PRESENTED BY: Rudy Garza Senior Vice President Distribution Services & Operations 1/4/2018 Community Update INWOOD COMMUNITY MEETING
8

INWOOD COMMUNITY MEETING - CPS Energy · Community Update INWOOD COMMUNITY MEETING. AGENDA •Outage History •Remediation Plan •Tree Trimming Map •Points of Contact 2. OUTAGE

Aug 02, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: INWOOD COMMUNITY MEETING - CPS Energy · Community Update INWOOD COMMUNITY MEETING. AGENDA •Outage History •Remediation Plan •Tree Trimming Map •Points of Contact 2. OUTAGE

P R E S E N T E D BY:

R u d y G a r za

S e n i o r V i c e P r e s i d e nt

D i s t r i b u t i o n S e r v i c e s & O p e ra t i o n s

1 / 4 / 2 0 1 8

C o m m u n i t y U p d a t e

INWOOD COMMUNITY MEETING

Page 2: INWOOD COMMUNITY MEETING - CPS Energy · Community Update INWOOD COMMUNITY MEETING. AGENDA •Outage History •Remediation Plan •Tree Trimming Map •Points of Contact 2. OUTAGE

AGENDA

• Outage History

• Remediation Plan

• Tree Trimming Map

• Points of Contact

2

Page 3: INWOOD COMMUNITY MEETING - CPS Energy · Community Update INWOOD COMMUNITY MEETING. AGENDA •Outage History •Remediation Plan •Tree Trimming Map •Points of Contact 2. OUTAGE

OUTAGE HISTORY

3

Outage DateDuration

(Hours)Cause Of Outage

11/17/2016 21:52 0.1 Substation Lockout - Animal

2/19/2017 22:46 0.9 Thunderstorms - Tornadoes

2/22/2017 19:19 1.1 Failed Connection

4/11/2017 14:10 Momentary Cause Unknown

5/6/2017 1:27 0.1 Substation Lockout - Animal

5/23/2017 16:39 Momentary Cause Unknown

5/29/2017 1:30 0.1 Substation Lockout – Equipment Failure

5/30/2017 15:37 0.4 Thunderstorms

8/26/2017 11:53 4.4 Thunderstorms - Trees (Tropical Storm Harvey High Wind)

9/27/2017 9:22 1.6 Vehicle Hit Pole

12/7/2017 19:31 7.1 Snow on Trees

12/19/2017 6:53 0.1 Cause Unknown

12/19/2017 8:04 2.0 Lightning Arrestor Failure

Page 4: INWOOD COMMUNITY MEETING - CPS Energy · Community Update INWOOD COMMUNITY MEETING. AGENDA •Outage History •Remediation Plan •Tree Trimming Map •Points of Contact 2. OUTAGE

OUTAGE CAUSES

4

Lightning – damaged cross arm Failed equipment Trees touching lines

Car hit poleAnimals

Page 5: INWOOD COMMUNITY MEETING - CPS Energy · Community Update INWOOD COMMUNITY MEETING. AGENDA •Outage History •Remediation Plan •Tree Trimming Map •Points of Contact 2. OUTAGE

OUTAGE TIME SUMMARY

5

Event Cause Duration (Hours)

Weather - Trees 12.8Equipment Failure 3.1

Vehicle 1.6

Substation Equipment 0.1

Substation Animal 0.2

17.8

Page 6: INWOOD COMMUNITY MEETING - CPS Energy · Community Update INWOOD COMMUNITY MEETING. AGENDA •Outage History •Remediation Plan •Tree Trimming Map •Points of Contact 2. OUTAGE

REMEDIATION PLAN• Reactive Response

• Completed full circuit inspection September 2017 – identified tree trimming

• Clearing trees contacting overhead power lines by end of February 2018

• Install animal guards at Substation by beginning of February 2018.

6

• Proactive Response• Installation of

additional equipment to minimize customer impact.

• Using drone technology with infrared scan to proactively assess equipment

Page 7: INWOOD COMMUNITY MEETING - CPS Energy · Community Update INWOOD COMMUNITY MEETING. AGENDA •Outage History •Remediation Plan •Tree Trimming Map •Points of Contact 2. OUTAGE

TREE TRIMMING

7

Completed Tree

Trimming

PHASE 3

PHASE 2

PHASE 1PHASE 4

PHASE 5

Install Animal Guard

Page 8: INWOOD COMMUNITY MEETING - CPS Energy · Community Update INWOOD COMMUNITY MEETING. AGENDA •Outage History •Remediation Plan •Tree Trimming Map •Points of Contact 2. OUTAGE

POINTS OF CONTACT

• Senior Executive Leadership• Rudy Garza – 210-353-3640

• Maria Garcia – 210-353-2368

• Engineering Executives• Ben Jordan- 210-353-4493

• CPS Energy Construction• Tony Alvarado 210-353-4128

• To Report Unplanned, Extended Outages• CPS Outage Line – 210-353- HELP (4357)