Sr. No. Name & Address Capital Investment (Rs.) Applied For Section Page No. Remarks 1 M/s. Pride Builders Pvt. Ltd., "Pride Soft City", S. no. 123 to 146, 295to298, 300to302, Vill- Charoli, Pune 450 Crs Establish RO(HQ) 1 to 9 Authority: Chairman 2 M/s. Darode Jog Realities Pvt. Ltd., "Liviano", S. no. 18, 19(P), Kharadi, Tal-Haveli, Dist-Pune 164 Crs. Establish RO(HQ) 10 to 17 3 M/s. Pune Dynasty Projects Pvt. Ltd, Plot no. 3 B, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 131.94 Cr Establish & Operate (part) RO(HQ) 18 to 34 4 M/s. Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ) 35 to 52 Authority: Chairman 5 M/s. Total Oil India Pvt. Ltd, Plot No: A-26, TTC Industrial Area, Rabale, Navi Mumbai, Maharashtra. 81.85 Crs 1st operate (Expansion) RO(HQ) 53 to 63 Authority: Chairman 6 M/s. East & West Builders, CTS No: 653/A, 611A/1, 656/A, 619/A, 616/A, 614/A, 612/A, 612/D, 287/A & 287/D, Kandivali (W), Mumbai 127.71 Crs 1st operate RO(HQ) 64 to 72 7 M/s. Tulsiani Sumer Associates, “Sahar Plaza”, 179 A to 179 F & 179 H, Village: Mulgaon & CTS No: 230A, 230B, 230C &238B, Village: Kondivita, M.V.Road, Andheri (E), Mumbai 202.27 Crs 1st operate RO(HQ) 73 to 80 Authority: Chairman 8 M/s. Siddhi Real Estate Developers (Highland Gardens), 81/1pt,87/2pt,66/5, 66/17, 66/18A, 66/20-26,62/2, 62/5A, 62/5B, 62/8, 62/9,62/11-14,63/1,63/4,63/5,63/8 etc of vill Dhokali, Thane. 417 Cr 1st operate (Part) RO(HQ) 81 to 87 Authority: Chairman List of Cases to be submitted before 8th Consent Committee Meeting of 2012 scheduled on 17. 09. 2012 at 15:00 hrs RESUBMISSION
64

Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

Jun 23, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

Sr. No. Name & Address

Capital Investment

(Rs.)Applied For Section Page No. Remarks

1 M/s. Pride Builders Pvt. Ltd., "Pride Soft City", S. no. 123 to 146, 295to298, 300to302, Vill-Charoli, Pune

450 Crs Establish RO(HQ) 1 to 9 Authority: Chairman

2 M/s. Darode Jog Realities Pvt. Ltd., "Liviano", S. no. 18, 19(P), Kharadi, Tal-Haveli, Dist-Pune

164 Crs. Establish RO(HQ) 10 to 17

3 M/s. Pune Dynasty Projects Pvt. Ltd, Plot no. 3 B, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune.

131.94 Cr Establish & Operate (part)

RO(HQ) 18 to 34

4 M/s. Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune.

471.38 Crs Establish & Operate

RO(HQ) 35 to 52 Authority: Chairman

5 M/s. Total Oil India Pvt. Ltd, Plot No: A-26, TTC Industrial Area,Rabale, Navi Mumbai, Maharashtra.

81.85 Crs 1st operate (Expansion)

RO(HQ) 53 to 63 Authority: Chairman

6 M/s. East & West Builders, CTS No: 653/A, 611A/1, 656/A, 619/A, 616/A, 614/A, 612/A, 612/D, 287/A & 287/D, Kandivali (W), Mumbai

127.71 Crs 1st operate RO(HQ) 64 to 72

7 M/s. Tulsiani Sumer Associates, “Sahar Plaza”, 179 A to 179 F & 179 H, Village: Mulgaon & CTS No: 230A, 230B, 230C &238B, Village: Kondivita, M.V.Road, Andheri (E), Mumbai

202.27 Crs 1st operate RO(HQ) 73 to 80 Authority: Chairman

8 M/s. Siddhi Real Estate Developers (Highland Gardens), 81/1pt,87/2pt,66/5, 66/17, 66/18A, 66/20-26,62/2, 62/5A, 62/5B, 62/8, 62/9,62/11-14,63/1,63/4,63/5,63/8 etc of vill Dhokali, Thane.

417 Cr 1st operate (Part)

RO(HQ) 81 to 87 Authority: Chairman

List of Cases to be submitted before 8th Consent Committee Meeting of 2012 scheduled on 17. 09. 2012 at 15:00 hrs

RESUBMISSION

Page 2: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

9 M/s. Simtools Ltd., S. No. 526(pt), 74/p, 75, 76, 72/7(pt), Panch Pakhadi, Thane.

244.35 Crs 1st operate RO(HQ) 88 to 95 Authority: Chairman

1 M/s. Ordance Factory Chanda, Tal- Bhadrawati, Dist - Chandrapur

97.71 Crs Review Item JD(APC) 96 to 112

1 M/s. Symbiosis "Symbiosis Education Campus", S. no. 227, plot no. 11, Lohgaon, tal-Haveli, Dist-Pune.

225 Crs Establish RO(HQ) 113 to 119 Authority: Chairman

2 M/s. Geomatrix Developers LLP, “SILVER CREST”,Plot No: 29, Sector: 25, Kamothe,Tal: Panvel Dist: Raigad, Maharashtra

121.90 Crs.

Establish RO(HQ) 120 to 126

3 M/s. Mahindra Bebanco Developers Ltd, S.No: 17(Pt), 18(Pt), 19(Pt), 26(Pt), 27(Pt), 28, 29(Pt), 30(Pt),31(Pt), 35(Pt), 36(Pt), 39(Pt),Khapri, Nagpur, Maharashtra

219.20 Crs Establish RO(HQ) 127 to 139 Authority: Chairman

4 M/s. Positive Packaging Indsutries Ltd., R.S. No.51,52 &53, Vill Ransai, Tal-Khalapur, Dist-Raigad.

51.14 Crs Establish (expansion)

RO(HQ) 140 to 148 Authority: Chairman

5 M/s. Sai Balaji Developers,S.No: 67/4(p), 69/1(p), 80/1(p), 80/2(p), 81(p),Pipeline Road, Village: Temghar,Bhadwad, Tal: Bhiwandi, Dist: Thane, Maharashtra

196.35 Crs Establish RO(HQ) 149 to 154

6 M/s. Bhima SSK Ltd. (Distillery unit) Gat no. 208, 209, 211, A/P. Takali (S), Tal-Mohol, Dits-Solapur.

67 Crs Establish AS(T) 155 to 166 Authority: Chairman

7 M/s. Sai Fertilizers & Phosphates (Pvt)Ltd, N-45, MIDC, Addl.Ambarnath, Dist.Thane

25.86 Crs Establish JD(PAMS) 167 to 173

8 M/s. Asahi Kasei Chemfield Pvt. Ltd., Plot no. B-40/6, 40/7, MIDC Kalmeshwar, Nagpur

37.15 Crs Establish (expansion) and renewal

JD(PAMS) 174 to 184

REVIEW ITEMS

FRESH AGENDA

Page 3: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

9 M/s. Fine Organic Indust. Pvt. Ltd., MIDC Addl. Ambernath

91.06 Crs Establish (expansion)

JD(PAMS) 185 to 197 Authority: Chairman

10 M/s. MITC Rolling Mills Pvt. Ltd., Unit-II, B-1, MIDC Palkhed, Tal- Dindori, Nashik

44.15 Crs Establish JD(APC) 198 to 204

11 M/s. MITC Rolling Mills Pvt. Ltd., B-2/2, MIDC Palkhed, Tal- Dindori, Nashik

27.45 Crs Establish (Expansion)

JD(APC) 205 to 211

12 M/s. Bajajsons Ltd., Plot No. 31, MIDC Satpur, Nashik

25.56 Crs Establish (Expansion)

JD(APC) 212 to 221

13 M/s. Gajanan Solvex Ltd.Mouje Sujatpur, Tal- Khamgaon, Dist- Bulhdhana

48.88 Cr Establish JD(WPC) 222 to 228

14 M/s Kadawa Goda Khore Sugar Mfg. Karkhana Ltd. (Sugar Unit), Gut No. 147/4, 148/1, 148/1/2A, 148/1/2B, A/p- Pimpalgaon (Nipani), Tal – Niphad,Dist. – Nashik.

89.25 Cr. Establish JD(WPC) 229 to 235 Authority: Chairman

15 M/s. Mahanagar Gas Limited, City Gate Station Opp Anik best Depot Near Everard Nagar Sion, Mumbai

91.70 Crs 1st operate RO(HQ) 236 to 251 Authority: Chairman

16 M/s. Gharda Chemicals Ltd., Plot no.F-1/1, MIDC Lote Tal-Khed, Dist-Ratnagiri.

45.00 Crs Amendment in consent to

operate

JD(PAMS) 252 to 256

17 M/s. H B Fuller India Adgesuves Pvt.Ltd, Plot no.1-E, Gat No.1140, 1295 & 1296m A/p.Shirwal, Tal. Khandala, Dist.Satara

40.02 Crs 1st operate JD(PAMS) 257 to 263

18 M/s. BOC India Ltd., T-25, MIDC Taloja, Dist-Raigad.

40.11 Crs 1st operate with

amalgamation

JD(PAMS) 264 to 271

19 M/s. Embio Ltd. (Formerly known as M/s. Emmelten Biotech Pharmaceuticals Ltd), Plot no. E-21, MIDC Mahad, Raigad.

40.43 Crs 1st operate (expansion)

with amalgamation

JD(PAMS) 272 to 281

20 M/s. Jolly Board Ltd. (New Boiler), Gut No. 276. A/p – Deshing, Tal – Kavthe Mahankal, Dist – Sangli.

34.26 Cr. 1st operate JD(WPC) 282 to 287

21 M/s.Godrej Ind.Ltd, Pirojshahnagar E E Highway, Vikhroli (E), Mumbai 400 079

80.50 Crs Renewal JD(PAMS) 288 to 296 Authority: Chairman

22 M/s. Viswaat Chemicals Ltd, N-1, MIDC, Addl.Ambernath, Dist.Thane

26.79 Crs Renewal with Expansion

JD(PAMS) 297 to 308

23 M/s. Pidilite Ind.Ltd, Plot No.A-21, MIDC, Mahad

91.70 Crs Renewal and 1st operate

JD(PAMS) 309 to 317 Authority: Chairman

Page 4: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

24 M/s. Hindustan Petroleum Corporation Ltd. (LPG Bottling plant), Chakan Talegaon Rd, Vill-Mahalunge, Tal-Khed, Dist-Pune

45.73 Crs Renewal JD(PAMS) 318 to 325

25 M/s. Hindustan Petroleum Corpn.Ltd (LPG Bottling), MIDC Malegaon, Tal.Sinner

43.55 Crs Renewal JD(PAMS) 326 to 331

26 M/s. Aarti Industries Ltd., E-50, Tarapur Industrial area, Boisar, Tal-Palghar, Dist-Thane.

49.49 Crs Renewal with amendment

JD(PAMS) 332 to 346

27 M/s. Transworld Furtichem Pvt. Ltd., Plot no. 39/1 & 39/2/1/2/3, MIDC Dhatav, Raigad.

47.24 Crs Renewal JD(PAMS) 347 to 353

28 M/s. Durabuild Technologies Pvt. Ltd., B-32/1, MIDC Area, Ranjangaon, Tal- Shirur, Dist - Pune

81.53 Crs Renewal with amalgamation

JD(APC) 354 to 360 Authority: Chairman

29 M/s. OMR Bagla Automotive Systems India Ltd., Gat No. 217, Vill- Chitegaon, Tal- Paithan, Dist - Aurangabad

83.80 Crs Renewal JD(APC) 361 to 366 Authority: Chairman

30 M/s. Metalfab Hightech Pvt. Ltd., Plot No. E-21,25 & 33-B/2, MIDC Indl Area, Hingna Road, Nagpur

37.18 Crs Renewal with amalgamation

JD(APC) 367 to 373

31 M/s. WCL Hindustan Lalpeth OCM, Chandrapur

66.77 Crs Renewal JD(APC) 374 to 387 Authority: Chairman

32 M/s. Mahale Filter System (I) Ltd., G No.410/411, Moje Urawade, Tal- Mulshi, Dist - Pune

28.2 Crs Renewal JD(APC) 388 to 396

33 M/s. Motherson Automotive Technologies Engg., Gat No.150, Vill- Ambethan, Tal- Khed, Dist - Pune

75.52 Crs Renewal with expansion

JD(APC) 397 to 406 Authority: Chairman

34 M/s. Potain India Ltd., 72/76, Indl Estate, Mundhwa, Dist - Pune

27.88 Crs Renewal JD(APC) 407 to 414

35 M/s. Minda Industries Ltd., B-6, MIDC Indl. Area, Chakan, Pune

54.38 Crs Renewal with expansion

JD(APC) 415 to 423 Authority: Chairman

36 M/s Shri Siddheshwar S. S. K. Ltd. (Sugar Unit),Kumathe, Post – Tikekarwadi,Tal- N. Solapur, Dist – Solapur.

80.45 Cr. Renewal JD(WPC) 424 to 431 Authority: Chairman

Page 5: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

37 M/s. Rayat Sahakari Sakhar karkhana Ltd., (Sugar unit)At:- Shewalewadi (Mhasoli), Tal.- Karad, Dist.- Satara

44.63 Cr. Renewal JD(WPC) 432 to 438

38 M/s Nirvan Silk Mills Pvt. Ltd., MIDC Tarapur, Dist Thane

46.55 Cr Establish JD(WPC) 439 to 447

39 M/s. Swami Samrath SSK Ltd., Dahitane, tal.- Akkalkot, Dist.- Solapur.

47.52 Cr Renewal JD(WPC) 448 to 456

40 Shri. Adinath SSK Ltd., (Sugar)A/p-Shelgaon,- Bhalwani, Dist.- Solapur.

28.30 Cr Renewal JD(WPC) 457 to 464

41 M/s Shri Chatrapati S. S. K. Ltd.,(Sugar) , A/p – Bhavaninagar,Tal- Indapur, Dist – Pune.

40.69 Cr Renewal JD(WPC) 465 to 472

42 M/s. Yashwant Sahakari Glucose Karkhana Ltd Siddheshwar Nagar, Shirala, Tal- Shirale, Dist- Sangli

30.60 Cr Renewal JD(WPC) 473 to 482

43 M/s Sudarshan Jeans Pvt. Ltd., Plot No. T-2, Five Star MIDC, Kagal – Hatkangale, Tal – Kagal, Dist – Kolhapur

60.10 Cr. Renewal JD(WPC) 483 to 490 Authority: Chairman

44 M/s SAB Miller Breweries Pvt. Ltd., Unit Foster Indua Ltd., M-99, MIDC Waluj, Aurangabad

71.09 Cr. Renewal JD(WPC) 491 to 501 Authority: Chairman

45 M/s R.S.R. Mohota Spg. And Wvg Mills Ltd., S. No. 71 to 74, Hingan Ghat, Tal. Hinganghat, Dist - Nagpur

83.93 Cr. Renewal JD(WPC) 502 to 509 Authority: Chairman

46 M/s. Allana Cold Storage Ltd., Plot No. D-38, TTC Industrial Area, MIDCTurbhe, Navi Mumbai

26.85 Cr Renewal JD(WPC) 510 to 517

47 M/s Sahakarmaharshi Bhausaheb Thorat S. S. K. Ltd. (Sugar Unit), Amritnagar, Tal – Sangamner, Dist – Ahmednagar.

82.12 Cr. Renewal JD(WPC) 518 to 525 Authority: Chairman

JD(APC) 12JD(PAMS) 14JD(WPC) 15AS(T) 1RO(HQ) 15Total 57

Page 6: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

MAHARASHTRA POLLUTION CONTROL BOARD

CC Agenda No. 01

Name of the Industry : M/s. Pride Builders Pvt. Ltd, "Pride Soft City", S. No: 123, 124, 125, 127, 128, 129, 130, 131, 132, 135, 138, 139, 140, 141, 142, 143,144, 145, 146, 295, 296,297,298, 300, 301, 302, Village: Charoli,

Pune, Maharashtra. HOD Remarks:

Application received for grant of Consent to Establish for Township Project “Pride Soft City" on, - Total plot area - 15,74,232 sq.mtr - Proposed BUA [As per FSI] - 12,66,412 sq.mtr - Total Construction BUA - 16,62,850 sq.mtr

Application received at RO, Pune, dt: 09/04/2012 and at HQ on 25/05/2012.

Applicant has submitted CA-Certificate stating Total project cost is 450.0 Cr

Applicant has obtained ‘Environment Clearance’ from GOI for Township Project “Pride Soft City", dt: 17/01/2008 on, - Total plot area - 15,74,232 sq.mtr - Proposed BUA [As per FSI] - 12,66,412 sq.mtr

RO-Pune has recommended the case for grant of for grant of consent to establish.

Previously the case was discussed in Board’s CC Meeting dt: 08/08/2012 and it was decided to call verification report for the Capital investment along with CA Certificate. In response to this applicant has submitted CA Certificate stating C.I of the total project is Rs. 450.0 Cr and submitted additional consent fees.

Recommended the case for grant of Consent to Establish for Township Project

Page 7: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 02

Name of the Industry : M/s Darode Jog Realities Pvt. Ltd, “Liviano", S. No. 18, 19(P), Kharadi, Tal - Haveli,

Dist: Pune, Maharashtra.

HOD Remarks :

Application received for grant of consent to establish for residential project “Liviano” on,

Total Plot Area 32,000 sq.mtrs Proposed BUA (As per FSI) 40,300.80 sq.mtrs Total construction BUA 75,856.22 sq.mtrs

Application received at RO, Pune, dt: 21/11/2011 and at HQ on 09/02/2012.

Applicant has submitted CA Certificate stating Total project cost is 164.0 Cr.

Applicant has applied for ‘Environment Clearance’ to GOM. The case is discussed in 44th SEAC meeting for grant of prior Environment Clearance subject to condition towards obtaining of NOC from the RRZ Committee.

RO-Pune has recommended the case for grant of consent to establish for the residential project with condition not to start construction before obtaining Environment Clearance.

The case was previously discussed in CC-Meeting, dt: 14/03/2012 and it was decided to grant C to E after receipt of decision of RRZ Committee.

The case was discussed in RRZ Committee meeting, dt: 21/08/2012 and it was decided to approve project with condition that 96% treated waste water shall be recycled & further discharged into PMC Sewer line.

Recommended the case for grant of consent to establish for residential project “Liviano” as per the recommendation of RRZ Committee. .

 

 

 

 

 

 

 

 

Page 8: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 03

Name of the Industry: M/s. Pune Dynasty Projects Pvt. Ltd, Plot No: 3B, Rajiv Gandhi Infotech Park,

Phase-II, MIDC, Hinjewadi, Pune.

HOD Remarks :

Applications received grant of consent to Establish & Consent to Operate (Part) For IT Park Project in the name of M/s. Pune Dynasty Projects Pvt. Ltd.

1] Applications received grant of consent to Establish For IT Park Project in the name of M/s. Pune Dynasty Projects Pvt. Ltd on,

Total Plot Area 66,619 sq.mtrs. Total construction BUA 1,33,683.753 sq.mtrs.

Application received at RO, Pune, dt: 02/12/2011 and at HQ on 23/12/2011. Applicant has submitted CA-Certificate stating C.I. of project is Rs. 131.94 Cr .

Applicant has obtained Environment Clearance in the name of M/s. Embassy Property Development Pvt. Ltd, from GOM, vide no: SEAC-2010/CR.297/TC.2, dt: 29/03/2011 for IT project on,

Total Plot Area 2,76,874.00 sq.mtrs. Proposed BUA [as per FSI] 4,64,732.62 sq.mtrs Total construction BUA 4,89,815.41 sq.mtrs with C.I is 435.0 Cr. 2] Application received grant of consent to Operate (Part) For IT Park Project in the

name of M/s. Pune Embassy Projects Pvt. Ltd on,

Total Plot Area 66,619 sq.mtrs. Total construction BUA 78,841.21 sq.mtrs.

Application received at RO, Pune, dt: 07/12/2011 and at HQ on 23/12/2011.

Applicant has submitted CA-Certificate stating C.I. of project is Rs. 82.69 Cr .

RO-Pune has recommend the case for grant of consent to Operate (Part) For IT Park Project in the name of M/s. Pune Dynasty Projects Pvt. Ltd on and states as,

This is a case of consent to operate for the IT & ITE’s activity. The Field Officer of SRO Pune-II has paid visit to the site on 08/12/2011 and reported that the construction has been already started and put into operation. Some of the activity prior to obtaining consent from the Board. Meantime this office is in receipt of

Page 9: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

application from Head Office towards compliance and resubmission. Based upon the visit report this office has issued Show Cause Notice towards operation of construction activity without consent and also instructed them not to take any effective steps towards construction/operation of the said project till they obtain consent from the Board. Meantime, they have applied for consent to establish and operate same time with two different names, they have also submitted letter of MIDC regarding restructuring of plot No.3 into 3A and 3B. They have obtained Environmental Clearance for plot no.3 which can be consider common for plot no. 3A & 3B as per Para no. 11 of EIA Notification of dated 14/09/2006 about transferability of Environmental Clearance.

Opinion of Legal Wing – As far of transfer of EC in one single name EIA Notification provides for such transfer on the basis of documentation, but as far as split of one EC there is no clear cut provision, Hence case may refer to CC.

Recommended that the case may be discussed in CC Meeting for further decision.

.

Page 10: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 04

Name of the Industry : M/s. Pune Embassy Projects Pvt. Ltd, Plot No: 3A, Rajiv Gandhi Infotech Park,

Phase-II, MIDC, Hinjewadi, Pune.

HOD Remarks:

Applications received grant of consent to Establish & Consent to Operate (Part) For IT Park Project in the name of M/s. Pune Embassy Projects Pvt. Ltd.

1] Applications received grant of consent to Establish For IT Park Project in the name of M/s. Pune Embassy Projects Pvt. Ltd on,

Total Plot Area 2,06,360 sq.mtrs. Total construction BUA 3,56,131.65 sq.mtrs.

Application received at RO, Pune, dt: 19/12/2011 and at HQ on 23/12/2011. Applicant has submitted CA-Certificate stating C.I. of project is Rs. 471.38 Cr .

Applicant has obtained Environment Clearance in the name of M/s. Embassy Property Development Pvt. Ltd, from GOM, vide no: SEAC-2010/CR.297/TC.2, dt: 29/03/2011 for IT project on,

Total Plot Area 2,76,874.00 sq.mtrs. Proposed BUA [as per FSI] 4,64,732.62 sq.mtrs Total construction BUA 4,89,815.41 sq.mtrs with C.I is 435.0 Cr. 2] Application received grant of consent to Operate (Part) For IT Park Project in the

name of M/s. Pune Embassy Projects Pvt. Ltd on,

Total Plot Area 2,06,360 sq.mtrs. Total construction BUA 1.82,714.70 sq.mtrs.

Application received at RO, Pune, dt: 21/12/2011 and at HQ on 23/12/2011.

Applicant has submitted CA-Certificate stating C.I. of project is Rs. 189.30 Cr .

RO-Pune has recommend the case for grant of consent to Operate (Part) For IT Park Project in the name of M/s. Pune Embassy Projects Pvt. Ltd on and states as,

This is a case of consent to operate for the IT & ITE’s activity. The Field Officer of SRO Pune-II has paid visit to the site on 08/12/2011 and reported that the construction has been already started and put into operation. Some of the activity prior to obtaining consent from the Board. Meantime this office is in receipt of

Page 11: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

application from Head Office towards compliance and resubmission. Based upon the visit report this office has issued Show Cause Notice towards operation of construction activity without consent and also instructed them not to take any effective steps towards construction/operation of the said project till they obtain consent from the Board. Meantime, they have applied for consent to establish and operate same time with two different names, they have also submitted letter of MIDC regarding restructuring of plot No.3 into 3A and 3B. They have obtained Environmental Clearance for plot no.3 which can be consider common for plot no. 3A & 3B as per Para no. 11 of EIA Notification of dated 14/09/2006 about transferability of Environmental Clearance.

Opinion of Legal Wing – In number of Cases more particularly in construction

projects after handing over the possessions to the occupants, the buildings are being handed over to different societies in the same project for effective management of the maintenance of the buildings and there it is not expected to have separate clearance to such projects. The environment clearance granted to whole project is being utilized for the operation & maintenance of the waste management in number of buildings and societies formed in that project. The condition about no change in layout, waste load and structure shall be imposed in the consent being considered by competent authority.

Recommended that the case may be discussed in CC Meeting for further decision.

Page 12: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 05 Name of the Industry : M/s. Total Oil India Pvt. Ltd,

Plot No: A-26, TTC Industrial Area, Rabale, Navi Mumbai, Maharashtra

HOD Remarks:

Application received for grant of consent to Establish & operate for enhancement of production capacity for the manufacturing of lubricating oil from 50,000 MT/A to 80,000 MT/A.

Application received at RO, NM, dt: 04/01/2012 and at HQ on 28/06/2012.

Applicant has submitted CA-Certificate stating C.I of the project is 81.85 Cr

Applicant has previously obtained Consent to Operate for for the manufacturing of lubricating oil from 50,000 MT/A, dt: 27/05/2011 valid upto: 31/12/2015.

RO-NM has recommended the case for grant consent to Establish & operate for

enhancement of production capacity for the manufacturing of lubricating oil from 50,000 MT/A to 80,000 MT/A with overriding effect to existing C to O.

This office has issued query letter for the submission of additional details, dt: 19/06/2012 and in response to this applicant has submitted reply dt: 25/06/2012.

Recommended the case for grant of consent to Establish & operate for

enhancement of production capacity for the manufacturing of lubricating oil from 50,000 MT/A to 80,000 MT/A upto: 31/12/2015 with overriding effect to existing C to O.

Page 13: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 06 :

Name of the Industry : M/s. East & West Builders, CTS No: 653/A, 611A/1, 656/A, 619/A, 616/A, 614/A,

612/A, 612/D, 287/A & 287/D, Kandivali (W), Mumbai, Maharashtra.

HOD Remarks :

Application received for grant of consent to operate (1st) for residential cum commercial Project on,

Total Plot Area 35,320.30 sq.mtrs.

Total construction BUA 65,323.47 sq.mtrs

Application received at RO, Mumbai, dt: 04/05/2011 and at HQ on 16/07/2011.

Applicant has submitted CA-Certificate stating C.I of the project is 127.71 Cr..

Applicant has previously applied for C to E in the year 2006 along with public hearing fess but yet not received C to E thus directly applied for C to O.

Applicant has obtained ‘Environment Clearance’ from GOI, dt: 02/03/2007.

Total Plot Area 35,320.30 sq.mtrs. Total construction BUA 65,323.47 sq.mtrs

RO, Mumbai has recommended the case for grant of consent to operate (1st) for residential cum commercial Project.

This office has issued query letter to RO-Mumbai dt: 28/09/2011 for the

submission of presentt status report along with status of application of C to E. In response to this SRO-IV Mumbai has submitted reply dt: 258/12/2011.

The case was previously discussed in Board’s CC Meeting dt: 19/01/2012 and

it was decide to call report from RO-Mumbai for the status of application of C to E. Thus SRO-IV states in their reply that PP has applied previously in the Year 2006 but their office is not having any record. Office is only having DR receipt of fees paid for C to E.

Recommended the case for grant of consent to operate (1st) for residential cum

commercial Project.

Page 14: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 07 :

Name of the Industry : M/s. Tulsiani Sumer Associates, “Sahar Plaza”, 179 A to 179 F & 179 H, Village: Mulgaon & CTS No: 230A, 230B, 230C &238B, Village: Kondivita, M.V.Road, Andheri (E), Mumbai, Maharashtra.

HOD Remarks:

Application received for grant of consent to operate (1st) (Part) for Commercial Project on,

Total Plot Area 35,346.70 sq.mtrs. Total construction BUA 40,000 sq.mtrs

Application received at RO, Mumbai, dt: 13/04/2012 and at HQ on 07/05/2012.

Applicant has submitted CA-Certificate stating C.I. of project is Rs. 202.27 Cr .

Applicant has obtained Consent to Establish for the Commercial project, dt: 22/03/2006. Total Plot Area 35,346.70 sq.mtrs.

Applicant has obtained ‘Environment Clearance’ from GOI for the Commercial project, dt: 19/10/2006 (C-23)

Total Plot Area 57,198 sq.mtrs. Total construction BUA 2,60,233 sq.mtrs.

RO, Mumbai has recommended the case for grant of Consent to operate (1st) (Part) for commercial Project upto: 30/04/2014

Recommended the case for grant of Consent to operate (1st) (Part) for commercial Project upto: 30/04/2014

Page 15: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 08 :

Name of the Industry : M/s. Siddhi Real Estate Developers, “Highland Gardens” S.No: 81/1pt, 87/2pt, 66/5, 66/17, 66/18A, 66/20, 66/21,

66/22,66/23, 66/24, 66/25, 66/26, 62/2, 62/5A, 62/5B, 62/8, 62/9, 62/11, 62/12, 62/13, 62/14, 63/1, 63/4, 63/5, 63/8, 63/11/1,68/14, 67, Village: Dhokali,

Thane, Maharashtra HOD Remarks:

Application received for grant of consent to operate (1st) (Part) for residential cum commercial Project “Highland Gardends" on,

Total Plot Area 19,106.48 sq.mtrs.

Total construction BUA 29,907.19 sq.mtrs

Application received at RO, Thane, dt: 24/05/2012 and at HQ on 21/06/2012.

Applicant has submitted CA-Certificate stating C.I of the project (Partt) is 58.14 Cr and that of the Total Project cost is Rs. 417 Cr..

Applicant has previously obtained Consent to Establish for residential cum commercial Project “Highland Gardends ", dt: 27/09/2010 on, Total Plot Area 2,58,535.04 sq.mtrs.

Total construction BUA 4,66,648.09 sq.mtrs With C.I = 417.0 Cr

Applicant has obtained ‘Environment Clearance’ from GOM, dt: 25/05/2010 Total Plot Area 2,58,535.04 sq.mtrs.

Total construction BUA 4,66,648.09 sq.mtrs

SRO-I, Thane has recommended the case for grant of consent to operate (1st) for residential cum commercial Project “Highland Garden’s" for 1-term.

Recommended the case for grant of consent to operate (1st) for residential cum commercial Project “Highland Garden’s" for 1-term.

Page 16: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 09:

Name of the Industry : M/s. Simtools Ltd, S. No. 526(pt), 74/p, 75, 76, 72/7(pt),

Panch Pakhadi, Thane, Maharashtra HOD Remarks:

Application received for grant of consent to operate (1st) for residential cum IT-Park Project (A&B Wing] on,

Total Plot Area 37,335.27 sq.mtrs. Proposed BUA 55,349.86 sq.mtrs Permissible BUA 69,422.12 sq.mtrs

Total construction BUA 78,435.51 sq.mtrs.

Application received at RO, Thane, dt: 03/05/2012 and at HQ on 16/05/2012.

Applicant has submitted CA-Certificate stating C.I of the project is 244.35 Cr

Applicant has previously obtained Consent to Establish for IT-Park project, dt:

04/09/2008 on (C-25) Total Plot Area 34,298 sq.mtrs.

Total construction BUA 6,35,850 sq.mtrs

Applicant has previously obtained Consent to Operate for IT-Park [A Wing] project, dt: 1/06/2011, valid till: 31/03/2013 on, (C-14) Total Plot Area 37,335.27 sq.mtrs.

Total construction BUA 25,356.81 sq.mtrs

Applicant has obtained ‘Environment Clearance’ from GOM, dt: 31/03/2009 (C-18) Total Plot Area 37.,335.27 sq.mtrs.

Total proposed BUA 34,711.06 sq.mtrs OR as actually approved by Thane Municipal Corporation considering height restriction if any by the Civil Aviation Dept.

SRO-Thane has recommended the case for grant of consent to operate (1st) for residential cum IT-Park Project (A&B Wing] upto: 31/03/2013

This office has issued query letter for the submission of additional details, dt: 24/05/2012 and in response to this RO-Thane has submitted reply dt: 02/06/2012

Recommended the case for grant of consent to operate (1st) for residential cum IT-Park Project (A&B Wing] upto: 31/03/2013.

Page 17: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

Review Agenda No. 01 Name of the Industry: M/s. Ordnance Factory Chanda, Tal: Bhadrawati, Dist: Chandrapur. HOD Remarks :

1. Board has granted consent vide letter dated 21.4.2012 valid up to 31.08.2016 with

the condition to obtain membership of CHWTSDF, Butibori and dispose hazardous

waste to CWTSDF. Also obtain bank guarantee of Rs.5/- Lakhs for upgradation of

ETP/STP within 3 months period.

2. Industry has not submitted the Bank Guarantee of RS.5/- Lakhs till date. Show

cause notice for revocation of consent issued vide letter dated 20.7.2012.

3. Industry vide letter dated 27.07.2012 has submitted the reply of SCN and requested

to allow Ordnance Factory Chanda to submit Bank Guarantee by 25.8.2012.

Accordingly M.S. has approved the request of O.F. Chanda to submit B.G. before

25.08.2012. However, industry has not submitted the B.G. till date.

4. Industry vide D.O. Letter to M.S. dated 7.8.2012 received on 23.08.2012 requested

to waive off the B.G. clause as a special case.

The industry’s request for waive off the B.G. placed before C.C. for further decision.

Page 18: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

FRESH AGENDA

CC Agenda No. 01:

Name of the Industry : M/s. Symbiosis, "Symbosis Education Campus", S.No: 227, Plot No: 11, Lohgaon, Tal: Haveli,

Dist: Pune, Maharashtra HOD Remarks:

Application received for grant of Consent to Establish for Educational Campus Project on, - Total plot area - 19,500 sq.mtr - Proposed BUA [As per FSI] - 32,608.45 sq.mtr - Total Construction BUA - 38,397.60 sq.mtr

Application received at RO, Pune, dt: 19/07/2012 and at HQ on 31/08/2012.

Applicant has submitted CA-Certificate stating Total project cost is 225.0 Cr

Applicant has applied for ‘Environment Clearance’ to GOM, dt: 26/12/2011 but yet not obtained.

RO-Pune has recommended the case for grant of Consent to Establish for

Educational Campus Project subject to obtaining NOC from Air Port authority and by imposing condition not to take any effective steps towards construction activity till they obtain Environmental Clearance.

Recommended the case for grant of Consent to Establish for Educational Campus Project subject to obtaining NOC from Air Port authority and by imposing condition not to take any effective steps towards construction activity till they obtain Environmental Clearance .

Page 19: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 02 : Name of the Industry : M/s. Geomatrix Developers LLP, “SILVER CREST”,

Plot No: 29, Sector: 25, Kamothe, Tal: Panvel Dist: Raigad, Maharashtra.

HOD Remarks:

Application received for grant of Consent to Establish for Consent to Establish for residential cum commercial Project “Silver Crest” on, - Total plot area - 14,599.90 sq.mtr - Proposed BUA [As per FSI] - 28,088.59 sq.mtr - Total Construction BUA - 49,828.24 sq.mtr

Application received at RO, Raigad, dt: 12/07/2012 and at HQ on 24/07/2012.

Applicant has submitted Undertaking stating Total project cost is 121.90 Cr.

Applicant has applied for ‘Environment Clearance’ to GOM, dt: 26/12/2011 but

yet not obtained.

RO/SRO-I, Raiagd has recommended the case for grant of Consent to Establish for

construction of residential cum commercial Project “Silver Crest”.

Recommended the case for grant of consent to Establish for Group Housing Project as no any construction work yet started.

Page 20: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 03 :

Name of the Industry : M/s. Mahindra Bebanco Developers Ltd, S.No: 17(Pt), 18(Pt), 19(Pt), 26(Pt), 27(Pt), 28, 29(Pt), 30(Pt),

31(Pt), 35(Pt), 36(Pt), 39(Pt), Khapri, Nagpur, Maharashtra HOD Remarks:

Application received for grant of Consent to Establish for Township Project on, - Total plot area - 1,02,192 sq.mtr - Proposed BUA [As per FSI] - 1,10,994.31 sq.mtr - Total Construction BUA - 1,50,037.16 sq.mtr

Application received at RO, Kalyan, dt: 22/11/2011 and at HQ on 04/08/2012.

The file was first send back to RO-Nagpur, dt: 10/05/2012 for the submission of details which is resubmitted by SRO-II, Nagpur dt: 04/08/2012.

Applicant has submitted CA-Certificate stating Total project cost is 219.20 Cr.

Project is located in MIHAN SEZ, Nagpur. MIHAN SEZ has already obtained EC

& C to E thus not required separate EC for this project. Thus not applied for EC. .

SRO, Nagpur has recommended the case for grant of Consent to Establish for

Township Project and states that this township activity is not mentioned in the EC of MIHAN SEZ. MIHAN SEZ has already obtained EC & C to E. Applicant claimed that though township activity is not mentioned in EC of MIHAN SEZ same is for processing & non processing zone and their residential activity covers as non processing activity & obtaining separate EC is not applicable to them.

Recommended the case for grant of consent to Establish for Township project considering applicants representation & MIHAN SEZ recommendations.

Page 21: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 04 :

Name of Industry: M/s. Positive Packaging Industries Ltd., S. no. 51, 52 & 53, village: Ransai, Khopoli – Pen road, Dist: Raigad.

HOD Remarks:

1. The Industry has obtained C to O vide No. MPCB/RO(HQ)/ HSMD/Plastic/ CC/

175 dt. 30.01.2012 is valid up to 31.07.2013 for manufacturing of Printed

Laminates for packaging are as follows:

Existing 1. Printed laminates used for packaging – 2000 MT/M.

2. Now, Industry has applied for manufacturing of Printed Laminates for packaning

are as follows:

Expansion (i.e. 2000 + 1000 = 3000 MT/M)

1. Printed laminates used for packaging – 1000 MT/M

3. The said application is received at SRO, Raigad - I on 02.05.2012. & at HQ on

14.05.2012.

4. Water consumption - 80 M.3 /day & Sewage Effluent - 23 M.3 /day.

5. As per the remarks of SRO, Raigad – I, Industry located in the catchments area

of Balganga river having distance of approx. 1 km. However, Balganga river is

declared in the A – I class zone as per the RRZ policy by the G.R. of Govt. of

Maharashtra dated 13.07.2009 & as amended up to date. 6. Industry has submitted the assessment / computation of pollution load & also

there is no change or increase in sewage effluent generation. Industry has

recycling & reusing the treated water from STP & achieving zero discharge. As

well as certificate regarding no increase in pollution load of Institute of

Petrochemical Engineering is submitted.

7. C to E for expansion may be granted.

Page 22: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 05 :

Name of the Industry : M/s. Sai Balaji Developers, S.No: 67/4(p), 69/1(p), 80/1(p), 80/2(p), 81(p),

Pipeline Road, Village: Temghar, Bhadwad, Tal: Bhiwandi, Dist: Thane, Maharashtra

HOD Remarks:

Application received for grant of Consent to Establish for Consent to Establish residential cum commercial Project on, - Total plot area - 45,459.90 sq.mtr - Proposed BUA [As per FSI] - 56,824 sq.mtr - Total Construction BUA - 71,030 sq.mtr

Application received at RO, Kalyan, dt: 07/07/2012 and at HQ on 06/08/2012.

Applicant has submitted CA-Certificate stating Total project cost is 196.35 Cr.

Applicant has applied for ‘Environment Clearance’ to GOM, dt: 26/12/2011 but

yet not obtained.

RO, Kalyan has recommended the case for grant of Consent to Establish for

residential cum commercial Project with condition not to start construction before obtaining Environment clearance.

Recommended the case for grant of consent to Establish for residential cum commercial Project as no any construction work yet started.

Page 23: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 06 :

Name of the Industry : M/s. Bhima SSK Ltd., (Distillery Unit) Gat no. 208, 209, 211, A/p. Takali(S),

Tal-Mohol, Dist.- Solapur

HOD Remarks:

1. Applied for Consent to Establish for 30 KLPD Distillery unit.

2. Consent for sugar unit is valid upto 31.12.2012.

3. Products are Rectified Spirit (900 KL/m) OR Extra Alcohol (800KL/m) OR Ethanol (Aasolate Alcohol) (600 KL/m).

4. This requires EC as per EIA notification, 2006.

5. Query letter was issued to industry on 08.02.2012 for non-submission of details of consent fees, C.I., existing consent copy water budget, effluent treatment & disposal JVS results, etc.

6. Industry has replied to the query letter on 12.03.2012 as below

a. Consent fees of Rs. 50,000/- is paid vide DD no. 28812 dtd 29.07.2009. b. Cess return is regularly submitted up to Feb. 2012. c. Copy of consent of sugar unit valid upto Dec. 2012 is submitted. d. Water Budget submitted. Total Fresh water input is 600 CMD (593 CMD industrial & 7 CMD

Domestic) & trade effluent generation is 370.5 CMD including spent wash whereas sewage generation is 6 CMD.

e. For treatment of spent wash (300 CMD) Bio-digester followed by evaporation system (where it is reduced to 125 CMD) followed by Bio-composting is proposed.

7. For the treatment of the D.E, industry has proposed Septic tank followed by soak pit.

8. Proposed Steam Boiler with Bagasse consumption of 850 MT/day. Multi-cyclone dust collector will be provided as an APC system.

9. Non-Hz waste in the form of ash will be generated which will disposed to brick mfg units.

10. Hz. Waste i.e. Sludge-1050Kg/day generated will be disposed of through composting.

11. SRO-Solapur vide email dated 12.09.2012 submitted as below:

a. EC is not obtained. b. Paid Cess for period upto 29.02.2012. c. Environmental Statement is not submitted. d. Compost yard is 6 Acres. e. There are three boilers for existing sugar industry.

12. Total C.I of the unit including Distillery and Sugar is Rs. 67 Crores (Distillery Rs.31.16 crs)

13. SRO-Solapur had recommended for grant of consent to establish. The case may be considered for grant of Consent to Establish after obtaining requisite consent fees as per revised fees structure and subject to obtaining EC.

Page 24: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 07 :

Name of Industry : M/s. Sai Fertilisers & Phosphates (P) Ltd. Plot No. N-45, MIDC Addl. Ambernath, Dist. Thane. HOD Remarks:

1. Application for Consent to Establish. 2. Products proposed – Chemicals. 3. Application received at SRO on 12/04/2012 and at HQ on 15/06/2012. 4. Industry proposed to set up Chemicals manufacturing plant at Addl. MIDC

Ambernath. IE generation will be 40.20 CMD. Industry proposes to provide Primary, secondary & Tertiary treatment. Treated effluent will be discharged to CETP. Industry proposes to provide dust collector to boiler & scrubbers for all sulphonation reactors to control of air emissions. Industry proposes to send HW to CHWTSDF. Proposed products require Environmental Clearance as per EIA Notification, 2006. RO Kalyan has recommended for grant of C to E.

5. Considering above, we may grant consent to Establish by imposing EC condition. 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 25: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 08 :

Name of Industry : M/s. Asahi Kasei Chemfield Pvt. Ltd, B-40/6, 40/7, MIDC Kalmeshwar,

Dist- Nagpur.

HOD Remarks :

1) Application for Consent to operate with amalgamation.

2) Manufacturing of Micro Crystalline Cellulose Powder -2250 MT/A

3) Application received at SRO on 25/07/2012 and at HQ on 30/08/2012.

4) The case was placed before Consent Committee in its meeting held on 21/04/2012 and it was decided to grant consent with the condition of upgrading the ETP within 4 months & submission of BG of Rs.5 lakh for the same and to grant separate consent for establish for expansion. Accordingly Consent to Establish was granted vide letter dtd-21/04/2012.

5) Now, as the industry requested for C to O, considering their plan to upgrade the ETP by Nov-2012 and meantime they have assured to discharge their effluent to CETP for further treatment.

6) Hence, we may consider the case for C to O with amalgamation by imposing suitable operational BG.

7) Submitted for CC approval.

.

Page 26: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 09 :

Name of Industry: M/s. Fine Organics Industries Pvt Ltd Plot No N-2, MIDC Addl Ambernath, Dist-Thane

HOD Remarks :

• Existing unit. • Mfg of specialty additives for food & polymer industries. • Applied for consent to establish for expansion • ETP provided, primary, secondary and tertiary , • Disposal- INTO CETP. • Earlier case was placed before CC meeting held on 2/5/2012 and it was decided to

issue show case notice for refusal as the CETP in MIDC Addl Ambernath is not yet commissioned.

• Now industry has replied that, they have provided two no. of ETP’s of (capacity 30 CMD each) total capacity 60 CMD and total industrial effluent generation after expansion will be 45.3 CMD (Existing 41.8 CMD + Addl 3.5 CMD) which is well with in designed capacity of ETP.

• RO Kalyan has reported that, CETP in Addl Ambernath is recently commissioned and slope of industry is opposite side of Chikhloli dam and no chances of effluent going into the dam.

• RO Kalyan has verified water consumption, which is consented quantity. • Existing C.I. Rs 89.75 Cr. + Expansion –Rs 1.41 Cr= Total 91.16 Cr • Existing IE – 41.80 CMD, Proposed IE 3.5 CMD, Total 45.3 CMD • JVS results are sometime exceeding. • RO Kalyan has recommended that, consent to establish for expansion may be

granted with suitable BG towards O & M of ETP.

Considering compliance submitted by RO, Kalyan we may grant consent to establish for expansion BG condition towards O & M of ETP.

Page 27: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 10 : Name of the Industry: M/s. MITC Rolling Mills Pvt. Ltd. (Unit-II), Plot No.B-1, MIDC Palkhed, Tal: Dindori, Dist: Nashik. HOD Remarks :

1) Red/LSI proposed unit applied for consent to establish.

2) Mfg. of TMT Bars, MS Rounds, MS Angles, MS Channels & Others – 12,500

MT/Month by re-rolling mill activity is proposed.

3) The proposed site is located in MIDC Palkhed and about 4 km from notified river

Kadvi A-II Class as reported R.O., Nashik. Satisfied RRZ Policy, 2009.

4) Capital Investment of the proposed project is Rs.44.15 Crores. Consent fee of

Rs.75,000/- paid.

5) Necessary air pollution control arrangements are proposed. Furnace oil will be used

for heating furnace.

6) Sufficient land is available for green belt development.

7) Regional Officer, Nashik Recommended for grant of consent to establish in new

premises.

We may grant Consent to Establish.

Page 28: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 11 :

Name of the Industry: M/s. MITC Rolling Mills Pvt. Ltd. (Unit-I), Plot No. B-2/2MIDC Palkhed, Tal: Dindori, Dist: Nashik. HOD Remarks :

1) Red/LSI existing unit of Rolling Mill & Casting. Now, applied for consent to establish

for expansion for Mfg. of TMT Bars, MS Rounds, MS Angles, MS Channels & Others

– 12,500 MT/Month by re-rolling mill activity.

2) The proposed expansion project site is located in MIDC Palkhed and about 4 km

from notified river Kadvi A-II Class as reported R.O., Nashik. Satisfied RRZ Policy,

2009.

3) Total Capital Investment of the Industry is Rs.27.45 Crores (Capital Investment of

existing unit is Rs.23.45 Crores & proposed expansion is Rs.4.0 Crores). Consent

fee of Rs.15,000/- paid.

4) Existing unit consent for the Rolling Mill and Casting is valid up to 30.04.2014.

5) SRO/RO, Nashik has not submitted compliance of existing unit consent conditions including the submission of B.G. by the industry and details of type of existing furnace with installed capacity are not furnished. Also, Air Pollution control system provided to these furnaces is not mentioned.

6) Analysis results of ambient and stack monitoring and JVS results of treated effluent are not furnished.

7) Details of water cess returns, Cess payment & environment statement are not furnished.

8) Necessary air pollution control arrangements are proposed. Coal will be used for

gasifier and then producer gas generated will be used in heating furnace.

9) Sub-Regional Officer, Nashik Recommended for grant of consent to establish for

expansion.

We may grant consent to Establish for Expansion.

Page 29: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 12

Name of the Industry : M/s Bajajsons Limited, Plot No.31, MIDC Satpur,Nashik. HOD Remarks :

• RED/LSI, Existing unit of engineering components (With & Without phosphating.

Existing unit consent was valid up to 31.5.2012.

• Now applied for consent to establish for expansion for mfg of Engg components with phosphating & Powder coating activity-200 MT/Month.

• Proposed project is in MIDC Satpur Nashik. Notified River Godavari A-II class is

more than 2 Km from the proposed project.

• Total Capital investment of the unit is Rs.25.56/- crore (Proposed expansion project

cost is Rs.9.83 crore & Existing unit C.I. is Rs.15.73 crore). Consent to Establish

(Expansion) fees of Rs.25,000/- paid.

• DE-6.5 CMD, IE-3.0 CMD Effluent will be treated in existing unit ETP & STP and

treated effluent will be disposed on land for gardening.

• For Powder Coating section cyclone separator provided.

• Member ship of CHWTSDF obtained.

• Cess returns paid up to Dec-2011.Environment statement submitted.

Recommended for grant of consent to Establish for expansion.

Page 30: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 13

Name of the Industry : M/s. Gajanan Solvex Ltd., Mouje Sujatpur, tal.- Khamgaon, Dist.- Buldhana.

HOD Remarks:

• Applied for grant of consent to establish. • Proposed manufacturing - cotton/ soya netural oil, cotton/soya deoiled cake soap

stock (Solvent Extraction plant). • Application received at HQ on dt.23.02.2012 and at SRO on dt.09.06.2011 • Proposed C.I of the unit is Rs.48.88 Cr. • Proposed site is at about 15 Kms from River Purna (A-II) class and about 100 mtrs

from Mumbai- Kolkatta National highway. • Industrial effluent generation will be 32.0 CMD. • For the treatment of the Industrial effluent industry has proposed ETP with

secondary and tertiary treatment. • Treated effluent is used on land for irrigation / gardening, land available is about 1.0

hector. • Proposed Boiler of capacity 6.0 TPH, and as an APC system proposed mechanical

dust collector / bag filters followed by chimney of height 33 mtrs. • R.O Pune has recommended for grant of Consent to Establish. • Recommended for grant of consent to establish.

 

 

 

Page 31: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 14

Name of industry : M/s Kadawa Goda Khore Sugar Mfg. Karkhana Ltd. (Sugar Unit), Gut No. 147/4, 148/1, 148/1/2A, 148/1/2B, A/p- Pimpalgaon (Nipani), Tal – Niphad,Dist. – Nashik.

HOD Remarks :

• Industry has applied for Consent to Establish. • Total Capital Investment is 89.25 Cr. • Crushing capacity of sugar unit is 4000 TCD and co-generation unit – 14 MW. • Previously Board has granted consent to establish to said unit on 04/05/2005 fr

manufacturing of crystalline sugar – 4500 MT/M & absolute alcohol 900 KL/M up to commissioning of unit with C/I/ of Rs. 30.29 Cr.

• Now the unit has submitted application for expansion for below mention quantities. • Unit has submitted River distance certificate from Irrigation department,

Nashik Division which state that unit is located 5.50 KM from Godavari River. • We may grant consent to establish after obtaining additional fee Rs. 25000/-

Page 32: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 15

Name of Industry: M/s Mahanagar Gas Ltd.(Gas Distribution System Kalyan and Dombivali), MGL House No. G-33, Bandra Kurla Complex, Bandra(E), Mumbai

HOD Remarks:

1. Applications for 1st consent to Operate Gas for proposed Natural Gas Pipeline

and Distribution System at Ambernath –Badlapur Area.

2. Application Received at SRO on 9/03/2009 and at HQ on 4/05/2012.

3. Industrial Effluent generation is Nil.

4. Hazardous waste will be send to CHWTSDF.

5. The Proposed project is not falls under CRZ Criteria.

6. As Per field visit report dated 29/2/2012,it is reported that installation of Gas

Distribution pipeline is observed to be completed.

7. RO has recommended the case for grant of consent to 1st operate.

8. Considering above, we may grant C to 1st Operate.

Page 33: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 16

Name of Industry : M/s. Gharda Chemicals Ltd., Plot No. F-1/1, MIDC Lote, Tal. Khed, Dist. Ratnagiri. HOD Remarks :

1. Application for Amendment in consent to operate for addition of cooling tower make up water consumption.

2. Product- Co-Gen Power. 2. Request Letter received at HQ on 06/08/2012. 3. Industry has submitted request letter to amend the consent for addition of

cooling tower make up water 600 m3/d. Existing consent for captive co-gen power 6.4 MW valid up to 31/12/2013. Industry reported that due to installation of waste heat recovery system, they were require to install additional cooling tower of capacity 40638 m3/d. and hence additional make up water of 600 m3/d. is required.

4. There is no change in IE generation. 5. This office vide letter dtd. 29/08/2012 called additional information from SRO

Chiplun 6. Considering this, decision may be taken for amendment in consent for

additional cooling tower make up water of 600 m3/d. 

Page 34: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 17

Name of the Industry : M/s H.B.Fuller India Adhesives Pvt. Ltd Plot No 1-E, G. No. 1140, 1295 & 1296 A/P- Shirwal, Tal- Khandala, Dist- Satara.

HoD Remarks :

• Application recd at RO Pune on 02.06.2012 • Application recd at HQ on 29.06.2012 • Mfg of Pressure Sensitive Adhesives Hygiene, Hot Melt adhesive & water based

adhesives. • Applied for of 1st consent to Operate. • Total C.I. Rs 40.02 Cr. • IE – 4.0 CMD, DE- 7.50 CMD • ETP provided, comprising primary, secondary & tertiary. • Disposal- On land for gardening. • RRZ location- 2.118 KM away from Nira River (A-II class). • As the proponent had install necessary pollution control system & is ready for its

commissioning.

We may consider the case for grant of 1st consent to Operate.

Page 35: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 18

Name of Industry: M/s BOC India Ltd., T-25, MIDC Taloja, Dist- Raigad.

HoD Remarks :

• Application recd at RO Navi Mumbai on 27.02.2012 • Application recd at HQ on 22.05.2012 at JD(APC) section. • Mfg of Industrial gases such as Argon,Helium,Nitrogen etc. • Applied for of 1st consent to Operate with amalgamation of existing consent. • Total C.I. Rs 40.11 Cr. • IE – NIL, DE- 3.0 CMD • RRZ location satisfied ( About more than 2.0 KM from Kasardi River) . • Industry has paid CESS upto April 2011 and return submitted upto March 2012. • Environment Statement submitted. • Industry has paid additional consent fee for amalgamation with existing consent.

We may consider the case for grant of 1st consent to Operate with amalgamation of existing consent. 

Page 36: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 19

Name of Industry: M/s Embio Ltd.(Formerly Known as M/s Emmerllen Biotech Pharmaceuticals Ltd.) Plot NO E-21, MIDC Mahad, Raigad

HOD Remarks :

• Application recd at RO Raigad on 06.02.2012 • Application recd at HQ on 22.02.2012 • Mfg of Bulk drug activity • Existing unit, C to O valid up to 31.12.2013. • C To E obtained for expansion in 2004 and EC obtained from MoEF on May 2006. • Applied for 1st Consent to operate for expansion with amalgamation of existing

consent. • Total C.I. Rs 40.43 Cr. • Existing IE – 235 CMD, Proposed IE- 315 CMD. • ETP provided comprising primary, secondary & tertiary followed by RO & MEE

system. • Disposal- 315 CMD will be reused in the process and cooling purpose. Only existing

235 CMD will be discharged to CETP. No additional discharge to CETP after expansion.

• Closure direction issued on 16.02.2012 and industry has appeared to NGT, New Delhi and obtained stay for direction. Restart order issued on 02.04.2012 with BG of Rs 5.00 lacs.

• Compliance report submitted by SRO, Mahad, which are adequate. • Industry CESS returns submitted upto April 2011 • Environmental Statement submitted for 2010-11.

Considering compliance made by industry, we may grant 1st consent to operate with amalgamation by imposing condition of total industrial effluent discharge to CETP not exceeds 235 CMD.

 

Page 37: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 20

Name of the Industry : M/s. Jolly Board Ltd., Gut No. 276,A/p.- Deshing, Tal- Kavthe Mahankal, Dist-Sangli.

HOD Remarks :

• Industry has applied for consent to Operate for operation of new 01 No. Boiler. It is

RED/LSI Unit.

• Application received at SRO on 19.3.2012 & at HQ on 25.5.2012.

• Capital investment for installation of Boiler is 6.63 Crs. As per Previous Consent C.I of

the industry is 27.53 Cr. Total C.I is 34.26 Cr

• Industry has obtained Consent to Establish for installation of Boiler on 17.01.2012

• Existing consent vide No. MPCB/PCI-III/EIC-KP-1464-08/7 dated-20/01/2009 for

manufacturing of Fiber Board -2500 MT/M which is valid upto 30.11.2013 with I.E.-28

CMD & D.E.-16 CMD.

• Industry has provided Bag filter cyclone to new installed Boiler.

• Industry has submitted Environment Statement of Year 2010-2011.

• Industry has submitted Cess return upto Aug 2011.

• The industry has paid consent fee Rs. 39600/- for consent to operate.

• SRO, Sangli has recommended the case for consent to operate with amalgamation of

existing consent i.e upto 31.11.2013.

• Recommended for consent to operate for operation of Boiler with amalgamation of

existing consent.

Page 38: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 21

Name of Industry: M/s.Godrej Industries Ltd., Pirojshah nagar- E, Vikhroli- E, Mumbai.

HOD Remarks:

- Applied for plain renewal of consent . - Capital Investment of the industry is Rs. 80.50/- Crs. - Industry has decrease in CI from 86.62/- Crs. to 80.50/- Crs. clarification

was sought, industry has stated vide their letter dtd. 14.08.2012 that they have demolished their two buildings i.e. godown & R & D building. Due to this total investment gone down.

- Earlier consent was valid up to 31.03.2012. - Industry has provided ETP. JVS resul;ts are within limits. - Industry has submitted cess returns up to March 012, and paid up to

31.07.011. - Environment audit statement submitted for year 2011. - Ces returns submitted up to Dec.. 011. - HW. disposal through CHWTSDF. - Earlier the case was deferred in CC meeting dtd.08.08.012, and was

decided to call explanation for decrease in CI. The explanation receipt from industry and SRO as above.

- The case is recommended  for grant of consent to operate for the period up to 31.03.2014. 

        

Page 39: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 22

Name of Industry : M/s. Viswaat Chemicals Ltd. Plot No. N-1, MIDC Addl. Ambernath, Dist. Thane. HOD Remarks :

1. Application for renewal of Consent with expansion(Additional capacity). 2. Product- Leather chemicals, Speciality chemicals, Textile chemicals. 3. Application received at SRO on 04/02/2012 and at HQ on 02/03/2012. 4. Placed in CC meeting dtd. 02/05/2012 and it was decided to issue SCN for

refusal of consent due to starting manufacturing additional products with out consent from MPCB. Accordingly SCN issued on 24/05/2012. Industry has replied to SCN vide letter dtd. 28/05/2012. RO Kalyan has submitted compliance report of vide letter dtd. 14/06/2012 as industry has provided fulfledge ETP. Industry is a member of CHWTSDF, Industry has furnished BG of Rs. 5,00,000/-. RO kalyan has Instructed industry to restrict the production as per existing consent. RO Kalyan has recommended to renew the consent with additional capacity.

5. Considering above, we may renew consent for existing production quantities & consent to establish for additional quantities by imposing condition of EC for additional quantities & not to start production before obtaining EC and C to O. 

 

 

 

 

 

 

 

 

 

 

 

Page 40: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 23

Name of Industry: M/s Pidilite Industries Ltd., Plot No. A-21, MIDC Mahad.

HOD Remarks :

• Application recd at RO Raigad on 23.07.2012 • Application recd at HQ on 16.08.2012 • Mfg of Chemicals. • Applied for renewal of consent and 1st Consent to operate with amalgamation. • Total C.I. Rs 91.70 Cr. • IE – 125 CMD, DE- 15 CMD • ETP provided comprising, primary, secondary & tertiary followed by RO System. • Disposal- Reused completely in cooling water make up / boiler feed water. No

discharge to CETP. • Industry has submitted BG of Rs 5.0 lacs as per C To E conditions. • Required pollution control system has been provided.

we may consider the case for renewal with 1st Operate by amalgamation.

Page 41: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 24

Name of Industry : M/s Hindustan Petroleum Corporation Ltd Chakan-Talegaon Rd, Vill Mahalunge, Dist- Pune

HOD Remarks :

• Application recd at RO Pune on 17.05.2012 • Application recd at HQ on 11.07.2012 . • LPG Bottling Activity • Applied for renewal of consent • Total C.I. Rs 45.73 Cr. • IE – 10, DE- 3.0 CMD • ETP comprising, primary and secondary. • Disposal- On land for gardening • JVS reports are within limit. • Environmental Statement, Form IV (HW) not submitted. • Industry has stated that, the free hold land is allotted by District Collector. • RO Pune has recommended that, for renewal of consent after receipt of land cost.

We may consider the case for renewal of consent subject to submission of Env. Statement, Form IV.

Page 42: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 25

Name of Industry : M/s Hindustan Petroleum Corporation Ltd Chakan-Talegaon Rd, Vill Mahalunge, Dist- Pune

HOD Remarks :

• Application recd at RO Pune on 17.05.2012 • Application recd at HQ on 11.07.2012 . • LPG Bottling Activity • Applied for renewal of consent • Total C.I. Rs 45.73 Cr. • IE – 10, DE- 3.0 CMD • ETP comprising, primary and secondary. • Disposal- On land for gardening • JVS reports are within limit. • Environmental Statement, Form IV (HW) not submitted. • Industry has stated that, the free hold land is allotted by District Collector. • RO Pune has recommended that, for renewal of consent after receipt of land cost.

We may consider the case for renewal of consent subject to submission of Env. Statement, Form IV.

Page 43: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 26

Name of Industry: M/s.Aarti Industries Ltd, E- 50 , Tarapur Industrial area, Boisar,,

Tal Palghar, Dist. Thane. HOD Remarks:

Applied for renewal of consent with product mix.

- Capital Investment of the industry is Rs. 49.49/- Crs. - Earlier consent was valid up to 30.11.2011. - Industry has proposed to decrease existing production by 3.76 MT/M and

proposed to increase qty of some existing products by 1.41 MT/M. and proposed to introduce new products of qty 2.33 MT/M.

- Industry has submitted pollution load assessment report of recg. University for no increase in pollution load.

- The generation of industrial effluent is 16 CMD, domestic- 11 CMD. - Industry has provide ETP having capacity of 24CMD and double effective

evaporation system. APC- Chimney and scrubber provided. - Environment audit statement submitted for year 2011. - Ces returns submitted up to Sept. 011. HW. disposal through CHWTSDF. - The case is recommended  for grant of consent to operate with product mix  

with no increase in pollution load.  

 

 

 

 

Page 44: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 27 :

Name of Industry: M/s. Transworld Furtichem Pvt Ltd Plot NO 39/1 & 39/2/1/2/3, MIDC Dahtav, Raigad

HOD Remarks :

• Mfg of Fertilizer chemicals. • Applied for renewal of consent. • Total C.I. Rs 47.24 Cr. • IE – 47.80 CMD, DE- 6.40 CMD • ETP provided, comprising primary & secondary. • Disposal- Into CETP • Industry CESS returns submitted upto June 2012. • Environmental Statement submitted for 2010-11. • As per earlier consent conditions industry has submitted NOC from RIA CETP.

Considering compliance made by industry, we may grant renewal of consent.

 

Page 45: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 28 : Name of the industry : M/s. Durabuild Technologies Pvt. Ltd., B-32/1, MIDC Area Ranjangaon, Tal. Shirur, Dist. Pune

HOD Remarks:

• Industry has applied for renewal of consent with amalgamation of consent

• Application received at SRO- Pune on dtd 28/02/2012 and at HQ on 01/08/2012

• 1st Consent was valid up to 31/01/2012 in GREEN Category for mfg Color Coating on Aluminium Coils

• 2nd consent was valid up to 28/02/2012 in RED Category for mfg of Aluminium Composite Panel

• Combined generation of industrial effluent is 1.5 CMD for which ETP provided

• Combined Domestic effluent generation is 7.2 CMD. For which septic tank & soak pit provided

• Ambient monitoring result of Pvt Lab on 17/01/2011 is under prescribed limit

• Air pollution control system provided to Boiler & D.G. set

• RO Pune Recommended the case grant of renewal of consent with amalgamation of consent for period up to 28/02/2013

• We may grant the consent for period up to 28/02/2013 with amalgamation

• We may place the consent application before CC for further consideration.

Page 46: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 29

Name of Industry: M/s. OMR Bagla Automotive Systems India Pvt. Ltd. G. No. 217, Vill:- Chitegaon, Tal:- Paithan, Aurangabad.

HOD Remarks :

• Applied for consent to Renewal. • Is engaged in activity of Aluminium Pressure Die Casting and Anodizing &

Chromodizing. There is no change in product & its quantities. • Total capital investment is Rs.83.80 cr. Earlier it was Rs. 70.67 cr. The increase

is Rs. 13.17 cr. The increase is in the lab equipment, storage & racks, plant & machinery modernization. Paid the fees for increased CI.

• Earlier consent is valid upto 31/12/2012. • Industrial effluent is 39 CMD, provided primary & secondary treatment facilities. • Domestic effluent is 18.0 CMD, provided STP. • Chromodizing section is provided with scrubber. • BG of Rs. 500000/- is submitted by industry at RO Aurangabad, which is valid

upto 31/12/2012. • We may grant plain renewal upto 31/12/2017, with extension of BG upto consent

validity period. • We may place the case before CAC for approval.

Page 47: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 30 :

Name of the Industry : M/s. Metalfab Hightech Pvt. Ltd., Plot No. E-21, 25 & 33-B/2, MIDC Industrial Area, Hingna Road, Nagpur. HOD Remarks:

1. Applied for renewal of Consent of existing unit with amalgamation of Consent to

operate for expansion.

2. Earlier consent of existing unit for production of Iron Steel Fabrication & Steel

Structure Machinery and Mechanical appliances and part of them – 1200 MT/Month

was valid up to 31.07.2012.

3. Board has granted Consent to establish vide letter dated 5.11.2011 for expansion

unit for manufacturing of Iron Steel Fabrication & Steel Structure Machinery and

Mechanical appliances and part of them – 600 MT/Month was valid up to COU.

4. Total Capital investment of the Industry is Rs.37.18 Crores. Consent fee of

Rs.1,68,100/- paid for the period up to 31.07.2014.

5. Domestic Effluent- 14.4 CMD, Septic Tank, Soak pit provided. Industrial Effluent-

Nil.

6. Bag filter provided to shot blasting machine. Also fume extraction system and filter

provided to spray painting booth

7. Industry has obtained membership of CHWTSDF, Butibori, Nagpur and disposed

hazardous waste such as paint residue to CHWTSDF regularly.

SRO, Nagpur-II recommended renewal of Consent of existing unit with

amalgamation of Consent to operate for expansion for the period up to 31.7.2014.

We may grant renewal of consent with expansion and amalgamation to the

existing one.

Page 48: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 31 Name of the Industry: M/s. WCL Hindustan Lalpeth Opencast Mine, Tal & Dist: Chandrapur. HOD Remarks:

1. Applied for renewal of consent for three years with no expansion in consented coal production of 1.0 Million Ton per year.

2. Earlier consent for the coal mining 1.0 million ton/year was valid up to 30.04.2012. 3. Gross Capital investment is increased from Rs 44.66 Cores to Rs 66.77 Cores and

thus deposited total consent fee of Rs 15, 50,000/- including consent fee for three years, mining charges at the rate of Rs 0.4 per ton per year & Rs 50,000/- towards consent to establish fee for increase in investment.

4. For pollution control, measures has been taken by the Mine authority. Water:- Sedimentation pond for treatment of Mine water. Effluent treatment plant at Workshop. Air :- a) Tarring of coal transportation road. b) Mobile water tankers for water spraying on haul roads.

c) Fixed water sprinklers at coal stockyard, CHP. d) Total expenditure made for pollution control system as on 1/12/2011 is

Rs.319.02 Lacs. 5. Water cess payment is made up to period of September 2011, however return is

submitted up to December 2011. Copy of environmental statement submitted 6. Mine authority has proposed following Environmental works;

a) Cement concrete road to weigh Bridge b) Providing & fixing sprinkling arrangement near portion of coal receiving pit-

surrounding area. c) Providing & fixing sprinkling arrangement of surrounding area of weigh bridge.

We may grant renewal of consent with condition that the mine authorities shall complete all the pollution control related works within next 03 months with Bank Guarantee of Rs.10/- Lakh and also directing R.O. Chandrapur to forfeit the existing Bank Guarantee of Rs.2/- towards non-compliance of earlier direction.

Page 49: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Item No. 32

Name of the industry: M/s. Mahale Filter Systems (India) Limited. Gat No. 410/411, Mouje Urawade, Tal. Mulshi, Dist. Pune

HOD Remarks:

• Applied for renewal of consent

• Application received at SRO- Pune on dtd 19/09/2011 and at HQ on 19/07/2012

• Previous consent was valid up to 31/10/2011

• Industry is generating 5 CMD of industrial effluent for which effluent treatment plant provided.

• JVS analysis result on 17/01/2012 is submitted. Concentration of BOD (110 PPM) are higher prescribed limit.

• Industry is generating 25.70 CMD of domestic effluent for which sewage treatment plant provided.

• Total land available use of treated effluent is 2.5 hectors

• HW send to authorized re-processor & CHWTSDF.

• Industry has provided 5 mtrs stack to LPG fired curing oven

• Regional Officer, Pune, has recommended for renewal of consent for period up to 31/10/2014.

• We may grant the consent for period up to 31/10/2014 with operation Bank guarantee of Rs. 2/- Lakhs.

• We may place the consent application before CC for further consideration.

Page 50: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 33

Name of the industry : M/s. Motherson Automotive Technologies Engineering, Gat No. 150, Village Ambethan, Tal. Khed, Dist. Pune 410 501

HOD Remarks:-

• Applied for renewal of consent with expansion

• Application received at SRO- Pune on dtd 14/09/201 and at HQ on 01/08/2012.

• Previous consent was valid up to 30/09/2011

• Industry located @ 4.0 Km from A-II class River Indrayani. Satisfied river distance criteria

• Industrial effluent Generation is 4.10 CMD for which effluent treatment plant provided.

• Domestic effluent is 14.24 CMD. For which sewage treatment plant provided

• Treated effluent is used for gardening

• JVS analysis result of water /air of Pvt. Lab are under prescribed limit.

• APC provided to D.G. Set & 4 nos oven

• Bag filter provided to paint booth section

• Hazardous waste sent CHWTSDF.

• Regional Officer, Pune, recommended for the renewal of consent with expansion for period up to 30/09/2013.

• We may grant renewal of consent with expansion with imposing operational B.G. of Rs. 5 Lakhs & Board resolution regarding carrying out expansion without prior permission from the Board

• We may place the consent application before CC for further consideration.

Page 51: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 34

Name of the industry : M/s. Potain India Ltd., 72/76, Industrial Estate, Mundwa, Dist. Pune 411 038

HOD Remarks:

• Applied for renewal of consent

• Application received at SRO- Pune on dtd 31/01/2012 and at HQ on 19/07/2012.

• Previous consent was valid up to 31/01/2012

• Industry is generating 10 CMD of industrial effluent for which effluent treatment plant provided.

• Industry is generating 40 CMD of domestic effluent for which septic tank & soak pit provided.

• Dust collector provided to shot blasting section & filter provided to paint booth.

• JVS result on 21/10/2011 is under prescribed limit.

• As per earlier consent condition industry submitted B.G. of Rs. 2/- Lakhs. Which is valid up to 05/09/2014

• Regional Officer, Pune, has recommended for renewal of consent for period up to 31/01/2015.

• We may grant renewal of consent up to 31/01/2015

• We may place the consent application before CC for further consideration.

Page 52: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 35

Name of the industry : M/s. Minda Industries Ltd., Plot No. B-6, MIDC Industrial Area, Chakan, Pune 410 501

HOD Remarks:

• Applied for renewal of consent with expansion

• Application received at SRO- Pune on dtd 31/05/2012 and at HQ on 27/06/2012

• Previous consent was valid up to 31/07/2012

• Industry located @ 6 Km away from A-II class River Indrayani. Satisfied river distance criteria

• Earlier industrial effluent was 5.8 CMD. Now it is 9.0 CMD for which Primary & tertiary effluent treatment plant provided.

• Earlier domestic effluent was 23.50 CMD. Now it is 32 CMD for which sewage treatment plant provided.

• SRO reported that ETP/STP capacity is adequate for additional load.

• Fume extraction system followed by scrubbing system is provided to surface treatment section

• APC system provided to D.G. set

• JVS analysis result of water /air under prescribed limit.

• Regional Officer, Pune, recommended for the renewal of consent with expansion for period up to 31/07/2014.

• We may grant renewal of consent with expansion with imposing operational B.G. of Rs. 5 Lakhs & Board resolution regarding carrying out expansion without prior permission from the Board

• We may place the consent application before CC for further consideration.

Page 53: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 36

Name of the Industry : M/s. Shri Siddheshwar SSK Ltd., (Distillery Unit), Kumathe, Tal.- North Solapur, Dist.- Solapur.

HOD Remarks:

• Applied for the renewal of the consent for the 20 KLPD distillery unit. • C.I of the unit is Rs.3.56 Crores. (Total C.I of the Industry is Rs.76.68 Cr. Including

Sugar Unit) • Industrial effluent generation is to the tune of 262 CMD. • For the treatment of the spent wash industry has provided Bio-Digestor followed by

composting. • RO, Pune has issued P.D on dt.15.06.2011 for the non compliance of the CREP

guidelines and for operating the distillery with higher capacity. • Industry has taken cognizance of the directions issued by the Board and taken steps

towards the compliance of CREP Norms • CREP Compliance -Partially complied to CREP Guidelines. • Recommended for Renewal of the consent for the decision in CC meeting.

Page 54: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 37

Name of the Industry : M/s. Rayat Sahakari Sakhar karkhana Ltd., At:- Shewalewadi (Mhasoli), tal.- Karad, Dist.- Satara

HOD Remarks:

• Applied for the Renewal of the consent for the 2500 TCD Sugar Unit. • C.I of the unit is Rs. 44.63 Crore. • Application received at SRO on dt.24.04.2012 and at HQ on dt.07.07.2012. • Industrial effluent generation is to the tune of 250 CMD and Domestic effluent is 120

CMD. • ETP provided with secondary treatment. • AS per report O & M of ETP is poor and JVS analysis results submitted

dt.13.02.2012 & 20.03.2012 are exceeding the Consented Norms. • For the treatment of the D.E septic tank followed by anaerobic filter is provided. • Land available for the disposal of the treated effluent is 75 Acres. • RO reported that industry not complied with CREP norms. • Multicyclone Type dust collector is provided as an APC system. • SRO Satara has issued warning Notice dt.31.03.2012 for the exceeding JVs

analysis results and towards O & M of ETP. • Recommended for decision to CC committee for grant of the consent with Bg of Rs.

5 lakhs and Rs. 2.0 Lakhs or refuse the consent for non compliance with encashment of BG of Rs. 2.0 Lakhs for non compliance of CREP norms.

Page 55: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 38

Name of the Industry: M/s Nirvan Silk Mills Pvt. Ltd, D-6,MIDC Tarapur

HOD Remarks :

• Applied for consent to Establish.

• Proposed Textile processing industry i.e Yarn dyeing.

• Capital Investment 46.55 Crores.

• Previously ind was involved in Grey cloth manufacturing without dyeing, printing

activity & consent was in greren category having validity upto 2020.

• Industrial Effluent generation 430CMD. D.E :-2.0CMD.

• Proposed to provide Tert. treatment followed ultra filtration and RO system followed

by multiple effect evaporation system to achieve Zero Discharge. The treated effluent will 100% recycled & reused.

• We may impose B.G. of Rs. 10 lakh for achieving Zero discharge.

Page 56: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 39

Name of the Industry : M/s.Swami Samarth SSK Ltd., Dahitane, tal.- Akkalkot, Dist.- Solapur.

HOD Remarks:

• Applied for the Renewal of the Consent for 2500 TCD Sugar unit. • Capacity of the unit is White Sugar -11000 MT/M, Molasses 4250 MT/M, Bagasse

30000 MT/M, Press mud -4250 MT/M. • Application received at SRO on dt.12.04.2012 and at HQ on dt. 21.06.2012. • Total water consumption is 600 CMD and Industrial effluent generation is to the tune

of 250 CMD. • ETP is provided with secondary treatment and SDB is provided. • JVS analysis results dt.24.01.2012, 29.03.2012 and 12.04.2012 are submitted,

which are exceeding the consented limits. • Treated effluent is used on land for irrigation / gardening and Land available for the

disposal of the treated effluent is 30 Hectors., which seems to be adequate. • Located at 5.0 Km from Bori River. • For an APC system industry has provided Multi Cyclone type of dust collector. • Industry has submitted BG of Rs. 2.0 lakhs valid upto 21.11.2012. • Cess returns are submitted upto December 2011. • Recommended for he renewal of consent with BG of Rs. 5.0 and Rs. 2.0 lakhs and

for the encashment of the exiting BG.

Page 57: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 40

Name of the Industry : Shree Adinath SSK Ltd., (Sugar Unit) A/p-Shelgaon,- Bhalwani, Dist.- Solapur. HOD Remarks:

• Applied for the Renewal of the Consent of 2500 TCD Sugar unit. • C.I of the Industry is Rs.28.30 Cr. • Total Water consumption is 1000 CMD, Industrial effluent generation is to the tune of

130 CMD and Domestic effluent is 40 CMD. • ETP of capacity 400 CMD with secondary treatment and sludge drying bed is

provided. • JVS analysis results are exceeding the consented limits in respect of BOD, COD,

SS. • Land available for the disposal of the treated effluent is 60 Acres. • Fly ash dust collector is provided as an APC system. • Industry has submitted the BG of Rs. 2.0 Lakhs which was valid upto 30.04.2012. • SRO reported cess returns are submitted and paid upto 31.05.2010. • SRO recommended for grant of renewal of consent upto 31.12.2012 . • Recommended for grant of Renewal of Consent with BG of Rs. 5.0 lakhs and Rs.

2.0 Lakhs.

Page 58: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 41 :

Name of the Industry : M/s Shri Chatrapati S. S. K. Ltd., A/p – Bhavaninagar, Tal- Indapur, Dist – Pune.

HOD Remarks:

• Industry has applied for renewal of consent. Industry category is RED/ LSI. • Capacity of unit is: White sugar – 11000 MT/M, Bagasse-30000 MT/M., Press mud-

4250 MT/M & Molasses- 4250 MT/M. • Total water consumption is 1600 CMD, in which Domestic effluent generated 200

CMD and Industrial effluent generated 350 CMD. • Effluent treatment plant consists of Primary & Secondary treatment system. Treated

effluent is used on land. • The JVS reports dated 24/11/11,20/12/11, 14/2/12 are exceeding the prescribed

standards with respect to BOD,COD,SS . • RO, Pune issued Proposed Direction dated 24/6/11 & directions dated 2/3/12 were

issued. • CREP- Industry has not provided 15 days storage tank for storage of treated effluent

it is under process. • Unit has three boilers with common stack of 60 Mtr height is equipped with fly ash

arrestor instate of ESP/scrubber. • Industry has submitted Environment Statement of 2010-11. • JVs are exceeding and recommended for grant of renewal with the condition of BG

of Rs. 5.O Lakhs and Rs. 2.0 Lakhs.

Page 59: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 42 :

Name of the Industry: M/s. Yashwant Sahakari Glucose Karkhana Ltd., Siddheshwar Nagar, Shirala,

Tal- Shirale, Dist- Sangli.

HOD Remarks :

• Industry has applied for renewal of consent. • Capital investment of industry is Rs. 30.60 Cr. • Application received at SRO on 30.06.2012 & at HQ 30.08.2012 • Capacity of industry 1) Liquid Glucose-1500 MT/M, Maize Starch- 1200 MT/M,

Dextrin- 200 MT/M, Germ-250 MT/M, gluten-220 MT/M & Bran-448 MT/M. • Total water consumption is 900 CMD. Industrial Effluent generation is 443 CMD &

Domestic effluent generation -40 CMD. • Industry has provided Effluent Treatment plant comprising primary screen chamber,

Equalization & Balancing tank, Buffer tank, Anaerobic Digester, Primary Settling tank, Secondary settling tank, Aeration tank, Secondary clarifier, SDB, Treated holding tank ( 02 Nos) & disposal sump.

• Treated effluent is used on land for disposal. Land available for disposal of treated effluent is 52 Acre.

• Industry has provided Fly ash arrestor to boiler as an APC. • Industry has paid cess upto March 2011 & returns Upto Dec 2011. • Industry has paid consent fee Rs. 175000 for renewal of consent to operate Upto

31.01.2013. • The case was discussed in CC meeting dated 30.5.2011 & it was decided to issue

Show Cause Notice for refusal for JVS results exceeding the consented parameter. • Industry has submitted the reply of SCN on 30.6.2012 stated that they have provided

ETP comprises screen chamber, buffer tank, Anaerobic Digester, Primary settling tank, Aeration tank, Secondary clarifier & Tertiary treatment. Also they have stated that production activity was not constant during the year 2011. Hence there is no constant feed to ETP. To avoid shock load they were gradually feeding the digester. The ETP is a Biological process hence it take 2-3 month to stabilized

• JVS results dated 20.4.2012 & 29.6.2011 are within the limit. • Recommended for reconsideration for consent to renewal

Page 60: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 43

Name of the Industry : M/s Sudarshan Jeans Pvt. Ltd., Plot No. T-2, Five Star MIDC, Kagal- Hatkangale, Tal- Kagal, Dist-Kolhapur HOD Remarks :

• Industry has applied for renewal of consent for Mfg of Denim Fabrics – 8 Lacs Mtrs/

/M. It is RED/LSI • Capital investment of the industry is Rs. 60.10 Cr as per C.A. certificate submitted by

the industry. • Total water consumption is 285 CMD Industrial effluent generation is 126 CMD and

Domestic effluent is 04 CMD. • For I.E. industry has provided Primary, Secondary & Tertiary treatment of ETP. • SRO has reported that industry is carried out their activity in phase wise manner.

The application made earlier was considering total effluent generation in 3 phase i.e. 120 CMD but at present industry have only completed 1 phase & Industry has submitted that actual generation of effluent is 40 CMD & treated effluent is used for gardening / plantation in own premises instate of discharging in CETP.

• Now the network of effluent carrying pipeline to CETP is completed and industry vide letter dated 22.8.2012 communicated to MIDC that they had completed pipeline work to ETP outlet to CETP chamber and agreed to send the treated effluent to CETP.

• SRO Kolhapur vide E-Mail dated 14.09.2012 reported that industry is a member of CETP Kagal and dispose the treated effluent to CETP through CETP pipeline network.

• JVS results dated 27.1.2012,23.2.2012 are within limit as per the consented standard..

• Industry has provided Multi cyclone separator for Boiler. • Industry is a member of CHWTSDF for disposal of Hazardous Waste. • Industry has submitted the Environmental Statement of year 2010-2011 & Cess paid

upto Dec 2011. • Industry has paid consent fee Rs. 200000 for renewal of consent to operate upto

31.10.2013 • SRO has recommended for renewal of consent to operate upto 31.10.2013 by taking

appropriate Bank Guarantee. • Recommended for consent to renewal

Page 61: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 44 : Name of the Industry: M/s. SAB Miller Breweries Pvt. Ltd. Unit Foster India

Ltd, M-99, MIDC Waluj, Aurangabad.

HOD Remarks:

• Industry has applied for renewal of Consent

• JVS results are exceeding the consented standards in respect of BOD i.e from 75 Mg/ltrs to 348 mg/Ltrs as against consented standard of 30 mg/Lts.

• The Capital investment of industry is increased to the tune of 10.66 crores towards

replacement of bottle conveyers, Pasteurizer & storage capacity paid necessary

consent fee.

• SCN for refusal may be issued.

Page 62: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 45

Name of the Industry: M/s R.S.R. Mohota Spg & Wvg Mills Ltd, S.no. 71 to 74,Hingan Ghat, Tq. Hinganghat, Dist. Nagpur.

HOD Remarks:

• Applied for renewal of Consent.

• Total C.I. of industry is 83.93 Crores.

• JVS results are exceeding the consented standards with respect to BOD & COD.

• Interim directions are issued to said industry by RO Nagpur on 19.12.2011. As per

report of SRO ind has complied some of the directions & some directions are not

complied including submission of Bank Guarantee.

• Personal Hearing was extended to said industry on 26.06.2012.

• It was decided to forfeit B.G. of Rs. 25,000/- towards non compliance of JVS.

• Obtain B.G. of Rs. 50,000/- from industry and grant 60 days time to industry.

Page 63: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 46

Name of industry: M/s. Allana Cold Storage Ltd., Plot No. D-38, TTC Industrial Area, MIDCTurbhe, Navi Mumbai

HOD Remarks :

• Industry has applied for renewal of consent. • Total Capital investment of unit is Rs. 26.85 Cr. The C.I. is increased from 26.63 Cr.

to 26.85 Cr. Industry has paid requisite fee as per increase in C.I. • The quantity of Meat is increased from 1250 to 2500 MT/M. Animal Fats (Tallow) –

250 MT/M and Poultry Feed Supplements Gelbones – 300 MT/M. • Previous consent has fish processing – 125 MT/M. Fish processing is not carried out

at present. • Total water consumption is 185.33 CMD. Domestic effluent generation is 7 CMD and

industrial effluent generation has increased from 163.5 CMD to 167.3 CMD. • Unit has existing effluent treatment plant which is adequate for treatment. • JVS are well with in prescribed standard. • Industry has submitted Environment Statement of year 2010-11. • We may renew the consent.

Page 64: Investment (Rs.) RESUBMISSION · Pune Embassy Projects Pvt. Ltd, Plot no. 3 A, Rajiv Gandhi Infotech Park, Phase-II, MIDC Hinjewadi, Dist:- Pune. 471.38 Crs Establish & Operate RO(HQ)

[Web Agenda of 8th CC meeting dated 17.09.2012)  

CC Agenda No. 47

Name of industry: M/s.Sahakarmaharshi Bhausaheb Thorat S. S. K. Ltd. (Sugar Unit), Amritnagar, Tal – Sangamner, Dist – Ahmednagar.

HOD Remarks :

• Industry has applied for Renewal of Consent. Industry. • Previous consent to operate was granted to M/s. Sangamner Bhag SSK Ltd (Sugar)

in year 2009 which was valid up to 30/06/2010. • JVS collected on 18/11/2011, 17/02/2012 & 15/03/2012 are not meeting the

standard prescribed in consent. • CREP: - Industry has also yet not provided 15 days storage Pakka lagoon as

per CREP. • We may grant consent to renewal with bank guarantee of Rs. 5 + 2 lakh.