VICINITY MAP - NO SCALE PROJECT LOCATION NO. REVISION BY DATE DESIGNED: DRAFTED: CHECKED: SCALE: PROJECT NO.: FILE NUMBER: SHEET NO.: DATE: A.01 SEPTEMBER 19, 2018 NO SCALE 038.005 038.005 LTL BAY LTL PROJECT NO. SHEET NO. A.01 038.005 LT LEON A S S O C I A T E S I N C 500 EAST LOCUST STREET SUITE 400 DES MOINES IOWA 50309 office 515-422-7016 www.ltleon.com CALL 811 / 1-800-292-8989 2 Working Days BEFORE YOU DIG DigSafeWait48.com IOWA ONE CALL IOWA DEPARTMENT OF NATURAL RESOURCES DEVELOPER ENGINEER 502 EAST NINTH STREET LAND AND WATERS BUREAU, CONSERVATION AND RECREATION DIVISION WALLACE STATE OFFICE BUILDING ATTN: NATE HOOGEVEEN, RIVER PROGRAMS COORDINATOR DES MOINES, IA 50319 PH: (515) 281-3134 FAX: (515) 281-8895/(515) 281-6794 EMAIL: [email protected]IOWA DEPARTMENT OF NATURAL RESOURCES CONSTRUCTION PLANS FOR LITTLETON DAM MITIGATION WAPSIPINICON RIVER DNR PROJECT NO. 10-03-10-01 SW 1/4 SECTION 9, TOWNSHIP 89N, RANGE 10W, BUCHANAN COUNTY, IOWA BUCHANAN COUNTY D.01 B.02 DETAILS - EXISTING DAM INDEX OF SHEETS B.01 DEMOLITION PLAN GENERAL NOTES A.01 COVER SHEET C.01 DETAILS F.03 LITTLETON VICINITY MAP - NO SCALE PROJECT LOCATION STATE STREET (COUNTY HIGHWAY D16) PERRY STREET RIVER ROAD BOULEVARD CENTRAL AVENUE WAPSIPINICON RIVER LITTLETON 20 INDEPENDENCE F.01 EROSION CONTROL PLAN F.02 GRADING PLAN - CUT SURFACE GRADING PLAN - FINISHED SURFACE PROFILE WATER ST. COUNTY ENGINEER INDEPENDENCE, IA 50644 BRIAN KEIERLEBER, ENGINEER BUCHANAN COUNTY 1511 1ST STREET E. PH: (319) 334-6031 EMAIL: [email protected]PH: (515) 422-0716 500 EAST LOCUST STREET, SUITE 400 LT LEON ASSOCIATES, INC. DES MOINES, IOWA 50309 EMAIL: [email protected]LUIS LEON, P.E. W.01-W.04 CROSS SECTIONS D.03 Pages or sheets covered by this seal: Signature Date I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. L I C E N S E D P R O F E S S I O N A L E N G I N E E R I O W A LEON Iowa License Number 18685 Luis T. Leon, P.E. LUIS T. 18685 My license renewal date is December 31, 2019. W.05-W.06 TYPICAL CROSS SECTIONS D.02 SITE PLAN
16
Embed
IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018 · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
VICINITY MAP - NO SCALE
PROJECTLOCATION
NO
.R
EV
IS
IO
NB
YD
AT
E
DE
SIG
NE
D:
DR
AF
TE
D:
CH
EC
KE
D:
SC
ALE
:
PR
OJE
CT
N
O.:
FILE
N
UM
BE
R:
SH
EE
T N
O.:
DA
TE
:
A.0
1
SE
PTE
MB
ER
19,
201
8N
O S
CA
LE
03
8.005
03
8.005
LT
L
BA
Y
LT
L
PROJECT NO. SHEET NO. A.01038.005
LT LEONA S S O C I A T E S I N C
500 EAST LOCUST STREET SUITE 400DES MOINES IOWA 50309
office 515-422-7016www.ltleon.com
CALL 811 / 1-800-292-8989
2 Working Days BEFORE YOU DIG
DigSafeWait48.com
IOWA
ONE CALL
IOWA DEPARTMENT OF NATURAL RESOURCES
DEVELOPER
ENGINEER
502 EAST NINTH STREET
LAND AND WATERS BUREAU, CONSERVATION AND RECREATION DIVISIONWALLACE STATE OFFICE BUILDING
I hereby certify that this engineering document wasprepared by me or under my direct personal supervisionand that I am a duly licensed Professional Engineerunder the laws of the State of Iowa.
LIC
EN
SE
D PROFESSIONAL ENG
INE
ER
IOW A
LEON
Iowa License Number 18685
Luis T. Leon, P.E.
LUIS T.
18685
My license renewal date is December 31, 2019.
W.05-W.06TYPICAL CROSS SECTIONS
D.02 SITE PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
NORTH
pspeed
Stamp
pspeed
Stamp
F
O
R
E
S
L
O
P
E
B
A
C
K
S
L
O
P
E
600'-0" IF SLOPE IS FLATTER THAN 5%
POST SPACING
1
VARIABLE (20'-0" FOR A NORMAL 10'-0" WIDE DITCH)
TYPICAL SILT FENCE DITCH CHECK
ATTACHMENT TO POST
FABRIC
WIRE OR
CABLE TIES
POST
INSERT 12 INCHES OF FABRIC A MINIMUM OF
6 INCHES DEEP (FABRIC MAY BE FOLDED
BELOW THE GROUND LINE)
1
TYPICAL SILT FENCE INSTALLATION ON
LONGITUDINAL SLOPES
PLAN VIEW
INSTALL PARELLEL TO
GROUND CONTOURS
INSTALL "J-HOOK" AT EACH END
OF AN INDIVIDUAL SECTION OF
SILT FENCE
GROUND CONTOURS
TYPICAL SILT FENCE INSTALLATION ON
LONGITUDINAL SLOPES
PROFILE VIEW
GROUND LINE
FABRIC
W
AT
ER
FLO
W
1
1
'T
' S
TE
EL
FE
NC
E P
OS
T
4'-0" M
IN
GROUND LINE
FABRIC 2
DETAILS OF SILT FENCE ON LONGITUDINAL
SLOPES
1
INSERT 12 INCHES OF FABRIC A MINIMUM OF
6 INCHES DEEP (FABRIC MAY BE FOLDED
BELOW THE GROUND LINE)
REDUCE POST SPACING TO 5'-0" AT WATER
CONCENTRATION AREAS, OR AS REQUIRED
TO ADEQUATELY SUPPORT FENCE
1
2
5'-0" MAXIMUM2" M
IN
5'-0" MAXIMUM
20" M
INIM
UM
8'-0" SPACING
200'-0" MAX LENGTH PER SECTION
2'-0" 3'-0"
NO
.R
EV
IS
IO
NB
YD
AT
E
DE
SIG
NE
D:
DR
AF
TE
D:
CH
EC
KE
D:
SC
ALE
:
PR
OJE
CT
N
O.:
FIL
E N
UM
BE
R:
SH
EE
T N
O.:
DA
TE
:
PROJECT NO.
SHEET NO.
LT LE
ONA
S S
O C
I A
T E
S
I N C
500
EAST
LOC
UST
STRE
ET S
UITE
400
DES
MOI
NES
IOWA
5
0309
offic
e 51
5-42
2-70
16ww
w.ltl
eon.c
om
038.005
DETAILS
B.01
PD
S
BA
Y
LT
L
NO
S
CA
LE
038.005
038.005
B.01
SE
PT
EM
BE
R 19, 2
018
LIT
TL
ET
ON
D
AM
M
IT
IG
AT
IO
N
WA
PS
IP
IN
IC
ON
R
IV
ER
LIT
TL
ET
ON
, IO
WA
DE
TA
IL
S
SILT FENCENOT TO SCALE3
BOULDER CLUSTER DETAILNOT TO SCALE1
FOOTER BOULDER SHALL BEBURIED 0.5' MIN. INTO CHANNEL
EXISTING GROUND
LOW FLOW WATER SURFACE=909.00
1.5' MIN. DEEP CLASS'E' RIPRAP BASE
STREAM BED
4.0' X 4.5' X 2.0' WEIR STONE
1.5'
1.5'
4.0'
3.0'
10.0'
9.0'
4.0'
9.0'
8.5'
7.5'
4.0'
5.0'
EXISTING DAM - PLAN VIEW
~2.0'~
~130.0'~
A'
A
C C'
B'
B
D
D' FLOW
FLOW
4.0' 10.0'
9.0'
3.0'
SPILLWAY
FISH LADDER
NOTE : WIDTH OF DAM NOT TO SCALE
A-A' SECTION
~2.0'~
~6.0'~
2.3'
FLOW
FLOW
B-B' SECTION1.5'
7.0'
3.0'4.0'
5.5'
~1.0'~
9.0'
9.0'
C-C' SECTION9.0'
2.2'
4.0'
1.5'
10.0'
5.0'
2.5'
9.0'
4.0'
~6.0'~
3.0'
10.0'
5.0'
9.0'
4.0'
3.0'SPILLWAY
FISH LADDER
~130.0'~
D-D' SECTION
9.0'
2.2'
1.5' 7.5' 7.5' 5.0'
2.0'
7.0'
NO
.R
EV
IS
IO
NB
YD
AT
E
DE
SIG
NE
D:
DR
AF
TE
D:
CH
EC
KE
D:
SC
ALE
:
PR
OJE
CT
N
O.:
FIL
E N
UM
BE
R:
SH
EE
T N
O.:
DA
TE
:
PROJECT NO.
SHEET NO.
LT LE
ONA
S S
O C
I A
T E
S
I N C
500
EAST
LOC
UST
STRE
ET S
UITE
400
DES
MOI
NES
IOWA
5
0309
offic
e 51
5-42
2-70
16ww
w.ltl
eon.c
om
038.005
DETAILS - EXIST. DAM
B.02
PD
S
BA
Y
LT
L
NO
S
CA
LE
038.005
038.005
B.02
SE
PT
EM
BE
R 19, 2
018
LIT
TL
ET
ON
D
AM
M
IT
IG
AT
IO
N
WA
QP
SIP
IN
IC
ON
R
IV
ER
LIT
TL
ET
ON
, IO
WA
DE
TA
IL
S - E
XIS
TIN
G D
AM
NOTE: DIMENSIONS OF EXISTING DAM ARE APPROXIMATE AND INTENDEDFOR ESTIMATING CONCRETE QUANTITIES
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
NO
.R
EV
IS
IO
NB
YD
AT
E
DE
SIG
NE
D:
DR
AF
TE
D:
CH
EC
KE
D:
SC
ALE
:
PR
OJE
CT
N
O.:
FIL
E N
UM
BE
R:
SH
EE
T N
O.:
DA
TE
:
PROJECT NO.
SHEET NO.
LT LE
ONA
S S
O C
I A
T E
S
I N C
500
EAST
LOC
UST
STRE
ET S
UITE
400
DES
MOI
NES
IOWA
5
0309
offic
e 51
5-42
2-70
16ww
w.ltl
eon.c
om
038.005
GENERAL NOTES
C.01
PD
S
BA
Y
LT
L
NO
S
CA
LE
038.005
038.005
C.0
1
SE
PT
EM
BE
R 19, 2
018
LIT
TL
ET
ON
D
AM
M
IT
IG
AT
IO
N
WA
PS
IP
IN
IC
ON
R
IV
ER
LIT
TL
ET
ON
, IO
WA
GE
NE
RA
L N
OT
ES
ELECTRIC & GAS:
ONE CALL1-800-292-8989
UTILITY CONTACTS
TELEPHONE:
260 FAIRVIEW AVENUEMIDAMERICAN ENERGY
P.O. BOX 600WATERLOO, IA 50704
541 YOUNG STREETFARMERS MUTUAL TELEPHONE COMPANY
JESUP, IOWA 50648(319) 827-1151
1-888-427-5632
GENERAL NOTES
1. PRIOR TO ANY EXCAVATION AT THE SITE, THE CONTRACTOR SHALL EXAMINE ANY APPLICABLEDRAWINGS AVAILABLE FROM THE OWNER AND/OR ENGINEER, AND CONSULT WITH OWNER'SPERSONNEL AND UTILITY COMPANY'S REPRESENTATIVES TO DETERMINE POSSIBLE UTILITYLOCATIONS AND DEPTHS. NO COMPENSATION WILL BE ALLOWED FOR DAMAGE RESULTING FROMFAILURE TO COMPLY WITH THIS REQUIREMENT.
2. ALL DEBRIS SPILLED ON THE PUBLIC R.O.W. SHALL BE PICKED UP BY THE CONTRACTOR AT THE ENDOF EACH WORK DAY.
3. ALL WORK SHALL BE IN ACCORDANCE WITH OSHA CODES AND STANDARDS. NOTHING INDICATED ONTHESE DRAWINGS SHALL RELIEVE THE CONTRACTOR FROM COMPLYING WITH ANY APPROPRIATESAFETY REGULATIONS.
4. FIELD VERIFY EXISTING GRADES AND LOCATION OF EXISTING UTILITIES, CONDUIT LINES, POLES,TREES, PAVING, BUILDINGS AND OTHER SITE STRUCTURES PRIOR TO DEMOLITION OR CONSTRUCTIONAND IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES.
5. CONTRACTOR SHALL PROTECT EXISTING UTILITIES, CONDUIT LINES, POLES, TREES, PAVING,BUILDINGS, SHORELINE, AND OTHER SITE STRUCTURES.
6. ALL DEMOLISHED ITEMS NOT TO BE SALVAGED SHALL BE LEGALLY DISPOSED OF OFF-SITE.7. CONSTRUCTION LIMITS ARE INDICATED ON THE PLANS. CONTRACTOR TO CONSULT WITH DNR ON:
STORAGE LOCATION OF MATERIALS, WORK AREA, JOB OFFICE AND EMPLOYEE PARKING. CONSULTWITH THE DNR IF CONSTRUCTION LIMITS NEED TO BE MODIFIED FROM THAT ILLUSTRATED ON THISPLAN.
8. THE CONTRACTOR WILL HOLD THE OWNER AND OWNER'S CONSULTANTS HARMLESS FROM ANY ANDALL CLAIMS OF ANY TYPE WHATSOEVER RESULTING FROM DAMAGES TO ADJOINING PUBLIC ORPRIVATE PROPERTY, INCLUDING REASONABLE ATTORNEY FEES INCURRED TO THE OWNER.
9. ALL EXCESS EXCAVATED GRAVEL AND SAND FROM CHANNEL SHALL BE USED TO FILL VOIDS IN ROCKARCH RAPIDS, PER DNR DIRECTION.
10. ADD CHOKE STONE AND COMPACT TO FILL VOIDS FOR EVERY 2 VERTICAL FEET OF BASE STONEINSTALLED.
11. CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS OUTSIDE OF THE RIVER CHANNEL, INCLUDINGACCESS ROAD, STAGING AREA, AND OVERBANK AREAS. CONTRACTOR SHALL ROTOTILL SOILS TO A 6”DEPTH IN AREAS WHERE COMPACTION OCCURRED DUE TO CONSTRUCTION ACTIVITIES.CONTRACTOR SHALL SEED, FERTILIZE, AND MULCH ALL DISTURBED AREAS PER THE EROSIONCONTROL PLAN AND SPECIFICATIONS. CONTRACTOR SHALL COORDINATE INSTALLATION,SPECIFICATIONS, AND WARRANTY REQUIREMENTS WITH ENGINEER.
12. CONTRACTOR SHALL REPLACE ANY FENCE DISTURBED DURING CONSTRUCTION TO DNR'SSATISFACTION.
13. CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN EROSION CONTROL UNTIL ESTABLISHMENT OFPERMANENT GROUNDCOVER.
14. TRAFFIC CONTROL DEVICES, PROCEDURES, AND LAYOUTS SHALL CONFORM TO THE CURRENTEDITION OF THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS(MUTCD).
15. CONTRACTOR SHALL CONTACT THE BUCHANAN COUNTY ENGINEER A MINIMUM OF 48 HOURS PRIORCONSTRUCTION.
16. DNR TO PROVIDE CONSTRUCTION STAKING.17. ALL BASE STONE AND WEIR STONE SHALL BE IOWA DOT CERTIFIED REVETMENT (RIPRAP) OR NATIVE
STONE WITH A MINIMUM SPECIFIC GRAVITY OF 2.65.18. WEIR ROCK PLACEMENT IS TO MEET A VERTICAL TOLERANCE OF 0.1'.19. QUANTITIES FOR EXCAVATION, SPOIL, AND BASE STONE MAY BE REDUCED IF BEDROCK IS
ENCOUNTERED. REMOVAL OF BEDROCK IS NOT PROPOSED. CONTACT DNR IF BEDROCK ISENCOUNTERED.
20. THE ENGINEER RESERVES THE RIGHT TO MAKE ADJUSTMENTS IN THE FIELD TO THE DIMENSIONS,STRUCTURE LOCATION, STRUCTURE DETAILS, AND ALL OTHER RELEVANT EROSION CONTROLPRACTICES NEEDED TO PRESERVE TREES AND OTHER HABITAT AND TO FIT SITE CONDITIONS.
21. IF ARCHEOLOGICAL SITES AND/OR CONTAMINATION (SITES) ARE LOCATED DURING CONSTRUCTION,THEN STOP WORK IMMEDIATELY AND CALL ENGINEER.
22. THE CONTRACTOR IS REQUIRED TO UTILIZE THE UTILITY ONE-CALL SERVICE AT (800) 292-8989 ATLEAST 48 HOURS PRIOR TO EXCAVATING ANYWHERE ON THE PROJECT.
23. ALL TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS, INCLUDING CONTROL POINTS, WERE PROVIDED BYIOWA DNR.
WATER:
1351 IOWA SPEEDWAY DRIVECENTRAL IOWA WATER ASSOCIATION
NEWTON, IA 50208(641) 792-7011
PROJECT SEQUENCING
THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SEQUENCE PLAN 10 DAYS PRIOR TO CONSTRUCTION.THE PLAN SHALL INCLUDE METHODS TO CONTAIN AND MANAGE SEDIMENT WITHIN THE IMPOUNDMENTUPSTREAM OF THE DAM. ENGINEER SHALL APPROVE PLAN PRIOR TO DAM REMOVAL. SUGGESTIONS FORPROJECT SEQUENCING ARE AS FOLLOWS:1. IDENTIFY ALL SIGNIFICANT PROJECT BOUNDARIES, EASEMENTS, ARCHAEOLOGICAL SITES, ACCESS
POINTS, CONSTRUCTION LIMITS AND CONTRACTOR STAGING AREAS WITH THE ENGINEER.2. ESTABLISH HAUL ROUTES AND CONTRACTOR STAGING AREAS.3. STAKE OUT CONSTRUCTION LIMITS PRIOR TO CONSTRUCTION.4. INSTALL EROSION CONTROL MEASURES IN ACCORDANCE WITH THE EROSION CONTROL PLAN.5. CLEAR AS DIRECTED WITHIN THE CONSTRUCTION LIMITS AS NEEDED TO EXCAVATE AND PLACE FILL
MATERIAL WITHIN THE AREAS SHOWN ON THE PLANS. PROTECT TREES MARKED FOR PRESERVATION.6. REMOVE AND STOCKPILE TOPSOIL WITHIN THE AREAS OF PROPOSED GRADING. BEGIN WORK AT THE
UPSTREAM END OF THE PROJECT REACH AND WORK IN THE DOWNSTREAM DIRECTION.7. EXCAVATE TO THE LINES AND GRADES SHOWN ON GRADING PLAN.8. DEMOLISH EXISTING DAM PER DEMOLITION PLAN. CUT ALL EXPOSED STEEL REBAR FLUSH WITH THE
REMAINING SURFACES. CONTROLLED REMOVAL IS REQUIRED TO MANAGE SEDIMENT UPSTREAM OFTHE DAM.
9. LAYOUT THE PROPOSED CHANNEL CENTERLINE.10. CONSTRUCT BASE STONE, CHOKE STONE, WEIR STONE, BANKFULL BENCH AND EROSION CONTROL
MEASURES AS SHOWN ON THE PLANS AND DETAILS, PROCEEDING IN THE DOWNSTREAM DIRECTION.11. RESPREAD TOPSOIL, PLANT, SEED AND MULCH ALL DISTURBED AREAS IMMEDIATELY AFTER
CONSTRUCTION PER THE EROSION CONTROL PLAN.12. WALK THE PROJECT SITE WITH THE ENGINEER TO DEVELOP A FINAL CHECK-LIST OF ITEMS LEFT TO BE
COMPLETED.13. REPAIR/COMPLETE ITEMS IDENTIFIED ON THE FINAL CHECK-LIST.14. REMOVE ALL WASTE FROM THE PROJECT AREA AND RESTORE ALL STAGING AND STOCKPILE AREAS
TO THEIR ORIGINAL APPEARANCE. SEED, FERTILIZE, AND MULCH ALL DISTURBED AREAS PER THEEROSION CONTROL PLAN.
15. WALK THE PROJECT SITE WITH THE ENGINEER AND OWNER TO APPROVE PROJECT COMPLETENESS.
CONTROL POINTS
NOTE:1. BID ITEM #6 - BASE STONE, CLASS 'E' REVETMENT INCLUDES THE QUANTITY OFBASE STONE REQUIRED AFTER SUBTRACTING AN ESTIMATED 145 TONS OF SALVAGEDCONCRETE FROM THE DAM REMOVAL.
QUANTITIES
ITEM NUMBER DESCRIPTIONMOBILIZATION (LS)THIS ITEM INCLUDES PROVIDING AND REMOVING CONSTRUCTION EQUIPMENT TO THE SITE. THISITEM WILL BE PAID PER LUMP SUM.
CLEARING AND GRUBBING (LS)ITEM INCLUDES REMOVAL OF ALL VEGETATION, TREES, SHRUBS, STUMPS, AND MISCELLANEOUSDEBRIS ENCOUNTERED WITHIN THE PROJECT AREA AND AS NOTED IN THE CONTRACTDOCUMENTS. TREE PROTECTION IS INCIDENTAL TO THIS ITEM. CLEARING IS BASED ONCONSTRUCTION LIMITS AND SHOULD BE LIMITED TO ONLY THE AREAS NECESSARY TO COMPLETETHE PROJECT AND APPROVED BY THE ENGINEER. THIS ITEM WILL BE PAID PER LUMP SUM.
DAM REMOVAL (LS)CONTRACTOR TO REMOVE DAM AS SHOWN ON SHEET D.01. THIS ITEM WILL BE PAID PER LUMP SUM.SALVAGING CONCRETE FROM DAM REMOVAL (ESTIMATED 145 TONS) AND PLACING AS BASE STONE ISINCIDENTAL TO THIS BID ITEM. ITEM INCLUDES CUTTING REBAR FLUSH WITH SALVAGE MATERIALINTENDED TO BE RE-USED AS BASE STONE.
EROSION CONTROL (LS)REFER TO SHEET F.03 FOR LOCATIONS AND DETAILS. THIS ITEM WILL BE PAID PER LUMP SUM. ITEMINCLUDES INSTALLATION, MAINTENANCE, AND REMOVAL OF 85 LF OF SILT FENCE INSTALLED PERPLANS AND SPECIFICATIONS. ITEM INCLUDES INSTALLATION AND MAINTENANCE OF 120 SY OFROLLED EROSION CONTROL PRODUCT INSTALLED PER PLANS AND SPECIFICATIONS.
BASE STONE, CLASS 'E' REVETMENT (TON)REFER TO D.03, F.02 AND W SHEETS FOR LOCATIONS AND DETAILS. ITEM INCLUDES PROVIDING ANDPLACING REVETMENT.
6" MINUS CHOKE STONE (TON)REFER TO SHEETS D.03, F.02, AND W SHEETS FOR LOCATIONS AND DETAILS. ITEM INCLUDESPROVIDING AND PLACING CHOKE STONE FOR FILLING VOIDS OF REVETMENT IN THE ROCK ARCHRAPIDS STRUCTURE. FILL VOIDS EVERY 2 FOOT LAYER OF REVETMENT. CHOKE STONE SHALL MEETPROJECT SPECIFICATIONS.
WEIR STONE (3.5'X3.0'X1.5' MIN.) (TON)REFER TO SHEETS D.03, F.02, W.05, AND W.06 FOR LOCATIONS AND DETAILS. ITEM INCLUDESPROVIDING AND PLACING WEIR (OR DERRICK) STONES ALONG WITH BOULDER CLUSTERS.MEASUREMENT AND PAYMENT FOR THE WEIR STONES SHALL BE BASED ON THE PLAN QUANTITY.THIS PAYMENT SHALL BE FULL COMPENSATION FOR FURNISHING ALL MATERIALS, LABOR, ANDEQUIPMENT NECESSARY TO INSTALL THE WEIR STONES AND BOULDER CLUSTERS PER PLAN. BIDITEM ESTIMATE ASSUMES 1.5 TONS +/- 0.5 TONS PER WEIR STONE. CONTRACTOR SHALL PROVIDE10-15% OF THE WEIR STONE QUANTITY WITH STONES MEASURING 4.0'X5.0'X1.2' FEET FOR BOULDERCLUSTER STRUCTURES. WEIR STONES SHALL HAVE A SPECIFIC GRAVITY OF 2.65 OR GREATER ANDSHALL BE APPROVED BY ENGINEER PRIOR TO PLACEMENT.
STABILIZED CONSTRUCTION ENTRANCE (MACADAM STONE) (LS)ITEM INCLUDES PROVIDING, PLACING, AND REMOVING STABILIZED CONSTRUCTION ENTRANCE.ENGINEERING FABRIC AND MAINTENANCE OF STABILIZED CONSTRUCTION ENTRANCE ARECONSIDERED INCIDENTAL TO THIS ITEM.
1
2
3
4
6
7
8
10
9
SEEDING/FERTILIZING/MULCHING (LS)THE CONTRACTOR SHALL SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS (APPROXIMATELY 0.2ACRES) PER EROSION CONTROL PLAN F.03 AND SPECIFICATIONS. THIS ITEM WILL BE PAID PER LUMPSUM. SEEDING, FERTILIZING, AND MULCHING SHALL COMPLY WITH SUDAS SECTION 9010.
EXCAVATION, EXPORT (CY)REFER TO SHEETS F.01, F.02, AND F.03 FOR LOCATIONS AND DETAILS. THIS ITEM WILL BE PAID ASDETERMINED BY ENGINEER PER TRUCK TICKETS. CONTRACTOR SHALL GRADE THE SITE AS DETAILEDIN THE PLANS. ANY SPOILS GENERATED AND NOT SPREAD ON-SITE SHALL BE EXPORTED TO ALOCATION DETERMINED BY THE CONTRACTOR. ANY SPOILS CONSISTING OF GRAVEL OR COBBLESHALL BE SALVAGED AND PLACED AS CHOKE STONE MATERIAL PER ENGINEER'S DIRECTION.
5
ESTIMATE REFERENCE INFORMATION
EXISTINGGRAVEL
PARKING LOT
WAPSIPINICON RIVER
CONSERVATION EASEMENT
APPROXIMATE TOP OF EXISTING DAM
STAGING AND STORAGE AREA
STABILIZED CONSTRUCTION ENTRANCE
EXISTING GRAVEL DRIVE
WATER STREET
BENTON STREET
WAPSIPINICON RIVER
30' 90'
GRAPHIC SCALE
60'0
GRAPHIC SCALE
N
NO
.R
EV
IS
IO
NB
YD
AT
E
DE
SIG
NE
D:
DR
AF
TE
D:
CH
EC
KE
D:
SC
ALE
:
PR
OJE
CT
N
O.:
FIL
E N
UM
BE
R:
SH
EE
T N
O.:
DA
TE
:
PROJECT NO.
SHEET NO.
LT LE
ONA
S S
O C
I A
T E
S
I N C
500
EAST
LOC
UST
STRE
ET S
UITE
400
DES
MOI
NES
IOWA
5
0309
offic
e 51
5-42
2-70
16ww
w.ltl
eon.c
om
038.005
DEMOLITION PLAN
D.01
PD
S
BA
Y
LT
L
1:30
038.005
038.005
D.0
1
SE
PT
EM
BE
R 19, 2
018
LIT
TL
ET
ON
D
AM
M
IT
IG
AT
IO
N
WA
PS
IP
IN
IC
ON
R
IV
ER
LIT
TL
ET
ON
, IO
WA
DE
MO
LIT
IO
N P
LA
N
KEY NOTES
1 CLEAR AND GRUB TREES AND SHRUBS FOR CONSTRUCTION ACCESS ANDREQUIRED GRADING.
2 REMOVE FULL VERTICAL EXTENT OF EXISTING CONCRETE DAM AND RAILING.SEE SHEET B.02. SALVAGED CONCRETE FROM DAM TO BE REUSED AS BASESTONE. CONTRACTOR SHALL BREAK SALVAGED CONCRETE TO APPROXIMATEBASE STONE SIZE.
3 PROTECT EXISTING FENCE.
4 PROTECT EXISTING STRUCTURES AND RETAINING WALL.
5 PROTECT EXISTING PLAYGROUND EQUIPMENT.
DEMOLITION NOTES
1. MECHANICALLY REMOVE THE DAM STRUCTURE AND FILL MATERIAL (NOBLASTING IS PERMITTED) AFTER DAMMED RIVER IS DRAWN DOWN TO MINIMIZESEDIMENT TRANSPORT DOWNSTREAM.
2. SALVAGE BROKEN CONCRETE FROM DAM AND REUSE AS BASE STONE FOR ROCKARCH RAPIDS CONSTRUCTION. EXPOSED REBAR SHALL BE CUT FLUSH. PROVIDEMINIMUM 2' COVER OF CLASS 'E' RIPRAP OVER ANY RE-USED CONCRETE.
3. CONTRACTOR SHALL PROTECT EXISTING SCOUR HOLE DOWNSTREAM OF DAMAND SHALL NOT FILL OR DISCARD MATERIAL IN HOLE OR DOWNSTREAM OF THEDAM. CONTRACTOR SHALL REMOVE ANY MATERIAL PLACED IN SCOUR HOLE.
4. SALVAGE EXISTING DAM SIGNS AND POSTS. PROVIDE TO DNR.
LEGEND
EXISTING CONTOUR
EXISTING PARKING LOT
CONSTRUCTION LIMITS
CONSERVATION EASEMENT
PROPERTY LINE
EXISTING DAM
STABILIZED CONSTRUCTIONENTRANCE
STAGING & STORAGE AREA
AutoCAD SHX Text
900
OWNER:PARKER, STUART E TRUST
OWNER:PARKER, STUART E TRUST
OWNER:PARKER, STUART E TRUST
OWNER:PARKER, STUART E TRUST
OWNER:COVENTRY, RANDY & SHERRY
OWNER:FISHER, MICHAEL D & DEBORAH K
OWNER:MOUNT, JENNIFER L
OWNER:
COOK, CRAIG A & BRENDA
OWNER:BICKERT, STANLEYE & IRENE E
OWNER:COOPER,MARIE E
OWNER:POISEL, STEPHEN L &AMANDA L
OWNER:LUCIER, SCOTT D & SUSAN M
WAPSIPIN
ICO
N RIVER
CP 103N: 3660053.090E: 5317713.617ELEV: 914.588
CP 102N: 3659989.122E: 5318009.482ELEV: 917.049
CP 101N: 3659998.778E: 5318116.377ELEV: 921.679
CP 100N: 3659894.991E: 5318143.866ELEV: 909.979
CONSTRUCTION LIMITS
CONSERVATIONEASEMENT
WA
TER
STR
EE
T
BENTON STREET
EXISTING GRAVELPARKING LOTPROPOSED ROCK
ARCH RAPIDS. SEESHEET F.02 FOR LOW
FLOW CHANNEL.
WEIR #1
WEIR #2
WEIR #3
WEIR #4
WEIR #5BOULDERCLUSTERS
STAGING ANDSTORAGE AREA
STABLIZED CONSTRUCTION ENTRANCE
PROTECT EXISTINGRETAINING WALL
PROPOSED WEIRSTONES ALONG EDGEOF BANKFULL BENCH.
PLACE WEIR STONES ON SLOPE PERENGINEER'S DIRECTION.
NO
.R
EV
IS
IO
NB
YD
AT
E
DE
SIG
NE
D:
DR
AF
TE
D:
CH
EC
KE
D:
SC
AL
E:
PR
OJE
CT
N
O.:
FIL
E N
UM
BE
R:
SH
EE
T N
O.:
DA
TE
:
PROJECT NO.
SHEET NO.
LT LE
ONA
S S
O C
I A
T E
S
I N C
500
EAST
LOC
UST
STRE
ET S
UITE
400
DES
MOI
NES
IOWA
5
0309
offic
e 51
5-42
2-70
16ww
w.ltl
eon.c
om
038.005
SITE PLAN
D.02
PD
S
BA
Y
LT
L
1:5
0
03
8.0
05
03
8.0
05
D.0
2
SE
PT
EM
BE
R 1
9, 2
01
8
LIT
TL
ET
ON
D
AM
M
IT
IG
AT
IO
N
WA
PS
IP
IN
IC
ON
R
IV
ER
LIT
TL
ET
ON
, IO
WA
SIT
E P
LA
N
150'100'0
GRAPHIC SCALE
50'
N
CONTROL POINT
CLASS 'E' RIPRAP
PROPOSED WEIR STONES
LEGEND
PROFILE ALIGNMENT
LOW FLOW TROUGH
CONSERVATION EASEMENT
PROPERTY LINE
CONSTRUCTION LIMITS
PROPOSED BOULDER CLUSTER
STABILIZED CONSTRUCTIONENTRANCE
STAGING & STORAGE AREA
PROPOSED CHANNELBED ELEVATION
(THALWEG)
REMOVE EXISTING DAM
APPROXIMATE SEDIMENT
3%4:1
PROPOSED LOWFLOW WATER
SURFACE
EXISTING CHANNELBED ELEVATION(THALWEG)
CUT RIVERBOTTOM (THALWEG)
3.0'
WEIR # 5CREST ELEV=909.46
TROUGHELEV=908.96
WEIR # 3CREST ELEV=911.06
TROUGHELEV=910.56
WEIR # 2CREST ELEV=911.86
TROUGHELEV=911.36
WEIR # 1CREST ELEV=912.66
TROUGHELEV=912.16
WEIR # 4CREST ELEV=910.26
TROUGHELEV=909.76
AVAILABLE AREA FOR REUSEOF SALVAGED DAM MATERIAL
CLASS 'E'RIPRAP BASE
BOULDER CLUSTERCREST ELEV=909.00
EXISTING CHANNELBED ELEVATION
(THALWEG)
1.5%
WEIR #1SEE SHEET F.02 AND W.05FOR ELEVATIONS AND LOCATIONS
WEIR #5
PROPOSED GRADE @BANKFULL SHELF ℄
CUT EXISTINGGRADE
EXISTING WALLAPPROXIMATELOCATION
EXISTING GRADE @BANKFULL SHELF ℄
CUT GRADE @BANKFULL SHELF ℄
NO
.R
EV
IS
IO
NB
YD
AT
E
DE
SIG
NE
D:
DR
AF
TE
D:
CH
EC
KE
D:
SC
ALE
:
PR
OJE
CT
N
O.:
FIL
E N
UM
BE
R:
SH
EE
T N
O.:
DA
TE
:
PROJECT NO.
SHEET NO.
LT LE
ONA
S S
O C
I A
T E
S
I N C
500
EAST
LOC
UST
STRE
ET S
UITE
400
DES
MOI
NES
IOWA
5
0309
offic
e 51
5-42
2-70
16ww
w.ltl
eon.c
om
038.005
PROFILE
D.03
PD
S
BA
Y
LT
L
1:10
H
1:2 V
038.005
038.005
D.0
3
SE
PT
EM
BE
R 19, 2
018
LIT
TL
ET
ON
R
IF
FL
E C
ON
ST
RU
CT
IO
N &
F
IS
H
PA
SS
AG
E R
ES
TO
RA
TIO
N
LIT
TL
ET
ON
, IO
WA
PR
OF
IL
E
SCALE: 1"=10' HORIZONTAL1"=2' VERTICAL
PROPOSED THALWEG PROFILE
BANKFULL BENCH PROFILESCALE: 1"=10' HORIZONTAL
1"=2' VERTICAL
CUT AREA
CLASS 'E' RIPRAP
AVAILABLE AREA FORREUSE OF SALVAGEDDAM MATERIAL
PROPOSED WEIR STONES
LEGEND
PROPOSED GRADE
EXISTING GRADE
PROPOSED LOW-FLOWWATER SURFACE
PROPOSED BOTTOMOF EXCAVATION
DAM REMOVAL
LUCIER, SCOTT D & SUSAN M
-0+
02.0
0
0+08
.00
0+18
.00
0+28
.00
0+38
.00
0+48
.00
0+58
.00
0+68
.00
0+78
.00
0+88
.00
0+98
.00 1+
08.0
0
1+18
.00
1+28
.00
1+38
.00
1+48
.00
1+58
.00
1+68
.00
1+78
.00
1+88
.00
1+98
.00
PROPOSED THALWEG
BANKFULL BENCH CENTERLINE
EXISTING GRAVELPARKING LOT
WAPSIPINICON RIVER
20' 60'0
GRAPHIC SCALE
40'
N
NO
.R
EV
IS
IO
NB
YD
AT
E
DE
SIG
NE
D:
DR
AF
TE
D:
CH
EC
KE
D:
SC
ALE
:
PR
OJE
CT
N
O.:
FIL
E N
UM
BE
R:
SH
EE
T N
O.:
DA
TE
:
PROJECT NO.
SHEET NO.
LT LE
ONA
S S
O C
I A
T E
S
I N C
500
EAST
LOC
UST
STRE
ET S
UITE
400
DES
MOI
NES
IOWA
5
0309
offic
e 51
5-42
2-70
16ww
w.ltl
eon.c
om
038.005
GRADING PLAN-CUT
F.01
PD
S
BA
Y
LT
L
1:20
038.005
038.005
F.0
1
SE
PT
EM
BE
R 19, 2
018
LIT
TL
ET
ON
D
AM
M
IT
IG
AT
IO
N
WA
PS
IP
IN
IC
ON
R
IV
ER
LIT
TL
ET
ON
, IO
WA
GR
AD
IN
G P
LA
N - C
UT
S
UR
FA
CE
NOTE:1. PROPOSED CONTOURS SHOW CUT SURFACE PRIOR TO PLACING ROCK.2. CUT SURFACE ASSUMES NO BEDROCK WILL BE ENCOUNTERED. SEE GENERAL NOTES #20 ON SHEET C.01.
PROPOSED CUT CONTOUR
EXISTING CONTOUR
LEGEND
CONSERVATION EASEMENT
EXISTING PARKING LOT
PROPERTY LINE
CONSTRUCTION LIMITS
PROFILE ALIGNMENT
AutoCAD SHX Text
900
AutoCAD SHX Text
900
LUCIER, SCOTT D & SUSAN M
-0+
02.0
0
0+08
.00
0+18
.00
0+28
.00
0+38
.00
0+48
.00
0+58
.00
0+68
.00
0+78
.00
0+88
.00
0+98
.00 1+
08.0
0
1+18
.00
1+28
.00
1+38
.00
1+48
.00
1+58
.00
1+68
.00
1+78
.00
1+88
.00
1+98
.00
PROPOSED THALWEG
BANKFULL BENCH CENTERLINE
CROSS SECTIONS (SEE SHEETS W.01 - W.06)
WEIR #1
BANKFULL BENCH (TYP.)
BOULDER CLUSTERS, TYP.SEE DETAIL ON SHEET B.01
LOW FLOW TROUGH
BEGIN DAM MITIGATION PROJECTSTA. 1+98.00
END DAM MITIGATION PROJECTSTA. 0+04.00
3%
EXISTING GRAVELPARKING LOT
PROPOSED CONTOURS
PROTECT EXISTING RETAINING WALL
EXISTING STRUCTURE/HOUSE -APPROXIMATE LOCATION
A
WEIR #5
B
C
D
E
F
G
H
I
WEIR #2WEIR #3
WEIR #4
WAPSIPINICON RIVER
20' 60'0
GRAPHIC SCALE
40'
N
NO
.R
EV
IS
IO
NB
YD
AT
E
DE
SIG
NE
D:
DR
AF
TE
D:
CH
EC
KE
D:
SC
ALE
:
PR
OJE
CT
N
O.:
FIL
E N
UM
BE
R:
SH
EE
T N
O.:
DA
TE
:
PROJECT NO.
SHEET NO.
LT LE
ONA
S S
O C
I A
T E
S
I N C
500
EAST
LOC
UST
STRE
ET S
UITE
400
DES
MOI
NES
IOWA
5
0309
offic
e 51
5-42
2-70
16ww
w.ltl
eon.c
om
038.005
GRADING PLAN-FINISH
F.02
PD
S
BA
Y
LT
L
1:20
038.005
038.005
F.0
2
SE
PT
EM
BE
R 19, 2
018
LIT
TL
ET
ON
D
AM
M
IT
IG
AT
IO
N
WA
PS
IP
IN
IC
ON
R
IV
ER
LIT
TL
ET
ON
, IO
WA
GR
AD
IN
G P
LA
N - F
IN
IS
HE
D S
UR
FA
CE
NOTE: SEE W.05 & W.06 FOR TYPICAL WEIR CROSS SECTIONS.
CLASS 'E' RIPRAP
BANKFULL BENCH AREA(CLASS 'E' RIPRAP)
PROPOSED WEIR STONES
PROPOSED CONTOUR
EXISTING CONTOUR
LEGEND
PROFILE ALIGNMENT
LOW FLOW TROUGH
CONSERVATION EASEMENT
PROPERTY LINE
CONSTRUCTION LIMITS
PROPOSED BOULDER CLUSTER
AutoCAD SHX Text
900
AutoCAD SHX Text
900
CONSTRUCTION LIMITS
STABILIZED CONSTRUCTION ENTRANCE
X
EXISTING GRAVEL
EXISTINGGRAVEL
PARKING LOT
WAPSIPINICON RIVER
CONSERVATION EASEMENT
SILT FENCE, TYP.
STAGING AND STORAGE AREA
WAPSIPINICON RIVER
ROLLED EROSION CONTROL PRODUCT, TYP.
30' 90'
GRAPHIC SCALE
60'0
GRAPHIC SCALE
N
NO
.R
EV
IS
IO
NB
YD
AT
E
DE
SIG
NE
D:
DR
AF
TE
D:
CH
EC
KE
D:
SC
ALE
:
PR
OJE
CT
N
O.:
FIL
E N
UM
BE
R:
SH
EE
T N
O.:
DA
TE
:
PROJECT NO.
SHEET NO.
LT LE
ONA
S S
O C
I A
T E
S
I N C
500
EAST
LOC
UST
STRE
ET S
UITE
400
DES
MOI
NES
IOWA
5
0309
offic
e 51
5-42
2-70
16ww
w.ltl
eon.c
om
038.005
EROSION CONTROL
F.03
PD
S
BA
Y
LT
L
1:30
038.005
038.005
F.0
3
SE
PT
EM
BE
R 19, 2
018
LIT
TL
ET
ON
D
AM
M
IT
IG
AT
IO
N
WA
PS
IP
IN
IC
ON
R
IV
ER
LIT
TL
ET
ON
, IO
WA
ER
OS
IO
N C
ON
TR
OL
P
LA
N
SILT FENCE
X
PROPOSED WEIR STONES
LEGEND
EROSION CONTROL NOTES
1. DISTURB THE LEAST AREA POSSIBLE TO COMPLETE THE SCOPEOF THE PROJECT.
2. ALL SEDIMENT AND EROSION CONTROL PRACTICES WILL BEINSPECTED AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS .ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THEEFFECTIVENESS OF THE BEST MANAGEMENT PRACTICES SHALLBE MADE IMMEDIATELY.
3. INSPECTIONS ARE THE RESPONSIBILITY OF THE CONTRACTOR.4. SOIL STABILIZATION WILL BE INITIATED ON ALL DISTURBED
AREAS WHERE CONSTRUCTION ACTIVITY WILL NOT OCCUR FORA PERIOD OF MORE THAN 21 CALENDAR DAYS OR WITHIN 14DAYS AFTER CONSTRUCTION ACTIVITY HAS PERMANENTLY ORTEMPORARILY CEASED. THIS SEQUENCE SHALL REPEAT ASGROUND COVER IS REMOVED BY SUBSEQUENT CONSTRUCTIONACTIVITY.
5. APPLY FREQUENT WATERING TO GROUND SURFACE, ASREQUIRED TO CONTROL DUST.
6. MAINTENANCE OF ALL TEMPORARY AND PERMANENT EROSIONCONTROL MEASURES IS THE RESPONSIBILITY OF THECONTRACTOR AND/OR SUBCONTRACTORS. CLEANING OFCONTROL DEVICES SHALL BEGIN WHEN THEY HAVE LOST 50%OF THEIR CAPACITY.
7. LOCATION OF SOLID WASTE CONTAINER AND PORTABLERESTROOM TO BE SPECIFIED BY CONTRACTOR AND APPROVEDBY ENGINEER.
8. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECTPAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TOMINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULARTRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT ISTRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROADSHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY.SEDIMENT SHALL BE REMOVED FROM THE ROADS BYSHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENTCONTROL DISPOSAL AREA. STREET WASHING SHALL BEALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THISMANNER.
9. ALL TEMPORARY EROSION AND SEDIMENT CONTROLMEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINALSITE STABILIZATION OR AFTER THE TEMPORARY MEASURESARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BYTHE IMPLEMENTING AGENCY. TRAPPED SEDIMENT AND THEDISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OFTEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZEDTO PREVENT FURTHER EROSION AND SEDIMENT.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANYIMPROVEMENTS TO THE ROAD CONDITIONS, GATES, ANDFENCES REQUIRED FOR ACCESS DURING CONSTRUCTION.
11. DURING CONSTRUCTION THE CONTRACTOR SHALL BERESPONSIBLE FOR INSTALLING ADDITIONAL EROSION CONTROLMEASURES NOT SHOWN ON THE PLANS BUT NECESSARY TOCONTROL EXCESS SEDIMENT.
12. CONTRACTOR SHALL REFUEL EQUIPMENT AT A LOCATIONAWAY FROM THE RIVER CHANNEL AND APPROVED BY THEENGINEER.
13. SEED, FERTILIZE, AND MULCH ALL DISTURBED AREA OUTSIDEOF THE CHANNEL USING EROSION CONTROL MIX PER THESPECIFICATIONS.