ARTICLES ITEM SPEC'PLAN OF INVESTMENT
REASONQ'ty U/price Amount
Holding Q'TY Perio
d
Digital Camera Canon 0 1 750 750 1~12 Take picture of material, problem
TOTAL 1,667,150
8/6/2019 Investment 2008
4/25
Page 4 of 25
Unit :USD
REMARK
85% of existing capacity
96.2% of existing MainSubstation
150 % existing capacity -rent diesel generator
More investment forproduction
Existing 01 set:Sometime Overload
Existing 01 set:Sometime Overload
8/6/2019 Investment 2008
5/25
Page 5 of 25
REMARK
Prevent electric shock
Service for Sand blasting job.
Service for Sand blasting job at No.2 Q.
Replace the existingone.
More investment forproduction
For equipmentscontrolled by PLC
8/6/2019 Investment 2008
6/25
Page 6 of 25
REMARK
For electrical mattersonly
8/6/2019 Investment 2008
7/25
Page 7 of 25
INVESTMENT PLAN 2006 ADJUSTING (REVISION 2)ELECTRIC DEPARTMENT Unit :USD
ARTICLES ITEM SPEC'PLAN OF INVESTMENT
REASON of INVESTMENT REMARK Q'ty U/price Amount
Building 16MVA 1 1 1~12
Structure 1500KVA 1 1 1~12
M a c h i n e r y
Transformer 450 KVA 0 1 25,000 25,000 1~12
Turbo Fan 30 HP 0 5 8,000 40,000 1~12
Ventilation 30HP 60 5 7,000 35,000 1~12
Overhead crane 5Ton 1 1 35,000 35,000 1~12
Chain hoist 3Ton 1 1 4,000 4,000 1~12
0 1 20,000 20,000 1~12 Test equipment for ship 440V (AC & DC)
0 1 15000 15000 1~12
Holdin
g Q'TY Period
Extension mainsubstation
Engarlement of Main Substation (Usingspare Transformer)
Pending for MConsideration (1,250,00
USD)
Increase Power for No.3S/S
Lack of Power for Sand blasting job at No.3Quay
Carrying out this year2005 (100,000 USD - M
Budget)
Incease power for Korean Dormitory (NewCondo 40 Room)
Service for Ship repairing (Vetilation atBosun Store, FPT, E/R)
Service for Oil Tank ship and No.4Substation
04 Sets are beingpurchased this year
Install one more at Motor shop, service forMotor, generator, transformer O/H
Install at maintenance W/S, service forrepairing all yard's electric equipment
Carrying out this year2005
Auto Voltage Regulationcontrol panel
In put :440ACOut put :
440DC
Instrument calibrationtable & compressor
0 ~ 50KG/cm 2
Test equipment for ship - CalibratePressure Gauge and Transmitter
8/6/2019 Investment 2008
8/25
Page 8 of 25
ARTICLES ITEM SPEC'PLAN OF INVESTMENT
REASON of INVESTMENT REMAQ'ty U/price Amount
Holding Q'TY Perio
d
300A 0 1 15000 15000 1~12 Test equipment for ship - Control system
TOOL
Portable panel CB600A*300A 53 10 2,000 20,000 1~12 Install more power at No.2 and No.3 Quay
Install more equipment i 1 20,000 20,000 1~12
10KV 1 1 4,000 4,000 1~12
Measure leake voltage 10KV 0 1 8,000 8,000 1~12
Power suply unit 220V 0 2 2,500 5,000 1~12
Dry Block Calibrated 0 1 2,500 2,500 1~12
Clamp Meter Digital 3 3 800 2,400 1~12 Check current (A) of ship capacity
Portable Test Kit 0 1 8,000 8,000 1~12 ACB test for ship repairing
Labelling machine 220V 0 1 1,500 1,500 1~12 Make name plate and marking
24VDC 4 4 2,000 8,000 1~12 For cable termination - PCTC and TAMDAO
24VDC 2 2 2,000 2,000 1~12 For cable cutting - PCTC and TAMDAO...
FurnitureComputer notebook 0 1 1,000 1,000 1~12 Will be purchased this year
Group power supplycontrol table
Pump, ACB-VCB
Install more inside No.5 S/S - For Sandblasting at No.2 Quay
High Voltage testerprobe
Open/Close FCO 6.6KV at Korean Dormitoryand Guest House Station
Check electric leakage at Man hole -Prevent electric shock
Test equipment for ship repairing (SupplyPower)
50 - 600 oC To calibrate Temperature sensor and meterfor ship repairing
0 ~ 50 A,220V
Battery Power forcompressor
Battery Power for cablecutter
Ram 256 40G PLC test for Milling Machine, dock pumpcontrol station
8/6/2019 Investment 2008
9/25
Page 9 of 25
ARTICLES ITEM SPEC'PLAN OF INVESTMENT
REASON of INVESTMENT REMARQ'ty U/price Amount
Holding Q'TY Perio
d
Digital Camera Canon 0 1 750 750 1~12 Take picture of material, problem
TOTAL272,150
8/6/2019 Investment 2008
10/25
Page 10 of 25
INVESTMENT PLAN 2007 OF ELECTRIC DEPARTMENTUnit: USD
Articles Items pecificatioInvestment Plan 2006 Investment Plan 2007
Q'ty U/price Amount
Building Cable and Equipment Store 0 36,000 1 40,000 40,000 Keeping cable andTotal 40,000
Increase Power for No.3 S/S 1500KVA 1 1 29,120 108,000 30,000 0 Increasing power fTotal 108,000 0
M a c h i n e r y
Transformer 450 KVA 0 1 25,000 25,000 2 25,000 50,000 Increasing power f Transformer 1500KVA 1 0 18,500 2 20,000 40,000 Increasing power f Transformer 14 0 2,500 6 3,000 18,000 Sand blasting job Turbo Fan 30 HP 0 5 8,000 40,000 9,000 0 Servicing for ship Axial Fan 30HP 60 4 6,500 28,000 8 7,000 56,000 Servicing for Oil T
380V, 800KVA 0 0 8,000 2 10,000 20,000 Shore power 380V
Overhead crane 5Ton 1 1 35,000 35,000 35,000 0 New installing at mChain hoist 3Ton 1 1 4,000 4,000 4,000 0 New installing at MInstall more equipment in S/ 1 20,000 20,000 20,000 0 Increasing power i
Total 28,000 124,000 184,000
TOOL
0 1 20,000 20,000 22,000 0 Test equipment fo0 1 15000 15000 16,000 0 Calibrating instrum
300A 0 1 15000 15000 16,000 0 Test equipment foPortable panel CB600A*300A 53 5 2,000 10,000 2,200 0Power Panel 0 0 1,500 15 2,000 30,000 More install at PE Power Panel VCB 630-1250A 1 0 8,000 2 9,000 18,000 New installing in NHigh Voltage tester probe 10KV 1 1 4,000 4,000 4,500 0 Open/Close FCO 6
Measure leake voltage 10KV 0 1 8,000 8,000 9,000 0 Check electric leakPower suply unit 220V 0 2 2,500 5,000 3,000 0Dry Block Calibrated 0 1 2,500 2,500 3,000 0 Calibrating instrumClamp Meter Digital 3 3 800 2,400 1,000 0 Check current (A)Portable Test Kit 0 ~ 50 A, 220V 0 1 8,000 8,000 8,000 0 ACB test for ship rLabelling machine 220V 0 1 1,500 1,500 1,500 0 Making name platLighting System 220V, 250W 1 0 15,000 1 20,000 20,000 More install in ourElectric Cable 250Sq*3C 0 0 29 3000 30 90,000 Extension power fPortable Tester Relay 0 - 50A 1 0 7,500 1 8,000 8,000 Simulating test forMultitester AC, DC 1000V 0 0 1,400 2 1,500 3,000 General checking Electric Motor 380V, 5.5KW 2 0 500 3 600 1,800 Spare for Jib Cran
24VDC 4 4 2 000 8 000 2 500 0 F bl i
CurrentQ'TY Q't
yU/pric
e
early
Executio2006
1 ST
150 M 2
Structure
,
, -
Out put :0 ~ 50 KG/cm 2
-
50 - 600 oC
8/6/2019 Investment 2008
11/25
Page 11 of 25
Articles Items pecificatioInvestment Plan 2006 Investment Plan 2007
PurposeQ'ty U/price Amount
CurrentQ'TY Q't
yU/pric
e
early
Executio2006
1 ST
Total 2,213
GRAND TOTAL 198,213 165,400 GRAND TOTAL 444,800 USD
e
8/6/2019 Investment 2008
12/25
Page 12 of 25
INVESTMENT PLAN 2006 ITEM - EARLY EXECUTION 2005ELECTRIC DEPARTMENT
ARTICLES ITEM SPEC'LAN OF INVESTMENT 200 2005 Early Execution Item
Q'ty U/price Amount Item BudgetElectric Others
t r u c t u r
1500 KVA 1 1 29,120 29,120Utility Line 11,853.60Digital Multimeter 4,667.88
Equipment for Substation 12,590.00
M a c h i n e r y
Ventilation 30HP 60 4 7,000OLTC
High Voltage Tester
0 1 20,000 20,000
Transformer 12,990.00
Equipment for Substation 1,040.00
Process Meter 1,920.00
DC Power Supplies 2,550.00Power Factor Meter 1,500.00
0 1 15000 15000 Power for Tug Boat 15,000.00
300A 0 1 15000 15000
Lighting Tower 4,000.00
Portable Relay Tester 5,300.00
Compressor for Terminal 3,750.00
High Voltage Tester 127.00
Clamp Meter 198.20
Ratchet Cable Cutter 395.00
Chain Block 560.10
TOOL Portable panel 53 5 2,000 10,000 Power Panel 9,460.00
Computer notebook 0 1 1,000 1,000 1,000.00
Digital Camera Canon 0 1 750 750460.00
Clamp Meter 32.00
Transformer 258.00
O 90 8 0 00
Holding Q'TY
Increase Power for No.3S/S (Electric Cable only)
108,000.00
Auto Voltage Regulationcontrol panel
440VAC/440VDC
Instrument calibrationtable & compressor
0 ~ 50KG/cm 2
Group power supplycontrol table
CB600A*300A
Furniture
Ram 256 40G Extension Power for M-GSetx ens on ower or -Set
8/6/2019 Investment 2008
13/25
8/6/2019 Investment 2008
14/25
Page 14 of 25
2006 INVESTMENT PLAN & ADDITIONALELECTRIC DEPARTMENT Unit :USD
ARTICLES ITEM SPEC'PLAN OF INVESTMENT ADDITIONAL
PURPOSEQ'ty U/price
1500KVA 1 1 ### ### 1~06 1 ### 28,000 4~7
M a c h i n e r y
Transformer 450 KVA 0 1 25,000 25,000 1~12 Incease power for K/ Dor'
Turbo Fan 30 HP 0 5 8,000 40,000 1~12 Service for Ship repairing
Ventilation Fan 30 HP 60 4 7,000 28,000 1~12 2 7,000 14,000 6~12 Service for Tank ship
Overhead crane 5Ton 1 1 35,000 35,000 1~12Chain hoist 3Ton 1 1 4,000 4,000 1~12AVR Control Panel 440V 0 1 20,000 20,000 1~12 Test equipment for ship
Instrument calibration table 0 1 15000 15,000 1~12 "
300A 0 1 15000 15,000 1~12 "Electric Cable & Accessories 185~250Sqmm 0 1 30,000 5~12
6.6 KV, 1250A 1 1 15,000 5~10
OLTC (On-Load Tap Changer) 110Kv 1 1 30,000 6~9Air Conditioner 12HP 0 2 4,000 8,000 5~7Lighting 1000W 1 1 5,000 5,000 5~12 More install for our yardCable Reel Motor 5.5KW 2 1 5,000 5,000 5~12
TOOL
Portable Panel 53 5 2,000 10,000 1~12 3 2,000 6,000 6~12 Install power for ship
Install more equipment in S/S 1 1 20,000 20,000 1~12
High Voltage tester probe 10KV 1 1 4,000 4,000 1~12 Open/Close FCO 6.6KV
Measure leakage voltage 10KV 0 1 8,000 8,000 1~12 Check electric leakage
Power supply unit 220V 0 2 2,500 5,000 1~12 Test equipment for ship
Dry Block Calibrated 0 1 2,500 2,500 1~12
Clamp Meter Digital 3 3 800 2,400 1~12 Check current (A)
Portable Test Kit 0 ~ 50 A, 220V 0 1 8,000 8,000 1~12 ACB test
Labelling machine 220V 0 1 1,500 1,500 1~12 Make name plate
Battery Power for compressor 24VDC 4 4 2,000 8,000 1~12 For cable termination
f bl F bl i
Holding Q'TY moun
ter od
pr ce
mount
er od
Structur
e
Increase Power for No.3
Substation
More Power forSandblasting
ns a more a o orshons a a ma n enanceW/S
0 ~ 50 KG/cm 2roup power supp y con ro
, ore ower or
More Power for Main Substation(VCB, Condensor, Relay..)
15,000
Power for 110KV MainSubstation
, ower or a nore ns a or u
rane a e rees stem:
~ump, -
VCB
ns a more ns e o.
S/S
50 - 600 oC To calibrate Temperature
8/6/2019 Investment 2008
15/25
Page 15 of 25
ARTICLES ITEM SPEC'PLAN OF INVESTMENT ADDITIONAL
PURPOSEQ'ty U/price
Holding Q'TY moun er o pr c moun er o
GRAND TOTAL 504,613
8/6/2019 Investment 2008
16/25
Page 16 of 25
ELECTRIC DEPARTMENT Unit :USDARTICLES ITEM SPEC'
PLAN OF INVESTMENTQ'ty U/price Amount Q'ty U/price Amount Period
Structure Increase Power for No.3 Substation 1500KVA 1 1 136,000 136,000 1~06 More Power for S
M a c h i n e r y
Transformer 450 KVA 0 1 25,000 25,000 1~12 Incease pow
Turbo Fan 30 HP 0 5 8,000 40,000 1~12 Service forVentilation Fan 30 HP 60 6 7,000 42,000 1~12 2 6,000 12,000 7 ~ 12 Service for Tank
Ventilation Fan 10HP 0 0 4 4,000 16,000 7 ~ 12 For M-G S
Overhead crane 5Ton 1 1 35,000 35,000 1~12 Install morChain hoist 3Ton 1 1 4,000 4,000 1~12 Install at
AVR Control Panel 440V 0 1 20,000 20,000 1~12 Test equip
Instrument calibration table 0 1 15000 15,000 1~12
Group power supply control table 300A 0 1 15000 15,000 1~12Electric Cable & Accessories 200~250Sqmm 0 1 30,000 30,000 5~12 1 20,000 20,000 7 ~ 12 More Power for Product
Jib Crane Cable 80Ton 125 Sqmm 1 1 12,000 12,000 7 ~ 12
Jib Crane Cable 30Ton 185 Sqmm * 3C 1 1 30,000 30,000 7 ~ 12 Spare for Jib Cran
6.6 KV, 1250A 1 1 15,000 15,000 5~10
OLTC (On-Load Tap Changer) 110Kv 1 1 30,000 30,000 6~9 Power for MAir Conditioner 12HP 0 2 4,000 8,000 5~7 More insLighting 1000W 1 1 5,000 5,000 5~12 More in
30T Jib Crane Cable Reel Motor 5.5KW 2 1 5,000 5,000 5~12 Jib Crane Cab30T Jib Crane DC Mag. Brake 110VDC 1 1 3,000 3,000 7 ~ 12 Spare for 30T30T Jib Crane Luffing Motor 90KW, 380V 1 1 18,000 18,000 7 ~ 12 Spare for 30T30T Jib Crane Aux. Hoist Motor 75KW, 380V 1 1 15,000 15,000 7 ~ 12 Spare for 30T JMagnetic Crane Main Hoist Motor 30KW, 380V 1 1 9,000 9,000 7 ~ 12Magnetic Crane DC Mag. Brake 110VDC 2 2 3,000 6,000 7 ~ 12 Spare for MagMagnetic Crane Resistor Box 30 ~ 45Kw 2 2 6,000 12,000 7 ~ 12 Spare for MagnDock Pump Motor's Starting Reactor 6.6 kV 1 1 6,000 6,000 7 ~ 12 Spare for Dock PCompressor cooling tower motor 22KW, 380V 1 1 2,000 2,000 7 ~ 12 Spare for Compr
b l h k f b
2006 INVESTMENT PLAN & ADDITIONAL (2 ND
HoldingQ'TY
ADDITIONAL (2 ND )er o
0 ~ 50 KG/cm 2
More Power for Main Substation (VCB,Condensor, Relay..)
8/6/2019 Investment 2008
17/25
Page 17 of 25
ARTICLES ITEM SPEC'PLAN OF INVESTMENT
Q'ty U/price Amount Q'ty U/price Amount PeriodHolding
Q'TY ADDITIONAL (2 ND )
er od
Digital Camera Canon 0 1 750 750 1~3TOTAL 504,613 177,000
GRAND TOTAL 681,613
8/6/2019 Investment 2008
18/25
Page 18 of 25
REMARK
Remain 02 set
Finished
Finished
Finished
50% (In Progress)
50%Finished
n s e n
ro ress
n s e n
8/6/2019 Investment 2008
19/25
Page 19 of 25
REMARK
Finished
8/6/2019 Investment 2008
20/25
Page 20 of 25
ELECTRIC DEPARTMENT Unit :USDARTICLES ITEM SPEC'
PLAN OF INVESTMENT
Q'ty U/price Amount Q'ty U/price Amount Period
Structure Increase Power for No.3 Substation 1500KVA 1 1 136,000 136,000 1~06 More Power for San
M a c h i n e r y
Transformer 450 KVA 0 1 25,000 25,000 1~12 Incease power f
Turbo Fan 30 HP 0 5 8,000 40,000 1~12 Service for Sh
Ventilation Fan 30 HP 60 6 7,000 42,000 1~12 Service for T
Ventilation Fan 10HP 0 0 For M-
AVR Control Panel 440V 0 1 20,000 20,000 1~12 Test equipme
Instrument calibration table 0 1 15000 15,000 1~12
Group power supply control table 300A 0 1 15000 15,000 1~12
6.6 KV, 1250A 1 1 15,000 15,000 5~10
Air Conditioner 12HP 0 2 4,000 8,000 5~7 More instal
Magnetic Crane Main Hoist Motor 30KW, 380V 1
TOOL
Portable Panel CB: 300A~600A 53 8 2,000 16,000 1~12 Install power foInstall more equipment in S/S Pump, ACB-VCB 1 1 20,000 20,000 1~12 Install more insideHigh Voltage tester probe 10KV 1 1 4,000 4,000 1~12 Open/Close FCMeasure leakage voltage 10KV 0 1 8,000 8,000 1~12 Check electric lDry Block Calibrated 0 1 2,500 2,500 1~12 To calibratePortable Test Kit 0 ~ 50 A, 220V 0 1 8,000 8,000 1~12 ACB testLabelling machine 220V 0 1 1,500 1,500 1~12 Make name pBattery Power for compressor 24VDC 4 4 2,000 8,000 1~12 For cable terminaBattery Power for cable cutter 24VDC 2 2 2,000 2,000 1~12 For cable cutting
TOTAL 386,000 0GRAND TOTAL 386,000
2006 INVESTMENT PLAN & ADDITIONAL (2 ND )
HoldingQ'TY
ADDITIONAL (2 ND )er od
0 ~ 50 KG/cm 2
More Power for Main Substation (VCB,
Condensor, Relay..)
P
S
7
50 - 600 oC
8/6/2019 Investment 2008
21/25
Page 21 of 25
CANCEL ITEMS OF INVESTMENT 2006ELECTRIC DEPARTMENT Unit :USD
ARTICLES ITEM SPEC'PLAN OF INVESTMENT
PURPOSE REQ'ty
M a c h i n e r y
Transformer 450 KVA 0 1 25,000 25,000 1~12
Turbo Fan 30 HP 0 5 8,000 40,000 1~12
AVR Control Panel 440V 0 1 20,000 20,000 1~12
Instrument calibration table 0 1 15000 15,000 1~12 "
300A 0 1 15000 15,000 1~12 "
TOTAL 115,000 0
GRAND TOTAL 115,000
Holding Q'TY
ADDITIONAL (2 ND )Q't
yU/pr c
eAmoun
tPer o
dU/pr c
eAmoun
tPer o
dIncease power for K/Dor'Service for Shipre airin
Test equipment forshi
0 ~ 50 KG/cm 2
Group power supp y controtable
8/6/2019 Investment 2008
22/25
INVESTMENT PLAN 2008ELECTRIC DEPARTMENT
ARTICLES ITEM SPEC'PLAN OF INVESTMENT
PURPOSEQ'ty U/price Amount Period
STORE for EQUIPMENT AND CABLE 10 * 15M 0 1 40,000 40,000 1~12 Keeping Cable and electric equipments clude C
M A C H I N E R Y
CABLE FOR NO1 &2 QUAY 240SQ*3C 0 5,000 400,000 400,000 1~12 Upgrade & replace old cable
CO2 POWER PANEL 5*MCCB + 9*SOCKET 0 110 400,000 400,000 1~12 Connect for CO2 welding m/c
380VAC & DC 0 1 45,000 45,000 1~12 Replace old system
200A 250M 0 1 30,000 30,000 1~12 Replace old system
POWER PANEL MCCB 300 - 600A 0 15 1,800 27,000 1~12
VCB POWER PANEL VCB 630 - 1250A 1 2 9,000 18,000 1~12 Main Power for Substation extension
POWER CABLE FOR MAIN SUBSTATION 240SQ*1C , 10kV 1 1 30,000 30,000 1~12 Cable from TR to Bus Duct
AXIAL FAN 380V, 10 HP 7 5 3,500 17,500 1~12 Ventilation for ship repairing
VENTILATION FAN 380V, 30HP 65 10 4,000 40,000 1~12 Ventilation for ship repairing
CABLE LINE 380M 185SQ*3C 0 1 60,000 60,000 1~12 Spare for Jib Crane 101
AIR COND' 13HP 5 3 5,000 15,000 1~12 Replace old one
DRILL MACHINE STAND TYPE 380VAC/10BAR 1 1 1,500 1,500 1~12 Make hole
HIGH SPEED CUT-OFF CUTTER 380V/50HZ,1450RPM 1 1 1,000 1,000 1~12 Cutting SteelGANTRY CRANE 2 TONS H:5M, L: 20M 0 1 10,500 10,500 1~12 Lift equiment
0 1 10,000 10,000 1~12 Cleaning motor in deep sea water
TOOL
LOAD METER FOR JIB CRANE 30T & 5T 1 2 20,000 40,000 1~12 Replace old one
SLIDE TRANSFORMER 440V, 40KVA 1 1 10,000 10,000 1~12 For Motor Test at Motor W/S
POWER ANALYSE AC, DC 1000V 0 1 5,000 5,000 1~12 Check electric equipment
AIR CHAIN BLOCK 10Ton 0 2 20,000 40,000 1~12 Lift equiment
HoldQ'TY
Building
TOWER CRANE CONTROL CIRCUITUPGRADE
MAGNETIC CRANE TROLLEY BARUPGRADE
Extension Power for Substation andP.E area
STEAM CLEANING TANK(Includingboiler system)
8/6/2019 Investment 2008
23/25
ARTICLES ITEM SPEC'PLAN OF INVESTMENT
PURPOSE RQ'ty U/price Amount Period
HoldQ'TY
TOTAL 1,254,000
8/6/2019 Investment 2008
24/25
..
8/6/2019 Investment 2008
25/25