2022-2025
Federal and state laws prohibit employment and/or public accommodation discrimination on the basis of age, color, creed, disability, gender
identity, national origin, pregnancy, race, religion, sex, sexual orientation or veteran’s status. If you believe you have been discriminated against,
please contact the Iowa Civil Rights Commission at 800-457-4416 or Iowa Department of Transportation's affirmative action officer. If you need
accommodations because of a disability to access the Iowa Department of Transportation’s services, contact the agency's affirmative action
officer at 800-262-0003.
Index Introduction .......................................................................... 1 Iowa DOT Programming Process ........................................ 2 Local Sponsor Programming Processes ............................... 4 Federal Transit Administration Programming Process ........ . 5 Financial Analysis ................................................................ 5 Public Participation .............................................................. 11 Changing an Approved STIP .............................................. 12
FHWA and FTA Programs FHWA FTA
Statewide projects ................................................ 14 ........ 314 Ames MPO (AAMPO) ......................................... 22 ........ 315 Cedar Rapids MPO (CMPO) .............................. 27 ........ 319 Council Bluffs MPO (MAPA) ............................. 39 ........ 320 Davenport MPO (Bi-State) ................................. 45 ........ 321 Des Moines MPO (DMAMPO) ........................... 53 ........ 322 Dubuque MPO (DMATS) .................................... 70 ........ 325 Iowa City MPO (MPOJC) .................................... 76 ........ 326 Sioux City MPO (SIMPCO) ................................ 81 ........ 330 Waterloo MPO (INRCOG) .................................. 88 ........ 332 RPA 1 (Upper Explorerland)................................ 94 ........ 335 RPA 2 (NIACOG) ................................................ 105 ........ 336 RPA 3 (NW IA Pl and Dev) ................................. 120 ........ 342 RPA 4 (Siouxland Regional) ................................ 134 ........ 344 RPA 5 (MIDAS) .................................................. 148 ........ 346 RPA 6 (Region 6) ................................................. 160 ........ 348 RPA 7 (IA Northland) .......................................... 172 ........ 349 RPA 8 (ECIA) ...................................................... 185 ........ 350 RPA 9 (Bi-State) .................................................. 197 ........ 351 RPA 10 (ECICOG) .............................................. 204 ........ 355 RPA 11 (CIRTPA) ............................................... 218 ........ 359 RPA 12 (Region XII COG) .................................. 235 ........ 362 RPA 13 (SWIPCO) .............................................. 245 ........ 364 RPA 14 (ATURA)................................................ 258 ........ 366 RPA 15 (Area 15)................................................. 265 ........ 369 RPA 16 (SE IA RPC) ........................................... 277 ........ 371 RPA 17 (Chariton Valley) .................................... 289 ........ 372 RPA 18 (MAPA) .................................................. 300
Appendix
Map: District Transportation Planners ............................. 373Map: Iowa’s Public Transit Systems ................................ 374 Advance Construction Conversion Candidates ................ 375 List of 2021 Authorized Projects ...................................... 378 List of 2021 Let Swap Projects ......................................... 427
Introduction
The 2022-2025 Iowa Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by Title 23 and Title 49, United States Code. The STIP is generated to provide the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) a listing of all projects that are candidates for federal aid from the FHWA and FTA for the four federal fiscal years (FFY) 2022-2025. The STIP was approved by FHWA and FTA on Sept. 21, 2021.
The STIP has been produced based on the current federal transportation bill, passed on December 4, 2015, the Fixing America’s Surface Transportation Act (FAST-Act). Under the FAST-Act FHWA federal funding programs include the National Highway Performance Program (NHPP), National Highway Freight Program (NHFP), Surface Transportation Block Grant Program (STBG), Transportation Alternatives Set-Aside (TAP), Congestion Mitigation and Air Quality Improvement Program (CMAQ), Highway Safety Improvement Program (HSIP), Railway-Highway Crossings, State Planning and Research, and Metropolitan Planning.
Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal aid expenditures, and approvals of metropolitan planning organizations’ (MPOs) transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.
The projects identified in the STIP are the result of statewide and regional efforts conducted by the Iowa DOT and each of Iowa’s Regional Planning Affiliations (RPAs) and MPOs. Projects are arranged according to whether the proposed funding is FHWA or FTA based. Projects are further sorted according to the MPO or RPA in which they reside and the individual program by which they are funded. Each entry shows the expected total
1
project cost, federal aid participation, and an item number to facilitate FHWA and FTA reporting.
In addition to projects with a unique location and sorted according to the process noted above some proposed obligations are identified under a broader category of statewide improvements. These entries are subject to alternate project selection processes and are separated and listed first. Examples of statewide programming entries include the DOT’s Railroad Highway program, the Highway Safety Improvement Program Secondary, Emergency Relief projects, and State Planning and Research funding, among others.
Some projects are identified that have no federal aid proposed. These projects have stood the test of Iowa’s statewide and local public participation processes and are candidates for federal aid if additional funds become available or if project schedules require deferral of candidates presently identified for federal participation. However, all projects included in the STIP, regardless of funding source, are expected to be accomplished in the federal fiscal year (FFY) indicated in the STIP.
Inclusion of a project in the STIP does not guarantee federal aid eligibility for the project. Eligibility for federal aid will be determined on a case-by-case basis when project authorization is requested from the FHWA or FTA.
Iowa DOT Programming Process
The Iowa DOT’s programming process is transparent, aligns available tools and plans, and incorporates appropriate and extensive stakeholder input. The major procedural steps include problem statement development, scoping, project advancement, project prioritization, program synthesis, and final programming. It is important to note that this process is also governed by Iowa’s long range transportation planning documents. As such, projects programmed in the Iowa Transportation Improvement Program (Five-Year Program) and STIP are consistent with Iowa’s long range State Transportation Plan – Iowa in Motion 2045, and several other planning documents, as discussed below. A copy of the State Transportation Plan can be found at:
https://iowadot.gov/iowainmotion/iowa-in-motion-home
The FAST Act continued the provisions for performance-based planning and programming (PBPP) that were established in the prior federal
reauthorization act, Moving Ahead for Progress in the 21st Century (MAP-21). The phase-in of federal PBPP requirements has been ongoing over the past several years. Iowa in Motion 2045 was adopted prior to initial state performance targets being developed; these targets will be included in the next update of the plan. Currently, statewide targets have been set for federally-required measures in the areas of safety (all roads), pavement condition (Interstate and non-Interstate National Highway System (NHS)), bridge condition (NHS), system reliability (Interstate and non-Interstate NHS), freight movement (Interstate), and transit asset management (small urban and rural transit systems).
Additional background on performance measures and targets, links to Iowa DOT performance-based plans, and current Iowa DOT performance targets are available at https://iowadot.gov/systems_planning/planning/federal-performance-management-and-asset-management. Discussion below provides an overview of the various performance-based plans and target-setting processes, and their connection to the investments included in the STIP.
Iowa in Motion 2045 established the following vision for Iowa DOT: “A safe and efficient multimodal transportation system that enables the social and economic well-being of all Iowans, provides enhanced access and mobility for people and freight, and accommodates the unique needs of urban and rural areas in an environmentally conscious manner.” The plan focuses on four investment areas, with a heavy emphasis on stewardship:
• Stewardship through maintaining a state of good repair• Modification through rightsizing the system• Optimization through improving operational efficiency and
resiliency• Transformation through increasing mobility and travel choices
Iowa in Motion 2045 includes analysis and strategies for the various modes of transportation in the state. For highways, this includes considerations related to capacity, mobility and safety, freight, condition, operations, and bridges. Pavement and bridge needs are anticipated to be addressed primarily through asset management as described in the Transportation Asset Management Plan (TAMP), which is highlighted below. The STIP helps to address the following identified needs by including investments that implement applicable strategies.
2
• Capacity needs were identified for three interurban interstate corridors and for several Interstate, NHS, and other State routes in urban areas. Strategies to address these needs include targeting investment toward areas anticipated to become congested by 2045, and considering targeting anticipatory investments at locations with potential congestion issues beyond 2045. Strategies include added capacity and/or operational improvements.
• Mobility and safety, or “Super-2” needs, were identified for five U.S. routes across Iowa, all of which are part of the NHS. Strategies to address these needs include targeting investment toward improvements such as wider paved shoulders, turn lanes, passing lanes, limited access, and geometric improvements. These improvements are largely anticipated to be opportunistic, and are likely to occur at spot locations when other pavement, bridge, or safety issues are being addressed.
• The operations analysis focused on prioritizing interstate corridors from an operations perspective, and implementing appropriate transportation system management and operations (TSMO) strategies on those corridors.
The 2019 Strategic Highway Safety Plan (SHSP) includes engineering strategies to help address issues with lane departure crashes and to improve intersections. These improvements are being implemented as appropriate throughout the State’s highway system. Strategies to help prevent lane departures include the installation of countermeasures such as centerline rumble strips, shoulder/edgeline rumble strips, curve delineation, shoulder treatments, and median cable barriers. Strategies to help improve intersections include implementing innovative improvements such as roundabouts, reduced conflict intersections, diverging diamond interchanges, and offset turn lanes; traffic signal modifications; intersection lighting; and bicycle/pedestrian intersection improvements. The HSIP program of projects included in the STIP has been produced based on the strategies contained in the SHSP and the Iowa DOT’s safety performance measure target setting process. Numerous stakeholder groups, including MPOs, participated in the target setting process. Working in partnership with local agencies, investments have been identified and programmed which will construct effective countermeasures to reduce traffic fatalities and serious injuries. Projects chosen for HSIP investment are based on crash history, roadway characteristics, and the existence of an infrastructure countermeasures that can address the types of crashes
present. The Iowa DOT continues to utilize a systemic safety improvement process rather than relying on “hot spot” safety improvements. Pavement and bridge projects on the Interstate System and non-Interstate NHS are determined in alignment with the Transportation Asset Management Plan (TAMP) and the performance target setting process. The TAMP helps connect the vision of Iowa in Motion 2045 with the projects programmed in the Five-Year Program and STIP. The TAMP describes how the existing highway system is managed. Preserving and improving this system is critical for achieving the system vision. The TAMP also connects Iowa in Motion 2045 and system/modal plans to Iowa DOT’s Five-Year Program and the STIP. Iowa in Motion 2045 defines a vision for the transportation system over the next 20 years, while the Five-Year Program and STIP identify specific investments over the next four to five years. The TAMP has a 10-year planning horizon and helps ensure that investments in the Five-Year Program and STIP are consistent with Iowa DOT’s longer-term vision. Pavement and bridge projects are identified and programmed in the STIP in a manner that is consistent with the strategies identified in the TAMP and the target-setting process. Pavement and bridge target setting involved an internal DOT working group and coordination with MPOs and local owners of NHS assets. The methodology used to set targets used current and historical condition and funding data to forecast future conditions. Asset management focuses on performing the right treatment at the right time to optimize investments and outcomes. The TAMP discusses the major investment categories that the Commission allocates funding through. Once the Commission approves the funding for these categories, Iowa DOT recommends the allocation of the funds to specific projects using the processes described in the TAMP. The TAMP includes a 10-year forecast of funding for pavement and bridge stewardship projects, and funding amounts in the STIP generally align with this forecast. The Iowa DOT strives to maintain the bridge inventory in a condition that provides safe and efficient movement of people and freight. Bridges are managed by using a bridge management process with forecasting capabilities to better identify future needs across the entire inventory. The ability to predict bridge needs beyond a short-term time horizon improves the ability to make better decisions today and predict what funding needs are necessary for a stable bridge inventory. Bridge projects are programmed to help meet the desired program outcomes documented in the TAMP.
3
The Iowa DOT works to provide a safe, serviceable, and sustainable roadway system through the use of its pavement management system. The pavement management system will assist program administrators in the selection of economical options for pavement decisions for the construction, reconstruction, rehabilitation, preservation, and maintenance of pavements. The pavement management system will be used to model and predict future pavements conditions based on various funding levels. This analysis will determine the level of funding to maintain the pavement system in a state of good repair. Pavement projects are programmed to help meet the desired program outcomes documented in the TAMP. Projects focused on improving pavement and bridge condition also often help improve system reliability and freight movement. Additional projects focused specifically on improving these areas of system performance are developed in alignment with the target-setting process for related performance measures, and the freight improvement strategies and freight investment plan included in the State Freight Plan. This plan includes a detailed analysis and prioritization of freight bottlenecks, which are locations that should be considered for further study and possibly for future improvements. A detailed analysis was performed to prioritize the bottlenecks based on their value to the overall system, traffic and infrastructure condition, and travel time performance. The process also involved extensive input from State, MPO, RPA, and industry representatives. State projects identified in the freight investment plan and programmed in the STIP were highly-ranked freight bottlenecks. System reliability and freight target setting involved an internal DOT working group and coordination with MPOs. The methodology used to set targets used current and historical data on condition and funding to forecast future condition. The State Freight Plan identifies several strategies that help direct investments made in the STIP. These include:
• Target investment to address mobility issues that impact freight movements.
• Emphasize the Iowa Multimodal Freight Network and utilize designs that are compatible with significant freight movements.
• Right-size the highway system and apply cost-effective solutions to locations with existing and anticipated issues.
Related to asset management and system resilience, 23 CFR Part 667 requires a periodic evaluation of public roads that have been impacted two
or more times since 1997 by a natural or man-made disaster resulting in an emergency or disaster declared by the Governor or the President and had permanent repairs completed using Federal funds. Any such locations that are targeted for projects to be completed with Federal funds would need to consider reasonable alternatives that could:
1) Reduce the need for Federal funds to be expended on emergency repair and reconstruction activities;
2) Better protect public safety and health and the human and natural environment; and
3) Meet transportation needs as described in the relevant and applicable Federal, State, local, and tribal plans and programs.
Iowa DOT completed this evaluation in November 2020 and identified six state-owned locations and two locally-owned locations that appear to meet the review requirements. With the identification of these eight locations, Iowa DOT will continue to utilize its Project Scoping and Prioritization tool to review these locations in the event a project is being developed within one of the eight identified areas. Iowa DOT will also work with the local asset owners to further review these locations and ensure compliance with the regulations in the event of a project in an identified area. Iowa DOT will continue to monitor all identified damage locations for future ER events and communicate within the department and with other system owners whenever new locations are found to meet the requirements set forth in regulation. The culmination of the DOT efforts outlined above is the approval of the DOT Five-Year Program. This document, approved by the Iowa Transportation Commission, incorporates a five-year plan for transportation investments on the highway system and includes various other modal programs. The current Iowa DOT Five-Year Program can be found at: https://iowadot.gov/program_management/Five-Year-Program
Local Sponsor Programming Processes Projects included in the STIP, but not located on the primary system, are identified and programmed through Iowa’s regional transportation planning process. In February 2018 Iowa’s Transportation Commission approved a Federal Aid Swap policy that allows certain locally sponsored projects to swap targeted federal aid dollars for state Primary Road Fund (PRF) dollars. Specifically, the Federal Aid Swap policy applies to STBG,
4
CMAQ, and HSIP funding targeted to locally sponsored projects. Swap funded projects have been included in the STIP document to provide a comprehensive listing of transportation improvements funded through the state of Iowa’s federal aid apportionments and PRF dollars. Iowa’s 18 RPAs and 9 MPOs annually receive targets of federal STBG funding for which they are responsible for programming. These organizations provide input to the STIP by conducting regional transportation planning efforts including project selection for targeted STBG/Swap funding. Projects identified by each agency are local priorities and are consistent with each agency’s long-range transportation plan. In addition to the STBG/Swap funded projects noted above, the STIP also includes county and city bridge projects funded with federal aid and Swap funding. Swap funds are targeted directly to Iowa’s 99 counties for investment in secondary road bridge infrastructure. The Iowa DOT also administers a city bridge program which makes Swap funding available for investment in municipal bridge projects. City and county bridge projects funded with FHWA or Swap funding are included in MPO and RPA TIPs and carried forward to the STIP. A number of additional grant programs are administered by the Iowa DOT which target FHWA and Swap funding to locally sponsored projects. Funding available to local sponsors includes STBG for TAP type projects, CMAQ, NHFP, HSIP, Recreational Trails, and Swap. The projects selected for funding as part of these grant programs are programmed in MPO and RPA TIPs and included in the STIP.
Federal Transit Administration Programming Process In addition to the FHWA program of projects outlined above, the draft STIP includes all projects for which Federal Transit Administration (FTA) funding may be utilized. The transit portion of the STIP was developed by Iowa’s MPOs and RPAs in cooperation with the state’s large urban, small urban, and regional transit systems. Public transit capital projects included in the STIP align with the transit asset management (TAM) planning and target setting processes undertaken by the Iowa DOT, transit agencies, and MPOs. The Iowa DOT establishes a group TAM plan and group targets for all small urban and rural providers while large urban providers establish their own TAM plans and targets. Investments are made in alignment with TAM plans with the intent of
keeping the state’s public transit vehicles and facilities in a state of good repair and meeting transit asset management targets. The Iowa DOT allocates funding for transit rollingstock in accordance with the Public Transit Management System process. In addition, the Iowa DOT awards public transit infrastructure grants in accordance with the project priorities established in Iowa Code chapter 924. Additional state and federal funding sources that can be used by transit agencies for vehicle and facility improvements are outlined in the funding chapter of the Transit Manager’s Handbook. Individual transit agencies determine the use of these sources for capital and operating expenses based on their local needs. Public transit projects included in the STIP align with the transit safety planning and target setting processes undertaken by the transit agencies and MPOs. While the Iowa DOT provided assistance with the development of initial Public Transportation Agency Safety Plans (PTASPs), each large urban transit provider is responsible for implementing its PTASP, which includes transit safety targets. Investments are made in alignment with PTASPs with the intent of keeping the state’s public transit operations, vehicles, and facilities safe and meeting transit safety targets. State and federal funding sources that can be used by transit agencies for operations, vehicles, and facility improvements are outlined in the funding chapter of the Transit Manager’s Handbook. Individual transit agencies determine the use of these sources for capital and operating expenses based on their local needs.
Financial Analysis The STIP identifies federal aid candidates for roadway, transit, and alternative investments for four federal fiscal years. The amount of FHWA funding considered available for the various apportionment (formula) categories are based on projected apportionments for the upcoming four-year period. For the purpose of fiscally constraining the STIP, FFY 2022-2025 federal aid apportionments have been based on FHWA notification N4510.854 – Fiscal Year 2021 Supplementary Tables. Some projects identified for funding from demonstration or other allocation (nonformula) programs are also included in the STIP. These other categories of funds have been programmed within amounts expected to be available from nonformula sources in the year programmed. The table on page 8 shows proposed FHWA funding by appropriation code and year. Although the programmed amounts may exceed annual apportionments funds carried over from earlier years cover any annual
5
deficits. The table also details estimated advance construction (AC) candidate projects and AC conversions. Additional information regarding the Iowa DOT’s use of the AC provision is provided later in the Financial Analysis section of the STIP. The programmed amounts shown in the fiscal constraint table express project costs in year of expenditure (YOE) dollars. The costs were adjusted to account for inflation by individual project sponsors. The AC provision is an important aspect of Iowa DOT’s cash flow management process that cannot be used effectively without the ability to authorize federal aid candidates and costs that exceed the baseline annual federal aid apportionments. The Iowa DOT maintains a “backlog” of AC projects to optimize federal aid as it relates to DOT funding strategies and revenue streams. This is done so the department can accomplish full recovery of obligation authority at an accelerated rate by converting AC projects against new apportionments for work substantially completed, and accomplishing new projects under the AC umbrella. Furthermore, the use of the AC provision offers the department additional security in ensure all federal aid obligation limitation will be obligated in the FFY it becomes available. The State of Iowa plans to continue this strategy by requesting authorization of many of the federal aid projects identified in the STIP as AC candidates and converting previous AC candidates for reimbursement on completed contracts. A listing of authorized AC candidates is maintained by the FHWA and the Iowa DOT and is included in the appendix. Although federal funds do provide a portion of the funding available for the highway construction program they are not the largest funding component for the Iowa DOT. Federal aid funds are an even smaller portion of local governments’ transportation budgets in Iowa. The table on page 9 demonstrates total nonfederal aid revenues estimated to be available for transportation investments within the four-year STIP period. In addition, the STIP includes information illustrating estimated operations and maintenance costs associated with management of the federal aid system. These amounts are shown on page 10. A comparison of the two tables demonstrates that state and local governments have sufficient nonfederal aid revenues available to cover the estimated cost of maintaining and operating the federal aid system. Furthermore, the state and local transportation revenues documented on page 8 demonstrate that the Iowa
DOT and local project sponsors of federal aid projects have sufficient local funding to meet federal aid matching requirements. The transit program identified in the STIP reflects the majority of transit activities in the state of Iowa. The amount available for FTA programs is based on expected allocations that will not be determined until after FFY 2022 has begun. Projected revenues used for programming (shown in the following table) are based on recent experience. Unlike FHWA programs, whereby the Iowa DOT is sponsor for a significant portion of the proposed expenditures, sponsors for transit activities are local governments and/or the service providers. Although some state funds are distributed to support transit activities, administration of the various programs occurs at the local level. Because costs related to transit capital and operating costs are relatively stable, it is unlikely reduced funding levels can be offset by any potential reductions in project costs. If available funds are less than projected, projects will be deferred or additional nonfederal shares will become the responsibility of the local sponsors. If funding is available beyond levels identified, additional expenditures may be rescheduled from the 2020 proposals. As during previous programming periods, a revised program will be submitted to the FTA if actual allocations differ significantly from current estimates.
6
2022-2025 Statewide Transportation Improvement Program
Estimated FTA Program Summary (x $1,000) Name Funding Source FY22 FY23 FY24 FY25
Metropolitan Planning Program 5303 $157 $157 $157 $157
Statewide Planning Program 5304 $20 $20 $50 $0 Urbanized Area Formula Assistance Program 5307 $36,859 $18,199 $20,620 $21,182 New Fixed Guideway Capital Program 5309 $0 $0 $0 $20,000 Seniors and Persons with Disabilities Program 5310 $2,872 $2,333 $2,586 $2,424 Nonurbanized Area Formula Assistance Program 5311 $17,981 $8,799 $8,079 $7,498
Bus and Bus Facilities Program 5339 $110,455 $16,887 $13,716 $10,124 Public Transit Infrastructure Grant Program (PTIG) PTIG $3,869 $700 $0 $80
State Transit Assistance (STA) STA $15,116 $10,942 $10,596 $10,224 Iowa's Clean Air Attainment Program ICAAP $52 $866 $424 $437 Surface Transportation Block Grant Program STBG $3,040 $3,197 $2,645 $1,400
The above information, when considered with the financial information contained on page 8, demonstrates that the 2022-2025 Iowa STIP is fiscally constrained given currently programmed federal aid amounts, estimated AC conversions, balances of contract authority, and estimated apportionments through FFY 2025.
7
APPROX UNOBLIG EST 2022 EST 2023 EST 2024 EST 2025BALANCE EST 2022 APPROX UNOBLIG FEDERAL-AID EST 2023 FEDERAL-AID EST 2024 FEDERAL-AID EST 2025 FEDERAL-AID
8/19/21 APPORTIONMENT BALANCE AUTHORIZATIONS APPORTIONMENT AUTHORIZATIONS APPORTIONMENT AUTHORIZATIONS APPORTIONMENT AUTHORIZATIONSFormula Fund AuthorizationsNational Highway Performance Program 23,361.0 307,873.0 331,234.0 149,585.0 307,873.0 164,414.0 307,873.0 142,981.0 307,873.0 123,251.0Highway Safety Improvement Program 50,428.0 28,117.0 78,545.0 29,345.0 28,117.0 27,546.0 28,117.0 30,276.0 28,117.0 31,176.0Congestion Mitigation Air Quality 8,070.0 11,796.0 19,866.0 19,377.0 11,796.0 11,842.0 11,796.0 11,138.0 11,796.0 11,436.0Metropolitan Planning 0.0 2,126.0 2,126.0 2,126.0 2,126.0 2,126.0 2,126.0 2,126.0 2,126.0 2,126.0Statewide Planning 15,747.0 10,604.0 26,351.0 2,900.0 10,604.0 2,900.0 10,604.0 2,900.0 10,604.0 2,900.0Railroad Highway 16,621.0 5,696.0 22,317.0 0.0 5,696.0 0.0 5,696.0 0.0 5,696.0 0.0STBG Urbanized 26,034.0 17,064.0 43,098.0 13,872.0 17,064.0 21,086.0 17,064.0 8,873.0 17,064.0 17,636.0STBG 5-200k 167.0 29,987.0 30,154.0 23,449.0 29,987.0 22,526.0 29,987.0 25,523.0 29,987.0 28,457.0STBG <5k 3,734.0 31,531.0 35,265.0 26,565.0 31,531.0 28,437.0 31,531.0 27,098.0 31,531.0 22,611.0STBG Off-System Bridge * 824.0 9,285.0 10,109.0 8,822.0 9,285.0 9,136.0 9,285.0 9,000.0 9,285.0 9,752.0STBG Flex 12,411.0 55,009.0 67,420.0 57,269.0 55,009.0 52,700.0 55,009.0 55,360.0 55,009.0 55,198.0TAP Urbanized 2,557.0 1,019.0 3,576.0 3,183.0 1,019.0 1,861.0 1,019.0 500.0 1,019.0 914.0TAP 5-200k 3,228.0 1,792.0 5,020.0 0.0 1,792.0 0.0 1,792.0 0.0 1,792.0 0.0TAP <5k 6,539.0 1,884.0 8,423.0 0.0 1,884.0 0.0 1,884.0 0.0 1,884.0 0.0TAP Flex * 56.0 4,695.0 4,751.0 0.0 4,695.0 0.0 4,695.0 14,000.0 4,695.0 4,572.0Recreational Trails Program 3,720.0 1,374.0 5,094.0 1,432.0 1,374.0 1,374.0 1,374.0 1,374.0 1,374.0 1,374.0National Highway Freight Program 12,701.0 18,162.0 30,863.0 17,807.0 18,162.0 18,162.0 18,162.0 18,162.0 18,162.0 18,162.0TE and SRTS 3,689.0 0.0 3,689.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total 538,014.0 727,901.0 355,732.0 538,014.0 364,110.0 538,014.0 349,311.0 538,014.0 329,565.0
Allocated Fund AutorizationsDemonstration Funds 87,699.0 87,699.0 31,192.0 0.0 25,000.0 0.0 0.0 0.0 0.0Emergency Relief 16,801.0 16,801.0 16,801.0 0.0 0.0 0.0 0.0 0.0 0.0Highway Infrastructure Program 74,444.0 74,444.0 0.0 0.0 0.0 0.0 0.0 0.0Total 47,993.0 25,000.0 0.0 0.0
Advance Construction CandidatesNational Highway Performance Program 232,163.0 125,624.0 204,311.0 220,119.0Statewide Planning 7,704.0 7,704.0 7,704.0 7,704.0Railroad Highway 5,696.0 5,696.0 5,696.0 5,696.0STBG <5k 18,666.0 0.0 5,000.0 0.0Total 264,229.0 139,024.0 222,711.0 233,519.0
Advance Construction ConversionNational Highway Performance Program 168,500.0 155,000.0 170,000.0 180,000.0Statewide Planning 7,704.0 7,704.0 7,704.0 7,704.0Railroad Highway 5,696.0 5,696.0 5,696.0 5,696.0Congestion Mitigation Air Quality 0.0 0.0 0.0 5,000.0STBG <5k 0.0 5,500.0 5,000.0 10,000.0Total 181,900.0 173,900.0 188,400.0 208,400.0
Total Apportioned Funds 538,014.0 538,014.0 538,014.0 538,014.0Total Authorized Formula Funds & AC Conversions 537,632.0 538,010.0 537,711.0 537,965.0
* STBG Off-System Bridge funding transferred to STBG-Flex and will fund STBG eligible activities* TAP Flex funding transferred to STBG-Flex and will fund TAP and STBG eligible activities
ProgramNational Highway Performance Program M001/M0E1/Z001/Z0E1 STBG <5kHighway Safety Improvement Program LS2E/MS3E/ZS30/ZS3E/MS32 STBG Off-System BridgeCongestion Mitigation Air Quality L400/M400/Z400/Z40E STBG FlexMetropolitan Planning Z45E TAP UrbanizedStatewide Planning M55E/ZS50/ZS5E/H560/L560/L56E/M56E/Z560/Z56E TAP 5-200k
TAP <5kTAP Flex M300/Z300
Recreational Trails Program Z940/Z94E TE and SRTS LU10/LU1E/LU1R/LU20/LU2E/LU2R/LU30/LU3E/LU3R/L22E/L22RSTBG Urbanized L230/L23E/M230/Z230/Z23E Demonstration Funds Q920/HY10/HY20/LY10/LY20/LY30/56C0STBG 5-200k M231/M2E1/Z231/Z2E1 Emergency Relief M9V0/M9VE/09VE/ER50/ER80/ER10/ER11/ER12/ER14/ER60National Highway Freight Program Z460/Z46E Highway Infrastructure Program Z918/Z970/Z910/Z919/Z972/Z911/Z920/Z906/Z921/Z908/Z913/Z922
Z233M240/M24E/Z240/Z24EZ301/Z3E1M302/M3E2/Z302/Z3E2
Railroad Highway LS40/LS4E/MS40/MS4E/ZS40/ZS4E/LS4R/MS50/MS5E/ZS50/ZS5E/H260/Q260/L27R
M303/M3E3/Z303/Z3E3
M232/M2E2/Z232/Z2E2/H200/L200/L20E
2022-2025 Statewide Transportation Improvement ProgramFHWA Program Federal-Aid Summary (x $1000)
Appropriation Codes Program Appropriation Codes
8
2022 2023 2024 2025RPA 1 $58,441,067 $59,609,888 $60,802,086 $62,018,128RPA 2 $103,100,949 $107,224,987 $111,513,986 $115,974,546RPA 3 $103,433,274 $107,570,605 $111,873,429 $116,348,366RPA 4 $59,267,208 $61,637,896 $64,103,412 $66,667,549RPA 5 $66,747,089 $68,082,031 $69,443,671 $70,832,545RPA 6 $52,891,865 $53,949,703 $55,028,697 $56,129,271RPA 7 $72,319,492 $73,765,882 $75,241,199 $76,746,023RPA 8 $76,725,014 $78,259,514 $79,824,704 $81,421,198RPA 9 $34,727,441 $36,116,539 $37,561,200 $39,063,648
RPA 10 $105,620,551 $112,564,851 $117,067,444 $124,809,185RPA 11 $126,358,415 $131,412,752 $136,669,262 $142,136,033RPA 12 $55,081,387 $56,183,015 $57,306,675 $58,452,809RPA 13 $34,832,233 $35,528,877 $36,239,455 $36,964,244RPA 14 $35,001,334 $36,401,388 $37,857,444 $39,371,742RPA 15 $55,251,726 $56,356,761 $57,483,896 $58,633,574RPA 16 $53,971,207 $55,590,344 $57,258,054 $58,975,796RPA 17 $38,023,272 $39,544,202 $41,125,971 $42,771,010RPA 18 $49,876,111 $51,891,106 $52,928,928 $53,987,507
Ames MPO $32,173,396 $33,322,445 $34,471,495 $35,620,545Cedar Rapids MPO $108,265,791 $110,431,107 $112,639,729 $114,892,524
Council Bluffs MPO $19,842,369 $20,239,216 $20,644,001 $21,056,881Davenport MPO $69,091,987 $71,855,667 $74,729,893 $77,719,089
Des Moines MPO $318,118,718 $330,843,467 $344,077,205 $357,840,294Dubuque MPO $20,523,169 $20,933,632 $21,352,305 $21,779,351Iowa City MPO $58,358,982 $60,693,341 $63,121,075 $65,645,918Sioux City MPO $52,827,853 $54,940,967 $57,138,606 $59,424,150Waterloo MPO $53,233,222 $54,297,886 $55,383,844 $56,491,521
Iowa DOT $884,000,000 $886,300,000 $892,500,000 $897,000,000Total Statewide $2,798,105,122 $2,865,548,070 $2,935,387,666 $3,008,773,447
Forecasted Non Federal-aid Revenues
9 9
2022 2023 2024 2025RPA 1 $13,779,768 $14,330,959 $14,904,198 $15,500,365RPA 2 $17,870,481 $18,585,300 $19,328,712 $20,101,861RPA 3 $18,117,618 $18,842,323 $19,596,016 $20,379,856RPA 4 $11,294,605 $11,746,390 $12,216,245 $12,704,895RPA 5 $14,559,910 $15,142,306 $15,747,999 $16,377,919RPA 6 $12,056,987 $12,539,267 $13,040,837 $13,562,471RPA 7 $14,667,246 $15,253,936 $15,864,094 $16,498,657RPA 8 $12,969,020 $13,487,781 $14,027,292 $14,588,383RPA 9 $6,444,588 $6,702,372 $6,970,466 $7,249,285RPA 10 $23,163,570 $24,090,113 $25,053,717 $26,055,866RPA 11 $28,155,055 $29,281,257 $30,452,507 $31,670,607RPA 12 $13,975,349 $14,534,362 $15,115,737 $15,720,366RPA 13 $6,287,258 $8,000,767 $8,320,797 $8,653,629RPA 14 $7,775,650 $8,056,676 $8,410,143 $8,746,549RPA 15 $12,478,145 $13,081,271 $13,604,522 $14,148,702RPA 16 $10,810,706 $11,135,027 $11,469,178 $11,813,151RPA 17 $11,265,330 $11,715,943 $12,184,581 $12,671,964RPA 18 $14,605,478 $14,941,404 $15,285,056 $15,636,613Ames MPO $2,713,586 $2,810,500 $2,907,414 $3,004,328Cedar Rapids MPO $6,449,148 $6,707,114 $6,975,399 $7,254,415Council Bluffs MPO $2,440,852 $2,514,078 $2,589,500 $2,667,185Davenport MPO $3,770,566 $3,921,388 $4,078,244 $4,241,373Des Moines MPO $13,657,340 $14,203,634 $14,771,779 $15,362,651Dubuque MPO $1,557,460 $1,619,759 $1,684,549 $1,751,931Iowa City MPO $4,361,339 $4,535,792 $4,717,224 $4,905,913Sioux City MPO $3,562,255 $3,704,745 $3,852,935 $4,007,052Waterloo MPO $4,757,271 $4,947,562 $5,145,465 $5,351,283Iowa DOT $354,000,000 $364,800,000 $376,700,000 $388,500,000Total Statewide $647,546,581 $671,232,027 $695,014,607 $719,127,270
Forecasted Operations and Maintenance Expenditures on Federal-aid System
1010
Public Participation Iowa’s public involvement procedures for federal aid candidates and other investments encourage public participation in development of transportation policy and project selection. Development of the state’s transportation policy is the responsibility of the Iowa Transportation Commission, a citizen board appointed by the governor. Development of the state’s Five-Year Program is subject to the review and approval of the Iowa Transportation Commission. Public meetings provide opportunities for public input directly to the Iowa Transportation Commission on, at a minimum, a monthly basis. Iowa Transportation Commission meetings are periodically held in locations outside the Iowa DOT's central complex to solicit input concerning its programming decisions. The department also maintains planning, field services coordination, and local systems staff at district offices to facilitate public involvement on a daily basis. As noted earlier, the Iowa DOT develops projects based on an overall investment strategy consistent with the state’s long-range plan. Some programs are intended to address specific aspects of the transportation systems, like highway safety or rail crossing signalization. Many projects and programs are developed to address transportation needs within an investment strategy that focuses portions of available funds toward economic development, maintenance and repairs, or system improvements. Many aspects of the programs, such as the railroad crossing improvements, clean air efforts, some bridge replacements, and highway safety have specific selection/ranking processes that have been adopted by the Iowa DOT to guide commitments of funds. Safety is always a foremost consideration. The approximately 114,000 miles of public roads in Iowa are managed by various government agencies. The Iowa DOT holds jurisdiction over those portions of the system designated the Primary Road System (approximately 9,000 miles), which includes interstates. Other rural roadways are the responsibility of the county governments (approximately 90,000 miles). Cities and towns generally retain jurisdiction over roadways within their corporate limits (approximately 14,000 miles). Roadways on federal properties are under jurisdiction of the respective federal agencies, just as those at state-owned facilities are under the jurisdiction of the various state agencies. Similarly, transit programs are administered by governmental agencies, generally on a city or regional basis.
Selection of projects funded by the FHWA and FTA occur at several levels, all subject to public participation requirements. Local programs are coordinated by MPOs in cities with populations greater than 50,000, and by similar organizations representing the “rural” areas called RPAs. In most situations, projects are initiated by sponsors within the MPO/RPA that are directly responsible for revenues required to match federal aid, providing future maintenance and other support, and accomplishing activities that are not selected for federal aid participation. Maps showing locations of the MPOs and RPAs, transit systems, and Iowa DOT district planners are provided in the appendix. Cities, counties, transit services, and interested individuals assist MPOs and RPAs in developing local improvement programs and transportation services. Each planning organization held public forums to consider FHWA and FTA investments within their areas for the years 2021 through 2024. Written comments and emails could also be submitted. Each group considered proposed expenditures and developed priorities for their area. All are also encouraged to review proposals for improvements on the state system and may propose modifications to programmed projects or identify candidates for future consideration. Subsequently, each MPO and RPA generated a draft TIP, held public meetings to record comments concerning the proposed program, and submitted the final TIP to the Iowa DOT for integration into a draft STIP. The Iowa DOT has also implemented public involvement procedures specific to the STIP. After compiling information contained in the Five-Year Program and MPO/RPA TIPs, an electronic copy of the draft STIP was distributed for public review through placement on the Iowa DOT’s website. Additionally, an Iowa DOT news release was distributed notifying media and the public of the STIP availability. Finally, a special meeting to solicit public input concerning the draft STIP from a statewide perspective was held virtually on Aug. 17, 2021. All comments received by the Iowa DOT from STIP or other public participation activities that relate to state-level programming are provided to the Iowa Transportation Commission for consideration during development of the next Iowa TIP. A compilation of all public comments concerning the Iowa DOT’s program will be available during review of the proposed TIP. Comments regarding projects generated at the local level will be used by the respective MPOs and RPAs during development of future TIPs.
11
Changing an Approved STIP Revisions are defined as changes to a TIP/STIP that occur between scheduled annual updates. There are two types of changes that occur under the umbrella of revision. The first is a major revision or “amendment.” The second is a minor revision or “administrative modification.” The Iowa DOT requires that each MPO or RPA adopt these definitions and thresholds, at a minimum, when determining an amendment vs. an administrative modification. Amendment An amendment is a revision that involves a major change to a project included in the TIP/STIP. This includes an addition or deletion of a project, a major change in the amount of programmed federal aid, or a major change in design concept or scope such as a changing of project termini. Administrative Modification A minor revision to a TIP or STIP is an administrative modification. It includes minor changes or project phase costs, minor changes to funding sources of previously included projects, and minor changes to project or project phase initiation dates. Amendment vs. Administrative Modification There are four main components that can be used to determine whether a project change constitutes an amendment or an administrative modification. They include the following.
Project costs: Determination will be made based on the percentage change or dollar amount of change in federal aid. Projects in which the federal aid has been increased by more than 30 percent or total federal aid increases by $2 million or more will require an amendment. Anything less can be processed as an administrative modification. Schedule changes: Changes in schedules to projects that are included in the first four years of the TIP/STIP will be considered administrative modifications. Projects that are added or deleted from the TIP/STIP will be processed as amendments.
Funding sources: Additional federal funding sources to a project will require an amendment. Changes to funding from one source to another will require an administrative modification. Scope changes: Changing project termini will be processed as an amendment. Other examples of changes that require amendment are changing the type of work from an overlay to reconstruction or changing the number of through lanes.
Procedural Requirements for Revisions Amendments are considered major revisions and therefore have more procedural requirements. Requirements for approving an amendment to the STIP include an opportunity for public input, policy board approval of locally sponsored project amendments, and a redemonstration of fiscal constraint of the STIP. Public involvement for all locally sponsored project amendments will occur at the MPO and RPA level. Statewide public review for Iowa DOT project amendments takes place prior to approval of the amendment in the STIP. Iowa DOT sponsored projects within an MPO must go through the MPO’s adopted amendment process, which includes public review and approval by the appropriate boards and committees. When possible, Iowa DOT amendments within an RPA also go through the RPA’s adopted amendment process. However, this is not required, and in some instances Iowa DOT amendments in RPAs are approved based solely on the statewide public review performed by the Iowa DOT. Administrative modifications have simplified procedures that allow more flexibility in the processing of changes. Each RPA and MPO is allowed to approve administrative modifications by seeking board approval or the planning agency may make minor changes administratively if the process to do so has been documented and approved by the appropriate technical and policy boards. Redemonstration of STIP fiscal constraint may be necessary for certain administrative modifications. Fiscal Constraint – Revisions In order to maintain fiscal constraint of the STIP document most revisions to the STIP that add a new project or increases a project’s federal aid amount will require that a corresponding change be made to another
12
programming entry to ensure that the STIP remains fiscally constrained. This requirement pertains to both administrative modifications and amendments to the STIP and is the responsibility of local project sponsors and local planning agencies for locally administered federal aid projects.
13
0 20
Iowa Department of Transportation
800 Lincoln Way, Ames, IA 50010
Phone: 515-239-1409
40 80 Miles
r----,
L ___ J Counties
14
RPA 0 / StatewideCMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
23405
Iowa Department ofTransportation
22002
STP-A-000s()--22-00
Bus Replacement: Large Urban and Rural Areas
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$3,800,000$3,000,000
$3,800,000$3,000,000
$3,800,000$3,000,000
$3,800,000$3,000,000
$15,200,000$12,000,000
25540
Iowa Department ofTransportation
22003
STP-A-000T()--22-00
Iowa Clean Air Attainment Program
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$5,000,000$2,000,000
$2,000,000
$5,000,000$2,000,000
$2,000,000
$5,000,000$2,000,000
$2,000,000
$15,000,000$6,000,000
$6,000,000
ER
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
15055
Iowa Department ofTransportation
22012
ER-000T()--58-00
STATEWIDE: EMERGENCY RELIEF PROGRAMPROJECTS TO BE DETERMINED
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$16,801,000$16,801,000
$16,801,000$16,801,000
15
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
25371
Iowa Department ofTransportation
22014
HSIP-000T()--2H-00
Statewide Interstate Guardrail Repair
Landscaping
FHWA Approved TotalFederal Aid
RegionalSwap
$1,100,000$990,000
$1,120,000$1,008,000
$1,140,000$1,026,000
$1,140,000$1,026,000
$4,500,000$4,050,000
8109
Iowa Department ofTransportation
22015
HSIP-000T()--2H-00
Statewide Railroad Crossings
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$500,000$450,000
$500,000$450,000
$500,000$450,000
$500,000$450,000
$2,000,000$1,800,000
15169
Iowa Department ofTransportation
22016
HSIP-000T()--2H-00
Statewide safety projects including centerline rumble strips,intersection improvements, and pavement markings
Pave, Traffic Signals, Pavement Markings
FHWA Approved TotalFederal Aid
RegionalSwap
$5,000,000$4,500,000
$28,987,000$26,088,300
$32,000,000$28,800,000
$33,000,000$29,700,000
$98,987,000$89,088,300
16
Iowa Department ofTransportation
22013
RRP-000T()--48-00
Railroad Highway Crossing and Surface Repair Programs
Pavement Rehab, Railroad Signals
FHWA Approved TotalFederal Aid
RegionalSwap
$6,328,622$5,695,760
$6,328,622$5,695,760
$6,328,622$5,695,760
$6,328,622$5,695,760
$25,314,488$22,783,040
ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
49733
Iowa Department ofTransportation
ILL-000T()--94-00
Advance Transportation Lifecycle Digital Delivery andDigital Twins in Iowa
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$1,250,000 $1,250,000
49734
Iowa Department ofTransportation
ILL-000T()--94-00
Collection of unpaved road strength modulus values usingvalidated intelligent compaction
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$1,250,000 $1,250,000
16
MISC
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
13250
Iowa Department ofTransportation
22031
MISC-000T()--XX-00
Allocated Funds: Research, Tech, Min Bus, Seatbelt, UseTax, Inv, NCPD, Etc.
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$2,500,000$2,000,000
$2,500,000$2,000,000
$2,500,000$2,000,000
$2,500,000$2,000,000
$10,000,000$8,000,000
45534
U.S. Fish andWildlife Service
22029
MISC-USFWD1R11()--XX-00
Neal Smith National Wildlife Refuge - Trail Rehabilitation
Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$450,000$450,000
$450,000$450,000
45535
U.S. Fish andWildlife Service
22030
MISC-USFWD1R11()--XX-00
DeSoto NWR Southgate Rec Area Rehabilitation
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$830,000$830,000
$830,000$830,000
NHFP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37003
Iowa Department ofTransportation
22032
INHFP-000T()--0F-00
Linking Iowa's Freight Transportation System
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$2,270,200$1,816,200
$2,270,200$1,816,200
$2,270,200$1,816,200
$6,810,600$5,448,600
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
16884
Iowa Department ofTransportation
22035
IM-000T()--13-00
STATEWIDE INTERSTATE SIGNING
Traffic Signs
FHWA Approved TotalFederal Aid
RegionalSwap
$1,000,000$900,000
$1,000,000$900,000
$1,000,000$900,000
$1,000,000$900,000
$4,000,000$3,600,000
16883
Iowa Department ofTransportation
22036
IM-000T()--13-00
STATEWIDE INTERSTATE LIGHTING
Lighting
FHWA Approved TotalFederal Aid
RegionalSwap
$500,000$450,000
$500,000$450,000
$500,000$450,000
$500,000$450,000
$2,000,000$1,800,000
17
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38343
Iowa Department ofTransportation
IMN-000T()--0E-00
STATEWIDE INTERSTATE PAVEMENT MAINTENANCE
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$9,500,000 $9,500,000 $9,500,000 $9,500,000 $38,000,000
16885
Iowa Department ofTransportation
NHSN-000T()--2R-00
STATEWIDE INTERSTATE REST AREA MAINTENANCE
Rest Area Improvement
DOT Approved TotalFederal Aid
RegionalSwap
$6,000,000 $6,000,000 $6,000,000 $6,000,000 $24,000,000
8114
Iowa Department ofTransportation
STPN-000S ()--2J-00
Statewide Contract Maintenance
Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$35,850,000 $36,350,000 $36,850,000 $37,350,000 $146,400,000
8112
Iowa Department ofTransportation
STPN-000T ()--2J-00
EMERGENCY - CONTINGENCY - U-STEP/C-STEP & TJRESERVE
Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$6,000,000 $6,000,000 $6,000,000 $6,000,000 $24,000,000
8113
Iowa Department ofTransportation
STPN-000T()--2J-00
STATEWIDE TRAFFIC CONTROL DEVICES
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$10,000,000 $10,000,000 $10,000,000 $10,000,000 $40,000,000
14
Iowa Department ofTransportation
STPN-000T()--2J-00
COOPERATIVE CITY/COUNTY/STATE HIGHWAYRESEARCH
Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$1,750,000 $2,000,000 $2,250,000 $2,500,000 $8,500,000
45526
Iowa Department ofTransportation
STPN-000T()--2J-00
POST LETTING PROJECT COST
Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$20,000,000 $20,000,000 $20,000,000 $20,000,000 $80,000,000
13428
Iowa Department ofTransportation
STPN-000T()--2J-00
STATEWIDE ROADSIDE IMPROVEMENTS
Landscaping
DOT Approved TotalFederal Aid
RegionalSwap
$2,500,000 $2,500,000 $2,500,000 $2,500,000 $10,000,000
3
Iowa Department ofTransportation
STPN-000T()--2J-00
STATEWIDE CONSULTANT SERVICES
Outside Services Engineering
DOT Approved TotalFederal Aid
RegionalSwap
$85,000,000 $85,000,000 $85,000,000 $85,000,000 $340,000,000
18
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
33936
Iowa Department ofTransportation
STPN-000T()--2J-00
AMERICANS WITH DISABILITIES ACT
Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$3,000,000 $3,000,000 $3,000,000 $3,000,000 $12,000,000
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36644
Iowa Department ofNatural Resources
22214
NRT-000S(955)--9G-00
Snowmobile Trail Grooming Equipment Purchase
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$300,000$240,000
$300,000$240,000
39451
Iowa Department ofNatural Resources
22213
NRT-000T()--9G-00
On Snow Grooming Equipment
Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$280,000$224,000
$280,000$224,000
48717
Iowa Department ofTransportation
22215
NRT-000T()--9G-00
Support for 2022 Bicycle Summit
Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$7,500$6,000
$7,500$6,000
48718
Iowa Department ofTransportation
22216
NRT-000T()--9G-00
FRT 2022 Committee Expenses
Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$1,250$1,000
$1,250$1,000
38352
Iowa Department ofNatural Resources
22217
NRT-000T(28)--9G-00
Iowa DNR OHV Program - Statewide - Purchase of Mowers
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$74,087$59,087
$74,087$59,087
38353
Iowa Department ofNatural Resources
22218
NRT-000T(29)--9G-00
Iowa DNR OHV Program: Marshall County Nicholson-FordOHV Park: Equipment Maintenance and Storage Building
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$67,712$53,712
$67,712$53,712
40058
Iowa Department ofTransportation
22219
NRT-000T()--9G-00
Federal Recreational Trails Program
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$1,717,704$1,374,000
$1,717,704$1,374,000
$1,717,704$1,374,000
$5,153,112$4,122,000
19
SPR
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
22190
Iowa Department ofTransportation
22223
SPR-000T()--8H-00
SPR; Technology Transfer; DOT Co-op/Intern Program;Management Systems. Snooper Trucks.
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$13,295,056$10,604,000
$13,295,056$10,604,000
$13,295,056$10,604,000
$13,295,056$10,604,000
$53,180,224$42,416,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
8252
Iowa Department ofTransportation
22224
STP-000T()--2C-00
Construction Industry Training Program
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$1,000,000$800,000
$1,000,000$800,000
$1,000,000$800,000
$1,000,000$800,000
$4,000,000$3,200,000
8119
Iowa Department ofTransportation
22225
STP-000T()--2C-00
PREVOCATIONAL TRAINING AND DBE SUPPORTSERVICES
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$360,000$288,000
$360,000$288,000
$360,000$288,000
$360,000$288,000
$1,440,000$1,152,000
9662
Iowa Department ofTransportation
22226
TAP-R- 000T()--8T-00
SCENIC BYWAYS PROGRAM - PROJECTSDETERMINED LATER
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$500,000$400,000
$500,000$400,000
$500,000$400,000
$500,000$400,000
$2,000,000$1,600,000
13745
Iowa Department ofTransportation
22228
STP-000T()--2C-00
Non-Interstate Pavement Modernization
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$140,000,000$80,000,000
$145,000,000$85,000,000
$150,000,000$90,000,000
$435,000,000$255,000,000
25541
Iowa Department ofTransportation
22227
TAP-R-000T()--8T-00
Statewide Transportation Alternatives Program: Projects tobe Determined
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$1,250,000$1,000,000
$1,250,000$1,000,000
$1,250,000$1,000,000
$3,750,000$3,000,000
20
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45486
Iowa Department ofTransportation
22339
TAP-R-000T(136)--8T-00
Iowa Safe Routes to School Partnership
Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$251,319$201,055
$251,319$201,055
45670
Iowa Department ofTransportation
22337
TAP-R-000T(183)--8T-00
Various: Integrated Roadside Vegetation Management
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$732,546$586,037
$732,546$586,037
45671
Iowa Department ofTransportation
22338
TAP-R-000T(184)--8T-00
Iowa Safe Routes to School Partnership
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$276,312$221,050
$276,312$221,050
38407
Iowa Department ofTransportation
22340
TAP-R-TREE(22)--8T-00
Iowa’s Living Roadways Trails Visioning
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$141,000$113,000
$141,000$113,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39497
Iowa Department ofTransportation
HSIP-SWAP-000T()--SJ-00
Statewide HSIP-SWAP Secondary Program
Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$6,000,000
$6,000,000
21
0
Boone
County
Ames Area Metropolitan Planning Organization
515 Clark Avenue, P.O.Box 811, Ames, IA 50010
Phone: 515-239-5165, Fax: 515-239-5142, https://www.cityofames.org
\
2 4 Miles
Story
County
/
�orts � Commercial
- Interstate
- National Highway System
Enhanced - Primary Roads
General Service - Local Roads
El Basic Service
El Local Service Transit rel Regional
[el Large Urban
rel Small Urban
rel Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
22
MPO 22 / AAMPOPL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
34214
MPO 22 / AAMPO
22204
RGPL-PA22(RTP)--PL-85
Trans Planning
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$126,575$101,260
$126,575$101,260
$126,575$101,260
$126,575$101,260
$506,300$405,040
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38031
Iowa Department ofTransportation
BRFN-69()--39-85
US69: GRAND AVE IN AMES 0.1 MI N OF LINCOLN WAY
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$238,000 $238,000
45416
Iowa Department ofTransportation
IMN-35()--0E-85
I-35: US 30 AND CO RD E15 INTERCHANGE RAMPS
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$836,000 $836,000
48489
Iowa Department ofTransportation
NHSN-30()--2R-85
US30: EB EXIT RAMP AT US 69 INTERCHANGE IN AMES
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$100,000 $100,000
45391
Iowa Department ofTransportation
IMN-35()--0E-85
I-35: US 30 TO CO RD D59 (SB)
DOT Approved TotalFederal Aid
RegionalSwap
$2,800,000 $2,800,000
24
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38304
MPO 22 / AAMPO
22229
RGTR-0155()--ST-85
CyRide: Vehicle Replacement
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$850,000$225,000
$225,000
$850,000$225,000
$225,000
37442
MPO 22 / AAMPO
22230
RGTR-0155()--ST-85
CyRide Vehicle Replacement
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$850,000$225,000
$225,000
$850,000$225,000
$225,000
48395
MPO 22 / AAMPO
22232
RGPL-PA22()--ST-85
Ames MPO Planning: STP Funds for TransportationPlanning (LRTP)
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$500,000$400,000
$400,000
$500,000$400,000
$400,000
45238
MPO 22 / AAMPO
22231
RGTR-0155()--ST-85
CyRide: Vehicle Replacement
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$850,000$225,000
$225,000
$850,000$225,000
$225,000
48396
MPO 22 / AAMPO
22233
RGTR-0155()--ST-85
In the city of Ames, CyRide: Vehicle Replacement
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$850,000$225,000
$225,000
$850,000$225,000
$225,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
19249
Ames
22341
TAP-U-0155()--8I-85
In the city of Ames, Ioway Creek: From Skunk River to S.5th St
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$922,000$400,000
$400,000
$922,000$400,000
$400,000
14983
Ames
22342
TAP-U-0155(SE16th)--8I-85
In the city of Ames, Skunk River Trail: From Ioway Creek toEast Lincoln Way
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$521,000$160,000
$160,000
$521,000$160,000
$160,000
DOT Note: Project eligible for FHWA TAP funding
25
SWAP-CMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48394
Ames
ICAAP-SWAP-0155()--SH-85
In the city of Ames, Second Phase Deployment AmesTraffic Signal Master Plan
Traffic Signals
DOT Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$1,750,000
$1,400,000
$1,750,000
$1,400,00045239
Ames
ICAAP-SWAP-0155(702)--SH-85
In the city of Ames, First Phase Deployment Ames TrafficSignal Master Plan
Traffic Signals
DOT Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$1,470,685
$1,176,548
$1,470,685
$1,176,548
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36919
Ames
STBG-SWAP-0155(705)--SG-85
In the city of Ames, On Cherry Avenue, from E Lincoln WaySouth .4 Miles to Southeast 5th Street,
Grade and Pave
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$2,400,000
$1,890,000
$1,890,000
$2,400,000
$1,890,000
$1,890,00038303
Ames
STBG-SWAP-0155(706)--SG-85
In the city of Ames, On Stange Rd and 24TH ST, fromBlankenburg Dr North .4 Miles to 24th ST and East .8 Milesto RR,
Grade and Pave
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$4,200,000
$1,600,000
$1,600,000
$4,200,000
$1,600,000
$1,600,000
35616
Ames
STBG-SWAP-0155(707)--SG-85
In the city of Ames, On North Dakota Avenue, from OntarioStreet North 0.17 Miles to Union Pacific Railroad Tracks
Pave
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$1,500,000
$900,000
$900,000
$1,500,000
$900,000
$900,00045233
Ames
STBG-SWAP-0155()--SG-85
In the city of Ames, on Lincoln Way, from Dotson Dr to SFranklin Ave
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$2,400,000
$1,686,000
$1,686,000
$2,400,000
$1,686,000
$1,686,00048397
Ames
STBG-SWAP-0155()--SG-85
In the city of Ames, On S 16TH ST, from University Blvd toApple Pl
Pavement Widening
DOT Approved TotalFederal Aid
RegionalSwap
$3,880,000
$2,814,000
$2,814,000
$3,880,000
$2,814,000
$2,814,000
26
Corridor Metropolitan Planning Organization
101 First Street SE, Cedar Rapids, IA 52401
Phone: 319-286-5041, Fax: 319-286-5130, www.corridormpo.com
Benton
County
l
�l ' �L>'
•
/ ,h
Mar
10
Cedar, .
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
General Service - Local Roads -+
-Ramps
� -I I 1-t
Fairfax
/
Basic Service
El Local Service Transit rel Regional
-Trails
-+- Railroad
l
Walford l
D;<
N
0 2 4
l
T
8 Miles
Johnson
County
rel Large Urban
rel Small Urban
rel Intercity Bus
C[I Amtrak
I Park & Ride
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
27
MPO 23 / CMPOCMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
6695
Cedar Rapids
22004
STP-A-1187(652)--22-57
In the City of Cedar Rapids, COLLINS RD: C AVEINTERSECTION
Pavement Widening
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$197,000$157,000
$197,000$157,000
PA Note: FA will be used for advanced right-of-way acquisition.
DOT Note: Total grant amount of $1,400,000. $1,243,078.57 already autnorized.
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48579
Iowa Department ofTransportation
22017
HSIPX-30()--3L-57
US30: IN CEDAR RAPIDS, FROM CIC RR TO CEDARRIVER TRAIL
Guardrail
FHWA Approved TotalFederal Aid
RegionalSwap
$750,000$675,000
$750,000$675,000
NHFP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39426
Cedar RapidsAirport Commission
22033
NHFP-CRAC(001)--2F-57
In the City of Cedar Rapids, Air Cargo Logistics Facility atEastern Iowa Airport
Buildings
FHWA Approved
11/16/2020
TotalFederal Aid
RegionalSwap
$1,150,000$925,000
$1,150,000$925,000
29
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38070
Iowa Department ofTransportation
22037
IM-380()--13-57
I-380: TOWER TERRACE INTERCHANGE IN HIAWATHA(STATE SHARE)
Grade and Pave, Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$15,779,000$14,201,100
$15,779,000$14,201,100
48523
Iowa Department ofTransportation
22038
NHSX-30()--3H-57
US30: IN CEDAR RAPIDS FROM MORGAN CREEK TOSTONEY POINT RD
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,600,000$2,880,000
$3,600,000$2,880,000
48531
Iowa Department ofTransportation
22039
IM-380()--13-57
I-380: BOYSON RD INTERCHANGE IN HIAWATHA
Grade and Pave, Bridge Replacement, Traffic Signs
FHWA Approved TotalFederal Aid
RegionalSwap
$20,602,000$18,541,800
$20,602,000$18,541,800
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
17107
MPO 23 / CMPO
22205
RGPL-PA23()--PL-00
MPO: Planning Funds
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$449,841$299,841
$374,841$299,841
$374,841$299,841
$374,841$299,841
$1,574,364$1,199,364
30
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48603
Iowa Department ofTransportation
IMN-380()--0E-57
I-380: MITIGATION FOR TOWER TERRACE RDINTERCHANGE, BOYSON RD INTERCHANGE ANDMAINLINE I-380
Wetland Mitigation
DOT Approved TotalFederal Aid
RegionalSwap
$31,000 $31,000
48506
Iowa Department ofTransportation
NHSN-922()--2R-57
IA922: IN CEDAR RAPIDS, FROM 6TH ST W TO THECEDAR RIVER
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,800,000 $1,800,000
39284
Iowa Department ofTransportation
BRFN-30()--39-57
US30: UP RR 1.6 MI W OF E JCT US 218 (WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,762,000 $1,762,000
39286
Iowa Department ofTransportation
IMN-380()--0E-57
I-380: SB REST AREA 3.0 MI S OF CEDAR RAPIDS
Grade and Pave, Rest Area Improvement
DOT Approved TotalFederal Aid
RegionalSwap
$4,336,000 $1,891,000 $6,227,000
39287
Iowa Department ofTransportation
IMN-380()--0E-57
I-380: CC RR AND ASH PIT 2.9 MI S OF IA 100 IN CEDARRAPIDS (NB & SB)
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$1,400,000 $1,400,000
45259
Iowa Department ofTransportation
BRFN-30()--39-57
US30: CIC RAILWAY 0.8 MI W OF I-380 IN CEDARRAPIDS (EB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,340,000 $1,340,000
45434
Iowa Department ofTransportation
IMN-380()--0E-57
I-380: BLAIRS FERRY RD 0.6 MI N OF IA 100
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$810,000 $810,000
45295
Iowa Department ofTransportation
IMN-380()--0E-57
I-380: 27TH AVE 1.7 MI N OF US 30
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$444,000 $444,000
48454
Iowa Department ofTransportation
BRFN-100()--39-57
IA100: CENTER POINT RD 0.2 MI E OF I-380
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,210,000 $1,210,000
31
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36958
MPO 23 / CMPO
22242
RGTR-PA23()--ST-57
In the City of Marion bus stop improvements located onnon-local roads.
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$394,000$315,000
$315,000
$394,000$315,000
$315,000
38373
MPO 23 / CMPO
22245
RGTR-PA23()--ST-57
Purchase 1 medium-duty 33' replacement ADA paratransitservice bus.
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$216,000$172,000
$172,000
$216,000$172,000
$172,000
PA Note: Replacing bus numbers 2403
38374
MPO 23 / CMPO
22246
RGTR-PA23()--ST-57
CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$1,084,000$866,000
$866,000
$1,084,000$866,000
$866,000
PA Note: Replacing bus numbers 2093 and 2094.
36995
Cedar Rapids
22239
STP-U-1187(796)--70-57
Lindale Trail Ext ph2 from Council St NE along abandonedrailway to 51st St & the CVNT Trail near Hwy 100
Ped/Bike ROW, Ped/Bike Grade & Pave, Ped/BikeMiscellaneous
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$1,190,000$950,000
$950,000
$1,190,000$950,000
$950,000
29791
Marion
22248
STP-U-4775(631)--70-57
10TH ST, Over Indian Creek, from the to be built TowerTerrace Rd South 2.1 M to Boyson Trail north of 8th Ave.
Ped/Bike Grade & Pave, Ped/Bike Structures,Ped/Bike Development
FHWA Approved
7/19/2022
TotalFederal Aid
RegionalSwap
$2,643,000$2,070,000
$2,070,000
$2,643,000$2,070,000
$2,070,000
PA Note: Project authorized for $223,479; total STIP limit 2,294,000.
38368
Cedar Rapids
22250
TAP-U-1187()--8I-57
On EDGEWOOD RD NE,from the north side of theEdgewood Rd Bridge to the ext.trail aprox 1K' north.
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$200,000$160,000
$160,000
$200,000$160,000
$160,000
30992
Cedar Rapids
22236
TAP-U-1187(786)--8I-57
CeMar Cedar Rapids Phase 4-Lindale Connector,MarionCity Limit N to Hwy100 and Lindale Mall Shopping Centers
Ped/Bike ROW, Ped/Bike Grade & Pave, Ped/BikeStructures
FHWA Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,827,000$1,457,000
$1,457,000
$1,827,000$1,457,000
$1,457,000
35691
Cedar Rapids
22251
TAP-U-1187(792)--8I-57
Lindale Trl Ext from existing trail along &under Blairs FerryRd. Along abandoned Rail to Council Street NE
Ped/Bike ROW, Ped/Bike Grade & Pave, Ped/BikeStructures
FHWA Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$2,183,000$1,663,000
$1,663,000
$2,183,000$1,663,000
$1,663,000
32
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
PA Note: Project authorized for $139,000 in STBG, total STBG STIP limit is $1,802,000; project authorized for $261,000 in TAP total STIP limit is $261,000.
DOT Note: Project eligible for FHWA TAP funding
25525
Cedar Rapids
22237
TAP-U-1187(793)--8I-57
In the city of Cedar Rapids, On EDGEWOOD RD NE, fromGlass Rd NE to approx 350' S of Blairs Ferry Rd NE
Ped/Bike Grade & Pave, Ped/Bike Structures
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$2,240,000$1,792,000
$1,792,000
$2,240,000$1,792,000
$1,792,000
PA Note: Project has $1,317,000 in STBG and $475,000 in STBG-TAP
38370
Cedar Rapids
22249
TAP-U-1187(811)--8I-57
In the city of Cedar Rapids, On EDGEWOOD RD BridgeNE, widen existing ped bridge to 8' for trail development.
Ped/Bike Structures
FHWA Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$825,000$660,000
$660,000
$825,000$660,000
$660,000
38371
Cedar Rapids
22238
TAP-U-1187(813)--8I-57
W side of WILEY BLVD SW,from 16th Ave to Williams BlvdSW incd all req intersection improvements.
Traffic Signals, Ped/Bike Grade & Pave, Ped/BikeMiscellaneous
FHWA Approved
7/19/2022
TotalFederal Aid
RegionalSwap
$1,715,000$1,372,000
$1,372,000
$1,715,000$1,372,000
$1,372,000
PA Note: Project has $227,000 in TAP and $1,145,000 in STBG
39557
Marion
22257
TAP-U-4775(639)--8I-57
In the city of Marion, From City Limits E under Hwy 100Bridge over Indian Creek to Grand Ave spur
Ped/Bike ROW, Ped/Bike Grade & Pave, Ped/BikeStructures
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$1,905,000$1,216,000
$1,216,000
$1,905,000$1,216,000
$1,216,000
39453
Linn CountyConservation Board
22240
TAP-U-C057()--8I-57
Worcester Rd W to 80th St NW, then N until Ellis Rd thenalong Hwy 100 and abandoned rail ROW to Covington Rd
Ped/Bike ROW, Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$875,000$700,000
$700,000
$2,172,000$709,000
$709,000
$3,047,000$1,409,000
$1,409,000
PA Note: Project has $700,000 of TAP in FFY22 for advanced ROW. Project also has $709,000 of STBG in FFY23.
36938
Linn CountyConservation Board
22241
TAP-U-C057(141)--8I-57
42nd ST N along Preserve Ln to Rock Island Preservealong abandoned rail aprox 250' E of Cedar River
Ped/Bike ROW, Ped/Bike Grade & Pave, Ped/BikeStructures
FHWA Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$908,000$726,000
$726,000
$908,000$726,000
$726,000
38775
MPO 23 / CMPO
22243
RGTR-PA23()--ST-57
CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$1,116,000$893,000
$893,000
$1,116,000$893,000
$893,000
PA Note: Replacing bus numbers 2131 and 2132.
33
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39454
MPO 23 / CMPO
22244
RGTR-PA23()--ST-57
Purchase 1 medium-duty 33' replacement ADA paratransitservice bus.
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$215,000$172,000
$172,000
$215,000$172,000
$172,000
PA Note: Replacing bus numbers 875
39455
Cedar Rapids
22234
TAP-U-1187()--8I-57
In the city of Cedar Rapids, Filling sw gaps b/w O & 16 Ave& add bus pads at stops & 4 benches & 2 shelters
Ped/Bike Grade & Pave, Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$554,000$325,000
$325,000
$554,000$325,000
$325,000
36965
Cedar Rapids
22252
TAP-U-1187(801)--8I-57
In the city of Cedar Rapids, Frm Midway Dr along VintonDitch to E Ave alg E Ave to Vinton Dth, to & alg F Ave to 13St
Ped/Bike Grade & Pave, Ped/Bike Structures
FHWA Approved
11/15/2022
TotalFederal Aid
RegionalSwap
$2,052,000$1,467,000
$1,467,000
$2,052,000$1,467,000
$1,467,000
45503
MPO 23 / CMPO
22253
RGTR-PA23()--ST-57
CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$1,116,000$893,000
$893,000
$1,116,000$893,000
$893,000
PA Note: Replacing bus numbers 2133 and 2134
45504
MPO 23 / CMPO
22254
RGTR-PA23()--ST-57
Linn County LIFTS Bus 2024
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$215,000$172,000
$172,000
$215,000$172,000
$172,000
PA Note: Replacing bus number 2876
29793
Cedar Rapids
22235
TAP-U-1187(819)--8I-57
Bowling St from 33rd Ave N to 21st Ave a 10' Trail. From 21st Ave to A Ave on Bowling ST &21st Ave 6' sidewalk &on-st.
Ped/Bike Grade & Pave, Ped/Bike Development
FHWA Approved
11/15/2022
TotalFederal Aid
RegionalSwap
$760,000$608,000
$608,000
$760,000$608,000
$608,000
PA Note: _
DOT Note: Project eligible for FHWA TAP funding
39452
Fairfax
22247
TAP-U-2462()--8I-57
On E CEMETERY RD, from Driftwood Ln E to Fairfax CityLimits
Ped/Bike ROW, Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$1,071,000$857,000
$857,000
$1,071,000$857,000
$857,000
34
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45506
Robins
22256
TAP-U-6520()--8I-57
In the city of Robins, On W MAIN ST, from N. Center PointRd SE to the Cedar Valley Nature Trail
Ped/Bike Grading
FHWA Approved TotalFederal Aid
RegionalSwap
$1,075,000$860,000
$860,000
$1,075,000$860,000
$860,000
PA Note: Project has $28,000 TAP in FFY24 and $832,000 STBG in FFY24
48404
MPO 23 / CMPO
22260
RGTR-PA23()--ST-57
Purchase 1 medium-duty 33' replacement ADA paratransitservice bus.
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$220,000$148,000
$148,000
$220,000$148,000
$148,000
48405
MPO 23 / CMPO
22261
RGTR-PA23()--ST-57
CR Transit two Heavy-Duty (35' diesel) Bus Replacements
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$1,149,000$767,000
$767,000
$1,149,000$767,000
$767,000
45505
Cedar Rapids
22255
TAP-U-1187()--8I-57
In the city of Cedar Rapids, On Cottage Grove Ave SE,from CeMar Trail SE to East Post Road
Ped/Bike ROW, Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$2,828,000$1,207,000
$1,207,000
$2,828,000$1,207,000
$1,207,000
48390
Cedar Rapids
22258
TAP-U-1187()--8I-57
In the city of Cedar Rapids, 0.65 miles of 12’ paved trailbtwn 9th Ave SE and Cedar River Trail along old RR grade.
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$1,088,000$164,000
$164,000
$1,088,000$164,000
$164,000
48391
Marion
22259
TAP-U-4775()--8I-57
In the city of Marion, Lucore Rd sidepath connection on Eside, build ped bridge over Indian Creek, to Indian Creek Rd
Ped/Bike Grade & Pave, Ped/Bike Structures
FHWA Approved TotalFederal Aid
RegionalSwap
$842,000$127,000
$127,000
$842,000$127,000
$127,000
35
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48392
Cedar Rapids
22344
TAP-U-1187()--8I-57
In the city of Cedar Rapids, Sidewalk along Stoney Pointand crossing F Ave to connect to Jacolyn Dr
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$480,000$240,000
$240,000
$480,000$240,000
$240,000
36964
Cedar Rapids
22343
TAP-U-1187()--8I-57
F Ave NW from 13th St NW to the Cedar River;Along theRiver N to I Ave NW & S to 1st Ave W
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$2,262,000$1,800,000
$1,800,000
$2,262,000$1,800,000
$1,800,000
PA Note: Project includes TAP $56K and STBG $1,744K
DOT Note: Project eligible for FHWA TAP funding
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48715
Cedar Rapids
BHM-SWAP-1187()--SA-57
In the city of Cedar Rapids, On 8TH AVE SW, Over CEDARRIVER, S28 T83 R07
Bridge Replacement - Other
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
36
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48679
Cedar Rapids
STBG-SWAP-1187()--SG-57
In the city of Cedar Rapids, and Marion, On Tower TerraceRoad, from E of Meadowknolls Rd to Alburnett Rd
Grade and Pave, Ped/Bike Grade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,330,000
$1,064,000
$1,064,000
$1,330,000
$1,064,000
$1,064,000PA Note: Previously TPMS #25545
48680
Cedar Rapids
STBG-SWAP-1187()--SG-57
In the city of Cedar Rapids, On Tower Terrace Road, fromE of C Ave to E of Meadowknolls Rd
Grade and Pave, Ped/Bike Grade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,058,000
$846,000
$846,000
$1,058,000
$846,000
$846,000PA Note: Previously TPMS #25545
48682
Cedar Rapids
STBG-SWAP-1187()--SG-57
In the city of Cedar Rapids, Rndabt at TT Rd NE & C AveNE, on C Ave from Sheffield Dr NE to N of St. Mark’sDriveway
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,579,000
$1,263,000
$1,263,000
$1,579,000
$1,263,000
$1,263,000
PA Note: Previously TPMS #25544
38366
Cedar Rapids
STBG-SWAP-1187(804)--SG-57
In the city of Cedar Rapids, Connect 6th ST at B Ave NW toEllis Blvd and E Ave NW.
Grade and Pave, Ped/Bike Grade & Pave
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$4,690,000
$1,808,000
$1,808,000
$4,690,000
$1,808,000
$1,808,00048681
Cedar Rapids
STBG-SWAP-1187()--SG-57
In the city of Cedar Rapids, On Tower Terrace Road, fromE of C Ave to E of Meadowknolls Rd
Grade and Pave, Ped/Bike Grade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$897,000
$717,000
$717,000
$897,000
$717,000
$717,000PA Note: Previously TPMS #25545
48683
Cedar Rapids
STBG-SWAP-1187()--SG-57
In the city of Cedar Rapids, Rndabt at TT Rd NE & C AveNE, on C Ave from Sheffield Dr NE to N of St. Mark’sDriveway
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$2,172,000
$1,737,000
$1,737,000
$2,172,000
$1,737,000
$1,737,000
PA Note: Previously TPMS #25544
34199
Cedar Rapids
STBG-SWAP-1187(785)--SG-57
On the proposed Tower Terrace rd, construct TowerTerrace from C Ave to Sumerset Ave
Grade and Pave, Sanitary Sewer, Ped/Bike Grade &Pave
DOT Approved
10/18/2022
TotalFederal Aid
RegionalSwap
$2,303,000
$836,000
$836,000
$2,303,000
$836,000
$836,000
37
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45508
Marion
STBG-SWAP-4775()--SG-57
In the city of Marion, On 7th Ave, from 12th ST E to 22nd St
Pavement Rehab/Widen, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,480,000
$903,000
$903,000
$2,451,000
$2,391,000
$2,391,000
$7,931,000
$3,294,000
$3,294,000PA Note: Project has $903K STBG in FFY24 for design and $2,391K STBG in FFY25
38
0
Metropolitan Area Planning Agency
2222 Cuming Street, Omaha, NE 68102
Phone: 402-444-6866, Fax: 402-951-6517, www.mapacog.org
I +-_._-I-
Dodge
County
Saunders
County
8 Miles
Washington
County
Cass
County
Pottawattamie
County
Iowa
Mills
County
�
I
�orts - Interstate
� Commercial - National Highway System
El Enhanced - Primary Roads
El General Service - Local Roads
El Basic Service
El Local Service Transit rel Regional
[el Large Urban
rel Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
39
MPO 24 / MAPADEMO
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
35678
Council Bluffs
22006
HDP-1642(685)--71-78
In the city of Council Bluffs, On STEVENS ROAD, fromState Orchard Road to Intersection with Norwood Drive S33T75 R43
Right of Way, Outside Services Engineering
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$2,106,810$1,685,490
$441,290
$2,106,810$1,685,490
$441,290
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48580
Iowa Department ofTransportation
22018
IHSIPX-80()--08-78
I-80: FRANKLIN AVE BRIDGES TO CO RD G30INTERCHANGE
Guardrail
FHWA Approved TotalFederal Aid
RegionalSwap
$1,900,000$1,710,000
$1,900,000$1,710,000
41
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38153
Iowa Department ofTransportation
22042
IM-80()--13-78
I-80: I-29/80/480 INTERSTATES IN COUNCIL BLUFFS(CBIS) STATE SHARE
Bridge Replacement, Lighting, Traffic Signs
FHWA Approved TotalFederal Aid
RegionalSwap
$60,242,200$54,184,700
$1,768,000
$3,280,000$2,952,000
$1,768,000
$4,180,000$3,762,000
$1,768,000
$67,702,200$60,898,700
$5,304,000
48565
Iowa Department ofTransportation
22043
IM-80()--13-78
I-80: MADISON AVE INTERCHANGE IN COUNCILBLUFFS
Grade and Pave, Bridge Replacement
FHWA Approved TotalFederal Aid
RegionalSwap
$5,000,000$4,500,000
$37,752,000$33,976,800
$1,768,000
$42,752,000$38,476,800
$1,768,000
48592
Iowa Department ofTransportation
22044
IMX-29()--02-78
I-29: CC RR 2.1 MI N OF US 6 IN COUNCIL BLUFFS (SB)
Bridge Rehabilitation, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,038,000$1,834,200
$2,038,000$1,834,200
48597
Iowa Department ofTransportation
22045
IMX-29()--02-78
I-29: 25TH ST 1.0 MI S OF N 16TH ST IN COUNCILBLUFFS (NB & SB)
Bridge Rehabilitation, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,845,000$1,660,500
$1,845,000$1,660,500
45310
Iowa Department ofTransportation
22040
IMX-680()--02-78
I-680: AT W JCT I-29 (EB & WB)
Bridge Deck Overlay
FHWA Approved TotalFederal Aid
RegionalSwap
$1,894,000$1,704,600
$1,894,000$1,704,600
48510
Iowa Department ofTransportation
22041
IMX-80()--02-78
I-80: FRANKLIN AVE TO US 6 IN COUNCIL BLUFFS
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,500,000$3,150,000
$3,500,000$3,150,000
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
29733
MPO 24 / MAPA
22206
RGPL-PA24()--PL-78
UZA of Pottawattamie County including the City of CouncilBluffs
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$144,567$115,567
$144,567$115,567
$144,567$115,567
$144,567$115,567
$578,268$462,268
42
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38013
Iowa Department ofTransportation
BRFN-275()--39-78
US275: MISSOURI RIVER IN COUNCIL BLUFFS (STATESHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$57,000 $57,000 $57,000 $57,000 $228,000
38123
Iowa Department ofTransportation
IMN-480()--0E-78
I-480: MISSOURI RIVER IN COUNCIL BLUFFS (STATESHARE)
Bridge Deck Overlay, Bridge Painting, Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$30,000 $3,131,000 $30,000 $30,000 $3,221,000
38124
Iowa Department ofTransportation
IMN-680()--0E-78
I-680: MISSOURI RIVER IN COUNCIL BLUFFS (STATESHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$48,000 $48,000 $48,000 $48,000 $192,000
38118
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: MISSOURI RIVER IN COUNCIL BLUFFS (EB & WB)(STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$42,000 $42,000 $42,000 $42,000 $168,000
48535
Iowa Department ofTransportation
STPN-80()--2J-78
I-80: US 6 IN COUNCIL BLUFFS TO JORDAN CREEK
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000 $1,000,000 $1,000,000 $3,500,000
45270
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: 24TH ST TO INDIAN CREEK IN COUNCIL BLUFFS
Grading
DOT Approved TotalFederal Aid
RegionalSwap
$1,750,000 $1,750,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48688
MPO 24 / MAPA
22262
STP-U-PA24()--70-78
Travel demand management planning
Planning Study
FHWA Approved TotalFederal Aid
RegionalSwap
$31,250$25,000
$25,000
$31,250$25,000
$25,000
43
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48689
Carter Lake
22346
TAP-T-1142()--8V-78
In the city of Carter Lake, connecting existing trail segmentsas shown in the map
Outside Services Engineering
FHWA Approved TotalFederal Aid
RegionalSwap
$40,000$32,000
$360,000$288,000
$400,000$320,000
35677
Council Bluffs
22345
TAP-T-1642(681)--8V-78
In the city of Council Bluffs, On Railroad Ave, fromKanesville Blvd N 1.03 Miles to Council Bluffs CorporateLimits
Ped/Bike Grade & Pave
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$613,000$490,000
$490,000
$613,000$490,000
$490,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
34126
Council Bluffs
STBG-SWAP-1642(686)--SG-78
In the city of Council Bluffs, On S EXPRESSWAY, from I-80N .7 Miles to 21st Avenue
Pavement Rehab, Sanitary Sewer
DOT Approved
5/17/2022
TotalFederal Aid
RegionalSwap
$3,260,815
$3,260,000
$3,260,000
$3,260,815
$3,260,000
$3,260,00025419
Council Bluffs
STBG-SWAP-1642()--SG-78
In the city of Council Bluffs, On W Graham Ave, from HighStreet to Fairmount Ave
Grade and Pave, Sanitary Sewer
DOT Approved TotalFederal Aid
RegionalSwap
$3,006,000
$2,405,000
$2,405,000
$3,006,000
$2,405,000
$2,405,00034125
Council Bluffs
STBG-SWAP-1642()--SG-78
On N 16TH ST, from Avenue G 1 miles to Nash Blvd
Pavement Rehab, Sanitary Sewer
DOT Approved TotalFederal Aid
RegionalSwap
$5,683,000
$4,546,000
$4,546,000
$5,683,000
$4,546,000
$4,546,00036984
Council Bluffs
STBG-SWAP-1642()--SG-78
In the city of Council Bluffs, On Hwy 192, from 21st AvenueNorth 1972 Feet to 16th Avenue
Grade and Pave, Sanitary Sewer
DOT Approved TotalFederal Aid
RegionalSwap
$5,660,000
$4,528,000
$4,528,000
$5,660,000
$4,528,000
$4,528,000
44
6 I
0 2
Bi-State Regional Commission
1504 Third Avenue, Third Floor, Rock Island, IL 61201-8612
Phone: 309-793-6300, Fax: 309-793-6305, www.bistateonline.org
Scott
ave
I I
4 8 Miles
Iowa
�-r�
_,., /, ,, 92 �
( ' ,I' -1
■-■
Rock
· · Island67
Oak,Grove
f
Rock Island
County Illinois )
�orts - Interstate
� Commercial - National Highway System
El Enhanced - Primary Roads
El General Service - Local Roads
-Ramps
-Trails
Basic Service
El Local Service Transit
� ......... m,-... �=:
j rel Regional -+- Railroad
Henry
County
[el Large Urban
rel Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Rivers
Major Lakes
C] MPO Planning Arear--1 L._ _ _J Counties
City Limits
Urban Area
45
MPO 25 / BSRCNHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38155
Iowa Department ofTransportation
22047
IM-NHS-74()--03-82
I-74: IN BETTENDORF AND DAVENPORT (CENTRALSECTION) STATE SHARE
Bridge Replacement, Bridge Removal, Landscaping
FHWA Approved TotalFederal Aid
RegionalSwap
$56,214,000$47,781,900
$56,214,000$47,781,900
45421
Iowa Department ofTransportation
22049
IMX-74()--02-82
I-74: 0.4 MI S OF I-80 TO 0.6 MI S OF US 6/KIMBERLY RDINTERCHANGE (EB/WB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,720,000$3,348,000
$3,720,000$3,348,000
39347
Iowa Department ofTransportation
22052
BRF-461()--38-82
IA461: DUCK CREEK 0.4 MI S OF US 6 IN DAVENPORT(NB)
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$4,454,000$3,563,200
$4,454,000$3,563,200
45432
Iowa Department ofTransportation
22048
BRF-461()--38-82
IA461: DME RR 1.0 MI E OF IA 22 IN DAVENPORT
Bridge Deck Overlay
FHWA Approved TotalFederal Aid
RegionalSwap
$1,867,000$1,493,600
$1,867,000$1,493,600
48420
Iowa Department ofTransportation
22046
BRF-461()--38-82
IA461: DUCK CREEK 0.3 MI S OF US 6 IN DAVENPORT(SB)
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$3,311,000$2,648,800
$3,311,000$2,648,800
48599
Iowa Department ofTransportation
22051
BRF-61()--38-82
US61: 210TH ST 1.1 MI N OF I-80 (RAMP)
Bridge Rehabilitation, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,905,000$1,524,000
$1,905,000$1,524,000
38166
Iowa Department ofTransportation
22050
IMX-80()--02-82
I-80: E OF IA 130 IN DAVENPORT TO CO RD Z30 (EB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$7,151,000$6,435,900
$7,151,000$6,435,900
47
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
16066
MPO 25 / BSRC
22207
RGPL-PA25()--PL-82
Quad Cities Urbanized Area
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$318,660$240,928
$318,660$240,928
$318,660$240,928
$318,660$240,928
$1,274,640$963,712
48
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38021
Iowa Department ofTransportation
BRFN-22()--39-82
IA22: DODGE CREEK 1.1 MI S OF CO RD Y48
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$415,000 $415,000
38023
Iowa Department ofTransportation
BRFN-67()--39-82
US67: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$25,000 $25,000 $25,000 $25,000 $100,000
38129
Iowa Department ofTransportation
IMN-74()--0E-82
I-74: MISSISSIPPI RIVER IN BETTENDORF (NB & SB)(STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000 $50,000 $50,000 $200,000
38131
Iowa Department ofTransportation
IMN-80()--0E-82
I-80: MISSISSIPPI RIVER IN LE CLAIRE (STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$100,000 $100,000 $100,000 $100,000 $400,000
48528
Iowa Department ofTransportation
NHSN-461()--2R-82
IA461: IN DAVENPORT, FROM 59TH ST TO S OF I-80
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$700,000 $700,000
45278
Iowa Department ofTransportation
NHSN-6()--2R-82
US6: 0.1 MI E OF IA 461 TO W OF ELMORE AVE INDAVENPORT
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$186,000 $186,000
48526
Iowa Department ofTransportation
NHSN-67()--2R-82
US67: FROM 8TH ST TO EWING ST IN LECLAIRE
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$510,000 $510,000
48557
Iowa Department ofTransportation
NHSN-67()--2R-82
US67: IN DAVENPORT, S OF MOUND ST
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$600,000 $600,000
39349
Iowa Department ofTransportation
NHSN-61()--2R-82
US61: N OF I-80 TO S OF WAPSIPINICON RIVER
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$2,891,000 $2,891,000
49
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45308
Iowa Department ofTransportation
IMN-280()--0E-82
I-280: EB OVER I-280 WB AT I-80
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$588,000 $588,000
38135
Iowa Department ofTransportation
IMN-280()--0E-82
I-280: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$40,000 $40,000 $80,000
45257
Iowa Department ofTransportation
IMN-80()--0E-82
I-80: UTICA RIDGE RD 3.3 MI E OF US 61
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$155,000 $155,000
45304
Iowa Department ofTransportation
IMN-80()--0E-82
I-80: WISCONSIN AVE 1.4 MI W OF IA 130
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$410,000 $410,000
48610
Iowa Department ofTransportation
IMN-80()--0E-82
I-80: MISSISSIPPI RIVER IN LE CLAIRE (STATE SHARE)
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$10,000 $10,000
50
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39350
Iowa Department ofTransportation
22266
STP-67()--2C-82
US67: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)
Bridge Rehabilitation
FHWA Approved TotalFederal Aid
RegionalSwap
$1,000,000$800,000
$1,000,000$800,000
36969
Bettendorf
22265
STP-U-0587(639)--70-82
In the city of Bettendorf, Forest Grove Dr. & Middle Road.
Grade and Pave, Ped/Bike Grade & Pave
FHWA Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$10,500,000$5,181,000
$5,181,000
$10,500,000$5,181,000
$5,181,000
38564
Davenport
22263
STP-U-1827(686)--70-82
On 53rd Street, from Eastern Avenue to Elmore Circle S12TT78N RR03
Grade and Pave
FHWA Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$5,400,000$3,706,878
$3,706,878
$5,400,000$3,706,878
$3,706,878
38024
Iowa Department ofTransportation
22267
STP-67()--2C-82
US67: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)
Bridge Painting
FHWA Approved TotalFederal Aid
RegionalSwap
$3,000,000$2,400,000
$3,000,000$2,400,000
39481
Davenport
22264
STP-U-1827()--70-82
In the city of Davenport, On 3rd & 4th St, from Telegraph Rdto Harrison St,
Pave, Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$9,074,235$7,259,388
$7,259,388
$9,074,235$7,259,388
$7,259,388
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44724
Davenport
22331
BROS-1827(687)--8J-82
On ELM ST, Over Canadian Pacific RR, from Mound St toEastern Ave S19 T78 R04E
Bridge Replacement
FHWA Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$2,470,525$1,000,000
$2,470,525$1,000,000
51
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36970
Davenport
22348
TAP-R-1827(688)--8T-82
On BRADY ST FRONTAGE, Over GOOSE CREEK, from59th St to Existing Path on VMP S12 T78 R03E
Ped/Bike Grade & Pave
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$775,063$530,917
$530,917
$775,063$530,917
$530,917
39480
Eldridge
22349
TAP-T-2290()--8V-82
In the city of Eldridge, On Townsend Farms, from S 5th St.4 Miles to S 1st St
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$356,000$284,800
$284,800
$356,000$284,800
$284,800
39482
Davenport
22347
TAP-T-1827()--8V-82
On Emies Park Ave & Locust St, from Duck Creek Trail atEmeis Park Ave 1 Miles to Wisconsin Ave,
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$654,463$522,770
$522,770
$654,463$522,770
$522,770
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37470
Scott County
BRS-SWAP-C082()--FF-82
On Z30, Over SPENCER CREEK, S6 T78 RE5
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00031021
Scott County
BRS-SWAP-C082(59)--FF-82
On Z30, Over SPENCER CREEK, S8 T78 RE5
Bridge Replacement
DOT Approved
1/17/2024
TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,000
52
I
0
Dallas
2
I
4
Des Moines Area Metropolitan Planning Organization
420 Watson Powell Jr. Parkway, Suite 200, Des Moines, IA 50309
Phone: 515-334-0075, Fax: 515-334-0098, www.dmampo.org
iorts - Interstate
Commercial - National Highway System
(I Enhanced - Primary Roads
(I General Service - Local Roads
(I Basic Service -Ramps
(I Local Service -TrailsTransit
-+- Railroad [el Regional
[el Rivers
Large Urban
[el Major Lakes
_,, ,
, Small Urban
C] MPO Planning Area[el Intercity Bus
r--1
CE! L_ _ _J Counties
Amtrak
I City Limits
Park & Ride Urban Area
53
MPO 26 / DMAMPODEMO
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45864
Polk County
22008
HDP-C077()--3C-77
In Polk County, Broadway Avenue from IA - 415 to US 6
Grade and Pave, Traffic Signals, Ped/Bike Grade &Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$39,891,000$25,000,000
$39,891,000$25,000,000
PA Note: Received $25M Build Grant
41343
MPO 26 / DMAMPO
22007
EDP-PA26(001)--7Y-77
On BIRDLAND DR, Over BIRDLAND LAGOON, S35 T79R24
Miscellaneous
FHWA Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$31,937,000$25,550,000
$550,000
$31,937,000$25,550,000
$550,000
55
ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
47352
Altoona
ILL-0132()--93-77
In the city of Altoona, reconstruction of 36th Ave SW andintersection of 36th and 8th St SW
Grade and Pave, Pavement Rehab, Ped/BikeMiscellaneous, Transit Investments
DOT Approved TotalFederal Aid
RegionalSwap
$3,000,000 $3,000,000
47314
Bondurant
ILL-0747()--93-77
In the city of Bondurant, extension of Grant St and 10th St,widening of NE 64th St from NE 78th to S HWY 65
Grade and Pave, Pavement Widening, Bridge New,Ped/Bike Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$26,988,205 $26,988,205
47353
Des Moines
ILL-1945()--93-77
In the city of Des Moines, one to two way conversion of 5th(Cherry to Grand) and Grand Ave (2nd to 5th)
Pavement Rehab, Traffic Signals, Pavement Markings,Traffic Signs, Ped/Bike Miscellaneous, Transit Investments
DOT Approved TotalFederal Aid
RegionalSwap
$1,875,000 $1,875,000
48363
Pleasant Hill
ILL-6102()--93-77
In the city of Pleasant Hill, design and construction ofMartha L Miller Dr NE 60th to NE 70th
Grade and Pave, Outside Services Engineering
DOT Approved TotalFederal Aid
RegionalSwap
$6,215,200 $6,215,200
48362
Urbandale
ILL-7875()--93-77
In the city of Urbandale, pedestrian bridge over I-80/35within half mile west of 86th Street Interchange
Ped/Bike Structures, Ped/Bike Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$2,500,000 $2,500,000
47311
Waukee
ILL-8177()--93-25
In the city of Waukee, from University Ave north 0.34 milesto Waukee Middle School
Grade and Pave, Culvert Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$6,500,000 $6,500,000
47351
West Des Moines
ILL-8260()--93-25
In the city of West Des Moines, pedestrian bridge toconnect Raccoon River Park to Walnut Woods St Park
Ped/Bike Structures, Ped/Bike Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$6,887,000 $6,887,000
47354
West Des Moines
ILL-8260()--93-25
In the city of West Des Moines, reconstruction of Civic MillsPkwy from S 91 Street to S Grand Prairie Pkwy
Pavement Rehab, Ped/Bike Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$9,440,000 $9,440,000
48364
Des MoinesInternational Airport
ILL-DMIA()--94-77
In the Des Moines International Airport, the second and thirdphases of Cowles Drive reconstruction
Grade and Pave, Ped/Bike Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$14,299,058 $14,299,058
56
ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48380
MPO 26 / DMAMPO
ILL-PA26()--94-25
In the City of Waukee, Approximately 3 acres in the I-80West Industrial Park Plat 2
Transit Investments
DOT Approved TotalFederal Aid
RegionalSwap
$11,605,000 $11,605,000
57
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38005
Iowa Department ofTransportation
22058
BRF-28()--38-77
IA28: RACCOON RIVER 3.7 MI N OF IA 5 (SB)
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$6,555,000$5,244,000
$6,555,000$5,244,000
39322
Iowa Department ofTransportation
22056
BRF-69()--38-77
US69: FOURMILE CREEK 0.8 MI S OF CO RD F22
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$300,000 $1,314,000$1,051,200
$1,614,000$1,051,200
39323
Iowa Department ofTransportation
22057
BRF-69()--38-77
US69: FOURMILE CREEK 0.3 MI N OF CO RD F22
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$310,000 $1,434,000$1,147,200
$1,744,000$1,147,200
38071
Iowa Department ofTransportation
22060
IM-35()--13-77
I-35: I-80/235 INTERCHANGE NE OF DES MOINES
Grade and Pave, Bridge New, Grading
FHWA Approved TotalFederal Aid
RegionalSwap
$1,103,000$992,700
$45,945,000$41,350,500
$18,058,000$16,346,000
$465,000$418,500
$65,571,000$59,107,700
48504
Iowa Department ofTransportation
22061
IMX-235()--02-77
I-235: HULL AVE IN DES MOINES TO THE NE I-35/80INTERCHANGE
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$2,060,000$1,854,000
$2,060,000$1,854,000
38111
Iowa Department ofTransportation
22053
IM-NHS-35()--03-77
I-35: NE 36TH ST TO N OF IA 210
Grade and Pave, Pave, Grading
FHWA Approved TotalFederal Aid
RegionalSwap
$41,734,200$35,424,150
$10,014,000
$25,824,200$21,900,650
$5,554,650
$65,158,000$55,384,300
$14,473,350
$132,716,400$112,709,100
$30,042,000
45342
Iowa Department ofTransportation
22054
IM-NHS-80()--03-25
I-80: W OF GRAND PRAIRIE PKWY TO E OF JORDANCREEK PKWY
Grade and Pave, Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$16,282,000$13,839,700
$20,053,000$17,045,050
$23,665,000$20,115,250
$60,000,000$51,000,000
45340
Iowa Department ofTransportation
22055
IM-NHS-80()--03-77
I-80: I-35/235 INTERCHANGE NE OF DES MOINES TOUS 65
Bridge Replacement, Grading, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$5,121,000$4,352,850
$21,073,000$17,912,050
$26,194,000$22,264,900
48464
Iowa Department ofTransportation
22059
IM-80()--13-77
I-80: UNIVERSITY AVE TO N OF DOUGLAS AVE
Grade and Pave, Bridge Replacement, Bridge Widening
FHWA Approved TotalFederal Aid
RegionalSwap
$1,800,000$1,620,000
$26,639,000$23,975,100
$28,439,000$25,595,100
58
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48539
Iowa Department ofTransportation
22063
IMX-80()--02-77
I-80: WB I-80 RAMP AT W I-35/235 INTERCHANGE
Grade and Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$1,800,000$1,620,000
$1,800,000$1,620,000
45338
Iowa Department ofTransportation
22064
IMX-80()--02-77
I-80: NW 72ND ST 1.0 MI W OF IA 28 (EB & WB)
Bridge Rehabilitation
FHWA Approved TotalFederal Aid
RegionalSwap
$3,320,000$2,988,000
$3,320,000$2,988,000
45343
Iowa Department ofTransportation
22062
NHSX-141()--3H-77
IA141: NW 121ST ST INTERSECTION INCL LOCAL RDCONNECTIONS
Grade and Pave, Traffic Signs, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$8,529,000$6,823,200
$8,529,000$6,823,200
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38361
MPO 26 / DMAMPO
22208
RGPL-PA26()--PL-77
MPO Planning Funding
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$972,321$750,000
$972,321$750,000
$972,321$750,000
$972,321$750,000
$3,889,284$3,000,000
59
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38007
Iowa Department ofTransportation
BRFN-69()--39-77
US69: FOURMILE CREEK 0.1 MI S OF CO RD F22
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$301,000 $1,336,000 $1,637,000
39335
Iowa Department ofTransportation
IMN-235()--0E-77
I-235: SW I-35/80 INTERCHANGE TO NE I-35/80INTERCHANGE
Landscaping
DOT Approved TotalFederal Aid
RegionalSwap
$115,000 $115,000 $120,000 $125,000 $475,000
45248
Iowa Department ofTransportation
IMN-235()--0E-77
I-235: SW I-35/80 INTERCHANGE TO NE I-35/80INTERCHANGE
Guardrail
DOT Approved TotalFederal Aid
RegionalSwap
$445,000 $445,000
45247
Iowa Department ofTransportation
IMN-35()--0E-77
I-35: IA 160 INTERCHANGE IN ANKENY NB EXIT RAMP
Traffic Signals
DOT Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000
45249
Iowa Department ofTransportation
IMN-80()--0E-77
I-80: DES MOINES RIVER TO IA 415
Guardrail
DOT Approved TotalFederal Aid
RegionalSwap
$408,000 $408,000
48595
Iowa Department ofTransportation
NHSN-160()--2R-77
IA160: 0.2 MI E OF SW STATE ST IN ANKENY
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$363,000 $363,000
45246
Iowa Department ofTransportation
NHSN-6()--2R-77
US6: HICKMAN RD TO NW 62ND AVE
Traffic Signals
DOT Approved TotalFederal Aid
RegionalSwap
$105,000 $105,000
48588
Iowa Department ofTransportation
NHSN-69()--2R-77
US69: 0.2 MI S OF NE BROADWAY AVE
Grading, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$99,000 $99,000
39327
Iowa Department ofTransportation
BRFN-65()--39-77
US65: SE 64TH AVE 1.0 MI N OF IA 5 (NB & SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,424,000 $1,424,000
60
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38247
Iowa Department ofTransportation
NHSN-69()--2R-77
US69: I-80 TO SE 33RD ST IN ANKENY
Erosion Control
DOT Approved TotalFederal Aid
RegionalSwap
$228,000 $228,000
45316
Iowa Department ofTransportation
BRFN-141()--39-77
IA141: IA 44 INTERCHANGE IN GRIMES (EB & WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,110,000 $1,110,000
48423
Iowa Department ofTransportation
IMN-235()--0E-77
I-235: W I-35/80 INTERCHANGE TO 2ND AVE
Grade and Pave, Traffic Signals, Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$5,226,000 $5,226,000
39216
Iowa Department ofTransportation
STPN-80()--2J-25
I-80: US 6/169 INTERCHANGE TO CO RD R22/UTE AVEINTERCHANGE
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$1,850,000 $1,850,000
48601
Iowa Department ofTransportation
IMN-235()--0E-77
I-235: E 6TH ST, E 9TH ST, E 12TH ST, AND US 69 INDES MOINES
Bridge Painting
DOT Approved TotalFederal Aid
RegionalSwap
$2,140,000 $2,140,000
38206
Iowa Department ofTransportation
NHSN-69()--2R-77
US69: DES MOINES RIVER TO N OF MAURY AVE IN DESMOINES (STATE SHARE)
Pavement Widening, Traffic Signals, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$852,000 $852,000
61
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
27146
MPO 26 / DMAMPO
22268
RGPL-PA26()--ST-77
Multimodal planning activities to reduce SOV trips, andmaintaining mode choice for MPOs travel demand model
Miscellaneous, Ped/Bike Miscellaneous, TransitInvestments
FHWA Approved TotalFederal Aid
RegionalSwap
$119,000$95,000
$95,000
$119,000$95,000
$95,000
$119,000$95,000
$95,000
$119,000$95,000
$95,000
$476,000$380,000
$380,000
22143
MPO 26 / DMAMPO
22269
RGTR-PA26()--ST-00
DART: Vehicle Purchase
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$2,027,200$1,410,200
$1,410,200
$2,038,000$1,400,000
$1,400,000
$1,693,750$1,355,000
$1,355,000
$1,625,000$1,300,000
$1,300,000
$7,383,950$5,465,200
$5,465,200
27151
Des Moines
22270
TAP-T-1945()--8V-77
In the city of Des Moines, Bill Riley Trail Bridge, OverRaccoon River
Ped/Bike Structures
FHWA Approved TotalFederal Aid
RegionalSwap
$425,000$100,000
$100,000
$425,000$100,000
$100,000
62
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
25421
Bondurant
22352
TAP-T-0747(609)--8V-77
In the City of Bondurant, Pedestrian/Bicycle Underpass atUS 65 by Oleson Dr north of Grant St
Ped/Bike Miscellaneous
FHWA Approved
9/21/2021
TotalFederal Aid
RegionalSwap
$3,194,000$1,645,000
$1,029,000
$3,194,000$1,645,000
$1,029,000
DOT Note: This project received a SRTS award of 80,000
45601
Polk CountyConservation Board
22425
TAP-T-C077(234)--8V-77
In Polk County, trail bridge over Beaver Creek
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$2,000,000$400,000
$400,000
$2,000,000$400,000
$400,000
45483
MPO 26 / DMAMPO
22354
TAP-T-PA26()--8V-77
Shelter installation at 16 locations in the metro
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$337,000$200,000
$200,000
$337,000$200,000
$200,000
39392
Ankeny
22351
TAP-T-0187()--8V-77
In the city of Ankeny, Oralabor Trail - SW State StUnderpass
Ped/Bike Structures
FHWA Approved TotalFederal Aid
RegionalSwap
$1,800,000$1,050,000
$1,050,000
$1,800,000$1,050,000
$1,050,000
37835
Des Moines
22350
TAP-T-1945()--8V-77
In the city of Des Moines, Carlisle Trail
Ped/Bike Grading, Ped/Bike Paving
FHWA Approved TotalFederal Aid
RegionalSwap
$2,600,000$1,000,000
$1,000,000
$2,600,000$1,000,000
$1,000,000
45481
Des Moines
22353
TAP-T-1945()--8V-77
In the city of Des Moines, In City of Des Moines, from WRiver Dr to 2nd Ave, along Des Moines River
Ped/Bike Grade & Pave, Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$1,565,000$500,000
$500,000
$1,565,000$500,000
$500,000
48660
Altoona
22357
TAP-T-0132()--8V-77
In the city of Altoona, In the City of Altoon, 36th Ave SWPedestrian and Transit Improvements
Ped/Bike Miscellaneous, Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$164,000$131,200
$131,200
$164,000$131,200
$131,200
48659
Des Moines
22356
TAP-T-1945()--8V-77
In the city of Des Moines, trail connection from Franklin toInter-Urban and Trestle to Trestle Trail
Ped/Bike Grade & Pave, Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$2,300,000$300,000
$300,000
$2,300,000$300,000
$300,000
63
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48661
Norwalk
22358
TAP-T-5587()--8V-77
In the city of Norwalk, sidewalk infill gaps on Elm Ave, LewisAve, Main Street
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$125,000$100,000
$100,000
$125,000$100,000
$100,000
48662
Waukee
22359
TAP-T-8177()--8V-25
In the city of Waukee, school and trail improvementsthroughout the City
Railroad Signals, Traffic Signs, Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$166,000$132,800
$132,800
$166,000$132,800
$132,800
48658
Polk CountyConservation Board
22355
TAP-T-C077()--8V-77
In Polk County, trail connection from Polk City to HighTrestle Trail
Ped/Bike Grade & Pave, Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$1,140,000$250,000
$250,000
$1,140,000$250,000
$250,000
SWAP-CMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48664
Des Moines
ICAAP-SWAP-1945()--SH-77
In the city of Des Moines, update traffic signal operations inentire city
Traffic Signals
DOT Approved TotalFederal Aid
RegionalSwap
$275,000
$220,000
$275,000
$220,00048665
Grimes
ICAAP-SWAP-3125()--SH-25
In the city of Grimes, systems engineering analysis andimplementation of system upgrades
Traffic Signals
DOT Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$1,094,000
$875,200
$1,094,000
$875,20048667
Norwalk
ICAAP-SWAP-5587()--SH-77
In the city of Norwalk, traffic signal system analysis andupgrade
Traffic Signals
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$883,000
$706,400
$883,000
$706,400
64
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36678
Polk County
BROS-SWAP-C077(216)--SE-77
On NE Berwick Dr over the UP Railroad, in Sec 5-79-23.0.60 mi N of NE 62 Ave
Bridge Replacement
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$1,400,000
$360,000
$1,400,000
$360,000
65
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36673
Carlisle
STBG-SWAP-1105(608)--SG-91
In the city of Carlisle, Scotch Ridge Road and Highway 5intersection south approx. 1,250 feet southwest
Pavement Rehab, Traffic Signals
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$3,249,000
$1,837,000
$1,837,000
$3,249,000
$1,837,000
$1,837,000PA Note: Joint Project with Warren County, TPMS project number 35771
27142
Des Moines
STBG-SWAP-1945(848)--SG-77
In the city of Des Moines, On 2nd Avenue Bridge, Over DesMoines River and Birdland Drive
Bridge Rehabilitation
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$4,000,000
$1,000,000
$2,000,000
$4,000,000
$1,000,000
$2,000,000PA Note: Includes $1,000,000 in SWAP-HBP funding.
27144
Des Moines
STBG-SWAP-1945(852)--SG-77
On Indianola Avenue Reconstruction, from East Army PostRoad to U.S. 69
Pavement Rehab
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$6,250,000
$3,000,000
$3,000,000
$6,250,000
$3,000,000
$3,000,00037833
Des Moines
STBG-SWAP-1945(855)--SG-77
In the city of Des Moines, Intelligent TransportationSystems Upgrade - Phase 2
Traffic Signals
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$15,000,000
$500,000
$500,000
$15,000,000
$500,000
$500,00036675
Des Moines
STBG-SWAP-1945(858)--SG-77
In the city of Des Moines, Walnut Street BridgeReplacement
Bridge Replacement
DOT Approved
6/21/2022
TotalFederal Aid
RegionalSwap
$11,000,000
$3,400,000
$3,400,000
$11,000,000
$3,400,000
$3,400,00037834
Des Moines
STBG-SWAP-1945(859)--SG-77
In the city of Des Moines, Guthrie Avenue ViaductRehabilitation
Pavement Rehab
DOT Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$5,000,000
$2,000,000
$2,000,000
$5,000,000
$2,000,000
$2,000,00037839
Urbandale
STBG-SWAP-7875()--SG-77
In the city of Urbandale, 128th Street Maintenance, DouglasParkway to Aurora Avenue
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$750,000
$750,000
$1,000,000
$750,000
$750,00036681
Urbandale
STBG-SWAP-7875(651)--SG-25
In the city of Urbandale, 170th Street (Alice's Road):Meredith Drive to Waterford Road
Pavement Rehab, Traffic Signals, Pavement Markings
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$7,180,000
$600,000
$600,000
$7,180,000
$600,000
$600,000
66
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36679
Polk County
STBG-SWAP-C077(232)--FG-77
On NE FRISK DR, Over Deer Creek N of NE 94 Ave
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$920,000
$543,000
$543,000
$920,000
$543,000
$543,00037444
Polk County
STBG-SWAP-C077(233)--FG-77
On NE 22nd St, from NE 54 Ave 0.5 miles to N of NE 58Ave
Pavement Rehab/Widen
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$3,200,000
$1,750,000
$1,750,000
$3,200,000
$1,750,000
$1,750,00037843
MPO 26 / DMAMPO
STBG-SWAP-PA26()--SG-77
In the City of Des Moines, Douglas/Euclid Avenues fromMerle Hay Road east to just west of E. 14th Street
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$5,000,000
$445,000
$445,000
$5,000,000
$445,000
$445,00039390
Ankeny
STBG-SWAP-0187()--SG-77
In the city of Ankeny, On NE Delaware Ave Widening - NE5th to 18th St
Pavement Widening
DOT Approved TotalFederal Aid
RegionalSwap
$12,150,000
$3,000,000
$3,000,000
$12,150,000
$3,000,000
$3,000,00039435
Des Moines
STBG-SWAP-1945()--SG-29
In the city of Des Moines, Intelligent Transportation SystemPhase 3
Traffic Signals
DOT Approved TotalFederal Aid
RegionalSwap
$12,000,000
$1,000,000
$1,000,000
$12,000,000
$1,000,000
$1,000,00039461
Johnston
STBG-SWAP-3827()--SG-77
In the city of Johnston, On NW 100thStreet, NW 62nd Ave south to 1000 feet north of the NW 54th Avenue
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$10,841,000
$750,000
$750,000
$10,841,000
$750,000
$750,000
39397
Norwalk
STBG-SWAP-5587()--SG-91
In the city of Norwalk, On the intersection of Beardley Stand IA 28 (Sunset Dr)
Pavement Rehab/Widen, Traffic Signals
DOT Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$2,190,000
$700,000
$700,000
$2,190,000
$700,000
$700,00039395
West Des Moines
STBG-SWAP-8260()--SG-77
In the city of West Des Moines, 8th Street Improvementsfrom I-235 South Ramp to Clegg Road
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$4,200,000
$3,000,000
$3,000,000
$4,200,000
$3,000,000
$3,000,00038607
Polk County
STBG-SWAP-C077(BR2444)--SK-77
On NW 86 St, Over LITTLE BEAVER CREEK, 0.50 MI N ofNW 70TH AVE
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,050,000
$600,000
$600,000
$1,050,000
$600,000
$600,000
67
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
32581
Polk County
STBG-SWAP-C077(BR6680)--SG-77
On NE 50TH AVE, Over MUD CREEK, 0.65 mi E of NE80TH ST
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$650,000
$300,000
$300,000
$650,000
$300,000
$300,00045479
Altoona
STBG-SWAP-0132()--SG-77
In the city of Altoona, On 8TH ST SW, Over NB US 65, S14T79 R23
Grade and Pave, Ped/Bike Grade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,700,000
$1,500,000
$1,500,000
$1,700,000
$1,500,000
$1,500,00039393
Des Moines
STBG-SWAP-1945()--SG-77
In the city of Des Moines, SE Connector from 30th St to US65
Pavement Rehab/Widen, Bridge New, Ped/BikeMiscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$41,000,000
$11,284,000
$11,284,000
$41,000,000
$11,284,000
$11,284,000
45476
Des Moines
STBG-SWAP-1945()--SG-77
In the city of Des Moines, citywide ITS upgrade Phase 4
Traffic Signals
DOT Approved TotalFederal Aid
RegionalSwap
$12,500,000
$500,000
$500,000
$12,500,000
$500,000
$500,00045474
Polk City
STBG-SWAP-6170()--SG-77
In the city of Polk City, On E NORTHSIDE DR, Over BIGCREEK, S36 T81 R25
Pavement Rehab/Widen, Ped/Bike Grade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,955,000
$893,000
$893,000
$1,955,000
$893,000
$893,00045475
Windsor Heights
STBG-SWAP-8477()--SG-77
In the city of Windsor Heights, 73rd Street from Universityto Hickman
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$10,000,000
$1,500,000
$1,500,000
$10,000,000
$1,500,000
$1,500,00045478
Polk County
STBG-SWAP-C077()--FG-77
In Polk County, On NE 38TH ST, north of NE 108 Ave
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$525,000
$350,000
$350,000
$525,000
$350,000
$350,00040171
Polk County
STBG-SWAP-C077(BR6333)--FG-77
On NE 108TH ST, Over CAMP CREEK, S26 T79 R22
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$860,000
$650,000
$650,000
$860,000
$650,000
$650,00045473
Clive
STBG-SWAP-1425()--SG-77
In the city of Clive, On I 80 W, Over WALNUT CREEK, S32T79 R25
Pavement Rehab/Widen, Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$2,400,000
$2,000,000
$2,000,000
$2,400,000
$2,000,000
$2,000,000
68
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45477
Des Moines
STBG-SWAP-1945()--SG-77
In the city of Des Moines, On FLEUR DR, Over RACCOONAND RR, S8 T78 R24
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$3,000,000
$2,000,000
$2,000,000
$3,000,000
$2,000,000
$2,000,00048651
Des Moines
STBG-SWAP-1945()--SG-77
In the city of Des Moines, ITS Upgrade Phase 5
Traffic Signals
DOT Approved TotalFederal Aid
RegionalSwap
$12,000,000
$500,000
$500,000
$12,000,000
$500,000
$500,00048650
Grimes
STBG-SWAP-3125()--SG-25
In the city of Grimes, S11th to 19th Street, SE 19th St fromS James St to 200’ west of Jacob St
Pavement Rehab/Widen, Traffic Signals, Ped/Bike Grade& Pave
DOT Approved TotalFederal Aid
RegionalSwap
$7,040,000
$500,000
$500,000
$7,040,000
$500,000
$500,000
48649
Urbandale
STBG-SWAP-7875()--SG-77
In the city of Urbandale, Meredith Dr from 86th to 104th St
Pavement Rehab, Ped/Bike Grade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,850,000
$500,000
$500,000
$1,850,000
$500,000
$500,00048656
Polk County
STBG-SWAP-C077()--SG-77
On F 48, Over CAMP CREEK, S23 T79 R22
DOT Approved TotalFederal Aid
RegionalSwap
$800,000
$550,000
$550,000
$800,000
$550,000
$550,00040200
Polk County
STBG-SWAP-C077()--SK-77
On NE 12TH AVE, Over MUD CREEK, S5 T78 R22, apprx0.50 Mi E of NE 88 ST
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$900,000
$600,000
$600,000
$900,000
$600,000
$600,000
69
I
0 1
Dubuque Metro Area Transportation Study
7600 Commerce Park, Dubuque, IA 52002
Phone: 563-556-4166, Fax: 563-556-0348, www.eciatrans.org
Iowa Dubuque
County
I I
2 4 Miles
Wisconsin
Grant
County
Jo Daviess
County
�orts - Interstate
� Commercial - National Highway System
El Enhanced - Primary Roads
El General Service - Local Roads
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
70
MPO 27 / DMATSDEMO
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
40123
Dubuque County
22009
HDP-C031(110)--3C-31
Improvements to Northwest Arterial/D10/S John DeereRoad
Grade and Pave, Traffic Signals, Right of Way, OutsideServices Engineering, Ped/Bike Grade & Pave
FHWA Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$14,123,443$5,452,023
$4,431,420
$4,431,420
$14,123,443$5,452,023
$4,431,420$4,431,420
DOT Note: Project received 2019 BUILD award
ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48381
Dubuque
ILL-2100()--93-31
In the city of Dubuque, Chaplain Schmitt Island TrailConnection, from 16th Street to Chaplain Schmitt VeteransMemorial
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$890,000 $890,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38279
Iowa Department ofTransportation
22065
NHSX-3()--3H-31
IA3: 0.7 MI N OF BOY SCOUT RD TO S OF CO RD C9YIN SAGEVILLE
Grade and Pave, Erosion Control, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$340,000$272,000
$19,853,000$15,882,400
$399,000$319,200
$20,592,000$16,473,600
45377
Iowa Department ofTransportation
22066
BRF-61()--38-31
US61: GRANDVIEW AVE 1.2 MI S OF US 20 IN DUBUQUE
Bridge Replacement
FHWA Approved TotalFederal Aid
RegionalSwap
$1,482,000$1,185,600
$1,482,000$1,185,600
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
13239
MPO 27 / DMATS
22209
RGPL-PA27()--PL-31
MPO Planning: Transportation Planning in DMATS area
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$161,812$108,513
$134,513$108,513
$134,513$108,513
$108,513$108,513
$539,351$434,052
72
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37926
Iowa Department ofTransportation
BRFN-20()--39-31
US20: MISSISSIPPI RIVER IN DUBUQUE (STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$70,000 $70,000 $70,000 $70,000 $280,000
37930
Iowa Department ofTransportation
BRFN-61()--39-31
US61: MISSISSIPPI RIVER IN DUBUQUE (STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000 $20,000 $20,000 $80,000
37931
Iowa Department ofTransportation
BRFN-61()--39-31
US61: PEOSTA CHANNEL 0.2 MI N OF E 11TH ST INDUBUQUE
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000 $55,000 $57,000 $212,000
38228
Iowa Department ofTransportation
NHSN-20()--2R-31
US20: SWISS VALLEY RD SW OF DUBUQUE
Erosion Control
DOT Approved TotalFederal Aid
RegionalSwap
$448,000 $448,000
39233
Iowa Department ofTransportation
STPN-20()--2J-31
US20: MISSISSIPPI RIVER IN DUBUQUE
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
39235
Iowa Department ofTransportation
STPN-61()--2J-31
US61: MISSISSIPPI RIVER IN DUBUQUE
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
45324
Iowa Department ofTransportation
BRFN-20()--39-31
US20: MIDDLE BRANCH CATFISH CREEK & CC RR 0.6MI E OF NW ARTERIAL IN DUBUQUE (EB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$657,000 $657,000
45289
Iowa Department ofTransportation
BRFN-61()--39-31
US61: PEOSTA CHANNEL 0.2 MI N OF E 11TH ST INDUBUQUE
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$10,672,000 $10,672,000
48600
Iowa Department ofTransportation
BRFN-61()--39-31
US61: MISSISSIPPI RIVER IN DUBUQUE (STATE SHARE)
Bridge Painting
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
73
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
33894
Dubuque
22271
HDP-2100(679)--3C-31
SW Arterial corridor between US 20 to US 151/61, US 20(MP 4.4884 to 6.3816) and US 151/61 (MP 186.334 to7.4998).
Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$11,473,436$578,436
$578,436
$11,473,436$578,436
$578,436
48402
Dubuque
22274
RGPL-2100()--ST-31
In the city of Dubuque, Trailer Mounted PortableChangeable Message Sign
Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$40,000$32,000
$32,000
$40,000$32,000
$32,000
45236
MPO 27 / DMATS
22272
RGPL-PA27()--ST-31
Transportation Planning
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$18,750$15,000
$15,000
$18,750$15,000
$15,000
45237
MPO 27 / DMATS
22273
RGPL-PA27()--ST-31
In the City of Dubuque Study and implement trafficmanagement systems,
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$41,666$33,333
$33,333
$41,666$33,333
$33,333
$83,332$66,666
$66,666
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48705
Dubuque
22362
TAP-U-2100()--8I-31
In the city of Dubuque, On John F Kennedy, from NorthwestArterial S to Asbury Rd
Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$416,257$190,000
$190,000
$416,257$190,000
$190,000
38301
Dubuque
22360
TAP-U-2100(697)--8I-31
On Bee Branch Creek Trail Project Phase 1,
Grade and Pave
FHWA Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$525,000$420,000
$420,000
$525,000$420,000
$420,000
48403
Dubuque CountyConservation Board
22361
TAP-U-C031()--8I-31
On Heritage Trail, from Rupp Hollow Rd W 4 miles toBurtons Furnace Rd
Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$1,500,000$500,000
$500,000
$1,500,000$500,000
$500,000
74
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36994
Dubuque
STBG-SWAP-2100()--SG-31
In the city of Dubuque, On Asbury Rd Improvements, fromSt. Ambrose St. to Carter Rd
Traffic Signals
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$400,000
$400,000
$500,000
$400,000
$400,00035228
Dubuque
STBG-SWAP-2100(698)--SG-31
In the city of Dubuque, On University Ave, fromPennsylvania Avenue to Loras Boulevard
Pavement Rehab/Widen, Right of Way, Outside ServicesPlanning, Outside Services Engineering
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$2,691,799
$2,200,000
$2,200,000
$3,953,330
$3,231,046
$3,231,046
$2,604,871
$2,128,954
$2,128,954
$9,250,000
$7,560,000
$7,560,000
39422
Asbury
STBG-SWAP-0252()--SG-31
In the city of Asbury, On Hales Mill Road, from AutumnDrive to Asbury Road
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,600,000
$1,000,000
$1,000,000
$1,600,000
$1,000,000
$1,000,00048706
Dubuque County
STBG-SWAP-C031()--SK-31
On OAKLAND FARMS RD, CATFISH CREEK, from Militaryrd to Whitetop Rd
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$3,000,000
$3,000,000
$3,000,000
$3,000,000
$3,000,000
$3,000,000
75
0
Metropolitan Planning Organization of Johnson County
410 East Washington Street, Iowa City, IA 52240
Phone: 319-356-5230, Fax: 319-356-5217, www.mpojc.org
Johnson
County
2 4 8 Miles
�orts - Interstate
� Commercial - National Highway System
El Enhanced - Primary Roads
El General Service - Local Roads
Basic Service
El Local Service Transit rel Regional
rel Large Urban
rel Small Urban
rel Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
76
MPO 28 / MPOJCNHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38068
Iowa Department ofTransportation
22067
NHS-80()--19-52
I-80: I-380/US 218 INTERCHANGE NEAR IOWA CITY(STATE SHARE)
Grade and Pave, Bridge New, Bridge Replacement
FHWA Approved TotalFederal Aid
RegionalSwap
$60,160,000$48,128,000
$12,294,000$9,835,200
$6,133,000$4,906,400
$235,000$188,000
$78,822,000$63,057,600
45303
Iowa Department ofTransportation
22068
IM-80()--13-52
I-80: 1ST AVE INTERCHANGE IN CORALVILLE (STATESHARE)
Grade and Pave, Bridge Replacement, CulvertReplacement
FHWA Approved TotalFederal Aid
RegionalSwap
$22,685,000$20,416,500
$22,685,000$20,416,500
48578
Iowa Department ofTransportation
22070
IM-NHS-380()--03-52
I-380: N OF FOREVERGREEN RD TO N OF PENN ST-SEGMENT 1
Grade and Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$9,700,000$8,245,000
$29,800,000$25,330,000
$39,500,000$33,575,000
39270
Iowa Department ofTransportation
22069
NHSX-1()--3H-52
IA1: E BURLINGTON ST TO N GOVERNOR ST IN IOWACITY (SB) STATE SHARE
Grade and Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$3,240,000$2,592,000
$3,240,000$2,592,000
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39689
MPO 28 / MPOJC
22210
RGPL-JCCOG(RTP)--PL-52
JCCOG: METROPOLITAN PLANNING PL FUNDS
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$214,364$178,637
$214,364$178,637
$214,364$178,637
$214,364$178,637
$857,456$714,548
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39272
Iowa Department ofTransportation
IMN-80()--0E-52
I-80: PRAIRIE DU CHIEN RD NE 1.3 MI W OF IA 1
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$302,000 $302,000
78
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36668
Iowa City
22275
STP-U-3715(669)--70-52
In the city of Iowa City, On Benton Street, from MormonTrek Boulevard East to Greenwood Drive
Pavement Rehab
FHWA Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$2,934,739$1,315,860
$1,315,860
$2,934,739$1,315,860
$1,315,860
38309
University Heights
22276
STP-U-7855()--70-52
In the city of University Heights, On Melrose Avenue, fromSunset Street east to east city limits
Pavement Rehab, Lighting, Pavement Markings
FHWA Approved TotalFederal Aid
RegionalSwap
$1,549,936$730,000
$730,000
$1,549,936$730,000
$730,000
39151
Coralville
22277
STP-U-1557()--70-52
In the city of Coralville, On 5th St, from just west of 12th Avewest through 20th Ave intersection
Pavement Rehab/Widen, Landscaping, Ped/Bike Paving
FHWA Approved TotalFederal Aid
RegionalSwap
$3,024,131$1,650,000
$1,650,000
$3,024,131$1,650,000
$1,650,000
39152
Tiffin
22278
STP-U-7662()--70-52
In the city of Tiffin, On North Park Rd, from Hwy 6 north2,000 Feet
Pavement Rehab/Widen, Ped/Bike Grade & Pave,Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$5,661,766$1,200,000
$1,200,000
$5,661,766$1,200,000
$1,200,000
45232
Iowa City
22279
STP-U-3715()--70-52
In the city of Iowa City, on Dodge Street, from BurlingtonStreet north to Governor Street.
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$14,181,200$3,750,000
$3,750,000
$14,181,200$3,750,000
$3,750,000
48400
Coralville
22281
STP-U-1557()--70-52
In the city of Coralville, On US 6 E, Over from Just west ofLowes W to I-80 bridge
Pavement Rehab/Widen, Lighting, Traffic Signals
FHWA Approved TotalFederal Aid
RegionalSwap
$3,105,000$864,560
$864,560
$3,105,000$864,560
$864,560
48401
Iowa City
22282
STP-U-3715()--70-52
In the city of Iowa City, On Taft Avenue, from Lower WestBranch Road S to American Legion Road
Grade and Pave, Ped/Bike Development
FHWA Approved TotalFederal Aid
RegionalSwap
$11,000,000$3,500,000
$3,500,000
$11,000,000$3,500,000
$3,500,000
48399
University Heights
22280
STP-U-7855()--70-52
In the city of University Heights, On Sunset Street, fromMelrose Ave S to Benton Street
Pavement Rehab, Ped/Bike Development
FHWA Approved TotalFederal Aid
RegionalSwap
$481,000$115,440
$115,440
$481,000$115,440
$115,440
79
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39434
Iowa City
22332
BRM-3715(667)--8N-52
In the city of Iowa City, Gilbert Street bridge, Gilbert Streetbridge over RALSTON CREEK.
Bridge Replacement
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$1,664,000$1,000,000
$1,664,000$1,000,000
39427
Iowa City
22333
BROS-3715(664)--8J-52
In the city of Iowa City, In City of Iowa City, 2nd Avenuebridge, 2nd Avenue bridge over Ralston Creek
Bridge Replacement
FHWA Approved
9/21/2021
TotalFederal Aid
RegionalSwap
$577,200$444,000
$577,200$444,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39150
Coralville
22364
TAP-U-1557()--8I-52
In the city of Coralville, On Clear Creek Trail on east side ofCamp Cardinal Blvd, from Hwy 6 S to Tom Harkin Trailhead
Ped/Bike Grade & Pave
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$512,830$212,519
$212,519
$512,830$212,519
$212,519
39149
Iowa City
22363
TAP-U-3715(670)--8I-52
In the city of Iowa City, On Hwy 6 Trail, from FairmeadowsBlvd east to Heinz Rd
Ped/Bike Grade & Pave
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$575,197$438,000
$438,000
$575,197$438,000
$438,000
45234
North Liberty
22365
TAP-U-5557()--8I-52
In the city of North Liberty, on North Liberty Trail, from northof Abraham Drive, north-northwest to Front Street.
Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$1,144,366$648,118
$648,118
$1,144,366$648,118
$648,118
80
South
Dakota
Siouxland Interstate Metropolitan Planning Council
1122 Pierce Street, Sioux City, IA 51105
Phone: 712-279-6286, Fax: 712-279-6920, www.simpco.org
Plymouth
County
Union
County
Dixon
County
0 2
\
Dakota
County
Nebraska
4 8 Miles
Iowa
Woodbury
County
�orts � Commercial
- Interstate
- National Highway System
Enhanced - Primary Roads
General Service - Local Roads
El Basic Service
El Local Service Transit rel Regional
[el Large Urban
rel Small Urban
rel Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
81
MPO 29 / SIMPCONHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48525
Iowa Department ofTransportation
22074
NHSX-12()--3H-97
IA12: IN SIOUX CITY, FROM US 20 TO GORDON DRVIADUCT
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$1,810,000$1,448,000
$1,810,000$1,448,000
48435
Iowa Department ofTransportation
22071
NHSX-376()--3H-97
IA376: N OF CUNNINGHAM DR TO N MARTHA ST INSIOUX CITY
Pavement Rehab, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,943,000$1,554,400
$1,943,000$1,554,400
48482
Iowa Department ofTransportation
22073
NHSX-376()--3H-97
IA376: N OF OUTER DR TO FLOYD BLVD IN SIOUX CITY
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$1,191,000$952,800
$1,191,000$952,800
39378
Iowa Department ofTransportation
22072
NHSX-20()--3H-97
US20: US 75/IA 12 IN SIOUX CITY TO LITTLE WHISKEYCR (EB/WB)
Grade and Pave, Pavement Rehab, Erosion Control
FHWA Approved TotalFederal Aid
RegionalSwap
$12,613,000$10,090,400
$12,732,000$10,185,600
$3,800,000$3,040,000
$29,145,000$23,316,000
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
18694
MPO 29 / SIMPCO
22211
RGPL-PA29()--PL-97
RGLPL: SIMPCO: MPO Planning
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$176,673$141,338
$176,673$141,338
$176,673$141,338
$176,673$141,338
$706,692$565,352
83
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38048
Iowa Department ofTransportation
BRFN-77()--39-97
US77: MISSOURI RIVER IN SIOUX CITY (STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$36,000 $36,000 $36,000 $36,000 $144,000
38148
Iowa Department ofTransportation
IMN-129()--0E-97
I-129: MISSOURI RIVER IN SIOUX CITY (STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000 $50,000 $50,000 $200,000
48575
Iowa Department ofTransportation
NHSN-12()--2R-97
IA12: W 19TH ST INTERSECTION IN SIOUX CITY
Grade and Pave, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$214,000 $214,000
45302
Iowa Department ofTransportation
BRFN-20()--39-97
US20: PROPOSED RD 0.5 MI W OF IA 12 (EB/WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$571,000 $571,000
45296
Iowa Department ofTransportation
BRFN-20()--39-97
US20: SERGEANT RD 2.1 MI W OF IA 12 (EB & WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$446,000 $446,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39148
Sergeant Bluff
22366
TAP-R-6890()--8T-97
In the city of Sergeant Bluff, The Loess Hills Scenic Trail(Phase 1) from Barker Park to South Ridge Rd
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$112,500$90,000
$90,000
$424,000$339,200
$339,200
$536,500$429,200
$429,200
84
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48379
Sioux City
BHM-SWAP-7057(703)--SA-97
In the city of Sioux City, On DACE AVE, Over OLD FLOYDRIVER CHANNEL
Bridge Rehabilitation
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$2,340,000
$1,000,000
$2,340,000
$1,000,00044954
Woodbury County
BRS-SWAP-C097(146)--FF-97
On D 12, Over CREEK, from Barker Avenue E 0.05 miles inSectiion 7 T89N R46W
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
85
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36656
Sergeant Bluff
STBG-SWAP-6890(610)--SG-97
In the city of Sergeant Bluff, On First Street, from Port NealRoad to C Street
Pavement Rehab
DOT Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$2,000,000
$1,400,000
$1,400,000
$2,000,000
$1,400,000
$1,400,00037828
Sioux City
STBG-SWAP-7057()--SG-97
In the city of Sioux City, On Dodge Ave, from South RustinSt to South Cecelia St
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,300,000
$1,040,000
$1,040,000
$1,300,000
$1,040,000
$1,040,00038311
Sioux City
STBG-SWAP-7057()--SG-97
In the city of Sioux City, On South Cecelia St, from DodgeAve to Morningside Ave
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$850,000
$117,000
$117,000
$850,000
$117,000
$117,00037829
Sioux City
STBG-SWAP-7057(706)--SG-97
In the city of Sioux City, HMA mill & overlay on HamiltonBlvd from 36th St to city limits and 15th St to 20th St
Pavement Rehab
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,215,000
$972,000
$972,000
$1,215,000
$972,000
$972,00036655
Sioux City
STBG-SWAP-7057(708)--SG-97
In the city of Sioux City, On Stone Park Blvd, from WestClifton St to Broken Kettle Road
Pavement Rehab
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$1,610,000
$1,288,000
$1,288,000
$1,610,000
$1,288,000
$1,288,00032763
Woodbury County
STBG-SWAP-C097(144)--FG-97
On K25, from Relocated Port Neal Road South 1.8 Miles toGelita Plant Entrance, Sec 7 and 18 T87 R47
Pavement Widening, Shoulder Grading, Granular Shoulders
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$2,887,000
$2,125,000
$2,125,000
$2,887,000
$2,125,000
$2,125,00038874
Sioux City
STBG-SWAP-7057()--SG-97
In the city of Sioux City, On Rebecca Street, from West 16thStreet to Villa Avenue
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,539,000
$1,158,000
$1,158,000
$1,539,000
$1,158,000
$1,158,00038873
Sioux City
STBG-SWAP-7057(709)--SG-97
In the city of Sioux City, On South Rustin Street, from LeechAvenue to Dodge Avenue
Pavement Rehab
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$1,759,000
$1,407,000
$1,407,000
$1,759,000
$1,407,000
$1,407,00048367
Sergeant Bluff
STBG-SWAP-6890()--SG-97
In the city of Sergeant Bluff, On First Street, from Farewayentrance to Old Lakeport Road
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$2,760,000
$1,794,000
$1,794,000
$2,760,000
$1,794,000
$1,794,000
86
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
47285
Sioux City
STBG-SWAP-7057()--SG-97
In the city of Sioux City, On IA 12 S, Over BACON CREEK
Culvert Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$4,224,400
$2,024,400
$2,024,400
$4,224,400
$2,024,400
$2,024,40047088
Plymouth County
STBG-SWAP-C075(C-80)--SK-75
On C-80, from K22 E 3.5 miles to HWY 75
DOT Approved TotalFederal Aid
RegionalSwap
$1,977,000
$1,500,000
$1,500,000
$1,977,000
$1,500,000
$1,500,000
87
Iowa Northland Regional Council of Governments
229 E. Park Ave, Waterloo, IA 50703
Phone: 319-235-0311, Fax: 319-235-2891, www.inrcog.org
\l)•-------=1------���t----l
� I� =--1-..,.....--1_57
Grund:yCounty
I I
I I
I I
I I
I
6 Hudson
N I I I
0 1 1 2
l
'I
� Waterl · Elk Run Raymond� L'
-��---�s
@� ®'��------"F'
Black Hawk County
�orts - Interstate
� Commercial - National Highway System
El Enhanced - Primary Roads
El General Service - Local Roads
Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
88
MPO 30 / INRCOGNHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38177
Iowa Department ofTransportation
22075
NHSX-27()--3H-7
IA27: US 20 TO RIDGEWAY AVE IN CEDAR FALLS(NB/SB) (STATE SHARE)
Grade and Pave, Culvert Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$5,228,000$4,182,400
$5,228,000$4,182,400
45382
Iowa Department ofTransportation
22076
NHSX-20()--3H-7
US20: HUDSON RD TO US 63 (EB & WB)
Grade and Pave, Traffic Signs
FHWA Approved TotalFederal Aid
RegionalSwap
$17,321,000$13,856,800
$17,321,000$13,856,800
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
16106
MPO 30 / INRCOG
22212
RGPL-BCHF()--PL-07
Waterloo MPO Planning: PL For Waterloo MPOTransportation Planning
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$237,532$190,025
$237,532$190,025
$237,532$190,025
$237,532$190,025
$950,128$760,100
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45254
Iowa Department ofTransportation
BRFN-63()--39-7
US63: CEDAR RIVER 0.2 MI N OF US 218 IN WATERLOO(NB)
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$1,199,000 $1,199,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45240
MPO 30 / INRCOG
22283
STP-U-PA30()--70-07
NE Industrial Access: NEPA
Outside Services Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$625,000$480,000
$480,000
$625,000$480,000
$480,000
90
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45045
Cedar Falls
22368
TAP-U-1185(655)--8I-07
On Lake Street Trail, from Central Ave E 0.6 miles toexisting trail
Ped/Bike Grade & Pave
FHWA Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$395,000$302,000
$302,000
$395,000$302,000
$302,000
39133
Waterloo
22367
TAP-U-8155(768)--8I-07
On Cedar River Marina Recreational Trail Enhancements,
Outside Services Engineering, Ped/Bike Grade &Pave, Ped/Bike Miscellaneous
FHWA Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$574,000$459,000
$459,000
$574,000$459,000
$459,000
48386
Waterloo
22369
TAP-U-8155()--8I-07
In the city of Waterloo, On Hess Rd Trail, from Shaulis Rd N0.32 miles to KOA Campground Entrance
Ped/Bike Grade & Pave, Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$189,160$151,328
$151,328
$189,160$151,328
$151,328
SWAP-CMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45736
Waterloo
ICAAP-SWAP-8155()--SH-07
In the city of Waterloo, On US 63 S, from Donald St S 1.0miles to Newell St S14 T89 R13
Traffic Signals
DOT Approved TotalFederal Aid
RegionalSwap
$145,000
$112,392
$145,000
$112,392
91
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37821
Elk Run Heights
STBG-SWAP-2312()--SG-07
In the city of Elk Run Heights, On Lafayette Rd & GilbertvilleRd, from WCL east and southeast 0.65 miles to Amber Ln
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,897,000
$1,200,000
$1,200,000
$1,897,000
$1,200,000
$1,200,00025388
Raymond
STBG-SWAP-6342(601)--SG-07
In the city of Raymond, On Lafayette Rd, from 2750' W ofTaylor Ln E 0.85 miles to 2nd St
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
DOT Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$3,256,000
$1,230,000
$1,230,000
$3,256,000
$1,230,000
$1,230,000
39136
Waterloo
STBG-SWAP-8155(775)--SG-07
On Hess Rd, from E Shaulis Rd N 0.4 miles to 500' north ofKOA Dr
Grade and Pave, Ped/Bike Grade & Pave
DOT Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$3,327,000
$2,727,000
$2,727,000
$3,327,000
$2,727,000
$2,727,00039139
Cedar Falls
STBG-SWAP-1185(657)--SG-07
In the city of Cedar Falls, On Main St, from 6th St South0.75 Miles to Seerley Blvd
Grade and Pave, Right of Way, Outside ServicesEngineering, Ped/Bike Grade & Pave
DOT Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$3,350,000
$1,500,000
$1,500,000
$4,250,000
$1,400,000
$1,400,000
$7,600,000
$2,900,000
$2,900,000
45241
Evansdale
STBG-SWAP-2432()--SG-07
On Lafayette Rd, from Evans Rd E 1.4 miles to ECL
Pavement Rehab, Outside Services Engineering, Ped/BikePaving, Ped/Bike Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$120,000
$102,000
$102,000
$2,500,000
$1,605,000
$1,605,000
$2,620,000
$1,707,000
$1,707,00036659
Hudson
STBG-SWAP-3577(608)--SG-07
In the city of Hudson, On Butterfield Rd, from Ranchero Rdnorth 0.5 Miles to 500' S of US-20
Outside Services Engineering
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$131,000
$104,000
$104,000
$131,000
$104,000
$104,00039137
Waterloo
STBG-SWAP-8155(776)--SG-07
On Hess Rd, from 500' N of KOA Dr N 0.45 miles to 960' Nof US 20
Grade and Pave, Ped/Bike Grade & Pave
DOT Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$3,840,000
$1,350,000
$1,350,000
$3,840,000
$1,350,000
$1,350,00039138
MPO 30 / INRCOG
STBG-SWAP-PA30()--SG-07
On IA 58, from US 63 North 4.0 Miles to 0.4 mi S ofRanchero Rd
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$563,000
$450,000
$450,000
$563,000
$450,000
$450,00038335
MPO 30 / INRCOG
STBG-SWAP-PA30()--SG-07
IA 27: US 20 TO RIDGEWAY AVE IN CEDAR FALLS (NB &SB)
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$625,000
$500,000
$500,000
$625,000
$500,000
$500,000
92
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
PA Note: MPO contribution to TPMS 38177
48388
Waterloo
STBG-SWAP-8155()--SG-07
In the city of Waterloo, On HESS RD, from 960' north of US20 N 0.4 miles to Grimm St
Pavement Rehab/Widen, Ped/Bike Grade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$4,060,000
$2,473,000
$2,473,000
$4,060,000
$2,473,000
$2,473,00034782
Black Hawk County
STBG-SWAP-C007(XXX)--FG-07
On ORANGE RD, from 900 FT EAST OF HAMMOND AVEE 2.5 miles to Hwy 218
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$970,000
$448,000
$448,000
$970,000
$448,000
$448,00048387
MPO 30 / INRCOG
STBG-SWAP-PA30()--SG-07
On US 63 , from US 20 NE 3.5 miles to 0.4 miles south ofUniversity Ave
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$875,000
$700,000
$700,000
$875,000
$700,000
$700,000PA Note: MPO contribution to Iowa DOT project
93
•
0
RPA 1 - Upper Explorerland Regional Planning Commission
325 Washington Street, Suite A, Decorah, IA 52101
Phone: 563-382-6171, Fax: 563-382-6311, www.uerpc.org
County� 150
____ ..._93_--.. ':J.
20 Miles
�orts � Commercial
El Enhanced
General Service
Basic Service
El Local Service Transit rel Regional
rel Large Urban
rel Small Urban
rel Intercity Bus
C[I Amtrak
I Park & Ride
- Interstate
- National Highway System
- Primary Roads
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
94
RPA 1HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48582
Iowa Department ofTransportation
22019
HSIPX-52()--3L-22
US52: MILLVILLE TO GUTTENBERG
Pavement Widening
FHWA Approved TotalFederal Aid
RegionalSwap
$1,250,000$1,125,000
$1,250,000$1,125,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48434
Iowa Department ofTransportation
22079
NHSX-52()--3H-96
US52: SCL TO W OF RR IN CASTALIA
Pavement Rehab, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,046,000$836,800
$1,046,000$836,800
48503
Iowa Department ofTransportation
22080
NHSX-52()--3H-96
US52: ECL OF OSSIAN TO CO RD B32 (STATE SHARE)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$1,648,000$1,318,400
$1,648,000$1,318,400
48424
Iowa Department ofTransportation
22078
BRF-3()--38-33
IA3: LITTLE WAPSIPINICON RIVER 0.2 MI W OF CO RDV68
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,994,000$1,595,200
$1,994,000$1,595,200
48629
Iowa Department ofTransportation
22081
BRF-3()--38-33
IA3: MAQUOKETA RIVER 1.7 MI E OF IA 187
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,035,000$1,628,000
$2,035,000$1,628,000
48416
Iowa Department ofTransportation
22077
BRF-76()--38-3
IA76: WATERLOO CREEK 2.2 MI N OF CO RD A26
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,395,000$1,916,000
$2,395,000$1,916,000
96
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37912
Iowa Department ofTransportation
BRFN-18()--39-22
US18: MISSISSIPPI RIVER IN MARQUETTE (STATESHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000 $20,000 $20,000 $80,000
38045
Iowa Department ofTransportation
BRFN-52()--39-96
US52: UPPER IOWA RIVER 1.8 MI N OF IA 9
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$332,000 $332,000
37876
Iowa Department ofTransportation
BRFN-9()--39-3
IA9: MISSISSIPPI RIVER IN LANSING (STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000 $20,000 $20,000 $80,000
48591
Iowa Department ofTransportation
STPN-76()--2J-22
IA76: IN MCGREGOR FROM BUELL AVE TO RIVER ST
Pave, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$4,800,000 $4,800,000
39202
Iowa Department ofTransportation
BRFN-18()--39-22
US18: STREAM 0.6 MI W OF E JCT US 52
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$2,039,000 $2,039,000
39256
Iowa Department ofTransportation
BRFN-9()--39-45
IA9: CRANE CREEK 1.4 MI W OF CO RD V26
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$279,000 $279,000
39255
Iowa Department ofTransportation
BRFN-9()--39-45
IA9: LITTLE WAPSIPINICON RIVER 0.1 MI W OF CO RDV10
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$242,000 $242,000
39257
Iowa Department ofTransportation
BRFN-9()--39-45
IA9: NORTH BRANCH TURKEY RIVER 4.3 MI E OF US 63
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,024,000 $1,024,000
45329
Iowa Department ofTransportation
BRFN-13()--39-22
IA13: VOLGA RIVER 4.1 MI S OF IA 56
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$674,000 $674,000
97
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45365
Iowa Department ofTransportation
BRFN-93()--39-33
IA93: STREAM 0.7 MI W OF CO RD V68
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$958,000 $958,000
48583
Iowa Department ofTransportation
STPN-128()--2J-22
IA128: W OF CLAYTON CENTER AND 1.1 MI W OF CORD X41
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$206,000 $206,000
48467
Iowa Department ofTransportation
BRFN-150()--39-33
IA150: VOLGA RIVER 0.2 MI N OF IA 93
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$730,000 $730,000
48574
Iowa Department ofTransportation
BRFN-52()--39-22
US52: TURKEY RIVER IN MILLVILLE
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,320,000 $1,320,000
48469
Iowa Department ofTransportation
BRFN-9()--39-96
IA9: TROUT CREEK 6.1 MI E OF US 52
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$470,000 $470,000
48552
Iowa Department ofTransportation
STPN-13()--2J-22
IA13: 0.05 MI E OF EMPIRE RD AND 0.2 MI SW OF IA 56
DOT Approved TotalFederal Aid
RegionalSwap
$190,000 $190,000
98
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
20
RPA 1
22284
RGPL-PA01(RTP)--ST-00
UERPC RPA-1 TRANSPORT PLANNING
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$37,500$30,000
$30,000
$37,500$30,000
$30,000
$43,750$35,000
$35,000
$43,750$35,000
$35,000
$162,500$130,000
$130,000
48625
Iowa Department ofTransportation
22286
STP-76()--2C-3
IA76: CLAYTON CO TO 0.2 MI W OF THE E JCT CO RDX32
Pavement Widening, Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$5,200,000$4,160,000
$5,200,000$4,160,000
45319
Iowa Department ofTransportation
22285
STP-9()--2C-3
IA9: MISSISSIPPI RIVER IN LANSING (STATE SHARE)
Grade and Pave, Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$37,246,000$29,796,800
$37,246,000$29,796,800
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
4811
Fayette County
22334
BROS-C033(77)--8J-33
On 240TH ST, Over TURNER CREEK, S2 T94 R09
FHWA Approved
11/19/2019
TotalFederal Aid
RegionalSwap
$481,000$1,000
$481,000$1,000
99
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38348
Winneshiek CountyConservation Board
22370
TAP-R-C096()--8T-96
Trail Bridge (Phase VII) On Dry Run Trail, Over Dry RunCreek
Ped/Bike Structures
FHWA Approved TotalFederal Aid
RegionalSwap
$665,000$274,000
$274,000
$665,000$274,000
$274,000
32585
Winneshiek CountyConservation Board
22371
TAP-R-C096(148)--8T-96
Trail Bridge (Phase VI) On Dry Run Trail, Over Dry RunCreek
Ped/Bike Structures
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$320,000$116,000
$116,000
$320,000$116,000
$116,000
DOT Note: Project eligible for FHWA TAP funding
39141
Fayette CountyConservation Board
22372
TAP-R-C033()--8T-33
Backbone Trail extension, from Nims Bridge (current trail)along Great River Road (south side) to Juniper Road
Scenic or Historic Hwy., Ped/Bike Paving, Ped/BikeMiscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$1,735,000$171,000
$171,000
$1,735,000$171,000
$171,000
45492
Clayton CountyConservation Board
22373
TAP-R-C022()--8T-22
On South/East side of Iowa 13, from 250th Street 1 miles toGrape Road
Ped/Bike Paving
FHWA Approved TotalFederal Aid
RegionalSwap
$854,233$192,000
$192,000
$854,233$192,000
$192,000
48642
Winneshiek CountyConservation Board
22374
TAP-R-C096()--8T-96
On Dry Run Trail, Over Multiple Drainages
Ped/Bike Structures
FHWA Approved TotalFederal Aid
RegionalSwap
$487,830$180,056
$180,056
$487,830$180,056
$180,056
100
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37527
Howard County
BHS-SWAP-C045()--FC-45
On A46, Over Crane Creek, S14 T98 R13
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00038486
Decorah
BRM-SWAP-1867(616)--SD-96
On POLE LINE RD, Over DRAINAGE, S8 T98 R08
Bridge Replacement
DOT Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00036406
Allamakee County
BROS-SWAP-C003(29R1)--FE-03
On Ellingson Bridge Drive, Over PATTERSON CREEK, S29T99N R06W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$550,000
$162,000
$550,000
$162,00029321
Clayton County
BROS-SWAP-C022(94)--SE-22
On 250TH ST, Over DRY MILL CREEK, in N1/4 S20 T93R04
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00045712
Fayette County
BROS-SWAP-C033()--FE-33
On V 62, Over TRIB TO WAPSIE RIVER, S7 T92 R10
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$81,000
$80,000
$81,000
$80,00045830
Fayette County
BROS-SWAP-C033(145)--SE-33
On H AVE, Over GUNDLACH CR, S13 T91 R08
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$360,000
$280,000
$360,000
$280,00038644
Howard County
BROS-SWAP-C045()--SE-45
On Vale Rd, Over Nichols Creek, S22 T100 R11
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00023616
Winneshiek County
BRS-SWAP-C096(119)--FF-96
On W 20, Over UPPER IOWA RIVER, S6 T98 R08
Bridge Replacement
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$2,600,000
$600,000
$2,600,000
$600,00047235
Clayton County
BROS-SWAP-C022()--SE-22
On 295TH ST, Over STREAM, from Grandview Rd W 0.1miles to Bridge S12 T92 R05
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
101
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44841
Fayette County
BROS-SWAP-C033()--SE-33
On 190TH ST, Over VOLGA RIVER, S6 T93 R09
DOT Approved TotalFederal Aid
RegionalSwap
$430,000
$350,000
$430,000
$350,00045939
Fayette County
BROS-SWAP-C033()--SE-33
On MAPLE RD, Over CREEK, S25 T95 R09
DOT Approved TotalFederal Aid
RegionalSwap
$380,000
$330,000
$380,000
$330,00038651
Howard County
BROS-SWAP-C045()--SE-45
On 135th St, Over South Branch Turkey River, S11 T98R12
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$540,000
$540,000
$540,000
$540,00037437
Winneshiek County
BROS-SWAP-C096()--FE-96
On 295TH AVE, Over SMALL CREEK, S24 T96 R10
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00045748
Winneshiek County
BROS-SWAP-C096()--SE-96
On 210TH ST, Over CREEK, S2 T97 R09
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00045750
Winneshiek County
BROS-SWAP-C096()--SE-96
On N BEAR RD, Over CREEK, S13 T100 R07
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00044877
Howard County
BRS-SWAP-C045()--FF-45
On V58, Over Nichols Creek, S22 T100 R11
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00037764
Allamakee County
BROS-SWAP-C003(14I1)--SE-03
On Picnic Woods Drive, Over TEEPLE CREEK, Bridge, S14T97N R06W
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00037763
Allamakee County
BROS-SWAP-C003(69)--SE-03
On Suttle Creek Road, Over YELLOW RIVER, Bridge, S18T96N R04W
DOT Approved
12/19/2023
TotalFederal Aid
RegionalSwap
$960,000
$960,000
$960,000
$960,000
102
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39035
Clayton County
BROS-SWAP-C022()--SE-22
On Coffee Rd, Over PLUM CREEK, S34 T91 R1
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00036500
Fayette County
BROS-SWAP-C033()--SE-33
On Y AVE, Over SMALL STREAM, S31 T94 R10
DOT Approved TotalFederal Aid
RegionalSwap
$140,000
$60,000
$140,000
$60,00038649
Howard County
BROS-SWAP-C045()--SE-45
On 25th St, Over Staff Creek, S13 T100 R14
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$495,000
$495,000
$495,000
$495,00038653
Howard County
BROS-SWAP-C045()--SE-45
On 180th St, Over Bohemian Creek, S3 T97 R11
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$360,000
$360,000
$360,000
$360,00032136
Winneshiek County
BRS-SWAP-C096(138)--FF-96
On W46, Over YELLOW RIVER, S9 T96 R07
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00044892
Howard County
BROS-SWAP-C045()--FE-45
On 20th St, Over Branch Upper Iowa River, S9 T100 R12
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$270,000
$270,000
$270,000
$270,00018343
Winneshiek County
BROS-SWAP-C096()--SE-96
On Pleasent View Rd., Over Canoe Creek, S33 T99 R7
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$900,000
$900,000
$900,000
$900,00039056
Allamakee County
BRS-SWAP-C003(18K3)--FF-03
On X42(Lansing Harpers Road), Over VILLAGE CREEK,S18 T98N R03W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$960,000
$960,000
$960,000
$960,000
103
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45940
Fayette County
HSIP-SWAP-C033()--FJ-33
On ECHO VLY RD from S Pine Street Southeast two miles
DOT Approved TotalFederal Aid
RegionalSwap
$1,267,000
$362,000
$1,267,000
$362,00044798
Fayette County
HSIP-SWAP-C033(143)--FJ-33
On B44 from W14 to HWY150
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$2,282,000
$512,000
$2,282,000
$512,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
29492
Allamakee County
STBG-SWAP-C003(67)--FG-03
On A26, from X20 Intersection 6.3 miles to IA 26
Pavement Rehab
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$4,800,000
$2,800,000
$2,800,000
$4,800,000
$2,800,000
$2,800,00035133
Fayette County
STBG-SWAP-C033(126)--FG-33
On W14, from 60th St to 150th St
Pavement Rehab
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$2,450,000
$2,100,000
$2,100,000
$2,450,000
$2,100,000
$2,100,00039140
Guttenberg
STBG-SWAP-3167()--SG-22
In the city of Guttenberg, On 5th Street, from Haydn Streetnorth .44 Miles to Kosciusko Street
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$431,000
$344,000
$344,000
$431,000
$344,000
$344,00037450
Howard County
STBG-SWAP-C045()--FG-45
On V10, from Hwy 9 North 9.5 Miles to MN Boarder
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$3,325,000
$2,519,000
$2,519,000
$3,325,000
$2,519,000
$2,519,00037438
Winneshiek County
STBG-SWAP-C096(154)--FG-96
On W 14, from Co Rd B16 (Spillville) S 4 miles to City ofFort Atkinson
Pavement Rehab
DOT Approved
12/19/2023
TotalFederal Aid
RegionalSwap
$2,200,000
$2,200,000
$2,200,000
$2,200,000
$2,200,000
$2,200,00045153
Allamakee County
STBG-SWAP-C003(A16 & A11)--FG-03
On A16 from Hwy 76 to MN Line and A11 from Hwy 26 toMN line
DOT Approved TotalFederal Aid
RegionalSwap
$3,200,000
$2,168,000
$2,168,000
$3,200,000
$2,168,000
$2,168,000
104
44
I
0 5
RPA 2 - North Iowa Council of Governments
525 6th Street SW, Mason City, IA 50401
Phone: 641-423-0491, Fax: 641-423-1637, www.niacog.org
20 Miles
Hancock
County
Mitchell
�orts � Commercial
El Enhanced
General Service
Basic Service
El Local Service Transit rel Regional
rel Large Urban
rel Small Urban
rel Intercity Bus
C[I Amtrak
I Park & Ride
- Interstate
- National Highway System
- Primary Roads
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
105
RPA 2HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48581
Iowa Department ofTransportation
22020
HSIPX-9()--3L-98
IA9: 1 MI E OF CO RD S56 TO E JCT CO RD T26
Pavement Widening
FHWA Approved TotalFederal Aid
RegionalSwap
$2,570,000$2,313,000
$2,570,000$2,313,000
107
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37965
Iowa Department ofTransportation
22085
BRF-169()--38-55
US169: BLACK CAT CREEK 4.2 MI N OF US 18
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,087,000$1,669,600
$2,087,000$1,669,600
37937
Iowa Department ofTransportation
22082
BRF-65()--38-35
US65: BAILEY CREEK 0.8 MI S OF S JCT CO RD C13
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,875,000$2,300,000
$2,875,000$2,300,000
38231
Iowa Department ofTransportation
22086
NHSX-18()--3H-34
US18: US 218/IA 27 INTERSECTION IN FLOYD
Grade and Pave, Bridge New, Erosion Control
FHWA Approved TotalFederal Aid
RegionalSwap
$21,061,000$16,848,800
$418,000$334,400
$21,479,000$17,183,200
DOT Note: Project includes HSIP funds for new bridge
48415
Iowa Department ofTransportation
22083
NHSX-18()--3H-55
US18: 1.65 MI E OF CO RD P64 TO W JCT CO RD R26
Pavement Widening, Pavement Rehab, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$7,682,000$6,145,600
$7,682,000$6,145,600
DOT Note: Project includes RPA contribution of $700,000 as programmed in TPMS 38317
45339
Iowa Department ofTransportation
22084
NHSX-65()--3H-17
US65: 0.1 MI S OF 27TH ST SW TO 6TH ST S IN MASONCITY
Grade and Pave, Traffic Signals, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$14,883,000$11,906,400
$14,883,000$11,906,400
48628
Iowa Department ofTransportation
22088
BRF-65()--38-17
US65: BEAVER DAM CREEK 2.6 MI N OF CO RD C13
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,755,000$2,204,000
$2,755,000$2,204,000
48613
Iowa Department ofTransportation
22087
NHSX-18()--3H-41
US18: E BRANCH IOWA RIVER TO COUNTRY CLUB DRIN GARNER
Pavement Rehab/Widen, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,041,000$1,632,800
$2,041,000$1,632,800
108
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37904
Iowa Department ofTransportation
BRFN-122()--39-17
IA122: WILLOW CREEK 4.4 MI E OF I-35 (WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$260,000 $260,000
39387
Iowa Department ofTransportation
BRFN-9()--39-98
IA9: BEAVER CREEK 0.5 MI W OF CO RD S18
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$10,000 $885,000 $895,000
38052
Iowa Department ofTransportation
BRFN-9()--39-98
IA9: I-35 INTERCHANGE
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$927,000 $927,000
38053
Iowa Department ofTransportation
BRFN-9()--39-98
IA9: STREAM 1.3 MI E OF US 65
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$295,000 $295,000
39197
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: 1.0 MI N OF CO RD B35 TO 1.0 MI N OF IA 9
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,210,000 $1,210,000
45355
Iowa Department ofTransportation
BRFN-122()--39-17
IA122: WILLOW CREEK 4.4 MI E OF I-35 (EB)
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $1,204,000 $1,209,000
39194
Iowa Department ofTransportation
BRFN-18()--39-17
US18: UP RR 1.5 MI W OF US 65 (WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$631,000 $631,000
39195
Iowa Department ofTransportation
BRFN-18()--39-17
US18: TRAIL 5.2 MI E OF E JCT I-35 (EB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$550,000 $550,000
39237
Iowa Department ofTransportation
BRFN-3()--39-35
IA3: SQUAW CREEK 0.6 MI E OF US 65 IN HAMPTON
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$321,000 $321,000
109
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39199
Iowa Department ofTransportation
BRFN-65()--39-17
US65: CALAMUS CREEK 1.8 MI N OF IA 122 IN MASONCITY
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$304,000 $304,000
39298
Iowa Department ofTransportation
BRFN-9()--39-66
IA9: LITTLE CEDAR RIVER 4.0 MI E OF E JCT US 218
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$391,000 $391,000
39299
Iowa Department ofTransportation
BRFN-9()--39-66
IA9: SOAP CREEK 6.1 MI E OF E JCT US 218
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$236,000 $236,000
39302
Iowa Department ofTransportation
BRFN-9()--39-66
IA9: WAPSIPINICON RIVER 1.5 MI E OF E JCT CO RDT62
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$269,000 $269,000
39301
Iowa Department ofTransportation
BRFN-9()--39-66
IA9: CEDAR RIVER 2.0 MI W OF W JCT US 218
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$408,000 $408,000
39300
Iowa Department ofTransportation
BRFN-9()--39-66
IA9: ROCK CREEK 5.8 MI W OF W JCT US 218
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$215,000 $215,000
39386
Iowa Department ofTransportation
BRFN-9()--39-98
IA9: WILLOW CREEK 0.4 MI W OF I-35
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$215,000 $215,000
39198
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: FRANKLIN CO TO 1.0 MI N OF CO RD B35
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,773,000 $1,773,000
39278
Iowa Department ofTransportation
STPN-15()--2J-55
IA15: LOTTS CREEK 6.3 MI S OF CO RD A42
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,725,000 $1,725,000
110
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39376
Iowa Department ofTransportation
STPN-9()--2J-95
IA9: N US 69 INTERSECTION NEAR LELAND
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$40,000 $40,000
45367
Iowa Department ofTransportation
BRFN-14()--39-34
IA14: FLOOD CREEK 3.6 MI S OF CO RD B45
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,833,000 $1,833,000
45251
Iowa Department ofTransportation
BRFN-18()--39-41
US18: W BRANCH IOWA RIVER 0.8 MI E OF CO RD R35
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$715,000 $715,000
45268
Iowa Department ofTransportation
BRFN-18()--39-41
US18: DITCH 2.8 MI E OF CO RD R35
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$692,000 $692,000
45301
Iowa Department ofTransportation
BRFN-218()--39-34
US218: CEDAR RIVER 0.2 MI S OF CO RD B33
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$441,000 $441,000
45330
Iowa Department ofTransportation
BRFN-69()--39-95
US69: PIKE RUN CREEK 0.5 MI N OF N JCT IA 9
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$776,000 $776,000
45433
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: MAIN ST 0.4 MI S OF N JCT US 18 (NB & SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,760,000 $1,760,000
48491
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: 1 MI N OF CO RD B35 TO NCL CLEAR LAKE
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$3,000,000 $3,000,000
45332
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: AT N JCT US 18 (NB & SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,791,000 $1,791,000
111
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45334
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: 4TH AVE S 0.6 MI S OF N JCT US 18 (NB & SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,588,000 $1,588,000
45300
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: IMRL RR 0.2 MI S OF N JCT US 18 (NB & SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,443,000 $1,443,000
45400
Iowa Department ofTransportation
IMN-35()--0E-35
I-35: CO RD C47 TO CERRO GORDO CO
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,860,000 $1,860,000
48589
Iowa Department ofTransportation
NHSN-169()--2R-55
US169: 0.1 MI S OF 240TH ST AND 0.1 MI S OF 290THST
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$326,000 $326,000
48585
Iowa Department ofTransportation
NHSN-18()--2R-55
US18: 0.2 MI E OF 175TH AVE
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$170,000 $170,000
48450
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: CO RD B60
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$570,000 $570,000
48470
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: AT CO RD B65
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$814,000 $814,000
48564
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: CO RD B20 3.9 MI N OF N JCT US 18
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$570,000 $570,000
112
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38325
Garner
22376
TAP-R-2837(605)--8T-41
In the city of Garner, On Trail, from Country Club Drive W2450 miles to State Street then south across HWY 18.
Ped/Bike Grade & Pave
FHWA Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$316,000$200,000
$200,000
$316,000$200,000
$200,000
48646
Lake Mills
22378
TAP-R-4135()--8T-95
In the city of Lake Mills, Along MAIN ST, in Lake Mills fromTrail W .147 miles to East side of Dollar General driveway
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$87,000$87,000
$87,000
$87,000$87,000
$87,000
45229
Ventura
22377
TAP-R-7967()--8T-17
In Ventura, trail adjacent to lake Street from Macintosh Parkto Venetian Village Bridge
Ped/Bike Development
FHWA Approved TotalFederal Aid
RegionalSwap
$613,432$339,000
$339,000
$613,432$339,000
$339,000
39414
Cerro GordoCountyConservation Board
22375
TAP-R-C017(108)--8T-17
On Prairie Land Trail, from s33 sw 3.1 Miles to the City ofThornton
Ped/Bike Grading
FHWA Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$815,600$598,000
$598,000
$815,600$598,000
$598,000
113
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45646
Worth County
BHOS-SWAP-C098(83)--FB-98
On S 34, Over ELK CREEK, S22 T99 R21
Bridge Rehabilitation
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00038737
Franklin County
BROS-SWAP-6940(602)--FE-35
In the city of Sheffield, On South Lincoln Street (S43), OverBAILEYE CREEK, S9 T93 R20
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,000,000
$800,000
$1,000,000
$800,00038736
Franklin County
BROS-SWAP-C035(109)--SE-35
On Indigo Avenue, Over SPRING CR, S21 T92 R21
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$375,000
$375,000
$375,000
$375,00024978
Kossuth County
BRS-SWAP-C055(194)--FF-55
On B55, Over E FORK DES MOINES RIVER, on NLINES31 T95 R28
Bridge Replacement
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00038549
Mitchell County
BRS-SWAP-C066()--FF-66
On T40, Over Unnamed Creek, S30 T100N R16W
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00037060
Winnebago County
BRS-SWAP-C095(81)--FF-95
On R20 (20th Ave), Over BLUE EARTH RIVER, from 440thSt N 0.25 miles to existing structure S9 T99 R26
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00044793
Winnebago County
BRS-SWAP-C095(81)--FF-95
On A42, Over DRAINAGE DITCH, from 70th Ave. W 0.3miles to existing structure S30 T98 R25
Bridge Replacement
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00047301
Franklin County
BHOS-SWAP-C035()--FB-35
On S 43, Over OTTER CREEK, S5 T92 R20
DOT Approved TotalFederal Aid
RegionalSwap
$240,000
$240,000
$240,000
$240,00045647
Worth County
BHOS-SWAP-C098()--SB-98
On 415TH ST, Over DRAINAGE, S26 T99 R20
Culvert New
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,000
114
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
47300
Franklin County
BHS-SWAP-C035()--FC-35
On Olive Avenue (S 43), Over SQUAW CREEK, S28 T92R20
DOT Approved TotalFederal Aid
RegionalSwap
$140,000
$140,000
$140,000
$140,0002888
Cerro GordoCounty
BROS-SWAP-C017(35)--SE-17
From Lark 1/4 mile East, Over Dam Creek Section 1 T-90N,R-20W on 160th street
Bridge Replacement
DOT Approved
6/20/2023
TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00036035
Floyd County
BROS-SWAP-C034(104)--SE-34
On VICTORY AVE, Over LITTLE CEDAR, along ELINE S16T96 R15
Bridge Replacement
DOT Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$1,600,000
$1,600,000
$1,600,000
$1,600,00038741
Franklin County
BROS-SWAP-C035()--SE-35
On 40th Street, Over BEAVER CREEK, S26 TT90N RR20
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00036259
Franklin County
BROS-SWAP-C035()--SE-35
On FRANKLIN AVE, Over HARTGRAVE CK, S19 T92 R18
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00045216
Franklin County
BROS-SWAP-C035()--SE-35
On RAIL AVE, Over SMALL STREAM, S14 T91 R20
DOT Approved TotalFederal Aid
RegionalSwap
$270,000
$270,000
$270,000
$270,00010477
Hancock County
BROS-SWAP-C041()--SE-41
On Birch Avenue, Over Lindsey Creek, S30 T97 R26
Bridge Replacement
DOT Approved
2/21/2023
TotalFederal Aid
RegionalSwap
$165,000
$165,000
$165,000
$165,0004917
Hancock County
BROS-SWAP-C041(125)--FE-41
On 225TH ST, from Deer Avenue East approximately 0.9miles, S34 T96 R26
Bridge Replacement
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$525,000
$525,000
$525,000
$525,00029411
Mitchell County
BROS-SWAP-C066(070)--SE-66
On ECHO AVE, Over ROCK CREEK, S23 T98 R18
Bridge Replacement
DOT Approved
2/20/2029
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,000
115
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37666
Worth County
BROS-SWAP-C098()--FE-98
On S18, Over STREAM, S3 T98 R22
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00037669
Worth County
BROS-SWAP-C098()--SE-98
On MALLARD AVE, Over DRAINAGE DITCH, S7 T98 R20
Culvert Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00024975
Kossuth County
BRS-SWAP-C055(B671608)--FF-55
P64: W Line 16 Wesley Twp. over PLUM CREEK
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00024976
Kossuth County
BRS-SWAP-C055(B773304)--FF-55
P64: W. Line of 33 Buffalo Twp. over Lidner Creek
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00037655
Floyd County
BROS-SWAP-C034()--SE-34
On 170TH ST, Over FLOOD CREEK, on NLINE S30 T96R17
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00038740
Franklin County
BROS-SWAP-C035()--SE-35
On Vine Avenue, Over N BEAVER CREEK, S15 TT90NRR19
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00037112
Hancock County
BROS-SWAP-C041()--SE-41
On DEER AVE, Over BOONE RIVER, S15 T95 R26
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$275,000
$275,000
$275,000
$275,00045766
Hancock County
BROS-SWAP-C041()--SE-41
On B 40, Over DRAINAGE DITCH 6, S4 T95 R24
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$150,000
$150,000
$150,000
$150,00045658
Mitchell County
BHS-SWAP-C066()--FC-66
On S 70, Over DEER CREEK, S9 T99 R18
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
116
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39011
Floyd County
BROS-SWAP-C034()--FE-34
On T42, Over CEDAR RIVER, at E1/4 S24 T97N R17W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,600,000
$1,600,000
$1,600,000
$1,600,00036258
Franklin County
BROS-SWAP-C035(100)--SE-35
On THRUSH AVE, Over SMALL STREAM, S29 T93 R19
Bridge Replacement
DOT Approved
1/17/2024
TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037667
Worth County
BROS-SWAP-C098()--SE-98
On A39, Over Winans Creek, S10 T98 R22
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00040116
Hancock County
BRS-SWAP-C041()--FF-41
On R35, Over W BRANCH IOWA RIVER, S21 T96 R25
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$175,000
$175,000
$175,000
$175,00045659
Mitchell County
BRS-SWAP-C066()--FF-66
On T 62, Over WAPSIPINICON RIVER, S14 T99 R15
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,000
117
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38317
RPA 2
STBG-SWAP-()--SG-41
On US HWY 18, from 1.65 Miles East of P64 east to theWest junction of R26
Pavement Rehab/Widen, Pavement Planing
DOT Approved TotalFederal Aid
RegionalSwap
$6,462,000
$700,000
$700,000
$6,462,000
$700,000
$700,00038315
Clear Lake
STBG-SWAP-1372(621)--SG-17
In the city of Clear Lake, On Main Avenue, from 8th StreetEast 0.35 Miles to 14th Street
Grade and Pave
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,987,000
$1,000,000
$1,000,000
$1,987,000
$1,000,000
$1,000,00039563
Hancock County
STBG-SWAP-C041(131)--SG-41
On B20, from Kossuth County Line East 9 Miles to CountyRoad R-35.
Pavement Rehab
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$1,625,000
$1,625,000
$1,625,000
$1,625,000
$1,625,000
$1,625,00036598
Kossuth County
STBG-SWAP-C055(195)--FG-55
On B46, from Kossuth County Route P60 East 6 Miles to IA17
Pavement Rehab
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,00039412
Mason City
STBG-SWAP-4822()--SG-17
In the city of Mason City, On ,Winn. Way 4th to Pierce, 12thSt. NE Federal to Kentucky,
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$800,000
$600,000
$600,000
$800,000
$600,000
$600,00048648
Mason City
STBG-SWAP-4822()--SG-17
In the city of Mason City, On 12TH ST NE, Over IdealCREEK, S1 T96 R20
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$800,000
$650,000
$650,000
$800,000
$650,000
$650,00035069
Mitchell County
STBG-SWAP-C066()--FG-66
On S 70, from State Highway 9 9 miles to Highway 105
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,100,000
$1,500,000
$1,500,000
$2,100,000
$1,500,000
$1,500,00036213
Worth County
STBG-SWAP-C098()--FG-98
On S 56, from A 39 N 7.7 miles to Co. 105
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,300,000
$500,000
$500,000
$1,300,000
$500,000
$500,00045514
RPA 2
STBG-SWAP-PA02()--SG-35
On IA 3 E, Over SQUAW CREEK, S34 T92 R19
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$5,400,000
$600,000
$600,000
$5,400,000
$600,000
$600,000
118
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45228
Charles City
STBG-SWAP-1242()--SG-34
In Charles City, Main Street from Gilbert St. to Lane St.
DOT Approved TotalFederal Aid
RegionalSwap
$1,200,000
$800,000
$800,000
$1,200,000
$800,000
$800,00037658
Floyd County
STBG-SWAP-C034()--FG-34
On T64,(155th Street & Underwood Ave), from ShadowAveue East and North 7.5 Miles to Mitchell County Line
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,100,000
$1,000,000
$1,000,000
$2,100,000
$1,000,000
$1,000,00039066
Franklin County
STBG-SWAP-C035()--FG-35
On C13 (250th Street), from S25 (Heather Avenue) E 8miles to S43 (Olive Avenue)
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,200,000
$500,000
$500,000
$2,200,000
$500,000
$500,00039022
Kossuth County
STBG-SWAP-C055(A16)--FG-55
On A16, from West County Line East 18 Miles to US 169
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,500,000
$1,250,000
$1,250,000
$2,500,000
$1,250,000
$1,250,00047058
Kossuth County
STBG-SWAP-C055(P30)--FG-55
On P30, from B63 (E Road) N 9 miles to US Highway 18
DOT Approved TotalFederal Aid
RegionalSwap
$1,300,000
$1,300,000
$1,300,000
$1,300,000
$1,300,000
$1,300,00048647
RPA 2
STBG-SWAP-PA02()--SG-55
On US 18, In Kossuth County from ECL Algona E to 0.8miles east of P-60
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$7,300,000
$1,000,000
$1,000,000
$7,300,000
$1,000,000
$1,000,000
119
0
RPA 3 - Northwest Iowa Planning and Development Commission
217 W Fifth Street, P.O. Box 1493, Spencer, IA 51301
Phone: 712-262-7225, Fax: 712-262-7665, www.nwipdc.org
� ........ 9 ----➔,-��-r�r}-_;:;:t;;;::-,.
I I
, 59 Osceola' I
I
6° County1 ickinsori ---- ----------+-------- County� ---
-:-�-,}a�-;----.&��
5 10 20 Miles
r
Clay County
-
I
,Palo Alto 1 County
I I
--- --------- -.---..... --...a.--
Buena Vista County
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
120
RPA 3HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48366
Iowa Department ofTransportation
22021
HSIPX-018-2(129)--3L-71
In Hartley from 8th Ave W to E of 8th Ave E
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$250,000$225,000
$250,000$225,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37994
Iowa Department ofTransportation
22089
BRF-18()--38-74
US18: CYLINDER CREEK AT W JCT CO RD N60
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,195,000$956,000
$1,195,000$956,000
38186
Iowa Department ofTransportation
22090
NHSX-71()--3H-30
US71: OKOBOJI GROVE RD IN ARNOLDS PARK TOEAST VIEW AVE
Grade and Pave, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$12,965,000$10,372,000
$12,965,000$10,372,000
39356
Iowa Department ofTransportation
22091
NHSX-75(55)--3H-84
US75: IN SIOUX CENTER (STATE SHARE)
Grade and Pave, Right of Way
FHWA Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$4,300,000$3,440,000
$18,950,000$15,160,000
$23,250,000$18,600,000
122
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37910
Iowa Department ofTransportation
BRFN-18()--39-21
US18: LOST ISLAND OUTLET 1.0 MI E OF CO RD M54
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$466,000 $466,000
37995
Iowa Department ofTransportation
BRFN-18()--39-74
US18: W FORK DES MOINES RIVER 2.5 MI E OF W JCTIA 4
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$446,000 $446,000
48436
Iowa Department ofTransportation
NHSN-18()--2R-21
US18: CP RR CROSSING N OF 7TH ST IN SPENCER
Pavement Rehab, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$151,000 $151,000
45298
Iowa Department ofTransportation
NHSN-18()--2R-21
US18: LOST ISLAND OUTLET 1.6 MI E OF CO RD M54
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$333,000 $333,000
48473
Iowa Department ofTransportation
STPN-59()--2J-71
US59: IN PRIMGHAR, FROM THE SCL TO NCL
Patching
DOT Approved TotalFederal Aid
RegionalSwap
$310,000 $310,000
48540
Iowa Department ofTransportation
STPN-7()--2J-11
IA7: IA 110 INTERSECTION IN STORM LAKE
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$900,000 $900,000
38284
Iowa Department ofTransportation
STPN-9()--2J-60
IA9: SOUTH DAKOTA EAST 0.5 MI
Grade and Pave, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$674,000 $674,000
39313
Iowa Department ofTransportation
BRFN-10()--39-71
IA10: MUD CREEK 1.9 MI W OF CO RD L48
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,420,000 $1,420,000
45359
Iowa Department ofTransportation
BRFN-18()--39-74
US18: PRAIRIE CREEK 2.8 MI W OF W JCT IA 15
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $1,483,000 $1,488,000
123
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39314
Iowa Department ofTransportation
BRFN-59()--39-71
US59: DRY RUN 0.4 MI N OF N JCT IA 10
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$374,000 $374,000
45312
Iowa Department ofTransportation
BRFN-10()--39-84
IA10: BIG SIOUX RIVER AT SOUTH DAKOTA (STATESHARE)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$985,000 $985,000
45435
Iowa Department ofTransportation
BRFN-3()--39-11
IA3: MAPLE CREEK 0.2 MI W OF CO RD M27
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$491,000 $491,000
45322
Iowa Department ofTransportation
BRFN-3()--39-11
IA3: STREAM 1.2 MI W OF US 71
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$229,000 $229,000
45299
Iowa Department ofTransportation
BRFN-4()--39-74
IA4: DITCH 3.0 MI N OF N JCT US 18
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$303,000 $303,000
48453
Iowa Department ofTransportation
BRFN-10()--39-84
IA10: ORANGE CITY SLOUGH 4.5 MI E OF US 75
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$380,000 $380,000
48444
Iowa Department ofTransportation
BRFN-18()--39-60
US18: BIG SIOUX RIVER AT SOUTH DAKOTA (STATESHARE)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$730,000 $730,000
48468
Iowa Department ofTransportation
BRFN-59()--39-71
US59: BRANCH FLOYD RIVER 1.9 MI N OF N JCT US 18
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$420,000 $420,000
48456
Iowa Department ofTransportation
BRFN-71()--39-30
US71: EAST OKOBOJI LAKE 1.7 MI N OF S JCT IA 9
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$510,000 $510,000
124
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45552
Dickinson CountyBoard ofSupervisors
22220
NRT-C030(062)--9G-30
Starting east of IA Hwy 86 heading west to 193rd Ave inMontgomery
Ped/Bike Grade & Pave
FHWA Approved
5/18/2021
TotalFederal Aid
RegionalSwap
$883,680$221,750
$883,680$221,750
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
141
RPA 3
22288
RGPL-PA03(RTP)--ST-00
NWIPDC - RPA 3: RPA 3 FHWA PLANNING
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$58,000$38,000
$38,000
$48,000$38,000
$38,000
$48,000$38,000
$38,000
$47,500$38,000
$38,000
$201,500$152,000
$152,000
36951
RPA 3
22287
RGTR-PA03()--ST-00
RTA dba/RIDES
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$111,600$89,600
$89,600
$111,600$89,600
$89,600
PA Note: Purchase replacement of 2 minivans
125
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39446
Clay County Boardof Supervisors
22380
TAP-U-C021()--8I-21
Along US Highway 71 ROW, from 300th St. N 1.5 Miles toSCL of City of Fostoria
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$729,000$583,000
$583,000
$729,000$583,000
$583,000
39447
Dickinson CountyBoard ofSupervisors
22379
TAP-U-C030()--8I-30
On Former IA & NW RR ROW, from 219th Ave in SpiritLake W 1.6 Miles to Jct. IA Highway 86
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$695,000$180,000
$180,000
$695,000$180,000
$180,000
48701
Clay County Boardof Supervisors
22382
TAP-U-C021()--8I-21
On US 71 N from City of Fostoria N .71 miles to 270th St.
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$458,394$272,000
$272,000
$458,394$272,000
$272,000
48700
Dickinson CountyBoard ofSupervisors
22381
TAP-U-C030()--8I-30
Along US 71 ROW from Clay/Dickinson County line N 1.5miles
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$762,480$272,000
$272,000
$762,480$272,000
$272,000
126
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48699
Rock Rapids
BRM-SWAP-6542(607)--SD-60
In the city of Rock Rapids, On N E ST, Over TOM CREEK,S34 T100 R45
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00019653
Lyon County
BROS-SWAP-C060()--FE-60
On K-52, Over Kanaranzi Creek, S22 T100 R45
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,296,000
$1,296,000
$1,296,000
$1,296,00045607
Obrien County
BROS-SWAP-C071(88)--FE-71
On 420th Street, Over WATERMAN CREEK, S23 T95 R39
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00045636
Osceola County
BROS-SWAP-C072(77)--SE-72
On 260TH ST, Over OCHEYDAN RIVER, S34 T98 R39
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,050,000
$825,000
$1,050,000
$825,00045962
Palo Alto County
BROS-SWAP-C074(110)--SE-74
On 570TH AVE, Over STREAM, S1 T95 R31
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00022229
Buena Vista County
BRS-SWAP-C011(100)--FF-11
M36: Over Bluebird Creek NW1/4 S5 T93N R37W
Culvert Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$950,000
$950,000
$950,000
$950,00036271
Lyon County
BRS-SWAP-C060(123)--FF-60
On K 60, Over TOM CREEK, S30 T100 R44
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$668,000
$668,000
$668,000
$668,0008684
Sioux County
BROS-SWAP-6550()--SE-84
On 14TH ST, Over Creamery Creek, S21 T97 R46
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$475,000
$470,000
$475,000
$470,00021407
Buena Vista County
BROS-SWAP-C011(BV95)--SE-11
220TH AVE: Over BR RACCOON RIVER NW1/4 S27 T92NR35W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,000
127
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44839
Osceola County
BROS-SWAP-C072()--SE-72
On ORIOLE AVE, Over OTTER CREEK, S31 T99 R41
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00045974
Palo Alto County
BROS-SWAP-C074()--SE-74
On 350TH AVE, Over STREAM, S20 T97 R34
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$340,000
$340,000
$340,000
$340,00012558
Sioux County
BROS-SWAP-C084()--FE-84
On B58 (470th Street), Over W BRANCH FLOYD RIVER,from Grant Ave E approx 0.1 miles, NW-NW 1/4 S17 T94R45
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$448,000
$450,000
$448,000
32321
Sioux County
BROS-SWAP-C084()--FE-84
On Lily Ave.(L22) NW of Hospers, IA, Over NO NAMECREEK, from 380th St S approx .90 miles SW-SW 1/4 S34T96 R43
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$375,000
$373,000
$375,000
$373,000
17855
Sioux County
BROS-SWAP-C084()--FE-84
On 340th Street (B20), SMALL STREAM, from Indian Eapprox 0.40 miles, NE-NW 1/4 S7 T96 R44
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$448,000
$450,000
$448,00026988
Sioux County
BROS-SWAP-C084()--SE-84
On 270th St, from Dogwood Ave E 0.5 mile, S1 T97 R47
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$451,000
$449,000
$451,000
$449,00044919
Lyon County
BRS-SWAP-C060(40Y)--FF-60
On L 26, Over TAFT CREEK, S24 T99 R43
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00044923
Lyon County
BRS-SWAP-C060(65Y)--FF-60
On L 26, Over WEST RAT CREEK, S1 T98 R43
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00036065
Sioux County
BRS-SWAP-C084(170)--FF-84
On 360th Street (B30), Over Rock River, SW-SE 1/4 S16T96 R47
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$3,565,000
$2,058,000
$3,565,000
$2,058,000
128
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45132
Lyon County
BHS-SWAP-C060(39W)--FC-60
On K 30, Over MUD CREEK, S4 T98 R46
DOT Approved TotalFederal Aid
RegionalSwap
$150,000
$150,000
$150,000
$150,00045131
Lyon County
BHS-SWAP-C060(51W)--FC-60
On K 42, Over ROCK RIVER, S23 T98 R46
DOT Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00034547
Obrien County
BROS-SWAP-C071(K-20)--SE-71
On Roosevelt Avenue 0.2 Miles South of 420th Street.
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00045968
Palo Alto County
BROS-SWAP-C074()--FE-74
On 460TH ST, Over OLD CHANNEL DES MOINES R, S5T94 R31
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$575,000
$575,000
$575,000
$575,00045975
Palo Alto County
BROS-SWAP-C074()--FE-74
On 460TH ST, Over DD, S12 T94 R31
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00035252
Sioux County
BROS-SWAP-C084()--FE-84
On 280th Street, from NW of Rock Valley from DogwoodAve E approx 3/4 mile NE-NE 1/4 S12 T97 R47
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$447,000
$450,000
$447,00032320
Sioux County
BROS-SWAP-C084()--FE-84
On 470th St.(B58) W. of Ireton, IA, Over Indian Creek, fromDogwood Ave E approx .10 miles NW-NW 1/4 S13 T94 R47
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$362,000
$360,000
$362,000
$360,00012560
Sioux County
BROS-SWAP-C084()--FE-84
290th Street: North of Hull, IA, from Harrison Ave E approx1/4 mile NW 1/4 S15 T97 R45
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$422,000
$419,000
$422,000
$419,00036201
Emmet County
BRS-SWAP-C032()--FF-32
On A 17, Over EF DES MOINES RIVER, S13 T100 R32
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,000
129
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45746
Osceola County
BHOS-SWAP-C072()--FB-72
On A 30, Over OCHEYEDAN RIVER, S35 T99 R40
DOT Approved TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,00020201
Osceola County
BRS-SWAP-C072(61)--FF-72
On NORTHWEST BLVD; Over Polly Creek; S12 T99 R42
Bridge Replacement
DOT Approved
3/20/2029
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38903
Clay County
HSIP-SWAP-C021(149)--FJ-21
On 280th street, from M27 E 9 miles to Hwy 71
Pave
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$2,535,000
$441,000
$2,535,000
$441,000
130
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38377
Milford
STBG-SWAP-5057()--SG-30
In the city of Milford, On 13th St., from US Highway 71 west.75 Miles to 213th Ave.
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$4,737,000
$1,657,800
$1,657,800
$4,737,000
$1,657,800
$1,657,80038378
Storm Lake
STBG-SWAP-7422(620)--SG-11
In the city of Storm Lake, On E Richland St., from IndustrySt east 600 Feet to Radio Road
Pavement Rehab
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$252,000
$163,529
$163,529
$252,000
$163,529
$163,52936431
Buena Vista County
STBG-SWAP-C011(116)--FG-11
On M36, Over LITTLE SIOUX RIVER, S5 T93 R37
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$3,014,000
$514,000
$2,094,000
$3,014,000
$514,000
$2,094,00026809
Buena Vista County
STBG-SWAP-C011(BV61)--FG-11
On C49, from US 71 E 6 miles to 190th Ave
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,000,000
$570,000
$570,000
$2,000,000
$570,000
$570,00020702
Lyon County
STBG-SWAP-C060(A18)--FG-60
On A18, from Big Sioux River East to Int of IA 9
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,640,000
$445,000
$445,000
$2,640,000
$445,000
$445,00035938
Palo Alto County
STBG-SWAP-C074(108)--FG-74
On B63, from 535th Ave East Approximately 4 Miles to CityLimits of West Bend
Pavement Rehab/Widen
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$1,280,000
$768,000
$768,000
$1,280,000
$768,000
$768,00036066
Sioux County
STBG-SWAP-C084()--FG-84
On L14 (Kiwi Ave), from IA Hwy #10 W. of Alton S 5 miles toSioux/Plymouth Co. Line
Pavement Rehab/Widen
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,484,000
$800,000
$800,000
$1,484,000
$800,000
$800,00021026
Sioux Center
NHSX-075-3(55)--3H-84
MAIN AVE: widening of Highway 75 (Main Ave.) from 3 to 5lane approx distance 1.4 mi.
Pavement Rehab/Widen
DOT Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$4,066,000
$980,000
$980,000
$4,066,000
$980,000
$980,00038376
Estherville
STBG-SWAP-2417()--SG-32
In the city of Estherville, On S. 1st St., from IA 9 SE .74Miles to IA 4
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$208,000
$208,000
$300,000
$208,000
$208,000
131
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39445
Spencer
STBG-SWAP-7170()--SG-21
In the city of Spencer, On E 4th St from 5th Ave E to 10thAve E
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,821,000
$453,000
$453,000
$1,821,000
$453,000
$453,00038904
Clay County
STBG-SWAP-C021()--FG-21
On M27, from B40 North 6.0 Miles to City of Everly
DOT Approved TotalFederal Aid
RegionalSwap
$1,800,000
$900,000
$900,000
$1,800,000
$900,000
$900,00038864
Emmet County
STBG-SWAP-C032()--FG-32
On A20, from Dickinson County Line East 3.4 Miles toCounty Road N26
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$800,000
$472,000
$472,000
$800,000
$472,000
$472,00038631
Palo Alto County
STBG-SWAP-C074()--FG-74
On N28, from Highway 18 South 6 Miles to City of Ayshire
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,800,000
$900,000
$900,000
$1,800,000
$900,000
$900,00037582
Sioux County
STBG-SWAP-C084()--FG-84
On 400th St. (B40), from near 7th Ave. SE in Sioux Centereast approximately 5.5 miles to Jefferson Ave. (K64)
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$2,001,000
$1,080,000
$1,080,000
$2,001,000
$1,080,000
$1,080,00044830
Dickinson County
STBG-SWAP-C030()--FG-30
On M-27, from North of Highway #9 N 1.4 miles to Old RRin Lake Park
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000
$900,000
$900,000
$1,500,000
$900,000
$900,00045027
Lyon County
STBG-SWAP-C060()--FG-60
On K16, from IA 9 N 3 miles to MN State Ln
DOT Approved TotalFederal Aid
RegionalSwap
$1,050,000
$500,000
$500,000
$1,050,000
$500,000
$500,00037714
Lyon County
STBG-SWAP-C060(L14)--FG-60
On L14, from the South George City Limits south 5 Miles tothe Sioux County Line
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,650,000
$825,000
$825,000
$1,650,000
$825,000
$825,00039074
Obrien County
STBG-SWAP-C071()--SG-71
On M-12 Vine Ave., from 320th Street S 6.899 miles to390th Street
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,680,000
$1,008,000
$1,008,000
$1,680,000
$1,008,000
$1,008,000
132
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38876
Osceola County
STBG-SWAP-C072(2024)--FG-72
On L32,L40,A22,A30,A34, from L32:HWY9-MNLINE;L40:HWY9-A30; A22:SIBLEY-HWY59; A30:NWBLVD-HWY59; A34:ASHTON-HWY59
Pavement Rehab, Granular Shoulders
DOT Approved TotalFederal Aid
RegionalSwap
$5,160,000
$1,419,000
$1,419,000
$5,160,000
$1,419,000
$1,419,000
39102
Sioux County
STBG-SWAP-C084()--FG-84
On Jackson Avenue (K64), from 400th Street (B40) N 3miles to 370th Street (B30)
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$927,000
$533,000
$533,000
$927,000
$533,000
$533,00048698
Iowa Department ofTransportation
STBG-SWAP-000()--SG-32
On IA Highwy 4 from int of IA 9 in Estherville N to the IA/MNState line
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,961,140
$300,000
$300,000
$2,961,140
$300,000
$300,00048695
Emmetsburg
STBG-SWAP-2395()--SG-74
In the city of Emmetsburg, On N Huron St from int US 18 N1,916 ft to County Rd N48
DOT Approved TotalFederal Aid
RegionalSwap
$550,000
$330,000
$330,000
$550,000
$330,000
$330,00048697
Sheldon
STBG-SWAP-6950()--SG-84
In the city of Sheldon, On WESTERN AVE from int o 16thSt., N .72 miles to int of US HWY 18
Patching
DOT Approved TotalFederal Aid
RegionalSwap
$2,400,000
$748,000
$748,000
$2,400,000
$748,000
$748,00048696
Sioux Center
STBG-SWAP-7055()--SG-84
In the city of Sioux Center, 23 block overlay project on 4thAve., 2nd St SE, 3rd St. NW anbd 2nd Ave.
DOT Approved TotalFederal Aid
RegionalSwap
$957,000
$478,500
$478,500
$957,000
$478,500
$478,50047205
Palo Alto County
STBG-SWAP-C074()--FG-74
On N40, North of 350th St. to B14
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$2,040,000
$1,020,000
$1,020,000
$2,040,000
$1,020,000
$1,020,000
133
I I
0 5 10
RPA 4 - Siouxland Regional Transportation Planning Association
1122 Pierce Street, P.O. Box 1077, Sioux City, IA 51102
Phone: 712-279-6286, Fax: 712-279-6920, www.simpco.org
Siouxland Interstate
Metropolitan Planning
Council (SIMPCO)
I
20 Miles
Plymouth
County
Woodbury
County
Cherokee
County
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
134
RPA 4NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39379
Iowa Department ofTransportation
22095
IMX-29()--02-97
I-29: IA 141 INTERCHANGE
Grade and Pave, Bridge Replacement, Erosion Control
FHWA Approved TotalFederal Aid
RegionalSwap
$200,000$180,000
$13,789,000$12,410,100
$238,000$214,200
$14,227,000$12,804,300
39381
Iowa Department ofTransportation
22098
BRF-20()--38-97
US20: ABANDONED RR 0.1 MI E OF CO RD D25(REMOVE BRIDGE)
Grade and Pave, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,902,000$2,321,600
$2,902,000$2,321,600
38246
Iowa Department ofTransportation
22092
NHSX-75()--3H-75
US75: N OF MAPLE ST IN HINTON TO S OF 2ND ST INMERRILL (NB)
Grade and Pave, Culvert Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$20,147,000$16,117,600
$20,147,000$16,117,600
39318
Iowa Department ofTransportation
22094
NHSX-75()--3H-75
US75: N OF MAPLE ST IN HINTON TO S OF 2ND ST INMERRILL (SB)
Grade and Pave, Culvert Replacement, Erosion Control
FHWA Approved TotalFederal Aid
RegionalSwap
$22,144,000$17,715,200
$357,000$285,600
$22,501,000$18,000,800
48417
Iowa Department ofTransportation
22093
BRF-31()--38-18
IA31: SILVER CREEK 1.0 MI W OF US 59
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,908,000$1,526,400
$1,908,000$1,526,400
48502
Iowa Department ofTransportation
22096
IMX-29()--02-67
I-29: N OF IA 175 TO WOODBURY CO (NB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,599,000$3,239,100
$3,599,000$3,239,100
48533
Iowa Department ofTransportation
22097
IMX-29()--02-67
I-29: 1.5 MI N OF IA 175 TO WOODBURY CO (SB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,693,000$3,323,700
$3,693,000$3,323,700
136
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37981
Iowa Department ofTransportation
BRFN-141()--39-67
IA141: MIDDLE SOLDIER RIVER 1.6 MI E OF IA 183
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$377,000 $377,000
37985
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: MAPLE RIVER 1.0 MI W OF E JCT IA 141
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$3,014,000 $3,014,000
37986
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: DITCH 1.9 MI W OF E JCT IA 141
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$259,000 $259,000
37984
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: MISSOURI RIVER E OF DECATUR NEBRASKA(STATE SHARE)
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$74,000 $74,000 $74,000 $74,000 $296,000
37982
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: MISSOURI RIVER E OF DECATUR NEBRASKA(STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$22,000 $22,000 $22,000 $22,000 $88,000
38000
Iowa Department ofTransportation
BRFN-3()--39-75
IA3: MINK CREEK 0.4 MI W OF CO RD K42
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$294,000 $294,000
38047
Iowa Department ofTransportation
BRFN-31()--39-97
IA31: LITTLE SIOUX RIVER 0.8 MI S OF US 20
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$774,000 $774,000
38003
Iowa Department ofTransportation
BRFN-404()--39-75
IA404: FLOYD RIVER 0.4 MI N OF IA 3 (SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$319,000 $319,000
38147
Iowa Department ofTransportation
IMN-29()--0E-97
I-29: CO RD K25 4.7 MI S OF US 20
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$160,000 $160,000
137
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48437
Iowa Department ofTransportation
NHSN-3()--2R-18
IA3: IA 143 INTERSECTION
Grade and Pave, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$303,000 $303,000
48455
Iowa Department ofTransportation
NHSN-3()--2R-75
IA3: NEAR 1ST AVE NE IN LE MARS
Pavement Rehab, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$479,000 $479,000
48432
Iowa Department ofTransportation
NHSN-59()--2R-18
US59: LINDEN ST TO S OF IA 3 IN CHEROKEE
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$2,369,000 $2,369,000
48472
Iowa Department ofTransportation
STPN-141()--2J-67
IA141: IN MAPLETON, FROM THE WCL TO ECL
Patching
DOT Approved TotalFederal Aid
RegionalSwap
$715,000 $715,000
45347
Iowa Department ofTransportation
STPN-175()--2J-47
IA175: MAPLE RIVER 1.0 MI E OF BATTLE CREEK
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$281,000 $281,000
48550
Iowa Department ofTransportation
STPN-175()--2J-67
IA175: IN ONAWA, FROM 20TH ST TO 3RD ST
Pavement Widening
DOT Approved TotalFederal Aid
RegionalSwap
$700,000 $700,000
48571
Iowa Department ofTransportation
STPN-175()--2J-67
IA175: I-29 INTERCHANGE
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$276,000 $276,000
39321
Iowa Department ofTransportation
BRFN-140()--39-75
IA140: RATHBURN CREEK 3.3 MI S OF CO RD C38
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$235,000 $235,000
39320
Iowa Department ofTransportation
BRFN-140()--39-75
IA140: CLEAR CREEK 2.8 MI S OF IA 3
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$180,000 $180,000
138
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39319
Iowa Department ofTransportation
BRFN-140()--39-75
IA140: W FORK LITTLE SIOUX RIVER 1.5 MI N OF CORD C66
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$531,000 $531,000
39303
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: MCCANDLESS CLEGHORN DITCH 0.6 MI E OF I-29 IN ONAWA
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,496,000 $1,496,000
39305
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: DITCH 3.0 MI E OF CO RD L12
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$816,000 $816,000
39304
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: MAPLE RIVER 3.8 MI E OF CO RD L20
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,050,000 $1,050,000
45282
Iowa Department ofTransportation
STPN-12()--2J-75
IA12: NEAR N JCT CO RD K18
DOT Approved TotalFederal Aid
RegionalSwap
$1,201,000 $1,201,000
45314
Iowa Department ofTransportation
BRFN-31()--39-97
IA31: STREAM 1.9 MI N OF CO RD D30
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$477,000 $477,000
45436
Iowa Department ofTransportation
BRFN-31()--39-97
IA31: STREAM 3.2 MI S OF CO RD D22
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$513,000 $513,000
48568
Iowa Department ofTransportation
BRFN-175()--39-97
IA175: REYNOLDS CREEK 1.6 MI W OF CO RD L37
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$320,000 $320,000
48448
Iowa Department ofTransportation
IMN-29()--0E-67
I-29: CO RD E24 INTERCHANGE
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$640,000 $640,000
139
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48609
Iowa Department ofTransportation
NHSN-3()--2R-18
IA3: 1.3 MI E OF US 59 TO 1.8 MI E OF US 59,INCLUDING LITTLE SIOUX RIVER AND OVERFLOWBRIDGES
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $5,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37804
RPA 4
22289
RGTR-PA04()--ST-00
One (1) Light Duty Bus, ADA compliant
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$102,400$81,400
$81,400
$102,400$81,400
$81,400
48492
Iowa Department ofTransportation
22292
STP-31()--2C-18
IA31: CO RD C66 IN WASHTA TO US 59
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$6,400,000$5,120,000
$6,400,000$5,120,000
48626
Iowa Department ofTransportation
22293
STP-31()--2C-97
IA31: FROM SCL OTO TO CO RD D22
Pavement Widening, Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$5,360,000$4,550,000
$5,360,000$4,550,000
DOT Note: Project includes STBG and HSIP Funds
48421
Iowa Department ofTransportation
22291
STP-59()--2C-18
US59: N OF IA 3 TO E JCT IA 10
Pavement Widening, Pavement Rehab, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$7,505,000$6,004,000
$7,505,000$6,004,000
DOT Note: Project includes STBG and HSIP funds
218
RPA 4
22290
RGPL-PA04(RTP)--ST-00
SIMPCO - RPA 4: RPA 4 FHWA PLANNING
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$58,500$46,800
$46,800
$58,500$46,800
$46,800
$58,500$46,800
$46,800
$175,500$140,400
$140,400
140
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38952
Marcus
22383
TAP-R-4762()--8T-18
In the city of Marcus, Recreational Trail extending from theCity Park around the School and residential areas
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$140,000$140,000
$140,000
$93,100$93,100
$93,100
$89,000$89,000
$89,000
$322,100$322,100
$322,100
141
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44804
Cherokee County
BHS-SWAP-C018(86)--FC-18
On C38, Over LITTLE SIOUX RIVER, 0.18 mile E ofCherokee City limits, S35 T92 R40
Bridge Rehabilitation
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00039551
Cherokee
BROS-SWAP-1272(626)--SE-18
In the city of Cherokee, On East Willow Street Bridge overRailroad Creek.
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$646,000
$517,000
$646,000
$517,00037539
Cherokee County
BROS-SWAP-C018(81)--SE-18
On 630th St, Over Silver Creek, 0.23 mile W of theintersection of 630th St and Hwy 59, S22 T90 R40
Bridge Replacement
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$635,000
$635,000
$635,000
$635,00029289
Plymouth County
BROS-SWAP-C075(158)--SE-75
On Diamond Ave, Over indian creek, S10 T93 R48
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$650,000
$650,000
$650,000
$650,00032716
Plymouth County
BROS-SWAP-C075(159)--SE-75
On SHAMROCK AVE, Over deep creek, S15 T93 R43
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00029291
Plymouth County
BROS-SWAP-C075(161)--FE-75
On K 42, Over CARTER CREEK, S2 T90 R46
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$625,000
$625,000
$625,000
$625,00018344
Woodbury County
BRS-SWAP-C097(147)--FF-97
D12 Over Pierson Creek 0.75 miles east of Mason Avenuein section 9, T89N, R42W
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00047143
Cherokee County
BROS-SWAP-C018()--SE-18
On C AVE, Over SMALL, 0.28 mile S of the intersection of500th St and C Ave, S16 T92 R42
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$169,000
$169,000
$169,000
$169,00045983
Monona County
BROS-SWAP-C067(91)--FE-67
On 220TH ST, Over Rock Creek, S35 T84 R42
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
142
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
35184
Plymouth County
BROS-SWAP-C075(240260)--SE-75
On 160TH ST, Over DEEP CREEK, S2 T92 R44
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00029298
Plymouth County
BROS-SWAP-C075(373407)--SE-75
On Granite Ave, Over broken kettle creek, S34 T93 R47
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00014259
Woodbury County
BROS-SWAP-C097(E-299-1)--FE-97
On CORRECTIONVILLE RD, Over WHISKEY CREEK,from Charles Ave. E 0.1 miles in Section 35 T89N R46W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00044820
Cherokee County
BRS-SWAP-C018()--FF-18
On L 48, Over BEAR CREEK, 0.76 miles N of theintersection of L48 and C16 S15 T93 R41
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$223,000
$223,000
$223,000
$223,00047154
Cherokee County
BROS-SWAP-C018()--SE-18
On 440th St, 0.97 mile W of the intersection of 440th St andY Ave, S14 T93 R39
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$183,000
$183,000
$183,000
$183,00047156
Cherokee County
BROS-SWAP-C018()--SE-18
On 520th St, Over FIDDLE CREEK, 0.45 mile E of theintersection of 520th St and B Ave, S29 T92 R42
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$176,000
$176,000
$176,000
$176,00044813
Cherokee County
BROS-SWAP-C018(79)--SE-18
On Keeline Rd, Over BADGER CREEK, 0.10 mile W of theintersection of 520th St and Keeline Rd S24 T92 R40
Bridge Replacement
DOT Approved
12/19/2023
TotalFederal Aid
RegionalSwap
$141,000
$141,000
$141,000
$141,00038760
Monona County
BROS-SWAP-C067(93)--FE-67
On L37, Over NE Norway Creek, in SW S26 T83 R42
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00038977
Plymouth County
BROS-SWAP-C075(150403)--SE-75
On LYNX AVE, Over plymouth creek, S4 T91N R45W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,000
143
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38973
Plymouth County
BROS-SWAP-C075(270407)--SE-75
On FIR AVE, Over broken kettle creek, S4 T92N R47W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00044999
Woodbury County
BRS-SWAP-C097(D15)--FF-97
On County Route D12/110th St. over Muddy Creek, 0.8miles east of Eastland Ave. in section 8 T89N R45W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00047166
Cherokee County
BROS-SWAP-C018()--SE-18
On 470th St, Over GREY CREEK, 0.48 mile E of theintersection of 470th St and Highway 59, S34 T93 R40
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$358,000
$358,000
$358,000
$358,00044982
Monona County
BROS-SWAP-C067(94)--FE-67
On Redwood Avenue, Over Elk Creek, S24 T82 R43
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00038918
Monona County
BROS-SWAP-C067(95)--FE-67
On L20, Over Jordan Creek, NE S28 T83 R43
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$825,000
$825,000
$825,000
$825,00036245
Plymouth County
BROS-SWAP-C075(142870)--SE-75
On 260TH ST, Over DRY BRANCH, S28 T91 R44
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00044643
Plymouth County
BROS-SWAP-C075(262690)--SE-75
On 200TH ST, Over W.BRANCH FLOYD RIVER, S26 T92R46
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00036229
Plymouth County
BROS-SWAP-C075(331080)--SE-75
On 110th St, Over deep creek, S3 T93 R43
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00032653
Woodbury County
BROS-SWAP-C097(D42)--SE-97
On 120TH ST, Over MUDDY CREEK, from Eastland Aveeast 0.8 Miles on NLINE S17 T89 R45
Bridge Replacement, Grading, Guardrail
DOT Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,000
144
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44822
Cherokee County
BRS-SWAP-C018()--FF-18
On M 25, Over LITTLE MAPLE RIVER, 0.45 mile N of theintersection of C66 and M25 S25 T90 R39
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$540,000
$540,000
$540,000
$540,00045203
Ida County
BRS-SWAP-C047()--FF-47
On D 15, Over UNNAMED CREEK, from Ida/Sac W .04miles to Bridge S25 T89 R39
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
145
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36643
Cherokee
STBG-SWAP-1272(628)--SG-18
In the city of Cherokee, On Euclid Avenue, from E SpruceStreet to E Bluff Street
Pavement Rehab
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$376,800
$268,800
$268,800
$376,800
$268,800
$268,80036642
Le Mars
STBG-SWAP-4257()--SG-75
In the city of Le Mars, On 12th Street SW, from CentralAvenue to 6th Avenue SW
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$700,200
$465,200
$465,200
$700,200
$465,200
$465,20035396
Le Mars
STBG-SWAP-4257(632)--SG-75
In the city of Le Mars, On Central Ave, from 12th St SE to5th St
Pavement Rehab
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$750,000
$600,000
$600,000
$750,000
$600,000
$600,00039094
Ida County
STBG-SWAP-C047()--FG-47
On D 50, from the intersection of Woodbury Ave and D50 E2 miles to the intersection of D50 and L51
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$1,130,000
$904,000
$904,000
$1,130,000
$904,000
$904,00037319
Monona County
STBG-SWAP-C067(92)--FG-67
On E16, from Mapleton East 5.5 Miles to Woodbury CountyLine
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,450,000
$1,160,000
$1,160,000
$1,450,000
$1,160,000
$1,160,00036249
Plymouth County
STBG-SWAP-C075(49-2023)--FG-75
On K49, from from C38 N 1mile, S27/28 T92 R45
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,244,000
$990,200
$990,200
$1,244,000
$990,200
$990,20045226
Le Mars
STBG-SWAP-4257()--SG-75
In the city of Le Mars, 7th Avenue E (K49) - 18th Street to24th Street
DOT Approved TotalFederal Aid
RegionalSwap
$782,000
$625,600
$625,600
$782,000
$625,600
$625,60047176
Cherokee
STBG-SWAP-1272()--SG-18
In the city of Cherokee, W Main Street from N. 11th Streetto N. 6th Street resurfacing
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$410,000
$328,000
$328,000
$410,000
$328,000
$328,00047178
Le Mars
STBG-SWAP-4257()--SG-75
In the city of Le Mars, 12th Street SE from 2nd Avenue SEto 7th Avenue SE (K49)
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$540,750
$432,600
$432,600
$540,750
$432,600
$432,600
146
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
47089
Plymouth County
STBG-SWAP-C075(K-42)--FG-75
On K 42, from Hwy 3 N 6.71 miles to C-12
DOT Approved TotalFederal Aid
RegionalSwap
$3,875,100
$921,100
$921,100
$3,875,100
$921,100
$921,10045042
Woodbury County
STBG-SWAP-C097(K-42)--FG-97
On Dallas Ave/K42, from K45 north approx 5 miles to theeast intersection of D53/280th St.and K42.
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$3,000,000
$1,500,000
$1,500,000
$3,000,000
$1,500,000
$1,500,000
147
RPA 5 - Mid-Iowa Development Association Council of Governments
602 1st Avenue South, Fort Dodge, IA 50501
Phone: 515-576-7183, Fax: 515-576-7184, www.midascog.net
I
Pocahontas i---4 County i
I
I - ---------------1 I I
Calhoun
County
o,...1
....,..N ....... 5----,-1,...1
0 ---,----.-----.-,,. Mi:7
Webster
County
Wright
County
�orts � Commercial
El Enhanced
General Service
Basic Service
El Local Service Transit rel Regional
[el Large Urban
rel Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
- Interstate
- National Highway System
- Primary Roads
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
148
RPA 5ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
41363
Hamilton County
ILL-C040(104)--92-40
On R 75, Over CC RR, S27 T89 R23
Bridge Replacement
DOT Approved
7/18/2023
TotalFederal Aid
RegionalSwap
$2,800,000 $2,800,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39372
Iowa Department ofTransportation
22099
BRF-926()--38-94
IA926: BUSINESS US 20 OVER DES MOINES RIVER ANDB AVE 1.3 MI N OF S JCT US 169 (WB)
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$12,000 $5,849,000$4,679,200
$5,861,000$4,679,200
39373
Iowa Department ofTransportation
22101
BRF-926()--38-94
IA926: BUSINESS US 20 OVER CN RR AND 7TH ST 1.5MI N OF S JCT US 169 (WB)
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$12,000 $9,103,000$7,282,400
$9,115,000$7,282,400
45356
Iowa Department ofTransportation
22100
BRF-3()--38-76
IA3: BIG CEDAR CREEK 6.3 MI W OF IA 4
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,206,000$964,800
$1,206,000$964,800
150
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38054
Iowa Department ofTransportation
BRFN-17()--39-99
IA17: PRAIRIE CREEK 0.9 MI N OF CO RD C26
Bridge Replacement, Wetland Mitigation, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$2,279,000 $2,279,000
38041
Iowa Department ofTransportation
BRFN-7()--39-94
IA7: NORTH LIZARD CREEK 0.5 MI W OF US 169
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$813,000 $813,000
48570
Iowa Department ofTransportation
BRFN-926()--39-94
IA926: DES MOINES RIVER 0.6 MI S OF N JCT US 169 INFORT DODGE
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$1,150,000 $1,150,000
38299
Iowa Department ofTransportation
IMN-69()--0E-99
US69: N OF UP RR TO N JCT CO RD C20
Wetland Mitigation
DOT Approved TotalFederal Aid
RegionalSwap
$105,000 $105,000
48548
Iowa Department ofTransportation
NHSN-169()--2R-94
US169: CN RR 0.5 MI S OF IA 7 IN FORT DODGE
Slope Improvement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000 $400,000
48474
Iowa Department ofTransportation
STPN-175()--2J-40
IA175: US 69 IN JEWELL TO 0.2 MI W OF DELPHI INELLSWORTH
DOT Approved TotalFederal Aid
RegionalSwap
$1,288,000 $1,288,000
39258
Iowa Department ofTransportation
BRFN-169()--39-46
US169: TRULNER CREEK 0.2 MI S OF CO RD C20
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$505,000 $505,000
39375
Iowa Department ofTransportation
BRFN-20()--39-94
US20: CO RD D20 AND UP RR 0.4 MI E OF CO RD D36(EB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,348,000 $1,348,000
39389
Iowa Department ofTransportation
BRFN-69()--39-99
US69: DRAINAGE DITCH 5 3.7 MI S OF IA 3
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$730,000 $730,000
151
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39374
Iowa Department ofTransportation
BRFN-7()--39-94
IA7: SOUTH LIZARD CREEK 0.8 MI E OF W JCT CO RDP29
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$634,000 $634,000
45422
Iowa Department ofTransportation
STPN-35()--2J-40
I-35: S OF US 20
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000
45326
Iowa Department ofTransportation
BRFN-175()--39-13
IA175: HARDIN CREEK 0.7 MI W OF CO RD P21
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$437,000 $437,000
48441
Iowa Department ofTransportation
BRFN-175()--39-13
IA175: PRAIRIE CREEK 3.0 MI E OF CO RD N28
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$420,000 $420,000
48462
Iowa Department ofTransportation
BRFN-175()--39-13
IA175: LAKE CREEK 2.0 MI W OF CO RD N37
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$510,000 $510,000
48425
Iowa Department ofTransportation
BRFN-175()--39-94
IA175: DITCH #52 0.8 MI E OF CO RD P29
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$570,000 $570,000
48471
Iowa Department ofTransportation
BRFN-926()--39-94
IA926: BUSINESS US 20 OVER DES MOINES RIVER ANDB AVE 1.3 MI N OF S JCT US 169 IN FORT DODGE (EB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
48563
Iowa Department ofTransportation
BRFN-926()--39-94
IA926: BUSINESS US 20 OVER CN RR AND 7TH ST 1.5MI N OF S JCT US 169 IN FORT DODGE (EB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$250,000 $250,000
48461
Iowa Department ofTransportation
IMN-35()--0E-40
I-35: IA 175 INTERCHANGE (NB/SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$500,000 $500,000
152
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
280
RPA 5
22294
RGPL-PA05()--ST-94
MIDAS - RPA 5: RPA 5 TRANSPORTATION PLANNING
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$40,000$32,000
$32,000
$43,750$35,000
$35,000
$43,750$35,000
$35,000
$127,500$102,000
$102,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38367
Humboldt
22384
TAP-R-3595(609)--8T-46
In the city of Humboldt, On trail from east of eagle ridgedrive east and trail extension in park
Ped/Bike Structures
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$1,370,227$954,181
$954,181
$1,370,227$954,181
$954,181
45489
Hamilton CountyConservation Board
22385
TAP-R-C040()--8T-40
Construct 2 identical observation decks on both side of theexisting JewEllsworth Trail to include benches.
Ped/Bike Miscellaneous
FHWA Approved TotalFederal Aid
RegionalSwap
$103,681$82,160
$82,160
$103,681$82,160
$82,160
48685
Fort Dodge
22386
TAP-U-2690()--8I-94
In the city of Fort Dodge, On N 22ND ST
Ped/Bike Structures
FHWA Approved TotalFederal Aid
RegionalSwap
$680,000$500,000
$500,000
$680,000$500,000
$500,000
153
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36996
Fort Dodge
BROS-SWAP-2690(631)--SE-94
On HIGHLAND PARK AVE, Over OVER UP RR, S29 T89R28
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,200,000
$1,000,000
$1,200,000
$1,000,00037728
Calhoun County
BROS-SWAP-C013()--FE-13
On 310th Street (D46), Over Drainage Ditch, from N.W.Cor. Sec.23 East 0.2 Miles, along NLINE S23 T87N R31W
Bridge Replacement
DOT Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$250,000
$249,000
$250,000
$249,00020429
Hamilton County
BROS-SWAP-C040(102)--SE-40
On XIRCUS AVE, Over Long Dick Creek, S22 T86 R23
Bridge Replacement
DOT Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00026825
Hamilton County
BROS-SWAP-C040(103)--SE-40
On TOLLMAN AVE, Over TRIB TO SKUNK, S12 T86 R24
Bridge Replacement
DOT Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00035219
Humboldt County
BROS-SWAP-C046(74)--SE-46
On Washington Ave., from NW corner Section 26 NorwayTwp S 0.6 miles S26 T91N R27W
Bridge Replacement
DOT Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$125,000
$120,000
$125,000
$120,00027098
Humboldt County
BROS-SWAP-C046(82)--SE-46
On Lone Tree Road, Over Beaver Creek, from N cornerSW 0.8 miles S32 T91N R28W
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00047198
Calhoun County
BROS-SWAP-C076(70)--SE-76
On 160TH ST, Over SOUTH BRANCH LIZARD, from NWcorner Sec. 3 E 0.6 miles S3 T89 R31
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$249,000
$250,000
$249,00029480
Pocahontas County
BROS-SWAP-C076(70)--SE-76
On 160th St (Cal) / 640th St (Poc) Over South Br Lizard, S3T89 R31 (Cal) / S34 T90 R31 (Poc)
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$328,000
$325,000
$328,000
$325,00032250
Webster County
BROS-SWAP-C094(128)--FE-94
On D68, Over Lost Grove Creek, along NLINE S34 T86R29
Bridge Replacement
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,000
154
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
47118
Wright County
BRS-SWAP-8550()--FF-99
In the city of Woolstock, On 330TH ST, Over EAGLECREEK, S31 T90 R25
DOT Approved TotalFederal Aid
RegionalSwap
$1,250,000
$1,250,000
$1,250,000
$1,250,00047062
Pocahontas County
BRS-SWAP-C076(73)--FF-76
On C 49, Over LIZARD CK DD #53, S31 T91 R31
Bridge New-CCS
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$685,000
$680,000
$685,000
$680,00037044
Wright County
BRS-SWAP-C099(100)--FF-99
On R75, Over Sheldon Creek, at Ctr S27 T90 R23
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00029443
Calhoun County
BROS-SWAP-C013()--SE-13
On 160th St., Over DD181 Big Cedar Creek, from NEcorner of Sec. 4 West 0.4 Miles, on NLINE S04 T89 R34
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$325,000
$324,000
$325,000
$324,00036486
Hamilton County
BROS-SWAP-C040()--SE-40
On 350TH ST, Over BRANCH OF D.D. JOHNSON NO. 9,S10 T86 R26
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$175,000
$175,000
$175,000
$175,00037344
Hamilton County
BROS-SWAP-C040()--SE-40
On 390th St., Over SQUAW CREEK, NW S32 T86 R25
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00038558
Humboldt County
BROS-SWAP-C046()--SE-46
On HAWAII AVENUE, Over DD HK JT2, from NWCORNER S 0.8 miles S8 T93N R29
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$275,000
$270,000
$275,000
$270,00035340
Pocahontas County
BROS-SWAP-C076()--SE-76
On 470TH ST, Over CROOKED CREEK, S9 T92 R31
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$503,000
$500,000
$503,000
$500,00034320
Hamilton County
BRS-SWAP-C040()--FF-40
On R-75, from 180th Street North approximately 0.1 miles,S10, T89, R23
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
155
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36518
Wright County
BRS-SWAP-C099()--FF-99
On R59, Over WHEELER CREEK, on WLINE S20 T91 R23
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00047211
Calhoun County
BHOS-SWAP-C013()--SB-13
On Eagle Ave, Over DD, from NW Cor. Sec. 11 S 0.6 milesS11 T89N R36W
DOT Approved TotalFederal Aid
RegionalSwap
$100,000
$99,000
$100,000
$99,00045102
Calhoun County
BROS-SWAP-C013()--SE-13
On 280TH ST, Over DD. NO 31, S6 T87 R31
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$399,000
$400,000
$399,00019451
Calhoun County
BROS-SWAP-C013(LO-2760)--SE-13
On 320TH ST, Over Purgatory Creek, from NW Cor Sec 27East 0.7 Miles, along NLINE S27 T87 R32
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$399,000
$400,000
$399,00038809
Hamilton County
BROS-SWAP-C040()--FE-40
On 250th St., Over Branch of South Skunk River (D.D. #4:Castner-Williams-Askland), in NW S23 T88N R24W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$175,000
$175,000
$175,000
$175,00038810
Hamilton County
BROS-SWAP-C040()--SE-40
On 260th St., Over Branch of South Skunk River, in NWS25 T88N R24W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$175,000
$175,000
$175,000
$175,00038715
Humboldt County
BROS-SWAP-C046()--SE-46
On Iowa Avenue, Over drainage ditch, from C49 S 0.7 milesto H. Web. Jt 1-10 Crossing S33 T91 R29
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$125,000
$120,000
$125,000
$120,00037779
Pocahontas County
BROS-SWAP-C076(S33Ced)--SE-76
On 640th St / 160Th St, Over BIG CEDAR CR DD 181,between S33 T90 R34 and S4 T89 R34
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$328,000
$325,000
$328,000
$325,00047216
Calhoun County
BROS-SWAP-C013()--FE-13
On Valley Ave, Over DD 83, from NW Cor. Sec. 17 E S11T87 N R31 W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$399,000
$400,000
$399,000
156
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45103
Calhoun County
BROS-SWAP-C013()--SE-13
On 210TH ST, Over LAKE CREEK, S26 T89 R32
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$249,000
$250,000
$249,00012449
Calhoun County
BROS-SWAP-C013(78)--SE-13
On 380th Street , Over Purgatory Creek, from NW cornerof Sec. 30 E 0.7 miles S30 T86N R32W
Bridge Replacement
DOT Approved
6/20/2023
TotalFederal Aid
RegionalSwap
$380,000
$378,000
$380,000
$378,00037352
Hamilton County
BROS-SWAP-C040()--SE-40
On 310TH ST, Over Main Branch of Mud Lake DD #71, NWS21 T87 R24
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$425,000
$425,000
$425,000
$425,00044660
Webster County
BROS-SWAP-C094(971804)--FE-94
On P63 over Holiday Creek S18 T89 R27
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00038884
Wright County
BROS-SWAP-C099()--SE-99
On Taylor Ave, Over Luicks Creek, in S31 TT93N RR23W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00038701
Webster County
BRS-SWAP-C094(802009)--FF-94
On P29, Over DRAINAGE DITCH, along WLINE S20 T88NR30W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00037263
Webster County
BRS-SWAP-C094(900121)--FF-94
On P29 (Fairbanks Ave) over Lizard Creek S01 T89 R30
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$960,000
$960,000
$960,000
$960,00038690
Webster County
BRS-SWAP-C094(901213)--FF-94
On P29 (Fairbanks Ave) over W Branch Lizard Creek S12T89 R30
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$960,000
$960,000
$960,000
$960,000
157
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38369
Fort Dodge
STBG-SWAP-2690(636)--SG-94
In the city of Fort Dodge, On 3rd Ave NW/Hawkeye Ave,from Northwest Des Moines River Bridge east to east of 6thSt NW
Miscellaneous
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$3,536,000
$1,900,000
$1,900,000
$3,536,000
$1,900,000
$1,900,000
47204
Calhoun County
STBG-SWAP-C013(D36)--FG-13
On 270th Street (D36), from East Corporate Line RockwellCity E 11 miles to Webster County Line
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$4,635,000
$1,000,000
$1,000,000
$4,635,000
$1,000,000
$1,000,00037777
Pocahontas County
STBG-SWAP-C076(C-49)--FG-76
On C-49, from the Buena Vista County line east 12 Miles toHwy 4
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,503,000
$1,500,000
$1,500,000
$2,503,000
$1,500,000
$1,500,00035186
Webster County
STBG-SWAP-C094(D14)--FG-94
On D14 (170th Street), from P56 (Nelson Avenue) east 8Miles to P71 (Vincent Avenue)
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$3,500,000
$3,050,000
$3,050,000
$3,500,000
$3,050,000
$3,050,00045488
Humboldt
STBG-SWAP-3595()--SG-46
Rehabilitation of Sumner Avenue from the intersection of13th St SW East to the Humboldt city limits.
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$900,000
$900,000
$900,000
$900,000
$900,000
$900,00045452
Thor
STBG-SWAP-7637()--SG-46
In the city of Thor: Dean St approx .25 miles east of P66
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$130,000
$130,000
$130,000
$130,000
$130,000
$130,00039045
Calhoun County
STBG-SWAP-C013()--FG-13
On N28 Dakota Ave, from Ia Hwy 175 North 11.5 Miles toD36 255th St.
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$5,000,000
$2,000,000
$2,000,000
$5,000,000
$2,000,000
$2,000,00038561
Humboldt County
STBG-SWAP-C046()--FG-46
On P66, from US Hwy 3 N 5.5 Miles to C26
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,000,000
$1,000,000
$1,400,000
$1,000,000
$1,000,00048684
Webster City
STBG-SWAP-8212()--SG-40
In the city of Webster City, On Beach Street, from SecondStreet S .7 miles to 400' South of Ohio Street
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,180,000
$850,000
$850,000
$1,180,000
$850,000
$850,000
158
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
47042
Wright County
STBG-SWAP-C099()--SG-99
On R33 and C54, from Hwy 3 South 5 miles then east 10miles to Hwy 69.
DOT Approved TotalFederal Aid
RegionalSwap
$2,200,000
$1,632,492
$1,632,492
$2,200,000
$1,632,492
$1,632,492
159
0 5 10
RPA 6 - Region 6 Resource Partners
903 East Main St, Suite A, Marshalltown, IA 50158
Phone: 641-752-0717, Fax: 641-752-9857, www.region6resources.org
(INRCOG)
Tama
County
______ § _____________ _
r
Dorts
Commercial
(I Enhanced
(I General Service
(I Basic Service
(I Local ServiceTransit
[el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
CE! Amtrak
I Park & Ride
- Interstate
- National Highway System
- Primary Roads
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1
L_ _ _J Counties
City Limits
Urban Area
160
RPA 6HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48438
Iowa Department ofTransportation
22022
HSIPX-330()--3L-64
IA330: N OF US 30 TO SCL OF ALBION
Pavement Widening
FHWA Approved TotalFederal Aid
RegionalSwap
$990,000$891,000
$990,000$891,000
162
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38154
Iowa Department ofTransportation
22106
IM-NHS-80()--03-79
I-80: 1.0 MI W OF IA 146 TO 2.0 MI E OF IA 146
Grade and Pave, Bridge Replacement, Erosion Control
FHWA Approved TotalFederal Aid
RegionalSwap
$17,070,000$14,509,500
$328,000$278,800
$17,398,000$14,788,300
45389
Iowa Department ofTransportation
22107
IMX-80()--02-79
I-80: 1.0 MI E OF US 63 TO E OF IOWA CO
FHWA Approved TotalFederal Aid
RegionalSwap
$2,396,000$2,156,400
$2,396,000$2,156,400
48623
Iowa Department ofTransportation
22110
NHSX-14()--3H-64
IA14: IOWA RIVER BRIDGE IN MARSHALLTOWN TO CORD E18
Pavement Widening, Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$5,406,000$4,324,800
$5,406,000$4,324,800
DOT Note: Project includes NHPP and HSIP funds
38249
Iowa Department ofTransportation
22103
NHSX-30()--3H-86
US30: W OF IA 21 TO 11TH AVE DR
Grade and Pave, Bridge New, Culvert Replacement
FHWA Approved TotalFederal Aid
RegionalSwap
$16,412,000$13,129,600
$16,412,000$13,129,600
38250
Iowa Department ofTransportation
22104
NHSX-30()--3H-86
US30: TAMA BYPASS TO W OF IA 21
Culvert Extension, Grading, Erosion Control
FHWA Approved TotalFederal Aid
RegionalSwap
$5,122,000$4,097,600
$328,000$262,400
$5,450,000$4,360,000
48495
Iowa Department ofTransportation
22108
NHSX-63()--3H-86
US63: 0.5 MI S OF IA 96 TO SCL TRAER
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$4,501,000$3,600,800
$4,501,000$3,600,800
48522
Iowa Department ofTransportation
22109
NHSX-63()--3H-86
US63: N OF WOLFE CREEK IN TRAER TO 0.5 MI S OF IA58
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$6,200,000$4,960,000
$6,200,000$4,960,000
45341
Iowa Department ofTransportation
22105
NHSX-63()--3H-79
US63: W JCT US 6 TO SCL TAMA
Grade and Pave, Pavement Rehab, Erosion Control
FHWA Approved TotalFederal Aid
RegionalSwap
$10,820,000$8,656,000
$358,000$286,400
$11,178,000$8,942,400
163
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48422
Iowa Department ofTransportation
22102
NHSX-63()--3H-86
US63: NCL TOLEDO TO N OF CO RD E29
Grade and Pave, Traffic Signs, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$20,000$16,000
$8,062,000$6,449,600
$8,082,000$6,465,600
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38015
Iowa Department ofTransportation
BRFN-6()--39-79
US6: ROCK CREEK 0.7 MI E OF W JCT IA 21
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$234,000 $234,000
48590
Iowa Department ofTransportation
STPN-146()--2J-79
IA146: 0.7 MI N OF NCL GRINNELL
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$152,000 $152,000
39360
Iowa Department ofTransportation
BRFN-63()--39-86
US63: WOLF CREEK 0.3 MI N OF IA 8 IN TRAER
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$822,000 $822,000
48460
Iowa Department ofTransportation
BRFN-65()--39-42
US65: UP RR 2.1 MI W OF IA 57
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48406
Marshalltown
22221
NRT-4797()--9G-64
In the city of Marshalltown, On Iowa River's Edge Trail,starting at Radio Tower Road and going Northwest 1.78miles
Grade and Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$375,000$300,000
$375,000$300,000
164
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48519
Iowa Department ofTransportation
22296
STP-21()--2C-79
IA21: S OF I-80 TO US 6
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$1,800,000$1,440,000
$1,800,000$1,440,000
48532
Iowa Department ofTransportation
22297
STP-96()--2C-86
IA96: 0.4 MI W OF US 63 TO US 63
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$300,000$240,000
$300,000$240,000
319
RPA 6
22295
RGPL-PA06(RTP)--ST-00
RSPC - RPA 6: RPA 6 TRANSPORTATION PLANNING
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$25,000$20,000
$20,000
$25,000$20,000
$20,000
$25,000$20,000
$20,000
$75,000$60,000
$60,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
35405
Grinnell
22387
TAP-U-3127()--8I-79
On Grinnell Trail, from SE corner of Industrial Ave & Ia Hwy146 south 1.21 Miles to NE corner of Stagecoach Rd
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$420,000$336,000
$336,000
$420,000$336,000
$336,000
DOT Note: Project eligible for FHWA TAP funding
34112
Marshalltown
22388
TAP-U-4797(625)--8I-64
In the city of Marshalltown, On Iowa River Trail, from Bridge#2 1 Miles to Bridge #5
Ped/Bike Structures
FHWA Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$683,750$547,000
$547,000
$683,750$547,000
$547,000
DOT Note: Project eligible for FHWA TAP funding
37613
Marshall County
22389
TAP-U-C064()--8I-64
Paving Bike Trail Int's at 233rd St,238th St,242nd St,250thSt, Jessup Av,265th St,Ingram Av,Hart Av,Glick Av
Ped/Bike Paving
FHWA Approved TotalFederal Aid
RegionalSwap
$180,000$144,000
$144,000
$180,000$144,000
$144,000
165
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38364
Traer
BROS-SWAP-7710(604)--SE-86
In the city of Traer, On 1st Street, Over Coon Creek
Bridge Replacement
DOT Approved
9/21/2021
TotalFederal Aid
RegionalSwap
$740,000
$592,000
$740,000
$592,00045114
Marshall County
BROS-SWAP-C064()--SE-64
On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17
Culvert Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$125,000
$125,000
$125,000
$125,00045115
Marshall County
BROS-SWAP-C064()--SE-64
On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17
Culvert Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$125,000
$125,000
$125,000
$125,00045125
Tama County
BROS-SWAP-C064()--SE-86
On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17
DOT Approved TotalFederal Aid
RegionalSwap
$125,000
$125,000
$125,000
$125,00045127
Tama County
BROS-SWAP-C064()--SE-86
On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17
DOT Approved TotalFederal Aid
RegionalSwap
$125,000
$125,000
$125,000
$125,00012250
Marshall County
BROS-SWAP-C064(115)--SE-64
On JESSUP AVE, Over MINERVA CREEK, Near N 1/4corner of S3 T84 R19
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,300,000
$1,300,000
$1,300,000
$1,300,00013588
Poweshiek County
BROS-SWAP-C079(53)--FE-79
On 80th St., Over A Small Stream, S20 T81 R15
DOT Approved
8/17/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00013586
Poweshiek County
BROS-SWAP-C079(57)--SE-79
On 370TH AVE, Over STONY CREEK, S10 T80 R14
Bridge Replacement
DOT Approved
8/17/2021
TotalFederal Aid
RegionalSwap
$950,000
$950,000
$950,000
$950,00035288
Tama County
BROS-SWAP-C086(102)--SE-86
On P AVE, Over NORTH WALNUT CREEK, from 400thStreet North 0.75 Miles, S33 T82 R14
Bridge Replacement
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,000
166
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45095
Tama County
BROS-SWAP-C086(103)--FE-86
On B AVE, Over SUGAR CREEK, S17 T84 R16
DOT Approved
8/17/2021
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00036418
Tama County
BROS-SWAP-C086(99)--SE-86
On K AVE, Over NORTH WALNUT CREEK, from 400th St.North 1500 Feet, S35 T82 R15
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00032615
Hardin County
BRS-SWAP-0077(601)--FF-42
In the city of Alden, On Main St. Alden, Over Iowa River, inS18 T89 R21
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,400,000
$1,000,000
$1,400,000
$1,000,00036262
Hardin County
BRS-SWAP-C042(108)--FF-42
On S57, Over Honey Creek, from 305th St. South 0.2 Miles,S15 T86 R20
Bridge Replacement
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00039040
Poweshiek County
BRS-SWAP-C079(64)--FF-79
On V18, Over Big Bear Creek, S14 T80N R14W
Bridge Replacement
DOT Approved
7/19/2022
TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,00037808
Poweshiek County
BHS-SWAP-C079(62)--FC-79
On F57, Over BUCK CREEK, S8 T78 R15
Bridge Rehabilitation
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00039003
Hardin County
BROS-SWAP-C042()--FE-42
On T Avenue, Over HONEY CREEK, S30 T86N R19
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00035995
Marshall County
BROS-SWAP-C064()--FE-64
On 1000 mile of Gerhart Ave, Over Mud Creek, in NW S6T85 R19
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00021779
Marshall County
BROS-SWAP-C064()--SE-64
On 140TH ST, Over MINERVA CREEK, from Durham AveE 0.02 miles S27 T85 R20
Bridge Replacement
DOT Approved
2/21/2023
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
167
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
34679
Poweshiek County
BROS-SWAP-C079()--FE-79
On 520TH AVE, Near the NW Corner of S28 T78N R13W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00034677
Poweshiek County
BROS-SWAP-C079()--SE-79
On 155TH ST, Over Dugout Creek, S16 T79 R14
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00039070
Tama County
BROS-SWAP-C086()--FE-86
On G Avenue, Near the W 1/4 Corner of S24 T84N R16W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00029486
Poweshiek County
BRS-SWAP-C079()--FF-79
On F29, Over Small Stream, S23 T80 R13
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00039065
Tama County
BRS-SWAP-C086()--FF-86
On E 44, Over TROUBLESOME CREEK, S14 T83N R13W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00033877
Tama County
BRS-SWAP-C086()--FF-86
On Business 30, Over Deer Creek, S21 T83 R15
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,0009136
Marshall County
BROS-SWAP-C064()--SE-64
On 3100 MILE OF WALLACE AVE, Over Brush Creek, from310th St S 0.9 miles S22 T82 R17
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00035994
Marshall County
BROS-SWAP-C064()--SE-64
On 1000 mile of Langford Ave, Over Dowd Creek, S1 T85R19
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00045106
Poweshiek County
BROS-SWAP-C079()--SE-79
On 460TH AVE, Over BUCK CREEK, S27 T79 R16
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,000
168
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45107
Poweshiek County
BROS-SWAP-C079()--SE-79
On 100TH ST, Over N ENGLISH RIVER, S15 T79 R15
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00029489
Poweshiek County
BROS-SWAP-C079(56)--SE-79
On 140th Street, Over Walnut Creek, S17 T81 R14
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00045092
Tama County
BROS-SWAP-C086()--FE-86
On S AVE, Over BRANCH WOLF CREEK, S6 T85 R13
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00039072
Tama County
BROS-SWAP-C086()--SE-86
On 220th Street, Over SIMPSON CREEK, S6 T84N R13
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00039068
Tama County
BROS-SWAP-C086()--SE-86
On E Avenue, Over BRANCH WOLF CREEK, S26 T86NR16W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00039069
Tama County
BROS-SWAP-C086()--SE-86
On F Avenue, Over BRANCH WOLF CREEK, S25 T86NR16W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00039071
Tama County
BROS-SWAP-C086()--SE-86
On P Avenue, Over BRANCH COON CREEK, S15 T85NR14W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00032544
Hardin County
BRS-SWAP-C042(16075)--FF-42
On S62, Over Small Stream, from D55 South 0.5 Miles, inSE S5 T86 R19
Culvert Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$275,000
$275,000
$275,000
$275,00039004
Hardin County
BROS-SWAP-C042(5139)--FE-42
On H Avenue, Over SOUTH FORK IOWA RIVER, alongWLINE S18 T88N R21W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
169
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
35992
Marshall County
BROS-SWAP-C064()--FE-64
On 2900 mile of Oaks Ave, Over South Timber Creek, atSW S9 T82 R18
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00032257
Marshall County
BROS-SWAP-C064()--SE-64
On 2900 Mile of Taylor Ave, Over Snipe Creek, S7 T82 R17
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,0005500
Marshall County
BROS-SWAP-C064(86)--SE-64
On Taylor Ave., Over Lutes Creek, from 300th St N 0.14miles S7 T82 R17
Bridge Replacement
DOT Approved
12/19/2023
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00045096
Tama County
BROS-SWAP-C086()--SE-86
On II AVE, Over RICHLAND CREEK, S21 T82 R15
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
170
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
35412
Ackley
STBG-SWAP-0015()--SG-42
In the city of Ackley, On Butler Street, from 3rd Ave north .3Miles to Park Avenue
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$125,000
$100,000
$100,000
$125,000
$100,000
$100,00038915
Marshall County
STBG-SWAP-C064()--FG-64
On E63, from Story Co Line E 5 miles to IA Hwy 330
Pavement Rehab
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,800,000
$1,500,000
$1,500,000
$1,800,000
$1,500,000
$1,500,00045044
Tama County
STBG-SWAP-C086()--FG-86
On T47, from E27 to IA96
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$2,500,000
$1,000,000
$1,000,000
$2,500,000
$1,000,000
$1,000,00045060
Alden
STBG-SWAP-0077()--SG-42
On Main Street, Over from D20 NE .53 miles to Iowa RiverBridge S18 T89 R21
DOT Approved TotalFederal Aid
RegionalSwap
$198,000
$198,000
$198,000
$198,000
$198,000
$198,00045064
Marshalltown
STBG-SWAP-4797()--SG-64
On HIGHLAND ACRES RD, from Lincoln Way 1.2 miles toMain Street S5 T83 R18
DOT Approved TotalFederal Aid
RegionalSwap
$4,875,000
$3,900,000
$3,900,000
$4,875,000
$3,900,000
$3,900,00038882
Marshall County
STBG-SWAP-C064()--FG-64
On E 29, from Story Co Line E 7.5 miles to Hopkins Ave
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,250,000
$1,000,000
$1,000,000
$2,250,000
$1,000,000
$1,000,00045899
Poweshiek County
STBG-SWAP-C079()--FG-79
On F29, from IA21 E to V36
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000
$1,200,000
$1,200,000
$1,500,000
$1,200,000
$1,200,000
171
0
Butler County
RPA 7 - Iowa Northland Regional Transportation Authority
229 East Park Avenue, Waterloo, IA 50703
Phone: 319-235-0311, Fax: 319-235-2891, www.inrcog.org
Chickasa� s3
County\
l �.,.I � Commercial
�--_,...,;;;;..._,�-�---;r,--:at\� El Enhanced
El General Service
El Basic Service
El Local Service
Transit
Buchanan County
--+
[el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
- Interstate
- National Highway System
- Primary Roads
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Area
r--1
L_ _ _J Counties
City Limits
Urban Area
172
RPA 7ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
34610
Buchanan County
ILL-C010()--92-10
On V62, Over WAPSIPINICON RIVER, from D-16 north 0.5Miles to Bridge
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$3,000,000 $3,000,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38159
Iowa Department ofTransportation
22111
IMX-380()--02-7
I-380: BUCHANAN CO TO 0.2 MI S OF E JCT US 20 (SB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$7,211,000$6,489,900
$7,211,000$6,489,900
39180
Iowa Department ofTransportation
22112
NHSX-218()--3H-9
US218: CEDAR RIVER IN JANESVILLE TO IA 116 INWAVERLY
Grade and Pave, Bridge Replacement, Grading
FHWA Approved TotalFederal Aid
RegionalSwap
$5,650,000$4,520,000
$14,214,000$11,371,200
$21,894,000$17,515,200
$41,758,000$33,406,400
39177
Iowa Department ofTransportation
22114
BRF-3()--38-9
IA3: CEDAR RIVER 3.7 MI E OF US 218 IN WAVERLY
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$7,672,000$6,137,600
$7,672,000$6,137,600
45383
Iowa Department ofTransportation
22113
BRF-14()--38-38
IA14: BLACK HAWK CREEK 1.5 MI S OF S JCT CO RDD35
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,442,000$1,953,600
$2,442,000$1,953,600
174
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37890
Iowa Department ofTransportation
BRFN-188()--39-12
IA188: STREAM 1.9 MI N OF CO RD C33
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$235,000 $235,000
45357
Iowa Department ofTransportation
BRFN-18()--39-19
US18: WINTERS LAKE OVERFLOW 2.9 MI E OF CO RDT76
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $1,695,000 $1,700,000
45291
Iowa Department ofTransportation
BRFN-218()--39-7
US218: MUD CREEK 0.9 MI N OF CO RD D46
Bridge Deck Overlay, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$2,000 $1,075,000 $1,077,000
45363
Iowa Department ofTransportation
BRFN-3()--39-12
IA3: HARTGRAVES CREEK OVERFLOW 0.5 MI W OF CORD T16
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $1,059,000 $1,064,000
39184
Iowa Department ofTransportation
BRFN-57()--39-12
IA57: DITCH 2.1 MI E OF E JCT IA 14
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,460,000 $1,460,000
37889
Iowa Department ofTransportation
BRFN-57()--39-12
IA57: GRAN CREEK 0.5 MI E OF CO RD T19
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$751,000 $751,000
45360
Iowa Department ofTransportation
BRFN-63()--39-9
US63: CRANE CREEK 1.5 MI S OF IA 188 (SB)
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $3,602,000 $3,607,000
45317
Iowa Department ofTransportation
BRFN-20()--39-10
US20: IA 150 INTERCHANGE IN INDEPENDENCE (EB &WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$552,000 $552,000
45292
Iowa Department ofTransportation
BRFN-20()--39-10
US20: CO RD W45 3.4 MI W OF IA 187
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$851,000 $851,000
175
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45297
Iowa Department ofTransportation
BRFN-20()--39-10
US20: WAPSIPINICON RIVER 1.5 MI E OF IA 150 (EB &WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$629,000 $629,000
48556
Iowa Department ofTransportation
IMN-380()--0E-10
I-380: NB WEIGH STATION 1.5 MI N OF CO RD D48
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,050,000 $1,050,000
48569
Iowa Department ofTransportation
BRFN-14()--39-12
IA14: STREAM 1.0 MI N OF CO RD C23
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$570,000 $570,000
48632
Iowa Department ofTransportation
BRFN-14()--39-38
IA14: WOLF CREEK 0.8 MI N FO CO RD D67
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,031,000 $1,031,000
48631
Iowa Department ofTransportation
BRFN-175()--39-38
IA175: MUNNS CREEK 0.8 MI E OF CO RD T47
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$806,000 $806,000
48458
Iowa Department ofTransportation
BRFN-18()--39-19
US18: WAPSIPINICON RIVER 0.1 MI E OF CO RD V14
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$930,000 $930,000
48554
Iowa Department ofTransportation
IMN-380()--0E-10
I-380: SB WEIGH STATION 3.5 MI N OF CO RD D48
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,097,000 $1,097,000
176
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
1403
RPA 7
22298
RGPL--PA07(RTP)--ST-00
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$50,000$40,000
$40,000
$50,000$40,000
$40,000
$50,000$40,000
$40,000
$50,000$40,000
$40,000
$200,000$160,000
$160,000
45058
RPA 7
22300
RGTR-PA07()--ST-00
Replace one light duty bus
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$85,000$68,000
$68,000
$85,000$68,000
$68,000
20948
RPA 7
22299
STP-U-PA07()--70-10
On IA 150, from I-380 north 28 Miles to Oelwein city limits
Planning Study
FHWA Approved TotalFederal Aid
RegionalSwap
$200,000$100,000
$100,000
$200,000$100,000
$100,000
PA Note: Planning Study
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39128
Waverly
22390
TAP-U-8190(638)--8I-09
In the city of Waverly, On 10th Ave SW, from Heritage Wayeast 0.5 Miles to 16th St SW
Ped/Bike Grade & Pave
FHWA Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$235,000$184,000
$184,000
$235,000$184,000
$184,000
48383
Black Hawk CountyConservation Board
22391
TAP-U-C007()--8I-07
On Cedar Valley Nature Trail, Over Miller Creek, from MillerCreek Rd S 0.2 miles to structure S3 T87 R12
Bridge Rehabilitation
FHWA Approved TotalFederal Aid
RegionalSwap
$282,286$210,000
$210,000
$282,286$210,000
$210,000
45024
Buchanan County
22392
TAP-U-C010()--8I-10
On Taylor's Ford Bridge, Over WAPSIPINICON RIVER,from 262nd St 0.8 miles to structure S32 T88 R08
Historic Preservation, Ped/Bike Structures
FHWA Approved TotalFederal Aid
RegionalSwap
$350,000$184,000
$184,000
$350,000$184,000
$184,000
177
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
20207
Butler County
BHS-SWAP-C012(P05T10)--FC-12
On T55, Over WEST FORK CEDAR RIVER, from 280thStreet South 2600 Feet to Bridge
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00033908
Sumner
BROS-SWAP-7490(601)--SE-09
In the city of Sumner, On 3rd St, Over Drainage, from NDivision St west 0.1 miles to bridge
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$773,000
$773,000
$773,000
$773,0008508
Bremer County
BROS-SWAP-C009(53)--SE-9
On KILLDEER AVE, Over QUARTER SECTION RUN, S35T91 R13
Bridge Replacement
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$575,000
$575,000
$575,000
$575,0009951
Bremer County
BROS-SWAP-C009(87)--SE-9
On MIDWAY AVE, Over CRANE CREEK, S7 T92 R12
Bridge Replacement
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00036522
Chickasaw County
BROS-SWAP-C019(107)--FE-19
On KENWOOD AVE, Over EAST WAPSIPINICON RIVER,on WLINE S24 T96 R13
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00045072
Grundy County
BROS-SWAP-C038(122)--SE-38
On 160TH ST, Over SOUTH FORK BEAVER CREEK, fromI Ave W 0.1 miles S6 T88 R17
Bridge Replacement
DOT Approved
10/19/2021
TotalFederal Aid
RegionalSwap
$880,000
$880,000
$880,000
$880,00030990
Butler County
BRS-SWAP-C012(113)--FF-12
On T55, Over OVERFLOW W FORK CEDAR RIV, from280th Street South 1800 Feet to Bridge
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,250,000
$1,250,000
$1,250,000
$1,250,00045079
Grundy County
BRS-SWAP-C038(126)--FF-38
On T 47, Over MOSQUITO CREEK, from Tama Rd N 0.2miles S33 T87 R16
Culvert Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$301,000
$300,000
$301,000
$300,00032354
Grundy County
BHOS-SWAP-C038()--FB-38
On T37, Over Minnehaha Creek, S13 T87 R17
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
178
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37170
Butler County
BHS-SWAP-C012(K08W10)--FC-12
On T25, Over WEST FORK CEDAR RIVER, from 245thStreet N 0.7 miles to Bridge
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00048694
Sumner
BROS-SWAP-7490()--SE-09
In the city of Sumner, On S DIVISION ST, Over LITTLEWAPSIPINICON RIVER, from IA 93 S 0.3 miles to structure
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,361,000
$1,000,000
$1,361,000
$1,000,000PA Note: Updated funding type from BHOS to BROS
12749
Butler County
BROS-SWAP-C012(B30W10)--SE-12
On MARSH AVE, from 135th St. S 0.7 miles to Bridge
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00040191
Butler County
BROS-SWAP-C012(K22W30)--SE-12
On JAY AVE, Over SMALL STREAM, from 260th Street N0.6 miles to Bridge
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00037171
Butler County
BROS-SWAP-C012(M28W10)--SE-12
On CEDAR AVE, Over BEAVER CREEK, from 335th StreetN 0.6 miles to Bridge
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00037708
Chickasaw County
BROS-SWAP-C019()--SE-19
On ODESSA AVE, Over EAST WAPSIPINICON RIVER, atS1/4 S9 T95 R12
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,100,000
$1,100,000
$1,100,000
$1,100,00037709
Chickasaw County
BROS-SWAP-C019()--SE-19
On 180TH ST, Over CRANE CREEK RIVER, S32 T96 R11
Bridge Replacement
DOT Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00032326
Grundy County
BROS-SWAP-C038(125)--SE-38
On R Ave, Over the North Fork of Black Hawk Creek, NWS36 T89 R16
Bridge Replacement
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00044898
Black Hawk County
BRS-SWAP-C007(XXX)--FF-07
On Poyner Rd (D38), Over INDIAN CREEK, S25 T88 R12
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$650,000
$650,000
$650,000
$650,000
179
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38994
Bremer County
BRS-SWAP-C009()--FF-09
On C50, Over CRANE CREEK, S21 TT91N RR12
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00027164
Bremer County
BROS-SWAP-C009(L-9-118)--SE-09
On 240TH ST, Over CREEK, S17 T91 R14
Bridge Replacement
DOT Approved
7/23/2018
TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00037121
Buchanan County
BROS-SWAP-C010()--SE-10
On 150TH ST, Over OTTER CR, from Indiana Ave. west0.1 Miles to Bridge, S32 T90 R09
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$990,000
$990,000
$990,000
$990,00044774
Butler County
BROS-SWAP-C012(C14T10)--SE-12
On KIPLING AVE, Over COLD WATER CREEK, from 120thStreet S 0.15 miles to Bridge
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00036307
Butler County
BROS-SWAP-C012(H03N10)--SE-12
On 160 ST, Over STREAM, from Vail Ave E 0.2 miles toBridge
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00038951
Chickasaw County
BROS-SWAP-C033()--FE-33
On York Avenue, Over SMALL STREAM, on WLINE S31T94N R10W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00036646
Grundy County
BROS-SWAP-C038()--SE-38
On 280TH ST, Over Creek, from the Hardin Co. line east0.3 Miles to a un-named stream, N1/4 S6 T86 R18
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$275,000
$275,000
$275,000
$275,00036648
Grundy County
BROS-SWAP-C038(C13)--SE-38
On G AVE, Over N FORK OF BEAVER CREEK, from 140thSt north 0.5 Miles to the North fork of Beaver Creek, S19T89 R17
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$625,000
$625,000
$625,000
$625,000
37697
Grundy County
BROS-SWAP-C038(D10)--SE-38
On 120TH ST, Over MIDDLE FORK BEAVER CREEK, S18T89 R18
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$395,000
$395,000
$395,000
$395,000
180
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
34854
Grundy County
BROS-SWAP-C038(K02)--SE-38
On 225TH ST, Over BRANCH BLACKHAWK CREEK, fromL Ave west 0.4 Miles to K-2, at Ctr S3 T87 R17
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$675,000
$675,000
$675,000
$675,00037463
Black Hawk County
BRS-SWAP-C007(XXX)--FF-07
On Eagle Road (D46), Over MILLER CREEK, on NLINES24 T87 R13
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$675,000
$675,000
$675,000
$675,00038950
Chickasaw County
BRS-SWAP-C019()--FF-19
On B28 (140th Street), Over LITTLE WAPSIPINICONRIVER, on SLINE S6 T96N R13W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,400,000
$1,400,000
$1,400,00037127
Buchanan County
BRM-SWAP-0807()--SD-10
On D48, Over LIME CREEK, from Brandon East .25 Milesto Lime Creek Bridge, S27 T87 R10
DOT Approved TotalFederal Aid
RegionalSwap
$1,525,000
$1,525,000
$1,525,000
$1,525,00044621
Bremer County
BROS-SWAP-C009(L-3-125)--FE-09
On 310TH ST, Over E.FK WAPSIPINICON RIVER, S3 T93R12
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00015384
Butler County
BROS-SWAP-C012(M19W10)--SE-12
On Franklin Ave., Over SMALL STREAM, from 320th St. N0.4 miles to Bridge
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00044608
Butler County
BROS-SWAP-C012(M7W10)--SE-12
On FRANKLIN AVE, Over SMALL STREAM, from 300th STN 0.2 miles to Bridge
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037174
Butler County
BROS-SWAP-C012(N03W10)--SE-12
On JAY AVE, Over SMALL STREAM, from 290th Street N0.5 miles to Bridge
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00040184
Butler County
BROS-SWAP-C012(N24W10)--SE-12
On LIBERTY AVE, Over BEAVER CREEK, 0.2 miles toBridge
DOT Approved TotalFederal Aid
RegionalSwap
$900,000
$900,000
$900,000
$900,000
181
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44927
Chickasaw County
BROS-SWAP-C019()--FE-19
On 310TH ST, Over E.FK WAPSIPINICON RIVER, S34T94N R12W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00019177
Grundy County
BROS-SWAP-C038(C5)--SE-38
I Ave: From 120th St north 1/8mi to an un-named stream
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00037703
Grundy County
BROS-SWAP-C038(E01)--SE-38
On 160TH St from H Ave east 0.3mi to the South Fork ofBeaver Creek, near the N1/4 S1 T88 R18
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$975,000
$975,000
$975,000
$975,00036649
Grundy County
BROS-SWAP-C038(G10)--SE-38
On P AVE, Over BLACK HAWK CREEK, from D25 north 0.9Miles to to Black Hawk Creek, S16 T88 R16
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00036650
Grundy County
BROS-SWAP-C038(H11)--SE-38
On T AVE, Over BRANCH BLACK HAWK CREEK, S18 T88R15
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$525,000
$525,000
$525,000
$525,000
182
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37826
Readlyn
STBG-SWAP-6345()--SG-09
In the city of Readlyn, On Main St, from 4th St south 0.22Miles to 1st St
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,061,000
$531,000
$531,000
$1,061,000
$531,000
$531,00034783
Black Hawk County
STBG-SWAP-C007(165)--FG-07
On D46 Eagle Road, from V37 Dysart Road East to Hwy218
Pavement Rehab
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$1,400,000
$800,000
$800,000
$1,400,000
$800,000
$800,00034434
Butler County
STBG-SWAP-C012(121)--FG-12
On T47 from Hwy 57 N 12 miles to Hwy 3
Pavement Rehab
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$2,975,000
$1,000,000
$1,000,000
$2,975,000
$1,000,000
$1,000,00039131
Janesville
STBG-SWAP-3792(602)--SG-09
In the city of Janesville, On 7th St, Over Cedar River, fromMain St West 0.1 Miles to Bridge
Bridge Replacement
DOT Approved
10/18/2022
TotalFederal Aid
RegionalSwap
$5,700,000
$500,000
$1,500,000
$5,700,000
$500,000
$1,500,000PA Note: Project includes $2M from the Iowa DOT as programmed in TPMS 39180
39132
Nashua
STBG-SWAP-5375()--SG-19
In the city of Nashua, On Greeley St, from Panama StSouth 0.35 Miles to 0.1 mi S of Livingston St
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,301,000
$500,000
$500,000
$1,301,000
$500,000
$500,00035024
Bremer County
STBG-SWAP-C009(L-10-121)--FG-09
On C50, from East Corporate Limits of Janesville East 3.5Miles to V25
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$900,000
$600,000
$600,000
$900,000
$600,000
$600,00034855
Grundy County
STBG-SWAP-C038()--FG-38
On D67, from IA 14 W 5 miles to the county line
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,925,000
$819,000
$819,000
$1,925,000
$819,000
$819,00040124
Buchanan County
STBG-SWAP-C010()--FG-10
On W35, from D22 to Quasqueton
DOT Approved TotalFederal Aid
RegionalSwap
$3,150,000
$1,721,000
$1,721,000
$3,150,000
$1,721,000
$1,721,00036494
Chickasaw County
STBG-SWAP-C019()--FG-19
V18 from Highway 18 N 8.5 miles to South City Limits of AltaVista
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$3,300,000
$1,147,000
$1,147,000
$3,300,000
$1,147,000
$1,147,000
183
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44769
Butler County
STBG-SWAP-C012(T16 Dumont)--FG-12
On T16, from Hwy 3 N 6 miles to C23
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000
$800,000
$800,000
$1,500,000
$800,000
$800,00047063
Grundy County
STBG-SWAP-C038(T47)--FG-38
On T 47, from Marshall County N 3.9 miles to IA175 S3 T86R16
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,200,000
$800,000
$800,000
$1,200,000
$800,000
$800,00048385
RPA 7
STBG-SWAP-PA07()--SG-07
On US 218, from La Porte City limits N 5.7 miles to SchrockRd
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$962,500
$770,000
$770,000
$962,500
$770,000
$770,000PA Note: RPA contribution to Iowa DOT project
184
(
RPA 8 - Regional Planning Affiliation 8
7600 Commerce Park, Dubuque, IA 52002
Phone: 563-556-4166, Fax: 563-556-0348, www.eciatrans.org
Delaware 38
County
-+
10 20Miles --i_
Jackson
County
Air orts
Commercial
El Enhanced
- Interstate
- National Highway System
- Primary Roads
El General Service Local Roads
El Basic Service - Ramps
El Local Service - Trails
Transit
[el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Area
r--1
L_ _ _J Counties
City Limits
Urban Area
185
RPA 8DEMO
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44681
Clinton County
22010
HDP-C023(124)--6B-23
On 220th Street, from Y-70 to Z-24 double chip seal withmicrosurface
FHWA Approved
8/17/2021
TotalFederal Aid
RegionalSwap
$550,000$440,000
$550,000$440,000
PA Note: Project awarded AID Demonstration funds
ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48370
De Witt
ILL-1855()--93-23
In the city of De Witt, INDUSTRIAL STREET EXTENSION
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$4,351,500 $4,351,500
48369
Dyersville
ILL-2160()--93-31
In the city of Dyersville, On 1ST ST SW, Over SMALLSTREAM
Pavement Widening, Bridge New
DOT Approved TotalFederal Aid
RegionalSwap
$19,900,000 $19,900,000
36188
Clinton County
ILL-C023()--92-23
On Y-68 over Wapsi backwater,S31,T81,R4E
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,375,000 $1,375,000
187
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37916
Iowa Department ofTransportation
22120
BRF-30()--38-23
US30: UP RR 5.8 MI E OF S JCT US 61 (EB & WB)
Bridge Deck Overlay
FHWA Approved TotalFederal Aid
RegionalSwap
$2,158,000$1,726,400
$2,158,000$1,726,400
DOT Note: Project includes repurposed earmark funds from IA161
48514
Iowa Department ofTransportation
22121
NHSX-20()--3H-28
US20: MAQUOKETA RIVER TO E OF IA 38
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$1,800,000$1,440,000
$1,800,000$1,440,000
38255
Iowa Department ofTransportation
22123
NHSX-3()--3H-31
IA3: E JCT PFEILER RD TO 0.7 MI N OF BOY SCOUT RD
Grade and Pave, Erosion Control, Traffic Signs
FHWA Approved TotalFederal Aid
RegionalSwap
$11,778,000$9,422,400
$343,000$274,400
$12,121,000$9,696,800
48515
Iowa Department ofTransportation
22122
NHSX-61()--3H-31
US61: 0.3 MI N OF CO RD D41 TO LAKE ELEANOR RD
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$4,155,000$3,324,000
$4,155,000$3,324,000
DOT Note: Project includes repurposed earmark funding (IA148) of $145,053.24
48413
Iowa Department ofTransportation
22116
BRF-30()--38-23
US30: UP RR 0.6 MI E OF CO RD Y4E
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$5,000$4,000
$5,009,000$4,007,200
$5,014,000$4,011,200
39204
Iowa Department ofTransportation
22118
BRF-30()--38-23
US30: WAPSIPINICON RIVER 1.5 MI E OF CO RD Y4E
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$6,000$4,800
$5,238,000$4,190,400
$5,244,000$4,195,200
45273
Iowa Department ofTransportation
22124
NHSX-13()--3H-28
IA13: HONEY CREEK 0.2 MI N OF CO RD D13 TO S JCTIA 3
Grade and Pave, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$16,149,000$12,919,200
$16,149,000$12,919,200
48412
Iowa Department ofTransportation
22115
BRF-136()--38-23
IA136: DITCH 8.6 MI N OF US 61
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$964,000$771,200
$964,000$771,200
188
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48426
Iowa Department ofTransportation
22117
BRF-136()--38-23
IA136: ELWOOD CREEK 3.1 MI W OF US 61
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,908,000$1,526,400
$1,908,000$1,526,400
48429
Iowa Department ofTransportation
22119
BRF-136()--38-23
IA136: BRANCH PRAIRIE CREEK 1.2 MI N OF US 61
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$964,000$771,200
$964,000$771,200
48615
Iowa Department ofTransportation
22125
BRF-136()--38-23
IA136: BRANCH PRAIRIE CREEK 1.9 MI N OF US 61
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$964,000$771,200
$964,000$771,200
48635
Iowa Department ofTransportation
22127
BRF-136()--38-23
IA136: BRANCH PRAIRIE CREEK 4.0 MI N OF US 61
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$964,000$771,200
$964,000$771,200
48627
Iowa Department ofTransportation
22126
BRF-20()--38-31
US20: MIDDLE BRANCH CATFISH CREEK & CC RR 0.6MI E OF NW ARTERIAL IN DUBUQUE (WB)
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$4,012,000$3,209,600
$4,012,000$3,209,600
189
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37917
Iowa Department ofTransportation
BRFN-136()--39-23
IA136: MISSISSIPPI RIVER IN CLINTON (STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$40,000 $40,000 $40,000 $40,000 $160,000
37915
Iowa Department ofTransportation
BRFN-30()--39-23
US30: MISSISSIPPI RIVER IN CLINTON (STATE SHARE)
Bridge Rehabilitation, Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$1,025,000 $25,000 $25,000 $25,000 $1,100,000
37952
Iowa Department ofTransportation
BRFN-52()--39-49
US52: MISSISSIPPI RIVER IN SABULA (STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$25,000 $25,000 $25,000 $25,000 $100,000
48553
Iowa Department ofTransportation
NHSN-67()--2R-23
US67: IN CLINTON, ON 3RD ST AND 4TH ST
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$298,000 $298,000
48507
Iowa Department ofTransportation
STPN-52()--2J-49
US52: IN THE CITY OF BELLEVUE
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$616,000 $616,000
39209
Iowa Department ofTransportation
BRFN-136()--39-23
IA136: DEEP CREEK 0.2 MI S OF CO RD Z2E
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$401,000 $401,000
39206
Iowa Department ofTransportation
BRFN-30()--39-23
US30: AMES CREEK 3.5 MI E OF E JCT US 61 (EB & WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$965,000 $965,000
39207
Iowa Department ofTransportation
BRFN-61()--39-23
US61: N JCT US 30 IN DE WITT (NB & SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,632,000 $1,632,000
39263
Iowa Department ofTransportation
BRFN-64()--39-49
IA64: STREAM 0.1 MI W OF CO RD E29
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$298,000 $298,000
190
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39262
Iowa Department ofTransportation
BRFN-64()--39-49
IA64: PRAIRIE CREEK 0.4 MI E OF IA 62
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$742,000 $742,000
39208
Iowa Department ofTransportation
STPN-136()--2J-23
IA136: MISSISSIPPI RIVER IN CLINTON
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$100,000 $100,000
39205
Iowa Department ofTransportation
STPN-30()--2J-23
US30: MISSISSIPPI RIVER IN CLINTON
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$150,000 $150,000
45327
Iowa Department ofTransportation
BRFN-20()--39-28
US20: BRANCH PLUM CREEK 5.0 MI E OF IA 38 (EB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$150,000 $150,000
45337
Iowa Department ofTransportation
BRFN-20()--39-31
US20: N FORK MAQUOKETA RIVER 0.5 MI W OF IA 136(EB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$368,000 $368,000
45305
Iowa Department ofTransportation
BRFN-20()--39-31
US20: IA 136 IN DYERSVILLE (EB & WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$561,000 $561,000
45307
Iowa Department ofTransportation
BRFN-20()--39-31
US20: CO RD Y17 IN EPWORTH (EB & WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$386,000 $386,000
45335
Iowa Department ofTransportation
BRFN-20()--39-31
US20: CO RD Y13 IN FARLEY (EB & WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$366,000 $366,000
45318
Iowa Department ofTransportation
BRFN-30()--39-23
US30: SILVER CREEK 0.7 MI E OF W JCT US 61 IN DEWITT (EB & WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,571,000 $1,571,000
191
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48442
Iowa Department ofTransportation
BRFN-136()--39-23
IA136: MISSISSIPPI RIVER IN CLINTON (STATE SHARE)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
48457
Iowa Department ofTransportation
BRFN-61()--39-49
US61: TARECOD CREEK 1.4 MI N OF CO RD E17 (NB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$350,000 $350,000
39259
Iowa Department ofTransportation
STPN-52()--2J-49
US52: MISSISSIPPI RIVER BRIDGE TO N OF SABULA
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$25,830,000 $25,830,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
478
RPA 8
22301
RGPL-PA08(RTP)--ST-00
On ECIA Transportation Planning
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$65,300$52,300
$52,300
$65,300$52,300
$52,300
$65,300$52,300
$52,300
$65,300$52,300
$52,300
$261,200$209,200
$209,200
48486
Iowa Department ofTransportation
22302
STP-38()--2C-28
IA38: N OF HOPKINTON TO DELHI
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,016,000$2,412,800
$3,016,000$2,412,800
48496
Iowa Department ofTransportation
22303
STP-38()--2C-28
IA38: NCL OF DELHI TO CO RD D22
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$2,000,000$1,600,000
$2,000,000$1,600,000
192
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45515
Dyersville
22393
TAP-R-2160(617)--8T-31
Heritage Trail Paving and Trailhead Improvements: From11th ST SE to Heritage Trail
Ped/Bike Grade & Pave, Ped/Bike Structures
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$750,000$242,111
$242,111
$750,000$242,111
$242,111
45516
Maquoketa
22394
TAP-U-4742(621)--8I-49
In the city of Maquoketa, On ALLEN ST, S25 T84 R02Efrom E Summit St to 200 th Ave
Ped/Bike Grade & Pave, Ped/Bike Miscellaneous
FHWA Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$577,952$242,111
$242,111
$577,952$242,111
$242,111
193
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
47215
Clinton County
BHOS-SWAP-C023(130)--FB-23
On 235th Street over Wapsi backwater, S12,T81,R1
DOT Approved
5/17/2022
TotalFederal Aid
RegionalSwap
$1,500,000
$500,000
$1,500,000
$1,500,000
$500,000
$1,500,00036143
Clinton County
BHS-SWAP-C023(118)--FC-23
On Y52, Over DRAINAGE DITCH 5, S1 T80 RE2
Bridge Deck Overlay
DOT Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$230,000
$230,000
$230,000
$230,00047197
Jackson County
BRM-SWAP-4742(621)--SD-49
On Y 53, Over PRAIRIE CREEK, S30 T84 R03E
DOT Approved TotalFederal Aid
RegionalSwap
$528,000
$528,000
$528,000
$528,00035332
Jackson County
BROS-SWAP-C049(82)--FE-49
On 475th Avenue, Bridge over Unnamed creek, S35 T86R5E
Bridge Replacement
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00035157
Clinton County
BROS-SWAP-C023()--SE-23
On 250 AVE, Over BLACK CREEK, S27 T82 RE3
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037337
Delaware County
BROS-SWAP-C028()--SE-28
On 130th Avenue, in NW S15 T89N R6W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037302
Dubuque County
BROS-SWAP-C031()--FE-31
On Clear Creek Road, in W1/4 S14 T90N R2W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00036548
Jackson County
BROS-SWAP-C049(86)--SE-49
On 49th Street, Over Creek, S18 T84 R1
Bridge Replacement
DOT Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00044755
Delaware County
BROS-SWAP-C028()--SE-28
On 140th Street, Over Routherford Branch, S24 T90N R5W
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,000
194
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37304
Dubuque County
BROS-SWAP-C031()--FE-31
On Graf Road, in NE S20 T89N R1E
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00037106
Dubuque County
BROS-SWAP-C031()--SE-31
On Fishpond Road, S3 T88N R1W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037751
Jackson County
BROS-SWAP-C049()--FE-49
On 17th Street, Over Elk Creek, S33 T84N R6E
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00036148
Clinton County
BHS-SWAP-C023()--FC-23
On Y4E, Over YANKEE RUN CREEK, S15 T81 RE1
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00044756
Delaware County
BROS-SWAP-C028()--SE-28
On 215th Avenue, Over Unnamed Stream, S24 T87N R5W
DOT Approved TotalFederal Aid
RegionalSwap
$225,000
$225,000
$225,000
$225,00039021
Jackson County
BROS-SWAP-C049()--FE-49
On 362nd Avenue (Z15), Over Duck creek, S25 T86 R4E
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$650,000
$650,000
$650,000
$650,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36146
Clinton County
HSIP-SWAP-C023(129)--FJ-23
Z-40 from E-50 to Hwy 64 in Miles
Pavement Rehab
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,200,000
$200,000
$1,200,000
$200,000
195
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48368
Camanche
STBG-SWAP-1040(610)--SG-23
In the city of Camanche, US Highway 67 & 7th AveRoundabout
Pave
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$896,400
$100,000
$100,000
$896,400
$100,000
$100,00035633
Clinton
STBG-SWAP-1415(634)--SG-23
In the city of Clinton, On Manufacturing Drive , from BluffBlvd to Rail road tracks
Pavement Rehab
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$3,900,000
$3,900,000
$3,900,000
$3,900,000
$3,900,000
$3,900,00044629
Delaware County
STBG-SWAP-C028()--FG-28
On Robinson Road (W63), from Linn County Line N 4.7miles
DOT Approved TotalFederal Aid
RegionalSwap
$2,499,342
$1,499,342
$1,499,342
$2,499,342
$1,499,342
$1,499,34245816
Clinton County
STBG-SWAP-C023()--FG-23
On F 12,from Z-24 E 5.0 miles to Z-36
DOT Approved TotalFederal Aid
RegionalSwap
$2,835,000
$1,185,000
$1,185,000
$2,835,000
$1,185,000
$1,185,00037309
Dubuque County
STBG-SWAP-C031()--FG-31
On Higginsport Road from Hwy 151 east 5.87 miles toMoloney Road
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,042,528
$1,492,528
$1,492,528
$2,042,528
$1,492,528
$1,492,52835330
Jackson County
STBG-SWAP-C049()--FG-49
On Z34 (435th Ave), from Preston N 5 miles to MaquoketaRiver
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,700,000
$900,000
$900,000
$1,700,000
$900,000
$900,000
196
N
0
RPA 9 - Bi-State Regional Commission
1504 Third Avenue, Third Floor, Rock Island, IL 61201-8612Phone: 309-793-6300, Fax: 309-793-6305, www.bistateonline.org
Muscatine 38
County
/
5 10
@]
20 Miles
Scott
County
Bi-State Regional
Commission (BSRC)
- Interstate
Commercial -National Highway System
- Primary Roads
(I General Service Local Roads
(I Basic Service -Ramps
(I Local Service -Trails
Transit -+- Railroad
[el Regional
[el Rivers
Large Urban
[el Major Lakes
Small Urban
[el C] RPA Planning Area
Intercity Bus r--1
CE! L_ _ _J Counties
Amtrak
I City Limits
Park & Ride Urban Area
197
RPA 9ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
35837
Scott County
ILL-C082(65)--92-82
On Y68, Over WAPSI RIVER OVERFLOW, S31 T81 RE4
Bridge Replacement
DOT Approved
2/21/2023
TotalFederal Aid
RegionalSwap
$1,375,000 $1,375,000
199
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37990
Iowa Department ofTransportation
BRFN-6()--39-70
US6: SUGAR CREEK 2.3 MI W OF IA 38
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$184,000 $184,000
37991
Iowa Department ofTransportation
BRFN-92()--39-70
IA92: MISSISSIPPI RIVER IN MUSCATINE (STATESHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000 $50,000 $50,000 $200,000
48498
Iowa Department ofTransportation
STPN-6()--2J-70
US6: ECL OF WEST LIBERTY TO IA 38
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$600,000 $600,000
48576
Iowa Department ofTransportation
STPN-6()--2J-70
US6: NEAR NOBLE AVE 2.9 MI E OF CO RD X46
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$117,000 $117,000
39309
Iowa Department ofTransportation
BRFN-6()--39-70
US6: IAIS RR 1.2 MI E OF IA 38
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$513,000 $513,000
39310
Iowa Department ofTransportation
BRFN-6()--39-70
US6: SUGAR CREEK 1.7 MI W OF W JCT IA 38
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$855,000 $855,000
45311
Iowa Department ofTransportation
BRFN-22()--39-70
IA22: WAPSINONOC CREEK 1.6 MI E OF W JCT IA 70
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$386,000 $386,000
45252
Iowa Department ofTransportation
BRFN-92()--39-70
IA92: MISSISSIPPI RIVER IN MUSCATINE (STATESHARE)
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
200
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
533
RPA 9
22304
RGPL-PA09(RTP)--ST-00
Region 9
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$25,132$10,000
$10,000
$17,566$10,000
$10,000
$17,566$10,000
$10,000
$10,000$10,000
$10,000
$70,264$40,000
$40,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39494
Long Grove
22395
TAP-R-4497()--8T-82
In the city of Long Grove, On 1st St, from E Grove Rd N0.60 Miles to Long Grove Corporate Limits
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$480,000$384,000
$384,000
$480,000$384,000
$384,000
201
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
32310
Muscatine County
BROS-SWAP-C070(70)--SE-70
On YORK AVENUE, Over Mud Creek, Near E 1/4 Corner,S2 T78 R1E
Bridge Replacement
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00037447
Muscatine County
BROS-SWAP-C070()--SE-70
On 150TH STREET, Near S 1/4 Corner, S30 T78N R1W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$340,000
$340,000
$340,000
$340,00037452
Muscatine County
BROS-SWAP-C070()--SE-70
On HOLLY AVENUE, Near NW Corner SW-SW, S20 T78NR3W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$365,000
$365,000
$365,000
$365,00031024
Scott County
BRS-SWAP-C082()--FF-82
On Y4E, Over Tributary to Rock Creek, S3 T80 RE1
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00044842
Muscatine County
BROS-SWAP-C070( )--SE-70
On N ISETT AVE, Over MOSQUITO CREEK, Near NECorner, S27 T78 R02
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$540,000
$540,000
$540,000
$540,00036077
Muscatine County
BROS-SWAP-C070(71)--SE-70
On TROLLEY AVENUE, Near SE Corner NE-NE, S27 T77R1W
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$540,000
$540,000
$540,000
$540,00039015
Muscatine County
BROS-SWAP-C070()--FE-70
On 120TH STREET F65, Near NE Corner SW-NE, S16 T78R1E
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00039014
Muscatine County
BROS-SWAP-C070()--SE-70
On 135TH STREET, Near W 1/4 Corner, S22 T78 R1E
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$270,000
$270,000
$270,000
$270,000
202
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
47291
Scott County
HSIP-SWAP-C082()--FJ-82
Intersection of Y40 and Hwy 130
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$76,000
$76,000
$76,000
$76,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
35023
Muscatine County
STBG-SWAP-C070()--FG-70
On OLD HWY 927 F58, from Durant Corp. to Walcott Corp.
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$2,500,000
$2,100,000
$2,100,000
$2,500,000
$2,100,000
$2,100,00035835
Scott County
STBG-SWAP-C082()--FG-82
On F58, from Y40 W 6 miles to 14th Ave
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$2,600,000
$2,600,000
$2,600,000
$2,600,000
$2,600,000
$2,600,000
203
RPA 10 - East Central Iowa Council of Governments
700 16th St, Suite 301, Cedar Rapids, IA 52402
Phone: 319-365-9941, Fax: 319-365-9981, www.ecicog.org
� N
I
0 5 10
Iowa
) I
20 Miles
:,
Corridor Metropolitan
Planning Organization
(CMPO)
6
r
iorts - Interstate
Commercial - National Highway System
(I Enhanced - Primary Roads
(I General Service Local Roads
(I Basic Service -Ramps
(I Local Service -TrailsTransit
-+- Railroad [el Regional
[el Rivers
Large Urban
[el Major Lakes
Small Urban C] RPA Planning Area
[el Intercity Busr--1
CE! L_ _ _J Counties
Amtrak
I City Limits
Park & Ride Urban Area
204
RPA 10HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48440
Iowa Department ofTransportation
22023
HSIPX-149()--3L-48
IA149: IN WILLIAMSBURG, FROM OLD MAN'S CREEKTO HAWKEYE DR
Pavement Widening
FHWA Approved TotalFederal Aid
RegionalSwap
$251,000$225,900
$251,000$225,900
38055
Iowa Department ofTransportation
22024
HSIPX-150()--3L-6
IA150: CURVE W OF URBANA NEAR 31ST AVE AND55TH ST
Grade and Pave, Erosion Control, Lighting
FHWA Approved TotalFederal Aid
RegionalSwap
$2,952,000$2,656,800
$164,000 $3,116,000$2,656,800
ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45851
Jones County
ILL-C053(92)--92-53
On LANDIS RD, Over WAPSIPINICON RIVER, S20 T84R03
Bridge New
DOT Approved
10/18/2022
TotalFederal Aid
RegionalSwap
$2,750,000 $2,750,000
7274
Washington County
ILL-C092(57)--92-92
On W21, Over SKUNK RIVER, S10 T74 R09
Bridge Replacement
DOT Approved
11/15/2022
TotalFederal Aid
RegionalSwap
$6,500,000 $6,500,000
45143
Benton County
ILL-C006()--92-06
On D 65, Over CEDAR RIVER, S6 T86 R10
DOT Approved TotalFederal Aid
RegionalSwap
$2,000,000 $2,000,000
47306
Benton County
ILL-C006()--92-06
On V 40, Over BUCKEYE CREEK, S22 T82 R12
DOT Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
206
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38151
Iowa Department ofTransportation
22130
IM-NHS-80()--03-52
I-80: 1.5 MI E OF IA 1 TO 0.5 MI E OF CO RD X30
Grade and Pave, Pave, Grading
FHWA Approved TotalFederal Aid
RegionalSwap
$39,538,000$33,607,300
$7,052,000$5,994,200
$20,063,000$17,053,550
$20,748,000$17,635,800
$87,401,000$74,290,850
38216
Iowa Department ofTransportation
22128
NHSX-30()--3H-6
US30: 11TH AVE DR TO W JCT US 218
Grade and Pave, Bridge New, Culvert Replacement
FHWA Approved TotalFederal Aid
RegionalSwap
$46,003,000$36,802,400
$26,127,000$20,901,600
$227,000$181,600
$72,357,000$57,885,600
39171
Iowa Department ofTransportation
22134
BRF-218()--38-6
US218: ABANDONED RR 2.6 MI N OF N JCT US 30(REMOVE BRIDGE)
Grade and Pave, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,380,000$1,104,000
$1,380,000$1,104,000
38168
Iowa Department ofTransportation
22133
IM-NHS-80()--03-16
I-80: E OF THE CEDAR RIVER TO W OF CO RD Y26
Grade and Pave, Bridge Replacement, Traffic Signs
FHWA Approved TotalFederal Aid
RegionalSwap
$19,580,000$16,643,000
$19,580,000$16,643,000
38214
Iowa Department ofTransportation
22129
NHSX-92()--3H-92
IA92: E OF US 218 TO IA 70 IN COLUMBUS JUNCTION
Grade and Pave, Culvert Replacement, Wetland Mitigation
FHWA Approved TotalFederal Aid
RegionalSwap
$22,234,000$17,787,200
$267,000$213,600
$22,501,000$18,000,800
39173
Iowa Department ofTransportation
22131
IMX-380()--02-6
I-380: IA 150 TO BLACK HAWK CO (SB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$9,845,000$8,860,500
$9,845,000$8,860,500
39172
Iowa Department ofTransportation
22132
IMX-380()--02-6
I-380: IA 150 TO BLACK HAWK CO (NB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$9,421,000$8,478,900
$9,421,000$8,478,900
48596
Iowa Department ofTransportation
22135
BRF-136()--38-53
IA136: MAQUOKETA RIVER 2.5 MI N OF CO RD E17
Bridge Rehabilitation, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,285,000$1,828,000
$2,285,000$1,828,000
48621
Iowa Department ofTransportation
22136
NHSX-30()--3H-16
US30: ECL LISBON TO WCL MECHANICSVILLE
Pavement Widening, Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,500,000$2,800,000
$3,500,000$2,800,000
207
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37962
Iowa Department ofTransportation
BRFN-136()--39-53
IA136: STREAM 0.2 MI N OF CO RD E45
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,339,000 $1,339,000
38039
Iowa Department ofTransportation
BRFN-218()--39-92
US218: N FORK LONG CREEK 1.0 MI S OF IA 92 (NB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$337,000 $337,000
38101
Iowa Department ofTransportation
IMN-380()--0E-52
I-380: CO RD F12 INTERCHANGE
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$450,000 $450,000
38100
Iowa Department ofTransportation
IMN-80()--0E-52
I-80: EAGLE AVE 6.1 MI W OF I-380
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$293,000 $293,000
48478
Iowa Department ofTransportation
NHSN-1()--2R-52
IA1: 0.4 MI TO 0.8 MI N OF CO RD F52
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$175,000 $175,000
45271
Iowa Department ofTransportation
NHSN-1()--2R-52
IA1: 1.7 MI N OF I-80
Grading, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$110,000 $110,000
38197
Iowa Department ofTransportation
NHSN-1()--2R-53
IA1: LINN CO TO US 151 AT VARIOUS LOCATIONS
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$2,015,000 $599,000 $2,614,000
48584
Iowa Department ofTransportation
NHSN-1()--2R-92
IA1: 0.25 MI W OF BRIGHTON
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$372,000 $372,000
48511
Iowa Department ofTransportation
NHSN-151()--2R-53
US151: OLD DUBUQUE RD INTERSECTION 0.95 MI NOF IA 64
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$350,000 $350,000
208
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48509
Iowa Department ofTransportation
STPN-38()--2J-53
IA38: US 151 TO EAST 9TH ST IN MONTICELLO
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,250,000 $1,250,000
48481
Iowa Department ofTransportation
STPN-64()--2J-53
IA64: W JCT IA 136 TO E JCT IA 136 IN WYOMING
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$241,000 $241,000
39174
Iowa Department ofTransportation
BRFN-150()--39-6
IA150: CEDAR RIVER 1.0 MI S OF CO RD E16
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,163,000 $1,163,000
45368
Iowa Department ofTransportation
BRFN-150()--39-6
IA150: PRAIRIE CREEK 1.8 MI N OF CO RD V71
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $501,000 $506,000
39193
Iowa Department ofTransportation
IMN-80()--0E-16
I-80: CO RD Y26 AND CO RD Y30 INTERCHANGERAMPS
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,486,000 $1,486,000
39285
Iowa Department ofTransportation
STPN-30()--2J-57
US30: IA 1 INTERCHANGE IN MOUNT VERNON
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$110,000 $110,000
38176
Iowa Department ofTransportation
STPN-30()--2J-6
US30: W JCT US 218 INTERCHANGE
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$120,000 $120,000
45385
Iowa Department ofTransportation
BRFN-151()--39-53
US151: KITTY CREEK 1.1 MI S OF CO RD X44 (SB)
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,214,000 $1,214,000
45364
Iowa Department ofTransportation
BRFN-218()--39-6
US218: STREAM 0.1 MI E OF CO RD V61
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$746,000 $746,000
209
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39271
Iowa Department ofTransportation
BRFN-6()--39-52
US6: BUFFALO CREEK 4.9 MI E OF CO RD W38
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$422,000 $422,000
48605
Iowa Department ofTransportation
IMN-380()--0E-52
I-380: N OF US 6 TO 1.25 MI N OF FOREVERGREEN RD
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$90,000 $90,000
45315
Iowa Department ofTransportation
IMN-80()--0E-16
I-80: W IA 38/CO RD X54 (MOSCOW RD)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$859,000 $859,000
45349
Iowa Department ofTransportation
IMN-80()--0E-48
I-80: EB REST AREA NEAR VICTOR
Grade and Pave, Lighting, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$7,898,000 $7,898,000
48465
Iowa Department ofTransportation
BRFN-13()--39-57
IA13: WAPSIPINICON RIVER IN CENTRAL CITY
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,520,000 $1,520,000
48562
Iowa Department ofTransportation
BRFN-136()--39-53
IA136: LITTLE BEAR CREEK 0.8 MI N OF IA 64
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$260,000 $260,000
48612
Iowa Department ofTransportation
BRFN-151()--39-53
US151: WAPSIPINICON RIVER 1.4 MI S OF IA 64 (NB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,270,000 $1,270,000
48447
Iowa Department ofTransportation
BRFN-30()--39-57
US30: CIC RR SPUR 0.8 MI W OF E JCT US 218 (EB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$800,000 $800,000
48449
Iowa Department ofTransportation
IMN-380()--0E-6
I-380: IA 150 INTERCHANGE (NB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$830,000 $830,000
210
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48608
Iowa Department ofTransportation
NHSN-30()--2R-16
US30: WCL MECHANICSVILLE TO WCL STANWOOD
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$400,000 $400,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
16834
RPA 10
22305
RGPL-PA10()--ST-00
Region 10-ECICOG: Region 10 Planning
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$211,250$169,000
$169,000
$111,250$89,000
$89,000
$115,000$92,000
$92,000
$120,000$96,000
$96,000
$557,500$446,000
$446,000
48624
Iowa Department ofTransportation
22306
STP-136()--2C-53
IA136: MAQUOKETA RIVER TO CASCADE
Pavement Widening, Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,746,000$3,157,000
$3,746,000$3,157,000
DOT Note: Project includes STBG and HSIP funds.
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39441
Johnson CountyConservation Board
22396
TAP-U-C052(124)--8I-52
On Clear Creek Trail, from Half Moon Ave 2.5 miles to FWKent Park
Ped/Bike Development
FHWA Approved
1/22/2031
TotalFederal Aid
RegionalSwap
$750,000$587,260
$587,260
$750,000$587,260
$587,260
48691
Linn CountyConservation Board
22397
TAP-U-C057()--8I-57
from Secrist Rd. Parking Lot NE 1.2 miles to Paralta Rd.
Ped/Bike Paving, Ped/Bike Structures
FHWA Approved TotalFederal Aid
RegionalSwap
$600,000$130,893
$130,893
$600,000$130,893
$130,893
39443
Linn CountyConservation Board
22426
TAP-U-C057(147)--8I-57
On Grant Wood Trail, from Oxley Road .113 miles toSecrist Rd, and then approx. 2935 feet East
Ped/Bike Paving, Ped/Bike Structures
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$1,410,087$634,087
$634,087
$1,410,087$634,087
$634,087
211
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48714
Shellsburg
BRM-SWAP-6962(606)--SD-06
In the city of Shellsburg, On Sells St, Over BEAR CREEK,S14 T84 R09
Work Not Assigned
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00045528
Williamsburg
BRM-SWAP-8427(602)--SD-48
In the city of Williamsburg, On STATE ST, Over OLD MANSCREEK, S10 T79 R10
Bridge Rehabilitation
DOT Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,697,250
$305,548
$1,305,548
$1,697,250
$305,548
$1,305,54848712
Coggon
BROS-SWAP-1452(601)--SE-57
In the city of Coggon, On N 3RD ST, Over BUFFALOCREEK, S3 T86 R06
Work Not Assigned
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$1,433,000
$1,000,000
$1,433,000
$1,000,00021820
Benton County
BROS-SWAP-C006()--FE-06
On W14, Over BR LITTLE BEAR CREEK, S14 T83 R10
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00032448
Benton County
BROS-SWAP-C006(109)--FE-06
On E24, Over SPRING CREEK, S24 T85 R09
Bridge Replacement
DOT Approved
9/21/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00012273
Benton County
BROS-SWAP-C006(119)--SE-06
On 75 ST, Over BR PRAIRIE CK, S10 T82 R09
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$325,000
$325,000
$325,000
$325,00036374
Cedar County
BROS-SWAP-C016(113)--FE-16
On F51-Old Muscatine Road, Over OTTER CREEK, S25T79 R02
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00035920
Iowa County
BROS-SWAP-C048(92)--SE-48
On 125th St, Over Honey Creek, S14 T81 R12
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00016421
Washington County
BROS-SWAP-C092(115)--SE-92
On Juniper Avenue, Over SMALL STREAM, S27 T74 R08
Culvert Replacement
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
212
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36609
Benton County
BRS-SWAP-C006()--FF-06
On E44, Over BEAR CREEK, S13 T83 R10
Culvert Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00029496
Benton County
BRS-SWAP-C006(108)--FF-06
On D65, Over SPRING CREEK, S20 T86 R11
Grade and Pave, Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00049731
Lowden
BROS-SWAP-4555()--SE-16
In the city of Lowden, On 8TH ST, Over DRAINAGE, S35T82 R01
Work Not Assigned
DOT Approved TotalFederal Aid
RegionalSwap
$370,000
$370,000
$370,000
$370,00018445
Benton County
BROS-SWAP-C006()--FE-06
On Benton-Linn Rd, Over Prairie Creek, S7 T82 R8
DOT Approved TotalFederal Aid
RegionalSwap
$375,000
$375,000
$375,000
$375,00036612
Benton County
BROS-SWAP-C006()--SE-06
On 69 ST, Over Little Bear Creek, S8 T83 R09
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00032447
Benton County
BROS-SWAP-C006()--SE-06
On 32 AVE DR, Over BR PRAIRIE CK, S11 T82 R09
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00025041
Benton County
BROS-SWAP-C006()--SE-06
On 16 AVE, Over SPRING CK, S30 T86 R11
DOT Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00038669
Cedar County
BROS-SWAP-C016()--SE-16
On Taylor Ave., Over SUGAR CREEK, S29 T80 R01
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00047221
Iowa County
BROS-SWAP-C048()--SE-48
On 200TH ST, Over CLEAR CREEK, S28 T80 R09
DOT Approved TotalFederal Aid
RegionalSwap
$530,000
$530,000
$530,000
$530,000
213
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39061
Johnson County
BROS-SWAP-C052()--SE-52
On 520TH ST SW, Over DEER CREEK, S20 T78 R08
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,00035287
Benton County
BROS-SWAP-C006()--FE-06
On 78th St, Over BR PRAIRIE CK, S19 T82 R10
DOT Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00035346
Benton County
BROS-SWAP-C006()--FE-06
On 63rd ST, Over MUD CREEK, S12 T84 R11
DOT Approved TotalFederal Aid
RegionalSwap
$275,000
$275,000
$275,000
$275,00010708
Benton County
BROS-SWAP-C006()--SE-06
On 32 AVE DR, Over BRANCH PRAIRIE CREEK, S11 T82R09
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00032728
Benton County
BROS-SWAP-C006()--SE-06
On 63 ST, Over OPPOSSUM CREEK, S11 T84 R10
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,0001801
Benton County
BROS-SWAP-C006(xx)--SE-06
55th ST: Over Pratt Creek, S36 T86 R11
DOT Approved TotalFederal Aid
RegionalSwap
$425,000
$425,000
$425,000
$425,00044627
Cedar County
BROS-SWAP-C016()--FE-16
On F 51, Over ELKHORN CREEK (LITTLE), S28 T79 R01
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00014732
Benton County
BRS-SWAP-C006()--FF-06
On V 66, Over MUD CREEK, S21 T84 R11
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00016422
Washington County
BRS-SWAP-C092(73)--FF-92
On W64, Over Long Creek, S22 T75 R6
Bridge Replacement
DOT Approved
11/21/2023
TotalFederal Aid
RegionalSwap
$850,000
$850,000
$850,000
$850,000
214
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45137
Benton County
BROS-SWAP-C006()--FE-06
On E 16, Over PRAIRIE CREEK, S10 T85 R10
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00032705
Benton County
BROS-SWAP-C006()--SE-06
On 21 AVE DR, Over MUD CREEK, S13 T84 R11
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$375,000
$375,000
$375,000
$375,00032633
Cedar County
BROS-SWAP-C016()--SE-16
On GREEN RD, Over ROCK RUN CR, S8 T80 R03
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00032343
Iowa County
BROS-SWAP-C048(Li-4058)--FE-48
On E Ave, 0.5 miles south of 273rd St, S35 T79 R12
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00018444
Benton County
BROS-SWAP-C057(BR 1912)--SE-57
On LINN BENTON RD, Over BEAR CR, S18 T84 R08
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00038963
Washington County
BROS-SWAP-C092()--FE-92
On 110TH ST, Over DEER CREEK, S10 T77 R08
Bridge Replacement, Grading
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00021440
Benton County
BRS-SWAP-C006()--FF-06
On V 61, Over SMALL STREAM, S6 T85 R10
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45952
Washington County
HSIP-SWAP-C092()--FJ-92
On W61, from G36 north to Riverside city limits,approximately 13.1 miles
Miscellaneous
DOT Approved TotalFederal Aid
RegionalSwap
$98,000
$88,000
$98,000
$88,000
215
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48693
Anamosa
STBG-SWAP-0165(606)--SG-53
In the city of Anamosa, the extension of Old Dubuque Rd, toParham Drive
Grade and Pave
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$1,900,000
$1,326,000
$1,326,000
$1,900,000
$1,326,000
$1,326,00035664
Urbana
STBG-SWAP-7872(605)--SG-06
In the city of Urbana, On Hutton Drive, from at Hwy 150intersection
Pavement Widening
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$527,400
$246,400
$246,400
$527,400
$246,400
$246,40048692
Washington
STBG-SWAP-8140(613)--SG-92
In the city of Washington, On LEXINGTON BLVD, fromNorth D Avenue W 1.79 miles to west of City Limits
Pavement Rehab
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$849,779
$849,779
$849,779
$849,779
$849,779
$849,779PA Note: This City project is tied to County project FM-CO92()--55-92.
45009
Iowa County
STBG-SWAP-C048(91)--FG-48
V44; I-80 South to 240th St
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$1,100,000
$1,100,000
$1,100,000
$1,100,000
$1,100,000
$1,100,00036530
Johnson County
STBG-SWAP-C052(120)--FG-52
On F44 (Herbert Hoover Highway), from 0.9 mile East ofWapsi to 0.2 mile West of Johnson Cedar Road
Grade and Pave
DOT Approved
8/17/2021
TotalFederal Aid
RegionalSwap
$4,438,000
$2,738,000
$2,738,000
$4,438,000
$2,738,000
$2,738,00035762
Jones County
STBG-SWAP-C053(90)--FG-53
On CO RD E34, from 400' south of 230TH AVE to City ofAnamosa Corporate Limits
Pave
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,750,000
$1,250,000
$1,250,000
$1,750,000
$1,250,000
$1,250,00038580
Iowa County
STBG-SWAP-C048()--FG-48
On V66, from 240th N 4 miles to 200th St
DOT Approved TotalFederal Aid
RegionalSwap
$2,000,000
$1,500,000
$1,500,000
$2,000,000
$1,500,000
$1,500,00036441
Linn County
STBG-SWAP-C057(D62)--FG-57
On WALKER RD, from BETTY'S GROVE RD (W35) 4.7miles to TROY MILLS RD (W45)
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$2,208,000
$2,208,000
$2,208,000
$2,208,000
$2,208,000
$2,208,00032702
Benton County
STBG-SWAP-C006()--FG-06
On E22, from Hwy 218 west 4.5 Miles to Near Garrison
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,000,000
$1,600,000
$1,600,000
$2,000,000
$1,600,000
$1,600,000
216
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
35908
Cedar County
STBG-SWAP-C016()--FG-16
On X54, from Muscatine County Line North 3.5 Miles toInterstate 80
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000
$1,145,000
$1,145,000
$1,500,000
$1,145,000
$1,145,00045219
Johnson County
STBG-SWAP-C052()--FG-52
On F67 (540th St SW), from County Line to Calkins Ave
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$2,200,000
$1,925,000
$1,925,000
$2,200,000
$1,925,000
$1,925,00037467
Jones County
STBG-SWAP-C053(C-929)--FG-53
On CO RD E28, from CO RD X28 to Buffalo Creek Bridge
Pave, Pavement Widening
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,00037742
Linn County
STBG-SWAP-C057(145)--FG-57
On BURNETT STATION RD, from CITY OF ALBURNETTto HWY 13
Pave
DOT Approved
1/22/2025
TotalFederal Aid
RegionalSwap
$1,375,000
$1,300,000
$1,300,000
$1,375,000
$1,300,000
$1,300,000
217
0 5 10
RPA 11 - Central Iowa Regional Transportation Planning Alliance
420 Watson Powell Jr. Parkway, Suite 200, Des Moines, IA 50309
Phone: 515-334-0075, Fax: 515-334-0098, www.dmampo.org/cirtpa
Des Moines Area
MPO (DMAMPO)
Jasper
County H
163
I
�orts � Commercial
- Interstate
- National Highway SystemEl Enhanced - Primary Roads
(S General Service
El Basic Service
(S Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L._ _ _J Counties
City Limits
Urban Area
218
RPA 11HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48551
Iowa Department ofTransportation
22025
HSIPX-69()--3L-85
US69: CO RD E57 INTERSECTION
Pavement Widening
FHWA Approved TotalFederal Aid
RegionalSwap
$400,000$360,000
$400,000$360,000
MISC
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48393
Jasper CountyConservation Board
22011
FLAP-C050()--7L-50
From Commerce Drive in Prairie City to NE 116th Streetnear Mitchellville
Ped/Bike Grade & Pave
FHWA Approved
3/21/2023
TotalFederal Aid
RegionalSwap
$1,800,000$300,000
$1,800,000$300,000
DOT Note: Project received FLAP funds
220
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37885
Iowa Department ofTransportation
22148
BRF-210()--38-8
IA210: DES MOINES RIVER 0.3 MI E OF CO RD E62
Bridge Rehabilitation
FHWA Approved TotalFederal Aid
RegionalSwap
$3,500,000$2,800,000
$3,500,000$2,800,000
38066
Iowa Department ofTransportation
22137
IM-80()--13-25
I-80: US 6/169 IN DE SOTO TO CO RD R16
Grade and Pave, Pave, Bridge Replacement
FHWA Approved TotalFederal Aid
RegionalSwap
$18,037,000$16,233,300
$10,221,000$9,198,900
$24,445,000$22,000,500
$239,000$215,100
$52,942,000$47,647,800
38150
Iowa Department ofTransportation
22143
IM-NHS-80()--03-50
I-80: NORTH SKUNK RIVER 2.1 MI E OF IA 224
Grade and Pave, Bridge Replacement, Erosion Control
FHWA Approved TotalFederal Aid
RegionalSwap
$11,558,000$9,824,300
$377,000 $11,935,000$9,824,300
45390
Iowa Department ofTransportation
22144
IMX-80()--02-50
I-80: 2.6 MI E OF CO RD S27 TO 0.8 MI E OF IA 14 (EB)
FHWA Approved TotalFederal Aid
RegionalSwap
$1,700,000$1,530,000
$1,700,000$1,530,000
45388
Iowa Department ofTransportation
22145
IMX-80()--02-50
I-80: 2.6 MI E OF CO RD S27 TO 1.3 MI E OF CO RD T14(WB)
FHWA Approved TotalFederal Aid
RegionalSwap
$2,100,000$1,890,000
$2,100,000$1,890,000
48620
Iowa Department ofTransportation
22151
NHSX-169()--3H-25
US169: S OF N RACCOON RIVER OVERFLOW TO IA 44
Pavement Widening, Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,754,000$3,098,200
$3,754,000$3,098,200
DOT Note: Project includes NHPP and HSIP funds
48501
Iowa Department ofTransportation
22146
NHSX-30()--3H-8
US30: 0.5 MI E OF IA 17 TO 230TH ST
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$1,351,000$1,080,800
$1,351,000$1,080,800
39357
Iowa Department ofTransportation
22147
NHSX-30()--3H-85
US30: CO RD S14 IN NEVADA
Grade and Pave, Bridge New, Traffic Signs
FHWA Approved TotalFederal Aid
RegionalSwap
$6,000 $5,958,000$4,766,400
$5,964,000$4,766,400
221
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48418
Iowa Department ofTransportation
22139
BRF-5()--38-91
IA5: SOUTH RIVER 0.2 MI N OF CO RD S31 (NB)
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$10,000 $3,807,000$3,045,600
$3,817,000$3,045,600
39367
Iowa Department ofTransportation
22141
IM-NHS-35()--03-91
I-35: N OF IA 92 TO S OF NORTH RIVER (SB)
Grade and Pave, Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$16,553,000$14,070,050
$16,553,000$14,070,050
38248
Iowa Department ofTransportation
22138
NHSX-30()--3H-85
US30: 0.5 MI E OF I-35 TO E OF 590TH AVE
Pave, Grading, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$16,572,000$13,257,600
$11,412,000$9,129,600
$358,000 $28,342,000$22,387,200
45366
Iowa Department ofTransportation
22140
BRF-14()--38-63
IA14: BRUSH CREEK 0.2 MI S OF CO RD G28
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$4,019,000$3,215,200
$4,019,000$3,215,200
45361
Iowa Department ofTransportation
22150
BRF-65()--38-91
US65: OTTER CREEK 1.6 MI S OF CO RD G58
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,524,000$2,019,200
$2,524,000$2,019,200
45386
Iowa Department ofTransportation
22142
BRF-69()--38-85
US69: WALNUT CREEK 0.2 MI N OF CO RD E57
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,110,000$1,688,000
$2,110,000$1,688,000
48604
Iowa Department ofTransportation
22149
BRF-14()--38-63
IA14: DES MOINES RIVER 1.2 MI N OF CO RD G40
Bridge Deck Overlay
FHWA Approved TotalFederal Aid
RegionalSwap
$8,860,000$7,088,000
$8,860,000$7,088,000
48634
Iowa Department ofTransportation
22152
BRF-30()--38-85
US30: SOUTH SKUNK RIVER 1.2 MI W OF I-35 (EB & WB)
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$13,025,000$10,420,000
$13,025,000$10,420,000
222
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37957
Iowa Department ofTransportation
BRFN-117()--39-50
IA117: SQUAW CREEK 1.7 MI N OF CO RD S6G
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$469,000 $469,000
37975
Iowa Department ofTransportation
BRFN-169()--39-61
US169: NORTH RIVER 3.5 MI N OF N JCT IA 92
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$329,000 $329,000
37955
Iowa Department ofTransportation
BRFN-6()--39-50
US6: DITCH 0.2 MI E OF CO RD T12
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$614,000 $614,000
38006
Iowa Department ofTransportation
BRFN-65()--39-77
US65: SKUNK RIVER 7.6 MI N OF I-80 (NB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$427,000 $427,000
38141
Iowa Department ofTransportation
IMN-35()--0E-91
I-35: CO RD G64 INTERCHANGE
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$415,000 $415,000
38142
Iowa Department ofTransportation
IMN-35()--0E-91
I-35: CO RD G50 INTERCHANGE 4.7 MI S OF IA 92
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$383,000 $383,000
45392
Iowa Department ofTransportation
IMN-80()--0E-50
I-80: CO RD T14 AND IA 224 INTERCHANGE RAMPS
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,600,000 $1,600,000
48558
Iowa Department ofTransportation
NHSN-163()--2R-63
IA163: 198TH AVE INTERSECTION
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$154,000 $154,000
38185
Iowa Department ofTransportation
NHSN-6()--2R-25
US6: S OF 302ND PL TO GREENWOOD HILLS DR INADEL (STATE SHARE)
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$1,092,000 $1,092,000
223
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48542
Iowa Department ofTransportation
NHSN-6()--2R-50
US6: 0.5 MI N OF I-80 IN NEWTON
Grading
DOT Approved TotalFederal Aid
RegionalSwap
$55,000 $55,000
48560
Iowa Department ofTransportation
STPN-117()--2J-50
IA117: SOUTH SKUNK RIVER NORTH 1000 FT
Ditch Improvement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$452,000 $452,000
48544
Iowa Department ofTransportation
STPN-6()--2J-50
US6: 0.6 MI W OF POWESHIEK CO
Grading
DOT Approved TotalFederal Aid
RegionalSwap
$40,000 $40,000
48545
Iowa Department ofTransportation
STPN-6()--2J-50
US6: 0.7 MI W OF IA 224
Grading
DOT Approved TotalFederal Aid
RegionalSwap
$56,000 $56,000
39265
Iowa Department ofTransportation
BRFN-14()--39-50
IA14: ALLOWAY CREEK 1.6 MI S OF IA 224
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$2,468,000 $2,468,000
39294
Iowa Department ofTransportation
BRFN-5()--39-63
IA5: S JCT IA 92
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,674,000 $1,674,000
39368
Iowa Department ofTransportation
BRFN-5()--39-91
IA5: COAL CREEK 0.8 MI N OF IA 316 (NB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$670,000 $670,000
48476
Iowa Department ofTransportation
IMN-80()--0E-50
I-80: 0.5 MI E OF CO RD T14 (SPEEDWAY DR) TO 0.5 MIE OF IA 224
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000 $1,500,000
38180
Iowa Department ofTransportation
NHSN-30()--2R-8
US30: CO RD R18 INTERSECTION
Grade and Pave, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$2,013,000 $2,013,000
224
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45431
Iowa Department ofTransportation
BRFN-92()--39-63
IA92: OLD HIGHWAY 92 3.9 MI E OF E JCT IA 5
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,111,000 $1,111,000
45309
Iowa Department ofTransportation
IMN-80()--0E-50
I-80: CHERRY CREEK 1.2 MI W OF IA 14 (EB & WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$727,000 $727,000
45344
Iowa Department ofTransportation
NHSN-169()--2R-25
US169: S OF N RACCOON RIVER 1.4 MI N OF US 6
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$46,000 $46,000
48466
Iowa Department ofTransportation
BRFN-316()--39-63
IA316: NS AND BNSF RR 2.5 MI N OF IA 5
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$640,000 $640,000
48411
Iowa Department ofTransportation
BRFN-5()--39-63
IA5: WALNUT CREEK 0.9 MI N OF CO RD G76
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,413,000 $1,413,000
48463
Iowa Department ofTransportation
BRFN-5()--39-63
IA5: WHITE BREAST CREEK 2.7 MI N OF IA 14 (NB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,140,000 $1,140,000
225
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36937
RPA 11
22307
RGPL-PA11()--ST-00
HIRTA: Vehicle Purchase
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$128,392$102,714
$102,714
$124,795$99,836
$99,836
$253,187$202,550
$202,550
48479
Iowa Department ofTransportation
22308
STP-117()--2C-50
IA117: N OF E 2ND ST IN PRAIRIE CITY TO CO RD F48IN COLFAX
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$2,500,000$2,000,000
$2,500,000$2,000,000
38272
Iowa Department ofTransportation
22309
STP-17()--2C-8
IA17: 0.5 MI N OF US 30 TO 3.0 MI N (STATE SHARE)
Pave, Erosion Control, Traffic Signs
FHWA Approved TotalFederal Aid
RegionalSwap
$4,955,000$3,964,000
$200,000 $5,155,000$3,964,000
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
32547
Dallas County
22335
BROS-C025(113)--8J-25
On 170th St, Over Slough Creek, on the south line of S27T81 R27, Beaver Township
Bridge Replacement
FHWA Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$300,000$240,000
$300,000$240,000
226
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39404
Boone CountyConservation Board
22399
TAP-R-C008(086)--8T-08
High Trestle to City of Boone Trail - Phase 1
Ped/Bike Grade & Pave, Ped/Bike Miscellaneous
FHWA Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$418,000$100,000
$100,000
$418,000$100,000
$100,000
45520
Dallas CountyConservation Board
22404
TAP-R-C025(123)--8T-25
RRVT Bridge Improvements Phase 2 - Bridge S OverMOSQUITO CREEK, S34 T79 R29
Ped/Bike Structures
FHWA Approved
8/16/2022
TotalFederal Aid
RegionalSwap
$462,500$250,000
$250,000
$462,500$250,000
$250,000
39406
Milo
22398
TAP-R-5087()--8T-91
In the city of Milo, Multi-use Path Project - From SoutheastWarren Elementary School to Centennial Park
Ped/Bike Grade & Pave
FHWA Approved
11/15/2022
TotalFederal Aid
RegionalSwap
$370,000$230,000
$230,000
$370,000$230,000
$230,000
39399
Dallas CountyConservation Board
22401
TAP-R-C025(117)--8T-25
RRVT Bridge Improvements Phase 3 - Bridge D
Ped/Bike Structures
FHWA Approved
10/18/2022
TotalFederal Aid
RegionalSwap
$462,500$250,000
$250,000
$462,500$250,000
$250,000
39483
Adel
22400
TAP-U-0035()--8I-25
In the city of Adel, Adel Recrational Trails
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$519,000$180,000
$180,000
$519,000$180,000
$180,000
45467
Adel
22402
TAP-R-0035()--8T-25
In the city of Adel, School and Raccoon River Valley TrailConnection
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$635,000$125,000
$125,000
$635,000$125,000
$125,000
45468
Pleasantville
22403
TAP-R-6125()--8T-63
In the City of Pleasantville, Highway 5 Trail Project
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$320,000$150,000
$150,000
$320,000$150,000
$150,000
48677
Story CountyConservation Board
22405
TAP-U-C085()--8I-85
HOINT: From the South Skunk River Scenic Bridge toCounty Road 610th Aveue
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$674,000$250,000
$250,000
$674,000$250,000
$250,000
227
SWAP-CMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45465
Boone County
ICAAP-SWAP-C008()--FH-08
On R AVE, S23 T84 R26
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,578,000
$800,000
$2,578,000
$800,000PA Note: Letting in conjunction with an Iowa DOT project STP-17-2(24) 2C-08
228
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
35884
Boone County
BROS-SWAP-C008(78)--FE-08
On J AVE, OVER UP RR, S27 T84 R27
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00036286
Dallas County
BROS-SWAP-C025(119)--SE-25
On 270th Street, Over Panther Creek, on the south line ofS15, T79N, R28W, Colfax Township
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$600,000
$590,000
$600,000
$590,00032498
Madison County
BROS-SWAP-C061()--FE-61
On R21, Over BRANCH TO CLANTON CREEK, at S1 T74R27
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00044730
Marion County
BROS-SWAP-C063(138)--SE-63
On STORY DR, Over ENGLISH CREEK, from 103rd to94th S16 T74 R20
Bridge Replacement
DOT Approved
10/19/2021
TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,00037566
Madison County
BRS-SWAP-2215(601)--FF-61
On R21 (PERU RD), Over CLANTON CREEK, S12 T74R27
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,800,000
$360,000
$1,800,000
$360,00037567
Madison County
BRS-SWAP-C061(115)--FF-61
On R35 (BEV. PARK RD.), Over CLANTON CREEK, S12T75 R26
Bridge Replacement
DOT Approved
8/17/2021
TotalFederal Aid
RegionalSwap
$2,200,000
$700,000
$2,200,000
$700,00032218
Jasper County
BHS-SWAP-C050()--FC-50
On County Road F48, Over Small Stream, along WLINES10 T79 R21
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00047106
Dallas County
BROS-SWAP-C025(B-67)--SE-25
On IVY PL, Over FROG CREEK, S16 T81 R28
Bridge New
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00032516
Dallas County
BROS-SWAP-C025(E-44)--SE-25
On B Avenue, Over Mosquito Creek, on the east line of S6,T80, R29, Lincoln Township
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$620,000
$600,000
$620,000
$600,000
229
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
16565
Jasper County
BROS-SWAP-C050( )--SE-50
N 75th Ave W: Over Clear Creek
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$375,000
$375,000
$375,000
$375,00037408
Jasper County
BROS-SWAP-C050()--FE-50
On S 44th Ave, Over SMALL STREAM, on NLINE S16 T79R19
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00038753
Jasper County
BROS-SWAP-C050()--SE-50
On Eagle St, Over INDIAN CREEK, in SW Corner of S27TT81N RR21W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00038606
Polk County
BROS-SWAP-C077(BR9150)--SE-77
ON SE 48TH AVE, IN THE NW 1/4 SEC 28-78-22, 0.98 MI.EAST OF SE POWERS DRIVE
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00032507
Story County
BROS-SWAP-C085(162)--FE-85
On 150th St., Over Skunk River, NLINE S31 T85 R23
Bridge Replacement
DOT Approved
11/15/2022
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00027021
Jasper County
BRS-SWAP-C050(116)--FF-50
On County Road F48, Over Squaw Creek, on the west sideof W 116th St S S11 T79 R21
Bridge Replacement
DOT Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,00032336
Marion County
BRS-SWAP-C063(T15)--FF-63
On T15, Over BNSF RR AND STREAM, from 165th toLisbon Dr.
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$2,750,000
$2,750,000
$2,750,000
$2,750,00047104
Dallas County
BROS-SWAP-C025(N-61)--SE-25
On 365TH ST, Over BEAR CREEK, S32 T78 R28
Culvert New
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00037298
Story County
BROS-SWAP-C085()--FE-85
On 530th Ave., Over Ballard Creek, on WLINE S15 T82R24
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
230
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
32791
Warren County
BROS-SWAP-C091(M2009)--SE-91
On 20TH AVE, Over PAINTER CREEK, S20 T75 R25
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00020595
Madison County
BRS-SWAP-C061()--FF-61
On P53, Over NORTH RIVER, S10 T76 R29
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,00047114
Dallas County
BHS-SWAP-C025(N-60)--FC-25
On F 60, Over PANTHER CREEK, S5 T78 R28
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00040161
Boone County
BROS-SWAP-C008(xx)--SE-08
On 310TH ST, Over LITTLE BEAVER CREEK, S18 T82R27
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00040162
Boone County
BROS-SWAP-C008(xx)--SE-8
On 140TH ST, Over MONTGOMERY CREEK, S25 T85R26
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00044737
Marion County
BROS-SWAP-C063(168th)--SE-63
On 168TH PL, Over Cedar Creek, from Vermont to MonroeCo. Line S27 T74 R19
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00037572
Madison County
BRS-SWAP-C061()--FF-61
On R35 (BEV. PARK RD.), Over MIDDLE RIVER, at SWS25 T76 R26
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$2,500,000
$2,500,000
$2,500,000
$2,500,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
8948
Dallas County
HSIP-SWAP-C025(A-31)--FJ-25
On P-46, from Highway 141 N 2.0 miles to Greene Co.,Dallas Township
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$2,000,000
$240,000
$676,000
$2,000,000
$240,000
$676,000
231
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48675
Boone
STBG-SWAP-0750()--SG-08
In the city of Boone, On W Park Ave approx. 750 ft W ofWestwood Blvd to S Marion St approx. 1,000 ft S ofMadison St
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000
$725,000
$725,000
$1,500,000
$725,000
$725,000
45451
Indianola
STBG-SWAP-3680()--SG-91
In the city of Indianola, East Hillcrest Avenue from NorthJefferson Way to North 14th Street
Grade and Pave, Traffic Signals
DOT Approved TotalFederal Aid
RegionalSwap
$4,522,600
$3,105,000
$3,105,000
$4,522,600
$3,105,000
$3,105,00029505
Newton
STBG-SWAP-5482(622)--SG-50
In the city of Newton, Union Drive Reconstruction, fromaprox 520ft S of N 4th Avenue to aprox 80ft N of N 19thAvenue
Pavement Rehab
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$2,800,000
$2,800,000
$2,800,000
$2,800,000
$2,800,000
$2,800,000
35889
Boone County
STBG-SWAP-C008()--FG-8
On E26, approximately .58 miles west and .50 miles east ofthe Des Moines River
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,000
$600,000
$600,00045720
Boone County
STBG-SWAP-C008()--SK-08
On X AVE, Over ONION CREEK, S25 T84 R25
DOT Approved
8/16/2022
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
$400,000
$400,00010913
Madison County
STBG-SWAP-C061()--FG-61
On G61 (MACKSBURG RD), from ADAIR/MADISONCOUNTY LINE EAST 6 Miles to FIELDSTONE AVE.
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,500,000
$2,500,000
$2,500,000
$2,500,000
$2,500,000
$2,500,00044729
Marion County
STBG-SWAP-C063(141)--FG-63
On G 76, from IA 5 to Van Buren Dr. S11 T74 R19
Pavement Rehab
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,000
$350,000
$350,00036012
Story County
STBG-SWAP-C085(164)--FG-85
On R38, from Slater City Limits north 8.0 Miles
Pavement Rehab
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$2,400,000
$2,400,000
$2,400,000
$2,400,000
$2,400,000
$2,400,00048644
Pella
STBG-SWAP-5947()--SG-63
In the city of Pella, - Washington Street and Fifield RoadIntersection
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$450,000
$450,000
$500,000
$450,000
$450,000
232
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39163
Perry
STBG-SWAP-5970()--SG-25
In the city of Perry, Willis Avenue Overlay from 3rd to 16thStreet
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$539,000
$539,000
$539,000
$539,000
$539,000
$539,00038624
Boone County
STBG-SWAP-C008(xx)--FG-08
On E 18, Over BLUFF CREEK, on NLINE S20 T85N R27W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$620,000
$620,000
$620,000
$620,000
$620,000
$620,00038825
Marion County
STBG-SWAP-C063()--FG-63
On McKimber and on S. Attica Rd. both from IA 5/92 toKnoxville Corp. Limit, and on 110th from IA 5/92 toMcKimber
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,000
$600,000
$600,000
40160
Boone County
STBG-SWAP-C008()--SK-08
On L RD, Over TRIB. OF DES MOINES RIVER, S14 T85R27
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,000
$350,000
$350,00037454
Dallas County
STBG-SWAP-C025(H-43)--FG-25
On R22, from Highway 44 N 5 miles to F31, GrantTownship
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,750,000
$800,000
$800,000
$2,750,000
$800,000
$800,00044747
Polk County
STBG-SWAP-C077(NE 42 St)--SG-77
On NE 42 St, from NE 150th Ave N 2 miles to NE 166th Ave
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,000
$350,000
$350,00041362
Story County
STBG-SWAP-C085(E29)--FG-85
On E29, from 700' west of 570th Ave. E 9.2 miles to 660thAve.
DOT Approved TotalFederal Aid
RegionalSwap
$1,800,000
$1,800,000
$1,800,000
$1,800,000
$1,800,000
$1,800,00036930
Pella
STBG-SWAP-5947()--SG-63
In the city of Pella, Oskaloosa St, from SE 16 to 240 St(Eagle Lane) including the intersection approx. 300 ft
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,650,000
$1,650,000
$1,650,000
$1,650,000
$1,650,000
$1,650,00044738
Marion County
STBG-SWAP-C063(OL)--FG-63
On G28 from IA 14 to Pella CL, T14 from Jasper Co. toPella CL, T17 from Old Hwy 92 to IA 5, S45 from G76 toLucas Co.
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$5,100,000
$1,600,000
$1,600,000
$5,100,000
$1,600,000
$1,600,000
233
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
40174
Polk County
STBG-SWAP-C077()--FG-77
On SE 6TH AVE, from SE 92 St to SE Camp Dr, 2.70 miles
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$459,000
$459,000
$459,000
$459,000
$459,000
$459,000
234
RPA 12 - Region XII Council of Governments
1009 East Anthony Street, P.O. Box 768, Carroll, IA 51401
Phone: 712-792-9914, Fax: 712-792-1751, www.region12cog.org
\.
i i
Audubon! I County I
Gutherie County
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
235
RPA 12NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39242
Iowa Department ofTransportation
22153
BRF-144()--38-37
IA144: EAST BUTTRICK CREEK 6.7 MI S OF IA 175
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,365,000$1,092,000
$1,365,000$1,092,000
45266
Iowa Department ofTransportation
22154
BRF-30()--38-24
US30: EAST BOYER RIVER 0.4 MI E OF W JCT US 59(EB & WB)
Bridge Rehabilitation
FHWA Approved TotalFederal Aid
RegionalSwap
$1,578,000$1,262,400
$1,578,000$1,262,400
48637
Iowa Department ofTransportation
22156
BRF-30()--38-14
US30: STORM CREEK 2.5 MI W OF CO RD N41
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,465,000$1,172,000
$1,465,000$1,172,000
48616
Iowa Department ofTransportation
22155
BRF-30()--38-24
US30: BOYER RIVER 0.8 MI E OF CO RD M14
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,665,000$1,332,000
$1,665,000$1,332,000
237
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37941
Iowa Department ofTransportation
BRFN-144()--39-37
IA144: EAST BUTTRICK CREEK 4.0 MI S OF IA 175
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$896,000 $896,000
39211
Iowa Department ofTransportation
NHSN-59()--2R-24
US59: N OF CO RD E59 TO N OF CO RD E53
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,041,000 $1,041,000
39212
Iowa Department ofTransportation
STPN-141()--2J-24
IA141: 2.8 MI E OF CO RD M36
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$451,000 $451,000
48497
Iowa Department ofTransportation
STPN-175()--2J-81
IA175: IA 471 INTERSECTION INCLUDING 0.3 MI N ONIA 471
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,105,000 $1,105,000
38208
Iowa Department ofTransportation
STPN-20()--2J-81
US20: W OF ADAMS AVE TO US 71
Wetland Mitigation
DOT Approved TotalFederal Aid
RegionalSwap
$171,000 $171,000
48521
Iowa Department ofTransportation
STPN-471()--2J-81
IA471: CO RD D36 INTERSECTION
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$558,000 $558,000
39185
Iowa Department ofTransportation
BRFN-141()--39-14
IA141: WEST NISHNABOTNA RIVER IN MANNING
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$347,000 $347,000
39213
Iowa Department ofTransportation
BRFN-141()--39-24
IA141: EAST SOLDIER RIVER 0.1 MI W OF CO RD L51
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$605,000 $605,000
39210
Iowa Department ofTransportation
BRFN-30()--39-24
US30: ROCKY RUN CREEK 4.5 MI W OF CO RD M55
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,481,000 $1,481,000
238
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38019
Iowa Department ofTransportation
BRFN-39()--39-81
IA39: PORTER CREEK 2.4 MI S OF CO RD D59
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$904,000 $904,000
45376
Iowa Department ofTransportation
BRFN-59()--39-24
US59: COON CREEK 2.1 MI S OF US 30
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $1,894,000 $1,899,000
48431
Iowa Department ofTransportation
BRFN-471()--39-81
IA471: DITCH 0.2 MI N OF CO RD D36
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $330,000 $335,000
48566
Iowa Department ofTransportation
BRFN-25()--39-39
IA25: BRUSHY CREEK 3.2 MI N OF IA 44
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$780,000 $780,000
48614
Iowa Department ofTransportation
BRFN-59()--39-24
US59: SOLDIER RIVER 2.9 MI S OF CO RD E16
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$520,000 $520,000
48618
Iowa Department ofTransportation
BRFN-71()--39-5
US71: STREAM 1.1 MI N OF CO RD F65
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$865,000 $865,000
239
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
35649
RPA 12
22310
RGPL-PA12()--ST-14
Regional Transportation Planning
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$100,000$80,000
$80,000
$100,000$80,000
$80,000
$100,000$80,000
$80,000
$100,000$80,000
$80,000
$400,000$320,000
$320,000
48708
RPA 12
22314
RGTR-PA12()--ST-37
Video Surveillance Equipment at Satellite Transit Facilities
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$4,020$3,216
$3,216
$4,020$3,216
$3,216
48499
Iowa Department ofTransportation
22311
STP-144()--2C-37
IA144: 230TH ST IN GRAND JUNCTION TO NCL DANA
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$2,014,000$1,611,200
$2,014,000$1,611,200
48622
Iowa Department ofTransportation
22312
STP-44()--2C-39
IA44: ECL OF GUTHRIE CENTER TO WCL OF PANORA
Pavement Widening, Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,454,000$2,865,000
$3,454,000$2,865,000
DOT Note: Project includes STPG and HSIP funds
48707
Iowa Department ofTransportation
22313
STP-IA39()--2C-24
On IA 39 N, from Deloit N to Odebolt
Pavement Rehab/Widen
FHWA Approved TotalFederal Aid
RegionalSwap
$10,350,000$960,000
$960,000
$10,350,000$960,000
$960,000
240
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45509
Audubon
22406
TAP-R-0300(604)--8T-05
In the city of Audubon, On Audubon Rec Center Link Trail,0.32 miles S28 T80 R35
Ped/Bike Paving
FHWA Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$140,000$112,000
$70,000
$140,000$112,000
$70,000
PA Note: $70,000 in Regional STBG - TAP Funds $42,000 in Statewide STBG-TAP SRTS Funds.
45511
Stuart
22408
TAP-R-7457(606)--8T-39
In the city of Stuart, On N 2ND ST, to West Central ValleySchool S33 T78 R30
Ped/Bike Grade & Pave
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$270,000$216,000
$135,000
$270,000$216,000
$135,000
PA Note: $135,000 in Regional STBG-TAP $81,000 in Statewide STBG-TAP SRTS Program
45510
Wall Lake
22407
TAP-U-8065()--8I-81
On Wall Lake Trail , 1.0 miles S17 T86 R36
Ped/Bike Grade & Pave
FHWA Approved
6/21/2022
TotalFederal Aid
RegionalSwap
$250,000$200,000
$200,000
$250,000$200,000
$200,000
48702
Denison
22409
TAP-U-1920()--8I-24
In the city of Denison, On 8TH AVE N
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$337,000$200,000
$200,000
$337,000$200,000
$200,000
48703
Sac CountyConservation Board
22410
TAP-U-C081()--8I-81
On Sauk Rail Trail
Ped/Bike Paving
FHWA Approved TotalFederal Aid
RegionalSwap
$250,000$200,000
$200,000
$250,000$200,000
$200,000
241
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
47153
Audubon
BROS-SWAP-0300(603)--SE-05
In the city of Audubon, On N DIVISION ST, Over BLUEGRASS CREEK, S20 T80 R35
Bridge Replacement
DOT Approved
10/19/2021
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00039562
Casey
BROS-SWAP-1152(602)--SE-39
In the city of Casey, On Thomas Street, Over Middle River
Bridge Replacement
DOT Approved
6/21/2022
TotalFederal Aid
RegionalSwap
$675,000
$540,000
$675,000
$540,00047255
Carroll County
BROS-SWAP-C014(169)--SE-14
On 280TH ST, Over FIELD STREAM, S4 T82 R35
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00044864
Crawford County
BROS-SWAP-C024(128)--SE-24
On H Ave crossing East Boyer River, North Line Section 11Westside Twp.
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00036451
Sac County
BROS-SWAP-C081(79)--SE-81
On IRA AVE, Over STREAM, from 0.40 miles South of280th St S5 T87 R37
Culvert New
DOT Approved
10/19/2021
TotalFederal Aid
RegionalSwap
$180,000
$180,000
$180,000
$180,00036468
Sac County
BROS-SWAP-C081(80)--FE-81
On N14 (Union Ave), Over DD 19, 0.80 Miles South of190th Ave (D15), SW S23 T89 R35
Bridge Replacement
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$325,000
$325,000
$325,000
$325,00036465
Sac County
BROS-SWAP-C081(BV-3660)--SE-81
On 270TH ST, Over INDIAN CREEK, from 0.60 miles Eastof Mace Ave. S36 T88 R37
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00036458
Sac County
BROS-SWAP-C081(JA-3230)--SE-81
On 270TH ST, Over SMALL STREAM, 0.30 miles East ofOtter Ave, NW S32 T88 R36
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00036463
Sac County
BRS-SWAP-C081(81)--FF-81
On D54 or 355th St, Over DD #60, 0.05 miles West of OtterAve.
Bridge Replacement
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,000
242
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36459
Sac County
BROS-SWAP-C081(78)--FE-81
On XAVIER AVE, Over RACCOON RIVER, from 0.20 milesSouth of 335th St. S35 T87 R35
Bridge Replacement
DOT Approved
9/20/2022
TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,00036455
Sac County
BROS-SWAP-C081(CO-0109)--SE-81
On GARD AVE, Over SMALL STREAM, from 0.90 milessouth of 220th Street S1 T88 R38
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$160,000
$160,000
$160,000
$160,00038541
Crawford County
BRS-SWAP-C024(129)--FF-24
On Co Rd L51, Over Soldier River, WLINE S13 T84 R41
DOT Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,00038947
Audubon County
BROS-SWAP-C005()--SE-05
On 240th St., Over Creek, in NE S16 T79N R34W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00045645
Crawford County
BROS-SWAP-C024()--SE-24
On U AVE, Over W. FK W.NISHNABOTNA RIVER, S11 T82R38
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037457
Sac County
BROS-SWAP-C081(77)--FE-81
On D 54, Over RACCOON RIVER, S11 T86 R35
Bridge Replacement
DOT Approved
9/17/2024
TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,00047072
Sac County
BROS-SWAP-C081(CO-1803)--SE-81
On BUCHANAN AVE, Over SMALL STREAM, S18 T88 R38
DOT Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00037458
Sac County
BROS-SWAP-C081(ED-0290)--SE-81
On 160th St., Over Un-named creek, 0.90 miles east of IraAve, on the Sac / BV Co. Line, NE S2 T89N R37W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00035304
Greene County
BROS-SWAP-C037(80)--FE-37
On P14, Over RACCOON RIVER, on WLINE S3 T83 R31
Bridge Replacement
DOT Approved
2/18/2025
TotalFederal Aid
RegionalSwap
$2,500,000
$2,500,000
$2,500,000
$2,500,000
243
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36469
Sac County
BROS-SWAP-C081(LE-1504)--FE-81
On M55 (Karr Ave), Over UNNAMED CREEK, 0.40 milesSouth of D59 (360th St.), NW S15 T86 R37
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00044846
Crawford County
BRS-SWAP-C024(BR47-30)--FF-24
On Co Rd M55 over the East Boyer River, near the centerof Section 30 Westside Twp.
DOT Approved TotalFederal Aid
RegionalSwap
$850,000
$850,000
$850,000
$850,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37622
Guthrie County
STBG-SWAP-C039(98)--FG-39
On F32, from Guthrie Center approx 14 miles to N46
Pavement Rehab
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$4,000,000
$1,000,000
$1,000,000
$4,000,000
$1,000,000
$1,000,00037676
Audubon County
STBG-SWAP-C005()--FG-05
On F32, from Co. Hwy M66 E 7.2 miles to US Hwy 71
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$3,000,000
$900,000
$900,000
$3,000,000
$900,000
$900,00037659
Greene County
STBG-SWAP-C037(81)--FG-37
On E57, from P-14 East 4.469 Miles to HWY-4
Pavement Rehab/Widen
DOT Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$2,550,000
$2,040,000
$2,040,000
$2,550,000
$2,040,000
$2,040,00038804
Sac County
STBG-SWAP-C081(N28-PCC)--FG-81
On N28, from Lytton-D36 S 11.6 miles to IA 175
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$5,000,000
$2,000,000
$2,000,000
$5,000,000
$2,000,000
$2,000,000
244
0
RPA 13 - Southwest Iowa Planning Council
1501 Southwest 7th Street, Atlantic, IA 50022
Phone: 712-243-4196, Fax: 712-243-3458, www.swipco.org
Omaha - Council Bluffs
Metropolitan Area
Planning Agency
(MAPA)
5 10
Fremont County
48
Montgo���r 48 County
71
•
Cass County
148
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
245
RPA 13ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45185
Page County
ILL-C073()--92-73
On N14 from 280th St (J53) north to IA 2; and on "J Road"from 130th St (J20) north and west to US 71
DOT Approved TotalFederal Aid
RegionalSwap
$2,500,000 $2,500,000
247
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37865
Iowa Department ofTransportation
22157
BRF-59()--38-73
US59: EAST NISHNABOTNA RIVER 1.0 MI N OF IA 48
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$40,000 $6,173,000$4,938,400
$6,213,000$4,938,400
38077
Iowa Department ofTransportation
22159
IMX-080()--02-15
I-80: 0.7 MI W OF US 71 TO ADAIR CO LINE (EB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$4,865,000$4,378,500
$4,865,000$4,378,500
38079
Iowa Department ofTransportation
22160
IMX-80()--02-15
I-80: POTTAWATTAMIE CO TO E OF IA 173 (WB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$1,401,000$1,260,900
$1,401,000$1,260,900
48414
Iowa Department ofTransportation
22158
NHSX-2()--3H-36
IA2: HORSE CREEK TO I-29
Culvert New, Grading, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$3,510,000$2,808,000
$3,510,000$2,808,000
39186
Iowa Department ofTransportation
22162
BRF-92()--38-15
IA92: SEVENMILE CREEK 1.7 MI W OF W JCT US 71
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,174,000$1,739,200
$2,174,000$1,739,200
45354
Iowa Department ofTransportation
22161
BRF-2()--38-36
IA2: DITCH 3.1 MI E OF I-29
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$5,061,000$4,048,800
$5,061,000$4,048,800
48630
Iowa Department ofTransportation
22163
BRF-2()--38-36
IA2: STREAM 3.9 MI E OF I-29
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$5,332,000$4,265,600
$5,332,000$4,265,600
45384
Iowa Department ofTransportation
22164
BRF-2()--38-36
IA2: DITCH 2.8 MI E OF I-29
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$5,321,000$4,256,800
$5,321,000$4,256,800
45350
Iowa Department ofTransportation
22165
NHSX-34()--3H-69
US34: W OF IA 48 TO CO RD H34
Grade and Pave, Lighting, Traffic Signals
FHWA Approved TotalFederal Aid
RegionalSwap
$12,901,000$10,320,800
$12,901,000$10,320,800
248
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37938
Iowa Department ofTransportation
BRFN-2()--39-36
IA2: MISSOURI RIVER E OF NEBRASKA CITY (STATESHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$21,000 $21,000 $21,000 $21,000 $84,000
37988
Iowa Department ofTransportation
BRFN-34()--39-69
US34: WEST NODAWAY RIVER 0.3 MI W OF US 71 (EB &WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,296,000 $1,296,000
37894
Iowa Department ofTransportation
BRFN-6()--39-15
US6: INDIAN CREEK 0.4 MI E OF IA 48
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$442,000 $442,000
37897
Iowa Department ofTransportation
BRFN-83()--39-15
IA83: EAST NISHNABOTNA RIVER 1.1 MI W OF W JCTUS 6
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$431,000 $431,000
38087
Iowa Department ofTransportation
IMN-29()--0E-36
I-29: MISSOURI TO 1.0 MI S OF IA 2 (NB)
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$678,000 $678,000
38086
Iowa Department ofTransportation
IMN-29()--0E-36
I-29: MAIN DITCH #6 0.4 MI S OF IA 333 (NB & SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,725,000 $1,725,000
39188
Iowa Department ofTransportation
IMN-80()--0E-15
I-80: 570TH ST 2.0 MI W OF IA 173 (EB & WB)
Grade and Pave, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $2,558,000 $2,563,000
45346
Iowa Department ofTransportation
NHSN-34()--2R-69
US34: WEST NODAWAY RIVER 0.3 MI W OF US 71 (EB)
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,170,000 $1,170,000
39308
Iowa Department ofTransportation
BRFN-34()--39-69
US34: MIDDLE NODAWAY RIVER 3.0 MI E OF US 71
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$638,000 $638,000
249
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39187
Iowa Department ofTransportation
BRFN-6()--39-15
US6: EAST NISHNABOTNA RIVER 2.6 MI E OF IA 48
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$817,000 $817,000
38088
Iowa Department ofTransportation
IMN-29()--0E-36
I-29: 1.5 MI N OF CO RD L31 TO 1.0 MI N OF CO RD J18(SB)
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,291,000 $1,291,000
45313
Iowa Department ofTransportation
BRFN-2()--39-36
IA2: FISHER CREEK 2.2 MI W OF US 59
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$659,000 $659,000
45290
Iowa Department ofTransportation
IMN-29()--0E-36
I-29: ABANDONED RR 1.6 MI S OF IA 2 (SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$701,000 $701,000
45264
Iowa Department ofTransportation
IMN-80()--0E-15
I-80: 770TH ST 1.9 MI E OF IA 148 (EB & WB)
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$1,555,000 $1,555,000
48598
Iowa Department ofTransportation
IMN-80()--0E-15
I-80: IA 148 INTERCHANGE
Bridge Rehabilitation, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $1,270,000 $1,275,000
48611
Iowa Department ofTransportation
BRFN-34()--39-69
US34: TARKIO RIVER 0.7 MI W OF CO RD M63
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$450,000 $450,000
48572
Iowa Department ofTransportation
IMN-29()--0E-36
I-29: 200TH ST 5.4 MI N OF IA 2
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$710,000 $710,000
48520
Iowa Department ofTransportation
IMN-80()--0E-15
I-80: POTTAWATTAMIE CO TO 0.3 MI W OF CO RD G30(VAR LOC)
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$4,375,000 $4,375,000
250
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
791
RPA 13
22315
RGPL-PA13(RTP)--ST-00
SW IA 4/SWIPCO: RPA 13 TRANSPORTATION PLANNING
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$10,000$8,000
$8,000
$10,000$8,000
$8,000
$10,000$8,000
$8,000
$10,000$8,000
$8,000
$40,000$32,000
$32,000
48484
Iowa Department ofTransportation
22316
STP-275()--2C-36
US275: N OF COLORADO AVE IN HAMBURG TO N OF SJCT IA 2
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$2,863,000$2,290,400
$2,863,000$2,290,400
48488
Iowa Department ofTransportation
22317
STP-275()--2C-36
US275: MISSOURI STATE LINE TO N OF COLORADOAVE IN HAMBURG
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$1,643,000$1,314,400
$1,643,000$1,314,400
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45182
Page County
22336
BRS-C073(139)--60-73
On D Ave (M41), Over East Nishnabotna River, S23 T70R39
FHWA Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$2,500,000$2,000,000
$500,000
$2,500,000$2,000,000
$500,000
251
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48653
Stanton
22413
TAP-R-7262()--8T-69
In the city of Stanton, From Prospect Street to old RRcorridor to 225th St.
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$244,435$100,000
$100,000
$244,435$100,000
$100,000
48652
Clarinda
22412
TAP-U-1332()--8I-73
In the city of Clarinda, On E. Washington St., from North 6thSt. .328 miles to N. 11th St.
Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$290,369$100,000
$100,000
$290,369$100,000
$100,000
38394
Shenandoah
22411
TAP-U-6965(616)--8I-73
In the city of Shenandoah, On Ferguson Ave.
Ped/Bike Structures
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$118,000$88,000
$88,000
$118,000$88,000
$88,000
252
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36178
Cass County
BROS-SWAP-C015(73)--FE-15
On Boston Road, Over Creek, from Olive Street East 0.1Miles, on NLINE S9 T77 R36
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00045590
Cass County
BROS-SWAP-C015(74)--SE-15
On 730th Street 0.2 miles south of White Pole Road
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00045702
MontgomeryCounty
BROS-SWAP-C069()--FE-69
On H 20, Over WEST NODAWAY, S21 T73 R36
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,00045704
MontgomeryCounty
BROS-SWAP-C069()--FE-69
On H 20, Over TARKIO CREEK TRIB, S23 T73 R37
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$425,000
$425,000
$425,000
$425,00038525
MontgomeryCounty
BROS-SWAP-C069()--SE-69
On 180th St, Over LITTLE TARKIO CREEK, S14 T72N R37
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$295,000
$295,000
$295,000
$295,00036170
Cass County
BROS-SWAP-C015(68)--SE-15
On 680th Street, Over West Nodaway River, BetweenVictoria Road Intersections, on WLINE S16 T74 R35
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00039013
Cass County
BROS-SWAP-C015(75)--FE-15
On 610th Street, Over Creek, from Oxford Road North 0.6Miles to Bridge #182, in NW S8 T75N R36W
Bridge Replacement
DOT Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00035856
MontgomeryCounty
BROS-SWAP-C069()--FE-69
On L Avenue (M59), Over BNSF RR, on WLINE S31 T72R37
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00038812
MontgomeryCounty
BROS-SWAP-C069()--SE-69
On W Avenue, Over Tributary to Nodaway River, fromCass Co line south 0.3 Miles, on WLINE S1 T73 R36
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
253
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45183
Page County
BROS-SWAP-C073()--FE-73
On M 32, Over STREAM, S8 T67 R39
DOT Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00045609
Page County
BROS-SWAP-C073(141)--FE-73
On 150th Street, Over East Nishnabotna River, S27 T70R39
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$2,250,000
$2,250,000
$2,250,000
$2,250,00024823
Fremont County
BRS-SWAP-C036()--FF-36
On J18, Over WALNUT CREEK, S13 T70 R40
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$900,000
$900,000
$900,000
$900,00045184
Page County
BRS-SWAP-C073(140)--FF-73
On J 53, Over BUCHANAN CREEK, S11 T67 R36
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,00038802
Cass County
BROS-SWAP-C015(250)--FE-15
On 710th Street, Over Creek, on WLINE S1 T76N R35W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00034494
Cass County
BROS-SWAP-C015(BR 269)--FE-15
On 660th Street, from Jackson Rd South 3/8 Miles, at S19T76 R35
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00037146
MontgomeryCounty
BROS-SWAP-C069()--FE-69
On L Avenue, Over Trib. to Little Tarkio Creek, from 230thSt South .1 Miles, on WLINE S7 T71 R37
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$320,000
$320,000
$320,000
$320,00037144
MontgomeryCounty
BROS-SWAP-C069()--FE-69
On M65 (Q Ave), Over BNSF RR, on WLINE S12 T71 R37
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00039058
Page County
BROS-SWAP-C073()--FE-73
On F Ave, Over unnamed tributary of West Tarkio Creek, inS13 T68 R39
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
254
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
7118
Cass County
BRS-SWAP-C015(46)--FF-15
On Highland Road (G-30), Over Indian Creek, from 555thSt West 1/2 Miles, at S5 T76 R37
Bridge Replacement
DOT Approved
7/19/2022
TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,00031035
MontgomeryCounty
BRS-SWAP-C069(63)--FF-69
On H54, Over Tributary to Tarkio Creek, on NLINE S33T71 R37
Bridge Replacement
DOT Approved
7/18/2023
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00010891
Cass County
BROS-SWAP-C015(210)--SE-15
Bridge 210 - On Nishna Valley Road, Over INDIAN CREEK,from Hwy 48 West 1/2 Miles, at S8 T75 R37
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$640,000
$640,000
$640,000
$640,00037689
Cass County
BROS-SWAP-C015(401)--SE-15
On Crooked Creek Road, Over Troublesome Creek, fromBoston Road South 0.9 Miles to Troublesome Creek, in S12T77 R35
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,000
45585
Cass County
BROS-SWAP-C015(Br168)--SE-15
On Quincy Road, Over Hoyt's Branch, from East C.L. ofCumberland E 0.1 miles S27 T75 R35
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00045710
MontgomeryCounty
BROS-SWAP-C069()--SE-69
On G AVE, Over LOCAL CREEK, S17 T72 R38
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00036638
Page County
BROS-SWAP-C073()--FE-73
On M 58, Over SNAKE CREEK, S31 T69 R37
DOT Approved TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,00037542
Fremont County
BRS-SWAP-C036()--FF-36
On L44 (Bluff Road), Over COOPER CREEK, in NE S7 T68R42
Grade and Pave, Bridge New
DOT Approved TotalFederal Aid
RegionalSwap
$1,100,000
$1,100,000
$1,100,000
$1,100,000
255
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48645
Red Oak
STBG-SWAP-6360(622)--SG-69
In the city of Red Oak, On Eastern Avenue, from ForestAvenue S .25 miles to Summit St.
DOT Approved
6/21/2022
TotalFederal Aid
RegionalSwap
$530,000
$330,000
$330,000
$530,000
$330,000
$330,00048389
Shenandoah
STBG-SWAP-6965(617)--SG-73
In the city of Shenandoah, On N. Center St. and W. NishnaRd.
Pavement Rehab
DOT Approved
10/19/2021
TotalFederal Aid
RegionalSwap
$1,033,000
$573,760
$573,760
$1,033,000
$573,760
$573,760PA Note: This project is actually three different streets. Two are STBG eligible. I marked both in the map but only one came up in the description. The two federal functional classified routes are N.Center St. from W. Sheridan Ave. to Ferguson Ave. and W. Nishna Rd. from Fremont St. to Anna Crose Highway. The local route is W. Thomas Ave. from US 59 to Railroad St. and is not markedon the map.
29201
Fremont County
STBG-SWAP-C036()--FG-36
On J18, from M16 East 4.0 Miles to 410th Ave
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,400,000
$1,400,000
$1,400,000
$1,400,000
$1,400,00032471
Page County
STBG-SWAP-C073(142)--FG-73
On O Avenue (M63), from IA 2 north 11 Miles to Page/Montgomery County Line
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$3,000,000
$3,000,000
$3,000,000
$3,000,000
$3,000,000
$3,000,00036169
Cass County
STBG-SWAP-C015(N-28)--FG-15
On 690th Street, from Iowa HWY 92 North 10.2 Miles toIowa HWY 83
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,250,000
$750,000
$750,000
$2,250,000
$750,000
$750,00026730
MontgomeryCounty
STBG-SWAP-C069(65)--FG-69
On H 34, from Bridge Over RED OAK CREEK, 1.75 miles
Pavement Rehab
DOT Approved
11/15/2022
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
$450,000
$450,00048643
Atlantic
STBG-SWAP-0285()--SG-15
In the city of Atlantic, On West 22nd St. from 7th St. to PalmStreet., from West E .77 miles
DOT Approved TotalFederal Aid
RegionalSwap
$1,376,627
$1,068,821
$1,068,821
$1,376,627
$1,068,821
$1,068,82137525
Fremont County
STBG-SWAP-C036()--FG-36
On J18, from 410th Ave. E 1.043 miles to U.S Hwy 59
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$800,000
$640,000
$640,000
$800,000
$640,000
$640,000
256
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45582
Cass County
STBG-SWAP-C015(G-30)--FG-15
On G 30, from Pott. County Line E 5.5 miles to 0.6 mileseast of 585th St.
DOT Approved TotalFederal Aid
RegionalSwap
$2,500,000
$2,500,000
$2,500,000
$2,500,000
$2,500,000
$2,500,00038717
MontgomeryCounty
STBG-SWAP-C069()--FG-69
On M63, from Page County Line North 5 Miles to StantonCity Limits
Pavement Rehab, Granular Shoulders
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,00047350
Page County
STBG-SWAP-C073()--FG-73
On J53 from 265th St easterly to Taylor County line and onJ55 from Teak Ave easterly to Taylor County line
DOT Approved TotalFederal Aid
RegionalSwap
$2,400,000
$1,400,000
$1,400,000
$2,400,000
$1,400,000
$1,400,000
257
L
0 5
/
10
RPA 14 -ATURA Transportation Planning Affiliation
101 East Montgomery Street, Creston, IA 50801
P hone: 641-782-8491, Fax: 641-782-8492, www.sicog.org
92
Adair County'
.-,.----..-----(
�orts � Commercial
- Interstate
- National Highway SystemUnion
County El Enhanced - Primary Roads
Taylor County
.. , Ringgold County
•
•
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
258
RPA 14NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45362
Iowa Department ofTransportation
22166
BRF-92()--38-1
IA92: W FORK NODAWAY RIVER 1.6 MI E OF CO RD N51
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$5,000$4,000
$4,274,000$3,419,200
$4,279,000$3,423,200
48518
Iowa Department ofTransportation
22167
IMX-80()--02-1
I-80: CASS CO TO IA 25 (WB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$8,586,000$7,727,400
$8,586,000$7,727,400
260
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37872
Iowa Department ofTransportation
BRFN-25()--39-1
IA25: I-80 INTERCHANGE
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$333,000 $333,000
39345
Iowa Department ofTransportation
BRFN-169()--39-80
US169: STREAM 0.1 MI N OF MISSOURI
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$997,000 $997,000
39362
Iowa Department ofTransportation
BRFN-169()--39-88
US169: ABANDONED RR 2.8 MI N OF N JCT US 34(REMOVE BRIDGE)
Grade and Pave, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,403,000 $1,403,000
45325
Iowa Department ofTransportation
BRFN-148()--39-87
IA148: MIDDLE BRANCH 102 RIVER 2.8 MI S OF CO RDJ20
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$580,000 $580,000
45331
Iowa Department ofTransportation
BRFN-34()--39-88
US34: FOUR MILE CREEK 2.0 MI E OF E JCT US 169
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$936,000 $936,000
48445
Iowa Department ofTransportation
BRFN-92()--39-1
IA92: GRAND RIVER 1.0 MI W OF CO RD P28
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$490,000 $490,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
19871
RPA 14
22318
RGPL-PA14(FY15)--ST-0
RPA 14: Transportation Planning ATURA RPA 14
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$87,513$25,289
$25,289
$87,513$25,289
$25,289
$87,513$25,289
$25,289
$87,513$25,289
$25,289
$350,052$101,156
$101,156
261
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45231
Corning
22414
TAP-R-1590(604)--8T-02
In the city of Corning, Hull Street, from Hull Street BridgeReplace NW 0.32 miles to School Sports Complex S34 T72R34
FHWA Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$200,000$160,000
$160,000
$200,000$160,000
$160,000
PA Note: Project received Regional STBG funding AND Regional TAP Funding. Actual Regional STBG Funding: $40,000; Actual Regional TAP Funding: $120,000.
262
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44924
Ringgold County
BHS-SWAP-C080()--FC-80
On J 23, Over PLATTE RIVER, S34 T70 R31
Bridge Approach Repair, Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00045594
Taylor County
BRS-SWAP-C087(68)--FF-87
On J 35, Over Small Stream, S26 T69 R34
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$650,000
$650,000
$650,000
$650,00045663
Adair County
BROS-SWAP-C001(118)--SE-01
On BROWN AVE, Over NODAWAY RIVER, S32 T74 R33
DOT Approved
10/18/2022
TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,00045074
Union County
BROS-SWAP-C088()--SE-88
On JOSHUA AVE, Over THREE MILE CREEK, from H17 N1.4 miles S10 T73 R30
Bridge Replacement, Bridge Removal
DOT Approved TotalFederal Aid
RegionalSwap
$528,000
$528,000
$528,000
$528,00023439
Ringgold County
BRS-SWAP-C080()--FF-80
On P27, Over Old Railroad ROW, S14 T68 R31
Bridge Removal
DOT Approved TotalFederal Aid
RegionalSwap
$430,000
$430,000
$430,000
$430,00034578
Ringgold County
BHS-SWAP-C080()--FC-80
On J55, Over W FORK GRAND RIVER, N S15 T67 R31
Bridge Approach Repair, Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00045075
Union County
BROS-SWAP-C088()--SE-88
On CHERRY ST RD, Over SMALL STREAM, from 205th StS 1.3 miles S31 T72 R30
Bridge Replacement, Bridge Removal
DOT Approved TotalFederal Aid
RegionalSwap
$370,000
$370,000
$370,000
$370,00034368
Adams County
BRS-SWAP-C002()--FF-02
On 150th St., Over East Nodaway River, S28 T72N R33W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00039121
Ringgold County
BRS-SWAP-C080()--FF-80
On P14, Over unknown stream, S30 T68 R31
Culvert Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$440,000
$440,000
$440,000
$440,000
263
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38949
Adams County
BROS-SWAP-C002()--SE-02
On 110th Street, Over STREAM, from West Stream bankE-W 500 Feet to East Stream Bank, along NLINE S12 T73NR34W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$340,000
$340,000
$340,000
$340,000
44944
Ringgold County
BRS-SWAP-C080()--FF-80
On P33, Over W.FK GRAND RIVER, S6 T69 R30
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,460,000
$1,460,000
$1,460,000
$1,460,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
40141
Bedford
STBG-SWAP-0487(604)--SG-87
On State St, from Bedford Coroporate Limits N .32 miles toMain St S26 T68 R34
DOT Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$110,000
$110,000
$110,000
$110,000
$110,000
$110,00037223
Union County
STBG-SWAP-C088()--FG-88
On OSAGE ST, from US Highway 34 north 0.5 Miles toAdams Street
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,000
$700,000
$700,00039079
Union County
STBG-SWAP-C088()--FG-88
On P27, from Ringgold-Union Street N 5.3 Miles
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$4,240,000
$2,120,000
$2,120,000
$4,240,000
$2,120,000
$2,120,00037776
Taylor County
STBG-SWAP-C087(60)--FG-87
On J35, Over WEST 102 RIVER, on NLINE S36 T69 R35
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,000
$1,200,000
$1,200,00035834
Ringgold County
STBG-SWAP-C080()--FG-80
On County Highway P27, from US Highway 169 North 7.2Miles to State Highway 2
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,700,000
$2,000,000
$2,000,000
$2,700,000
$2,000,000
$2,000,000
264
0 5 10
RPA 15 - Area 15 Regional Planning Commission
224 East Second Street, P.O. Box 1110, Ottumwa, IA 52501
Phone: 641-684-6551, Fax: 641-684-4894, www.area15rpc.com
Mahaska
County 92 ,_,_�--�::---._
149 Keokuk
Van Buren
County
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
265
RPA 15HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48439
Iowa Department ofTransportation
22026
HSIPX-1()--3L-89
IA1: 0.6 MI S OF BIRMINGHAM TO 227TH ST / SCLFAIRFIELD
Pavement Widening
FHWA Approved TotalFederal Aid
RegionalSwap
$1,650,000$1,485,000
$1,650,000$1,485,000
ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45501
Oskaloosa
ILL-5780()--93-62
PEL/PA Planning Study for SE (IA 163 to IA 92) and NE (IA92 to US 63) connectors around Oskaloosa.
Trans Planning
DOT Approved TotalFederal Aid
RegionalSwap
$950,000 $950,000
267
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37963
Iowa Department ofTransportation
22175
BRF-78()--38-54
IA78: DME RR 8.8 MI E OF IA 149
Bridge Replacement, Wetland Mitigation, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$8,016,000$6,412,800
$8,016,000$6,412,800
37977
Iowa Department ofTransportation
22174
BRF-92()--38-62
IA92: NORTH SKUNK RIVER 2.6 MI E OF E JCT CO RDV13
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$5,931,000$4,744,800
$5,931,000$4,744,800
39363
Iowa Department ofTransportation
22169
BRF-1()--38-89
IA1: LITTLE LICK CREEK 1.2 MI N OF S JCT IA 16
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$3,829,000$3,063,200
$3,829,000$3,063,200
39365
Iowa Department ofTransportation
22172
BRF-63()--38-90
US63: VILLAGE CREEK 3.1 MI S OF US 34
Bridge Widening
FHWA Approved TotalFederal Aid
RegionalSwap
$2,095,000$1,676,000
$2,095,000$1,676,000
39293
Iowa Department ofTransportation
22168
NHSX-63()--3H-62
US63: NW BYPASS OF OSKALOOSA
Bridge New, Grading, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$5,900,000$4,720,000
$24,821,000$19,856,800
$1,722,000$1,377,600
$32,443,000$25,954,400
39364
Iowa Department ofTransportation
22173
NHSX-63()--3H-90
US63: LITTLE SOAP CREEK 1.9 MILES N OF DAVIS CO
Bridge Rehabilitation, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,942,000$1,553,600
$1,942,000$1,553,600
45267
Iowa Department ofTransportation
22170
BRF-34()--38-90
US34: BNSF RR 1.2 E OF W JCT US 63 IN OTTUMWA(EB & WB)
Bridge Rehabilitation
FHWA Approved TotalFederal Aid
RegionalSwap
$2,994,000$2,395,200
$2,994,000$2,395,200
45256
Iowa Department ofTransportation
22171
BRF-2()--38-89
IA2: FOX RIVER 1.5 MI E OF CO RD V64
Bridge Rehabilitation
FHWA Approved TotalFederal Aid
RegionalSwap
$1,269,000$1,015,200
$1,269,000$1,015,200
268
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37960
Iowa Department ofTransportation
BRFN-1()--39-51
IA1: MIDDLE WALNUT CREEK 3.1 MI S OF S JCT IA 78
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$340,000 $340,000
38033
Iowa Department ofTransportation
BRFN-34()--39-90
US34: BEAR CREEK 1.2 MI W OF CO RD H35
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$489,000 $489,000
38034
Iowa Department ofTransportation
BRFN-34()--39-90
US34: BARDELL ST 0.5 MI E OF IA 149 IN OTTUMWA(WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$262,000 $262,000
39269
Iowa Department ofTransportation
BRFN-1()--39-51
IA1: BIG CEDAR CREEK 2.8 MI S OF US 34
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$519,000 $519,000
39292
Iowa Department ofTransportation
BRFN-23()--39-62
IA23: TRIBUTARY OF CEDAR CREEK 0.8 MI N OF CORD T67
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$906,000 $906,000
39366
Iowa Department ofTransportation
BRFN-34()--39-90
US34: SOUTH AVERY CREEK 0.7 MI E OF CO RD T61
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$645,000 $645,000
39275
Iowa Department ofTransportation
BRFN-78()--39-54
IA78: RICHLAND CREEK 5.8 MI E OF IA 149
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$848,000 $848,000
36939
Fairfield
NHSN-001-2(35)--2R-51
In the city of Fairfield, On Highway 1/South Main, fromFillmore Ave 0.53 miles to 300 ft S of Libertyville Rd
Pavement Widening, Ped/Bike Paving
DOT Approved
11/15/2022
TotalFederal Aid
RegionalSwap
$900,001
$320,000
$320,000
$900,001
$320,000
$320,000PA Note: $240,000 STBG already programmed and reimbursed on PE, $320,000 should be debited as TAP. DOT funding is programmed as TPMS #38195.
38195
Iowa Department ofTransportation
NHSN-1()--2R-51
IA1: S OF LIBERTYVILLE RD TO FILLMORE AVE INFAIRFIELD
Pavement Widening
DOT Approved TotalFederal Aid
RegionalSwap
$3,500,000 $3,500,000
269
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48586
Iowa Department ofTransportation
NHSN-34()--2R-51
US34: 0.3 MI E OF BUS 34 TO 0.4 MI E OF UMBER AVE(VAR LOC)
Slope Improvement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$497,000 $497,000
38198
Iowa Department ofTransportation
NHSN-92()--2R-54
IA92: IA 21 AND CO RD V33 INTERSECTIONS
Grade and Pave, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,169,000 $5,169,000
48443
Iowa Department ofTransportation
BRFN-92()--39-54
IA92: GERMAN CREEK 3.0 MI E OF E JCT IA 149
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$260,000 $260,000
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45551
Mahaska County
22222
NRT-C062(097)--9G-62
At Bluff Creek OHV Park, 1625 325th Street, S19 T74 R16
Bridge Replacement
FHWA Approved TotalFederal Aid
RegionalSwap
$408,200$326,560
$408,200$326,560
270
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
881
RPA 15
22319
RGPL-PA15(RTP)--ST-00
RPA 15: RPA 15 TRANSPORTATION PLANNING
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$25,000$20,000
$20,000
$25,000$20,000
$20,000
48508
Iowa Department ofTransportation
22320
STP-149()--2C-54
IA149: IA 22 TO IOWA CO
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$2,500,000$2,000,000
$2,500,000$2,000,000
48619
Iowa Department ofTransportation
22321
STP-149()--2C-90
IA149: N OF W WOODLAND AVE IN OTTUMWA TO 1.1MI N OF US 63
Pavement Widening, Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$4,450,000$3,560,000
$4,450,000$3,560,000
DOT Note: Project includes STBG and HSIP funds
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48687
Van Buren CountyConservation Board
22415
TAP-U-C089(100)--8I-89
Along Eagle Dr, from J40 N 2.5 miles S23 T69 R10
Miscellaneous
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$268,000$208,000
$208,000
$268,000$208,000
$208,000
271
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48704
Fairfield
BHM-SWAP-2465()--SA-51
In the city of Fairfield, On BUSINESS 34 SIGNED RTE,Over WEST CROW CREEK, S30 T72 R09
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00045800
Wapello County
BHS-SWAP-C090()--FC-90
On H 21 (POWER PLANT ROAD), Over MIDDLE AVERYCREEK, S26 T73 R15
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$100,000
$100,000
$100,000
$100,00045801
Wapello County
BHS-SWAP-C090()--FC-90
On H 21 (POWER PLANT ROAD), Over Rail Road, S26T73 R15
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$100,000
$100,000
$100,000
$100,00037786
Jefferson County
BROS-SWAP-4650(601)--SE-51
On 175TH ST, Over CREEK, S9 T72 R10
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$425,000
$340,000
$425,000
$340,00036349
Jefferson County
BROS-SWAP-C051()--SE-51
On GRASSTREE AVE, Over EAST BRANCH LICK CREEK,S30 T71 R10 BRIDGE REPLACEMENT
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$570,000
$570,000
$570,000
$570,00036337
Jefferson County
BROS-SWAP-C051(81)--FE-51
On CEDAR AVE, Over ROCK CREEK, S4 T71 R11
Bridge Replacement
DOT Approved
6/21/2022
TotalFederal Aid
RegionalSwap
$675,000
$675,000
$675,000
$675,00034366
Mahaska County
BROS-SWAP-C062(99)--FE-62
On 335'th Street, Over Cedar Creek, in NW S34 T74NR14W
Bridge Replacement
DOT Approved
8/17/2021
TotalFederal Aid
RegionalSwap
$850,000
$850,000
$850,000
$850,00044763
Van Buren County
BROS-SWAP-C089()--SE-89
On 197TH RD, Over WILDCAT CREEK, S19 T69 R10
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00029230
Wapello County
BROS-SWAP-C090(100)--SE-90
On 15th Street, Over Brush Creek, S32 T71 R14
Bridge Replacement
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
272
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
12637
Wapello County
BRS-SWAP-C090()--FF-90
On H 31 (Bladensburg Road), Over JORDAN CREEK, S17T72 R12
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00036350
Jefferson County
BROS-SWAP-C051()--SE-51
On 148TH ST, Over CREEK, S30 T73 R11
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$570,000
$570,000
$570,000
$570,00044744
Van Buren County
BROS-SWAP-C089()--SE-89
On ROBIN AVE, Over Bear Creek, S01 T68 R09
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00044762
Van Buren County
BROS-SWAP-C089()--SE-89
On 210TH ST, Over TRIB COATES CR, S31 T69 R08
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$150,000
$150,000
$150,000
$150,00034990
Wapello County
BROS-SWAP-C090()--FE-90
On Whiskey Ridge, Over Middle Avery Creek, SW S6 T72R15
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00034991
Wapello County
BROS-SWAP-C090()--SE-90
On 200th Avenue, Over Brush Creek, S26 T71 R15
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00036333
Jefferson County
BRS-SWAP-C051(72)--FF-51
On H43 Libertyville RD, Over BIG CEDAR CREEK, S3 T71R10
DOT Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$2,200,000
$2,200,000
$2,200,000
$2,200,00040091
Mahaska County
BRS-SWAP-C062()--FF-62
On G 29, Including Bridge Number 236910 Over N SKUNKRIVER and Overflow Bridge Number 236920, S10 T76NR14
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$3,250,000
$3,250,000
$3,250,000
$3,250,000
36346
Jefferson County
BHOS-SWAP-C051()--FB-51
On CARNATION BLVD, Over CREEK, S22 T72 R11
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$260,000
$260,000
$260,000
$260,000
273
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45699
Mahaska County
BHOS-SWAP-C062()--FB-62
On G 15, Over BUCKLEY CREEK(MIDDLE BR), S9 T77R17
DOT Approved TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,00037797
Jefferson County
BROS-SWAP-C051()--FE-51
On BUCKEYE AVE, Over COMPETINE CREEK, S5 T72R11
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$580,000
$580,000
$580,000
$580,00038928
Wapello County
BROS-SWAP-C090()--SE-90
On Soap Creek Road, Over LITTLE SOAP CREEK, S18T71N R14W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00034989
Wapello County
BROS-SWAP-C090()--SE-90
On 180th Ave, Over Little Soap Creek, NE S19 T71 R14
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00047307
Jefferson County
BRS-SWAP-C051()--FF-51
On W 30, Over CEDAR CREEK, S36 T71 R09
DOT Approved TotalFederal Aid
RegionalSwap
$2,100,000
$2,100,000
$2,100,000
$2,100,00038927
Wapello County
BRS-SWAP-C090()--FF-90
On Lake Rd, Over VILLAGE CREEK, NW S10 T71N R14W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00036351
Jefferson County
BROS-SWAP-C051()--SE-51
On IRIS AVE, Over MITCHELL CREEK, S16 T72 R10
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$486,000
$486,000
$486,000
$486,00045175
Jefferson County
BROS-SWAP-C051()--SE-51
On CEDAR AVE, Over BRANCH ROCK CREEK, S33 T72R11
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00044743
Van Buren County
BROS-SWAP-C089()--SE-89
On 180th St, approximately 1/2 mile east of Peach Ave,east 1/2 mile over unnamed stream and Coppers creek
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$375,000
$375,000
$375,000
$375,000
274
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44767
Van Buren County
BROS-SWAP-C089()--SE-89
On 235TH RD, Over REEDS CREEK, S11 T68 R08
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00038930
Wapello County
BROS-SWAP-C090()--SE-90
On 110TH AVE, Over LITTLE SOAP CREEK, S33 T71NR13W
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00045065
Wapello County
BROS-SWAP-C090()--SE-90
On 240TH AVE, Over Unnamed tributary to Little SoapCreek, S20 T71 R15
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00045067
Wapello County
BROS-SWAP-C090()--SE-90
On RICHLAND RD, Over MENNEIKA CREEK, S17 T73R14
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00045693
Mahaska County
BRS-SWAP-C062()--FF-62
On T 67, Over CEDAR CREEK, S24 T74 R15
DOT Approved TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44745
Van Buren County
HSIP-SWAP-C089(99)--FJ-89
Intersections of Hwy 2 and V56, V64, Gold Ave., W20, W40;W40 and J40; V56 and J40; and Hwy 16 and V64, W30,W40
Pavement Rehab
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$93,900
$88,900
$93,900
$88,900
45859
Wapello County
HSIP-SWAP-C090(101)--FJ-90
On Various Paved Farm To Market Routes, 25 miles
Pavement Markings
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$414,000
$289,000
$414,000
$289,000
275
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45142
Jefferson County
STBG-SWAP-C051(82)--FG-51
On H 43, ,from Pine Jack St S 1.4 miles to Libertyville Rd
Pavement Rehab
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$430,000
$430,000
$430,000
$430,000
$430,000
$430,00044764
Van Buren County
STBG-SWAP-C089()--FG-89
On J 40, from Davis County Line 5.7 miles to V64
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,900,000
$1,900,000
$1,900,000
$1,900,000
$1,900,000
$1,900,00039430
Ottumwa
STBG-SWAP-5825()--SG-90
In the city of Ottumwa, On Mary Street, from Ferry StreetWest 0.70 to Shaul Avenue
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$2,197,128
$2,055,354
$2,055,354
$2,197,128
$2,055,354
$2,055,35445491
Oskaloosa
STBG-SWAP-5780()--SG-62
On South 7th Street, S19 T75 R15
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,400,000
$1,400,000
$1,400,000
$1,400,000
$1,400,00045057
Wapello County
STBG-SWAP-C090()--FG-90
On 87TH ST, from 220th Ave. W 3.0 miles to 194th Avenue
Pavement Widening, Culvert Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$2,300,000
$2,000,000
$2,000,000
$2,300,000
$2,000,000
$2,000,000
276
I I
0 5 10
RPA 16 - Southeast Iowa Regional Planning Commission
211 North Gear Avenue, Suite 100, West Burlington, IA 52655
Phone: 319-753-5107, Fax: 319-754-4763, www.seirpc.com
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
I
20 Miles
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
277
RPA 16HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48446
Iowa Department ofTransportation
22027
HSIPX-78()--3L-58
IA78: ECL MORNING SUN TO US 61
Pavement Widening
FHWA Approved TotalFederal Aid
RegionalSwap
$400,000$360,000
$400,000$360,000
ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44833
Des Moines County
ILL-C029(91)--92-29
On 40TH AVE, Over HAWKEYE DOLBEE CHANNEL, S20T72 R01
DOT Approved
11/15/2022
TotalFederal Aid
RegionalSwap
$2,000,000 $2,000,000
NHFP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39425
Mount Pleasant
22034
NHFP-5292(626)--2F-44
In the city of Mount Pleasant, BJRY Transload Building
Buildings, Outside Services Engineering
FHWA Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$670,000$536,000
$670,000$536,000
279
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37972
Iowa Department ofTransportation
22180
BRF-78()--38-58
IA78: HONEY CREEK 1.8 MI W OF US 61
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,105,000$1,684,000
$2,105,000$1,684,000
38226
Iowa Department ofTransportation
22176
NHSX-61()--3H-29
US61: S OF 210TH ST TO N OF MEDIAPOLIS
Pave, Bridge New, Grading
FHWA Approved TotalFederal Aid
RegionalSwap
$12,356,000$9,884,800
$29,792,000$23,833,600
$1,398,000$1,118,400
$43,546,000$34,836,800
39230
Iowa Department ofTransportation
22177
NHSX-61()--3H-29
US61: N OF MEDIAPOLIS TO 0.5 MI N OF IA 78
Bridge New, Culvert New, Grading
FHWA Approved TotalFederal Aid
RegionalSwap
$2,400,000$1,920,000
$22,481,000$17,984,800
$3,194,000$2,555,200
$28,075,000$22,460,000
37968
Iowa Department ofTransportation
22179
BRF-136()--38-56
IA136: MISSISSIPPI RIVER IN KEOKUK (STATE SHARE)
Bridge Deck Overlay
FHWA Approved TotalFederal Aid
RegionalSwap
$5,000,000$4,000,000
$5,000,000$4,000,000
48419
Iowa Department ofTransportation
22178
BRF-218()--38-44
US218: SOUTH FISH CREEK 0.7 MI N OF CO RD J20(NB)
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,037,000$1,629,600
$2,037,000$1,629,600
280
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37969
Iowa Department ofTransportation
BRFN-136()--39-56
IA136: MISSISSIPPI RIVER IN KEOKUK (STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000 $20,000 $20,000 $80,000
37924
Iowa Department ofTransportation
BRFN-34()--39-29
US34: MISSISSIPPI RIVER IN BURLINGTON (STATESHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000 $50,000 $50,000 $200,000
37973
Iowa Department ofTransportation
BRFN-92()--39-58
IA92: LITTLE INDIAN CREEK 1.9 MI W OF S JCT US 61
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$425,000 $425,000
45380
Iowa Department ofTransportation
NHSN-218()--2R-56
US218: NB ON RAMP TO IA 27
Grade and Pave, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$406,000 $406,000
38225
Iowa Department ofTransportation
NHSN-61()--2R-29
US61: MEMORIAL PARK RD IN BURLINGTON TO S OF210TH ST
Pavement Rehab, Erosion Control
DOT Approved TotalFederal Aid
RegionalSwap
$2,669,000 $2,669,000
48529
Iowa Department ofTransportation
NHSN-61()--2R-56
US61: KEOKUK TO N JCT US 218
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$663,000 $663,000
45358
Iowa Department ofTransportation
BRFN-218()--39-44
US218: NORTH FISH CREEK 1.1 MI N OF CO RD J20(NB)
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,000 $3,188,000 $3,193,000
39227
Iowa Department ofTransportation
BRFN-34()--39-29
US34: N CENTRAL AVE IN BURLINGTON
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,307,000 $1,307,000
45379
Iowa Department ofTransportation
STPN-2()--2J-56
IA2: 3.5 MI E OF CO RD J56
Slope Improvement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$322,000 $322,000
281
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45260
Iowa Department ofTransportation
BRFN-136()--39-56
IA136: SOAP CREEK AND BNSF RR 1.8 MI E OF US 61 INKEOKUK
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,414,000 $1,414,000
45265
Iowa Department ofTransportation
BRFN-34()--39-29
US34: WB RAMP TO US 34 0.4 MI W OF IL INBURLINGTON
Bridge Rehabilitation, Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,398,000 $1,476,000 $2,874,000
45333
Iowa Department ofTransportation
BRFN-34()--39-29
US34: 8TH ST 1.8 MI E OF US 61 IN BURLINGTON
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$546,000 $546,000
45263
Iowa Department ofTransportation
BRFN-34()--39-29
US34: CURRAN ST 0.8 MI E OF US 61 IN BURLINGTON
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$925,000 $925,000
48541
Iowa Department ofTransportation
NHSN-218()--2R-56
US218: WEIGH STATION S OF CO RD J38/130TH ST
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$277,000 $277,000
48451
Iowa Department ofTransportation
BRFN-34()--39-29
US34: W BURLINGTON AVE 0.5 MI W OF US 61 (EB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$640,000 $640,000
48593
Iowa Department ofTransportation
BRFN-34()--39-29
US34: W BURLINGTON AVE 0.5 MI W OF US 61 (WB)
Bridge Rehabilitation, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$325,000 $325,000
48459
Iowa Department ofTransportation
BRFN-61()--39-29
US61: US 34 IN BURLINGTON
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,270,000 $1,270,000
48427
Iowa Department ofTransportation
BRFN-78()--39-44
IA78: STREAM 0.3 MI W OF E JCT CO RD W66
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$964,000 $964,000
282
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48606
Iowa Department ofTransportation
NHSN-61()--2R-29
US61: BRANCH SMITH CREEK 1.0 MI S OF LOUISA CO
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$15,000 $15,000
48607
Iowa Department ofTransportation
NHSN-61()--2R-58
US61: 0.5 MI N OF IA 78 TO 2.0 MI S OF IA 92
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$5,800,000 $5,800,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
949
RPA 16
22322
RGPL-PA16(RTP)--ST-00
SEIRPC: RPA 16 TRANSPORTATION PLANNING
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$197,434$141,924
$141,924
$197,434$141,924
$141,924
$197,434$141,924
$141,924
$197,434$141,924
$141,924
$789,736$567,696
$567,696
48493
Iowa Department ofTransportation
22324
STP-78()--2C-44
IA78: WINFIELD TO US 61
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$8,138,000$6,510,400
$8,138,000$6,510,400
48517
Iowa Department ofTransportation
22325
STP-78()--2C-44
IA78: 130TH ST/JAMES AVE INTERSECTION TOWINFIELD
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$900,000$720,000
$900,000$720,000
39156
SEIBUS
22323
RGTR-SEIBUS()--ST-29
SEIBUS: Purchase of two Light Duty ADA Buses
Transit Investments
FHWA Approved TotalFederal Aid
RegionalSwap
$158,000$126,400
$126,400
$158,000$126,400
$126,400
283
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
25472
Houghton
22416
TAP-R-3562(601)--8T-56
In the city of Houghton, Loop trail starting and ending atBentler Street and south city limits, 1.2 miles in length
Outside Services Engineering, Ped/Bike ROW, Ped/BikeGrade & Pave
FHWA Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$166,286$133,028
$133,028
$166,286$133,028
$133,028
PA Note: PE consultant previously authorized $28,000 in Federal Aid (original FA amount was $146,628)
DOT Note: Project eligible for FHWA TAP funding
34170
Louisa County
22421
TAP-R-C058(060)--8T-58
145th Street from 500 ft E of west C J city limits west toX17, then south to 110 ft W of Mulberry St in Columbus City
Shoulder Grading, Ped/Bike Paving
FHWA Approved
8/18/2020
TotalFederal Aid
RegionalSwap
$225,000$133,229
$133,229
$225,000$133,229
$133,229
39157
Burlington
22418
TAP-U-0977(652)--8I-29
In the city of Burlington, trail along West Ave from RooseveltAve east to Terrace Dr
Traffic Signals, Pavement Markings, Ped/Bike Grade &Pave
FHWA Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$277,334$217,613
$217,613
$277,334$217,613
$217,613
PA Note: PE consultant previously authorized $21,267 in Federal Aid (original FA amount was $238,880).
18682
Burlington
22417
TAP-U-0977(654)--8I-29
In the city of Burlington, Flint River Trail, on Bluff Road fromCash Street south to approx. 200 ft S of 8th St
Ped/Bike Grade & Pave, Ped/Bike Miscellaneous,Ped/Bike Development
FHWA Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$515,000$300,000
$300,000
$515,000$300,000
$300,000
DOT Note: Project eligible for FHWA TAP funding
48641
West Burlington
22420
TAP-R-8255()--8T-29
In the city of West Burlington, trail along S Gear Ave south0.6 mi. from W Huston St to US 34 SE Ramp
Bridge Deck Overlay, Outside Services Engineering,Ped/Bike Grade & Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$890,496$275,357
$275,357
$890,496$275,357
$275,357
45448
Keokuk
22419
TAP-U-3942()--8I-56
In the city of Keokuk, trail along Mississippi River fromVictory Park S 1.0 mi. to boat launch
Subdrains, Outside Services Engineering, Ped/Bike Grade& Pave
FHWA Approved TotalFederal Aid
RegionalSwap
$1,182,370$347,534
$347,534
$1,182,370$347,534
$347,534
284
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39409
Fort Madison
BROS-SWAP-2697(630)--SE-56
In the city of Fort Madison, On AVENUE F, Over FRENCHCREEK
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$1,090,000
$870,000
$1,090,000
$870,00045482
Fort Madison
BROS-SWAP-2697(634)--SE-56
In the City of Fort Madison, On 27TH ST, Over DRYCREEK
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$1,090,000
$870,000
$1,090,000
$870,00025009
Lee County
BROS-SWAP-C056(111)--FE-56
On 140th Ave, Over Little Sugar Creek, from 210th St north0.7 Miles; S26 T68N R7W
Bridge Replacement
DOT Approved
9/20/2022
TotalFederal Aid
RegionalSwap
$501,000
$500,000
$501,000
$500,00012810
Des Moines County
BRS-SWAP-C029(86)--FF-29
On DMC Hwy 99 , Over Dry Branch Creek, S17 T70 R2
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$1,350,000
$1,100,000
$1,350,000
$1,100,00044805
Henry County
BROS-SWAP-C044(173)--SE-44
On IOWA AVE, Over BRANCH FISH CREEK, S16, T-70N,R-6W
DOT Approved TotalFederal Aid
RegionalSwap
$610,000
$600,000
$610,000
$600,00037155
Lee County
BROS-SWAP-C056()--SE-56
On 265TH AVE, Over tributary to Devil's Creek, from ChalkRidge Rd N 500 Feet; NW1/4 S26 T68 R05
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$351,000
$350,000
$351,000
$350,00012784
Des Moines County
BHOS-SWAP-C029(FR14)--FB-29
On North Gear Avenue, Over Flint Creek, S23 T70 R3
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00035119
Des Moines County
BROS-SWAP-C029(FR11)--FE-29
Upper Flint Road Bridge, Over Knotty Creek, S24, T70,R3W
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037154
Lee County
BROS-SWAP-C056()--FE-56
On BELFAST RD, Over MONK CREEK, from 140th Aveeast 4300 Feet, in NE1/4 S2 T66 R07
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$551,000
$550,000
$551,000
$550,000
285
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
3508
Lee County
BROS-SWAP-C056(63)--FE-56
On Chalk Ridge Rd, Over Devil's Creek, from 265th Aveeast 220 Feet; NW1/4 S26 T68 R5
Bridge Replacement
DOT Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$1,401,000
$1,400,000
$1,401,000
$1,400,00038943
Des Moines County
BHS-SWAP-C029(PG27)--FC-29
On Danville Road Bridge, Over Flint Creek, S22 T71 R4
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00045936
Henry County
BHS-SWAP-C044(199)--FC-44
On X 23, Over SKUNK RIVER, S28, T-70N, R-5W
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$260,000
$250,000
$260,000
$250,00048654
Burlington
BRM-SWAP-0977()--SD-29
In the city of Burlington, on S MAIN ST, over DRAINAGE
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$8,000,000
$1,000,000
$8,000,000
$1,000,00045122
Lee County
BROS-SWAP-C056()--SE-56
On 115TH ST, Over HELL HOLLOW CREEK, S12 T69 R05
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$501,000
$500,000
$501,000
$500,000
286
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36915
Burlington
STBG-SWAP-0977()--SG-29
In the City of Burlington, On WASHINGTON ST, from FrontStreet W to approximately 100 feet east of Hawkeye Street
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$4,500,000
$867,275
$867,275
$4,500,000
$867,275
$867,275
38314
Burlington
STBG-SWAP-0977(656)--SG-29
In the city of Burlington, On 9TH ST, from Angular St S toSouth St, and on MADISON AVE, from South St S to SunsetAve
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,866,512
$420,469
$420,469
$1,866,512
$420,469
$420,469
38312
Fort Madison
STBG-SWAP-2697()--SG-56
In the city of Fort Madison, On AVE L, from 20th St. W to30th St.
Pavement Rehab, Outside Services Engineering, Ped/BikeGrade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,560,000
$780,000
$780,000
$1,560,000
$780,000
$780,000
35391
Fort Madison
STBG-SWAP-2697(636)--SG-56
In the city of Fort Madison, On AVE H, from 10th St west to18th St
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$4,182,800
$1,246,179
$1,246,179
$4,182,800
$1,246,179
$1,246,179
36954
West Burlington
STBG-SWAP-8255(609)--SG-29
In the city of West Burlington, On MT PLEASANT ST, fromSouth Gear Avenue west to US 34 Exit Ramp E ofinterchange
Pavement Rehab, Outside Services Engineering
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$1,290,000
$374,637
$374,637
$1,290,000
$374,637
$374,637
32640
Louisa County
STBG-SWAP-C058(62)--FG-58
On X17, From G62 to Philadelphia St, 6.1 Miles and On CoHwy. 305, From X43 to Hwy 61 1.6 Miles
Pavement Rehab
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$2,057,000
$1,481,440
$1,481,440
$2,057,000
$1,481,440
$1,481,44039155
Burlington
STBG-SWAP-0977()--SG-29
In the city of Burlington, On AGENCY ST, from Melrose Ct Eto Curran St
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,597,523
$1,302,635
$1,302,635
$1,597,523
$1,302,635
$1,302,635
PA Note: Project includes approx. 50' of sidewalk improvements to the east, north, and south from the Curran Street intersection, plus an additional 300' of sidewalk to the north along Curran Street.
32282
Henry County
STBG-SWAP-C044(W55 South)--FG-44
On W55, from 235th Street south to J20 in Salem
DOT Approved TotalFederal Aid
RegionalSwap
$2,800,000
$1,426,423
$1,426,423
$2,800,000
$1,426,423
$1,426,423
287
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45447
Burlington
STBG-SWAP-0977()--SG-29
In the city of Burlington, on SUMMER ST, from Harrison AveS to Koestner St
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$2,912,002
$1,176,159
$1,176,159
$2,912,002
$1,176,159
$1,176,159
45116
Lee County
STBG-SWAP-C056()--FG-56
On J40, from US 218 / Hwy 27 E 5.9 miles to West PointCorp Limits
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,212,000
$1,408,177
$1,408,177
$2,212,000
$1,408,177
$1,408,17748640
Fort Madison
STBG-SWAP-2697()--SG-56
In the city of Fort Madison, On AVE L, from 30th St W to35th St, and on AVE O from 36th St W to 41st St
Pavement Rehab, Outside Services Engineering, Ped/BikeGrade & Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,998,000
$1,263,879
$1,263,879
$1,998,000
$1,263,879
$1,263,879
24843
Des Moines County
STBG-SWAP-C029(DMC99)--FG-29
On X99, from Burlington CL to Meeker's Landing Road
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$3,500,000
$1,491,135
$1,491,135
$3,500,000
$1,491,135
$1,491,135
288
..
RPA 17 - Chariton Valley Planning and Development
308 North 12th Street, Centerville, IA 52544
Phone: 641-437-4359, Fax: 641-437-1161, www.charitonvalleyplanning.com
!I
-�-·---
I I I I
.--- i ayne f ppanoo
ount
(
�I I I
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
El General Service
El Basic Service
Local Roads
-Ramps
II _Jc!.,......:......::::.:::.:::J..L. __ ...J. __ .:.J_....,1.�...;,---..a..-"'--.....,. __1
El Local Service � Transit
-Trails
I I I I I
0 5 10 20 Miles
[el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
289
RPA 17FM
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38623
Wayne County
FM-C093(94)--55-93
On J-46, from S-40 E 3 miles to 190th Street, T68 R21
Pave
DOT Approved
8/16/2022
TotalFederal Aid
RegionalSwap
$1,750,000 $1,750,000
291
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37974
Iowa Department ofTransportation
22185
BRF-34()--38-59
US34: STREAM 2.1 MI E OF E JCT US 65
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,162,000$1,729,600
$2,162,000$1,729,600
48500
Iowa Department ofTransportation
22184
NHSX-34()--3H-68
US34: ALBIA TO WAPELLO CO LINE
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,277,000$2,621,600
$3,277,000$2,621,600
48433
Iowa Department ofTransportation
22182
NHSX-65()--3H-93
US65: IA 2 TO LUCAS CO LINE
Pavement Rehab, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$3,402,000$2,721,600
$3,402,000$2,721,600
39168
Iowa Department ofTransportation
22181
BRF-5()--38-4
IA5: COOPER CREEK 1.5 MI N OF IA 2
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,707,000$2,165,600
$2,707,000$2,165,600
37883
Iowa Department ofTransportation
22186
BRF-5()--38-4
IA5: NORTH CREEK 2.6 MI S OF CO RD T20
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$4,726,000$3,780,800
$4,726,000$3,780,800
39218
Iowa Department ofTransportation
22187
BRF-63()--38-26
US63: FOX RIVER 2.1 MI N OF IA 2
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$6,000 $3,485,000$2,788,000
$3,491,000$2,788,000
39370
Iowa Department ofTransportation
22183
BRF-65()--38-93
US65: CALEB CREEK 2.0 MI S OF CO RD J46
Bridge Replacement
FHWA Approved TotalFederal Aid
RegionalSwap
$2,573,000$2,058,400
$2,573,000$2,058,400
292
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37880
Iowa Department ofTransportation
BRFN-2()--39-4
IA2: WALNUT CREEK 0.8 MI E OF CO RD S70
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$253,000 $253,000
38083
Iowa Department ofTransportation
IMN-35()--0E-27
I-35: MISSOURI TO POLK CO
Guardrail
DOT Approved TotalFederal Aid
RegionalSwap
$100,000 $100,000 $100,000 $100,000 $400,000
48512
Iowa Department ofTransportation
NHSN-5()--2R-68
IA5: 3RD AVE TO RR CROSSING IN ALBIA
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
45369
Iowa Department ofTransportation
NHSN-65()--2R-93
US65: STREAM 0.3 MI N OF CO RD J54
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$471,000 $471,000
48638
Iowa Department ofTransportation
STPN-69()--2J-20
US69: WHITE BREAST CREEK TO JUST N OF OSCEOLASCL
Ditch Improvement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$2,000 $210,000 $212,000
39290
Iowa Department ofTransportation
BRFN-34()--39-59
US34: LITTLE WHITE BREAST CREEK 2.5 MI W OF CORD S56
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$312,000 $312,000
39307
Iowa Department ofTransportation
BRFN-34()--39-68
US34: BNSF RR 4.5 MI W OF IA 5
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$443,000 $443,000
39200
Iowa Department ofTransportation
IMN-35()--0E-20
I-35: 0.5 MI N OF US 34 TO WARREN CO (NB)
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$3,923,000 $3,923,000
48555
Iowa Department ofTransportation
IMN-35()--0E-20
I-35: NB WEIGH STATION 1.2 MI N OF CO RD H45
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,130,000 $1,130,000
293
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39220
Iowa Department ofTransportation
IMN-35()--0E-27
I-35: 310TH ST 2.5 MI S OF US 69 (NB & SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$937,000 $937,000
48547
Iowa Department ofTransportation
NHSN-34()--2R-68
US34: 0.5 MI E OF CO RD S70 AND APPROX 1 MI W OFCO RD T19
Slope Improvement
DOT Approved TotalFederal Aid
RegionalSwap
$120,000 $120,000
45423
Iowa Department ofTransportation
STPN-63()--2J-26
US63: N FABIUS CREEK 2.6 MI N OF MISSOURI
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000
45294
Iowa Department ofTransportation
BRFN-2()--39-93
IA2: JACKSON CREEK 3.8 MI W OF CO RD S56
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$769,000 $769,000
45412
Iowa Department ofTransportation
IMN-35()--0E-20
I-35: 0.5 MI N OF US 34 TO WARREN CO (SB)
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,204,000 $2,204,000
48561
Iowa Department ofTransportation
BRFN-2()--39-27
IA2: MCGRUDER CREEK 1.5 MI E OF E JCT US 69
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$190,000 $190,000
48430
Iowa Department ofTransportation
BRFN-63()--39-26
US63: NORTH CHEQUEST CREEK 2.6 MI N OF CO RDJ3T
Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,007,000 $1,007,000
48587
Iowa Department ofTransportation
BRFN-63()--39-26
US63: MIDDLE CHEQUEST CREEK 0.2 MI N OF 180THST
Bridge Widening, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$955,000 $955,000
48573
Iowa Department ofTransportation
IMN-35()--0E-27
I-35: CO RD R30 1.0 MI S OF IA 2
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$684,000 $684,000
294
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
1001
RPA 17
22326
RGPL-PA17(RTP)--ST-00
RPA 17: RPA 17 TRANSPORTATION PLANNING
Trans Planning
FHWA Approved TotalFederal Aid
RegionalSwap
$82,000$66,000
$66,000
$82,000$66,000
$66,000
$82,000$66,000
$66,000
$82,000$66,000
$66,000
$328,000$264,000
$264,000
48487
Iowa Department ofTransportation
22327
STP-69()--2C-27
US69: MISSOURI STATE LINE TO 0.25 MI E OF I-35
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$2,333,000$1,866,400
$2,333,000$1,866,400
295
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45738
Decatur County
BHS-SWAP-C027(85)--FC-27
On J 20, Over Long Creek, S32 T70 R26
Bridge Rehabilitation
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$375,000
$375,000
$375,000
$375,00045737
Decatur County
BHS-SWAP-C027(86)--FC-27
On J 20, Over GRAND RIVER, S34 T70 R27
Bridge Rehabilitation
DOT Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$375,000
$375,000
$375,000
$375,00037665
Lucas County
BROS-SWAP-C059(64)--FE-59
On 530TH ST, Over NORTH CEDAR CREEK, S27/34 T73R20
Bridge Replacement
DOT Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$725,000
$725,000
$725,000
$725,00037362
Wayne County
BROS-SWAP-C093(101)--FE-93
On J-44, Over Jackson Creek, S1 T68 R21
Bridge Replacement
DOT Approved
3/21/2023
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00017227
Wayne County
BROS-SWAP-CO93(85)--FE-93
On Birch Rd, Over Locust Creek, S22 T67 R20
Bridge Replacement
DOT Approved
5/15/2029
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00026792
Monroe County
BRS-SWAP-C068(76)--FF-68
On H27, 165th St., Over Abandoned Railroad, from 677thAve West Approx 700 Feet to Bridge, in S1 T72 R17
Bridge Removal
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$875,000
$875,000
$875,000
$875,00026793
Monroe County
BRS-SWAP-C068(77)--FF-68
On H27, 165th st, Over BNSF RR, from 685th Ave WestApprox .1 Miles to said Bridge, in S6 T72 R16
Bridge Replacement
DOT Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$2,875,000
$2,875,000
$2,875,000
$2,875,00038783
Decatur County
BHS-SWAP-C027(77)--FC-27
On J66, Over Weldon River, S22 T67 R24
Bridge Deck Overlay
DOT Approved
10/18/2022
TotalFederal Aid
RegionalSwap
$691,200
$691,200
$691,200
$691,20045626
Appanoose County
BROS-SWAP-C004()--SE-04
On 135TH AVE, Over COAL CREEK, from 524th St S 0.9miles to bridge S10 T68 R19
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,000
296
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
44776
Clarke County
BROS-SWAP-C020(123)--FE-20
On PACIFIC ST, Over OTTER CREEK, S17 T73 R24
Bridge Replacement
DOT Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,0006407
Clarke County
BROS-SWAP-C020(124)--FE-20
On KANSAS ST, Over S SQUAW CREEK, S15 T72 R26
Bridge Replacement
DOT Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00047090
Clarke County
BROS-SWAP-C020(126)--FE-20
On HOOVER ST, Over WHITE BREAST CREEK, S26 T72R26
Bridge Replacement
DOT Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00047091
Clarke County
BROS-SWAP-C020(127)--SE-20
On WYOMING ST, Over Creek, S6 T73 R24
Bridge Replacement
DOT Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,0008899
Clarke County
BROS-SWAP-C020(67)--SE-20
SCOTT STREET: .25 MI. W. OF 195TH AVE. ON SCOTTST.
Bridge Replacement
DOT Approved
11/15/2022
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00040228
Decatur County
BROS-SWAP-C027(87)--FE-27
On J 48, Over Unnamed Tributary to Grand River, S16 T68R26
Bridge Replacement
DOT Approved
11/15/2022
TotalFederal Aid
RegionalSwap
$650,000
$650,000
$650,000
$650,0001040
Lucas County
BROS-SWAP-C059(28)--FE-59
On H 50, Over UP RR, S21 T71 R21
Bridge Replacement
DOT Approved
6/20/2023
TotalFederal Aid
RegionalSwap
$2,250,000
$1,500,000
$2,250,000
$1,500,00045553
Davis County
BRS-SWAP-C026(125)--FF-26
On J 15, Over SOAP CREEK, S7 T70 R12
DOT Approved
5/17/2022
TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,00039597
Appanoose County
BROS-SWAP-C004()--FE-04
On 110th Ave, Over Walnut Creek, from IA 2 South 1.1Miles, on WLINE S32 T69 R19
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
297
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37195
Davis County
BROS-SWAP-C026(117)--SE-26
On Ice Ave, 0.9 miles South of 260th St
Bridge Replacement
DOT Approved
5/17/2022
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037673
Lucas County
BROS-SWAP-C059(66)--SE-59
On 220TH AVE, Over WOLF CREEK, in the SE1/4 S25 T71R22
Bridge Replacement
DOT Approved
11/21/2023
TotalFederal Aid
RegionalSwap
$360,000
$360,000
$360,000
$360,00038781
Decatur County
BRS-SWAP-C027(81)--FF-27
On J66, Over Little River, in SE S13 T67 R25
Bridge Replacement
DOT Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$1,100,000
$1,100,000
$1,100,000
$1,100,00045630
Appanoose County
BROS-SWAP-C004()--SE-04
On 150TH AVE, Over WALNUT CREEK, from IA 2 N 0.8miles to bridge S25 T69 R19
DOT Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00020715
Decatur County
BROS-SWAP-C027()--FE-27
On J 67, over Shane Creek, S20 T67 R27
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00045069
Monroe County
BROS-SWAP-C068()--SE-68
On 595TH AVE, Over CREEK, from 265th St S .03 miles toSaid Bridge S27 T71 R18
DOT Approved TotalFederal Aid
RegionalSwap
$150,000
$150,000
$150,000
$150,00037363
Wayne County
BROS-SWAP-CO93(97)--SE-93
On 245th St, Over Walnut Creek, S36 T69 R20
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00040112
Davis County
BRS-SWAP-C026()--FF-26
On V 17, Over SMALL STREAM, S19 T70 R14
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,000
298
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
17484
Lucas County
STBG-SWAP-C059(51)--FG-59
On H20, from Iowa Highway 14 East 0.93 miles to the westUPRR ROW in Williamson
Pavement Rehab/Widen
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$500,000
$226,000
$226,000
$500,000
$226,000
$226,00045211
Lucas County
STBG-SWAP-C059(71)--FG-59
H30 from 490th St N on 215th Ave 0.5 & E on 495th St 1.75miles to Iowa Hwy 14, and On H32 from S23 E 2.10 miles
Pavement Rehab/Widen
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$2,430,000
$1,300,000
$1,300,000
$2,430,000
$1,300,000
$1,300,00037629
Monroe County
STBG-SWAP-C068()--FG-68
On S-70 S from State Hwy 34 2 miles to end of asphalt &H32 from State Hwy 5 W 3.75 miles to 586th Ave
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,000
$750,000
$750,00039511
Appanoose County
STBG-SWAP-C004()--FG-04
On S70, from J5T North 7.8 Miles to Monroe County Line
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$1,250,000
$1,250,000
$1,250,000
$1,250,000
$1,250,000
$1,250,00039512
Appanoose County
STBG-SWAP-C004()--FG-04
On J5T, from 195th Ave North & East 1 Miles to J29
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,000
$250,000
$250,00045055
Monroe County
STBG-SWAP-C068()--SG-68
On T 61, from State Hwy 137 S 1 miles to 170th St
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,00038780
Decatur County
STBG-SWAP-C027(J66)--FG-27
On J 66, from HWY 69 SE 6.9 miles to Missouri State Line
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$4,108,500
$1,100,000
$1,100,000
$4,108,500
$1,100,000
$1,100,000
299
I
RPA 18 - MAPA Transportation Planning Affiliation
2222 Cuming Street, Omaha, NE 68102
Phone: 402-444-6866, Fax: 402-342-0949, www.mapacog.org
I
Omaha - Council Bluffs
Metropolitan Area
Planning Agency
(MAPA)
ttawatta
Count
Shelby
County
•
iorts
Commercial
(I Enhanced
(I General Service
(I Basic Service
(I Local ServiceTransit
[el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
CE! Amtrak
I Park & Ride
- Interstate
- National Highway System
- Primary Roads
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1
L_ _ _J Counties
City Limits
0 5
I
10 20 Miles Urban Area
300
RPA 18HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48549
Iowa Department ofTransportation
22028
HSIPX-34()--3L-65
US34: CO RD L55 INTERSECTION
Pavement Widening
FHWA Approved TotalFederal Aid
RegionalSwap
$906,000$815,400
$906,000$815,400
302
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
39338
Iowa Department ofTransportation
22188
BRF-59()--38-78
US59: E BRANCH W NISHNABOTNA RIVER 1.0 MI S OFIA 83
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$6,000 $3,713,000$2,970,400
$3,719,000$2,970,400
38116
Iowa Department ofTransportation
22189
IMX-29()--02-78
I-29: DITCH 1.6 MI S OF I-880
Bridge Replacement
FHWA Approved TotalFederal Aid
RegionalSwap
$953,000$857,700
$953,000$857,700
38117
Iowa Department ofTransportation
22190
IMX-29()--02-78
I-29: DITCH 0.5 MI S OF I-880
Bridge Replacement
FHWA Approved TotalFederal Aid
RegionalSwap
$1,713,000$1,541,700
$1,713,000$1,541,700
38115
Iowa Department ofTransportation
22191
IMX-29()--02-78
I-29: DITCH 2.4 MI S OF I-880
Bridge Replacement, Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$2,600,000$2,340,000
$2,600,000$2,340,000
38164
Iowa Department ofTransportation
22198
IMX-29()--02-78
I-29: CO RD G12 0.4 MI N OF I-880
Grade and Pave, Bridge Replacement, Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$3,600,000$3,240,000
$3,600,000$3,240,000
48505
Iowa Department ofTransportation
22194
IMX-80()--02-78
I-80: 0.4 MI E OF I-880 TO 0.1 MI W OF SILVER CREEKBRIDGE (EB & WB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$2,521,000$2,268,900
$2,521,000$2,268,900
38122
Iowa Department ofTransportation
22196
IMX-80()--02-78
I-80: W NISHNABOTNA RIVER TO 1.0 MI E OF RESTAREA (WB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$1,727,000$1,554,300
$1,727,000$1,554,300
48534
Iowa Department ofTransportation
22199
IMX-80()--02-78
I-80: 0.1 MI W OF SILVER CREEK BRIDGE TO CASS CO(EB/WB)
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,863,000$3,476,700
$3,863,000$3,476,700
48480
Iowa Department ofTransportation
22193
NHSX-34()--3H-65
US34: 0.1 MI E OF US 275 TO BNSF BRIDGE 0.9 MI E OFCO RD L55
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$1,151,000$920,800
$1,151,000$920,800
303
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48516
Iowa Department ofTransportation
22195
NHSX-59()--3H-65
US59: US 34 TO CO RD H12
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$3,246,000$2,596,800
$3,246,000$2,596,800
45306
Iowa Department ofTransportation
22192
IMX-80()--02-78
I-80: IDLEWOOD RD 4.6 MI E OF US 6 (EB & WB)
Bridge Deck Overlay
FHWA Approved TotalFederal Aid
RegionalSwap
$1,360,000$1,224,000
$1,360,000$1,224,000
45244
Iowa Department ofTransportation
22197
NHSX-30()--3H-43
US30: MISSOURI VALLEY BYPASS
Culvert New, Grading, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$6,800,000$5,440,000
$60,282,200$48,159,200
$67,082,200$53,599,200
48617
Iowa Department ofTransportation
22201
BRF-30()--38-43
US30: STREAM 3.4 MI E OF IA 44
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$1,028,000$822,400
$1,028,000$822,400
48633
Iowa Department ofTransportation
22202
BRF-59()--38-78
US59: AT JCT IA 92
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$2,545,000$2,036,000
$2,545,000$2,036,000
48636
Iowa Department ofTransportation
22203
IMX-29()--02-43
I-29: OLD SOLDIER RIVER DITCH 4.0 MI S OF IA 127(NB/SB)
Bridge Replacement, Right of Way
FHWA Approved TotalFederal Aid
RegionalSwap
$4,069,000$3,662,100
$4,069,000$3,662,100
39339
Iowa Department ofTransportation
22200
IMX-80()--02-78
I-80: KEG CREEK 0.8 MI E OF CO RD L66 (EB & WB)
Bridge Rehabilitation
FHWA Approved TotalFederal Aid
RegionalSwap
$5,080,000$4,572,000
$5,080,000$4,572,000
304
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
37947
Iowa Department ofTransportation
BRFN-30()--39-43
US30: MISSOURI RIVER E OF BLAIR NEBRASKA (STATESHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$35,000 $35,000 $35,000 $35,000 $140,000
37948
Iowa Department ofTransportation
BRFN-30()--39-43
US30: STREAM 2.3 MI E OF CO RD F32
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$1,319,000 $1,319,000
37979
Iowa Department ofTransportation
BRFN-34()--39-65
US34: MISSOURI RIVER N OF PLATTSMOUTHNEBRASKA (STATE SHARE)
Bridge Cleaning
DOT Approved TotalFederal Aid
RegionalSwap
$45,000 $45,000 $45,000 $45,000 $180,000
38010
Iowa Department ofTransportation
BRFN-59()--39-78
US59: I-80 INTERCHANGE AT AVOCA (NB & SB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$647,000 $647,000
38008
Iowa Department ofTransportation
BRFN-59()--39-78
US59: STREAM 2.4 MI N OF IA 92
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$138,000 $138,000
38012
Iowa Department ofTransportation
BRFN-92()--39-78
IA92: JORDAN CREEK 3.5 MI E OF US 59
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$359,000 $359,000
38108
Iowa Department ofTransportation
IMN-29()--0E-65
I-29: REST AREA N OF US 34 (NB)
Rest Area Improvement
DOT Approved TotalFederal Aid
RegionalSwap
$3,971,000 $3,971,000
38121
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: CO RD M16 INTERCHANGE AT SHELBY
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$272,000 $272,000
48543
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: REST AREAS 1 MI N OF CO RD G30 N OFUNDERWOOD
Grading
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000 $1,500,000
305
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48559
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: WB WEIGH STATION 4.1 MI E OF US 59
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$1,238,000 $1,238,000
48483
Iowa Department ofTransportation
STPN-183()--2J-43
IA183: CO RD F20 IN PISGAH TO OAK ST INMOORHEAD
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$593,000 $593,000
48594
Iowa Department ofTransportation
STPN-275()--2J-65
US275: 0.3 MI S OF CO RD H40
Culvert Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$408,000 $408,000
39249
Iowa Department ofTransportation
BRFN-127()--39-43
IA127: STEER CREEK 0.5 MI E OF IA 183
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$740,000 $740,000
39248
Iowa Department ofTransportation
BRFN-30()--39-43
US30: MISSOURI RIVER E OF BLAIR NEBRASKA (STATESHARE)
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$125,000 $125,000
37949
Iowa Department ofTransportation
BRFN-30()--39-43
US30: WILSON DITCH 2.1 MI W OF I-29
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$888,000 $888,000
39355
Iowa Department ofTransportation
BRFN-44()--39-83
IA44: MOSQUITO CREEK 0.3 MI E OF IA 191
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$1,102,000 $1,102,000
39340
Iowa Department ofTransportation
BRFN-92()--39-78
IA92: GRAYBILL CREEK 1.2 MI E OF E JCT US 59
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$573,000 $573,000
45250
Iowa Department ofTransportation
IMN-880()--0E-78
I-880: MOSQUITO CREEK 0.5 MI E OF IA 191 (WB)
Bridge Rehabilitation
DOT Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
306
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
45424
Iowa Department ofTransportation
STPN-29()--2J-43
I-29: LITTLE SIOUX RIVER N OF CO RD F20
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$120,000 $120,000
45293
Iowa Department ofTransportation
BRFN-92()--39-78
IA92: SILVER CREEK 2.8 MI E OF TREYNOR
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$598,000 $598,000
48428
Iowa Department ofTransportation
BRFN-92()--39-78
IA92: INDIAN CREEK 0.7 MI W OF CO RD M47
Bridge Replacement, Right of Way
DOT Approved TotalFederal Aid
RegionalSwap
$766,000 $766,000
48452
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: CO RD G30 INTERCHANGE
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$800,000 $800,000
48475
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: 0.4 MI E OF I-880 TO 0.1 MI W OF SILVER CREEKBRIDGE (WB)
DOT Approved TotalFederal Aid
RegionalSwap
$1,312,000 $1,312,000
48546
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: WB REST AREA 1.0 MI N OF CO RD G30 N OFUNDERWOOD
Rest Area Improvement
DOT Approved TotalFederal Aid
RegionalSwap
$4,150,000 $4,150,000
48567
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: MCPHERSON AVE 1.6 MI W OF US 6 (WB)
Bridge Deck Overlay
DOT Approved TotalFederal Aid
RegionalSwap
$660,000 $660,000
48577
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: ABANDONED RR 3.0 MI E OF I-880 (BRIDGEREMOVAL EB & WB)
Grade and Pave
DOT Approved TotalFederal Aid
RegionalSwap
$4,472,000 $4,472,000
48536
Iowa Department ofTransportation
STPN-34()--2J-65
US34: MISSOURI RIVER N OF PLATTSMOUTHNEBRASKA
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
307
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48537
Iowa Department ofTransportation
STPN-680()--2J-78
I-680: MISSOURI RIVER 3.1 MI W OF I-29
Traffic Signs
DOT Approved TotalFederal Aid
RegionalSwap
$400,000 $400,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
48527
Iowa Department ofTransportation
22330
STP-173()--2C-83
IA173: CASS CO LINE TO 0.25 MI S OF CO RD F58 INELK HORN
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$2,637,000$2,109,600
$2,637,000$2,109,600
48477
Iowa Department ofTransportation
22328
STP-191()--2C-83
IA191: HARRISON CO TO IA 44
FHWA Approved TotalFederal Aid
RegionalSwap
$1,144,000$915,200
$1,144,000$915,200
48524
Iowa Department ofTransportation
22329
STP-92()--2C-78
IA92: TREYNOR TO CARSON
Pavement Rehab
FHWA Approved TotalFederal Aid
RegionalSwap
$5,498,000$4,398,400
$5,498,000$4,398,400
308
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
26699
PottawattamieCountyConservation Board
22422
TAP-R-C078(184)--8T-78
On Railroad Highway, from Council Bluffs N 27 Miles toNeola and Crescent
Ped/Bike Miscellaneous, Ped/Bike Development
FHWA Approved
1/21/2026
TotalFederal Aid
RegionalSwap
$936,000$200,000
$200,000
$936,000$200,000
$200,000
DOT Note: Project eligible for FHWA TAP funding.
39439
Glenwood
22424
TAP-T-2955()--8V-65
In the city of Glenwood, On East Sharp Street walking/biketrail, from Vine Street to Lake Drive
Ped/Bike Paving
FHWA Approved TotalFederal Aid
RegionalSwap
$141,000$113,000
$113,000
$141,000$113,000
$113,000
38389
Glenwood
22423
TAP-U-2955()--8I-65
In the city of Glenwood, On Pedestrian trail south of ESharp Street in Glenwood Lake Park for 2.5 Miles
Ped/Bike Grade & Pave, Ped/Bike Structures,Ped/Bike Development
FHWA Approved TotalFederal Aid
RegionalSwap
$1,255,000$72,000
$72,000
$1,255,000$72,000
$72,000
309
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38477
Harlan
BROS-SWAP-3275(604)--SE-83
On North 7th Street, Over Small Stream.
Bridge Replacement
DOT Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00037119
Harrison County
BROS-SWAP-C043(90)--SE-43
On PARKER TRL, Over BOYER RIVER, S4 T79 R42
Bridge Replacement
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,415,000
$1,400,000
$1,415,000
$1,400,00032804
Mills County
BROS-SWAP-C065(115)--FE-65
On Paddock Ave, Over Local Creek, in NE S21 T71 R43
Bridge Replacement
DOT Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00045569
Harrison County
BRS-SWAP-C043(89)--FF-43
On F 50, Over ALLEN CREEK, S35 T79 R44
Bridge Replacement
DOT Approved
10/19/2021
TotalFederal Aid
RegionalSwap
$660,000
$650,000
$660,000
$650,00032693
Harrison County
BROS-SWAP-C043(Cass2)--SE-43
On VIENNA AVE, Over PIGEON CREEK, from 220th St. S0.3 miles S1 T79 R41
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00035284
Mills County
BROS-SWAP-C065()--SE-65
On 400th Street, Over Indian Creek, on ELINE S27 T72R40
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00018229
PottawattamieCounty
BROS-SWAP-C078(177)--SE-78
On 210TH ST, Over PIGEON CREEK, S27 T77 R43
Bridge Replacement
DOT Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,00020363
Mills County
BHOS-SWAP-C065(84)--FB-65
On M 21, Over FARM CREEK, S15 T73 R40
Bridge Rehabilitation
DOT Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00045577
Harrison County
BRS-SWAP-C043(Mog3)--FF-43
On K 45, Over STREAM, from Eden Ave N 0.1 miles S13T80 R45
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$310,000
$310,000
$310,000
$310,000
310
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
36497
Harrison County
BROS-SWAP-C043(SJ10)--SE-43
On Canal St. Over WILLOW RIVER, from Kenton Ave W0.1 miles S21 T78 R44
Bridge Replacement
DOT Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00013048
PottawattamieCounty
BRS-SWAP-C078()--FF-78
On G 18, Over BNSF RR, S19 T77 R41
Bridge Removal
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,000
311
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
35296
Mills County
STBG-SWAP-C065(114)--FG-65
On L55, from H20 N 3.1 miles to Dobney Avenue
Pavement Rehab
DOT Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$1,800,000
$400,000
$400,000
$1,800,000
$400,000
$400,00021847
PottawattamieCounty
STBG-SWAP-C078(205)--FG-78
On M 47, from Highway 6 N 5 miles to G30
Pavement Rehab, Patching
DOT Approved
2/15/2022
TotalFederal Aid
RegionalSwap
$1,900,000
$1,000,000
$1,000,000
$1,900,000
$1,000,000
$1,000,00037436
Harrison County
STBG-SWAP-C043(L16)--FG-43
On L16, from Willow Creek N 6.6 Miles to Monona CountyLine
Pave, Granular Shoulders
DOT Approved TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,000
$1,200,000
$1,200,00035289
Mills County
STBG-SWAP-C065()--FG-65
On Gaston Ave. , from 245th Street East 4.0 Miles to 287thStreet
Pavement Rehab/Widen
DOT Approved TotalFederal Aid
RegionalSwap
$1,500,000
$500,000
$500,000
$1,500,000
$500,000
$500,00044761
Harrison County
STBG-SWAP-C043(F66)--FG-43
On F-66 (335th Street), from Seward Ave E 4 miles to Hwy191
Pave
DOT Approved TotalFederal Aid
RegionalSwap
$360,000
$145,000
$145,000
$360,000
$145,000
$145,00035293
Mills County
STBG-SWAP-C065()--FG-65
On L-63, Over SILVER CREEK, from Malvern City LimitsSouth 7 miles to Fremont County Line
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,000,000
$1,250,000
$1,250,000
$2,000,000
$1,250,000
$1,250,00045729
Harrison County
STBG-SWAP-C043(L20s)--FG-43
On L-20, Under CPRR, from Pott Co. N 3.4 miles to UP RRXING
DOT Approved TotalFederal Aid
RegionalSwap
$964,000
$884,000
$884,000
$964,000
$884,000
$884,00035291
Mills County
STBG-SWAP-C065()--FG-65
On L-31, from Jenkins Ave. N 1.5 miles to HWY U.S.34
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$320,000
$320,000
$320,000
$320,000
$320,000
$320,00032566
PottawattamieCounty
STBG-SWAP-C078()--FG-78
On G30, from Mosquito Creek Bridge East 8 Miles to L66
Pavement Rehab, Patching, Pavement Planing
DOT Approved TotalFederal Aid
RegionalSwap
$1,925,000
$325,000
$325,000
$1,925,000
$325,000
$325,000
312
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2022 2023 2024 2025 Totals
38726
Shelby County
STBG-SWAP-C083()--FG-83
On M-16, from City Limits of Shelby, Iowa 14 miles toCounty Road F-32
Pavement Rehab
DOT Approved TotalFederal Aid
RegionalSwap
$2,000,000
$1,800,000
$1,800,000
$2,000,000
$1,800,000
$1,800,000
313
RPA-00 / Statewide (4 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5311 OPT 4978 Interregional Express Bus (IRXB) Total 1,787,289 Operations FA 1,429,831 Other SA 357,458
5311 OPT 6519 Intercity Bus Assistance Program Total 6,448,053 Operations FA 2,149,351 Other SA
5311 OPT 6520 RTAP Program Total 240,024 Operations FA 240,024 Other SA
STA OPT 6521 Urban Fellowships Total 150,000 Operations FA Other SA 150,000
314
MPO-22 / AAMPO (51 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
PTIG Ames 6493 HVAC Phase III - Tire Shop, Paint/Body Shop, Bus Vehicle Exhaust Total 510,618 Capital FA Rehabilitation SA 408,494
5307 Ames 6495 Miscellaneous Equipment (Chargers & Dispensers) Total 300,000 Operations FA 240,000 Other SA
5307 Ames 6496 Bus Storage Rehabilitation Total 54,986 Capital FA 43,989 Rehabilitation SA
5307 Ames 6511 West Ames Service Modifications (Yr. 3) Total 400,465 Operations FA 320,372 Expansion SA
5307 Ames 6512 Cherry Night Service (Yr. 2) Total 41,930 Operations FA 33,544 Expansion SA
5307 Ames 6513 Lilac Midday Service (Yr. 2) Total 39,569 Operations FA 31,655 Expansion SA
5307 Ames 6514 Brown Night Service (Year 2) Total 37,480 Operations FA 29,984 Expansion SA
5310 Ames 6488 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 07654 SA
5310 Ames 6489 Conversion Van Total 63,261 Capital FA 53,772 Replacement Unit #: 07655 SA
5310 Ames 6490 Infotainment LED Signage Total 44,634 Capital FA 35,707 Expansion SA
STA, 5307 Ames 914 General Operations Total 12,540,004 13,041,604 13,563,268 14,105,798Operations FA 7,000,000 2,700,000 2,800,000 2,900,000Misc SA 869,019 900,000 900,000 900,000
5339 Ames 3314 Maintenance Facility Expansion Total 3,500,000 6,250,000 Capital FA 2,800,000 5,000,000 Expansion SA
5339 Ames 4661 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09075 SA
5339 Ames 4663 Heavy Duty Bus (40-42 ft.) Total 517,615 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973 Replacement Unit #: 00954 SA
5339 Ames 4664 Heavy Duty Bus (40-42 ft.) Total 517,615 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973 Replacement Unit #: 00953 SA
315
MPO-22 / AAMPO (51 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Ames 4665 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09072 SA
5339 Ames 4666 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09074 SA
5339 Ames 5097 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09070 SA
5339 Ames 5098 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09071 SA
5339 Ames 5099 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09077 SA
5339 Ames 5555 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09073 SA
5339 Ames 5563 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 09076 SA
5339 Ames 5564 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital Diesel, UFRC, Low Floor, BioDiesel, Electric FA 739,500 Replacement Unit #: 00950 SA
5339 Ames 5565 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital Diesel, UFRC, Low Floor, BioDiesel, Electric FA 739,500 Replacement Unit #: 00952 SA
5339 Ames 5566 Heavy Duty Articulated Bus Total 568,750 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 483,438 Replacement Unit #: 00951 SA
5339 Ames 5567 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel, Electric FA 739,500 Replacement Unit #: 00949 SA
5307 Ames 5568 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital UFRC, Low Floor, Electric FA 739,500 Replacement Unit #: 00504 SA
5307 Ames 5569 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital Diesel, UFRC, Low Floor, BioDiesel, Electric FA 739,500 Replacement Unit #: 00501 SA
STP Ames 5575 Heavy Duty Articulated Bus Total 281,250 281,250 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 225,000 225,000 Expansion SA
5310 Ames 6012 Annunciator Annual Service Fees Total 142,116 95,000 95,000 95,000Operations FA 113,693 76,000 76,000 76,000Misc SA
316
MPO-22 / AAMPO (51 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Ames 6015 Heavy Duty Articulated Bus Total 568,750 Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 483,438 Replacement Unit #: 00502 SA
5307 Ames 6016 Heavy Duty Bus (40-42 ft.) Total 870,000 Capital UFRC, VSS, Low Floor, Electric FA 739,500 Replacement Unit #: 00503 SA
5339 Ames 6017 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 00188 SA
5339 Ames 6018 Heavy Duty Bus (40-42 ft.) Total 512,709 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 00186 SA
5339 Ames 6019 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 00189 SA
5339 Ames 6020 Heavy Duty Bus (40-42 ft.) Total 512,710 Capital Diesel, UFRC, Low Floor, BioDiesel FA 435,803 Replacement Unit #: 00187 SA
5310 Ames 919 Contracted Paratransit Service Total 162,500 162,500 162,500Capital FA 130,000 130,000 130,000Misc SA
5310 Ames 920 Associated Transit Improvements Total 50,000 50,000 50,000Capital FA 40,000 40,000 40,000Replacement SA
5339 Ames 6022 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00418 SA
5339 Ames 6469 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00419 SA
5339 Ames 6470 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00420 SA
5339 Ames 6471 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00421 SA
5339 Ames 6472 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00422 SA
5339 Ames 6473 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00423 SA
5339 Ames 6474 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00424 SA
317
MPO-22 / AAMPO (51 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Ames 6475 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00425 SA
5339 Ames 6476 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00429 SA
5339 Ames 6477 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00430 SA
5339 Ames 6478 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00431 SA
5339 Ames 6479 Heavy Duty Bus (40-42 ft.) Total 528,091 Capital Diesel, UFRC, Low Floor, BioDiesel FA 448,877 Replacement Unit #: 00432 SA
STP Ames 6480 Heavy Duty Bus (40-42 ft.) Total 281,250 Capital Diesel, UFRC, VSS, Low Floor, Electric FA 225,000 Other SA
318
MPO-23 / CMPO (10 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STA, 5307,5310
Cedar Rapids 960 General Ops./Maint./Admin. Total 10,440,000 10,490,000 10,540,000 10,590,000Operations FA 3,150,000 3,150,000 3,150,000 3,150,000Misc SA 690,000 690,000 690,000 690,000
STP Cedar Rapids 4986 CR Transit - Purchase 2 Heavy-Duty (35' diesel) Replacing bus #s 2093 &2094
Total 1,142,000
Capital FA 767,000 Replacement SA
STP Cedar Rapids 4987 CR Transit - 1 medium-duty 32' ADA paratransit bus; Replacing bus#2403 Total 220,000 Capital FA 148,000 Replacement SA
STP Cedar Rapids 5322 CR Transit - Purchase 2 Heavy-duty buses Replacing bus #s 2131 & 2132 Total 1,116,000 Capital FA 893,000 Other SA
STP Cedar Rapids 5323 CR Transit - Purchase 1 medium-duty bus; Replacing bus#2875 Total 215,000 Capital FA 172,000 Replacement SA
STP MPO-23 5639 Edgewood Road Transit Stops and Sidewalk Total 554,000 Capital FA 325,000 Expansion SA
STP Cedar Rapids 5872 CR Transit - 1 medium-duty 32' ADA paratransit bus - Replacing bus#2876 Total 215,000 Capital FA 172,000 Replacement SA
STP Cedar Rapids 5873 CR Transit - Purchase 2 Heavy-duty replacement buses - bus #s 2133 &2134
Total 1,116,000
Capital FA 893,000 Replacement SA
5307 Cedar Rapids 6228 Medium Duty Bus (29-32 ft.) Total 215,000Capital Diesel FA 172,000Replacement SA
5307 Cedar Rapids 6229 Heavy Duty Bus (35-39 ft.) Total 1,116,000Capital FA 893,000Replacement SA
319
MPO-24 / MAPA (7 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5310 Region 13 / SWITA 5666 Non-ADA Standard Minivan Total 38,750 Capital Low Floor FA 31,000 Expansion SA
STA, 5307 Council Bluffs 3036 General Operations Maint./Admin Total 1,152,000 1,152,000 1,152,000 Operations FA 273,000 273,000 273,000 Other SA 175,000 175,000 175,000
5310 Council Bluffs 3796 Council Bluffs Special Transit Service (STS) Contracting Total 89,040 175,000 175,000 160,000Capital FA 44,520 87,500 87,500 80,000Other SA
5310 Council Bluffs 6085 Light Duty Bus (158" wb) Total 84,000 Capital Low Floor FA 67,200 Replacement Unit #: AG3 SA
5310 Council Bluffs 6086 Light Duty Bus (158" wb) Total 84,000 Capital Low Floor FA 67,200 Replacement Unit #: AG2A SA
5310 Council Bluffs 6087 Light Duty Bus (158" wb) Total 92,500 Capital Low Floor FA 74,000 Replacement Unit #: AG8 SA
5310 Council Bluffs 6549 Light Duty Bus (158" wb) Total 92,500 Capital FA 74,000 Replacement SA
320
MPO-25 / BSRC (14 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STA, 5307 BMTA 985 General Operations Total 819,545 844,132 869,456 895,540Operations FA 131,127 135,061 139,113 143,286Misc SA 204,304 201,790 199,771 215,857
5307 BMTA 987 Preventative Maintenance Total 186,718 192,320 198,090 204,032Capital FA 149,374 153,856 158,472 163,226Replacement SA
5307 BMTA 993 Transit Planning Total 33,951 34,969 36,018 37,099Planning FA 27,161 27,976 28,815 29,679Misc SA
STA, 5307,5310
BMTA 3787 ADA Operations Total 249,829 257,948 266,332 274,987Operations FA 199,863 206,358 213,066 219,990Other SA 49,966 51,590 53,266 54,997
5307 BMTA 5657 ADP Software Total 16,000 16,000 16,000 16,000Capital FA 12,800 12,800 12,800 12,800Misc SA
STA, 5307 Davenport 979 General Operations Total 5,135,817 5,135,817 5,135,817 5,135,817Operations FA 850,000 850,000 850,000 850,000Misc SA 500,000 500,000 500,000 500,000
5307 Davenport 980 Preventative Maintenance Total 792,227 792,227 792,227 792,227Capital FA 530,000 530,000 530,000 530,000Replacement SA
5310 Davenport 981 ADA Paratransit Assistance Total 622,854 622,854 622,854 622,854Operations FA 115,000 115,000 115,000 115,000Misc SA
5307 Davenport 2595 Bus Amenities Total 60,000 60,000 60,000 60,000Capital FA 48,000 48,000 48,000 48,000Expansion SA
5310 Davenport 3022 JARC Projects Total 152,982 152,982 152,982 152,982Operations FA Other SA
5303 MPO-25 2203 MPO Transit Planning Total 76,246 76,246 76,246 76,246Planning FA 60,997 60,997 60,997 60,997Other SA
5339 Davenport 6539 Bus Shelters Total 150,000 Capital FA 120,000 Expansion SA
5339 BMTA 6079 Bus Replacement Total 439,040 Capital FA 373,184 Replacement SA
5307, 5339 Davenport 6540 Heavy Duty Bus (35-39 ft.) Total 1,700,000 1,700,000Capital FA 1,360,000 1,360,000Replacement SA
321
MPO-26 / DMAMPO (34 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5307 Des Moines DART 1027 Security/Safety Improvements at Facilities Total 200,000 10,000 Capital FA 160,000 8,000 Replacement SA
5307 Des Moines DART 1042 Support Vehicles Total 185,000 425,000 Capital FA 148,000 340,000 Replacement SA
ICAAP Des Moines DART 6499 Route 17 Extension to Bondurant Total 65,335 67,295 13,460 Operations FA 52,267 53,835 Expansion SA
5307 Des Moines DART 6501 Support Equipment Total 110,000 Capital FA 88,000 Replacement SA
5307 Des Moines DART 6502 Radio System Replacement Total 763,125 363,125 Capital FA 610,500 290,500 Replacement SA
5307 Des Moines DART 6504 Safety/Security Improvements for Fleet - Operator Barriers Total 1,200,000 Capital FA 960,000 Expansion SA
STA Des Moines DART 995 General Operations/Maintenance/Administration Total 2,343,131 2,389,994 2,437,794 2,486,550Operations FA Misc SA 1,874,505 1,911,995 1,950,235 1,989,240
5311 Des Moines DART 996 Operations for Rural Services Total 26,260 26,786 27,322 27,870Operations FA 13,130 13,393 13,661 13,935Misc SA
5310 Des Moines DART 997 Subcontracted Paratransit Operations Total 50,000 112,500 152,500 168,750Operations FA 40,000 90,000 122,000 135,000Misc SA
5307 Des Moines DART 1020 Preventive Maintenance Total 3,437,500 3,437,500 3,437,500 3,437,500Operations FA 2,750,000 2,750,000 2,750,000 2,750,000Misc SA
5307 Des Moines DART 1021 ADA Paratransit Total 593,750 593,750 593,750 593,750Operations FA 475,000 475,000 475,000 475,000Misc SA
5307 Des Moines DART 1024 Admin and Maint. Facility Engineering and Design Total 50,000 25,000 10,000 10,000Capital FA 40,000 20,000 8,000 8,000Replacement SA
5307 Des Moines DART 1026 Facility Renovations Total 82,500 147,500 10,000 10,000Capital FA 66,000 118,000 8,000 8,000Replacement SA
5307 Des Moines DART 2480 Twenty Lease Buses - 20 (2015 Lease) Total 845,000 845,000 845,000 845,000Capital FA 676,000 676,000 676,000 676,000Replacement SA
5307 Des Moines DART 2482 Computer Software Total 200,000 10,000 10,000 10,000Capital FA 160,000 8,000 8,000 8,000Replacement SA
322
MPO-26 / DMAMPO (34 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5307 Des Moines DART 1028 Shop and Garage Equipment Total 125,000 25,000 25,000 25,000Capital FA 100,000 20,000 20,000 20,000Replacement SA
5307 Des Moines DART 1029 Miscellaneous Equipment Total 10,000 10,000 10,000 10,000Capital FA 8,000 8,000 8,000 8,000Replacement SA
5307 Des Moines DART 1030 Computer Hardware Total 60,000 61,250 70,000 40,000Capital FA 48,000 49,000 56,000 32,000Replacement SA
STP, 5307,5310
Des Moines DART 1032 Associated Transit Improvements Total 677,030 234,375 217,500 375,000Capital FA 541,624 187,500 174,000 300,000Replacement SA
PTIG, 5339,5307
Des Moines DART 5115 New Maintenance & Operations Facility Total 20,120,000 2,443,750 1,625,000 Capital FA 15,496,000 1,455,000 1,300,000 Replacement SA 600,000 500,000
STP, 5307 Des Moines DART 5673 Four Heavy-Duty Articulated Buses w/Surv. & AVL Total 3,952,001 Capital FA 3,271,063 Replacement SA
5310 Des Moines DART 6506 Microtransit Operating Total 92,000 94,000 96,000 Operations FA 46,000 47,000 48,000 Other SA
5310, 5307 Des Moines DART 6508 Two less than 30' Buses w/Surv., Fareboxes & AVL Total 281,216 Capital FA 239,034 Replacement SA
5307, 5310 Des Moines DART 6507 Four Less Than 30' Buses w/Surv., Fareboxes & AVL Total 584,929 Capital FA 497,190 Replacement SA
5307 Des Moines DART 6503 Mobile Ticketing Platform Total 25,000 Capital FA 20,000 Replacement SA
STP, 5307,5339
Des Moines DART 4762 Six to Seven Heavy-Duty Buses w/Surv. & AVL Total 3,405,538 4,241,252 4,410,902Capital FA 2,807,207 3,520,377 3,661,767Replacement SA
ICAAP Des Moines DART 3120 Express Service Improvements Total 206,000 212,180 218,546Operations FA 164,800 169,744 174,836Expansion SA
5307 Des Moines DART 1046 RideShare Vehicles (Repl/Exp) Total 720,000 675,000 701,250Capital FA 576,000 540,000 561,000Replacement SA
ICAAP Des Moines DART 1049 Park & Ride Lot Total 500,000 Capital FA 400,000 Expansion SA
ICAAP Des Moines DART 1756 Local Routes Service Improvements Total 309,000 318,270 327,819Operations FA 247,200 254,616 262,255Expansion SA
323
MPO-26 / DMAMPO (34 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5307 Des Moines DART 6536 Mobility on Demand Total 62,500 62,500Capital FA 50,000 50,000Other SA
5307, 5310 Des Moines DART 4292 Six Less Than 30' Buses w/Surv., Fareboxes & AVL Total 912,489 948,989Capital FA 775,616 806,641Replacement SA
5307 Des Moines DART 6505 One 40' Heavy-Duty Electric Bus W/Surv., Farebox & AVL Total 950,000Capital FA 760,000Replacement SA
5309 Des Moines DART 3867 Enhanced Corridors Total 25,000,000Capital FA 20,000,000Expansion SA
324
MPO-27 / DMATS (3 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5307 Dubuque 6523 5307 FTA Formula Funding Total 2,585,504 Operations FA 1,292,752 Other SA
5310 Dubuque 6524 5310 Preventative Maintenance Total 76,746 Operations FA 61,397 Other SA
STA Dubuque 6525 STA Operating Funding Total 655,308 Operations FA Other SA 327,654
325
MPO-28 / MPOJC (50 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STA, 5307,5310
CAMBUS 6440 General operations/maintenance/administration/planning Total 4,219,849 Operations FA 822,687 Misc SA 805,666
5339 CAMBUS 6441 In-ground hoist system Total 120,000 Capital FA 96,000 Expansion SA
5339 CAMBUS 6442 Associated capital bus maintenance (spare parts) Total 200,000 Capital FA 160,000 Replacement SA
5339 CAMBUS 6443 6 replacement passenger shelters Total 90,000 Capital FA 72,000 Replacement SA
5339 CAMBUS 6444 Forklift for maintenance Total 60,000 Capital FA 48,000 Replacement SA
5339 CAMBUS 6445 Expansion and upgrade of maintenance facility Total 5,250,000 Capital FA 4,200,000 Replacement SA
5339 CAMBUS 6446 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 11 SA
5339, 5310 CAMBUS 6447 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 12 SA
5339 CAMBUS 6448 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 94 SA
5339 CAMBUS 6449 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 95 SA
5339 CAMBUS 6450 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 96 SA
5339 CAMBUS 6451 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 97 SA
5339 CAMBUS 6452 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 98 SA
5339 CAMBUS 6453 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 99 SA
5339 CAMBUS 6454 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 100 SA
326
MPO-28 / MPOJC (50 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 CAMBUS 6455 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 101 SA
5339 CAMBUS 6456 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 102 SA
5339 CAMBUS 6457 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 103 SA
5339 CAMBUS 6458 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 104 SA
5339 CAMBUS 6459 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 105 SA
5310 Coralville 6408 Contract services for persons with special needs Total 334,800 Operations FA 32,664 Misc SA
5339 Coralville 6409 Associated capital bus maintenance (spare parts) Total 75,000 Capital FA 60,000 Misc SA
5339 Coralville 6411 Design and construction of Intermodal Transportation Center/Phase II Total 10,500,000 Capital FA 8,400,000 Expansion SA
5339 Coralville 6412 Construct new Transit Facility/Phase II Total 1,500,000 Capital FA 1,200,000 Expansion SA
5339 Coralville 6414 Two passenger shelters and associated improvements Total 14,000 Capital FA 11,200 Replacement SA
5339 Coralville 6415 Three passenger shelters and associated improvements Total 21,000 Capital FA 16,800 Expansion SA
5339 Coralville 6416 Shop equipment for transit maintenance (armature lathe, misc) Total 75,000 Operations FA 60,000 Other SA
5339 Coralville 6417 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 108 SA
5339 Coralville 6418 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 109 SA
5339 Coralville 6419 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 110 SA
327
MPO-28 / MPOJC (50 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Coralville 6420 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 111 SA
5339 Coralville 6421 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 112 SA
5339 Coralville 6422 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Expansion SA
5339 Coralville 6423 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Expansion SA
5339 Coralville 6424 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital UFRC, VSS, Low Floor FA 444,303 Expansion SA
5339 Coralville 6425 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Expansion SA
5339 Coralville 6426 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Expansion SA
5339 Coralville 6427 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Expansion SA
5339 Coralville 6428 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Expansion SA
STA, 5307 Coralville 6231 General Operations/Maintenance/Administration/Planning Total 2,070,641 Operations FA 550,000 Misc SA 304,111
STA, 5307 Iowa City 6226 General operations/maintenance/administrative/planning Total 8,660,631 Operations FA 1,900,000 Misc SA 554,905
5310 Iowa City 6227 Contracted services for people with special needs Total 1,800,000 Operations FA 119,186 Misc SA
5339 Iowa City 6430 Passenger shelters and associated improvements Total 50,000 Capital FA 40,000 Expansion SA
5339 Iowa City 6431 Associated capital bus maintenance (spare parts) Total 338,000 Capital FA 270,400 Replacement SA
5339 Iowa City 6432 New transit maintenance/bus storage facility Total 20,000,000 Capital FA 16,000,000 Replacement SA
328
MPO-28 / MPOJC (50 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Iowa City 6433 Heavy Duty Bus (40-42 ft.) Total 1,089,539 Capital UFRC, VSS, Low Floor, Electric FA 926,108 Replacement Unit #: 656 SA
5339 Iowa City 6434 Heavy Duty Bus (40-42 ft.) Total 1,089,539 Capital UFRC, VSS, Low Floor, Electric FA 926,108 Replacement Unit #: 658 SA
5339 Iowa City 6435 Heavy Duty Bus (40-42 ft.) Total 1,089,539 Capital UFRC, VSS, Low Floor, Electric FA 926,108 Replacement Unit #: 660 SA
5339 Iowa City 6436 Heavy Duty Bus (40-42 ft.) Total 1,089,539 Capital UFRC, VSS, Low Floor, Electric FA 926,108 Replacement Unit #: 661 SA
5339 Iowa City 6439 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 810 SA
329
MPO-29 / SIMPCO (28 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5311 MPO-29 1313 FTA Planning Total 54,089 54,089 54,089 54,089Planning FA 43,271 43,271 43,271 43,271Misc SA
5310 Sioux City 6265 Capital projects & Svc exceeding ADA Requirements, & Sat. SSC Rides Total 17,898 Capital FA 14,318 Other SA
STA Sioux City 6266 MLK structural rehabilitation, concrete sealing, and concrete repairs Total 75,000 Capital FA Rehabilitation SA 60,000
PTIG, 5339 Sioux City 6267 Replacement of Transit Maintenance & Storage Facility - NEW BUILDING Total 10,000,000 Capital FA 7,520,000 Replacement SA 600,000
STA, 5307 Sioux City 6268 Governor's apportionment for 5307 from IA, NE, & SD plus Iowa STA Total 3,762,249 Operations FA 1,694,749 Other SA 371,751
PTIG, 5307 Sioux City 6344 MLK Boiler and Chiller Equipment repairs and replacement Total 40,000 Capital FA 8,000 Rehabilitation SA 24,000
STA, PTIG,5307
Sioux City 6345 MLK Heat Pump replacements - five (5) units Total 85,000 Capital FA 68,000 Replacement SA
PTIG, 5339 Sioux City 6346 Transit Garage remodeling - battery electric buses & charging stations Total 50,000 Capital FA 45,000 Rehabilitation SA
STA, 5307 Sioux City 6347 New Project Total 50,000 Capital FA 40,000 Replacement Unit #: 1303 -F350 Service Truck SA
5307 Sioux City 6348 Consultant to review op. system - recommend updates/new tech Total 60,000 Operations FA 48,000 Other SA
5307 Sioux City 6350 New Project Total 65,000 Capital FA 52,000 Replacement Unit #: 1304 F450 Service Truck SA
5339, 5307 Sioux City 6352 Heavy Duty Bus (30-34 ft.) Total 900,000 Capital UFRC, VSS, Low Floor, Electric FA 765,000 Replacement Unit #: 1324 Electric Replacement SA
5339, 5307 Sioux City 6353 Medium Duty Bus (29-32 ft.) Total 900,000 Capital UFRC, VSS, Low Floor, Electric FA 765,000 Replacement Unit #: 1325 Electric Replacement SA
5339, 5307 Sioux City 6354 New Project Total 900,000 Capital UFRC, VSS, Low Floor, Electric FA 765,000 Replacement Unit #: 1326 Electric Replacement SA
5307 Sioux City 6355 Heavy Duty Bus (35-39 ft.) Total 497,149 Capital Diesel, UFRC, VSS, Low Floor FA 422,577 Replacement Unit #: 1331 SA
330
MPO-29 / SIMPCO (28 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339, 5307 Sioux City 6356 Heavy Duty Bus (30-34 ft.) Total 900,000 Capital UFRC, VSS, Low Floor, Electric FA 765,000 Replacement Unit #: 1332 Electric Replacement SA
5339, 5307 Sioux City 6357 Heavy Duty Bus (35-39 ft.) Total 900,000 Capital UFRC, VSS, Low Floor, Electric FA 765,000 Replacement Unit #: 1338 Electric Replacement SA
5307 Sioux City 6358 Heavy Duty Bus (35-39 ft.) Total 497,149 Capital Diesel, UFRC, VSS, Low Floor FA 422,577 Replacement Unit #: 1339 SA
5307, 5339 Sioux City 6359 Heavy Duty Bus (35-39 ft.) Total 497,149 Capital Diesel, UFRC, VSS, Low Floor FA 422,577 Replacement Unit #: 1340 SA
5307, 5339 Sioux City 6360 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital Diesel, UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 1341 SA
5307 Sioux City 6361 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital Diesel, UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 1352 SA
5307 Sioux City 6362 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital Diesel, UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 1353 SA
5307 Sioux City 6363 Heavy Duty Bus (40-42 ft.) Total 522,709 Capital Diesel, UFRC, VSS, Low Floor FA 444,303 Replacement Unit #: 1354 SA
PTIG, 5307 Sioux City 6364 Replacement Bus Wash Equipment for Transit Garage Total 300,000 Capital FA Replacement SA 240,000
PTIG, 5339,5307
Sioux City 6365 Electric Infrastructure Remodeling of Transit Garage for Electric Bus Fleet Total 50,000 Capital FA Rehabilitation SA 40,000
PTIG, 5307,5339
Sioux City 6366 Replacement automatic sliding doors for MLK Total 40,000 Capital FA Replacement SA 32,000
PTIG, 5339,5307
Sioux City 6367 Install two electric vehicle charging stations in Transit Garage Total 136,000 Capital FA 108,800 Other SA
5310 Sioux City 6515 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1355 SA
331
MPO-30 / INRCOG (40 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Waterloo MET 6304 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS FA 168,512 Replacement Unit #: 512 SA
5339 Waterloo MET 6307 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 503 SA
5339 Waterloo MET 6308 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 702 SA
5339 Waterloo MET 6309 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 412 SA
5339 Waterloo MET 6310 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 902 SA
5339 Waterloo MET 6311 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 901 SA
5339 Waterloo MET 6312 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 116 SA
5339 Waterloo MET 6313 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 216 SA
5339 Waterloo MET 6314 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 301 SA
5339 Waterloo MET 6315 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 415 SA
5339 Waterloo MET 6316 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 515 SA
5339 Waterloo MET 6317 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 615 SA
5339 Waterloo MET 6328 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 210D SA
5339 Waterloo MET 6329 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 310D SA
5339 Waterloo MET 6330 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 903 SA
332
MPO-30 / INRCOG (40 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Waterloo MET 6331 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 110 SA
5307 Waterloo MET 1168 General Operations/Maintenance/Administration/Planning Total 5,400,000 5,600,000 6,000,000 6,600,000Operations FA 2,700,000 2,800,000 3,000,000 3,300,000Misc SA
5303, 5303 Waterloo MET 2128 Planning Total 120,000 120,000 120,000 120,000Planning FA 96,000 96,000 96,000 96,000Other SA
5310 Waterloo MET 2278 Preventative Maintenance Total 94,000 94,000 94,000 94,000Capital FA 75,200 75,200 75,200 75,200Other SA
STA Waterloo MET 2279 State Transit Operating Total 340,000 345,000 375,000 405,000Operations FA Other SA 340,000 345,000 375,000 405,000
5339 Waterloo MET 4324 Heavy Duty Bus (35-39 ft.) Total 497,149 Capital Diesel, UFRC, VSS, Low Floor FA 422,577 Replacement Unit #: 410 SA
5339 Waterloo MET 4325 Heavy Duty Bus (35-39 ft.) Total 497,149 Capital Diesel, UFRC, VSS, Low Floor FA 422,577 Replacement Unit #: 510D SA
5339 Waterloo MET 5848 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 218 SA
5339 Waterloo MET 5849 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS FA 168,512 Replacement Unit #: 315 SA
5339 Waterloo MET 5850 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS FA 168,512 Replacement Unit #: 117 SA
5339 Waterloo MET 5279 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS FA 168,512 Replacement Unit #: 115 SA
5339 Waterloo MET 5280 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS FA 168,512 Replacement Unit #: 215 SA
5339 Waterloo MET 5277 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 212 SA
5339 Waterloo MET 5278 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 312 SA
5339 Waterloo MET 6333 Heavy Duty Bus (30-34 ft.) Total 479,300 Capital Diesel, UFRC, VSS, Low Floor FA 407,405 Replacement Unit #: 113 SA
333
MPO-30 / INRCOG (40 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Waterloo MET 6335 Heavy Duty Bus (30-34 ft.) Total 489,300 Capital Diesel, UFRC, VSS, Low Floor FA 415,905 Replacement Unit #: 112 SA
5339 Waterloo MET 5854 Light Duty Bus (176" wb) Total 110,000 Capital Diesel, VSS FA 93,500 Replacement Unit #: 120 SA
5339 Waterloo MET 5702 Heavy Duty Bus (30-34 ft.) Total 495,268 Capital Diesel, UFRC, VSS, Low Floor FA 420,978 Replacement Unit #: 114 SA
5339 Waterloo MET 6320 Heavy Duty Bus (35-39 ft.) Total 495,268 Capital Diesel, UFRC, VSS FA 420,978 Replacement Unit #: 214 SA
5339 Waterloo MET 6321 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Replacement Unit #: 320 SA
5339 Waterloo MET 6322 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Replacement Unit #: 420 SA
5339 Waterloo MET 6323 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Replacement Unit #: 520 SA
5339 Waterloo MET 6324 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Expansion Unit #: 620 SA
5339 Waterloo MET 6325 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Replacement Unit #: 720 SA
5339 Waterloo MET 6326 Light Duty Bus (176" wb) Total 110,000Capital Diesel, VSS FA 93,500Replacement Unit #: 820 SA
334
RPA-01 (12 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STA, PTIG,5311
Region 1 /NEICAC-Transit
4179 General Operations/Maintenance/Administration Total 1,140,000 1,151,000 Operations FA 690,000 700,000 Other SA 450,000 451,000
5339 Region 1 /NEICAC-Transit
4639 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 12052 SA
5339 Region 1 /NEICAC-Transit
4642 Light Duty Bus (176" wb) Total 93,700 Capital VSS FA 79,645 Replacement Unit #: 10185 SA
5339 Region 1 /NEICAC-Transit
4644 Light Duty Bus (176" wb) Total 93,700 Capital VSS FA 79,645 Replacement Unit #: 10187 SA
5339 Region 1 /NEICAC-Transit
4645 Minivan Total 53,500 Capital VSS FA 45,475 Replacement Unit #: 12053 SA
5339 Region 1 /NEICAC-Transit
4646 Minivan Total 53,500 Capital VSS FA 45,475 Replacement Unit #: 12054 SA
5339 Region 1 /NEICAC-Transit
4649 Light Duty Bus (176" wb) Total 93,700 Capital VSS FA 79,645 Replacement Unit #: 11184 SA
5339 Region 1 /NEICAC-Transit
4651 Light Duty Bus (176" wb) Total 93,700 Capital VSS FA 79,645 Replacement Unit #: 12186 SA
5339 Region 1 /NEICAC-Transit
4652 Light Duty Bus (176" wb) Total 93,700 Capital VSS FA 79,645 Replacement Unit #: 12187 SA
5339 Region 1 /NEICAC-Transit
4653 Minivan Total 53,500 Capital VSS FA 45,475 Replacement Unit #: 14054 SA
5339 Region 1 /NEICAC-Transit
4654 Minivan Total 53,500 Capital VSS FA 45,475 Replacement Unit #: 14055 SA
PTIG Region 1 /NEICAC-Transit
1220 Maintenance Facility HVAC Upgrade Total 100,000Capital FA Rehabilitation SA 80,000
335
RPA-02 (83 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STA, 5311 Mason City 4697 General Operations Total 1,581,060 1,648,738 1,698,200 Operations FA 625,542 664,555 684,492 Other SA 329,976 339,875 350,071
STA, 5311,5310
Region 2 / NIARTS 1238 General Operations/Maintenance/Administration Total 2,639,425 3,087,082 3,241,436 3,338,678Operations FA 778,296 859,257 902,220 929,286Misc SA 486,912 499,968 524,966 540,715
5339 Region 2 / NIARTS 2816 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: D074 SA
5339 Region 2 / NIARTS 2824 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D067 SA
5339 Region 2 / NIARTS 4863 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: M006 SA
5339 Region 2 / NIARTS 4865 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: T001 SA
5339 Region 2 / NIARTS 4867 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D073 SA
5339 Region 2 / NIARTS 4868 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 1001 SA
5339 Region 2 / NIARTS 4869 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 1002 SA
5339 Region 2 / NIARTS 6232 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 9010 SA
5339 Region 2 / NIARTS 6233 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 9015 SA
5339 Region 2 / NIARTS 6235 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: B019 SA
5339 Region 2 / NIARTS 6236 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: B021 SA
5339 Region 2 / NIARTS 6237 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D069 SA
5339 Region 2 / NIARTS 6238 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D070 SA
336
RPA-02 (83 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 2 / NIARTS 6239 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D071 SA
5339 Region 2 / NIARTS 6240 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D076 SA
5339 Region 2 / NIARTS 6241 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D077 SA
5339 Region 2 / NIARTS 6242 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D078 SA
5339 Region 2 / NIARTS 6243 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D079 SA
5339 Region 2 / NIARTS 6245 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: U003 SA
5339 Region 2 / NIARTS 6246 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: W005 SA
5339 Mason City 4876 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 49 SA
5339 Mason City 4877 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 50 SA
5339 Region 2 / NIARTS 6105 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D084 SA
5339 Region 2 / NIARTS 6106 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: B018 SA
5339 Region 2 / NIARTS 6107 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D089 SA
5339 Region 2 / NIARTS 6108 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: B020 SA
5339 Region 2 / NIARTS 6109 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D088 SA
5339 Region 2 / NIARTS 6110 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D090 SA
337
RPA-02 (83 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 2 / NIARTS 6111 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D081 SA
5339 Region 2 / NIARTS 6112 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D083 SA
5339 Region 2 / NIARTS 6113 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D087 SA
5339 Region 2 / NIARTS 6114 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D082 SA
5339 Region 2 / NIARTS 6115 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: E009 SA
5339 Region 2 / NIARTS 6116 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D092 SA
5339 Region 2 / NIARTS 6117 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: E010 SA
5339 Region 2 / NIARTS 6118 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D091 SA
5339 Region 2 / NIARTS 6119 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: E011 SA
5339 Region 2 / NIARTS 6120 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D086 SA
5339 Region 2 / NIARTS 6121 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D093 SA
5339 Region 2 / NIARTS 6122 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: U004 SA
5339 Region 2 / NIARTS 6123 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D094 SA
5339 Region 2 / NIARTS 6124 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D096 SA
5339 Region 2 / NIARTS 6125 Light Duty Bus (138" wb) Total 100,050 Capital VSS FA 85,042 Replacement Unit #: D095 SA
338
RPA-02 (83 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
PTIG Region 2 / NIARTS 6252 Replace facility insulation and inner panels Total 250,000 Capital FA Replacement SA 200,000
5339 Region 2 / NIARTS 6234 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 9022 SA
5339 Mason City 4878 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 51 SA
5339 Mason City 4879 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 52 SA
5339 Mason City 4880 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 53 SA
5339 Mason City 4881 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 54 SA
5339 Mason City 4882 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 55 SA
5339 Mason City 5430 Light Duty Bus (176" wb) Total 112,198 Capital Diesel, UFRC, VSS FA 95,368 Replacement Unit #: 56 SA
5339 Region 2 / NIARTS 6126 Light Duty Bus (176" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: B022 SA
5339 Region 2 / NIARTS 6127 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: D085 SA
5339 Region 2 / NIARTS 6128 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 8011 SA
5339 Region 2 / NIARTS 6129 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 8010 SA
5339 Region 2 / NIARTS 6130 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 4008 SA
5339 Region 2 / NIARTS 6131 Light Duty Bus (158" wb) Total 108,000 Capital VSS FA 91,800 Replacement Unit #: B023 SA
5339 Region 2 / NIARTS 6132 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 6007 SA
339
RPA-02 (83 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 2 / NIARTS 6133 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 5003 SA
5339 Region 2 / NIARTS 6134 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: A006 SA
5339 Region 2 / NIARTS 6135 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: G020 SA
5339 Region 2 / NIARTS 6136 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: 9024 SA
5339 Region 2 / NIARTS 6137 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: S027 SA
5339 Region 2 / NIARTS 6138 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: S029 SA
5339 Region 2 / NIARTS 6139 Light Duty Bus (158" wb) Total 102,280 Capital VSS FA 86,938 Replacement Unit #: S028 SA
5339 Region 2 / NIARTS 6140 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: S026 SA
5339 Region 2 / NIARTS 6141 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: 2009 SA
5339 Region 2 / NIARTS 6142 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: G021 SA
5339 Region 2 / NIARTS 6143 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: A007 SA
5339 Region 2 / NIARTS 6144 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: M007 SA
5339 Region 2 / NIARTS 6145 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: D097 SA
5339 Region 2 / NIARTS 6146 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: W006 SA
5339 Region 2 / NIARTS 6147 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: G023 SA
340
RPA-02 (83 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 2 / NIARTS 6148 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: G022 SA
5339 Region 2 / NIARTS 6149 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: T002 SA
5339 Region 2 / NIARTS 6150 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: D098 SA
5339 Region 2 / NIARTS 6247 Light Duty Bus (158" wb) Total 102,280Capital VSS FA 86,938Replacement Unit #: 9025 SA
5339 Region 2 / NIARTS 6248 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: B024 SA
5339 Region 2 / NIARTS 6249 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: E012 SA
5339 Region 2 / NIARTS 6250 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: E013 SA
5339 Region 2 / NIARTS 6251 Light Duty Bus (176" wb) Total 108,000Capital VSS FA 91,800Replacement Unit #: E014 SA
341
RPA-03 (24 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STA, STP,5311
Region 3 / RIDES 2890 General Operations/Maintenance/Administation Total 3,140,000 3,300,000 3,150,000 Operations FA 640,000 750,000 650,000 Misc SA 500,000 550,000 500,000
5339 Region 3 / RIDES 6004 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 0923 SA
5339 Region 3 / RIDES 6007 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 0920 SA
5339 Region 3 / RIDES 6009 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 0914 SA
5339 Region 3 / RIDES 4884 Light Duty Bus (158" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 0926 SA
5339 Region 3 / RIDES 4885 Light Duty Bus (176" wb) Total 103,500 Capital VSS FA 87,975 Replacement Unit #: 0917 SA
5339 Region 3 / RIDES 4886 Light Duty Bus (158" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 0931 SA
5339 Region 3 / RIDES 4887 Minivan Total 58,000 Capital VSS FA 49,300 Replacement Unit #: 1201 SA
5339 Region 3 / RIDES 4888 Light Duty Bus (176" wb) Total 103,500 Capital VSS FA 87,975 Replacement Unit #: 0915 SA
5339 Region 3 / RIDES 5420 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1501 SA
5339 Region 3 / RIDES 5421 Light Duty Bus (158" wb) Total 91,100 Capital VSS FA 77,435 Replacement Unit #: 1602 SA
5339 Region 3 / RIDES 5422 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1704 SA
5339 Region 3 / RIDES 5423 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1703 SA
5339 Region 3 / RIDES 5424 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1702 SA
5339 Region 3 / RIDES 5425 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1701 SA
342
RPA-03 (24 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 3 / RIDES 5426 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1700 SA
5339 Region 3 / RIDES 5427 Minivan Total 55,000 Capital VSS FA 46,750 Replacement Unit #: 1801 SA
STA, 5311 Region 3 / RIDES 6337 Operations/Maintenance/Administration Total 3,700,000Operations FA 700,000Misc SA 500,000
5339 Region 3 / RIDES 6338 Light Duty Bus (158" wb) Total 96,280Capital VSS FA 81,838Replacement Unit #: 1802 SA
5339 Region 3 / RIDES 6339 Light Duty Bus (158" wb) Total 96,280Capital VSS FA 81,838Replacement Unit #: 1805 SA
5339 Region 3 / RIDES 6340 Light Duty Bus (158" wb) Total 96,280Capital VSS FA 81,838Replacement Unit #: 1087 SA
5339 Region 3 / RIDES 6341 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 1806 SA
5339 Region 3 / RIDES 6342 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 1808 SA
5339 Region 3 / RIDES 6343 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 1813 SA
343
RPA-04 (18 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STP Region 4 / SRTS 5128 Light Duty Bus (176" wb) with vss Total 102,000 Capital FA 86,700 Expansion SA
5339 Region 4 / SRTS 5894 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7560 SA
5339 Region 4 / SRTS 5895 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7561 SA
5339 Region 4 / SRTS 5896 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7562 SA
5311 Region 4 / SRTS 6271 FTA operating 5310\5311 formula Total 982,468 982,468 982,468 982,468Operations FA 491,234 491,234 491,234 491,234Other SA
STA Region 4 / SRTS 6272 STA state operating Total 460,043 460,043 460,043 460,043Operations FA Other SA 460,043 460,043 460,043 460,043
5339 Region 4 / SRTS 6274 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7550A SA
5339 Region 4 / SRTS 6275 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7555A SA
5339 Region 4 / SRTS 6276 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7556 SA
5339 Region 4 / SRTS 6277 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7557 SA
5339 Region 4 / SRTS 6278 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7558 SA
5339 Region 4 / SRTS 6279 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 7559 SA
5311 RPA-04 2132 FTA Planning Total 30,418 30,418 30,418 31,024Planning FA 24,335 24,335 24,335 24,819Misc SA
5339 Region 4 / SRTS 5902 Light Duty Bus (176" wb) Total 102,500 Capital VSS FA 87,125 Replacement Unit #: 7563 SA
5339 Region 4 / SRTS 5903 Light Duty Bus (176" wb) Total 102,500 Capital VSS FA 87,125 Replacement Unit #: 7564 SA
344
RPA-04 (18 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 4 / SRTS 5904 Light Duty Bus (176" wb) Total 102,500 Capital VSS FA 87,125 Replacement Unit #: 7565 SA
5339 Region 4 / SRTS 5905 Light Duty Bus (176" wb) Total 102,500 Capital VSS FA 87,125 Replacement Unit #: 7566 SA
STP Region 4 / SRTS 6273 New Bus Wash system for new SRTS building Total 102,500 Capital FA 82,000 Expansion SA
345
RPA-05 (21 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Fort Dodge 6396 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: FD64 SA
5339 Fort Dodge 6398 Medium Duty Bus (29-32 ft.) Total 210,920 Capital Diesel, UFRC, VSS FA 179,282 Replacement Unit #: FD60 SA
STA, 5311 Fort Dodge 1331 General Operations/Maintenance/Administration Total 628,584 653,727 679,877 707,072Operations FA 381,102 396,346 412,200 428,688Misc SA 247,482 257,381 267,677 278,384
5311 Fort Dodge 3261 Intercity Bus Marketing Funds Total 9,400 9,400 9,400 9,400Operations FA 7,500 7,500 7,500 7,500Misc SA
STA, 5311 Region 5 / MIDAS 1314 General Operations/Maintenance/Administration Total 736,898 766,374 797,029 828,910Operations FA 349,052 363,014 377,535 392,636Misc SA 387,846 403,360 419,494 436,274
5307 Region 5 / MIDAS 1350 RPA Transportation Planning Total 34,526 35,907 37,343 38,837Planning FA 27,621 28,726 29,875 31,070Misc SA
PTIG Region 5 / MIDAS 6404 Pathfinders Facility 602 1st Ave S Total 890,000 Capital FA Other SA 600,000
5339 Region 5 / MIDAS 6460 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 10-3 SA
5339 Region 5 / MIDAS 6461 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 09-3 SA
5339 Fort Dodge 6397 Light Duty Bus (158" wb) Total 107,411 Capital UFRC, VSS FA 91,299 Replacement Unit #: FD63 SA
5339 Fort Dodge 6399 Light Duty Bus (176" wb) Total 113,360 Capital UFRC, VSS FA 96,356 Replacement Unit #: FD62 SA
5339 Region 5 / MIDAS 6462 Light Duty Bus (176" wb) Total 106,080 Capital VSS FA 90,168 Replacement Unit #: 09-7 SA
5339 Region 5 / MIDAS 6463 Light Duty Bus (176" wb) Total 106,080 Capital VSS FA 90,168 Replacement Unit #: 09-4 SA
5339 Fort Dodge 6400 Light Duty Bus (176" wb) Total 117,894 Capital UFRC, VSS FA 100,210 Replacement Unit #: FD66 SA
5339 Fort Dodge 6401 Light Duty Bus (176" wb) Total 117,894 Capital UFRC, VSS FA 100,210 Replacement Unit #: FD67 SA
346
RPA-05 (21 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 5 / MIDAS 6464 Light Duty Bus (176" wb) Total 110,323 Capital VSS FA 93,775 Replacement Unit #: 09-8 SA
5339 Region 5 / MIDAS 6465 Light Duty Bus (158" wb) Total 104,137 Capital VSS FA 85,516 Replacement Unit #: 10-1 SA
5339 Fort Dodge 6402 Light Duty Bus (176" wb) Total 122,610Capital UFRC, VSS FA 104,219Replacement Unit #: FD70 SA
5339 Fort Dodge 6403 Light Duty Bus (176" wb) Total 122,610Capital UFRC, VSS FA 104,219Replacement Unit #: FD68 SA
5339 Region 5 / MIDAS 6466 Light Duty Bus (158" wb) Total 108,302Capital VSS FA 92,057Replacement Unit #: 08-4 SA
5339 Region 5 / MIDAS 6467 Light Duty Bus (158" wb) Total 108,302Capital VSS FA 92,057Replacement Unit #: 10-2 SA
347
RPA-06 (7 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STA, 5311 Marshalltown 2134 General Operations/Maintenance/Administration Total 778,649 784,000 790,000 797,000Operations FA 211,603 213,000 215,000 217,000Other SA 192,046 195,000 198,000 200,000
STA, 5311 Region 6 /PeopleRides
1280 General Operations/Maintenance/Administration Total 1,050,000 1,100,000 1,150,000 1,163,000Operations FA 174,150 176,000 178,000 180,000Misc SA 253,851 257,000 260,000 263,000
5339 Region 6 /PeopleRides
5077 Conversion Van Total 57,920 Capital FA 49,232 Replacement Unit #: 412 SA
5339 Region 6 /PeopleRides
5505 Light Duty Bus (158" wb) Total 90,280 Capital FA 76,738 Replacement Unit #: 312 SA
5339 Region 6 /PeopleRides
5998 Conversion Van Total 57,920 Capital FA 49,232 Replacement Unit #: 214 SA
5339 Region 6 /PeopleRides
5999 Conversion Van Total 57,920 Capital FA 49,232 Replacement Unit #: 114A SA
5339 Region 6 /PeopleRides
6468 Light Duty Bus (158" wb) Total 90,280Capital FA 76,738Replacement Unit #: 115 SA
348
RPA-07 (13 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STA, 5311 Region 7 / INRTC 1377 General Operations/Maintenance/Administration Total 1,186,670 1,210,404 1,223,639 688,495Operations FA 320,253 326,658 333,191 339,855Misc SA 328,531 335,102 341,804 348,640
5339 Region 7 / INRTC 3498 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1001 SA
5311 Region 7 / INRTC 3500 RPA Transportation Planning Total 39,000 39,000 39,000 39,000Planning FA 31,200 31,200 31,200 31,200Misc SA
5339 Region 7 / INRTC 3860 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1401 SA
5339 Region 7 / INRTC 3861 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1402 SA
5339 Region 7 / INRTC 6200 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1201 SA
5339 Region 7 / INRTC 5282 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1601 SA
5339 Region 7 / INRTC 5707 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: V061 SA
5339 Region 7 / INRTC 5283 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1801 SA
5339 Region 7 / INRTC 5284 Light Duty Bus (176" wb) Total 100,000 Capital VSS FA 85,000 Replacement Unit #: 1802 SA
5339 Region 7 / INRTC 5693 Light Duty Bus (176" wb) Total 100,000Capital VSS FA 85,000Replacement Unit #: 1901 SA
5339 Region 7 / INRTC 5705 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 1701 SA
5339 Region 7 / INRTC 5706 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 1702 SA
349
RPA-08 (5 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STA, 5311 Clinton 6406 Light Duty Bus (158" wb) Total 96,280 Capital VSS, Low Floor FA 81,838 Replacement Unit #: 1256 SA
5339, 5311 Clinton 6410 Light Duty Bus (176" wb) Total 109,000 Capital UFRC, VSS, Low Floor, Hybrid FA 92,650 Replacement Unit #: 1255 SA
STA, 5311 Clinton 6413 Operations Total 2,011,934 Operations FA 735,394 Other SA 276,190
STA, 5311 Region 8 / RTA 4406 Operations Total 647,212 Operations FA 314,928 Other SA 332,284
5339 Region 8 / RTA 4831 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 4484 SA
350
RPA-09 (53 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5304 RPA-09 1484 Transit Planning Total 25,328 25,328 55,328 Planning FA 20,262 20,262 50,262 Misc SA
STA, 5311 Muscatine 4174 Transit Operations Total 1,139,900 1,174,097 1,209,300 1,245,600Operations FA 512,150 461,700 475,500 485,700Other SA 275,126 272,500 280,600 291,900
5339 Muscatine 5132 Light Duty Bus (176" wb) Total 109,800 Capital UFRC, VSS FA 93,330 Replacement Unit #: 253 SA
5339 Muscatine 5133 Light Duty Bus (176" wb) Total 109,800 Capital UFRC, VSS FA 93,330 Replacement Unit #: 254 SA
5311 Muscatine 6516 Automatic Drive Through Wash Bay Total 657,900 Capital FA 422,559 Expansion SA
5339 Region 9 / RBT 6492 Bus Garage Total 5,700,000 Capital FA 4,560,000 Expansion SA
STA, 5311 Region 9 / RBT 1425 General Operations/Maintenance/Administration Total 3,989,639 3,989,639 3,989,639 3,989,639Operations FA 356,389 356,389 356,389 356,389Misc SA 373,085 373,085 373,085 373,085
5339 Region 9 / RBT 4366 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 747 SA
5339 Region 9 / RBT 4367 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 745 SA
5339 Region 9 / RBT 4368 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 772 SA
5339 Region 9 / RBT 4369 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 773 SA
5339 Region 9 / RBT 4370 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 774 SA
5339 Region 9 / RBT 4908 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 901 SA
5339 Muscatine 5577 Light Duty Bus (176" wb) Total 113,100 Capital UFRC, VSS FA 96,135 Replacement Unit #: 255 SA
5339 Muscatine 5578 Conversion Van Total 68,110 Capital UFRC, VSS FA 57,894 Replacement Unit #: 256 SA
351
RPA-09 (53 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Muscatine 5579 Light Duty Bus (158" wb) Total 107,200 Capital UFRC, VSS FA 91,120 Replacement Unit #: 257 SA
5339 Region 9 / RBT 4909 Light Duty Bus (158" wb) Total 98,988 Capital VSS FA 84,140 Replacement Unit #: 998 SA
5339 Region 9 / RBT 4910 Light Duty Bus (158" wb) Total 98,988 Capital VSS FA 84,140 Replacement Unit #: 999 SA
5339 Region 9 / RBT 5414 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 200 SA
5339 Region 9 / RBT 5415 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 201 SA
5339 Region 9 / RBT 5416 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 202 SA
5339 Region 9 / RBT 5417 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 241 SA
5339 Region 9 / RBT 5418 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 242 SA
5339 Region 9 / RBT 5419 Light Duty Bus (176" wb) Total 104,880 Capital VSS FA 89,148 Replacement Unit #: 243 SA
5339 Muscatine 6041 Light Duty Bus (158" wb) Total 110,400 Capital UFRC, VSS FA 93,840 Replacement Unit #: 258 SA
5339 Muscatine 6042 Light Duty Bus (176" wb) Total 116,400 Capital UFRC, VSS FA 98,940 Replacement Unit #: 259 SA
5339 Region 9 / RBT 5742 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 812 SA
5339 Region 9 / RBT 5743 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 813 SA
5339 Region 9 / RBT 5744 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 814 SA
5339 Region 9 / RBT 5745 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 815 SA
352
RPA-09 (53 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 9 / RBT 5746 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 817 SA
5339 Region 9 / RBT 5747 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 818 SA
5339 Region 9 / RBT 5748 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 819 SA
5339 Region 9 / RBT 5749 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 821 SA
5339 Region 9 / RBT 5750 Light Duty Bus (176" wb) Total 107,846 Capital VSS FA 91,669 Replacement Unit #: 820 SA
5339 Region 9 / RBT 5751 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 825 SA
5339 Region 9 / RBT 5752 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 826 SA
5339 Region 9 / RBT 5753 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 828 SA
5339 Region 9 / RBT 5754 Light Duty Bus (158" wb) Total 101,778 Capital VSS FA 86,511 Replacement Unit #: 829 SA
5339 Region 9 / RBT 5755 Light Duty Bus (176" wb) Total 107,846 Capital VSS FA 91,669 Replacement Unit #: 827 SA
5339 Muscatine 6517 Light Duty Bus (176" wb) Total 119,900Capital UFRC, VSS FA 101,915Replacement Unit #: 260 SA
5339 Muscatine 6518 Light Duty Bus (158" wb) Total 128,751Capital UFRC, VSS, Low Floor FA 109,438Replacement Unit #: 261 SA
5339 Region 9 / RBT 6170 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 946 SA
5339 Region 9 / RBT 6185 Light Duty Bus (176" wb) Total 110,902Capital VSS FA 94,267Replacement Unit #: 914 SA
5339 Region 9 / RBT 6203 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 933 SA
353
RPA-09 (53 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 9 / RBT 6204 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 937 SA
5339 Region 9 / RBT 6205 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 945 SA
5339 Region 9 / RBT 6206 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 944 SA
5339 Region 9 / RBT 6207 Light Duty Bus (176" wb) Total 110,902Capital VSS FA 94,267Replacement Unit #: 915 SA
5339 Region 9 / RBT 6208 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 940 SA
5339 Region 9 / RBT 6188 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 932 SA
5339 Region 9 / RBT 6189 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 934 SA
5339 Region 9 / RBT 6192 Light Duty Bus (158" wb) Total 104,652Capital VSS FA 88,954Replacement Unit #: 936 SA
354
RPA-10 (58 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5311 Region 10 / ECICOG 1485 General Operations/Maintenance/Administration Total 2,719,200 2,719,200 2,719,200 2,719,200Operations FA 650,000 650,000 650,000 650,000Misc SA
5311 Region 10 / ECICOG 1540 RPA Transportation Planning Total 175,000 175,000 175,000 175,000Planning FA 140,000 140,000 140,000 140,000Misc SA
5310 Region 10 / ECICOG 3576 General Operations/Maintenance/Contracted Service Total 1,480,800 1,480,800 1,480,800 1,480,800Operations FA 354,000 354,000 354,000 354,000Other SA
5339 Region 10 / ECICOG 4972 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 219 SA
5339 Region 10 / ECICOG 4977 Light Duty Bus (138" wb) Total 92,050 Capital VSS FA 78,243 Replacement Unit #: 487 SA
5339 Region 10 / ECICOG 5456 Light Duty Bus (138" wb) Total 92,050 Capital VSS FA 78,243 Replacement Unit #: 401 SA
5339 Region 10 / ECICOG 6290 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 331 SA
5339 Region 10 / ECICOG 6280 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 343 SA
5339 Region 10 / ECICOG 6281 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 344 SA
5339 Region 10 / ECICOG 6282 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 342 SA
5339 Region 10 / ECICOG 6283 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 341 SA
5339 Region 10 / ECICOG 6284 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 246 SA
5339 Region 10 / ECICOG 6292 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 310 SA
5339 Region 10 / ECICOG 6293 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 218 SA
5339 Region 10 / ECICOG 6294 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 308 SA
355
RPA-10 (58 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 10 / ECICOG 6295 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 309 SA
5339 Region 10 / ECICOG 6296 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 400 SA
5339 Region 10 / ECICOG 6253 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 482 SA
5339 Region 10 / ECICOG 6254 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 483 SA
5339 Region 10 / ECICOG 6255 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 484 SA
5339 Region 10 / ECICOG 6256 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 485 SA
5339 Region 10 / ECICOG 6257 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 486 SA
5339 Region 10 / ECICOG 6261 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 47L SA
PTIG Region 10 / ECICOG 6336 Expansion and Remodel Bus Storage Building Washington Iowa Total 590,570 Capital FA Other SA 472,456
5339 Region 10 / ECICOG 5446 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 488 SA
5339 Region 10 / ECICOG 5448 Medium Duty Bus (29-32 ft.) Total 192,800 Capital VSS FA 163,880 Replacement Unit #: 267 SA
5339 Region 10 / ECICOG 5449 Medium Duty Bus (29-32 ft.) Total 192,800 Capital VSS FA 163,880 Replacement Unit #: 266 SA
5339 Region 10 / ECICOG 5450 Medium Duty Bus (29-32 ft.) Total 192,800 Capital VSS FA 163,880 Replacement Unit #: 265 SA
5339 Region 10 / ECICOG 5451 Medium Duty Bus (29-32 ft.) Total 192,800 Capital VSS FA 163,880 Replacement Unit #: 264 SA
5339 Region 10 / ECICOG 5454 Light Duty Bus (176" wb) Total 90,500 Capital Low Floor FA 76,925 Replacement Unit #: 333 SA
356
RPA-10 (58 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 10 / ECICOG 5455 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 311 SA
5339 Region 10 / ECICOG 6289 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 332 SA
5339 Region 10 / ECICOG 5452 Light Duty Bus (138" wb) Total 89,000 Capital VSS FA 75,650 Replacement Unit #: 345 SA
5339 Region 10 / ECICOG 5453 Light Duty Bus (138" wb) Total 89,000 Capital VSS FA 75,650 Replacement Unit #: 346 SA
5339 Region 10 / ECICOG 5771 Light Duty Bus (158" wb) Total 91,100 Capital VSS FA 77,435 Replacement Unit #: 402 SA
5339 Region 10 / ECICOG 5776 Light Duty Bus (158" wb) Total 91,100 Capital VSS FA 77,435 Replacement Unit #: 312 SA
5339 Region 10 / ECICOG 5777 Light Duty Bus (158" wb) Total 91,100 Capital VSS FA 77,435 Replacement Unit #: 313 SA
5339 Region 10 / ECICOG 5782 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 335 SA
5339 Region 10 / ECICOG 5783 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 336 SA
5339 Region 10 / ECICOG 5784 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 337 SA
5339 Region 10 / ECICOG 5789 Light Duty Bus (138" wb) Total 89,000 Capital VSS FA 75,650 Replacement Unit #: 347 SA
5339 Region 10 / ECICOG 5797 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 268 SA
5339 Region 10 / ECICOG 5798 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 269 SA
5339 Region 10 / ECICOG 5808 Light Duty Bus (158" wb) Total 91,100 Capital VSS FA 77,435 Replacement Unit #: 489 SA
5339 Region 10 / ECICOG 5809 Light Duty Bus (176" wb) Total 96,500 Capital VSS FA 82,025 Replacement Unit #: 490 SA
357
RPA-10 (58 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 10 / ECICOG 6262 Medium Duty Bus (29-32 ft.) Total 203,920Capital VSS FA 173,332Replacement Unit #: 350 SA
5339 Region 10 / ECICOG 6263 Medium Duty Bus (29-32 ft.) Total 203,920Capital VSS FA 173,332Replacement Unit #: 351 SA
5339 Region 10 / ECICOG 6258 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 491 SA
5339 Region 10 / ECICOG 6259 Light Duty Bus (158" wb) Total 96,280Capital VSS FA 81,838Replacement Unit #: 492 SA
5339 Region 10 / ECICOG 6260 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 493 SA
5339 Region 10 / ECICOG 6297 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 403 SA
5339 Region 10 / ECICOG 6298 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 404 SA
5339 Region 10 / ECICOG 6299 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 405 SA
5339 Region 10 / ECICOG 6285 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 348 SA
5339 Region 10 / ECICOG 6286 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 349 SA
5339 Region 10 / ECICOG 6287 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 440 SA
5339 Region 10 / ECICOG 6288 Minivan Total 58,189Capital VSS FA 49,461Replacement Unit #: 338 SA
5339 Region 10 / ECICOG 6291 Minivan Total 55,689Capital Low Floor FA 47,336Replacement Unit #: 316 SA
358
RPA-11 (42 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 11 / HIRTA 6209 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1141 SA
STA, 5311 Region 11 / HIRTA 6210 Day to Day Operations/Adm Total 1,412,919 Operations FA 835,879 Other SA 577,040
5339 Region 11 / HIRTA 6212 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1142 SA
5339 Region 11 / HIRTA 6213 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 3323 SA
5339 Region 11 / HIRTA 6214 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5516 SA
5339 Region 11 / HIRTA 6215 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 5519 SA
PTIG Region 11 / HIRTA 6541 Boone Bus Parking Total 275,000 Capital FA Expansion SA 220,000
STP Region 11 / HIRTA 6542 Conversion Van Total 60,420 Capital VSS, Hybrid FA 51,357 Expansion SA
5339 Region 11 / HIRTA 6543 HIRTA Admin / Bus Facility Total 9,000,000 Capital FA 7,200,000 Expansion SA
5339 Region 11 / HIRTA 4452 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 3326 SA
5339 Region 11 / HIRTA 4460 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 3325 SA
5339 Region 11 / HIRTA 4463 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 8727 SA
STP Region 11 / HIRTA 5157 Conversion Van Total 60,420 Capital VSS, Hybrid FA 51,357 Expansion SA
5339 Region 11 / HIRTA 5977 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 1143 SA
5339 Region 11 / HIRTA 5992 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 6526 SA
359
RPA-11 (42 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 11 / HIRTA 6216 Light Duty Bus (158" wb) Total 90,280 Capital FA 76,738 Replacement Unit #: 3329 SA
5339 Region 11 / HIRTA 6217 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1144 SA
5339 Region 11 / HIRTA 6218 Light Duty Bus (176" wb) Total 96,040 Capital FA 81,600 Replacement Unit #: 2227 SA
5339 Region 11 / HIRTA 3242 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 2228 SA
5339 Region 11 / HIRTA 4442 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1146 SA
5339 Region 11 / HIRTA 4445 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1149 SA
5339 Region 11 / HIRTA 5980 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1147 SA
5339 Region 11 / HIRTA 5983 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 3328 SA
5339 Region 11 / HIRTA 5986 Minivan Total 56,564 Capital VSS FA 48,080 Replacement Unit #: 3330 SA
5339 Region 11 / HIRTA 5987 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 4420 SA
STP Region 11 / HIRTA 6061 Conversion Van Total 58,727 Capital UFRC, VSS FA 49,918 Expansion SA
STP Region 11 / HIRTA 6062 Conversion Van Total 58,727 Capital UFRC, VSS FA 49,918 Expansion SA
5339 Region 11 / HIRTA 4448 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 2229 SA
5339 Region 11 / HIRTA 5989 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5521 SA
5339 Region 11 / HIRTA 5990 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5523 SA
360
RPA-11 (42 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 11 / HIRTA 5991 Light Duty Bus (138" wb) Total 94,049 Capital VSS FA 79,942 Replacement Unit #: 5522 SA
5339 Region 11 / HIRTA 4446 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1150 SA
5339 Region 11 / HIRTA 4444 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1148 SA
5339 Region 11 / HIRTA 5988 Light Duty Bus (176" wb) Total 131,120 Capital VSS, Low Floor FA 111,452 Replacement Unit #: 4422 SA
5339 Region 11 / HIRTA 5979 Minivan Total 58,189 Capital VSS FA 49,461 Replacement Unit #: 1145 SA
5339 Region 11 / HIRTA 4450 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 2231 SA
5339 Region 11 / HIRTA 6219 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 2230 SA
5339 Region 11 / HIRTA 6220 Minivan Total 55,689Capital FA 47,336Replacement Unit #: 4419 SA
5339 Region 11 / HIRTA 5993 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 8725 SA
5339 Region 11 / HIRTA 5994 Light Duty Bus (138" wb) Total 94,050Capital VSS FA 79,943Replacement Unit #: 8728 SA
5339 Region 11 / HIRTA 5995 Light Duty Bus (158" wb) Total 96,280Capital VSS FA 81,838Replacement Unit #: 8729 SA
5339 Region 11 / HIRTA 6063 Non-ADA LD bus (176" wb) Total 156,000Capital UFRC, VSS, Low Floor FA 124,800Expansion SA
361
RPA-12 (24 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STA, 5311 Region 12 / WITS 1585 Operations/Maintenance/Administration Total 2,512,549 2,525,000 2,535,000 2,535,000Operations FA 704,673 715,000 720,000 720,000Misc SA 467,876 410,000 415,000 415,000
5311 Region 12 / WITS 1599 RPA Transportation Planning Total 32,878 32,000 32,000 32,000Planning FA 26,302 25,600 25,600 25,600Misc SA
5339 Region 12 / WITS 5359 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1101 SA
5339 Region 12 / WITS 5360 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1102 SA
5339 Region 12 / WITS 5362 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1007 SA
5339 Region 12 / WITS 5364 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1201 SA
5339 Region 12 / WITS 5884 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 1502 SA
5339 Region 12 / WITS 5358 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: JJ03 SA
5339 Region 12 / WITS 5363 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: JJ02 SA
5339 Region 12 / WITS 5361 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 0901 SA
5339 Region 12 / WITS 5885 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 1504 SA
5339 Region 12 / WITS 5886 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 1402 SA
5339 Region 12 / WITS 5365 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1301 SA
5339 Region 12 / WITS 5366 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1302 SA
5339 Region 12 / WITS 6387 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 1501 SA
362
RPA-12 (24 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 12 / WITS 6388 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1103 SA
5339 Region 12 / WITS 6389 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 1104 SA
5339 Region 12 / WITS 5367 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: JJ04 SA
5339 Region 12 / WITS 5887 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 1401 SA
5339 Region 12 / WITS 6390 Conversion Van Total 60,420Capital VSS FA 51,357Replacement Unit #: 1505 SA
5339 Region 12 / WITS 6391 Conversion Van Total 60,420Capital VSS FA 51,357Replacement Unit #: 1507 SA
5339 Region 12 / WITS 6392 Conversion Van Total 60,420Capital VSS FA 51,357Replacement Unit #: 1508 SA
5339 Region 12 / WITS 6393 Conversion Van Total 60,420Capital VSS FA 51,357Replacement Unit #: 1601 SA
5339 Region 12 / WITS 6394 Light Duty Bus (176" wb) Total 102,000Capital VSS FA 86,700Replacement Unit #: 1506 SA
363
RPA-13 (21 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
PTIG Region 13 / SWITA 6544 Bus barn expansion project Total 630,260 Capital FA Expansion SA 504,208
5311 Region 13 / SWITA 6545 New Project Total 2,611,180 Operations FA 2,611,180 Other SA
5339 Region 13 / SWITA 6386 Minivan Total 55,689 Capital FA 47,336 Replacement Unit #: 1014 SA
5339 Region 13 / SWITA 6368 Light Duty Bus (138" wb) Total 88,049 Capital FA 74,842 Replacement Unit #: 904 SA
5339 Region 13 / SWITA 6369 Light Duty Bus (138" wb) Total 88,049 Capital FA 74,842 Replacement Unit #: 0905 SA
5339 Region 13 / SWITA 6370 Light Duty Bus (138" wb) Total 88,049 Capital FA 74,842 Replacement Unit #: 0906 SA
5339 Region 13 / SWITA 6371 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1009 SA
5339 Region 13 / SWITA 6372 Light Duty Bus (138" wb) Total 88,049 Capital FA 74,842 Replacement Unit #: 0907 SA
5339 Region 13 / SWITA 6373 Light Duty Bus (138" wb) Total 88,049 Capital FA 74,842 Replacement Unit #: 0908 SA
5339 Region 13 / SWITA 6374 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1003 SA
5339 Region 13 / SWITA 6375 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1007 SA
5339 Region 13 / SWITA 6376 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1016 SA
5339 Region 13 / SWITA 6377 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1201 SA
5339 Region 13 / SWITA 6378 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1202 SA
5339 Region 13 / SWITA 6379 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1203 SA
364
RPA-13 (21 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 13 / SWITA 6380 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1301 SA
5339 Region 13 / SWITA 6381 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1302 SA
5339 Region 13 / SWITA 6382 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1303 SA
5339 Region 13 / SWITA 6383 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1304 SA
5339 Region 13 / SWITA 6384 Light Duty Bus (176" wb) Total 96,000 Capital FA 81,600 Replacement Unit #: 1305 SA
5339 Region 13 / SWITA 6385 Minivan Total 55,689 Capital FA 47,336 Replacement Unit #: 1013 SA
365
RPA-14 (34 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 14 / SIT 6198 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 25B SA
STA, 5311 Region 14 / SIT 6187 General Operations-Southern Iowa Trolley Total 788,207 Operations FA 411,004 Other SA 377,203
5339 Region 14 / SIT 2746 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 21-S SA
5339 Region 14 / SIT 2750 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: S-18 SA
5339 Region 14 / SIT 3245 Light Duty Bus (158" wb) Total 96,280 Capital VSS FA 81,838 Replacement Unit #: 22-S SA
5339 Region 14 / SIT 3248 Minivan Total 58,191 Capital VSS FA 49,462 Replacement Unit #: 24-S SA
5339 Region 14 / SIT 3249 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: S-26 SA
5339 Region 14 / SIT 3250 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: S-27 SA
5339 Region 14 / SIT 3771 Minivan Total 60,418 Capital VSS FA 51,355 Replacement Unit #: 28-S SA
5339 Region 14 / SIT 3246 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 23-S SA
5339 Region 14 / SIT 4139 Conversion Van Total 62,737 Capital VSS FA 53,326 Replacement Unit #: 29S SA
5339 Region 14 / SIT 4138 Light Duty Bus (176" wb) Total 107,834 Capital VSS FA 91,659 Replacement Unit #: 101 SA
5339 Region 14 / SIT 4629 Light Duty Bus (176" wb) Total 107,834 Capital VSS FA 91,659 Replacement Unit #: 102 SA
5339 Region 14 / SIT 4630 Light Duty Bus (176" wb) Total 107,834 Capital VSS FA 91,659 Replacement Unit #: 103 SA
5339 Region 14 / SIT 4631 Light Duty Bus (176" wb) Total 107,834 Capital VSS FA 91,659 Replacement Unit #: 104 SA
366
RPA-14 (34 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 14 / SIT 5333 Light Duty Bus (176" wb) Total 107,834 Capital VSS FA 91,659 Replacement Unit #: 105 SA
5339 Region 14 / SIT 6546 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 36-S SA
5339 Region 14 / SIT 6547 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 37-S SA
5339 Region 14 / SIT 6548 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 38-S SA
5339 Region 14 / SIT 6199 Light Duty Bus (158" wb) Total 121,386Capital VSS FA 105,553Replacement Unit #: 112 SA
5339 Region 14 / SIT 6193 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 34-S SA
5339 Region 14 / SIT 6194 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 35-S SA
5339 Region 14 / SIT 6195 Light Duty Bus (176" wb) Total 111,987Capital VSS FA 95,189Replacement Unit #: 110 SA
5339 Region 14 / SIT 6196 Light Duty Bus (176" wb) Total 111,987Capital VSS FA 95,189Replacement Unit #: 111 SA
5339 Region 14 / SIT 6197 Light Duty Bus (158" wb) Total 105,553Capital VSS FA 89,720Replacement Unit #: 113 SA
5339 Region 14 / SIT 6186 Light Duty Bus (138" wb) Total 101,545Capital VSS FA 86,313Replacement Unit #: 109 SA
5339 Region 14 / SIT 5334 Light Duty Bus (176" wb) Total 111,987Capital VSS FA 95,189Replacement Unit #: 106 SA
5339 Region 14 / SIT 5335 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 30-S SA
5339 Region 14 / SIT 5336 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 31-S SA
5339 Region 14 / SIT 5337 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 32-S SA
367
RPA-14 (34 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 14 / SIT 5338 Minivan Total 65,144Capital VSS FA 55,372Replacement Unit #: 33-S SA
5339 Region 14 / SIT 5716 Light Duty Bus (176" wb) Total 111,987Capital VSS FA 95,189Replacement Unit #: 108 SA
5339 Region 14 / SIT 5332 Light Duty Bus (176" wb) Total 111,987Capital VSS FA 95,189Replacement Unit #: 107 SA
5339 Region 14 / SIT 2330 Transit Facility Total 2,400,000Capital FA 2,000,000Other SA
368
RPA-15 (17 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
STA, 5311 Region 15 / 10-15Transit
1721 General Operations/Maintenance/Administration Total 3,674,260 3,500,000 3,500,000 3,500,000Operations FA 1,070,833 1,000,000 1,000,000 1,000,000Misc SA 603,427 500,000 500,000 500,000
STA, 5311 Region 15 / 10-15Transit
6055 General Operations/Maintenance/Administration FIXED ROUTE Total 665,392 600,000 600,000 600,000Operations FA 386,730 350,000 350,000 350,000Other SA 228,662 200,000 200,000 200,000
5339 Region 15 / 10-15Transit
6065 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 153 SA
5339 Region 15 / 10-15Transit
6066 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 154 SA
5339 Region 15 / 10-15Transit
6067 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 155 SA
5339 Region 15 / 10-15Transit
6068 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 157 SA
5339 Region 15 / 10-15Transit
6069 Light Duty Bus (176" wb) Total 97,200 Capital VSS FA 82,620 Replacement Unit #: 161 SA
5339 Region 15 / 10-15Transit
6070 Light Duty Bus (176" wb) Total 97,200 Capital VSS FA 82,620 Replacement Unit #: 165 SA
PTIG Region 15 / 10-15Transit
6529 Purchase Land and Create a Transfer Stn for Fixed Rt Total 1,250,000 Capital FA Expansion SA 600,000
5339 Region 15 / 10-15Transit
6071 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 162 SA
5339 Region 15 / 10-15Transit
6072 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 163 SA
5339 Region 15 / 10-15Transit
6073 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 164 SA
5339 Region 15 / 10-15Transit
6074 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 166 SA
5339 Region 15 / 10-15Transit
6075 Minivan Total 56,500 Capital VSS FA 48,025 Replacement Unit #: 167 SA
5339 Region 15 / 10-15Transit
6076 Medium Duty Bus (29-32 ft.) Total 196,249 Capital VSS FA 166,812 Replacement Unit #: 169A SA
369
RPA-15 (17 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Region 15 / 10-15Transit
6077 Medium Duty Bus (29-32 ft.) Total 196,249 Capital VSS FA 166,812 Replacement Unit #: 169B SA
5339 Region 15 / 10-15Transit
6078 Light Duty Bus (176" wb) Total 97,200 Capital VSS FA 82,620 Replacement Unit #: 168 SA
370
RPA-16 (14 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5339 Burlington 6201 Medium Duty Bus (29-32 ft.) Total 210,920 Capital UFRC, VSS FA 179,282 Replacement Unit #: 730 SA
STA, 5311 Burlington 1670 General Operations/Maintenance/Administration Total 1,207,900 1,207,900 1,207,900 1,207,900Operations FA 469,017 469,017 469,017 469,017Misc SA 275,919 275,919 275,919 275,919
5339 Burlington 6172 Medium Duty Bus (29-32 ft.) Total 210,920 Capital UFRC, VSS FA 179,282 Replacement Unit #: 722 SA
5339 Burlington 6173 Light Duty Bus (176" wb) Total 109,000 Capital UFRC, VSS FA 92,650 Replacement Unit #: 732 SA
5339 Burlington 6176 Medium Duty Bus (29-32 ft.) Total 210,920 Capital UFRC, VSS FA 179,282 Replacement Unit #: 731 SA
5339 Burlington 6177 Medium Duty Bus (29-32 ft.) Total 210,920 Capital UFRC, VSS FA 179,282 Replacement Unit #: 729 SA
5339 Region 16 / SEIBUS 6179 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 121 SA
5339 Region 16 / SEIBUS 6180 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 122 SA
5339 Region 16 / SEIBUS 6181 Light Duty Bus (176" wb) Total 102,000 Capital VSS FA 86,700 Replacement Unit #: 111 SA
STA, 5339 Region 16 / SEIBUS 6182 Medium Duty Bus (to 28 ft.) Total 198,249 Capital Diesel, VSS, Low Floor FA 168,512 Replacement Unit #: 953 SA 29,737
5339 Region 16 / SEIBUS 6183 Conversion Van Total 60,420 Capital VSS FA 51,357 Replacement Unit #: 021 SA
5339 Region 16 / SEIBUS 6184 Light Duty Bus (176" wb) Total 102,000 Capital VSS, Low Floor FA 86,700 Replacement Unit #: 112 SA
STA, 5311 Region 16 / SEIBUS 1675 General Operations/Maintenance/Administration Total 1,329,651 1,329,651 1,329,651 1,329,651Operations FA 367,306 367,306 367,306 367,306Misc SA 386,135 386,135 386,135 386,135
5311 RPA-16 1694 RPA Transportation Planning Total 32,629 32,629 32,629 32,629Planning FA 26,104 26,104 26,104 26,104Misc SA
371
RPA-17 (1 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY22 FY23 FY24 FY25
5311 RPA-17 1702 RPA Transportation Planning Total 37,500 37,500 37,500 37,500Planning FA 37,500 37,500 37,500 37,500Misc SA
372
temmE
neirB'O yalC otlA olaP
htuomylP atsiV aneuB
llahsraM
noyL nosnikciD
xuoiS
tdlobmuH
radeC
aloecsO
nanahcuB
notgnihsaW
eeL
yrneH
asiuoL
enitacsuM
ttocS
kukoeK
neruB naVsivaD
nosreffeJollepaWeornoM
esoonappA
sacuLekralC
rutaceD
noinU
dloggniRrolyaT
smadAyremogtnoMslliM
eimattawattoP ssaC riadA
nosirraH yblehS
anonoM drofwarC
nobuduA
llorraC eneerG
yrubdooW adI caS
htussoK ogabenniW htroW
kcocnaH odroG orreC
thgirW nilknarF reltuB
nuohlaCretsbeW
notlimaH nidraH
enooB yrotS
eirhtuG sallaD kloP
nosidaM nerraW noiraM
enyaW
aksahaM
keihsewoPrepsaJ awoI nosnhoJ
noskcaJsenoJnniLnotneBamaT
erawaleDkwaH kcalBydnurG
remerB
etteyaF notyalC
dyolF wasakcihC
llehctiM drawoH keihsenniW eekamallA
euqubuD
tnomerF egaP
notnilC
senioM seD
eekorehC
Hector Torres-Cacho205 E. 227th StFairfield, IA 52556641-469-4007Fax: 641-472-3622
Catherine Cutler5455 Kirkwood Blvd. SWCedar Rapids, IA 52404319-364-0235Fax: 319-364-9614
Krista Billhorn428 43rd St. SWMason City, IA 50401641-422-9447Fax: 641-422-9457
Andy Loonan1020 S. Fourth St.Ames, IA 50010515-239-1996Fax: 515-239-1472
Dakin Schultz2800 Gordon DriveP.O. Box 987Sioux City, IA 51102712-274-5837Fax: 712-276-2822
Scott Suhr2210 E. Seventh St.Atlantic, IA 50022712-243-7627Fax: 712-243-6788
District Transportation Planners’ Areas of ResponsibilityMetropolitan Planning Organizations and Regional Planning Affiliations January 2020
Northwest IowaPlanning and Development
Commission
Siouxland RegionalTransportation Planning
Association
MAPA RuralTransportation Planning
Affiliation
Southwest IowaPlanning Council
ATURATransportation Planning
Affiliation
Region XIICouncil of Governments
MIDASCouncil of Governments
North Iowa AreaCouncil of Governments
Central Iowa RegionalTransportation
Planning Alliance
Region 6 Resource Partners
Iowa NorthlandRegional Transportation
Authority
Upper ExplorerlandRegional Planning
Commission
East CentralIntergovernmental
Association
East Central IowaCouncil of Governments
Bi-StateRegional Commission
Southeast IowaRegional
Planning Commission
Area XVRegional
Planning Commission
Chariton ValleyTransportation
Planning Affiliation
Sioux City
Omaha/Council Bluffs
Des Moines
Ames
Iowa City
WaterlooDubuque
Cedar Rapids
Davenport/Rock Island
Transportation Districts
Metropolitan Planning Organizations
Regional Planning Affiliations
23
4
5
6
7
8
9
10
11
12
13 14 1516
17
18
1
satnohacoP
Sam Shea5455 Kirkwood Blvd. SWCedar Rapids, IA 52404319-286-4907Fax: 319-364-9614
23
4 5
61
373
www.masoncity.net/pview.aspx?id=18070&catid=477
www.cityofottumwa.com/departments/transit
www.midascog.net/transit/dart
www.ci.marshalltown.ia.us/static/departments/works/transit.php
www.muscatineiowa.gov/index.aspx?NID=75
www.ci.clinton.ia.us/html/MTA.html
www.burlingtoniowa.org/publicworks/bus.html
www.nwiarides.org/
www.swipco.org
www.riverbendtransit.org
www.region12cog.org/western_iowa_public_transit/public_transit.asp
www.southerniowatrolley.org
www.ridehirta.com
www.simpco.org/srts/
www.midascog.net/transit/region-v
www.r2bus.org
www.1015transit.com
www.region6planning.org
www.seirpc.com/seibus/route.html
www.ecicog.org/ecitransit
www.inrcog.org/rtc.htm
www.rta8.org/
www.neicac.org/transport.html
www.cityofdubuque.org/thejule
www.cyride.com
www.icgov.org/default/?id=1515
www.uiowa.edu/~cambus
www.coralville.org/index.aspx?nid=80
www.cedar-rapids.org/transit/
www.mettransit.orgwww.sioux-city.org/transit
www.ridedart.com
www.bettendorf.org/department/?fDD=22-0
www.yellowandblueforyou.com
www.cityofdavenportiowa.com/department/division.php?structureid=420
13
12
4
3
5
14
2
15
11
10
1
16
9
6
7
8
Iowa's Public Transit System
4 Transit Systems in urbanized areas > 200,000 population8 Transit Systems in urbanized areas 50,000 to 200,000 population7 Transit Systems in small urban areas < 50,000 population16 Regional Transit Systems
374
Advance Construction Projects - STIP Number 22001
Pottawattamie BRF-6-1(114)--38-78 $72,574
Johnson STP-A-006-7(90)--22-52 $1,534,519 Webster STP-A-2690(632)--22-94 $161,962Polk STP-A-6102(614)--22-77 $39,577
Fremont ER-029-1(126)0--06-36 $2,693,035 Mills ER-034-1(123)--28-65 $1,351,074Fremont ER-029-1(129)2--06-36 $1,046,427 Muscatine ER-061-4(111)--28-70 $72,844Fremont ER-029-1(132)22--06-36 $180,530 O Brien ER-010-2(41)--28-71 $410,254Fremont ER-029-1(138)25--06-36 $51,034 Pottawattamie ER-029-4(126)57--06-78 $505,366Fremont ER-029-1(139)13--06-36 $46,087 Pottawattamie ER-680-1(186)0--06-78 $1,656,324Fremont ER-C036(80)--58-36 $588,735 Pottawattamie ER-680-1(187)0--06-78 $2,897,608Fremont ER-C036(81)--58-36 $2,109,944 Pottawattamie ER-680-1(188)0--06-78 $41,558Fremont ER-C036(85)--58-36 $540,478 Ringgold ER-C080(78)--58-80 $501,978Fremont ER-C036(87)--58-36 $825,153 Statewide ER-000-T(176)--28-00 $92,560Linn ER-030-7(216)--28-57 $154,864 Statewide ER-000-T(177)--28-00 $192,942Linn ER-380-6(454)18--06-57 $29,375 Warren ER-065-3(85)--28-91 $66,540Linn ER-380-6(455)17--06-57 $414,383 Washington ER-001-4(57)--28-92 $1,823Mills ER-034-1(118)--28-65 $24,290 Woodbury ER-C097(145)--58-97 $86,266
Pottawattamie IHSIPX-080-1(494)44--08-78 $565,572
Adair IMX-080-2(256)86--02-01 $2,579,400 Dubuque NHSX-20-9(185)--3H-31 $60,273Appanoose NHSX-005-1(79)--3H-04 $6,539,682 Fayette NHSX-018-8(46)--3H-33 $3,900,426Benton NHSX-150-2(26)--3H-06 $3,418,382 Floyd NHSX-218-9(140)--3H-34 $1,116,000Benton NHSX-150-2(28)--3H-06 $2,372,161 Harrison NHSX-030-1(171)--3H-43 $3,197,554Benton NHSX-030-6(185)--3H-06 $180,178 Harrison NHSX-030-1(190)--3H-43 $2,439,983Benton NHSX-030-6(182)--3H-06 $2,068,000 Jasper IMX-080-5(343)174--02-50 $6,304,658Benton NHSX-030-6(184)--3H-06 $660,000 Jasper IMX-80-5(334)174--02-50 $23,214Benton NHSX-030-6(225)--3H-06 $411,200 Johnson IM-380-6(319)2--13-52 $182,096Black Hawk NHSX-020-6(72)--3H-07 $11,467,606 Johnson NHS-080-6(330)239--11-52 $3,169,455Black Hawk NHSX-020-6(83)--3H-07 $49,423 Johnson NHS-080-6(333)239--11-52 $6,750,035Black Hawk IMX-380-7(130)55--02-07 $6,489,900 Johnson NHS-080-6(337)239--11-52 $3,941,988Bremer NHSX-218-8(141)--3H-09 $3,172,800 Johnson NHS-080-6(340)239--11-52 $6,147,790Butler NHSX-003-5(85)--3H-12 $2,760,173 Johnson NHS-080-6(343)239--11-52 $5,502,394Chickasaw NHSX-218-9(139)--3H-19 $2,801,600 Johnson NHS-080-6(346)239--11-52 $5,766,035Des Moines NHSX-061-2(73)--3H-29 $345,901 Johnson NHS-080-6(348)239--11-52 $6,181,588Des Moines NHSX-061-2(93)--3H-29 $2,006,723 Johnson NHS-080-6(351)239--11-52 $2,982,932Dubuque NHSX-020-9(253)--3H-31 $2,208,354 Johnson NHS-080-6(356)239--11-52 $2,627,819Dubuque NHSX-20-9(183)--3H-31 $20,888,062 Johnson NHS-080-6(358)239--11-52 $6,133,892Dubuque NHSX-20-9(184)--3H-31 $132,156 Johnson NHS-080-6(360)239--11-52 $7,746,345
Bridge Program
Congestion Mitigation and Air Quality
Emergency Relief Program
Highway Safety Improvement Program
National Highway Performance Program
375
Advance Construction Projects - STIP Number 22001
Johnson NHS-080-6(372)239--11-52 $36,809,516 Pottawattamie IM-29-3(71)54--13-78 $3,056,549Johnson NHS-080-6(393)239--11-52 $296,620 Pottawattamie IM-29-3(73)54--13-78 $4,302,081Johnson NHS-080-6(403)239--11-52 $4,529,232 Pottawattamie IM-29-3(74)54--13-78 $4,963,227Johnson NHS-080-6(404)239--11-52 $3,646,991 Pottawattamie IM-480-1(166)0--13-78 $4,769,379Johnson NHS-080-6(440)239--11-52 $520,348 Pottawattamie IM-480-1(167)0--13-78 $3,846,569Johnson IM-080-7(116)249--13-52 $2,447,684 Poweshiek IM-080-5(357)182--13-79 $136,245Johnson IM-080-7(117)248--13-52 $122,889 Poweshiek IM-080-5(358)182--13-79 $70,453Johnson IM-080-7(157)249--13-52 $117,091 Poweshiek IM-NHS-080-5(356)182--03-79 $7,728,639Johnson IM-080-7(166)249--13-52 $8,525,867 Scott IM-074-1(278)5--13-82 $1,285,702Keokuk NHSX-092-8(40)--3H-54 $3,204,105 Scott IM-074-1(279)5--13-82 $8,044,258Linn NHSX-151-3(169)--3H-57 $53,499 Scott IM-NHS-074-1(197)5--03-82 $10,841,772Linn NHSX-151-3(170)--3H-57 $1,993,198 Scott IM-NHS-074-1(198)5--03-82 $12,488,551Mills NHSX-534-1(91)--3H-65 $1,243,549 Scott IM-NHS-074-1(200)5--03-82 $29,094,067Polk IMX-035-4(296)88--02-77 $5,026,306 Scott IM-NHS-074-1(206)5--03-82 $6,633,687Pottawattamie IM-NHS-80-1(408)--03-78 $4,100,335 Scott IMX-280-8(169)8--02-82 $4,385,000Pottawattamie NHSX-059-3(46)--3H-78 $2,324,330 Scott IMX-280-8(162)8--02-82 $13,253,850Pottawattamie IM-029-3(192)54--13-78 $14,764,719 Tama NHSX-030-6(236)--3H-86 $2,929,430Pottawattamie IM-029-3(193)54--13-78 $17,735,583 Tama NHSX-30-6(192)-3H-86 $190,829Pottawattamie IM-029-3(218)53--13-78 $3,206,268 Tama NHSX-030-6(234)--3H-86 $456,000Pottawattamie IM-029-3(219)53--13-78 $2,463,143 Tama NHSX-030-6(235)--3H-86 $256,800Pottawattamie IM-029-3(220)53--13-78 $5,916,405 Tama NHSX-030-6(240)--3H-86 $9,793,600Pottawattamie IM-0293(221)54--13-78 $14,598,284 Tama NHSX-030-6(241)--3H-86 $154,400Pottawattamie IM-029-3(222)54--13-78 $7,033,281 Tama NHSX-030-6(242)--3H-86 $42,400Pottawattamie IM-29-3(70)53--13-78 $1,976,918 Tama NHSX-030-6(256)--3H-86 $3,384,800Pottawattamie IM-029-3(183)53--13-78 $1,961,292 Warren IM-035-2(430)61--13-91 $1,050,250Pottawattamie IM-029-3(184)53--13-78 $1,918,959 Warren IM-035-2(451)61--13-91 $6,211Pottawattamie IM-029-3(232)53--13-78 $255,719 Warren IM-NHS-035-2(429)61-03-91 $6,396,096Pottawattamie IM-NHS-029-3(68)53--03-78 $4,546,680 Wayne NHSX-065-1(36)--3H-93 $2,720,000Pottawattamie IM-NHS-29-3(141)53-03-78 $26,297,330 Winneshiek NHSX-150-5(9)--3H-96 $2,933,264Pottawattamie IM-NHS-29-3(142)53-03-78 $4,833,703 Woodbury IMX-029-6(302)127--02-97 2557800
Statewide RRP-RR01(214)--8A-00 $315,000 Statewide RRP-RR05(216)--8A-00 $292,500Statewide RRP-RR01(215)--8A-00 $252,000 Statewide RRP-RR06(214)--8A-00 $315,000Statewide RRP-RR01(216)--8A-00 $450,000 Statewide RRP-RR03(207)--8A-00 $374,400Statewide RRP-RR02(208)--8A-00 $9,360 Statewide RRP-RR01(209)--8A-00 $374,400Statewide RRP-RR02(214)--8A-00 $369,000 Statewide RRP-RR02(202)--8A-00 $336,960Statewide RRP-RR02(215)--8A-00 $270,000 Statewide RRP-RR02(207)--8A-00 $327,600Statewide RRP-RR02(216)--8A-00 $369,000 Statewide RRP-RR02(212)--8A-00 $327,600Statewide RRP-RR03(214)--8A-00 $369,000 Statewide RRP-RR03(208)--8A-00 $257,400Statewide RRP-RR03(215)--8A-00 $157,500 Statewide RRP-RR04(207)--8A-00 $279,000Statewide RRP-RR03(216)--8A-00 $360,000 Statewide RRP-RR04(208)--8A-00 $234,900Statewide RRP-RR04(214)--8A-00 $369,000 Statewide RRP-RR05(208)--8A-00 $234,000Statewide RRP-RR04(216)--8A-00 $427,500 Statewide RRP-RR06(208)--8A-00 $374,400Statewide RRP-RR05(214)--8A-00 $270,000
Rail-Highway Crossing Program
National Highway Performance Program
376
Advance Construction Projects - STIP Number 22001
Statewide RRP-RR02(190)--8A-00 $3,000 Statewide SPR-PL20(056)-8H-00 $962,687Statewide SPR-RE20(056)-8H-00 $1,072,517 Statewide SPR-PL21(057)--8H-00 $4,172,994Statewide SPR-RE21(057)--8H-00 $460,659 Statewide SPR-PL22(058)--8H-00 $5,866,766Statewide SPR-PL19(055)--8H-00 $44,790
Boone STP-017-2(23)--2C-08 $2,757,361 Pottawattamie STP-092-1(72)--2C-78 $1,981,285Clinton STP-067-2(65)--2C-23 $2,195,742 Sioux STP-010-1(81)--2C-84 $4,297,638Crawford STP-141-3(74)--2C-24 $5,461,486 Statewide RRP-RR00(213)--8A-00 $7,500Jones STP-064-1(27)--2C-53 $2,279,848 Statewide STP-000-T(168)-2C-00 $75,681Keokuk STP-021-1(42)--2C-54 $3,280,687 Statewide STP-00JT(178)--2C-00 $288,000Lee BRF-002-9(32)--38-56 $2,141,989 Statewide STP-CCT(17)--2C-00 $50,000Mills STP-275-2(23)--2C-65 $2,151,180 Story STP-065-5(37)--2C-85 $5,789,286Polk ITS-035-4(216)92-25-77 $161,778 Webster STP-175-6(37)--2C-94 $4,333,050Pottawattamie BRF-92-1(64)--38-78 $196,240 Wright STP-017-4(46)--2C-99 $1,936,042
Statewide Planning and Research
Surface Transportation Block Grant Program
377
RPA 0 / StatewideCMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
23405
Iowa Department ofTransportation
21157
STP-A-000s()--22-00
Bus Replacement: Large Urban and Rural Areas
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$3,800,000$3,000,000
$3,800,000$3,000,000
$3,800,000$3,000,000
$3,800,000$3,000,000
$15,200,000$12,000,000
ER
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
15055
Iowa Department ofTransportation
21158
ER-000T()--58-00
STATEWIDE: EMERGENCY RELIEF PROGRAMPROJECTS TO BE DETERMINED
Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$19,189,000$19,189,000
$19,189,000$19,189,000
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
8109
Iowa Department ofTransportation
21163
HSIP-000T()--2H-00
Statewide Railroad Crossings
Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$500,000$450,000
$500,000$450,000
$500,000$450,000
$500,000$450,000
$2,000,000$1,800,000
15169
Iowa Department ofTransportation
21164
HSIP-000T()--2H-00
Statewide safety projects including centerline rumble strips,intersection improvements, and pavement markings
Pave, Traffic Signals, Pavement Markings
Authorized TotalFederal Aid
RegionalSwap
$1,250,000$1,125,000
$20,166,000$18,149,400
$25,000,000$22,500,000
$25,000,000$22,500,000
$71,416,000$64,274,400
25371
Iowa Department ofTransportation
21162
HSIP-000T(865)--2H-00
Statewide Interstate Guardrail Repair
Landscaping
Authorized TotalFederal Aid
RegionalSwap
$865,000$778,500
$865,000$778,500
$865,000$778,500
$865,000$778,500
$3,460,000$3,114,000
16
Iowa Department ofTransportation
21159
RRP-000T()--48-00
Railroad Highway Crossing and Surface Repair Programs
Pavement Rehab, Railroad Signals
Authorized TotalFederal Aid
RegionalSwap
$6,329,257$5,696,331
$6,329,257$5,696,331
$6,329,257$5,696,331
$6,329,257$5,696,331
$25,317,028$22,785,324
378
MISC
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
13250
Iowa Department ofTransportation
21160
MISC-000T()--XX-00
Allocated Funds: Research, Tech, Min Bus, Seatbelt, UseTax, Inv, NCPD, Etc.
Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$2,500,000$2,000,000
$2,500,000$2,000,000
$2,500,000$2,000,000
$2,500,000$2,000,000
$10,000,000$8,000,000
22190
Iowa Department ofTransportation
21165
MISC-000T()--XX-00
SPR; Technology Transfer; DOT Co-op/Intern Program;Management Systems. Snooper Trucks.
Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$13,455,283$10,764,227
$13,455,283$10,764,227
$13,455,283$10,764,227
$13,455,283$10,764,227
$53,821,132$43,056,908
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16884
Iowa Department ofTransportation
21167
IM-000T()--13-00
STATEWIDE INTERSTATE SIGNING
Traffic Signs
Authorized TotalFederal Aid
RegionalSwap
$1,000,000$900,000
$1,000,000$900,000
$1,000,000$900,000
$1,000,000$900,000
$4,000,000$3,600,000
16883
Iowa Department ofTransportation
21168
IM-000T()--13-00
STATEWIDE INTERSTATE LIGHTING
Lighting
Authorized TotalFederal Aid
RegionalSwap
$500,000$450,000
$500,000$450,000
$500,000$450,000
$500,000$450,000
$2,000,000$1,800,000
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45523
Iowa Department ofTransportation
21155
NRT-000T(170)--9G-00
Support for 2021 Bicycle Summit
Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$8,000$6,000
$8,000$6,000
379
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
8252
Iowa Department ofTransportation
21169
STP-000T()--2C-00
Construction Industry Training Program
Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$1,000,000$800,000
$1,000,000$800,000
$1,000,000$800,000
$1,000,000$800,000
$4,000,000$3,200,000
8119
Iowa Department ofTransportation
21170
STP-000T()--2C-00
PREVOCATIONAL TRAINING AND DBE SUPPORTSERVICES
Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$360,000$288,000
$360,000$288,000
$360,000$288,000
$360,000$288,000
$1,440,000$1,152,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44754
University ofNorthern Iowa
21153
TAP-R-000T(137)--8T-00
UNI Integrated Roadside Vegetation Management
Landscaping
Authorized TotalFederal Aid
RegionalSwap
$676,750$541,400
$676,750$541,400
45792
Iowa Department ofTransportation
21448
TAP-R-000T(185)--8T-00
2021-2022 Iowa Bicycle Map Printing
Ped/Bike Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$55,000$44,000
$55,000$44,000
DOT Note: Project to be authorized using TE funds.
380
MPO 22 / AAMPOCMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
48676
MPO 22 / AAMPO
21456
STP-A-0155()--86-85
In the city of Ames, CyRide: Transit Operations for #6Brown, #11 Cherry, #12 Lilac, West Ames
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$519,446$415,555
$519,446$415,555
45554
MPO 22 / AAMPO
21421
STP-A-PA22()--86-85
CyRide: Transit Operations for #6 Brown, #11 Cherry, #12Lilac, West Ames (#1 Red, #11 Cherry, #7 Purple)
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$540,456$432,363
$540,456$432,363
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34214
MPO 22 / AAMPO
21002
RGPL-PA22(RTP)--PL-85
Trans Planning
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$126,897$101,897
$126,897$101,897
$126,897$101,897
$126,897$101,897
$507,588$407,588
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36918
MPO 22 / AAMPO
21005
RGTR-0155()--ST-85
CyRide: Vehicle Replacement
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$850,000$225,000
$225,000
$850,000$225,000
$225,000
381
MPO 23 / CMPONHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37860
Iowa Department ofTransportation
21038
BRF-30()--38-57
US30: CEDAR RIVER 0.5 MI W OF E JCT US 151 (EB)
Bridge Replacement, Traffic Signs
Authorized TotalFederal Aid
RegionalSwap
$11,258,000$9,006,400
$11,258,000$9,006,400
38070
Iowa Department ofTransportation
21037
IM-380-6()--13-57
I-380: TOWER TERRACE INTERCHANGE IN HIAWATHA(STATE SHARE)
Grade and Pave, Bridge Replacement, Traffic Signs
Authorized TotalFederal Aid
RegionalSwap
$17,545,000$15,790,500
$17,545,000$15,790,500
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
17107
MPO 23 / CMPO
21027
RGPL-PA23()--PL-00
MPO: Planning Funds
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$374,841$299,841
$374,841$299,841
$374,841$299,841
$374,841$299,841
$1,499,364$1,199,364
382
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36956
MPO 23 / CMPO
21022
RGTR-PA23()--ST-57
CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$1,032,000$825,000
$825,000
$1,032,000$825,000
$825,000
PA Note: Replacing bus numbers 2091 and 2092.
36957
MPO 23 / CMPO
21023
RGTR-PA23()--ST-57
Purchase 1 medium-duty 33' replacement ADA paratransitservice bus.
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$205,000$164,000
$164,000
$205,000$164,000
$164,000
PA Note: Replacing bus numbers 2402
37075
Cedar Rapids
21044
TAP-U-1187(799)--8I-57
In the city of Cedar Rapids, FromCherryHill Pk,to Sharon Lnalong Gordon Ave,Cherokee Pk to Midway Dr
Ped/Bike ROW, Ped/Bike Grade & Pave
Authorized
9/21/2021
TotalFederal Aid
RegionalSwap
$2,742,000$2,193,000
$2,193,000
$2,742,000$2,193,000
$2,193,000
PA Note: Project has $1,442,000 in STBG and $751,000 in TAP.
35692
Marion
21032
TAP-U-4775(635)--8I-57
In the city of Marion, 10TH AVE,Construct 10' side paths inROW on N&S sides of street from 35th St to Eagleview Dr
Ped/Bike Grade & Pave
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$3,537,000$2,830,000
$2,830,000
$3,537,000$2,830,000
$2,830,000
PA Note: Project has $2,583,000 in STBG and $247,000 in TAP.
39556
Marion
21043
TAP-U-4775(638)--8I-57
In the city of Marion, From E side of Indian Creek Bridgeover Marion Bvld E to 7th St
Ped/Bike Grade & Pave, Ped/Bike Structures
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$1,812,000$1,450,000
$1,450,000
$1,812,000$1,450,000
$1,450,000
383
MPO 24 / MAPACHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44990
Council Bluffs
21442
BRM-CHBP-1642(683)--NB-78
On N BROADWAY, Over INDIAN CREEK, from SpencerAvenue to 100ft North of Indian Creek S19 T75 R43
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$2,300,260$1,256,260
$1,044,000
$2,300,260$1,256,260
$1,044,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38153
Iowa Department ofTransportation
21048
IM-NHS-I-80()--03-78
I-80: I-29/80/480 INTERSTATES IN COUNCIL BLUFFS(CBIS) STATE SHARE
Grade and Pave, Bridge Replacement, Traffic Signs
Authorized TotalFederal Aid
RegionalSwap
$227,000,000$192,950,000
$138,740,000$124,866,000
$4,183,000$3,764,700
$4,588,000$4,129,200
$374,511,000$325,709,900
DOT Note: Project includes 2021 and 2022 NHFP funding.
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
29733
MPO 24 / MAPA
21046
RGPL-PA24()--PL-78
UZA of Pottawattamie County including the City of CouncilBluffs
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$148,567$115,567
$148,567$115,567
$148,567$115,567
$148,567$115,567
$594,268$462,268
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45410
Iowa Department ofTransportation
21049
STP-92()--2C-78
IA92: HARRY LANGDON BLVD IN COUNCIL BLUFFS TO0.3 MI E OF STATE ORCHARD RD
Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$2,861,000$2,288,800
$2,861,000$2,288,800
384
MPO 25 / BSRCNHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38167
Iowa Department ofTransportation
21058
IMX-280()--02-82
I-280: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)
Bridge Rehabilitation
Authorized TotalFederal Aid
RegionalSwap
$17,000,000$15,300,000
$17,000,000$15,300,000
38136
Iowa Department ofTransportation
21059
IMX-I-280()--02-82
I-280: W OF IA 22 TO MISSISSIPPI RIVER (EB & WB)
Grade and Pave
Authorized TotalFederal Aid
RegionalSwap
$6,036,274$5,432,646
$6,036,274$5,432,646
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16066
MPO 25 / BSRC
21054
RGPL-PA25()--PL-82
Quad Cities Urbanized Area
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$318,660$240,928
$318,660$240,928
$318,660$240,928
$318,660$240,928
$1,274,640$963,712
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36969
Bettendorf
21055
STP-U-0587(639)--70-82
On FRST GRV DR, from International Dr to Middle Rd
Grade and Pave, Ped/Bike Grade & Pave
Authorized
1/19/2022
TotalFederal Aid
RegionalSwap
$6,630,000$5,181,000
$5,181,000
$6,630,000$5,181,000
$5,181,000
DOT Note: PE authorized for $829,791
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44724
Davenport
21061
BROS-1827(687)--8J-82
On ELM ST, Over Canadian Pacific RR, from Mound St toEastern Ave S19 T78 R04E
Bridge Replacement
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$2,470,525$1,000,000
$2,470,525$1,000,000
385
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39479
Eldridge
21433
TAP-T-2290(614)--8V-82
In the city of Eldridge, On E LeClaire Rd, from N 16th Ave .5Miles to Scott Park Rd,
Ped/Bike Grade & Pave
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$559,200$447,200
$447,200
$559,200$447,200
$447,200
386
MPO 26 / DMAMPOCHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36680
Polk County
21065
BRS-CHBP-C077(228)--GB-77
On NE 82ND AVE 0.10 miles W of NE 109 St,
Bridge Replacement
Authorized
9/21/2021
TotalFederal Aid
RegionalSwap
$1,610,060$710,060
$900,000
$900,000
$1,610,060$710,060
$900,000$900,000
CMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39415
MPO 26 / DMAMPO
21073
STP-A-PA26()--86-77
Dart: Euclid/Douglas Ave Crosstown (Route 50) - Yr 3
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$392,186$313,749
$392,186$313,749
48668
MPO 26 / DMAMPO
21458
STP-A-PA26()--86-77
DART's Route #17 Extension from Altoona to Bondurant
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$63,432$50,745
$63,432$50,745
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39326
Iowa Department ofTransportation
21426
IM-I-35()--13-77
I-35: S OF NE 54TH AVE TO 0.5 MI S OF E 1ST ST INANKENY
Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$3,935,000$3,541,000
$3,935,000$3,541,000
47127
Iowa Department ofTransportation
21455
IMX-080-4(94)140--02-77
W US 65 INTERCHANGE EASTBOUND EXIT RAMP
Pave
Authorized TotalFederal Aid
RegionalSwap
$775,000$697,500
$775,000$697,500
387
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38361
MPO 26 / DMAMPO
21063
RGPL-PA26()--PL-77
MPO Planning Funding
Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$985,059$758,809
$985,059$758,809
$985,059$758,809
$985,059$758,809
$3,940,236$3,035,236
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39464
West Des Moines
21412
RGPL-8260()--ST-77
In the city of West Des Moines, University Avenue CorridorMaster Plan
Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$150,000$100,000
$100,000
$150,000$100,000
$100,000
45512
MPO 26 / DMAMPO
21089
RGPL-PA26()--ST-00
Pavement data collection
Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$300,000$250,000
$250,000
$300,000$250,000
$250,000
27146
MPO 26 / DMAMPO
21062
RGPL-PA26()--ST-77
Transportation Management Association
Miscellaneous, Ped/Bike Miscellaneous, TransitInvestments
Authorized TotalFederal Aid
RegionalSwap
$119,000$95,000
$95,000
$119,000$95,000
$95,000
$119,000$95,000
$95,000
$119,000$95,000
$95,000
$476,000$380,000
$380,000
22143
MPO 26 / DMAMPO
21064
RGTR-PA26()--ST-00
DART: Vehicle Purchase
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$1,680,000$1,400,000
$1,400,000
$2,027,200$1,410,200
$1,410,200
$2,038,000$1,400,000
$1,400,000
$1,693,750$1,355,000
$1,355,000
$7,438,950$5,565,200
$5,565,200
35369
Ankeny
21069
TAP-T-0187(640)--8V-77
In the City of Ankeny, High TrestleTrail Extension SEMagazine Road to 750' south of center line of SE OralaborRoad
Ped/Bike Grade & Pave
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$2,160,000$700,000
$700,000
$2,160,000$700,000
$700,000
PA Note: $100K of STBG Funding, $600K of TAP Funding
35375
Norwalk
21088
TAP-T-5587(604)--8V-91
In the city of Norwalk, a pedestrian bridge over an inlet toLake Colechester on Beardsley Street.
Ped/Bike Grade & Pave
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$500,000$100,000
$100,000
$500,000$100,000
$100,000
388
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45480
Clive
21074
TAP-T-1425(628)--8V-25
In the city of Clive, Clive Aquatic Center, and Campbell Park
Ped/Bike Miscellaneous
Authorized
1/22/2031
TotalFederal Aid
RegionalSwap
$204,000$170,000
$170,000
$204,000$170,000
$170,000
PA Note: In the city of Clive, Clive Aquatic Center, and Campbell Park and purchase of e-Bikes for BCycle fleet
36682
Warren County
21071
TAP-U-C091(131)--8I-91
Palomino Parkway to East County Line Road includingSuncrest Drive, and Pilmer Dr
Ped/Bike ROW, Ped/Bike Grade & Pave
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$240,000$192,000
$192,000
$240,000$192,000
$192,000
389
MPO 27 / DMATSPL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
13239
MPO 27 / DMATS
21091
RGPL-PA27()--PL-31
MPO Planning: Transportation Planning in DMATS area
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$136,495$109,196
$135,196$109,196
$135,196$109,196
$135,196$109,196
$542,083$436,784
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45236
MPO 27 / DMATS
21097
RGPL-PA27()--ST-31
Transportation Planning
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$18,750$15,000
$15,000
$18,750$15,000
$15,000
$37,500$30,000
$30,000
45237
MPO 27 / DMATS
21098
RGPL-PA27()--ST-31
In the City of Dubuque Study and implement trafficmanagement systems,
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$41,666$33,333
$33,333
$41,666$33,333
$33,333
$41,666$33,333
$33,333
$124,998$99,999
$99,999
390
MPO 28 / MPOJCNHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38069
Iowa Department ofTransportation
21124
IM-380()--13-52
I-380: W FOREVERGREEN RD INTERCHANGE 2.0 MI NOF I-80 IN TIFFIN (STATE SHARE)
Traffic Signals
Authorized TotalFederal Aid
RegionalSwap
$400,000$360,000
$400,000$360,000
38068
Iowa Department ofTransportation
21122
NHS-I-80()--19-52
I-80: I-380/US 218 INTERCHANGE NEAR IOWA CITY(STATE SHARE)
Grade and Pave, Bridge New, Bridge Replacement
Authorized TotalFederal Aid
RegionalSwap
$207,565,000$173,430,250
$60,061,000$48,048,800
$14,029,000$11,223,200
$4,629,000$3,703,200
$286,284,000$236,405,450
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39689
MPO 28 / MPOJC
21118
RGPL-JCCOG(RTP)--PL-52
JCCOG: METROPOLITAN PLANNING PL FUNDS
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$267,761$179,761
$223,761$179,761
$223,761$179,761
$223,761$179,761
$939,044$719,044
391
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
33922
Iowa City
21105
STP-U-3715(666)--70-52
In the city of Iowa City, On American Legion Road, fromScott Boulevard east 1.1 Miles to Taft Avenue
Grade and Pave
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$9,152,000$3,608,000
$3,608,000
$9,152,000$3,608,000
$3,608,000
PA Note: Project #33923 funding in FYFY20 moved back to FY21. Map was corrected to match project description on December 29, 2020.
33923
Iowa City
21109
STP-U-3715(668)--70-52
On IWV Road, from Hebl Ave east 1.5 Miles to Hwy 218,and Hebl Ave from IC Landfill to IWV
Grade and Pave
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$3,517,280$930,000
$930,000
$3,517,280$930,000
$930,000
PA Note: Awarded $930,000 in STP funds. These funds will be used in the MPOJC eligible segment between Hwy 218 and Hurt Road. Project funding was moved from FY20 to FY21 to allow fundingin project #33922 to move up to FY20. Amended FY20 TIP on May 27, 2020 to add water main between IWV Road and Iowa City Landfill. Amended FY21 TIP on November 18, 2020 to add watermain between IWV Road and Iowa City Landfill.
38310
North Liberty
21102
STP-U-5557(622)--70-52
In the city of North Liberty, On Ranshaw Way, from ZellerStreet south to Hawkeye Drive
Pavement Rehab/Widen, Lighting, Ped/Bike Structures
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$6,697,600$2,576,000
$2,576,000
$6,697,600$2,576,000
$2,576,000
DOT Note: Project has been approved for the use of Advance Construction. Reimbursement can begin in FFY 2022.
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39427
Iowa City
21108
BROS-3715(664)--8J-52
In City of Iowa City, 2nd Avenue bridge, 2nd Avenue bridgeover Ralston Creek
Bridge Replacement
Authorized
9/21/2021
TotalFederal Aid
RegionalSwap
$577,200$444,000
$577,200$444,000
392
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
33926
Coralville
21114
TAP-U-1557(646)--8I-52
In the city of Coralville, On Coralville Iowa River Trail, fromRocky Shore Drive northwest .5 Miles to Clear Creek
Ped/Bike Grade & Pave
Authorized
8/18/2020
TotalFederal Aid
RegionalSwap
$924,560$613,000
$613,000
$924,560$613,000
$613,000
DOT Note: Project eligible for FHWA TAP funding
33925
Tiffin
21115
TAP-U-7662(614)--8I-52
In the city of Tiffin, On Tiffin Clear Creek trail Phase 6, fromKimberlite Street south .1 Miles to Brown Street
Ped/Bike Grade & Pave
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$228,800$102,000
$102,000
$228,800$102,000
$102,000
DOT Note: Project eligible for FHWA TAP funding
393
MPO 29 / SIMPCOPL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
18694
MPO 29 / SIMPCO
21126
RGPL-PA29(RTP)--PL-97
RGLPL: SIMPCO: MPO Planning
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$270,991$142,228
$270,991$142,228
$270,991$142,228
$270,991$142,228
$1,083,964$568,912
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
19720
Sioux City
21450
STP-ES-7057(672)--8I-97
In the city of Sioux City, Milwaukee Railroad Shops HistoricDistrict, Railroad and Museum Trail Improvements
Historic Preservation, Ped/Bike Grade & Pave
Authorized
10/19/2021
TotalFederal Aid
RegionalSwap
$563,000$450,000
$563,000$450,000
36933
Sioux City
21127
TAP-U-7057(700)--8I-97
On Big Sioux/Highway 12 Trail, from Big Sioux River toHighway 12
Ped/Bike Grade & Pave
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$600,000$300,000
$600,000$300,000
DOT Note: Project eligible for FHWA TAP funding. Funding from part of 2010 Statewide TE award
394
MPO 30 / INRCOGNHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38218
Iowa Department ofTransportation
21144
NHSX-20()--3H-7
US20: US 63 TO IA 21 IN WATERLOO (EB & WB)
Grade and Pave, Traffic Signs
Authorized TotalFederal Aid
RegionalSwap
$16,561,000$13,248,800
$16,561,000$13,248,800
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16106
MPO 30 / INRCOG
21130
RGPL-PA30()--PL-07
Waterloo MPO Planning: PL For Waterloo MPOTransportation Planning
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$239,025$191,220
$239,025$191,220
$239,025$191,220
$239,025$191,220
$956,100$764,880
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45454
MPO 30 / INRCOG
21141
RGPL-PA30()--ST-07
MPO-wide Iowa Pavement Management Program data
Outside Services Planning
Authorized TotalFederal Aid
RegionalSwap
$78,000$78,000
$78,000
$78,000$78,000
$78,000
37824
Cedar Falls
21136
TAP-U-1185(654)--8I-07
In the city of Cedar Falls, On Union Rd Trail, from W 12th Stsouth 1.0 Miles to W 27th St
Ped/Bike Grade & Pave
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$375,000$300,000
$300,000
$375,000$300,000
$300,000
39420
Waterloo
21440
TAP-U-8155(773)--8I-07
On US 63, from Parker St S 1.7 miles to Washington St
Outside Services Engineering
Authorized
1/22/2031
TotalFederal Aid
RegionalSwap
$435,890$198,832
$198,832
$435,890$198,832
$198,832
PA Note: Total STIP limit is $348,712.
395
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39135
Elk Run Heights
21135
TAP-U-2312(604)--8I-07
In the city of Elk Run Heights, On Mayor's Park, west ofMcCoy Rd and south of Lafayette Rd
Ped/Bike Grade & Pave, Ped/Bike Structures,Ped/Bike Miscellaneous
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$536,000$428,000
$428,000
$536,000$428,000
$428,000
35359
Waterloo
21133
TAP-U-8155(766)--8I-07
In the city of Waterloo, On Shaulis Rd Trail, from CedarTerrace Dr E 0.7 miles to Cedar Valley Nature Trail
Ped/Bike Grade & Pave
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$593,000$474,000
$474,000
$593,000$474,000
$474,000
DOT Note: Project eligible for FHWA TAP funding
39134
Waterloo
21134
TAP-U-8155(767)--8I-07
In the city of Waterloo, On Park Ave, from Franklin St South0.75 Miles to US 218 SB
Ped/Bike Structures, Ped/Bike Miscellaneous
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$172,000$137,000
$137,000
$172,000$137,000
$137,000
39421
Waterloo
21132
TAP-U-8155(774)--8I-07
In the city of Waterloo, On US 63, from Parker St S 1.7miles to Washington St
Landscaping, Ped/Bike Grade & Pave, Ped/BikeMiscellaneous
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$2,069,500$1,587,466
$1,110,528
$2,069,500$1,587,466
$1,110,528
PA Note: $476,938 in old TE funds. Project has both MPO TAP and STBG funds.
DOT Note: Project to be authorized using only Transportation Enhancement funds.
396
RPA 1CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38489
Elkader
21425
BHM-CHBP-2315(607)--NA-22
In the city of Elkader, On Bridge Street, Over Turkey River
Bridge Rehabilitation
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$1,491,580$491,580
$1,000,000
$1,491,580$491,580
$1,000,00035080
Allamakee County
21181
BRS-CHBP-C003(63)--GB-03
On B25, Over Cota Creek, S23 T97N R03W
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$700,340$382,340
$318,000
$700,340$382,340
$318,00029473
Howard County
21185
BRS-CHBP-C045(88)--GB-45
On V10, Over Staff Creek
Bridge Replacement
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$500,000$273,100
$226,900
$500,000$273,100
$226,900
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45443
Iowa Department ofTransportation
21187
HSIP-IA150()--2H-96
IA150: FAYETTE CO TO SCL OF CALMAR
Pavement Widening, Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$5,410,000$4,328,000
$5,410,000$4,328,000
DOT Note: Project includes 3R and HSIP funds.
45284
Iowa Department ofTransportation
21188
HSIPX-IA150()--3L-33
IA150: HALL ST IN WEST UNION TO WINNESHIEK CO
Pavement Widening
Authorized TotalFederal Aid
RegionalSwap
$1,600,000$1,440,000
$1,600,000$1,440,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
20
RPA 1
21184
RGPL-PA01(RTP)--ST-00
UERPC RPA-1 TRANSPORT PLANNING
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$37,500$30,000
$30,000
$37,500$30,000
$30,000
$37,500$30,000
$30,000
$43,750$35,000
$35,000
$156,250$125,000
$125,000
397
RPA 2CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
29446
Kossuth County
21334
BROSCHBP-C055(189)--GA-55
On B14, Over E FORK DES MOINES RIVER, near NE S12T97 R29, Burt Township
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$518,480$218,480
$300,000
$518,480$218,480
$300,00034608
Worth County
21330
BROSCHBP-C098(79)--GA-98
On A39, Over STREAM, S8 T98 R21
Bridge Replacement
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$325,000$177,515
$147,485
$325,000$177,515
$147,48534712
Franklin County
21329
BRS-CHBP-C035(102)--GB-35
On S41, Over DD NO. 6, from 80th Street North 1 Miles to90th Street
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$650,000$355,030
$294,970
$650,000$355,030
$294,9707371
Kossuth County
21335
BRS-CHBP-C055(176)--GB-55
A42: N Line 19, Greenwood Twp.E FORK DES MOINESRIVER
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$518,480$218,480
$300,000
$518,480$218,480
$300,00037681
Mitchell County
21327
BRS-CHBP-C066(78)--GB-66
On S70, Over ROCK CREEK, S8 T98 R18
Bridge Replacement
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$350,000$191,170
$158,830
$350,000$191,170
$158,830
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
48581
Iowa Department ofTransportation
21459
HSIPX-9()--3L-98
IA9: 1 MI E OF CO RD S56 TO E JCT CO RD T26
Pavement Widening
Authorized TotalFederal Aid
RegionalSwap
$2,570,000$2,313,000
$2,570,000$2,313,000
45398
Iowa Department ofTransportation
21340
HSIPX-US18()--3L-34
US18: E OF CEDAR RIVER RR IN CHARLES CITY TOLITTLE CEDAR RIVER (STATE SHARE)
Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$3,417,000$3,075,300
$3,417,000$3,075,300
398
NHFP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38423
Iowa NorthernRailway Company
21341
NHFP-INRC(001)--2F-00
In the city of Garner, On Iowa Northern Railway
Miscellaneous
Authorized
9/21/2021
TotalFederal Aid
RegionalSwap
$1,390,068$1,112,068
$1,390,068$1,112,068
DOT Note: Project authorized for ROW $60,960.
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38231
Iowa Department ofTransportation
21337
NHSX-018-6()--3H-34
US18: US 218/IA 27 INTERSECTION IN FLOYD
Grade and Pave, Bridge New, Right of Way
Authorized TotalFederal Aid
RegionalSwap
$21,846,000$17,476,800
$436,000$348,800
$22,282,000$17,825,600
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
73
RPA 2
21328
RGPL-PA02(RTP)--ST-00
NIACOG: RPA 2 TRANSPORTATION PLANNING
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$30,000$25,000
$25,000
$70,000$56,000
$56,000
$70,000$56,000
$56,000
$70,000$56,000
$56,000
$240,000$193,000
$193,000
399
RPA 3CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36416
Dickinson County
21342
BROSCHBP-C030(59)--GA-30
On A 18, Over LITTLE SIOUX RIVER, S32 T100 R37
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$750,000$382,340
$367,660
$750,000$382,340
$367,66035314
Lyon County
21434
BROSCHBP-C060(124)--NC-60
On BIRCH AVE, Over KLONDIKE CREEK,
Bridge New
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$600,000$382,240
$217,760
$600,000$382,240
$217,76036566
Osceola County
21436
BROSCHBP-C072(76)--NC-72
On OLIVE AVE, Over POLLY CREEK, WLINE S13 T99 R42
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$350,000$191,170
$158,830
$350,000$191,170
$158,830
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45321
Iowa Department ofTransportation
21347
HSIP-IA10()--2H-84
IA10: IA 12 IN HAWARDEN TO US 75
Pavement Widening, Pavement Rehab, Right of Way
Authorized TotalFederal Aid
RegionalSwap
$7,427,000$5,941,600
$7,427,000$5,941,600
DOT Note: Project includes 3R and HSIP funding.
45283
Iowa Department ofTransportation
21350
HSIPX-10()--3L-84
IA10: IA 12 IN HAWARDEN TO NEAR OHIO AVE
Pavement Widening
Authorized TotalFederal Aid
RegionalSwap
$893,000$803,700
$893,000$803,700
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37993
Iowa Department ofTransportation
21348
BRF-59()--38-71
US59: ABANDONED RR 0.9 MI S OF CO RD B40(REMOVE BRIDGE)
Grade and Pave, Right of Way
Authorized TotalFederal Aid
RegionalSwap
$3,189,000$2,551,200
$3,189,000$2,551,200
400
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45552
Dickinson CountyBoard ofSupervisors
21423
NRT-C030(062)--9G-30
Starting east of IA Hwy 86 heading west to 193rd Ave inMontgomery
Ped/Bike Grade & Pave
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$883,680$221,750
$883,680$221,750
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36951
RPA 3
21344
RGTR-PA03()--ST-00
RTA dba/RIDES
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$111,600$89,600
$89,600
$111,600$89,600
$89,600
PA Note: Purchase replacement of 2 minivans
401
RPA 4CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
12827
Woodbury County
21360
BROSCHBP-C097(141)--GA-97
O'Brien Ave.: From D38 to 210th Street in section 36-88-43over Wright Creek
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$1,100,000$600,820
$499,180
$1,100,000$600,820
$499,18033890
Woodbury County
21354
BRS-CHBP-C097(139)--GB-97
On K 64, Over DRAINAGE, from 160th St N 0.1 miles in S3T88 R45
Bridge Approach Repair, Bridge Replacement, Guardrail
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$850,000$464,270
$385,730
$850,000$464,270
$385,730
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38001
Iowa Department ofTransportation
21359
BRF-12()--38-75
IA12: INDIAN CREEK 4.0 MI N OF CO RD C16
Bridge Replacement, Right of Way
Authorized TotalFederal Aid
RegionalSwap
$2,355,000$1,884,000
$2,355,000$1,884,000
402
RPA 5CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
2806
Webster County
21367
BROSCHBP-C094(124)--NC-94
On Mining Boulevard, Over Unnamed Creek, in NE1/4 S18T88 R28
Bridge Replacement
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$100,000$54,620
$45,380
$100,000$54,620
$45,38032243
Webster County
21366
BROSCHBP-C094(125)--NC-94
On 120TH ST, Over Bass Creek, along NLINE S14 T90R29
Bridge Replacement
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$130,000$71,006
$130,000$71,006
36553
Calhoun County
21365
BRS-CHBP-C013(98)--GB-13
On 270th Street (D36), Over Lake Creek, from NW cornerSec. 32 East 0.2 Miles, along NLINE S32 T88N R32W
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$690,410$300,410
$389,000
$690,410$300,410
$389,000
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45444
Iowa Department ofTransportation
21368
HSIP-IA17()--2H-99
IA17: HAMILTON CO TO SCL OF EAGLE GROVE
Pavement Widening, Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$3,483,000$2,790,000
$3,483,000$2,790,000
DOT Note: Project includes 3R and HSIP funds.
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45418
Iowa Department ofTransportation
21370
STP-175()--2C-94
IA175: ECL OF LOHRVILLE TO GOWRIE
Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$4,494,000$3,595,200
$4,494,000$3,595,200
403
RPA 6CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35106
Marshall County
21382
BROSCHBP-C064(134)--NC-64
On In 2500 Mile of 260th St, Over North Timber Creek, S23T83 R18
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$600,000$327,720
$272,280
$600,000$327,720
$272,28037809
Poweshiek County
21374
BRS-CHBP-C079(060)--GB-79
On F62, Over SUGAR CREEK, S7 T78 R16
Bridge Replacement
Authorized
9/21/2021
TotalFederal Aid
RegionalSwap
$850,000$464,270
$385,730
$850,000$464,270
$385,730
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45286
Iowa Department ofTransportation
21387
HSIPX-20()--3L-42
US20: E OF US 65 TO 2.0 MI E OF CO RD S56 (VARLOC)
Pavement Widening
Authorized TotalFederal Aid
RegionalSwap
$2,215,000$1,993,500
$2,215,000$1,993,500
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38154
Iowa Department ofTransportation
21385
IM-NHS-80()--03-79
I-80: 1.0 MI W OF IA 146 TO 2.0 MI E OF IA 146
Grade and Pave, Pave, Bridge Replacement
Authorized TotalFederal Aid
RegionalSwap
$8,524,000$7,245,400
$16,960,000$14,416,000
$358,000$304,300
$25,842,000$21,965,700
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36931
Hardin CountyBoard ofSupervisors
21380
NRT-C042(87)--9G-42
On Iowa River Trail, from Bridge 19 south 9.3 Miles toBridge 25
Bridge Rehabilitation, Culvert Replacement
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$618,000$494,000
$247,000
$618,000$494,000
$247,000
PA Note: admistrative map changes 05/10/2021
404
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36302
RPA 6
21375
STP-U-PA06()--70-64
Purchase 1 expansion non-accessible minivan
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$53,000$42,000
$42,000
$53,000$42,000
$42,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39485
Hardin CountyBoard ofSupervisors
21379
TAP-R-C042(104)--8T-42
On the Iowa River's Edge Trail, starting at 12th Avenue inEldora and ending NE of 1304 S River Road in SteamboatRock
Ped/Bike Grade & Pave
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$1,130,000$570,000
$145,000
$1,130,000$570,000
$145,000
405
RPA 7CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16345
Bremer County
21392
BROSCHBP-C009(84)--NC-09
On GRAND AVE, Over STREAM, S18 T91 R13
Culvert Replacement
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$581,088$131,088
$450,000
$581,088$131,088
$450,00037638
Bremer County
21391
BRS-CHBP-C009(82)--GB-09
On V14, Over HORTON CREEK, on WLINE S23 T93 R14
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$726,036$426,036
$300,000
$726,036$426,036
$300,00037534
Chickasaw County
21390
BRS-CHBP-C019(105)--GB-19
On V48 (Quinlan Ave), Over EAST FORK WAPSIPINICON,S1/4 S13 T94 R12
Bridge Replacement
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$600,000$327,720
$272,280
$600,000$327,720
$272,28032353
Grundy County
21393
BRS-CHBP-C038(114)--GB-38
On D35, Over tributary of Black Hawk Creek, Ctr S34 T88R15
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$450,000$245,790
$450,000$245,790
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
48365
Iowa Department ofTransportation
21451
HSIPX-063-8(69)--3L-19
2 Lane to 4 Lane Transition N of New Hampton
Lighting
Authorized TotalFederal Aid
RegionalSwap
$42,000$37,800
$42,000$37,800
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45419
Iowa Department ofTransportation
21401
NHSX-3()--3H-12
IA3: W JCT IA 14 TO IA 188
Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$4,062,000$3,249,600
$4,062,000$3,249,600
406
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
1403
RPA 7
21388
RGPL--PA07(RTP)--ST-00
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$50,000$40,000
$40,000
$50,000$40,000
$40,000
$50,000$40,000
$40,000
$50,000$40,000
$40,000
$200,000$160,000
$160,000
407
RPA 8DEMO
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44681
Clinton County
21449
HDP-C023(124)--6B-23
On 220th Street, from Y-70 to Z-24 double chip seal withmicrosurface
Authorized
8/17/2021
TotalFederal Aid
RegionalSwap
$550,000$440,000
$550,000$440,000
DOT Note: Project awarded AID Demonstration funds
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45438
Iowa Department ofTransportation
21405
HSIP-IA136()--2H-31
IA136: CC RR IN DYERSVILLE TO IA 3 IN LUXEMBURG
Pavement Widening, Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$4,845,000$3,876,000
$4,845,000$3,876,000
DOT Note: Project includes 3R and HSIP funds.
45442
Iowa Department ofTransportation
21404
HSIP-US67()--2H-23
US67: 37TH AVE N IN CLINTON TO CO RD E50
Pavement Widening, Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$4,700,000$3,870,000
$4,700,000$3,870,000
DOT Note: Project includes 3R and HSIP funds.
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
478
RPA 8
21402
RGPL-PA08(RTP)--ST-00
On ECIA Transportation Planning
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$90,375$72,300
$72,300
$65,300$52,300
$52,300
$65,300$52,300
$52,300
$65,300$52,300
$52,300
$286,275$229,200
$229,200
408
RPA 9STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
533
RPA 9
21411
RGPL-PA09(RTP)--ST-00
Region 9
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$17,566$10,000
$10,000
$17,566$10,000
$10,000
$17,566$10,000
$10,000
$17,566$10,000
$10,000
$70,264$40,000
$40,000
409
RPA 10CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
20727
Benton County
21414
BROSCHBP-C006(110)--GA-06
24 AVE DR: Over Bear Creek
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$725,000$395,995
$329,005
$725,000$395,995
$329,00532445
Benton County
21415
BROSCHBP-C006(116)--GA-06
On 22nd Ave, Over PRATT CREEK, S36 T86 R11
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$500,000$273,100
$226,900
$500,000$273,100
$226,90037778
Benton County
21416
BROSCHBP-C006(117)--NC-06
On 30 AVE DR, Over BR OPOSSUM CK, S33 T85 R09
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$400,000$218,480
$181,520
$400,000$218,480
$181,52035353
Johnson County
21194
BROSCHBP-C052(123)--NC-52
On BLACK HAWK AVE, Over BR CLEAR CR, S20 T80 R08
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$775,000$273,100
$501,900
$775,000$273,100
$501,9002745
Benton County
21413
BRS-CHBP-C006(115)--GB-06
On V-44, Over Br Prairie Creek, at WLINE S6 T82 R11
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$300,000$163,860
$136,140
$300,000$163,860
$136,140
410
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45439
Iowa Department ofTransportation
21201
HSIP-IA150()--2H-06
IA150: VINTON TO I-380
Pavement Widening, Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$5,622,600$4,723,800
$5,622,600$4,723,800
DOT Note: Project includes 3R and HSIP funds.
45437
Iowa Department ofTransportation
21200
HSIP-IA150()--2H-06
IA150: I-380 TO INDEPENDENCE
Pavement Widening, Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$6,500,000$5,184,000
$6,500,000$5,184,000
DOT Note: Project includes 3R and HSIP funds.
45285
Iowa Department ofTransportation
21202
HSIPX-IA22()--3L-92
IA22: 9TH ST IN KALONA TO E OF BOISE ST INRIVERSIDE
Pavement Widening
Authorized TotalFederal Aid
RegionalSwap
$2,600,000$2,340,000
$2,600,000$2,340,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38151
Iowa Department ofTransportation
21196
IM-NHS-80()--03-52
I-80: 1.5 MI E OF IA 1 TO 0.5 MI E OF CO RD X30
Grade and Pave, Pave, Grading
Authorized TotalFederal Aid
RegionalSwap
$38,211,000$32,479,350
$28,619,000$24,326,150
$41,946,000$35,654,100
$15,295,000$13,000,750
$124,071,000$105,460,350
38216
Iowa Department ofTransportation
21197
NHSX-030-6()--3H-06
US30: 11TH AVE DR TO W JCT US 218
Grade and Pave, Bridge New, Right of Way
Authorized TotalFederal Aid
RegionalSwap
$63,192,000$50,553,600
$36,509,000$29,207,200
$99,701,000$79,760,800
39282
Iowa Department ofTransportation
21199
NHSX-151()--3H-57
US151: CRABAPPLE CREEK 2.9 MI N OF N JCT IA 13(NB)
Grade and Pave, Bridge Replacement, Traffic Signs
Authorized TotalFederal Aid
RegionalSwap
$4,006,000$3,204,800
$4,006,000$3,204,800
411
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16834
RPA 10
21192
RGPL-PA10()--ST-00
Region 10-ECICOG: Region 10 Planning
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$103,750$83,000
$83,000
$107,500$86,000
$86,000
$111,250$89,000
$89,000
$115,000$92,000
$92,000
$437,500$350,000
$350,000
45406
Iowa Department ofTransportation
21203
STP-64()--2C-53
IA64: WYOMING TO MONMOUTH
Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$3,487,000$2,789,600
$3,487,000$2,789,600
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39442
Jones CountyConservation Board
21195
TAP-R-C053(089)--8T-53
Wapsipinicon Trail Phase 2: From Int. of Stallion Creek andShaw Rd 0.5 miles to Hale Bridge and trailhead
Ped/Bike Grade & Pave
Authorized
9/21/2021
TotalFederal Aid
RegionalSwap
$466,145$381,272
$243,145
$466,145$381,272
$243,145
PA Note: Project also includes construction of a new trailhead entry.
39444
Washington CountyConservation Board
21190
TAP-R-C092(110)--8T-92
On Kewash Nature Trail, from end of Phase 1, 7400 feet(1.40 miles) to bridge over Crooked Creek
Ped/Bike Grade & Pave
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$517,315$317,315
$317,315
$517,315$317,315
$317,315
39441
Johnson CountyConservation Board
21191
TAP-U-C052(124)--8I-52
On Clear Creek Trail, from Half Moon Ave 2.5 miles to FWKent Park
Ped/Bike Development
Authorized
1/22/2031
TotalFederal Aid
RegionalSwap
$677,671$337,260
$337,260
$677,671$337,260
$337,260
412
RPA 11CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36285
Dallas County
21215
BROSCHBP-C025(115)--NC-25
On 250TH ST, Over Walnut Creek, On the south line of S2,T79, R26, Walnut Township
Bridge Replacement
Authorized
9/21/2021
TotalFederal Aid
RegionalSwap
$480,000$245,790
$230,000
$480,000$245,790
$230,00037548
Madison County
21224
BROSCHBP-C061(124)--NC-61
On HOGBACK BRIDGE RD, Over DRAINAGE, at S1/4 S23T76 R28
Bridge Replacement
Authorized
9/21/2021
TotalFederal Aid
RegionalSwap
$1,000,000$655,440
$344,560
$1,000,000$655,440
$344,56032785
Warren County
21219
BROSCHBP-C091(132)--GA-91
On R35 (10TH AVE), Over BRANCH BADGER CREEK,S31 T77 R25
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$900,000$491,580
$408,420
$900,000$491,580
$408,42024850
Warren County
21222
BROSCHBP-C091(134)--NC-91
On IDAHO ST, Over BRANCH MIDDLE RIVER, from 50THAVE 0.3 miles S15 T76 R25
Bridge Replacement
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$400,000$218,480
$181,520
$400,000$218,480
$181,52037403
Jasper County
21212
BRS-CHBP-C050(128)--GB-50
On T38, Over SUGAR CREEK, S13 T80 R17
Bridge Replacement
Authorized
9/21/2021
TotalFederal Aid
RegionalSwap
$450,000$245,790
$204,210
$450,000$245,790
$204,21015532
Jasper County
21213
BRS-CHBP-C050(129)--GB-50
On F-24, Over Clear Creek, S2 T80 R21
Bridge Replacement
Authorized
9/21/2021
TotalFederal Aid
RegionalSwap
$750,000$409,650
$340,350
$750,000$409,650
$340,35014749
Madison County
21223
BRS-CHBP-C061(125)--GB-61
On CLARK TOWER RD., Over North Fork Clanton Creek,S12 T74 R28
Bridge Replacement
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$1,750,000$955,850
$794,150
$1,750,000$955,850
$794,15029272
Story County
21211
BRS-CHBP-C085(155)--GB-85
On E18, Over East Indian Creek, on NLINE S19 T85 R22
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$550,410$300,410
$250,000
$550,410$300,410
$250,00032798
Warren County
21220
BRS-CHBP-C091(133)--GB-91
On S23, Over MILL CREEK, S27 T74 R22
Bridge Replacement
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$700,000$382,340
$317,660
$700,000$382,340
$317,660
413
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38066
Iowa Department ofTransportation
21228
IM-080-3()--13-25
I-80: US 6/169 IN DE SOTO TO CO RD R16
Grade and Pave, Pave, Bridge Replacement
Authorized TotalFederal Aid
RegionalSwap
$17,792,000$16,012,800
$9,387,000$8,448,300
$25,078,000$22,570,200
$52,257,000$47,031,300
38156
Iowa Department ofTransportation
21238
IM-NHS-35()--03-91
I-35: N OF NORTH RIVER TO S OF BADGER CREEK(SB)
Grade and Pave, Bridge Replacement, Wetland Mitigation
Authorized TotalFederal Aid
RegionalSwap
$14,339,000$12,188,150
$14,339,000$12,188,150
38096
Iowa Department ofTransportation
21235
IMX-80()--02-50
I-80: 0.9 MI E OF IA 224 TO 1.0 MI W OF IA 146 (EB &WB)
Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$4,990,000$4,491,000
$4,990,000$4,491,000
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45471
Dallas CountyConservation Board
21227
NRT-C025(116)--9G-25
On 130th Street, approx. 1,700 ft West of M Avenue to MAvenue
Ped/Bike Grade & Pave
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$664,000$328,175
$664,000$328,175
414
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36937
RPA 11
21210
RGPL-PA11()--ST-00
HIRTA: Vehicle Purchase
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$167,795$134,236
$134,236
$144,820$115,820
$115,820
$124,795$99,836
$99,836
$437,410$349,892
$349,892
45415
Iowa Department ofTransportation
21236
STP-65()--2C-85
US65: 0.5 MI S OF US 30 TO IA 175 IN HUBBARD
Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$6,767,000$5,413,600
$6,767,000$5,413,600
38272
Iowa Department ofTransportation
21231
STP-IA17()--2C-08
IA17: 0.5 MI N OF US 30 TO 3.0 MI N (STATE SHARE)
Pave, Bridge New, Grading
Authorized TotalFederal Aid
RegionalSwap
$7,800,000$6,229,200
$6,062,000$4,849,600
$200,000$160,000
$14,062,000$11,238,800
DOT Note: Project includes $490,000 in repurposed earmark funding
45521
RPA 11
21240
STP-PA11()--2C-00
Pavement Data Collection Opt In
Miscellaneous
Authorized TotalFederal Aid
RegionalSwap
$281,250$225,000
$225,000
$281,250$225,000
$225,000
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38665
Madison County
21209
BROS-C061(119)--5F-61
On Settlers Ave., Over STREAM, at SE S36 T77N R27W
Bridge Replacement
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$550,000$440,000
$550,000$440,000
415
RPA 12CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35111
Guthrie County
21244
BRS-CHBP-C039(95)--GB-39
On P20, Over North River, S34 T78 R31
Bridge Replacement
Authorized
9/21/2021
TotalFederal Aid
RegionalSwap
$750,000$314,611
$435,389
$750,000$314,611
$435,389
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45440
Iowa Department ofTransportation
21246
HSIP-IA39()--2H-24
IA39: US 59 TO MAIN ST N IN DELOIT
Pavement Widening, Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$3,500,000$2,960,000
$3,500,000$2,960,000
DOT Note: Project includes 3R and HSIP funds.
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45353
Iowa Department ofTransportation
21245
STP-IA141()--2C-24
IA141: S JCT US 59 TO WCL MANNING
Pavement Rehab/Widen, Right of Way
Authorized TotalFederal Aid
RegionalSwap
$6,705,000$5,364,000
$500,000
$6,705,000$5,364,000
$500,000
DOT Note: Project includes RPA 12 contribution of $500,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39475
Manning
21241
TAP-R-4702(607)--8T-14
Manning SRTS South Phase I from 10th Street to PleasantStreet
Ped/Bike Paving
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$164,000$131,200
$82,000
$164,000$131,200
$82,000
416
RPA 13CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37637
Cass County
21253
BROSCHBP-C015(71)--GA-15
On Boston Road, Over small creek, from Hwy 71 east 1.0,on NLINE S7 T77 R35
Bridge Replacement
Authorized
10/20/2020
TotalFederal Aid
RegionalSwap
$400,000$218,480
$400,000$218,480
20520
Fremont County
21254
BROSCHBP-C036(78)--GA-36
On J40, Over Fisher Creek, S35 T69 R40
Bridge Replacement
Authorized
10/20/2020
TotalFederal Aid
RegionalSwap
$750,000$409,650
$340,350
$750,000$409,650
$340,35037142
MontgomeryCounty
21257
BROSCHBP-C069(72)--GA-69
On N18 (T Ave), Over Tributary to West Nodaway River atNW 1/4 corner, S33 T71 R36
Culvert Replacement
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$300,000$177,515
$122,485
$300,000$177,515
$122,48531031
MontgomeryCounty
21256
BRS-CHBP-C069(73)--GB-69
On M37, Over Crabapple Creek, on Ctr S16 T72 R39
Bridge Replacement
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$700,000$327,720
$372,280
$700,000$327,720
$372,28022376
Page County
21251
BRS-CHBP-C073(123)--GB-73
On J-20, Over West Tarkio River, S27 T70 R38
Bridge Replacement
Authorized
10/20/2020
TotalFederal Aid
RegionalSwap
$650,030$355,030
$295,000
$650,030$355,030
$295,000
417
RPA 14HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45274
Iowa Department ofTransportation
21266
HSIPX-34()--3L-88
US34: W JCT US 169 IN AFTON
Grade and Pave
Authorized TotalFederal Aid
RegionalSwap
$376,000$338,400
$376,000$338,400
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38018
Iowa Department ofTransportation
21268
BRF-169()--38-80
US169: MIDDLE FORK GRAND RIVER 5.3 MI S OF IA 2
Bridge Replacement
Authorized TotalFederal Aid
RegionalSwap
$1,551,000$1,240,800
$1,551,000$1,240,800
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
19871
RPA 14
21264
RGPL-PA14(FY15)--ST-0
RPA 14: Transportation Planning ATURA RPA 14
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$96,705$33,516
$33,516
$96,705$33,516
$33,516
$96,705$33,516
$33,516
$96,705$33,516
$33,516
$386,820$134,064
$134,064
418
RPA 15CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36328
Jefferson County
21417
BROSCHBP-C051(75)--GA-51
On 257TH ST, Over STREAM, S24 T71 R10
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$500,000$273,100
$226,900
$500,000$273,100
$226,90037569
Wapello County
21419
BROSCHBP-C090(95)--GA-90
On 215th Avenue, Over Bear Creek, S27 T72 R15
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$375,000$204,825
$170,175
$375,000$204,825
$170,17529233
Wapello County
21418
BROSCHBP-C090(96)--NC-90
On 28th Street, Over Chippewa Creek, NE S28 T71 R12
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$175,000$95,585
$79,415
$175,000$95,585
$79,415
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45320
Iowa Department ofTransportation
21270
HSIP-IA2()--2H-89
IA2: CO RD W40 TO PARK ST IN DONNELLSON
Pavement Widening, Pavement Rehab, Right of Way
Authorized TotalFederal Aid
RegionalSwap
$2,721,000$2,176,800
$2,721,000$2,176,800
DOT Note: Project includes 3R and HSIP funds
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37976
Iowa Department ofTransportation
21277
BRF-92()--38-62
IA92: MUCHAKINOCK CREEK 1.3 MI W OF IA 163
Bridge Replacement, Wetland Mitigation
Authorized TotalFederal Aid
RegionalSwap
$4,682,000$3,745,000
$4,682,000$3,745,000
45395
Iowa Department ofTransportation
21275
NHSX-92()--3H-54
IA92: E JCT IA 149 TO CO RD V67
Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$3,586,000$2,868,800
$3,586,000$2,868,800
419
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
881
RPA 15
21269
RGPL-PA15(RTP)--ST-00
RPA 15: RPA 15 TRANSPORTATION PLANNING
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$43,750$35,000
$35,000
$43,750$35,000
$35,000
45496
RPA 15
21280
RGTR-PA15()--ST-00
Transit Capital Investment, Replace bus # 151
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$55,000$44,000
$44,000
$55,000$44,000
$44,000
45497
RPA 15
21281
RGTR-PA15()--ST-00
Transit Capital Investment, replace bus # 152
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$55,000$44,000
$44,000
$55,000$44,000
$44,000
45498
RPA 15
21282
RGTR-PA15()--ST-00
Transit Capital Replacement, replace bus # 156
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$55,000$44,000
$44,000
$55,000$44,000
$44,000
45499
RPA 15
21283
RGTR-PA15()--ST-00
Transit Capital Investment, replace bus # 102
Transit Investments
Authorized TotalFederal Aid
RegionalSwap
$55,000$44,000
$44,000
$55,000$44,000
$44,000
45373
Iowa Department ofTransportation
21271
STP-IA21()--2C-54
IA21: IA 92 TO NCL OF WHAT CHEER
Pavement Rehab, Right of Way
Authorized TotalFederal Aid
RegionalSwap
$3,975,000$3,175,000
$3,975,000$3,175,000
420
RPA 16DEMO
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38347
Burlington
21444
EDP-0977(650)--7Y-29
In the city of Burlington, On MAIN ST, from High St toAngular St; then on JEFFERSON ST, from Central Ave toFront St
Grade and Pave, Landscaping, Ped/Bike ROW
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$15,193,193$12,423,193
$15,193,193$12,423,193
45532
Burlington
21445
EDP-0977(653)--7Y-29
In the City of Burlington, Downtown RiverfrontImprovements
Grade and Pave, Landscaping
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$4,576,807$4,576,807
$4,576,807$4,576,807
NHFP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39425
Mount Pleasant
21285
NHFP-5292(626)--2F-44
In the city of Mount Pleasant, BJRY Transload Building
Buildings, Outside Services Engineering
Authorized
1/11/2022
TotalFederal Aid
RegionalSwap
$670,000$536,000
$670,000$536,000
DOT Note: PE Authorized for $84,439.20
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37966
Iowa Department ofTransportation
21299
BRF-2()--38-56
IA2: SUGAR CREEK 1.8 MI W OF US 218
Bridge Replacement, Right of Way
Authorized TotalFederal Aid
RegionalSwap
$2,974,000$2,379,200
$2,974,000$2,379,200
38226
Iowa Department ofTransportation
21297
NHSX-061-2()--3H-29
US61: S OF 210TH ST TO N OF MEDIAPOLIS
Pave, Bridge New, Grading
Authorized TotalFederal Aid
RegionalSwap
$19,115,000$15,292,000
$26,853,000$21,482,400
$45,968,000$36,774,400
38225
Iowa Department ofTransportation
21298
NHSX-61()--3H-29
US61: MEMORIAL PARK RD IN BURLINGTON TO S OF210TH ST
Grade and Pave, Bridge Replacement, Erosion Control
Authorized TotalFederal Aid
RegionalSwap
$27,240,000$21,792,000
$2,669,000$2,135,200
$29,909,000$23,927,200
421
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
949
RPA 16
21290
RGPL-PA16(RTP)--ST-00
SEIRPC: RPA 16 TRANSPORTATION PLANNING
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$237,344$160,082
$160,082
$237,344$160,082
$160,082
$277,549$222,039
$222,039
$277,549$222,039
$222,039
$1,029,786$764,242
$764,242
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39157
Burlington
21292
TAP-U-0977(652)--8I-29
In the City of Burlington, trail along West Ave fromRoosevelt Ave east to Terrace Dr
Traffic Signals, Pavement Markings, Ped/Bike Grade &Pave
Authorized
12/21/2021
TotalFederal Aid
RegionalSwap
$298,601$238,880
$238,880
$298,601$238,880
$238,880
DOT Note: PE Authorized for $21,267
29688
Des Moines CountyBoard ofSupervisors
21289
TAP-U-C029()--8I-29
Flint River Trail, North along US Hwy 61 to Flint Bottom Rd
Ped/Bike Grade & Pave, Ped/Bike Structures
Authorized TotalFederal Aid
RegionalSwap
$500,000$400,000
$400,000
$500,000$400,000
$400,000
DOT Note: Project eligible for FHWA TAP funding. NHSX-061-2(69)--3H-29
422
RPA 17CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
19094
Monroe County
21302
BROSCHBP-C068(74)--GA-68
On T55, 720th Ave, Over Miller Creek, from Hwy 137 SouthApprox 1 Miles to said bridge, at NE S14 T73 R16
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$750,000$409,650
$340,350
$750,000$409,650
$340,350
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37881
Iowa Department ofTransportation
21304
BRF-5()--38-4
IA5: DITCH 0.6 MI S OF CO RD T30
Bridge Replacement, Right of Way
Authorized TotalFederal Aid
RegionalSwap
$2,457,000$1,965,600
$2,457,000$1,965,600
37882
Iowa Department ofTransportation
21305
BRF-5()--38-4
IA5: SHOAL CREEK 2.8 MI N OF CO RD T20
Bridge Replacement, Right of Way
Authorized TotalFederal Aid
RegionalSwap
$3,964,000$3,171,200
$3,964,000$3,171,200
38224
Iowa Department ofTransportation
21310
NHSX-63()--3H-26
US63: SOAP CREEK 0.9 MI S OF WAPELLO CO
Bridge Replacement, Wetland Mitigation
Authorized TotalFederal Aid
RegionalSwap
$6,975,000$5,580,000
$6,975,000$5,580,000
45397
Iowa Department ofTransportation
21309
NHSX-IA5()--3H-04
IA5: N OF HAYNES AVE IN CENTERVILLE TO N OF US34 IN ALBIA
Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$8,624,000$6,899,200
$8,624,000$6,899,200
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
1001
RPA 17
21300
RGPL-PA17(RTP)--ST-00
RPA 17: RPA 17 TRANSPORTATION PLANNING
Trans Planning
Authorized TotalFederal Aid
RegionalSwap
$41,000$33,000
$33,000
$41,000$33,000
$33,000
$41,000$33,000
$33,000
$41,000$33,000
$33,000
$164,000$132,000
$132,000
423
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38430
Murray
21420
TAP-R-5327(601)--8T-20
In the city of Murray, Murray Rec Complex Trail, south of1st Street between 130th and 135th Ave
Ped/Bike Development
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$120,000$96,000
$96,000
$120,000$96,000
$96,000
PA Note: The project amount is $95,233.
39548
Decatur CountyConservation Board
21430
TAP-R-C027(078)--8T-27
Approximately 1.2 miles from west edge of Leon to westedge of Little River Lake,
Ped/Bike Development
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$432,600$345,600
$345,600
$432,600$345,600
$345,600
38429
Centerville
21435
TAP-U-1210(612)--8I-04
In Centerville: S.10th, Water, Lane to CHS Dr, Liberty to S.Main & Morgan Cline Park to Drake & Francis Ave to S.Main
Ped/Bike Development
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$910,000$374,766
$374,766
$910,000$374,766
$374,766
424
RPA 18HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45445
Iowa Department ofTransportation
21317
HSIP-US275()--2H-65
US275: N OF NCL OF TABOR TO US 34
Pavement Widening, Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$5,026,000$4,020,800
$5,026,000$4,020,800
DOT Note: Project includes 3R and HSIP funds.
45441
Iowa Department ofTransportation
21318
HSIP-US30()--2H-43
US30: MISSOURI RIVER TO I-29
Pavement Widening, Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$5,737,800$4,590,200
$5,737,800$4,590,200
DOT Note: Project includes 3R and HSIP funds.
45275
Iowa Department ofTransportation
21325
IHSIPX-I-80()--08-78
I-80: CO RD G30 TO CO RD L66
Guardrail
Authorized TotalFederal Aid
RegionalSwap
$2,250,000$2,000,000
$2,250,000$2,000,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45409
Iowa Department ofTransportation
21326
NHSX-59()--3H-78
US59: CO RD G30 TO SCL OF AVOCA
Pavement Rehab
Authorized TotalFederal Aid
RegionalSwap
$3,449,000$2,759,200
$3,449,000$2,759,200
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
33878
Harlan
21454
STP-E-3275(603)--8V-83
In the city of Harlan, On US 59, S12 T79 R39
Miscellaneous
Authorized
10/01/2021
TotalFederal Aid
RegionalSwap
$120,000$96,000
$96,000
$120,000$96,000
$96,000
PA Note: Two signs were removed (along IA Hwy 44) and the two signs on US Hwy 59 remain. Item will be presented as an amendment to the RPA TIP to the RPA-18 Policy and TechnicalCommittee on April 14. Grant funds are shared between TPMS #33878 (STP-E-3275(603)--8V-83) Community Entrance Signs and TPMS #40168 (TAP-U-3275(605)--8I-83) Street Lights.
425
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38386
Elk Horn
21311
TAP-R-2305(602)--8T-83
On In the City of Elk Horn between Salem Street andMadison Street., from This project will be a loop of .31 Miles
Ped/Bike Paving, Ped/Bike Grade & Pave, Ped/BikeDevelopment
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$152,000$100,000
$100,000
$152,000$100,000
$100,000
40089
Mills CountyConservation Board
21313
TAP-R-C065(109)--8T-65
On On the Wabash Trace in Silver City
Bridge Replacement
Authorized TotalFederal Aid
RegionalSwap
$189,000$151,000
$151,000
$189,000$151,000
$151,000
426
MPO 22 / AAMPOSWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36927
Ames
STBG-SWAP-0155(703)--SG-85
In the city of Ames, On East 13th Street, from Duff AvenueEast .4 Miles to Meadowlane Avenue,
Pavement Rehab
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$2,500,000
$1,600,000
$1,600,000
$2,500,000
$1,600,000
$1,600,000
427
MPO 23 / CMPOSWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34198
Cedar Rapids
STBG-SWAP-1187(807)--SG-57
In the city of Cedar Rapids, On EDGEWOOD RD NE, fromHwy 100 north to Blairs Ferry Rd
Pavement Rehab, Sanitary Sewer, Ped/Bike Paving
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$1,952,000
$925,000
$925,000
$1,952,000
$925,000
$925,00039462
Cedar Rapids
STBG-SWAP-1187(808)--SG-57
Tower Terrace Rd aprx 300' E of Edgewood Rd to aprx1,000' W of Miller Rd & all intersections.
Grade and Pave, Pavement Widening, Ped/Bike Grade& Pave
Authorized
8/17/2021
TotalFederal Aid
RegionalSwap
$1,893,000
$1,514,000
$1,514,000
$1,893,000
$1,514,000
$1,514,000
39463
Hiawatha
STBG-SWAP-3432(611)--SG-57
Tower Terrace Rd aprx 300' E of N.Center Point Rd to aprx75' E of Goldfinch Ln; roundabout at N.Center Point Rd
Grade and Pave, Pavement Widening, Ped/Bike Grade& Pave
Authorized
8/17/2021
TotalFederal Aid
RegionalSwap
$3,727,000
$1,514,000
$1,514,000
$3,727,000
$1,514,000
$1,514,000
428
MPO 26 / DMAMPOSWAP-CMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45484
Waukee
ICAAP-SWAP-8177(626)--SH-25
In City of Waukee, intersection of Ashworth Dr, Warrior Lnand Northview Dr
Pavement Rehab/Widen, Traffic Signs
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$2,077,370
$1,277,370
$2,077,370
$1,277,370
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35368
Ankeny
STBG-SWAP-0187(643)--SG-77
In the city of Ankeny, On West First Street, from SW ScottStreet to Ankeny Boulevard
Pave
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$6,030,000
$2,530,000
$2,530,000
$6,030,000
$2,530,000
$2,530,00025172
Des Moines
STBG-SWAP-1945(841)--SG-77
On East Douglas Avenue Reconstruction, from East 42ndStreet to East 56th Street
Grade and Pave, Pavement Rehab/Widen, Right of Way
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$10,000,000
$5,800,000
$5,800,000
$10,000,000
$5,800,000
$5,800,00036674
Des Moines
STBG-SWAP-1945(853)--SG-77
In the City of Des Moines, Ingersoll Avenue Reconstruction,from Polk Blvd to 42nd St
Pavement Rehab
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$2,750,000
$1,000,000
$1,000,000
$2,750,000
$1,000,000
$1,000,00035377
West Des Moines
STBG-SWAP-8260(651)--SG-77
In the city of West Des Moines, Grand Avenue Widening:from 1st Street to 6th Street
Grade and Pave
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$5,586,550
$3,652,550
$3,652,550
$5,586,550
$3,652,550
$3,652,550PA Note: STBG funding limit: $3,652,550
34816
Polk County
STBG-SWAP-C077(229)--FG-77
On NW 26TH ST, from NW 66 Ave to Hwy 415
Pavement Rehab
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$6,750,000
$1,750,000
$1,750,000
$6,750,000
$1,750,000
$1,750,000
429
MPO 29 / SIMPCOSWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36656
Sergeant Bluff
STBG-SWAP-6890(610)--SG-97
In the city of Sergeant Bluff, On First Street, from Port NealRoad to C Street
Pavement Rehab
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$2,000,000
$1,400,000
$1,400,000
$2,000,000
$1,400,000
$1,400,00035398
Sioux City
STBG-SWAP-7057(705)--SG-97
In the city of Sioux City, On South Fairmount Street, fromTransit Avenue to Vine Avenue
Pavement Rehab
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$2,756,000
$1,824,000
$1,824,000
$2,756,000
$1,824,000
$1,824,000
430
MPO 30 / INRCOGSWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
29681
Cedar Falls
STBG-SWAP-1185(652)--SG-07
In the city of Cedar Falls, On Cedar Heights Dr, fromGreenhill Rd south 0.8 miles to Viking Rd
Pavement Rehab/Widen, Right of Way, Outside ServicesEngineering
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$4,055,000
$2,900,000
$2,900,000
$4,055,000
$2,900,000
$2,900,000
37823
Waterloo
STBG-SWAP-8155(769)--SG-07
In the city of Waterloo, Traffic Cameras & Fiber OpticsCommunications: Bound by Walnut, Mullan, Washington, 6th
Traffic Signals, Miscellaneous
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$620,000
$496,000
$496,000
$620,000
$496,000
$496,000PA Note: PE is allowed by the MPO for this project.
431
RPA 1SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38486
Decorah
BRM-SWAP-1867(616)--SD-96
On POLE LINE RD, Over DRAINAGE, S8 T98 R08
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00035077
Allamakee County
BROS-SWAP-C003(66)--FE-03
On Smithfield Drive, Over YELLOW RIVER, S9 T96N R05W
Bridge Replacement
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$710,000
$710,000
$710,000
$710,00032839
Allamakee County
BROS-SWAP-C003(68)--SE-03
On Livingood Springs Road, Over YELLOW RIVER, S3T96N R06W
Bridge Replacement
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$610,000
$600,000
$610,000
$600,00038821
Fayette County
BROS-SWAP-C033(140)--SE-33
On 120TH ST, Over UNNAMED CREEK, S7 T92 R10
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$380,000
$350,000
$380,000
$350,00018433
Fayette County
BROS-SWAP-C033(141)--SE-33
On L AVE, Over VOLGA RIVER, on WLINE S29 T92 R08
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$360,000
$360,000
$360,000
$360,00038820
Fayette County
BROS-SWAP-C033(142)--SE-33
On W 55, Over BEAVER CREEK, S24 T94 R07
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$430,000
$350,000
$430,000
$350,00034726
Winneshiek County
BROS-SWAP-C096(150)--SE-96
On SCENIC RIVER RD, Over UPPER IOWA RIVER, fromintersection of Bluffton Rd 0.9 miles S25 T99 R09
Bridge Replacement, Grading
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$900,000
$900,000
$900,000
$900,00038664
Fayette County
BRS-SWAP-C033(139)--FF-33
On W 14, Over VOLGA RIVER, S30 T93 R09
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$560,000
$500,000
$560,000
$500,000
432
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
20122
Winneshiek County
STBG-SWAP-C096(153)--SG-96
On W 20, from Co. Rd A34 N 12 miles to Co. Rd. A18
Pavement Rehab
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$3,667,800
$1,488,000
$1,853,800
$3,667,800
$1,488,000
$1,853,800
433
RPA 2SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39449
Plymouth
BROS-SWAP-6142(601)--SE-17
In the city of Plymouth, On Main Street Bridge Replacement
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$580,000
$464,000
$580,000
$464,00032747
Floyd County
BROS-SWAP-C034(102)--FE-34
On B35 (180th Street), Over SHELL ROCK RIVER, onNLINE S33 T96 R18
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$1,400,000
$1,400,000
$1,400,000
$1,400,00032381
Franklin County
BROS-SWAP-C035(93)--SE-35
On 200th Street, Over Buffalo Creek, S1 T92 R21
Bridge Replacement
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00032526
Mitchell County
BROS-SWAP-C066(76)--SE-66
On A19, Over WAPSIPINICON RIVER, on WLINE S21T100 R15
Bridge Replacement
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$640,000
$640,000
$640,000
$640,00036340
Worth County
BROS-SWAP-C098(80)--SE-98
On 350TH ST, Over DRAINAGE DITCH, from Killdeer AveW .55 miles S34 T98 R21
Bridge Replacement
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00026731
Cerro GordoCounty
BRS-SWAP-7642(602)--FF-17
On B65/Larch St, Over unnamed drainage ditch, 1500 Feetto east of Finch Avenue, in S24 T94 R22
Bridge Replacement
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
434
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36921
Algona
STBG-SWAP-0085(617)--SG-55
In the city of Algona, On Main Street, from Lucas St. .26Miles to Commercial St.
Grade and Pave
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$1,247,000
$997,000
$997,000
$1,247,000
$997,000
$997,00036923
Mason City
STBG-SWAP-4822(638)--SG-17
In the city of Mason City, On Monroe Avenue, from 5thStreet SW 1.04 Miles to 12th Street NW
Pavement Rehab, Culvert Replacement
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$1,500,000
$1,000,000
$1,000,000
$1,500,000
$1,000,000
$1,000,000
435
RPA 3SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
32593
Clay County
BROS-SWAP-C021(145)--FE-21
On N14, Over ELK CREEK, in NW S15 T95 R35
Bridge Replacement
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037616
Palo Alto County
BROS-SWAP-C074(109)--SE-74
On 400th Ave, 0.25 miles North of Hwy 18
Bridge Replacement
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$240,000
$240,000
$240,000
$240,00036271
Lyon County
BRS-SWAP-C060(123)--FF-60
On K60, over Tom Creek
Bridge Replacement
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$668,000
$668,000
$668,000
$668,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44785
Emmet County
HSIP-SWAP-C032(53)--FJ-32
Emmet County - Multiple Locations,
Pavement Widening
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$346,000
$329,000
$346,000
$329,000
436
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36950
Spencer
STBG-SWAP-7170(629)--SG-21
In the city of Spencer, On 4th Street, from from intersectionof 5th Ave E W 5680 Feet
Grade and Pave
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$800,000
$400,000
$400,000
$800,000
$400,000
$400,00035659
Storm Lake
STBG-SWAP-7422(618)--SG-11
In the city of Storm Lake, On Oneida St., from MilwaukeeAvenue south .42 Miles to East Railroad St.
Pavement Rehab
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$1,788,000
$594,000
$594,000
$1,788,000
$594,000
$594,00032222
Emmet County
STBG-SWAP-C032(54)--FG-32
On N52, from Highway 4 North Approximately 4.4 Miles toCity of Dolliver
Pavement Rehab
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$1,040,000
$600,000
$600,000
$1,040,000
$600,000
$600,00034999
Sioux County
STBG-SWAP-C084(167)--FG-84
On Eagle Ave (K30) N of Ireton, from 420th St (B46) S 3.0miles to IA Hwy #10 (450th St)
Pavement Rehab
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$878,000
$527,000
$527,000
$878,000
$527,000
$527,000
437
RPA 4SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38551
Ida Grove
BRM-SWAP-3650(606)--SD-47
In the city of Ida Grove, On Moorhead Ave., Over OdeboltCreek
Bridge Replacement
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$2,785,000
$1,000,000
$2,785,000
$1,000,00038912
Monona County
BROS-SWAP-C067(89)--FE-67
On 160th Street, Over Rush Creek, SE S35 T85 R42
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00038703
Monona County
BRS-SWAP-C067(90)--FF-67
On E16, Over Rush Creek, N1/4 S24 T83 R42
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$900,000
$900,000
$900,000
$900,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37810
Cherokee
STBG-SWAP-1272(627)--SG-18
In the city of Cherokee, On N. Roosevelt Street, from E.Main Street to Magnetic Avenue
Pavement Rehab
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$1,050,000
$840,000
$840,000
$1,050,000
$840,000
$840,000
438
RPA 5SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36551
Calhoun County
BROS-SWAP-C013(100)--SE-13
On 380th Street, Over Stream, from NW corner Sec. 25East 0.7 Miles, along NLINE S25 T86N R33W
Bridge Replacement
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$250,000
$249,000
$250,000
$249,00037722
Calhoun County
BROS-SWAP-C013(101)--SE-13
On 165th Street, Over Lake Creek, Ctr S06 T89 R32
Bridge Replacement
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$251,000
$1,000
$251,000
$1,00020429
Hamilton County
BROS-SWAP-C040(102)--SE-40
On XIRCUS AVE, Over Long Dick Creek, S22 T86 R23
Bridge Replacement
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00026825
Hamilton County
BROS-SWAP-C040(103)--SE-40
On TOLLMAN AVE, Over TRIB TO SKUNK, S12 T86 R24
Bridge Replacement
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00035219
Humboldt County
BROS-SWAP-C046(74)--SE-46
On Washington Ave., from NW corner Section 26 NorwayTwp S 0.6 miles S26 T91N R27W
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$125,000
$120,000
$125,000
$120,00023611
Webster County
BROS-SWAP-C094(112)--SE-94
On 170th Street, Over Lizard Creek, along NLINE S11 T89R30
Bridge Replacement
Authorized
10/20/2020
TotalFederal Aid
RegionalSwap
$1,070,000
$1,070,000
$1,070,000
$1,070,00035909
Webster County
BROS-SWAP-C094(126)--FE-94
On D60, Over DD, along NLINE S8 T86 R30
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00035910
Webster County
BROS-SWAP-C094(127)--FE-94
On D60, Over BUTTRICK CREEK, along NLINE S10 T86R30
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
439
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34565
Hamilton County
STBG-SWAP-C040(100)--FG-40
On D65, from 1st Street in the City of Randall E 7 miles toHardin County Line S26 T86 R24
Pavement Rehab/Widen
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$2,000,000
$1,630,000
$1,630,000
$2,000,000
$1,630,000
$1,630,000
440
RPA 6SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38990
Hardin County
BROS-SWAP-C042(102)--SE-42
On M Avenue, Over the South Fork of the Iowa River, W1/4S1 T87N R21W
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00013588
Poweshiek County
BROS-SWAP-C079(53)--FE-79
On 80th St., Over A Small Stream, S20 T81 R15
Authorized
8/17/2021
TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00017390
Poweshiek County
BROS-SWAP-C079(55)--SE-79
On 110th Street, Over Little Bear Creek, Near the W 1/4Corner Sec 26, T80N, R15W
Bridge Replacement
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00013586
Poweshiek County
BROS-SWAP-C079(57)--SE-79
On 370TH AVE, Over STONY CREEK, S10 T80 R14
Bridge Replacement
Authorized
8/17/2021
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00045095
Tama County
BROS-SWAP-C086(103)--FE-86
On B AVE, Over SUGAR CREEK, S17 T84 R16
Authorized
8/17/2021
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037782
Tama County
BROS-SWAP-C086(104)--FE-86
On 220TH ST, Over BRANCH SALT CREEK, from UAvenue East, NLINE S4 T84 R13
Bridge Replacement
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,000PA Note: Project approved for advancement on 3/29/21 by Region 6 Resource Partners Board
44623
Hardin County
BRS-SWAP-C042(106)--FF-42
On S 27, Over TIPTON CREEK, from D41 S 1.1 miles S2T87 R22
Authorized
10/20/2020
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
441
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38337
State Center
STBG-SWAP-7272(604)--SG-64
In the city of State Center, On 4th Street SE, from 3rd StreetNW East 1.34 Miles to 6th Avenue SE
Pavement Rehab
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$493,000
$394,000
$394,000
$493,000
$394,000
$394,00016532
Hardin County
STBG-SWAP-C042(107)--FG-42
On D55, from US Hwy 65 E 7.25 miles to Co Hwy S55, andOn S33, from Co Hwy D55 North 4.5 Miles to US Hwy 65
Pave
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$3,650,000
$1,500,000
$1,500,000
$3,650,000
$1,500,000
$1,500,00016616
Marshall County
STBG-SWAP-C064(119)--FG-64
S52: From STATE CENTER, N to E29 (190TH ST)
Pave
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$1,400,000
$600,000
$600,000
$1,400,000
$600,000
$600,00034932
Poweshiek County
STBG-SWAP-C079(61)--FG-79
On V30/F17, from Main Street in Hartwick Northeasterly 3.0Miles to Poweshiek-Iowa Rd
Pavement Rehab
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$1,500,000
$1,000,000
$1,000,000
$1,500,000
$1,000,000
$1,000,00045049
Tama County
STBG-SWAP-C086(105)--FG-86
On HWY E64, from Richland Creek to V18
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$2,500,000
$970,000
$970,000
$2,500,000
$970,000
$970,000
442
RPA 7SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36531
Black Hawk County
BROS-SWAP-C007(161)--SE-07
On E GRESHAM RD, Over CRANE CREEK, from ELKRUN RD East 0.25 Miles, S10 T90 R12
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$900,000
$900,000
$900,000
$900,00029322
Black Hawk County
BROS-SWAP-C007(164)--SE-07
On Kimball Ave, Over Miller Creek, S27 T87 R13
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00045644
Bremer County
BROS-SWAP-C009(88)--FE-09
On V 62, Over TRIB TO WAPSIE RIVER, S7 T92 R10
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$125,000
$125,000
$125,000
$125,00032451
Butler County
BROS-SWAP-C012(114)--SE-12
On BIRCH AVE, Over Unnamed Creek, from Birch Ave0.01 miles to Bridge Location
Bridge Replacement
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00038757
Chickasaw County
BRS-SWAP-2750(603)--FF-19
On V48, Roanoke Avenue, Over PLUM CREEK, S7 TT94NRR11
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44723
Bremer County
HSIP-SWAP-C009()--SJ-09
On C33 and C50, V14, V43, V49, V56, V62,
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$59,500
$54,500
$59,500
$54,50044614
Buchanan County
HSIP-SWAP-C010(114)--FJ-10
W13, IA 281 to 175th St; 118th St, Hazleton ECL to MasonAve; Olympic Ave/155th St, 205th St/Nathan Bethel Ave
Authorized
10/20/2020
TotalFederal Aid
RegionalSwap
$44,000
$40,000
$44,000
$40,000
443
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36216
Waverly
STBG-SWAP-8190(637)--SG-09
In the city of Waverly, On 1st St NW, from W Bremer Ave(IA-3) north 0.3 Miles to 5th Ave NW
Pavement Rehab
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$900,000
$450,000
$450,000
$900,000
$450,000
$450,00036175
Black Hawk County
STBG-SWAP-C007(163)--FG-07
On Dunkerton Road (C66), from Hwy 63 East 4 Miles to ElkRun Road (V43)
Pave, Pavement Rehab
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$1,810,000
$800,000
$800,000
$1,810,000
$800,000
$800,00034435
Butler County
STBG-SWAP-C012(119)--FG-12
On C55, from HWY 14 7 miles to T55
Pavement Rehab
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$1,750,000
$800,000
$800,000
$1,750,000
$800,000
$800,00032698
Chickasaw County
STBG-SWAP-C019(92)--FG-19
On B44 (210th Street), from V56 East 3 Miles to FayetteCounty line.
Pave
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$1,200,000
$500,000
$500,000
$1,200,000
$500,000
$500,000
444
RPA 8SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36143
Clinton County
BHS-SWAP-C023(118)--FC-23
On Y52, Over DRAINAGE DITCH 5, S1 T80 RE2
Bridge Deck Overlay
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00035155
Clinton County
BROS-SWAP-C023(122)--FE-23
On F21, Over BARBER CREEK, S32 T81 RE3
Bridge Replacement
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00026844
Delaware County
BROS-SWAP-C028(95)--SE-28
On 285th Street , from 110th Ave East 0.2 Miles, S5 T87 R6
Bridge Replacement
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037088
Dubuque County
BROS-SWAP-C031(106)--FE-31
On Simon Road, in NE S26 T87N R1W
Bridge Replacement
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00037745
Jackson County
BROS-SWAP-C049(81)--SE-49
On 400th Street, Over Lux Creek, S2 T87N R3E
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00038765
Delaware County
BRS-SWAP-C028(98)--FF-28
On 110th Avenue, in NE S31 T88N R6W
Bridge Replacement
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
445
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35162
Clinton County
HSIP-SWAP-C023(123)--FJ-23
CIR with HMA overlay on 245 ST, from DeWitt City Limits toUS 30
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$1,400,000
$503,500
$1,400,000
$503,50045518
Dubuque County
HSIP-SWAP-C031(111)--FJ-31
On Y 21, from 0.32 Miles North of Hwy 151 N 4.75 miles to0.04 Miles South of Monastery Road
Pave
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$750,000
$486,000
$750,000
$486,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36932
Camanche
STBG-SWAP-1040(608)--SG-23
In the city of Camanche, On 9th Avenue, from Railroad toAnamosa Rd
Pavement Rehab
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$380,000
$303,000
$303,000
$380,000
$303,000
$303,00037744
Jackson County
STBG-SWAP-C049(83)--FG-49
On Z34 (418th Avenue), from Hwy 64 1.56 Miles to ClintonCounty Line
Pavement Rehab
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
$450,000
$450,00037749
Jackson County
STBG-SWAP-C049(85)--FG-49
On 188th Street, Over Lytle Creek, S5 T85N R2E
Bridge Replacement
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
$450,000
$450,000
446
RPA 9SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36076
Muscatine County
BROS-SWAP-C070(68)--SE-70
On DOUGLAS AVENUE, Near SW Corner NE-NE, S3 T77R4W
Bridge Replacement
Authorized
8/17/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34197
Muscatine
STBG-SWAP-5330(627)--SG-70
On Grandview Ave, from Hershey Ave. Intersection,Hershey Ave 2.4 Miles to US 61
Pavement Rehab/Widen
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$9,500,000
$3,550,000
$3,550,000
$9,500,000
$3,550,000
$3,550,000
447
RPA 10SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16307
Benton County
BHS-SWAP-C006(118)--FC-06
On V-66, Over Prairie Creek, S13 T82 R11
Bridge Rehabilitation
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00045528
Williamsburg
BRM-SWAP-8427(602)--SD-48
On STATE ST, Over OLD MANS CREEK, S10 T79 R10
Bridge Rehabilitation
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$1,450,000
$1,000,000
$1,450,000
$1,000,00034829
Cedar County
BROS-SWAP-C016(110)--SE-16
On RED STAR RD, Over SUGAR CREEK, S4 T80 R02
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00038569
Iowa County
BROS-SWAP-C048(90)--SE-48
On WW Ave, S11 T78 R9
Bridge New
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00032704
Benton County
BRS-SWAP-C006(114)--FF-06
On V37, Over WOLF CREEK, S19 T86 R12
Authorized
10/20/2020
TotalFederal Aid
RegionalSwap
$2,400,000
$400,000
$2,400,000
$400,000DOT Note: Project was awarded $2,000,000 of state county bridge funds.
448
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35666
Washington
STBG-SWAP-8140(612)--SG-92
In the city of Washington, On W. Buchanan, from currenttermination to South Avenue E.
Grade and Pave
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$1,936,440
$1,936,440
$1,936,440
$1,936,440
$1,936,440
$1,936,44032639
Cedar County
STBG-SWAP-C016(111)--FG-16
On Y14 from F44 (290th Street) N 5.2 miles to StateHighway 130 & Y4F from Hwy 130 to Inland Cemetary
Pavement Rehab
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$2,850,000
$1,645,000
$1,645,000
$2,850,000
$1,645,000
$1,645,00036530
Johnson County
STBG-SWAP-C052(120)--FG-52
On F44 (Herbert Hoover Highway), from 0.9 miles East ofWapsi Ave. to 0.1 miles West of Johnson Cedar Road, S12T79 R05
Grade and Pave
Authorized
8/17/2021
TotalFederal Aid
RegionalSwap
$4,305,046
$2,738,046
$2,738,046
$4,305,046
$2,738,046
$2,738,046
38850
Washington County
STBG-SWAP-C092(114)--FG-92
On W61, from G26 north to Spruce Avenue
Pave, Pavement Widening
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$3,720,000
$2,520,000
$2,520,000
$3,720,000
$2,520,000
$2,520,000DOT Note: Actual funding limit $2,110,232
449
RPA 11SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45461
Zearing
BROS-SWAP-8612(602)--SE-85
On S PEARL ST, Over MIDDLE MINERVA CREEK, S21T85 R21
Bridge Replacement
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00035886
Boone County
BROS-SWAP-C008(83)--SE-08
On QW LN, Over BIKE TRAIL, S35 T82 R26
Bridge Replacement
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$950,000
$950,000
$950,000
$950,00035066
Madison County
BROS-SWAP-C061(116)--SE-61
On VALLEYVIEW AVE., Over DRAINAGE, S10 T75 R26
Bridge Replacement
Authorized
9/15/2020
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00038596
Polk County
BROS-SWAP-C077(231)--SE-77
On NW 134 Ave 0.20 Mi E of NW 2nd St
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,00037567
Madison County
BRS-SWAP-C061(115)--FF-61
On R35 (BEV. PARK RD.), Over CLANTON CREEK, S12T75 R26
Bridge Replacement
Authorized
8/17/2021
TotalFederal Aid
RegionalSwap
$2,000,000
$500,000
$2,000,000
$500,000DOT Note: Project awarded State Bridge Replacement funds ($1,500,000)
44728
Marion County
BRS-SWAP-C063(136)--FF-63
On G 62, Over WALNUT CREEK, S28 T75 R18
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
450
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39410
Huxley
STBG-SWAP-3630(606)--SG-85
In the city of Huxley, East 1st Street Rec Phase 1- Fromapprox. 240' east of Parkridge Ave east approx. 650'
Pavement Rehab
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$365,000
$240,000
$240,000
$365,000
$240,000
$240,00045469
Huxley
STBG-SWAP-3630(607)--SG-85
In the City of Huxley, on East 1st Street from approx. 100feet east of Hwy 69 to approx. 240 feet east of ParkridgeAve
Pavement Rehab
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$431,000
$125,000
$125,000
$431,000
$125,000
$125,000
39160
Knoxville
STBG-SWAP-4040(612)--SG-63
In the city of Knoxville, On Park Lane Dr, Larson St, RockIsland St, 2nd St, and Roche St
Pavement Rehab
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$935,000
$935,000
$935,000
$935,000
$935,000
$935,00045470
Story City
STBG-SWAP-7430(616)--SG-85
In the City of Story City, on Broad Street from Lafayette toGrand
Pavement Rehab, Ped/Bike Paving
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$560,000
$125,000
$125,000
$560,000
$125,000
$125,00036920
Winterset
STBG-SWAP-8497(603)--SG-61
In the city of Winterset, 10th Street Reconstruction, fromIowa 92 and Benton Street.
Pavement Rehab
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$1,300,000
$1,300,000
$1,300,000
$1,300,000
$1,300,000
$1,300,00023591
Boone County
STBG-SWAP-C008(85)--FG-08
On Lower Ledges Rd and E-52, from Lower LedgesEasterly 4.2 Miles to Hwy 17
Pavement Rehab
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,00034906
Marion County
STBG-SWAP-C063(137)--FG-63
On T14, from Pella Corp. Limit to Jasper Co. Line S15 T77R18
Pavement Widening, Shoulder Grading
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$1,200,000
$700,000
$700,000
$1,200,000
$700,000
$700,00034601
Polk County
STBG-SWAP-C077(230)--FG-77
On NE 112 St/Camp Dr/SE 116 St, from Hwy 163 to E CL ofRunnells
Pavement Rehab
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$1,204,000
$1,204,000
$1,204,000
$1,204,000
$1,204,000
$1,204,000
451
RPA 12SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36097
Audubon County
BROS-SWAP-C005(73)--SE-05
On 300th St., Over Troublesome Creek, in NE S7 T78NR34W
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00041351
Guthrie County
BRS-SWAP-C039(96)--FF-39
On F 25, Over MOSQUITO CREEK, S1 T80 R30
Bridge Replacement
Authorized
5/18/2021
TotalFederal Aid
RegionalSwap
$1,150,000
$1,150,000
$1,150,000
$1,150,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
32532
Carroll County
STBG-SWAP-C014(168)--FG-14
On N33, from THE JCT OF E60 AND N33 IN THE TOWNOF DEDHAM, THEN, NORTH 10.4 Miles to JCT US 30
Pavement Rehab/Widen
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$2,800,000
$750,000
$750,000
$2,800,000
$750,000
$750,00032773
Crawford County
STBG-SWAP-C024(126)--FG-24
On E16, from ECL Schleswig East 17.25 Miles toIntersection with Co. Rd. M64
Pavement Rehab
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$4,600,000
$2,000,000
$2,000,000
$4,600,000
$2,000,000
$2,000,000
452
RPA 13SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
23745
Cass County
BROS-SWAP-C015(72)--FE-15
Bridge 208 - On Indian Creek St, from White Pole Rd North0.4 Miles, at S5 T75 R37
Bridge Replacement
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,000
453
RPA 14SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36063
Adair County
BROS-SWAP-C001(113)--SE-01
On 330th St, Over Shanghar Creek, on NLINE S34 T74R32
Bridge Replacement
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$675,000
$675,000
$675,000
$675,00039120
Ringgold County
BROS-SWAP-C080(77)--FE-80
On 200th Street, Over unknown stream, from Hwy P33 0.5miles to Washington 20 bridge S29 T69 R30
Bridge Replacement
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00037356
Union County
BROS-SWAP-C088(65)--FE-88
On H45, Over SMALL STREAM, from P17 west 0.32 Miles,on NLINE S18 T71 R31
Culvert Replacement
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$307,000
$307,000
$307,000
$307,00041342
Adams County
BRS-SWAP-1590(603)--FF-02
On HULL ST, Over STREAM, S34 T72 R34
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00038948
Adams County
BRS-SWAP-C002(78)--FF-02
On H 33, Over MT. ZION BRANCH, from W approach Eastand West Bound 500 Feet to E approach, on NLINE S13T72N R33W
Bridge Replacement
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
40141
Bedford
STBG-SWAP-0487(604)--SG-87
On State St, from Bedford Coroporate Limits N .32 miles toMain St S26 T68 R34
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$110,000
$110,000
$110,000
$110,000
$110,000
$110,000
454
RPA 15PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36939
Fairfield
NHSN-001-2(35)--2R-51
On Highway 1/South Main, from Fillmore Ave 0.53 miles to300 ft S of Libertyville Rd
Pavement Widening, Ped/Bike Paving
Authorized
11/15/2022
TotalFederal Aid
RegionalSwap
$700,001
$560,000
$560,000
$700,001
$560,000
$560,000PA Note: RPA funding should be debited as follows: $240,000 STBG and $320,000 TAP. DOT funding is programmed as TPMS #38195.
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36068
Mahaska County
BROS-SWAP-C062(96)--FE-62
On 110th Str., Over Elk Creek, from Int. of Adams Ave and110th East 0.5 Miles to Bridge 238410, along ELINE S7 T77R17
Bridge Replacement, Grading, Right of Way
Authorized
9/15/2020
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,000
34366
Mahaska County
BROS-SWAP-C062(99)--FE-62
On 335'th Street, Over Cedar Creek, in NW S34 T74NR14W
Bridge Replacement
Authorized
8/17/2021
TotalFederal Aid
RegionalSwap
$850,000
$850,000
$850,000
$850,00021573
Wapello County
BROS-SWAP-C090(80)--SE-90
225th Ave: Over Middle Avery Creek
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$620,000
$620,000
$620,000
$620,000
455
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39432
Fairfield
STBG-SWAP-2465(626)--SG-51
In the city of Fairfield, On 4th Street, from BroadwayAvenue North 0.25 Miles to BNSF Right-of-way
Grade and Pave
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$447,700
$447,700
$447,700
$447,700
$447,700
$447,700PA Note: Includes $30,500 in FY20 for PE and $417,200 in FY21 for construction.
39431
Fairfield
STBG-SWAP-2465(627)--SG-51
In the city of Fairfield, 32nd Street, 250 feet south ofJackpine Loop 0.75 miles to Burlington Avenue S34 T72R10
Grade and Pave
Authorized
3/16/2021
TotalFederal Aid
RegionalSwap
$823,000
$823,000
$823,000
$823,000
$823,000
$823,000
35815
Keokuk County
STBG-SWAP-C054(120)--FG-54
On G29, from THE MAHASKA COUNTY LINE EAST toHIGHWAY 21
Pave
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$1,900,000
$1,900,000
$1,900,000
$1,900,000
$1,900,000
$1,900,000
456
RPA 16SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34167
Fort Madison
STBG-SWAP-2697(633)--SG-56
In the city of Fort Madison, On AVE H, from 6th Street westto 10th Street
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$2,022,800
$1,011,400
$1,011,400
$2,022,800
$1,011,400
$1,011,400
35817
Lee County
STBG-SWAP-C056(109)--FG-56
On J40, from West Point Corporate Limits east 8.7 Miles toFort Madison Corporate Limits
Pavement Rehab
Authorized
11/18/2020
TotalFederal Aid
RegionalSwap
$3,088,000
$2,300,000
$2,300,000
$3,088,000
$2,300,000
$2,300,000
457
RPA 17SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37208
Appanoose County
BROS-SWAP-C004(112)--FE-04
On 110th Ave, Over Unnamed Trib to Cooper Crk, from105th Ave South .45 Miles to Zeiss Bridge, on WLINE S8T68N R19W
Bridge Replacement
Authorized
4/20/2021
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
38554
Clarke County
BROS-SWAP-C020(118)--FE-20
On Elk Street, Over North Hoosier Creek
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00038553
Clarke County
BROS-SWAP-C020(119)--FE-20
1/2 Mi. East of 250th. on Meadow St. Sec. 34, T-73N, R-25W.
Bridge Replacement
Authorized
2/16/2021
TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00037192
Davis County
BROS-SWAP-C026(112)--SE-26
On Mahogany Ave, 0.2 miles North of 265th St
Bridge Replacement
Authorized
9/15/2020
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,0003992
Monroe County
BROS-SWAP-C068(86)--SE-68
On 730th Ave, Over Middle Avery Creek, from 189th St N1.3 miles to said bridge S11 T72 R16
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$475,000
$475,000
$475,000
$475,000
458
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
40163
Davis County
STBG-SWAP-C026(121)--FG-26
On 180th Street, from Drakesville Oval west 4.3 miles
Authorized
8/18/2020
TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,000
$750,000
$750,00032177
Decatur County
STBG-SWAP-C027(79)--FG-27
On J 20, from R15 E 7.26 miles to I-35
Pavement Rehab
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$4,100,000
$1,200,000
$1,200,000
$4,100,000
$1,200,000
$1,200,00044691
Decatur County
STBG-SWAP-C027(80)--FG-27
On J 20, from WCL Grand River, Iowa E 0.64 miles to R15
Pavement Rehab
Authorized
6/15/2021
TotalFederal Aid
RegionalSwap
$600,000
$200,000
$200,000
$600,000
$200,000
$200,000
459
RPA 18SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38477
Harlan
BROS-SWAP-3275(604)--SE-83
On North 7th Street, Over Small Stream.
Bridge Replacement
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00036432
Harrison County
BROS-SWAP-C043(88)--SE-43
On 280TH ST, Over WILLOW RIVER, 0.8 mi E of NW Cor4-78-43
Bridge Replacement
Authorized
1/20/2021
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00036207
PottawattamieCounty
BRS-SWAP-C078(199)--FF-78
On M16, Over STREAM, on WLINE S4 T76 R40
Culvert Replacement
Authorized
12/15/2020
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36205
PottawattamieCounty
STBG-SWAP-C078(204)--FG-78
On L66, from the Highway 6 Intersection North 6.5 Miles tothe South Intersection of G30
Patching
Authorized
7/20/2021
TotalFederal Aid
RegionalSwap
$6,050,000
$1,250,000
$1,250,000
$6,050,000
$1,250,000
$1,250,000
460