    Trains 6 & 7, AKG-2 and Common Offplot Projects Overview

  • 8/2/2019 Investor Pres Qatar07 Rasgas Slide

    3/13

  • 8/2/2019 Investor Pres Qatar07 Rasgas Slide

    4/13

    RasGas Onshore Production Facilities

    Burj Dubai: under construction, potentially the largestfreestanding structure in the world.

    Approximately 1.1 km

    565 m (1853 ft)*

    * September 2007

  • 8/2/2019 Investor Pres Qatar07 Rasgas Slide

    5/13

  • 8/2/2019 Investor Pres Qatar07 Rasgas Slide

    6/13

    Project management success is measured via four key factors:

    - Safety, cost, schedule and quality

    Project safety results have been outstanding

    - Performance is better than the Middle East Oil & Gas Producersas a whole

    - Use of ExxonMobil safety systems and management focus a key to

    success

    Facility start-up has gone well with design capacity reached quickly

    - Learnings shared between trains to allow continuous improvement

    in reliability

    Each project completed on or ahead of schedule and within budget

    Recently Completed Project Results

  • 8/2/2019 Investor Pres Qatar07 Rasgas Slide

    7/13

  • 8/2/2019 Investor Pres Qatar07 Rasgas Slide

    8/13

    Train 6 Construction

    Erecting Train 6 Amine Absorber Column

    (1,400 Tons)

  • 8/2/2019 Investor Pres Qatar07 Rasgas Slide

    9/13

    132-inch diameter Underground Cooling

    Water Lines

    Train 7 Construction

    Propane & Ethane Bullets (Storage)

  • 8/2/2019 Investor Pres Qatar07 Rasgas Slide

    10/13

  • 8/2/2019 Investor Pres Qatar07 Rasgas Slide

    11/13

    Liquids Storage Facilities (Tank Farm)

    Liquids Loading Berths (RLC Port)

    RasGas-Managed Common Offplot Projects Progressing Well

    Condensate Phase 1(8 tanks)

    LPG

    Phase 1

    LPG

    Phase 2

    (2 tanks)

    Condensate

    Phase 2

    (6 tanks)

  • 8/2/2019 Investor Pres Qatar07 Rasgas Slide

    12/13

    Liquid Storage Facilities (Tank Farm)

    Condensate

    Phase 2

    (6 tanks)

    LPG

    Phase 2

    (2 tanks)

    Oryx

    QG

    Condensate

    Laffan

    Refinery

    LPG

    Phase 1

    DEL, Pearl,

    Barzan

    Condensate

    Phase 1

    (8 tanks)

    RG

    Condensate

  • 8/2/2019 Investor Pres Qatar07 Rasgas Slide