553,600

$36,509,000$29,207,200

$99,701,000$79,760,800

39282

Iowa Department ofTransportation

21199

NHSX-151()--3H-57

US151: CRABAPPLE CREEK 2.9 MI N OF N JCT IA 13(NB)

Grade and Pave, Bridge Replacement, Traffic Signs

Authorized TotalFederal Aid

RegionalSwap

$4,006,000$3,204,800

$4,006,000$3,204,800

411

Page 418: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

16834

RPA 10

21192

RGPL-PA10()--ST-00

Region 10-ECICOG: Region 10 Planning

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$103,750$83,000

$83,000

$107,500$86,000

$86,000

$111,250$89,000

$89,000

$115,000$92,000

$92,000

$437,500$350,000

$350,000

45406

Iowa Department ofTransportation

21203

STP-64()--2C-53

IA64: WYOMING TO MONMOUTH

Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$3,487,000$2,789,600

$3,487,000$2,789,600

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39442

Jones CountyConservation Board

21195

TAP-R-C053(089)--8T-53

Wapsipinicon Trail Phase 2: From Int. of Stallion Creek andShaw Rd 0.5 miles to Hale Bridge and trailhead

Ped/Bike Grade &amp; Pave

Authorized

9/21/2021

TotalFederal Aid

RegionalSwap

$466,145$381,272

$243,145

$466,145$381,272

$243,145

PA Note: Project also includes construction of a new trailhead entry.

39444

Washington CountyConservation Board

21190

TAP-R-C092(110)--8T-92

On Kewash Nature Trail, from end of Phase 1, 7400 feet(1.40 miles) to bridge over Crooked Creek

Ped/Bike Grade &amp; Pave

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$517,315$317,315

$317,315

$517,315$317,315

$317,315

39441

Johnson CountyConservation Board

21191

TAP-U-C052(124)--8I-52

On Clear Creek Trail, from Half Moon Ave 2.5 miles to FWKent Park

Ped/Bike Development

Authorized

1/22/2031

TotalFederal Aid

RegionalSwap

$677,671$337,260

$337,260

$677,671$337,260

$337,260

412

Page 419: Iowa Statewide Transportation Improvement Program

RPA 11CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36285

Dallas County

21215

BROSCHBP-C025(115)--NC-25

On 250TH ST, Over Walnut Creek, On the south line of S2,T79, R26, Walnut Township

Bridge Replacement

Authorized

9/21/2021

TotalFederal Aid

RegionalSwap

$480,000$245,790

$230,000

$480,000$245,790

$230,00037548

Madison County

21224

BROSCHBP-C061(124)--NC-61

On HOGBACK BRIDGE RD, Over DRAINAGE, at S1/4 S23T76 R28

Bridge Replacement

Authorized

9/21/2021

TotalFederal Aid

RegionalSwap

$1,000,000$655,440

$344,560

$1,000,000$655,440

$344,56032785

Warren County

21219

BROSCHBP-C091(132)--GA-91

On R35 (10TH AVE), Over BRANCH BADGER CREEK,S31 T77 R25

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$900,000$491,580

$408,420

$900,000$491,580

$408,42024850

Warren County

21222

BROSCHBP-C091(134)--NC-91

On IDAHO ST, Over BRANCH MIDDLE RIVER, from 50THAVE 0.3 miles S15 T76 R25

Bridge Replacement

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$400,000$218,480

$181,520

$400,000$218,480

$181,52037403

Jasper County

21212

BRS-CHBP-C050(128)--GB-50

On T38, Over SUGAR CREEK, S13 T80 R17

Bridge Replacement

Authorized

9/21/2021

TotalFederal Aid

RegionalSwap

$450,000$245,790

$204,210

$450,000$245,790

$204,21015532

Jasper County

21213

BRS-CHBP-C050(129)--GB-50

On F-24, Over Clear Creek, S2 T80 R21

Bridge Replacement

Authorized

9/21/2021

TotalFederal Aid

RegionalSwap

$750,000$409,650

$340,350

$750,000$409,650

$340,35014749

Madison County

21223

BRS-CHBP-C061(125)--GB-61

On CLARK TOWER RD., Over North Fork Clanton Creek,S12 T74 R28

Bridge Replacement

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$1,750,000$955,850

$794,150

$1,750,000$955,850

$794,15029272

Story County

21211

BRS-CHBP-C085(155)--GB-85

On E18, Over East Indian Creek, on NLINE S19 T85 R22

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$550,410$300,410

$250,000

$550,410$300,410

$250,00032798

Warren County

21220

BRS-CHBP-C091(133)--GB-91

On S23, Over MILL CREEK, S27 T74 R22

Bridge Replacement

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$700,000$382,340

$317,660

$700,000$382,340

$317,660

413

Page 420: Iowa Statewide Transportation Improvement Program

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38066

Iowa Department ofTransportation

21228

IM-080-3()--13-25

I-80: US 6/169 IN DE SOTO TO CO RD R16

Grade and Pave, Pave, Bridge Replacement

Authorized TotalFederal Aid

RegionalSwap

$17,792,000$16,012,800

$9,387,000$8,448,300

$25,078,000$22,570,200

$52,257,000$47,031,300

38156

Iowa Department ofTransportation

21238

IM-NHS-35()--03-91

I-35: N OF NORTH RIVER TO S OF BADGER CREEK(SB)

Grade and Pave, Bridge Replacement, Wetland Mitigation

Authorized TotalFederal Aid

RegionalSwap

$14,339,000$12,188,150

$14,339,000$12,188,150

38096

Iowa Department ofTransportation

21235

IMX-80()--02-50

I-80: 0.9 MI E OF IA 224 TO 1.0 MI W OF IA 146 (EB &WB)

Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$4,990,000$4,491,000

$4,990,000$4,491,000

RTP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45471

Dallas CountyConservation Board

21227

NRT-C025(116)--9G-25

On 130th Street, approx. 1,700 ft West of M Avenue to MAvenue

Ped/Bike Grade &amp; Pave

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$664,000$328,175

$664,000$328,175

414

Page 421: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36937

RPA 11

21210

RGPL-PA11()--ST-00

HIRTA: Vehicle Purchase

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$167,795$134,236

$134,236

$144,820$115,820

$115,820

$124,795$99,836

$99,836

$437,410$349,892

$349,892

45415

Iowa Department ofTransportation

21236

STP-65()--2C-85

US65: 0.5 MI S OF US 30 TO IA 175 IN HUBBARD

Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$6,767,000$5,413,600

$6,767,000$5,413,600

38272

Iowa Department ofTransportation

21231

STP-IA17()--2C-08

IA17: 0.5 MI N OF US 30 TO 3.0 MI N (STATE SHARE)

Pave, Bridge New, Grading

Authorized TotalFederal Aid

RegionalSwap

$7,800,000$6,229,200

$6,062,000$4,849,600

$200,000$160,000

$14,062,000$11,238,800

DOT Note: Project includes $490,000 in repurposed earmark funding

45521

RPA 11

21240

STP-PA11()--2C-00

Pavement Data Collection Opt In

Miscellaneous

Authorized TotalFederal Aid

RegionalSwap

$281,250$225,000

$225,000

$281,250$225,000

$225,000

STBG-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38665

Madison County

21209

BROS-C061(119)--5F-61

On Settlers Ave., Over STREAM, at SE S36 T77N R27W

Bridge Replacement

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$550,000$440,000

$550,000$440,000

415

Page 422: Iowa Statewide Transportation Improvement Program

RPA 12CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

35111

Guthrie County

21244

BRS-CHBP-C039(95)--GB-39

On P20, Over North River, S34 T78 R31

Bridge Replacement

Authorized

9/21/2021

TotalFederal Aid

RegionalSwap

$750,000$314,611

$435,389

$750,000$314,611

$435,389

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45440

Iowa Department ofTransportation

21246

HSIP-IA39()--2H-24

IA39: US 59 TO MAIN ST N IN DELOIT

Pavement Widening, Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$3,500,000$2,960,000

$3,500,000$2,960,000

DOT Note: Project includes 3R and HSIP funds.

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45353

Iowa Department ofTransportation

21245

STP-IA141()--2C-24

IA141: S JCT US 59 TO WCL MANNING

Pavement Rehab/Widen, Right of Way

Authorized TotalFederal Aid

RegionalSwap

$6,705,000$5,364,000

$500,000

$6,705,000$5,364,000

$500,000

DOT Note: Project includes RPA 12 contribution of $500,000

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39475

Manning

21241

TAP-R-4702(607)--8T-14

Manning SRTS South Phase I from 10th Street to PleasantStreet

Ped/Bike Paving

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$164,000$131,200

$82,000

$164,000$131,200

$82,000

416

Page 423: Iowa Statewide Transportation Improvement Program

RPA 13CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

37637

Cass County

21253

BROSCHBP-C015(71)--GA-15

On Boston Road, Over small creek, from Hwy 71 east 1.0,on NLINE S7 T77 R35

Bridge Replacement

Authorized

10/20/2020

TotalFederal Aid

RegionalSwap

$400,000$218,480

$400,000$218,480

20520

Fremont County

21254

BROSCHBP-C036(78)--GA-36

On J40, Over Fisher Creek, S35 T69 R40

Bridge Replacement

Authorized

10/20/2020

TotalFederal Aid

RegionalSwap

$750,000$409,650

$340,350

$750,000$409,650

$340,35037142

MontgomeryCounty

21257

BROSCHBP-C069(72)--GA-69

On N18 (T Ave), Over Tributary to West Nodaway River atNW 1/4 corner, S33 T71 R36

Culvert Replacement

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$300,000$177,515

$122,485

$300,000$177,515

$122,48531031

MontgomeryCounty

21256

BRS-CHBP-C069(73)--GB-69

On M37, Over Crabapple Creek, on Ctr S16 T72 R39

Bridge Replacement

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$700,000$327,720

$372,280

$700,000$327,720

$372,28022376

Page County

21251

BRS-CHBP-C073(123)--GB-73

On J-20, Over West Tarkio River, S27 T70 R38

Bridge Replacement

Authorized

10/20/2020

TotalFederal Aid

RegionalSwap

$650,030$355,030

$295,000

$650,030$355,030

$295,000

417

Page 424: Iowa Statewide Transportation Improvement Program

RPA 14HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45274

Iowa Department ofTransportation

21266

HSIPX-34()--3L-88

US34: W JCT US 169 IN AFTON

Grade and Pave

Authorized TotalFederal Aid

RegionalSwap

$376,000$338,400

$376,000$338,400

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38018

Iowa Department ofTransportation

21268

BRF-169()--38-80

US169: MIDDLE FORK GRAND RIVER 5.3 MI S OF IA 2

Bridge Replacement

Authorized TotalFederal Aid

RegionalSwap

$1,551,000$1,240,800

$1,551,000$1,240,800

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

19871

RPA 14

21264

RGPL-PA14(FY15)--ST-0

RPA 14: Transportation Planning ATURA RPA 14

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$96,705$33,516

$33,516

$96,705$33,516

$33,516

$96,705$33,516

$33,516

$96,705$33,516

$33,516

$386,820$134,064

$134,064

418

Page 425: Iowa Statewide Transportation Improvement Program

RPA 15CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36328

Jefferson County

21417

BROSCHBP-C051(75)--GA-51

On 257TH ST, Over STREAM, S24 T71 R10

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$500,000$273,100

$226,900

$500,000$273,100

$226,90037569

Wapello County

21419

BROSCHBP-C090(95)--GA-90

On 215th Avenue, Over Bear Creek, S27 T72 R15

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$375,000$204,825

$170,175

$375,000$204,825

$170,17529233

Wapello County

21418

BROSCHBP-C090(96)--NC-90

On 28th Street, Over Chippewa Creek, NE S28 T71 R12

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$175,000$95,585

$79,415

$175,000$95,585

$79,415

HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45320

Iowa Department ofTransportation

21270

HSIP-IA2()--2H-89

IA2: CO RD W40 TO PARK ST IN DONNELLSON

Pavement Widening, Pavement Rehab, Right of Way

Authorized TotalFederal Aid

RegionalSwap

$2,721,000$2,176,800

$2,721,000$2,176,800

DOT Note: Project includes 3R and HSIP funds

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

37976

Iowa Department ofTransportation

21277

BRF-92()--38-62

IA92: MUCHAKINOCK CREEK 1.3 MI W OF IA 163

Bridge Replacement, Wetland Mitigation

Authorized TotalFederal Aid

RegionalSwap

$4,682,000$3,745,000

$4,682,000$3,745,000

45395

Iowa Department ofTransportation

21275

NHSX-92()--3H-54

IA92: E JCT IA 149 TO CO RD V67

Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$3,586,000$2,868,800

$3,586,000$2,868,800

419

Page 426: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

881

RPA 15

21269

RGPL-PA15(RTP)--ST-00

RPA 15: RPA 15 TRANSPORTATION PLANNING

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$43,750$35,000

$35,000

$43,750$35,000

$35,000

45496

RPA 15

21280

RGTR-PA15()--ST-00

Transit Capital Investment, Replace bus # 151

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$55,000$44,000

$44,000

$55,000$44,000

$44,000

45497

RPA 15

21281

RGTR-PA15()--ST-00

Transit Capital Investment, replace bus # 152

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$55,000$44,000

$44,000

$55,000$44,000

$44,000

45498

RPA 15

21282

RGTR-PA15()--ST-00

Transit Capital Replacement, replace bus # 156

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$55,000$44,000

$44,000

$55,000$44,000

$44,000

45499

RPA 15

21283

RGTR-PA15()--ST-00

Transit Capital Investment, replace bus # 102

Transit Investments

Authorized TotalFederal Aid

RegionalSwap

$55,000$44,000

$44,000

$55,000$44,000

$44,000

45373

Iowa Department ofTransportation

21271

STP-IA21()--2C-54

IA21: IA 92 TO NCL OF WHAT CHEER

Pavement Rehab, Right of Way

Authorized TotalFederal Aid

RegionalSwap

$3,975,000$3,175,000

$3,975,000$3,175,000

420

Page 427: Iowa Statewide Transportation Improvement Program

RPA 16DEMO

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38347

Burlington

21444

EDP-0977(650)--7Y-29

In the city of Burlington, On MAIN ST, from High St toAngular St; then on JEFFERSON ST, from Central Ave toFront St

Grade and Pave, Landscaping, Ped/Bike ROW

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$15,193,193$12,423,193

$15,193,193$12,423,193

45532

Burlington

21445

EDP-0977(653)--7Y-29

In the City of Burlington, Downtown RiverfrontImprovements

Grade and Pave, Landscaping

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$4,576,807$4,576,807

$4,576,807$4,576,807

NHFP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39425

Mount Pleasant

21285

NHFP-5292(626)--2F-44

In the city of Mount Pleasant, BJRY Transload Building

Buildings, Outside Services Engineering

Authorized

1/11/2022

TotalFederal Aid

RegionalSwap

$670,000$536,000

$670,000$536,000

DOT Note: PE Authorized for $84,439.20

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

37966

Iowa Department ofTransportation

21299

BRF-2()--38-56

IA2: SUGAR CREEK 1.8 MI W OF US 218

Bridge Replacement, Right of Way

Authorized TotalFederal Aid

RegionalSwap

$2,974,000$2,379,200

$2,974,000$2,379,200

38226

Iowa Department ofTransportation

21297

NHSX-061-2()--3H-29

US61: S OF 210TH ST TO N OF MEDIAPOLIS

Pave, Bridge New, Grading

Authorized TotalFederal Aid

RegionalSwap

$19,115,000$15,292,000

$26,853,000$21,482,400

$45,968,000$36,774,400

38225

Iowa Department ofTransportation

21298

NHSX-61()--3H-29

US61: MEMORIAL PARK RD IN BURLINGTON TO S OF210TH ST

Grade and Pave, Bridge Replacement, Erosion Control

Authorized TotalFederal Aid

RegionalSwap

$27,240,000$21,792,000

$2,669,000$2,135,200

$29,909,000$23,927,200

421

Page 428: Iowa Statewide Transportation Improvement Program

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

949

RPA 16

21290

RGPL-PA16(RTP)--ST-00

SEIRPC: RPA 16 TRANSPORTATION PLANNING

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$237,344$160,082

$160,082

$237,344$160,082

$160,082

$277,549$222,039

$222,039

$277,549$222,039

$222,039

$1,029,786$764,242

$764,242

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39157

Burlington

21292

TAP-U-0977(652)--8I-29

In the City of Burlington, trail along West Ave fromRoosevelt Ave east to Terrace Dr

Traffic Signals, Pavement Markings, Ped/Bike Grade &amp;Pave

Authorized

12/21/2021

TotalFederal Aid

RegionalSwap

$298,601$238,880

$238,880

$298,601$238,880

$238,880

DOT Note: PE Authorized for $21,267

29688

Des Moines CountyBoard ofSupervisors

21289

TAP-U-C029()--8I-29

Flint River Trail, North along US Hwy 61 to Flint Bottom Rd

Ped/Bike Grade &amp; Pave, Ped/Bike Structures

Authorized TotalFederal Aid

RegionalSwap

$500,000$400,000

$400,000

$500,000$400,000

$400,000

DOT Note: Project eligible for FHWA TAP funding. NHSX-061-2(69)--3H-29

422

Page 429: Iowa Statewide Transportation Improvement Program

RPA 17CHBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

19094

Monroe County

21302

BROSCHBP-C068(74)--GA-68

On T55, 720th Ave, Over Miller Creek, from Hwy 137 SouthApprox 1 Miles to said bridge, at NE S14 T73 R16

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$750,000$409,650

$340,350

$750,000$409,650

$340,350

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

37881

Iowa Department ofTransportation

21304

BRF-5()--38-4

IA5: DITCH 0.6 MI S OF CO RD T30

Bridge Replacement, Right of Way

Authorized TotalFederal Aid

RegionalSwap

$2,457,000$1,965,600

$2,457,000$1,965,600

37882

Iowa Department ofTransportation

21305

BRF-5()--38-4

IA5: SHOAL CREEK 2.8 MI N OF CO RD T20

Bridge Replacement, Right of Way

Authorized TotalFederal Aid

RegionalSwap

$3,964,000$3,171,200

$3,964,000$3,171,200

38224

Iowa Department ofTransportation

21310

NHSX-63()--3H-26

US63: SOAP CREEK 0.9 MI S OF WAPELLO CO

Bridge Replacement, Wetland Mitigation

Authorized TotalFederal Aid

RegionalSwap

$6,975,000$5,580,000

$6,975,000$5,580,000

45397

Iowa Department ofTransportation

21309

NHSX-IA5()--3H-04

IA5: N OF HAYNES AVE IN CENTERVILLE TO N OF US34 IN ALBIA

Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$8,624,000$6,899,200

$8,624,000$6,899,200

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

1001

RPA 17

21300

RGPL-PA17(RTP)--ST-00

RPA 17: RPA 17 TRANSPORTATION PLANNING

Trans Planning

Authorized TotalFederal Aid

RegionalSwap

$41,000$33,000

$33,000

$41,000$33,000

$33,000

$41,000$33,000

$33,000

$41,000$33,000

$33,000

$164,000$132,000

$132,000

423

Page 430: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38430

Murray

21420

TAP-R-5327(601)--8T-20

In the city of Murray, Murray Rec Complex Trail, south of1st Street between 130th and 135th Ave

Ped/Bike Development

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$120,000$96,000

$96,000

$120,000$96,000

$96,000

PA Note: The project amount is $95,233.

39548

Decatur CountyConservation Board

21430

TAP-R-C027(078)--8T-27

Approximately 1.2 miles from west edge of Leon to westedge of Little River Lake,

Ped/Bike Development

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$432,600$345,600

$345,600

$432,600$345,600

$345,600

38429

Centerville

21435

TAP-U-1210(612)--8I-04

In Centerville: S.10th, Water, Lane to CHS Dr, Liberty to S.Main & Morgan Cline Park to Drake & Francis Ave to S.Main

Ped/Bike Development

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$910,000$374,766

$374,766

$910,000$374,766

$374,766

424

Page 431: Iowa Statewide Transportation Improvement Program

RPA 18HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45445

Iowa Department ofTransportation

21317

HSIP-US275()--2H-65

US275: N OF NCL OF TABOR TO US 34

Pavement Widening, Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$5,026,000$4,020,800

$5,026,000$4,020,800

DOT Note: Project includes 3R and HSIP funds.

45441

Iowa Department ofTransportation

21318

HSIP-US30()--2H-43

US30: MISSOURI RIVER TO I-29

Pavement Widening, Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$5,737,800$4,590,200

$5,737,800$4,590,200

DOT Note: Project includes 3R and HSIP funds.

45275

Iowa Department ofTransportation

21325

IHSIPX-I-80()--08-78

I-80: CO RD G30 TO CO RD L66

Guardrail

Authorized TotalFederal Aid

RegionalSwap

$2,250,000$2,000,000

$2,250,000$2,000,000

NHPP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45409

Iowa Department ofTransportation

21326

NHSX-59()--3H-78

US59: CO RD G30 TO SCL OF AVOCA

Pavement Rehab

Authorized TotalFederal Aid

RegionalSwap

$3,449,000$2,759,200

$3,449,000$2,759,200

STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

33878

Harlan

21454

STP-E-3275(603)--8V-83

In the city of Harlan, On US 59, S12 T79 R39

Miscellaneous

Authorized

10/01/2021

TotalFederal Aid

RegionalSwap

$120,000$96,000

$96,000

$120,000$96,000

$96,000

PA Note: Two signs were removed (along IA Hwy 44) and the two signs on US Hwy 59 remain. Item will be presented as an amendment to the RPA TIP to the RPA-18 Policy and TechnicalCommittee on April 14. Grant funds are shared between TPMS #33878 (STP-E-3275(603)--8V-83) Community Entrance Signs and TPMS #40168 (TAP-U-3275(605)--8I-83) Street Lights.

425

Page 432: Iowa Statewide Transportation Improvement Program

STBG-TAP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38386

Elk Horn

21311

TAP-R-2305(602)--8T-83

On In the City of Elk Horn between Salem Street andMadison Street., from This project will be a loop of .31 Miles

Ped/Bike Paving, Ped/Bike Grade &amp; Pave, Ped/BikeDevelopment

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$152,000$100,000

$100,000

$152,000$100,000

$100,000

40089

Mills CountyConservation Board

21313

TAP-R-C065(109)--8T-65

On On the Wabash Trace in Silver City

Bridge Replacement

Authorized TotalFederal Aid

RegionalSwap

$189,000$151,000

$151,000

$189,000$151,000

$151,000

426

Page 433: Iowa Statewide Transportation Improvement Program

List of Let Projects - Swap Funding

Page 434: Iowa Statewide Transportation Improvement Program

MPO 22 / AAMPOSWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36927

Ames

STBG-SWAP-0155(703)--SG-85

In the city of Ames, On East 13th Street, from Duff AvenueEast .4 Miles to Meadowlane Avenue,

Pavement Rehab

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$2,500,000

$1,600,000

$1,600,000

$2,500,000

$1,600,000

$1,600,000

427

Page 435: Iowa Statewide Transportation Improvement Program

MPO 23 / CMPOSWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

34198

Cedar Rapids

STBG-SWAP-1187(807)--SG-57

In the city of Cedar Rapids, On EDGEWOOD RD NE, fromHwy 100 north to Blairs Ferry Rd

Pavement Rehab, Sanitary Sewer, Ped/Bike Paving

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$1,952,000

$925,000

$925,000

$1,952,000

$925,000

$925,00039462

Cedar Rapids

STBG-SWAP-1187(808)--SG-57

Tower Terrace Rd aprx 300' E of Edgewood Rd to aprx1,000' W of Miller Rd & all intersections.

Grade and Pave, Pavement Widening, Ped/Bike Grade&amp; Pave

Authorized

8/17/2021

TotalFederal Aid

RegionalSwap

$1,893,000

$1,514,000

$1,514,000

$1,893,000

$1,514,000

$1,514,000

39463

Hiawatha

STBG-SWAP-3432(611)--SG-57

Tower Terrace Rd aprx 300' E of N.Center Point Rd to aprx75' E of Goldfinch Ln; roundabout at N.Center Point Rd

Grade and Pave, Pavement Widening, Ped/Bike Grade&amp; Pave

Authorized

8/17/2021

TotalFederal Aid

RegionalSwap

$3,727,000

$1,514,000

$1,514,000

$3,727,000

$1,514,000

$1,514,000

428

Page 436: Iowa Statewide Transportation Improvement Program

MPO 26 / DMAMPOSWAP-CMAQ

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45484

Waukee

ICAAP-SWAP-8177(626)--SH-25

In City of Waukee, intersection of Ashworth Dr, Warrior Lnand Northview Dr

Pavement Rehab/Widen, Traffic Signs

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$2,077,370

$1,277,370

$2,077,370

$1,277,370

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

35368

Ankeny

STBG-SWAP-0187(643)--SG-77

In the city of Ankeny, On West First Street, from SW ScottStreet to Ankeny Boulevard

Pave

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$6,030,000

$2,530,000

$2,530,000

$6,030,000

$2,530,000

$2,530,00025172

Des Moines

STBG-SWAP-1945(841)--SG-77

On East Douglas Avenue Reconstruction, from East 42ndStreet to East 56th Street

Grade and Pave, Pavement Rehab/Widen, Right of Way

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$10,000,000

$5,800,000

$5,800,000

$10,000,000

$5,800,000

$5,800,00036674

Des Moines

STBG-SWAP-1945(853)--SG-77

In the City of Des Moines, Ingersoll Avenue Reconstruction,from Polk Blvd to 42nd St

Pavement Rehab

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$2,750,000

$1,000,000

$1,000,000

$2,750,000

$1,000,000

$1,000,00035377

West Des Moines

STBG-SWAP-8260(651)--SG-77

In the city of West Des Moines, Grand Avenue Widening:from 1st Street to 6th Street

Grade and Pave

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$5,586,550

$3,652,550

$3,652,550

$5,586,550

$3,652,550

$3,652,550PA Note: STBG funding limit: $3,652,550

34816

Polk County

STBG-SWAP-C077(229)--FG-77

On NW 26TH ST, from NW 66 Ave to Hwy 415

Pavement Rehab

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$6,750,000

$1,750,000

$1,750,000

$6,750,000

$1,750,000

$1,750,000

429

Page 437: Iowa Statewide Transportation Improvement Program

MPO 29 / SIMPCOSWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36656

Sergeant Bluff

STBG-SWAP-6890(610)--SG-97

In the city of Sergeant Bluff, On First Street, from Port NealRoad to C Street

Pavement Rehab

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$2,000,000

$1,400,000

$1,400,000

$2,000,000

$1,400,000

$1,400,00035398

Sioux City

STBG-SWAP-7057(705)--SG-97

In the city of Sioux City, On South Fairmount Street, fromTransit Avenue to Vine Avenue

Pavement Rehab

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$2,756,000

$1,824,000

$1,824,000

$2,756,000

$1,824,000

$1,824,000

430

Page 438: Iowa Statewide Transportation Improvement Program

MPO 30 / INRCOGSWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

29681

Cedar Falls

STBG-SWAP-1185(652)--SG-07

In the city of Cedar Falls, On Cedar Heights Dr, fromGreenhill Rd south 0.8 miles to Viking Rd

Pavement Rehab/Widen, Right of Way, Outside ServicesEngineering

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$4,055,000

$2,900,000

$2,900,000

$4,055,000

$2,900,000

$2,900,000

37823

Waterloo

STBG-SWAP-8155(769)--SG-07

In the city of Waterloo, Traffic Cameras & Fiber OpticsCommunications: Bound by Walnut, Mullan, Washington, 6th

Traffic Signals, Miscellaneous

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$620,000

$496,000

$496,000

$620,000

$496,000

$496,000PA Note: PE is allowed by the MPO for this project.

431

Page 439: Iowa Statewide Transportation Improvement Program

RPA 1SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38486

Decorah

BRM-SWAP-1867(616)--SD-96

On POLE LINE RD, Over DRAINAGE, S8 T98 R08

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00035077

Allamakee County

BROS-SWAP-C003(66)--FE-03

On Smithfield Drive, Over YELLOW RIVER, S9 T96N R05W

Bridge Replacement

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$710,000

$710,000

$710,000

$710,00032839

Allamakee County

BROS-SWAP-C003(68)--SE-03

On Livingood Springs Road, Over YELLOW RIVER, S3T96N R06W

Bridge Replacement

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$610,000

$600,000

$610,000

$600,00038821

Fayette County

BROS-SWAP-C033(140)--SE-33

On 120TH ST, Over UNNAMED CREEK, S7 T92 R10

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$380,000

$350,000

$380,000

$350,00018433

Fayette County

BROS-SWAP-C033(141)--SE-33

On L AVE, Over VOLGA RIVER, on WLINE S29 T92 R08

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$360,000

$360,000

$360,000

$360,00038820

Fayette County

BROS-SWAP-C033(142)--SE-33

On W 55, Over BEAVER CREEK, S24 T94 R07

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$430,000

$350,000

$430,000

$350,00034726

Winneshiek County

BROS-SWAP-C096(150)--SE-96

On SCENIC RIVER RD, Over UPPER IOWA RIVER, fromintersection of Bluffton Rd 0.9 miles S25 T99 R09

Bridge Replacement, Grading

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$900,000

$900,000

$900,000

$900,00038664

Fayette County

BRS-SWAP-C033(139)--FF-33

On W 14, Over VOLGA RIVER, S30 T93 R09

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$560,000

$500,000

$560,000

$500,000

432

Page 440: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

20122

Winneshiek County

STBG-SWAP-C096(153)--SG-96

On W 20, from Co. Rd A34 N 12 miles to Co. Rd. A18

Pavement Rehab

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$3,667,800

$1,488,000

$1,853,800

$3,667,800

$1,488,000

$1,853,800

433

Page 441: Iowa Statewide Transportation Improvement Program

RPA 2SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39449

Plymouth

BROS-SWAP-6142(601)--SE-17

In the city of Plymouth, On Main Street Bridge Replacement

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$580,000

$464,000

$580,000

$464,00032747

Floyd County

BROS-SWAP-C034(102)--FE-34

On B35 (180th Street), Over SHELL ROCK RIVER, onNLINE S33 T96 R18

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$1,400,000

$1,400,000

$1,400,000

$1,400,00032381

Franklin County

BROS-SWAP-C035(93)--SE-35

On 200th Street, Over Buffalo Creek, S1 T92 R21

Bridge Replacement

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,00032526

Mitchell County

BROS-SWAP-C066(76)--SE-66

On A19, Over WAPSIPINICON RIVER, on WLINE S21T100 R15

Bridge Replacement

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$640,000

$640,000

$640,000

$640,00036340

Worth County

BROS-SWAP-C098(80)--SE-98

On 350TH ST, Over DRAINAGE DITCH, from Killdeer AveW .55 miles S34 T98 R21

Bridge Replacement

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00026731

Cerro GordoCounty

BRS-SWAP-7642(602)--FF-17

On B65/Larch St, Over unnamed drainage ditch, 1500 Feetto east of Finch Avenue, in S24 T94 R22

Bridge Replacement

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,000

434

Page 442: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36921

Algona

STBG-SWAP-0085(617)--SG-55

In the city of Algona, On Main Street, from Lucas St. .26Miles to Commercial St.

Grade and Pave

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$1,247,000

$997,000

$997,000

$1,247,000

$997,000

$997,00036923

Mason City

STBG-SWAP-4822(638)--SG-17

In the city of Mason City, On Monroe Avenue, from 5thStreet SW 1.04 Miles to 12th Street NW

Pavement Rehab, Culvert Replacement

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$1,500,000

$1,000,000

$1,000,000

$1,500,000

$1,000,000

$1,000,000

435

Page 443: Iowa Statewide Transportation Improvement Program

RPA 3SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

32593

Clay County

BROS-SWAP-C021(145)--FE-21

On N14, Over ELK CREEK, in NW S15 T95 R35

Bridge Replacement

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00037616

Palo Alto County

BROS-SWAP-C074(109)--SE-74

On 400th Ave, 0.25 miles North of Hwy 18

Bridge Replacement

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$240,000

$240,000

$240,000

$240,00036271

Lyon County

BRS-SWAP-C060(123)--FF-60

On K60, over Tom Creek

Bridge Replacement

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$668,000

$668,000

$668,000

$668,000

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

44785

Emmet County

HSIP-SWAP-C032(53)--FJ-32

Emmet County - Multiple Locations,

Pavement Widening

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$346,000

$329,000

$346,000

$329,000

436

Page 444: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36950

Spencer

STBG-SWAP-7170(629)--SG-21

In the city of Spencer, On 4th Street, from from intersectionof 5th Ave E W 5680 Feet

Grade and Pave

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$800,000

$400,000

$400,000

$800,000

$400,000

$400,00035659

Storm Lake

STBG-SWAP-7422(618)--SG-11

In the city of Storm Lake, On Oneida St., from MilwaukeeAvenue south .42 Miles to East Railroad St.

Pavement Rehab

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$1,788,000

$594,000

$594,000

$1,788,000

$594,000

$594,00032222

Emmet County

STBG-SWAP-C032(54)--FG-32

On N52, from Highway 4 North Approximately 4.4 Miles toCity of Dolliver

Pavement Rehab

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$1,040,000

$600,000

$600,000

$1,040,000

$600,000

$600,00034999

Sioux County

STBG-SWAP-C084(167)--FG-84

On Eagle Ave (K30) N of Ireton, from 420th St (B46) S 3.0miles to IA Hwy #10 (450th St)

Pavement Rehab

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$878,000

$527,000

$527,000

$878,000

$527,000

$527,000

437

Page 445: Iowa Statewide Transportation Improvement Program

RPA 4SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38551

Ida Grove

BRM-SWAP-3650(606)--SD-47

In the city of Ida Grove, On Moorhead Ave., Over OdeboltCreek

Bridge Replacement

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$2,785,000

$1,000,000

$2,785,000

$1,000,00038912

Monona County

BROS-SWAP-C067(89)--FE-67

On 160th Street, Over Rush Creek, SE S35 T85 R42

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,00038703

Monona County

BRS-SWAP-C067(90)--FF-67

On E16, Over Rush Creek, N1/4 S24 T83 R42

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$900,000

$900,000

$900,000

$900,000

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

37810

Cherokee

STBG-SWAP-1272(627)--SG-18

In the city of Cherokee, On N. Roosevelt Street, from E.Main Street to Magnetic Avenue

Pavement Rehab

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$1,050,000

$840,000

$840,000

$1,050,000

$840,000

$840,000

438

Page 446: Iowa Statewide Transportation Improvement Program

RPA 5SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36551

Calhoun County

BROS-SWAP-C013(100)--SE-13

On 380th Street, Over Stream, from NW corner Sec. 25East 0.7 Miles, along NLINE S25 T86N R33W

Bridge Replacement

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$250,000

$249,000

$250,000

$249,00037722

Calhoun County

BROS-SWAP-C013(101)--SE-13

On 165th Street, Over Lake Creek, Ctr S06 T89 R32

Bridge Replacement

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$251,000

$1,000

$251,000

$1,00020429

Hamilton County

BROS-SWAP-C040(102)--SE-40

On XIRCUS AVE, Over Long Dick Creek, S22 T86 R23

Bridge Replacement

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00026825

Hamilton County

BROS-SWAP-C040(103)--SE-40

On TOLLMAN AVE, Over TRIB TO SKUNK, S12 T86 R24

Bridge Replacement

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00035219

Humboldt County

BROS-SWAP-C046(74)--SE-46

On Washington Ave., from NW corner Section 26 NorwayTwp S 0.6 miles S26 T91N R27W

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$125,000

$120,000

$125,000

$120,00023611

Webster County

BROS-SWAP-C094(112)--SE-94

On 170th Street, Over Lizard Creek, along NLINE S11 T89R30

Bridge Replacement

Authorized

10/20/2020

TotalFederal Aid

RegionalSwap

$1,070,000

$1,070,000

$1,070,000

$1,070,00035909

Webster County

BROS-SWAP-C094(126)--FE-94

On D60, Over DD, along NLINE S8 T86 R30

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00035910

Webster County

BROS-SWAP-C094(127)--FE-94

On D60, Over BUTTRICK CREEK, along NLINE S10 T86R30

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,000

439

Page 447: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

34565

Hamilton County

STBG-SWAP-C040(100)--FG-40

On D65, from 1st Street in the City of Randall E 7 miles toHardin County Line S26 T86 R24

Pavement Rehab/Widen

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$2,000,000

$1,630,000

$1,630,000

$2,000,000

$1,630,000

$1,630,000

440

Page 448: Iowa Statewide Transportation Improvement Program

RPA 6SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38990

Hardin County

BROS-SWAP-C042(102)--SE-42

On M Avenue, Over the South Fork of the Iowa River, W1/4S1 T87N R21W

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00013588

Poweshiek County

BROS-SWAP-C079(53)--FE-79

On 80th St., Over A Small Stream, S20 T81 R15

Authorized

8/17/2021

TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,00017390

Poweshiek County

BROS-SWAP-C079(55)--SE-79

On 110th Street, Over Little Bear Creek, Near the W 1/4Corner Sec 26, T80N, R15W

Bridge Replacement

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00013586

Poweshiek County

BROS-SWAP-C079(57)--SE-79

On 370TH AVE, Over STONY CREEK, S10 T80 R14

Bridge Replacement

Authorized

8/17/2021

TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00045095

Tama County

BROS-SWAP-C086(103)--FE-86

On B AVE, Over SUGAR CREEK, S17 T84 R16

Authorized

8/17/2021

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00037782

Tama County

BROS-SWAP-C086(104)--FE-86

On 220TH ST, Over BRANCH SALT CREEK, from UAvenue East, NLINE S4 T84 R13

Bridge Replacement

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$250,000

$250,000

$250,000

$250,000PA Note: Project approved for advancement on 3/29/21 by Region 6 Resource Partners Board

44623

Hardin County

BRS-SWAP-C042(106)--FF-42

On S 27, Over TIPTON CREEK, from D41 S 1.1 miles S2T87 R22

Authorized

10/20/2020

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,000

441

Page 449: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38337

State Center

STBG-SWAP-7272(604)--SG-64

In the city of State Center, On 4th Street SE, from 3rd StreetNW East 1.34 Miles to 6th Avenue SE

Pavement Rehab

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$493,000

$394,000

$394,000

$493,000

$394,000

$394,00016532

Hardin County

STBG-SWAP-C042(107)--FG-42

On D55, from US Hwy 65 E 7.25 miles to Co Hwy S55, andOn S33, from Co Hwy D55 North 4.5 Miles to US Hwy 65

Pave

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$3,650,000

$1,500,000

$1,500,000

$3,650,000

$1,500,000

$1,500,00016616

Marshall County

STBG-SWAP-C064(119)--FG-64

S52: From STATE CENTER, N to E29 (190TH ST)

Pave

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$1,400,000

$600,000

$600,000

$1,400,000

$600,000

$600,00034932

Poweshiek County

STBG-SWAP-C079(61)--FG-79

On V30/F17, from Main Street in Hartwick Northeasterly 3.0Miles to Poweshiek-Iowa Rd

Pavement Rehab

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$1,500,000

$1,000,000

$1,000,000

$1,500,000

$1,000,000

$1,000,00045049

Tama County

STBG-SWAP-C086(105)--FG-86

On HWY E64, from Richland Creek to V18

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$2,500,000

$970,000

$970,000

$2,500,000

$970,000

$970,000

442

Page 450: Iowa Statewide Transportation Improvement Program

RPA 7SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36531

Black Hawk County

BROS-SWAP-C007(161)--SE-07

On E GRESHAM RD, Over CRANE CREEK, from ELKRUN RD East 0.25 Miles, S10 T90 R12

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$900,000

$900,000

$900,000

$900,00029322

Black Hawk County

BROS-SWAP-C007(164)--SE-07

On Kimball Ave, Over Miller Creek, S27 T87 R13

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,00045644

Bremer County

BROS-SWAP-C009(88)--FE-09

On V 62, Over TRIB TO WAPSIE RIVER, S7 T92 R10

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$125,000

$125,000

$125,000

$125,00032451

Butler County

BROS-SWAP-C012(114)--SE-12

On BIRCH AVE, Over Unnamed Creek, from Birch Ave0.01 miles to Bridge Location

Bridge Replacement

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$300,000

$300,000

$300,000

$300,00038757

Chickasaw County

BRS-SWAP-2750(603)--FF-19

On V48, Roanoke Avenue, Over PLUM CREEK, S7 TT94NRR11

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,000

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

44723

Bremer County

HSIP-SWAP-C009()--SJ-09

On C33 and C50, V14, V43, V49, V56, V62,

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$59,500

$54,500

$59,500

$54,50044614

Buchanan County

HSIP-SWAP-C010(114)--FJ-10

W13, IA 281 to 175th St; 118th St, Hazleton ECL to MasonAve; Olympic Ave/155th St, 205th St/Nathan Bethel Ave

Authorized

10/20/2020

TotalFederal Aid

RegionalSwap

$44,000

$40,000

$44,000

$40,000

443

Page 451: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36216

Waverly

STBG-SWAP-8190(637)--SG-09

In the city of Waverly, On 1st St NW, from W Bremer Ave(IA-3) north 0.3 Miles to 5th Ave NW

Pavement Rehab

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$900,000

$450,000

$450,000

$900,000

$450,000

$450,00036175

Black Hawk County

STBG-SWAP-C007(163)--FG-07

On Dunkerton Road (C66), from Hwy 63 East 4 Miles to ElkRun Road (V43)

Pave, Pavement Rehab

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$1,810,000

$800,000

$800,000

$1,810,000

$800,000

$800,00034435

Butler County

STBG-SWAP-C012(119)--FG-12

On C55, from HWY 14 7 miles to T55

Pavement Rehab

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$1,750,000

$800,000

$800,000

$1,750,000

$800,000

$800,00032698

Chickasaw County

STBG-SWAP-C019(92)--FG-19

On B44 (210th Street), from V56 East 3 Miles to FayetteCounty line.

Pave

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$1,200,000

$500,000

$500,000

$1,200,000

$500,000

$500,000

444

Page 452: Iowa Statewide Transportation Improvement Program

RPA 8SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36143

Clinton County

BHS-SWAP-C023(118)--FC-23

On Y52, Over DRAINAGE DITCH 5, S1 T80 RE2

Bridge Deck Overlay

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$200,000

$200,000

$200,000

$200,00035155

Clinton County

BROS-SWAP-C023(122)--FE-23

On F21, Over BARBER CREEK, S32 T81 RE3

Bridge Replacement

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00026844

Delaware County

BROS-SWAP-C028(95)--SE-28

On 285th Street , from 110th Ave East 0.2 Miles, S5 T87 R6

Bridge Replacement

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00037088

Dubuque County

BROS-SWAP-C031(106)--FE-31

On Simon Road, in NE S26 T87N R1W

Bridge Replacement

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00037745

Jackson County

BROS-SWAP-C049(81)--SE-49

On 400th Street, Over Lux Creek, S2 T87N R3E

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00038765

Delaware County

BRS-SWAP-C028(98)--FF-28

On 110th Avenue, in NE S31 T88N R6W

Bridge Replacement

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,000

445

Page 453: Iowa Statewide Transportation Improvement Program

SWAP-HSIP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

35162

Clinton County

HSIP-SWAP-C023(123)--FJ-23

CIR with HMA overlay on 245 ST, from DeWitt City Limits toUS 30

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$1,400,000

$503,500

$1,400,000

$503,50045518

Dubuque County

HSIP-SWAP-C031(111)--FJ-31

On Y 21, from 0.32 Miles North of Hwy 151 N 4.75 miles to0.04 Miles South of Monastery Road

Pave

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$750,000

$486,000

$750,000

$486,000

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36932

Camanche

STBG-SWAP-1040(608)--SG-23

In the city of Camanche, On 9th Avenue, from Railroad toAnamosa Rd

Pavement Rehab

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$380,000

$303,000

$303,000

$380,000

$303,000

$303,00037744

Jackson County

STBG-SWAP-C049(83)--FG-49

On Z34 (418th Avenue), from Hwy 64 1.56 Miles to ClintonCounty Line

Pavement Rehab

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,000

$450,000

$450,00037749

Jackson County

STBG-SWAP-C049(85)--FG-49

On 188th Street, Over Lytle Creek, S5 T85N R2E

Bridge Replacement

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,000

$450,000

$450,000

446

Page 454: Iowa Statewide Transportation Improvement Program

RPA 9SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36076

Muscatine County

BROS-SWAP-C070(68)--SE-70

On DOUGLAS AVENUE, Near SW Corner NE-NE, S3 T77R4W

Bridge Replacement

Authorized

8/17/2021

TotalFederal Aid

RegionalSwap

$350,000

$350,000

$350,000

$350,000

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

34197

Muscatine

STBG-SWAP-5330(627)--SG-70

On Grandview Ave, from Hershey Ave. Intersection,Hershey Ave 2.4 Miles to US 61

Pavement Rehab/Widen

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$9,500,000

$3,550,000

$3,550,000

$9,500,000

$3,550,000

$3,550,000

447

Page 455: Iowa Statewide Transportation Improvement Program

RPA 10SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

16307

Benton County

BHS-SWAP-C006(118)--FC-06

On V-66, Over Prairie Creek, S13 T82 R11

Bridge Rehabilitation

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,00045528

Williamsburg

BRM-SWAP-8427(602)--SD-48

On STATE ST, Over OLD MANS CREEK, S10 T79 R10

Bridge Rehabilitation

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$1,450,000

$1,000,000

$1,450,000

$1,000,00034829

Cedar County

BROS-SWAP-C016(110)--SE-16

On RED STAR RD, Over SUGAR CREEK, S4 T80 R02

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,00038569

Iowa County

BROS-SWAP-C048(90)--SE-48

On WW Ave, S11 T78 R9

Bridge New

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$450,000

$450,000

$450,000

$450,00032704

Benton County

BRS-SWAP-C006(114)--FF-06

On V37, Over WOLF CREEK, S19 T86 R12

Authorized

10/20/2020

TotalFederal Aid

RegionalSwap

$2,400,000

$400,000

$2,400,000

$400,000DOT Note: Project was awarded $2,000,000 of state county bridge funds.

448

Page 456: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

35666

Washington

STBG-SWAP-8140(612)--SG-92

In the city of Washington, On W. Buchanan, from currenttermination to South Avenue E.

Grade and Pave

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$1,936,440

$1,936,440

$1,936,440

$1,936,440

$1,936,440

$1,936,44032639

Cedar County

STBG-SWAP-C016(111)--FG-16

On Y14 from F44 (290th Street) N 5.2 miles to StateHighway 130 & Y4F from Hwy 130 to Inland Cemetary

Pavement Rehab

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$2,850,000

$1,645,000

$1,645,000

$2,850,000

$1,645,000

$1,645,00036530

Johnson County

STBG-SWAP-C052(120)--FG-52

On F44 (Herbert Hoover Highway), from 0.9 miles East ofWapsi Ave. to 0.1 miles West of Johnson Cedar Road, S12T79 R05

Grade and Pave

Authorized

8/17/2021

TotalFederal Aid

RegionalSwap

$4,305,046

$2,738,046

$2,738,046

$4,305,046

$2,738,046

$2,738,046

38850

Washington County

STBG-SWAP-C092(114)--FG-92

On W61, from G26 north to Spruce Avenue

Pave, Pavement Widening

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$3,720,000

$2,520,000

$2,520,000

$3,720,000

$2,520,000

$2,520,000DOT Note: Actual funding limit $2,110,232

449

Page 457: Iowa Statewide Transportation Improvement Program

RPA 11SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

45461

Zearing

BROS-SWAP-8612(602)--SE-85

On S PEARL ST, Over MIDDLE MINERVA CREEK, S21T85 R21

Bridge Replacement

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$550,000

$550,000

$550,000

$550,00035886

Boone County

BROS-SWAP-C008(83)--SE-08

On QW LN, Over BIKE TRAIL, S35 T82 R26

Bridge Replacement

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$950,000

$950,000

$950,000

$950,00035066

Madison County

BROS-SWAP-C061(116)--SE-61

On VALLEYVIEW AVE., Over DRAINAGE, S10 T75 R26

Bridge Replacement

Authorized

9/15/2020

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00038596

Polk County

BROS-SWAP-C077(231)--SE-77

On NW 134 Ave 0.20 Mi E of NW 2nd St

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$800,000

$800,000

$800,000

$800,00037567

Madison County

BRS-SWAP-C061(115)--FF-61

On R35 (BEV. PARK RD.), Over CLANTON CREEK, S12T75 R26

Bridge Replacement

Authorized

8/17/2021

TotalFederal Aid

RegionalSwap

$2,000,000

$500,000

$2,000,000

$500,000DOT Note: Project awarded State Bridge Replacement funds ($1,500,000)

44728

Marion County

BRS-SWAP-C063(136)--FF-63

On G 62, Over WALNUT CREEK, S28 T75 R18

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,000

450

Page 458: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39410

Huxley

STBG-SWAP-3630(606)--SG-85

In the city of Huxley, East 1st Street Rec Phase 1- Fromapprox. 240' east of Parkridge Ave east approx. 650'

Pavement Rehab

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$365,000

$240,000

$240,000

$365,000

$240,000

$240,00045469

Huxley

STBG-SWAP-3630(607)--SG-85

In the City of Huxley, on East 1st Street from approx. 100feet east of Hwy 69 to approx. 240 feet east of ParkridgeAve

Pavement Rehab

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$431,000

$125,000

$125,000

$431,000

$125,000

$125,000

39160

Knoxville

STBG-SWAP-4040(612)--SG-63

In the city of Knoxville, On Park Lane Dr, Larson St, RockIsland St, 2nd St, and Roche St

Pavement Rehab

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$935,000

$935,000

$935,000

$935,000

$935,000

$935,00045470

Story City

STBG-SWAP-7430(616)--SG-85

In the City of Story City, on Broad Street from Lafayette toGrand

Pavement Rehab, Ped/Bike Paving

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$560,000

$125,000

$125,000

$560,000

$125,000

$125,00036920

Winterset

STBG-SWAP-8497(603)--SG-61

In the city of Winterset, 10th Street Reconstruction, fromIowa 92 and Benton Street.

Pavement Rehab

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$1,300,000

$1,300,000

$1,300,000

$1,300,000

$1,300,000

$1,300,00023591

Boone County

STBG-SWAP-C008(85)--FG-08

On Lower Ledges Rd and E-52, from Lower LedgesEasterly 4.2 Miles to Hwy 17

Pavement Rehab

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$1,500,000

$1,500,000

$1,500,000

$1,500,000

$1,500,000

$1,500,00034906

Marion County

STBG-SWAP-C063(137)--FG-63

On T14, from Pella Corp. Limit to Jasper Co. Line S15 T77R18

Pavement Widening, Shoulder Grading

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$1,200,000

$700,000

$700,000

$1,200,000

$700,000

$700,00034601

Polk County

STBG-SWAP-C077(230)--FG-77

On NE 112 St/Camp Dr/SE 116 St, from Hwy 163 to E CL ofRunnells

Pavement Rehab

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$1,204,000

$1,204,000

$1,204,000

$1,204,000

$1,204,000

$1,204,000

451

Page 459: Iowa Statewide Transportation Improvement Program

RPA 12SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36097

Audubon County

BROS-SWAP-C005(73)--SE-05

On 300th St., Over Troublesome Creek, in NE S7 T78NR34W

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,00041351

Guthrie County

BRS-SWAP-C039(96)--FF-39

On F 25, Over MOSQUITO CREEK, S1 T80 R30

Bridge Replacement

Authorized

5/18/2021

TotalFederal Aid

RegionalSwap

$1,150,000

$1,150,000

$1,150,000

$1,150,000

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

32532

Carroll County

STBG-SWAP-C014(168)--FG-14

On N33, from THE JCT OF E60 AND N33 IN THE TOWNOF DEDHAM, THEN, NORTH 10.4 Miles to JCT US 30

Pavement Rehab/Widen

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$2,800,000

$750,000

$750,000

$2,800,000

$750,000

$750,00032773

Crawford County

STBG-SWAP-C024(126)--FG-24

On E16, from ECL Schleswig East 17.25 Miles toIntersection with Co. Rd. M64

Pavement Rehab

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$4,600,000

$2,000,000

$2,000,000

$4,600,000

$2,000,000

$2,000,000

452

Page 460: Iowa Statewide Transportation Improvement Program

RPA 13SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

23745

Cass County

BROS-SWAP-C015(72)--FE-15

Bridge 208 - On Indian Creek St, from White Pole Rd North0.4 Miles, at S5 T75 R37

Bridge Replacement

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,000

453

Page 461: Iowa Statewide Transportation Improvement Program

RPA 14SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36063

Adair County

BROS-SWAP-C001(113)--SE-01

On 330th St, Over Shanghar Creek, on NLINE S34 T74R32

Bridge Replacement

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$675,000

$675,000

$675,000

$675,00039120

Ringgold County

BROS-SWAP-C080(77)--FE-80

On 200th Street, Over unknown stream, from Hwy P33 0.5miles to Washington 20 bridge S29 T69 R30

Bridge Replacement

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00037356

Union County

BROS-SWAP-C088(65)--FE-88

On H45, Over SMALL STREAM, from P17 west 0.32 Miles,on NLINE S18 T71 R31

Culvert Replacement

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$307,000

$307,000

$307,000

$307,00041342

Adams County

BRS-SWAP-1590(603)--FF-02

On HULL ST, Over STREAM, S34 T72 R34

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$550,000

$550,000

$550,000

$550,00038948

Adams County

BRS-SWAP-C002(78)--FF-02

On H 33, Over MT. ZION BRANCH, from W approach Eastand West Bound 500 Feet to E approach, on NLINE S13T72N R33W

Bridge Replacement

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,000

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

40141

Bedford

STBG-SWAP-0487(604)--SG-87

On State St, from Bedford Coroporate Limits N .32 miles toMain St S26 T68 R34

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$110,000

$110,000

$110,000

$110,000

$110,000

$110,000

454

Page 462: Iowa Statewide Transportation Improvement Program

RPA 15PRF

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36939

Fairfield

NHSN-001-2(35)--2R-51

On Highway 1/South Main, from Fillmore Ave 0.53 miles to300 ft S of Libertyville Rd

Pavement Widening, Ped/Bike Paving

Authorized

11/15/2022

TotalFederal Aid

RegionalSwap

$700,001

$560,000

$560,000

$700,001

$560,000

$560,000PA Note: RPA funding should be debited as follows: $240,000 STBG and $320,000 TAP. DOT funding is programmed as TPMS #38195.

SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36068

Mahaska County

BROS-SWAP-C062(96)--FE-62

On 110th Str., Over Elk Creek, from Int. of Adams Ave and110th East 0.5 Miles to Bridge 238410, along ELINE S7 T77R17

Bridge Replacement, Grading, Right of Way

Authorized

9/15/2020

TotalFederal Aid

RegionalSwap

$700,000

$700,000

$700,000

$700,000

34366

Mahaska County

BROS-SWAP-C062(99)--FE-62

On 335'th Street, Over Cedar Creek, in NW S34 T74NR14W

Bridge Replacement

Authorized

8/17/2021

TotalFederal Aid

RegionalSwap

$850,000

$850,000

$850,000

$850,00021573

Wapello County

BROS-SWAP-C090(80)--SE-90

225th Ave: Over Middle Avery Creek

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$620,000

$620,000

$620,000

$620,000

455

Page 463: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

39432

Fairfield

STBG-SWAP-2465(626)--SG-51

In the city of Fairfield, On 4th Street, from BroadwayAvenue North 0.25 Miles to BNSF Right-of-way

Grade and Pave

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$447,700

$447,700

$447,700

$447,700

$447,700

$447,700PA Note: Includes $30,500 in FY20 for PE and $417,200 in FY21 for construction.

39431

Fairfield

STBG-SWAP-2465(627)--SG-51

In the city of Fairfield, 32nd Street, 250 feet south ofJackpine Loop 0.75 miles to Burlington Avenue S34 T72R10

Grade and Pave

Authorized

3/16/2021

TotalFederal Aid

RegionalSwap

$823,000

$823,000

$823,000

$823,000

$823,000

$823,000

35815

Keokuk County

STBG-SWAP-C054(120)--FG-54

On G29, from THE MAHASKA COUNTY LINE EAST toHIGHWAY 21

Pave

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$1,900,000

$1,900,000

$1,900,000

$1,900,000

$1,900,000

$1,900,000

456

Page 464: Iowa Statewide Transportation Improvement Program

RPA 16SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

34167

Fort Madison

STBG-SWAP-2697(633)--SG-56

In the city of Fort Madison, On AVE H, from 6th Street westto 10th Street

Grade and Pave, Outside Services Engineering, Ped/BikeGrade &amp; Pave

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$2,022,800

$1,011,400

$1,011,400

$2,022,800

$1,011,400

$1,011,400

35817

Lee County

STBG-SWAP-C056(109)--FG-56

On J40, from West Point Corporate Limits east 8.7 Miles toFort Madison Corporate Limits

Pavement Rehab

Authorized

11/18/2020

TotalFederal Aid

RegionalSwap

$3,088,000

$2,300,000

$2,300,000

$3,088,000

$2,300,000

$2,300,000

457

Page 465: Iowa Statewide Transportation Improvement Program

RPA 17SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

37208

Appanoose County

BROS-SWAP-C004(112)--FE-04

On 110th Ave, Over Unnamed Trib to Cooper Crk, from105th Ave South .45 Miles to Zeiss Bridge, on WLINE S8T68N R19W

Bridge Replacement

Authorized

4/20/2021

TotalFederal Aid

RegionalSwap

$400,000

$400,000

$400,000

$400,000

38554

Clarke County

BROS-SWAP-C020(118)--FE-20

On Elk Street, Over North Hoosier Creek

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,00038553

Clarke County

BROS-SWAP-C020(119)--FE-20

1/2 Mi. East of 250th. on Meadow St. Sec. 34, T-73N, R-25W.

Bridge Replacement

Authorized

2/16/2021

TotalFederal Aid

RegionalSwap

$550,000

$550,000

$550,000

$550,00037192

Davis County

BROS-SWAP-C026(112)--SE-26

On Mahogany Ave, 0.2 miles North of 265th St

Bridge Replacement

Authorized

9/15/2020

TotalFederal Aid

RegionalSwap

$600,000

$600,000

$600,000

$600,0003992

Monroe County

BROS-SWAP-C068(86)--SE-68

On 730th Ave, Over Middle Avery Creek, from 189th St N1.3 miles to said bridge S11 T72 R16

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$475,000

$475,000

$475,000

$475,000

458

Page 466: Iowa Statewide Transportation Improvement Program

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

40163

Davis County

STBG-SWAP-C026(121)--FG-26

On 180th Street, from Drakesville Oval west 4.3 miles

Authorized

8/18/2020

TotalFederal Aid

RegionalSwap

$750,000

$750,000

$750,000

$750,000

$750,000

$750,00032177

Decatur County

STBG-SWAP-C027(79)--FG-27

On J 20, from R15 E 7.26 miles to I-35

Pavement Rehab

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$4,100,000

$1,200,000

$1,200,000

$4,100,000

$1,200,000

$1,200,00044691

Decatur County

STBG-SWAP-C027(80)--FG-27

On J 20, from WCL Grand River, Iowa E 0.64 miles to R15

Pavement Rehab

Authorized

6/15/2021

TotalFederal Aid

RegionalSwap

$600,000

$200,000

$200,000

$600,000

$200,000

$200,000

459

Page 467: Iowa Statewide Transportation Improvement Program

RPA 18SWAP-HBP

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

38477

Harlan

BROS-SWAP-3275(604)--SE-83

On North 7th Street, Over Small Stream.

Bridge Replacement

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$1,000,000

$1,000,000

$1,000,000

$1,000,00036432

Harrison County

BROS-SWAP-C043(88)--SE-43

On 280TH ST, Over WILLOW RIVER, 0.8 mi E of NW Cor4-78-43

Bridge Replacement

Authorized

1/20/2021

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,00036207

PottawattamieCounty

BRS-SWAP-C078(199)--FF-78

On M16, Over STREAM, on WLINE S4 T76 R40

Culvert Replacement

Authorized

12/15/2020

TotalFederal Aid

RegionalSwap

$500,000

$500,000

$500,000

$500,000

SWAP-STBG

Project IDSponsor

STIP ID

Project NumberLocation

Work Codes

Approval LevelLetting Date

2021 2022 2023 2024 Totals

36205

PottawattamieCounty

STBG-SWAP-C078(204)--FG-78

On L66, from the Highway 6 Intersection North 6.5 Miles tothe South Intersection of G30

Patching

Authorized

7/20/2021

TotalFederal Aid

RegionalSwap

$6,050,000

$1,250,000

$1,250,000

$6,050,000

$1,250,000

$1,250,000

460