Inventory of Major Alberta Projects Alberta Finance and Enterprise 4th Floor, Commerce Place Edmonton, Alberta T5J 4L6 March 2011
Inventory of Major Alberta Projects
Alberta Finance and Enterprise4th Floor, Commerce PlaceEdmonton, Alberta T5J 4L6
March 2011
Inventory of Major Alberta Projects
Introduction
The Inventory of Major Alberta Projects is produced by Alberta Finance and Enterprise to assist firms in identifying potential supply opportunities. The Inventory lists construction projects in Alberta valued at $5.0 million or greater that are planned, underway, or have recently been completed. This edition also identifies projects that have been put on hold or deferred due to the economic downturn. Project data is obtained from public and private information sources. Where possible, this data has been verified with the project proponent/developer. However, users of the Inventory may wish to confirm project data with the proponent/developer. While efforts have been made to obtain the most recent information, it should be noted that projects are constantly being re-evaluated by industry. Although the Inventory attempts to be as comprehensive as possible, some information may not be available at the time of printing, or not published due to reasons of confidentiality. The Inventory can be accessed on the Internet at www.albertacanada.com/about-alberta/inventory-of-major-projects.html. New projects and (where possible) updated information on current projects is added to the Internet database on a monthly basis. The print edition of the report is produced quarterly. Projects added to the Inventory between January 1 and March 31, 2011 are noted in upper case in the Project Description column. If you have questions or require additional information about the Inventory, contact Alberta Finance and Enterprise by phone at (780) 427-6787, or by fax at (780) 422-0061.
Inventory of Major Alberta ProjectsSummary
Project Sector # of ProjectsValue of Al
($Millil Projects ons) # on Hold
Value of Projects on Hold ($ Millions)
Agriculture & Related 9 $262.7 0Biofuels 12 $1,449.6 1 $210.0Chemicals & Petrochemicals 4 $117.5 0Commercial/Retail 53 $8,507.8 4 $186.0Commercial/Retail and Residential 8 $2,663.8 4 $1,227.8Forestry & Related 8 $298.5 0Infrastructure 263 $17,834.6 6 $94.5Institutional 136 $8,020.1 9 $360.5Manufacturing 7 $674.2 2 $24.0Mining 5 $4,945.0 1 $4,500.0Oil & Gas 7 $1,440.0 0Oil Sands 59 $106,495.6 9 $15,507.0Other Industrial 6 $1,479.6 0Pipelines 30 $7,526.7 1 $2,000.0Power 40 $14,213.7 0Residential 89 $4,850.7 18 $1,662.0Telecommunications 2 $656.0 0Tourism/Recreation 101 $3,820.3 4 $125.3Total 839 $185,256.40 59 $25,897.1
1. This Inventory lists projects in Alberta, valued at $5 million or greater, that have recently been completed, are currently under construction, or are proposed to start construction within two years. Not all projects over this threshold are listed due to reasons of confidentiality and/or due to information not being available at the time of printing.
2. Project data is obtained from public information sources. Although, where possible, this data has been verified with the project proponent/developer, users of the Inventory may wish to confirm project data with the proponent/developer.
3. The Inventory does not breakdown project expenditures by any given year. The cost of a project is the value of expenditures expected over all phases of project construction, which may span over two or more years.
4. The cost of projects listed in the Inventory are estimated values only.
Inventory of Major Alberta Projects
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Agriculture & Related
Agropur Cheese Plant Expansion County of Lethbridge (near Diamond City)
$23.0 2011 Under construction. Stuart Olson Dominion Construction.
Alberta Sustainable Resource Development
Grazing Reserve Maintenance and Infrastructure Upgrades
across Alberta $9.2 2010-2011 Under construction.
BioNeutra Substitute Sugar Plant and Starch Plant
Calmar $100.0 Proposed. Planned completion by 2012.
Biosphere Technologies Inc.
Biorefining Demonstration Facility Lacombe $35.0 Proposed
Cargill Inc. GRAIN ELEVATOR AND CROP PROTECTION SEED SHED
MD of Smoky River (W of MCLennan)
$13.0 2011- Announced. FWS Group (Phase 1). Phase 1 to be completed in 2011, phase 2 (grain terminal) to be added at later date.
Cargill Meat Solutions PLANT MODERNIZATION / EXPANSION
High River $42.0 2011-2012 Announced
Hole's Greenhouses 'Enjoy Centre' Retail Complex St. Albert $25.0 2009-2011 Completed. Maclean Young Construction.
Ponoka Ag - Event Centre Society (PAECS)
Ag - Event Centre Ponoka $8.5 2010-2011 Nearing completion. Stretch Construction. Facility will include the Canadian Professional Rodeo Hall of Fame.
Western Irrigation District Canal Upgrades Wheatland Cty (btwn Chestermere Lk and Strathmore)
$7.0 2010-2011 Nearing completion
Biofuels
Alberta Ethanol and Biodiesel GP
Integrated Biodiesel and Ethanol Refinery Phase 1
Red Deer County (near Innisfail)
$190.0 Proposed. Planned construction start spring 2011.
1April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
All Peace Industries Ltd. Biodiesel Fuel Plant four locations under consideration
$50.0 Proposed. Locations under consideration include High Prairie, Fort Saskatchewan, Smoky Lake and Waskatenau.
Bfuel Canada Corp. Biodiesel Plant Lethbridge County (near Chin)
$35.0 2011-2012 Announced.
BioStreet Canada Biodiesel Plant Minburn County (near Vegreville)
$210.0 On hold. Trimark Engineering.
BioWaste to Energy for Canada Integration Initiative Corp. (BECii)
BECii CLEAN ENERGY CENTRE AT GROW - GEN BIOGAS PLANT
County of Two Hills (Hairy Hill)
$11.6 Proposed
Blue Horizon Energy Inc. 'Blue Horizon' Biodiesel Facility MD of Smoky River (S of McLennan)
$160.0 Proposed. Feasibility study completed. Previously called Bluesky Biofuel Facility.
City of Edmonton Biofuel Feedstock Plant Edmonton $38.0 Proposed for 2011
City of Edmonton / Alberta Energy Research Institute / GreenField Ethanol / Enerkem Greenfield Alberta Biofuels
Biofuel Facility Producing Ethanol from Municipal Solid Waste
Edmonton $70.0 2010-2011 Under construction
CR Fuels Inc. Alternative Energy (Ethanol, Biodiesel and Biogas Digester) Complex
MD of Taber (E of Purple Springs)
$325.0 Proposed for 2011 - 2013.
CR Fuels Inc. Biofuel Complex (Biofuel Village) Wheatland County (N of Strathmore)
$235.0 2011-2012 Announced. Biodiesel, ethanol and electrical generation.
ECB Enviro North America Inc.
Biogas and Co-gen Plant (3.2MW) Lethbridge County
$25.0 Proposed for 2011.
Growing Power Hairy Hill / ATCO Midstream
Bio - Energy Facility (Integrated Biorefinery)
County of Two Hills (near Hairy Hill)
$100.0 2010-2012 Under construction (biogas facility). FWS Construction. Biorefinery proposed for 2011 - 2012.
2April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Chemicals & Petrochemicals
Alberta Sulphur Terminals (a division of Hazco Environmental Services)
Sulphur Forming and Shipping Facility
Lamont County (E of Bruderheim)
$35.0 2011 Announced. Planned construction start Q1 2011. NRCB approved July 2009.
Methanex Corp. Plant Infrastructure Upgrade / Re - Opening
Medicine Hat $40.0 2010-2011 Completed
NovaGreen Commercial Facility Killam $35.0 Proposed for late 2012 or early 2013.
NovaGreen Inc. Demonstration Facility Killam $7.5 2011 Announced
Commercial/Retail
Alberta Development Partners Inc.
'Stampede Trail' Retail Development, Calgary Stampede Grounds
Calgary $150.0 Proposed for 2011 - 2013. Part of Stampede Park $400M expansion.
Alberta Infrastructure North Petroleum Plaza Tenant Improvements
Edmonton $8.2 2010-2011 Nearing completion. Graham Construction.
Alliance Pipeline Office Alterations Calgary $5.5 Proposed
Aquatera Utilities Inc. Office Building Grande Prairie $20.0 Proposed
Aspen Properties Ltd. 'Palliser Square' East and West Towers
Calgary $220.0 Proposed
ATCO Electric Office / Warehouse Lloydminster $6.0 2010-2011 Under construction. Clark Builders.
Burnet Duckworth & Palmer
INTERIOR ALTERATIONS Calgary $12.0 Proposed
Cadillac Fairview Corp. 'Calgary City Centre' Development Phase 1 (Office Tower), Eau Claire District
Calgary $60.0 Proposed. Phase 2 onwards on hold.
Camgill Enterprises 'Century Crossing' Commercial Development
Spruce Grove $75.0 2010-2013 Under construction. Phased development.
Canadian Tire Real Estate Ltd.
Canadian Tire / Marks Work Wearhouse Store, Gateway
Canmore $7.0 2011 Under construction
3April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
CAPP Investments Ltd. 'Skyway Professional Centre' Medical Office Building
Red Deer $40.0 On hold. Timcon Construction. Originally proposed for 2010 - 2011.
Church of Jesus Christ LDS
'Lethbridge Welfare Complex' Office / Warehouse Building
Lethbridge $5.2 Proposed
City of Calgary Calgary Public Building Restoration, Stephen Avenue Mall
Calgary $25.0 2009-2011 Completed. Chandos Construction.
Deloitte Office Alterations Calgary $6.0 2010-2011 Completed. Stuart Olson Dominion Construction.
Dialog Warehouse Calgary $16.0 Proposed
Federated Co - op Warehouse Expansion Calgary $6.1 Proposed
Genco Development Corp. '634 Genco Court' Office Building Calgary $21.0 On hold. Originally proposed for 2010 - 2011
Gregg Distributors Ltd. DISTRIBUTION CENTRE Edmonton $38.0 2011-2012 Announced. Dawson Wallace Construction.
GWL Realty Advisors Ltd. / Remington Development Corp.
Warehouse Building 3, Prospect Business Park
Edmonton $14.2 Proposed
Harvard Developments / Cameron Development Corp.
'Currents of Windermere' Retail Development
Edmonton $500.0 2008-2011 Under construction. Willl include Cineplex theatre complex. Home Depot, Wal-Mart, Canadian Tire, London Drugs completed.
Hertz Rent A Car Car Rental Outlet Calgary $5.3 Proposed
Husky Energy NEW OFFICE BUILDING Lloydminster $24.4 2010-2011 Under construction. CANA Construction.
Imperial Equities Inc. Industrial Building RM of Wood Buffalo (Fort McMurray)
$13.0 2010-2011 Completed
Inland Pipe PLANT PHASE 2 Calgary $8.3 Proposed
Lowe's Companies Canada
New Store, Sunridge Calgary $15.0 2010-2011 Under construction. Gioffre Companies Inc.
Lowe's Companies Canada
Lowe's of South Edmonton Edmonton $17.0 2010-2011 Nearing completion. Wright Construction Western Inc.
4April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Matco Investments Ltd. / Alberta Investment Management / SITQ
'Eighth Avenue Place' Office Building East Tower
Calgary $600.0 2007-2011 Under construction. EllisDon Construction.
Matthews Southwest Developments
'The Bow' Office Tower Calgary $1,500.0 2007-2012 Under construction. Ledcor Construction.
McCall Electric Wholesaler
Warehouse / Office Building Calgary $5.5 Proposed
MD of Foothills / Town of High River
Charles Clark Medical Centre High River $5.2 2010-2011 Under construction. Chandos Construction.
Oxford Properties Oxford Airport Business Park Calgary $500.0 Proposed. Multi - phased project will take eight years to complete. Planned construction first building in 2011 - 2012.
PRISM Developments 'Prism Place' Office Building Calgary $36.7 2011-2012 Announced. Planned construction start May 2011.
ProCura Developments Associated Engineering Building Renovations / Upgrades
Edmonton $10.0 Proposed. Planned start 2011.
Qualico Developments Conversion of Golden West Golf Course to Light Industrial / Business Park
Edmonton $500.0 Proposed
Qualico Developments EPCOR Office Tower Edmonton $250.0 2008-2012 Under construction. Ledcor Construction.
Remington Development Corp.
'Quarry Park' Mixed-Use Development phases 1 and 2
Calgary $1,000.0 2006-2015 Under construction. Phase 1 completed. Office building A under construction.
Remington Developments Westwinds Business Park Phase 3 Calgary $13.0 Proposed for 2011 - 2012
RioCan RIET / Trinity Development Group / Canada Pension Plan Investment Board
'Jacksonport' Retail Development Calgary $230.0 Proposed
Royop Corporation 'Gates of Walden' Shopping Centre Calgary $10.5 2010-2011 Under construction. Dawson Wallace.
SmartCentres Sylvan Lake Power Centre Phase 2 (Eight Buildings)
Sylvan Lake $20.0 Proposed
5April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
SmartCentres Sylvan Lake Power Centre (Ten Buildings)
Sylvan Lake $50.0 2007-2011 Under construction. Wal-Mart anchor tenant. Dollarama nearing completion, Canadian Tire under construction
Southgate Chevrolet Buick GMC
Car Dealership Calgary $6.5 2010-2011 Under construction. Barjac Construction Management.
Springwood Development Commercial Development Cochrane $75.0 On hold. Domtar site remediation will start by end of August 2010 and last up to two years.
Sun Life Financial INTERIOR ALTERATIONS Calgary $7.3 2011 Under construction. Stuart Olson Dominion Construction.
The Ironwood Group 'Ironwood Tower' Office Building Edmonton $50.0 On hold. Dominion Construction.
Totem Building Supplies New Store, Stony Plain Road Edmonton $6.0 2010-2011 Under construction. Dawson Wallace.
Town of St. Paul MEDICAL CENTRE St. Paul $6.0 Proposed
Trans America Developments
'Millennium Ridge' Retail Development
Strathcona County (Sherwood Park)
$14.0 2010-2011 Under construction.
Wal - Mart Canada Interior Alterations Calgary $7.5 Proposed
Wal - Mart Canada South Side Store Expansion to Supercentre
Red Deer $5.0 2010-2011 Completed. Elan Construction.
Wal - Mart Canada Corp. NEW STORE NORTHWEST (#1122) Edmonton $14.0 Proposed
WAM Development Group / AIMCo
'Stonegate Landing' Retail, Office and Industrial Development
Calgary $2,250.0 2010-2016 Announced. Land servicing underway. Possible construction start industrial area in 2010.
Western Securities 'Hanson Square' Retail / Office Building
Calgary $17.4 2010-2011 Under construction. Stuart Olson Dominion.
Commercial/Retail and Residential
Anderson Builders Group (1989) Inc.
Mixed Use Building Red Deer $8.0 2010-2011 Nearing completion
Baralot International 'Sky Plaza' Development (Office Space and Condo Units)
Calgary $66.0 On hold pending improved market conditions. Originally proposed for 2010 - 2011.
6April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
FRAM Building Group / Slokker Canada Corp. / Tricon Capital Group
HIGHRISE AND MEDIUM RISE BUILDINGS, EAST VILLAGE
Calgary $300.0 Proposed. Possible construction start sometime in 2012.
Harvard Developments Eau Claire Market Redevelopment Calgary $750.0 On hold
Jade Developments 'Copperstone Village' Residential / Commercial Building
Airdrie $11.8 On hold
River City Developments 'Elements at Rivers Edge' Mixed Use Building
Red Deer $28.0 2010-2011 Under construction
Torode Commercial Ltd. 'Ramsay Exchange' Commercial, Retail and Residential Development
Calgary $1,100.0 Proposed. Phased development.
WAM Development / Opus Building Corp.
'Stampede Station' Retail / Office Space, Hotel and Residential Buildings
Calgary $400.0 2004-2011 On hold. Phase 2 (office towers).
Forestry & Related
Alberta - Pacific Forest Industries Ltd. (Al - Pac)
PLANT UPGRADES County of Athabasca (Boyle)
$62.9 Proposed for 2011 - 2012.
Diashowa - Marubeni Peace River Pulp Division
Construction / Installation of 25MW Generator
Peace River $40.0 2010-2011 Nearing completion
Millar Western Forest Products Ltd.
Sawmill Fox Creek $45.8 2010-2011 Under construction
Sundre Forest Products 2011 Capital Improvements Sundre $13.0 2011 Announced
West Fraser Mills Ltd. Recovery Boiler and Pulp Machine Upgrades
Hinton $37.8 Proposed
West Fraser Mills Ltd. Sawmill Equipment Upgrades Hinton $39.0 2010-2012 Under construction.
West Fraser Mills Ltd. Facility Upgrades, Blue Ridge Lumber
Woodlands County (near Whitecourt)
$28.0 Proposed
Weyerhaeuser Electrical Turbine (48MW) County of Grande Prairie
$32.0 2010-2011 Completed
7April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Infrastructure
Alberta Infrastructure Highway 201 Grade, Base and Pave, Bridge (Stoney Tr / Crowchild Tr Interchange)
Calgary $41.6 2009-2011 Under construction. South Rock Ltd.
Alberta Infrastructure Federal Building Redevelopment Edmonton $165.0 2008-2011 Under construction. Clark Builders.
Alberta Infrastructure Federal Building Parkade and Centennial Plaza
Edmonton $110.0 2009-2011 Under construction. Clark Builders.
Alberta Infrastructure Legislature Dome Renovations / Repairs
Edmonton $6.1 2010-2012 Announced. Building Science Engineering.
Alberta Infrastructure Acheson Industrial Building and Alberta Infrastructure Shop Redevelopment
Edmonton/Parkland Cty
$20.1 Proposed for 2011 - 2012
Alberta Infrastructure / Alberta Health and Wellness
MEDICAL EXAMINER BUILDING ADDITION / RENOVATION
Edmonton $12.5 Proposed
Alberta Transportation Highway Twinning Project (North South Trade Corridor)
across Alberta $1,900.0 1998-2012 Under construction. 500km across Alberta
Alberta Transportation Southeast Section Calgary Ring Road (Stoney Trail) from 17 Ave SE to Highway 2A
Calgary $769.0 2010-2013 Under construction. Chinook Roads Partnership.
Alberta Transportation Highway 22, Highway 11 and SH 766 Pave
Clearwater and Lacombe Counties
$20.0 2010-2011 Under construction. Riverside Contracting (Montana). Highway 22 from Hwy 11 to Hwy 53; Hwy 11 E of Condor to SH766; SH766 from N of Eckville to Hwy 12.
Alberta Transportation Twinning Highway 28 from 57 Ave to 10 St
Cold Lake $26.4 2009-2011 Under construction
Alberta Transportation HIGHWAY 56 / SH 609 / SH 833 PAVE
County of Camrose
$8.0 Proposed. Hwy 56 from S of SH609 to Hwy 13; SH609 from Edberg to Hwy 56; SH833 from Camrose to SH617.
Alberta Transportation HIGHWAY 61 GRADE, BASE AND PAVE
County of Forty Mile
$7.9 2011 Announced. South Rock.
8April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Alberta Transportation Highway 16 and SH 831 Pave County of Minburn (near Vegreville)
$14.4 2011 Announced. E Construction / Ruel Bros.
Alberta Transportation Highway 1 Pave County of Newell (SH873 to W of SH884)
$15.4 2011 Announced. South Rock.
Alberta Transportation Highway 1 Pave County of Newell (W of Bassano to SH 550)
$16.1 2010-2011 Under construction. Border Paving.
Alberta Transportation Highway 2 / Highway 2A / Highway 13 / SH611 Pave
County of Wetaskiwin
$11.0 Proposed
Alberta Transportation Bridge over N Saskatchewan River Drayton Valley $60.0 2010-2013 Announced. Phase 1 (eastern approach work) under construction.
Alberta Transportation Callingwood Rd and Lessard Rd Interchanges, Anthony Henday Drive
Edmonton $45.0 2009-2011 Under construction. Alberco Construction.
Alberta Transportation Anthony Henday Dr / Stony Plain Rd Interchange
Edmonton $168.6 2009-2011 Under construction. KMC / PCL A Joint Venture.
Alberta Transportation Anthony Henday Dr (Hwy 216) / Rabbit Hill Rd Interchange and Bridge
Edmonton $14.0 2010-2011 Under construction. PCL Construction Management.
Alberta Transportation Anthony Henday / Cameron Heights Drive Interchange
Edmonton $25.0 2010-2011 Under construction. Graham Construction.
Alberta Transportation Anthony Henday Drive NW Edmonton area $1,420.0 2008-2011 Under construction. NORTHWESTCONNECT General Partnership. Yellowhead Tr to Manning Freeway.
Alberta Transportation Highway 16 and SH 627 Grade, Base and Pave and Intersection Improvements
Edmonton area $15.1 2010-2011 Announced. E Construction / Ruel Brothers.
Alberta Transportation Highway 13 / Highway 36 / SH 602 Flagstaff County $15.5 2010-2011 Under construction. Border Paving.
Alberta Transportation HIGHWAY 63 CLEARING AND GRADING
Lac la Biche County
$0.0 2011-2012 Announced. Thompson Bros (Const) Ltd. $20.8 million. Part of Highway 63 twinning project.
9April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Alberta Transportation Highway 12 Road Improvements (Re - alignment)
Lacombe County (Hwy 20 to SH 792)
$14.0 Proposed
Alberta Transportation SH 625 Grade, Base and Pave, Bridge Culvert, Lighting
Leduc County (Nisku)
$14.5 2010-2011 Under construction. Border Paving.
Alberta Transportation Roadwork plus Two Bridges Mackenzie County
$17.9 2010-2011 Under construction. Prairie North Construction.
Alberta Transportation Highway 58 Grade, Base and Pave Mackenzie County (S of Negus Ck to High Level)
$26.7 2011-2012 Under construction. Knelsen Sand & Gravel.
Alberta Transportation Highway 88 Base and Pave Mackenzie County (Tall Creek IR to Bear R)
$18.2 2010-2011 Under construction. Ledcor Alberta.
Alberta Transportation Highway 33 Base, Grade and Pave MD of Big Lakes (Swan Hills area)
$11.7 2010-2011 Completed. E Construction.
Alberta Transportation HIGHWAY 2 GRADE, BASE AND PAVE PLUS BRIDGE REMOVAL
MD of Foothills (N of Nanton to S of Cayley)
$12.0 2011-2012 Announced. Mesken Contracting.
Alberta Transportation Highway 43 Grade, Base and Pave MD of Greenview $25.7 2010-2011 Under construction. Richardson Bros (Olds) Ltd. From E of Crook Creek to W of Sturgeon Lk IR.
Alberta Transportation HIGHWAY 40 GRADE, BASE AND PAVE
MD of Greenview (Berland R to S of Muskeg Cabins)
$11.5 2011-2012 Announced. Wapiti Gravel Suppliers.
Alberta Transportation Twinning Highway 43 near Sturgeon Lake Cree Nation
MD of Greenview (Crooked Ck to Valleyview)
$26.0 2010-2012 Announced
Alberta Transportation Highway 88 Base and Pave MD of Opportunity (N of SH686 to Willow Creek)
$11.7 2010-2011 Announced. Carmacks Enterprises.
10April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Alberta Transportation Highway 2A Grade, Base and Pave MD of Peace (Hwy 2 to Grimshaw)
$7.2 2011 Announced. Ledcor Alberta.
Alberta Transportation Highway 1A Grade, Base and Pave MD of Rocky View (E of Hwy 22 to W of SH 766)
$9.5 2010-2011 Under construction. South Rock.
Alberta Transportation Highway 9 Widen, Base and Pave MD of Rocky View (N of Hwy 1 to N of SH566)
$20.4 2010-2011 Under construction. South Rock Ltd.
Alberta Transportation SH 791 EXTENSION FROM SH 590 TO HIGHWAY 42
Red Deer County $14.6 Proposed. Part of Alberta Transportations three-year construction program 2012-2014.
Alberta Transportation Interchange Reconfiguration jct Highways 2 / 11 (Grade, Base and Pave)
Red Deer County (N of Red Deer)
$23.7 2010-2011 Under construction. Border Paving.
Alberta Transportation Highway 21, Highway 56, SH 601 and SH 590 Base and Pave
Red Deer, Kneehill and Stettelr Counties
$12.6 2010-2011 Under construction. Border Paving. Hwy 21 from N of SH587 to S of Hwy 42; Hwy 56 from S of SH 589 to S of Hwy 12; SH601 from Hwy 12 to Hwy 21.
Alberta Transportation North - Bound Bridge across Athabasca River
RM of Wood Buffalo
$127.0 2008-2011 Under construction. Flatiron Construction.
Alberta Transportation Highway 63 Grading RM of Wood Buffalo
$17.6 2010-2011 Under construction. Prairie Roadbuilders. S of May Tower to S of House River.
Alberta Transportation Highway 63 / Thickwood Blvd and Highway 63 / Confederation Way Interchanges
RM of Wood Buffalo (Fort McMurray)
$300.0 2009-2012 Under construction. South Rock.
Alberta Transportation Highway 63 Grade, Base and Pave RM of Wood Buffalo (Fort McMurray)
$43.7 2010-2012 Under construction. Graham Bros. Construction Group. N of Athabasca R to S of Thickwood Blvd.
Alberta Transportation Twinning Highway 63 RM of Wood Buffalo (Fort McMurray) to jct Hwy 55 (near Grassland)
$940.0 2007-2015 Under construction.. Section N of Wandering River in 2010 - 2011
11April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Alberta Transportation Highway 63 Pave RM of Wood Buffalo (S of SH881 to S of Hwy 69)
$7.1 2010-2011 Under construction. Knelsen Sand and Gravel.
Alberta Transportation SH 727 PAVE Saddle Hills County (Hwy 49 to SH680)
$6.7 2011 Announced. Knelsen Sand and Gravel.
Alberta Transportation SH 727 Grade and Bridges over Howard Creek and Kitsuan River
Saddle Hills Cty (Hwy 49 to S of SH680)
$37.9 2009-2011 Under construction. Sureway Construction.
Alberta Transportation Highway 28 Grade, Base and Pave Sturgeon County $12.0 2010-2011 Under construction. E Construction / Ruel Brothers.
Alberta Transportation Carseland - Bow / Travers Reservoir Concrete Structures
Vulcan County $11.8 2010-2011 Under construction. Graham Infrastructure.
Alberta Transportation Highway 24 Crack Repair and Pave Vulcan County (Hwy 23 to Bow R)
$7.7 2010-2011 Under construction. Border Paving. Project includes SH817 sideslope repair from SH901 to S of Strathmore.
Alberta Transportation Highway 40 Grade, Base and Pave Yellowhead County (N of Hwy 16 to S of Pinto Ck)
$6.0 Proposed.
Aquatera Utilities Inc. Wastewater Treatment Plant Upgrades
Grande Prairie $40.0 Proposed
Barrhead Regional Water Commission
Water Treatment Plant Expansion Barrhead $13.0 Proposed
Brazeau County Municipal Administration Building and Public Works Facility
Drayton Valley $19.8 2009-2011 Nearing completion
Calgary Airport Authority North - South Parallel Runway Calgary $620.0 2011-2015 Announced. Planned construction start April 2011.
Calgary Airport Authority International Transborder Concourse Calgary $1,400.0 2011-2015 Announced. EllisDon Construction.
Calgary Airport Authority / City of Calgary
Road Improvements to 36 St NE between 48 Ave and Airport Rd
Calgary $10.5 2010-2011 Under construction
Calgary Convention Centre Authority
Convention and Trade Show Facility Calgary $300.0 Proposed. Planned completion in late 2013.
12April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Calgary Municipal Land Corp. (CMLC)
Infrastructure Upgrades, The Rivers (including East Village)
Calgary $200.0 2007-2012 Under construction
Calgary Police Services Office Alterations Calgary $25.0 2009-2011 Under construction
Canadian National Railway (CN)
'Calgary Logistics Park' Intermodal Terminal
Rocky View County (Conrich)
$100.0 Proposed. Pending approvals.
Central Aviation / Springbank Aero Properties
Springbank Airport Development (Office and Hangar Expansion) plus Two New Hangars
Rocky View County (Springbank)
$6.0 Proposed. Scott Builders.
City of Airdrie 'Chinook Winds' Regional Waste Management Facility, Park and Operations Centre
Airdrie $11.4 2010- Announced.
City of Airdrie Emergency Services Facility, Chinook Winds
Airdrie $9.0 2010-2011 Under construction. Bird Construction.
City of Airdrie West Side Emergency Services Station
Airdrie $13.0 2010-2011 Under construction. Bird Construction.
City of Airdrie RCMP Detachment Airdrie $10.5 2010-2012 Under construction
City of Calgary St. Patrick's Island Bridge Calgary $15.0 Proposed
City of Calgary FIRE STATION, SOUTH CALGARY Calgary $10.0 Proposed. Graham Construction and Engineering.
City of Calgary 37 St / Glenmore Tr SW Interchange Calgary $40.0 Proposed. Detour bridge completed Sept 2010.
City of Calgary Interchange at 14 St and 90 Ave SW Calgary $12.9 On hold. Originally scheduled for 2008 - 2010.
City of Calgary WEST LRT 69 ST STATION Calgary $9.9 Proposed
City of Calgary Fire Station, Marda Loop Calgary $15.0 Proposed
City of Calgary Road Widening Peigan Tr from Barlow Tr to 52 St SE
Calgary $9.0 On hold.
City of Calgary Westbrook LRT Station / Tower Calgary $37.1 Proposed
City of Calgary 52 St SE Widening Phase 3 (Supporting Road Network)
Calgary $10.0 Proposed. Planned constructIon start October 2010.
13April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
City of Calgary 210 AVE TRUNK UTILITIES CONTRACT 3B
Calgary $6.0 Proposed
City of Calgary Rehabilitation of Westbound Bow Trail Bridge over CPR
Calgary $8.0 Proposed
City of Calgary Fire / Ambulance Station, Bridlewood Calgary $15.8 Proposed for 2012.
City of Calgary Interchange Trans Canada Highway and Bowfort Rd NW
Calgary $47.0 On hold.
City of Calgary Fire Station, Royal Oak Calgary $15.0 Proposed for 2011 - 2012. Pending funding approval.
City of Calgary Widen 14 St W from 90 Ave S to Anderson Rd
Calgary $14.5 On hold.
City of Calgary Fire Station, Seton Calgary $15.0 Proposed for 2011 - 2012.
City of Calgary Fire Station, Symons Valley Calgary $15.0 Proposed for 2011
City of Calgary Glenmore Water Treatment Plant Upgrades / Expansion
Calgary $218.7 2004-2011 Nearing completion. PCL Construction.
City of Calgary Cranston Bow River Crossing Water Pipeline
Calgary $12.6 2008-2011 Under construction. Phased construction.
City of Calgary 'Harvey Passage' Weir Reconstruction, Bow River
Calgary $16.6 2008-2011 Under construction. Degraaf Excavating Ltd.
City of Calgary Emergency Operations Control Centre
Calgary $54.0 2009-2012 Under construction.
City of Calgary LRT Extension Northeast, Westwinds to Saddle Ridge
Calgary $124.0 2009-2012 Under construction. Standard General (grading, utilities, noise barrier, park and ride). Whitehorn Station PCL Construction.
City of Calgary LRT Extension NW to Rocky Ridge, Tuscany
Calgary $115.0 2009-2014 Under construction. LRT overpass over Stoney Tr. Graham Construction Group. LRT track, station construction start 2012.
City of Calgary Lakeview Storm System Improvements
Calgary $17.4 2010-2011 Nearing completion. Caliber Systems.
14April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
City of Calgary Metis Trail NE from 64 Ave to 96 Ave Calgary $18.6 2010-2011 Under construction (phase 2). Standard General. Phase 1 64 Ave LRT tunnel. Phase 2 link from 80 to 96 Ave.
City of Calgary 54 St SE Stormwater Wetland Pond Calgary $6.5 2010-2011 Announced. Caliber Systems.
City of Calgary Mahogany Storm Trunk Calgary $6.4 2010-2011 Nearing completion. Whissell Contractors.
City of Calgary 'Peace Bridge' Pedestrian Bridge over Bow R near Prince's Island
Calgary $24.5 2010-2011 Nearing completion. Graham Infrastructure.
City of Calgary Sunalta West LRT Calgary $9.4 2010-2011 Under construction
City of Calgary Wastewater Sanitary Trunk / Lift Station Projects 2010 - 2011
Calgary $62.0 2010-2011 Under construction. Nose Creek trunk, Saddle Ridge relief trunk. Nose Creek Phase A contract 3 Whissell Contractors.
City of Calgary 7 Ave LRT Station Rehabilitation Calgary $20.0 2010-2011 Completed
City of Calgary West LRT Parkade Calgary $28.0 2010-2011 Under construction
City of Calgary Downtown Accommodation Plan (Three Buildings)
Calgary $7.0 2010-2012 Announced
City of Calgary 96 Ave N Extension from Deerfoot Tr to Airport Trail and Deerfoot Tr / Airport Tr Interchange
Calgary $28.7 2010-2012 Under construction. Aecon Construction.
City of Calgary West LRT Line from Downtown to Westside Rec Centre
Calgary $1,000.0 2010-2012 Under construction. SNC Lavelin Construction (Pacific).
City of Calgary 13 Avenue Greenway Phase 1 (1 St SE to 4 St SW)
Calgary $8.5 2011 Under construction. Volker Stein Contracting.
City of Calgary STORM WATER QUALITY RETROFITS
Calgary $17.0 2011-2012 Announced. Planned construction of three ponds.
City of Calgary East Calgary Landfill Scalehouse and Entrance Replacement
Calgary $14.0 2011-2012 Announced
City of Calgary East McKenzie Feedermain Calgary $20.0 2011-2012 Announced
City of Calgary Spyhill Landfill Scale House and Entrance Replacement
Calgary $13.0 2011-2012 Announced
15April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
City of Calgary LAKEVIEW STORM SYSTEM UPGRADES PHASE 2
Calgary $8.0 2011-2012 Announced
City of Calgary SPYHILL LANDFILL GAS COLLECTION SYSTEM AND TREATMENT
Calgary $10.0 2011-2012 Announced
City of Calgary SHEPARD LANDFILL COLLECTION SERVICES DEPOT II
Calgary $8.0 2011-2012 Announced
City of Calgary MacLeod Trail Feedermain phase 2 Calgary $7.0 2011-2012 Announced
City of Calgary SHEPARD LANDFILL STORMWATER COLLECTION AND TREATMENT EXPANSION
Calgary $10.0 2011-2012 Announced
City of Calgary SADDLE RIDGE RELIEF TRUNK Calgary $5.0 2011-2012 Announced
City of Calgary NOSE CREEK SANITARY TRUNK PHASE B
Calgary $32.0 2011-2012 Announced
City of Calgary CRESTMONT PUMP STATION Calgary $10.0 2011-2012 Announced
City of Calgary WEST PINE CREEK SANITARY TRUNK PART 1 and MACLEOD TRAIL FEEDERMAIN PHASE 2
Calgary $16.0 2011-2012 Announced. Caliber Systems.
City of Calgary CURRIE PUMP STATION Calgary $15.0 2011-2012 Announced
City of Calgary Fire Station, Douglas Glen Calgary $7.0 2011-2012 Announced
City of Calgary EAST CALGARY LANDFILL COLLECTION SERVICES DEPOT
Calgary $13.0 2011-2012 Announced
City of Calgary / Calgary Municipal Land Corporation
Four Lane Underpass connecting East Village and Victoria Park / Stampede Grounds (4 St SE)
Calgary $70.0 2010-2011 Under construction. Graham Construction.
City of Camrose Wastewater Treatment Facility Camrose $55.0 Proposed
City of Edmonton Kennedale Waste Management Facility Expansion
Edmonton $9.0 Proposed for 2011 - 2012.
City of Edmonton FIRE STATION, HERITAGE VALLEY Edmonton $7.6 Proposed
16April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
City of Edmonton Heavy Repair and Equipment Facility, Ellerslie
Edmonton $56.0 Proposed.
City of Edmonton LRT Parkade at Century Park Edmonton $15.0 Proposed
City of Edmonton Kennedale Traffic Operations Building
Edmonton $7.0 Proposed
City of Edmonton Quesnell Bridge Widening and Rehabilitation
Edmonton $161.0 2009-2011 Under construction. Concreate USL Ltd.
City of Edmonton Transit Park and Ride, Eaux Claires Edmonton $12.0 2010-2011 Completed
City of Edmonton Fire Station 27, Ellerslie Edmonton $10.1 2010-2011 Under construction. Stuart Olson Dominion Construction.
City of Edmonton Fulton Place and Capilano Neighbourhood Rehabilitation
Edmonton $11.5 2010-2012 Under construction. Carmacks Enterprises.
City of Edmonton Police Station, Southwest Edmonton $20.8 2010-2012 Under construction. Clark Builders.
City of Edmonton LRT Extension from Downtown to NAIT
Edmonton $725.0 2010-2014 Announced. EPCOR Tower tunnel nearing completion. Planned construction start spring 2011.
City of Edmonton Scona Road Improvements Edmonton $24.0 2011 Announced.
City of Edmonton 2011 SOUTH RESIDENTIAL AND INDUSTRIAL OVERLAY
Edmonton $8.8 2011 Announced. Lafarge Canada Ltd. Greenview residential, McIntyre Industrial, Weir Industrial.
City of Edmonton 2011 Neighbourhood Renewal Projects
Edmonton $140.0 2011 Announced
City of Edmonton GATEWAY BLVD / 23 AVE INTERCHANGE CONTRACT 2 (ROAD UPGRADING / REALIGNMENT)
Edmonton $11.2 2011 Under construction. Park Paving.
City of Edmonton Engineering Services Office and Lab Facility
Edmonton $15.7 2011 Announced. Chandos Construction.
City of Edmonton WHITEMUD DRIVE / 17 ST INTERCHANGE
Edmonton $19.0 2011-2012 Announced. Graham Construction.
City of Edmonton REPLACEMENT FOR WALTERDALE BRIDGE
Edmonton $132.0 2013-2014 Announced
17April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
City of Fort Saskatchewan Police Building Expansion Fort Saskatchewan
$5.6 Proposed for 2012.
City of Fort Saskatchewan Civic Office Building (City Hall) / Library
Fort Saskatchewan
$18.0 Proposed for 2011. To be built beside existing city hall.
City of Fort Saskatchewan 100 Ave Downtown Improvements Program
Fort Saskatchewan
$10.0 2010-2012 Under construction. Three - year project.
City of Grande Prairie Wastewater Treatment Plant Upgrades Phase 2
Grande Prairie $45.0 Proposed for 2011 - 2014. Tender call for general contractor anticipated summer 2011.
City of Grande Prairie Fire Station #3, Centre West Industrial Park
Grande Prairie $6.3 2010-2012 Under construction. Clark Builders.
City of Grande Prairie 116 ST UPGRADES BETWEEN 68 AVE AND 97 AVE
Grande Prairie $7.0 2011 Announced
City of Leduc Public Services Buildings Leduc $10.7 2010-2011 Nearing completion. PCL Construction. Four buildings.
City of Lethbridge Transit Administration Centre Expansion
Lethbridge $16.0 Proposed for 2011 - 2013.
City of Lethbridge Police Headquarters Expansion Lethbridge $26.7 Proposed for 2013 - 2015.
City of Lethbridge Upgrades to 28 St N Lethbridge $10.0 Proposed.
City of Lethbridge Fleet Services Building plus Other Work
Lethbridge $17.3 2010-2011 Nearing completion. Western Construction and Combustion Services.
City of Lloydminster RCMP Detachment Building Lloydminster $10.2 Proposed
City of Lloydminster Sewage Treatment Plant Expansion Lloydminster $7.8 2010-2011 Announced
City of Medicine Hat Water Treatment Plant Discharge Treatment Facility
Medicine Hat $30.0 Proposed. Planned completion in 2014.
City of Medicine Hat Alterations to Existing Building ( future location of Environmental Utilities Dept)
Medicine Hat $6.0 Proposed. Tender call expected late May / early June.
City of Medicine Hat Fire Station, South Ridge Medicine Hat $7.5 Proposed. Planned completion by / in 2014.
18April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
City of Medicine Hat SOUTH RIDGE DRIVE UPGRADE TO FOUR LANES FROM HIGHWAY 1 (TCH) TO STRACHAN ROAD
Medicine Hat $11.7 Proposed
City of Red Deer Gaetz Avenue Revitalization Project Red Deer $8.6 Proposed. Gaetz Avenue between 46 St. and 53 St.
City of Red Deer Intersection Upgrades 32 St between Spruce Drive and 40 Avenue
Red Deer $8.0 Proposed for 2013.
City of Red Deer Intersection Improvements on Spruce Drive, Springfield Ave and 40 Ave
Red Deer $8.5 Proposed for 2011 and / or 2012.
City of Red Deer Sanitary Sewer and Storm Water Sewer Improvements
Red Deer $36.0 Proposed
City of Red Deer Wastewater Treatment Plant Upgrade phases 1 to 3
Red Deer $70.2 2007-2011 Under construction. Graham Industrial Services.
City of Red Deer 2011 PAVING PROJECTS Red Deer $5.5 2011 Announced
City of Red Deer North Side Highway Connector Project phase 1A
Red Deer $15.5 2011-2012 Announced. Northside Construction Partnership (grading Gaetz Ave to 78 St).
City of St. Albert Western Boundary Road Phase 3 (Ray Gibbon Drive)
St. Albert $47.0 Proposed. Giroux Rd to Villeneuve Rd.
City of St. Albert Arterial Road Connections to Anthony Henday Drive
St. Albert $11.2 Proposed
City of St. Albert Landfill / Sewage Lagoon Remediation in Riel Park, phases 1 and 2
St. Albert $24.0 2008-2011 Nearing completion (phase 2).
City of St. Albert Wastewater Capacity Expansion St. Albert $15.0 2010-2011 Announced
Clearwater County 2011 Local Roadwork Clearwater County
$5.7 2011 Announced. Sandstar Construction.
County of Grande Prairie Inland Multi - Modal Logistics Park (Integrated Rail / Truck Container Depot) Phase 1
County of Grande Prairie
$28.0 Proposed
19April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
County of Grande Prairie 2011 Road Construction Projects County of Grande Prairie
$17.3 2011 Announced
County of Newell County Office Building County of Newell $13.0 2010-2012 Under construction. Ledcor Construction.
County of St. Paul Krider Road Base and Pave County of St. Paul $5.0 Proposed
County of Vermilion River ACE REGIONAL WATER SYSTEM PHASE 1 WATERMAIN CONTRACTS 1 AND 2
County of Vermilion River
$14.3 2011 Announced. Nu Edge Construction.
County of Vermilion River ACE REGIONAL WATER SYSTEM PHASE 1 WATER TRANSFER STATION
Vegreville $6.0 Proposed
Cypress County Eagle Butte Road Grade, Base and Pave
Cypress County $6.0 Proposed for 2011.
Defence Construction Canada
Infrastructure Upgrades, CFB Cold Lake
Cold Lake $120.0 2006-2015 Under construction
Defence Construction Canada
Fire Station, CFB Suffield Cypress County (Ralston)
$6.0 Proposed for 2011. Tender closes April 14.
Defence Construction Canada
Training Accommodation Building, CFB Edmonton
Edmonton $11.6 2011-2012 Under construction. Pentagon Structures.
Defence Construction Canada
Community Centre, CFB Wainwright Wainwright $5.1 On hold. Originally proposed for 2011 - 2012.
Edmonton Regional Airport Authority
Edmonton International Airport Expansion
Leduc County $1,800.0 2009-2012 Under construction. Central utilities plant 2010 - 2011 Stuart Olson. Apron expansion Dufferin Construction. Control tower and office building 2010 - 2012 EllisDon. Main terminal expansion 2009-2012 PCL Construction.
EPCOR North LRT Extension -- Distribution and Transmission Power Facilities
Edmonton $17.0 Proposed
EPCOR 2011 WATER MAIN RENEWALS Edmonton $30.6 2011 Announced
Fort McMurray Regional Airport Authority
Fort McMurray Airport Upgrade / Expansion
RM of Wood Buffalo (Fort McMurray)
$198.0 Proposed for 2011 - 2013. Terminal and expanded parking. Tender for general contractor expected June 2011.
20April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Hangar Development / Edmonton Airports
Combined Hangar / Office Building, Edmonton International Airport
Leduc County $20.0 2010-2011 Under construction. Clarke Builders.
Lac la Biche County Wastewater Treatment Facility, Lift Station and Forcemain
Lac la Biche County
$22.0 Proposed for 2011 - 2012. Maple Reinders.
Lac la Biche County Wastewater Biological Nutrient Removal Facility
Lac la Biche County (Lac la Biche)
$5.0 Proposed for 2011. Maple Reinders.
Lacombe County 2011 Road Construction and Paving Programs
Lacombe County $18.2 2011 Announced.
MD of Bonnyville 54 Ave Reconstruction Bonnyville $5.6 Proposed
MD of Foothills / Town of High River
SH 543 (Tongue Creek Rd) Extension
MD of Foothills / High River
$17.4 2010-2011 Under construction. Graham Infrastructure.
MD of Greenview Forestry Trunk Road Upgrading Project Phase 3
MD of Greenview $10.0 Proposed
MD of Greenview 2011 LOCAL ROAD SURFACING MD of Greenview $5.8 2011 Announced. Wapiti Gravel Suppliers.
MD of Greenview Government Building Valleyview $5.2 2010-2011 Completed. Dawson Wallace.
MD of Lesser Slave River South Shore Wastewater Project MD of Lesser Slave River
$10.0 2009-2011 Under construction. Phase 4 Urban Underground Solutions.
MD of Wainwright RIBSTONE ROAD, TRUCK PIT ROAD BASE AND PAVE
MD of Wainwright $5.9 2011 Announced. Border Paving.
Mountain View County Road Restoration Mountain View County
$12.0 2010- Proposed. Multi - year project.
Municipality of Crowsnest Pass
Upgrades to Frank Sewer Plant Crowsnest Pass $30.0 Proposed for 2011 - 2019. To be completed in stages over eight and a half years.
Northern Sunrise County / Woodland Cree First Nation / Village of Nampa
'New Water' Regional Water Project Phase 2A
Northern Sunrise County
$10.8 2010-2011 Announced. Good Brothers Construction (water pipeline Cadotte Lake to Little Buffalo).
Parks Canada Twinning Highway 1 Banff National Park (Castle Jct to BC border)
$30.3 2009-2012 Under construction. Dawson Construction. Phase 3B completed.
21April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Parks Canada Twinning Trans - Canada Highway and Associated Bridges Km 76 to 82
Banff National Park (near Lake Louise to BC)
$46.7 2010-2011 Under construction. Aecon Group.
Public Works and Government Services Canada
RCMP Detachment Building High Level $7.8 Proposed
Red Deer Regional Airport Airport Alteration and Runway Extension
Red Deer County $6.0 On hold pending funding. Originally proposed for 2010 - 2011.
Regional Municipality of Wood Buffalo
REGIONAL LANDFILL CELLS 2, 3 AND STOCKPILE PAD
RM of Wood Buffalo
$8.0 Proposed
Regional Municipality of Wood Buffalo
PARSONS CREEK WATER RESERVOIR AND PUMP STATION
RM of Wood Buffalo
$12.0 Proposed
Regional Municipality of Wood Buffalo
REPLACEMENT BRIDGE FOR FORT MACKAY RIVER BRIDGE
RM of Wood Buffalo
$10.0 Proposed
Regional Municipality of Wood Buffalo
GREGOIRE EAST SANITARY OUTFALL CONTRACT 2 (HDD SIPHON)
RM of Wood Buffalo
$14.0 Proposed
Regional Municipality of Wood Buffalo
Highway 69 Improvements Contract 1
RM of Wood Buffalo
$8.0 Proposed. Planned construction start March.
Regional Municipality of Wood Buffalo
Saline Creek Outfall Sewer, Water Supply
RM of Wood Buffalo
$11.4 2010-2011 Under construction. Tri - City Contracting.
Regional Municipality of Wood Buffalo
2011 SOLID WASTE PROJECTS RM of Wood Buffalo
$23.0 2011 Announced
Regional Municipality of Wood Buffalo
2011 WATER SERVICES PROJECTS
RM of Wood Buffalo
$148.0 2011 Announced
Regional Municipality of Wood Buffalo
2011 ROAD REHABILITATION AND INFRASTRUCTURE PROJECTS
RM of Wood Buffalo
$153.0 2011 Announced
Regional Municipality of Wood Buffalo
2011 TRANSPORTATION PROJECTS
RM of Wood Buffalo
$144.0 2011 Announced
Regional Municipality of Wood Buffalo
Water Supply Line Upgrade Contract 1
RM of Wood Buffalo (Conklin)
$12.7 2010-2011 Under construction. Alpha Construction.
22April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Regional Municipality of Wood Buffalo
Franklin Ave / Highway 63 Interchange
RM of Wood Buffalo (Fort McMurray)
$10.0 Proposed
Regional Municipality of Wood Buffalo
Parsons Creek Site Grading Stage 2 RM of Wood Buffalo (Fort McMurray)
$16.9 2010-2011 Under construction. Sureway Construction.
Regional Municipality of Wood Buffalo
Fire Station #5 (South Station) RM of Wood Buffalo (Fort McMurray)
$19.4 2010-2011 Under construction. Marshall-Lee Construction.
Regional Municipality of Wood Buffalo
Athabasca Water Treatment Plant Upgrades
RM of Wood Buffalo (Fort McMurray)
$161.5 2010-2012 Under construction. Bird Construction.
Regional Municipality of Wood Buffalo
LOWER TOWNSITE REDEVELOPMENT (WATER LINES, SEWER LINES, STORM LINES, SURFACE WORK)
RM of Wood Buffalo (Fort McMurray)
$60.0 2011-2013 Announced
Regional Municipality of Wood Buffalo
LOWER TOWNSITE RESERVOIR AND PUMP STATION
RM of Wood Buffalo (Ft McMurray)
$13.0 Proposed
Regional Municipality of Wood Buffalo
Lower Townsite West Loop Road Contract 1 (Roadwork, Sanitary Sewer, Watermain)
RM of Wood Buffalo (Ft McMurray)
$6.0 Proposed for 2011.
Regional Municipality of Wood Buffalo
Parsons Development Area Water Transmission Main Phase 1
RM of Wood Buffalo (Ft McMurray)
$12.4 2010-2011 Under construction. Tri - City Contracting.
Regional Municipality of Wood Buffalo
Holding Cell Facility RM of Wood Buffalo (Ft McMurray)
$20.0 2011-2012 Announced. Planned construction start summer 2011.
Rocky View County Two Fire Stations, East Balzac and Elbow Valley
Rocky View County
$10.0 2010-2011 Under construction (Elbow). Balzac Devitt & Forand.
Rocky View County Wastewater Pipeline Rocky View County (Dalroy to Langdon)
$18.0 Proposed
23April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Saddle Lake Cree Nation Water Treatment Plant Upgrades Contract 5
Saddle Lake Cree Nation
$7.0 Proposed
Santas Anonymous / Christmas Bureau of Edmonton
Jerry Forbes Centre for Community Spirit
Edmonton $21.0 Proposed for 2011 - 2012. Synergy Projects.
South Red Deer Regional Wastewater Commission
Regional Wastewater Pipeline Olds to Red Deer $96.0 2009-2014 Under construction. Three phases: Innisfail - Penhold; Penhold - Red Deer; Olds - Innisfail. Olds - Innisfail section to start construction late summer 2011. Penhold - Red Deer to be built after the other two phases.
South Red Deer Regional Wastewater Commission (SRDRWC) / City of Red Deer
Wastewater Treatment Plant Upgrade Phase 4
Red Deer $80.0 Proposed for 2011 - 2012.
Strathcona County 17 St Water Reservoir / Pumphouse Upgrades
Strathcona County
$19.0 2009-2011 Under construction. Sure - Form Construction.
Strathcona County 2011 RURAL ROAD OVERLAY PROGRAM
Strathcona County
$5.1 2011 Announced
Strathcona County Ardrossan Wastewater Line Strathcona County (Ardrossan)
$30.0 Proposed. To be considered in 2011 budget.
Strathcona County Rge Rd 220 Pave and Intersection Upgrade (Rge Rd 220 / Hwy 15)
Strathcona County (N from Hwy 15)
$12.6 2011-2012 Announced. Carmacks Enterprises.
Strathcona County Firefighter Training Centre / Fire Station 6
Strathcona County (Sherwood Park)
$17.5 Proposed
Sturgeon County 195 Ave E and 82 St Grade, Base and Pave
Sturgeon County $7.1 2010-2011 Under construction. Carmacks Enterprises.
Town of Beaumont St. Vital Park Reservoir and Pumphouse
Beaumont $6.2 2009-2011 Nearing completion. Gabriel Construction.
Town of Beaumont / City of Edmonton
50 St Widening from SH625 to 41 Ave in Edmonton
Beaumont $40.0 Proposed
24April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Town of Blackfalds RCMP Detachment Building and Fire Station
Blackfalds $5.3 2010-2011 Nearing completion. Shunda Consulting and Construction Management.
Town of Bonnyville RCMP Detachment Building Bonnyville $5.5 2010-2011 Under construction. GenMec ACL Inc.
Town of Bragg Creek / Rocky View County / Province of Alberta
Water and Wastewater Treatment Facility
Rocky View County / Bragg Creek
$26.0 2010-2012 Under construction (phase 1 -- water treatment plant).
Town of Chestermere Sanitary Forcemain Chestermere $13.8 Proposed for 2012 or 2013.
Town of Chestermere Lift Station 13 (Sanitary Lift Station) Chestermere $9.0 Proposed for 2012 or 2013.
Town of Cochrane Centre Avenue Redevelopment Cochrane $9.0 Proposed for 2012
Town of Devon Water Treatment Plant Devon $5.6 2010-2011 Under construction. Nason Contracting Group.
Town of Didsbury North Industrial Area Roadwork and Stormwater Management
Didsbury $6.4 Proposed
Town of Drayton Valley New Water Treatment Plant Drayton Valley $19.0 Proposed for 2011 - 2012.
Town of Drayton Valley WASTEWATER TREATMENT FACILITY EXPANSION
Drayton Valley $7.7 Proposed
Town of High River / MD of Foothills
BRIDGE OVER HIGHWOOD RIVER High River $18.0 2011 Under construction
Town of Lacombe HIGHWAY 2A GRADE, BASE AND PAVE
Lacombe $17.1 2011-2012 Announced. Border Paving.
Town of Mundare Main Street Revitalization Mundare $6.3 2010-2011 Under construction
Town of Okotoks Southridge Emergency Services Building
Okotoks $11.0 2011-2012 Announced. RCMP, municipal enforcement and fire station.
Town of Peace River Shaftesbury Water Treatment Plant Upgrades (part of regional water system with MD of Northern Lights)
Peace River $20.0 Proposed for 2011 - 2012. Regional system also includes line to Dixonville, reservoir on West Hill.
Town of Slave Lake Water Treatment Plant Upgrades Slave Lake $9.8 2010-2011 Completed. Alpha Construction.
Town of Slave Lake Treated Water Reservoir and UV Disinfection
Slave Lake $8.1 2010-2011 Nearing completion. Alpha Construction.
25April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Town of Sundre EAST SIDE SERVICING PROJECT Sundre $19.0 Proposed
Town of Sylvan Lake Town Administration Building Sylvan Lake $6.4 Proposed for 2011 - 2012. Tender for general contractor expected early 2011. Planned construction start mid 2011.
Town of Sylvan Lake Lakeshore Drive Redevelopment Phase 3
Sylvan Lake $6.0 Proposed for 2011.
Town of Vauxhall / MD of Taber
Regional Water Treatment Plant and Pipework
MD of Taber $19.3 2011-2012 Announced. Vauxhall to Enchant and Vauxhall to Hays.
Town of Wetaskiwin 50 Ave (Main St) Makeover (Water / Sewer Lines and Streetscape) phases 1 and 2
Wetaskiwin $11.0 2011-2012 Announced. Phase 1 (48 St to 50 St) in 2011, phase 2 (50 St to 53 St) in 2012. The remainder of downtown (47 St to 48 St and 53 St to 56 St) to be completed at a later date.
Town of Whitecourt / Woodlands County
Water and Sewer Lines at Whitecourt Airport
Whitecourt $7.0 2010-2011 Completed
Village of Longview Water Treatment Plant Upgrades and Wastewater Lagoon
MD of Foothills (Longview)
$5.8 Proposed for 2011
Village of Thorsby Water Treatment Plant Leduc County (Thorsby)
$6.3 2010-2011 Under construction. Nason Contracting Group.
Vulcan County Water Treatment Plant Vulcan County (near Vulcan)
$6.7 Proposed for 2011 - 2012.
Institutional *Procurement activities under direction of associated School Board
Acadia Foundation New Seniors Lodge Hanna $15.0 2010-2011 Nearing completion. Kellar Construction.
Acadia Foundation / East Central Housing Society
Consort Lodge Renovations / Expansion
Special Area 4 (Consort)
$9.2 2009-2011 Completed. Shunda Consulting and Construction Management.
AgeCare Health Services Ltd.
'Walden' SUPPORTIVE LIVING FACILITY
Calgary $19.8 Proposed for 2011 - 2012
AgeCare Health Services Ltd.
Seniors Supportive Housing Units, Sagewood Lodge (Phase 1)
Strathmore $12.2 2009-2011 Under construction
Alberta Health and Wellness / Good Samaritan Society
Designated Assisted Living (DAL) Facility
Taber $13.0 2008-2011 On hold. FWS Construction.
26April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Alberta Health and Wellness / University of Alberta
Edmonton Clinic South Building (Ambulatory Learning Centre)
Edmonton $300.0 2008-2012 Under construction. PCL Construction.
Alberta Health and Wellness / University of Alberta
Edmonton Clinic North Building Edmonton $250.0 2008-2012 Under construction. PCL Construction Management.
Alberta Infrastructure Bow Island Health Centre Renovations
Bow Island $5.0 2011-2012 Announced. Planned construction start August.
Alberta Infrastructure / Alberta Health and Wellness
Barrhead Healthcare Centre Redevelopment
Barrhead $17.3 Proposed. Deferred pending results of Alberta Health Services review.
Alberta Infrastructure / Alberta Health and Wellness
HOSPITAL RENOVATIONS Beaverlodge $5.3 Proposed
Alberta Infrastructure / Alberta Health and Wellness
Calgary Cancer Infrastructure Plan Calgary $141.0 Proposed for 2012 - 2015
Alberta Infrastructure / Alberta Health and Wellness
Cross Cancer Institute Renovations Calgary $67.0 Proposed
Alberta Infrastructure / Alberta Health and Wellness
Hospital for South Calgary (South Health Campus phase 1)
Calgary $1,310.0 2007-2012 Under construction. EllisDon Construction. Kasian Architecture / HDR Inc.
Alberta Infrastructure / Alberta Health and Wellness
Pediatric Intensive Care Unit Expansion, Stollery Children's Hospital
Edmonton $8.1 Proposed for 2012 - 2013
Alberta Infrastructure / Alberta Health and Wellness
Edmonton Cancer Infrastructure Plan Edmonton $67.0 Proposed
Alberta Infrastructure / Alberta Health and Wellness
Endoscopy Suite Expansion, U of Alberta Hospital
Edmonton $14.5 Proposed for 2011 - 2012
27April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Alberta Infrastructure / Alberta Health and Wellness
Northern Alberta Urology Centre (Prostate Cancer Clinic)
Edmonton $0.0 Proposed for 2012 - 2013. Part of the Edmonton Clinic South project.
Alberta Infrastructure / Alberta Health and Wellness
Norwood - Glenrose Long Term Care Facility
Edmonton $68.0 On hold. Jen - Col Construction. Originally scheduled for 2008 - 2010.
Alberta Infrastructure / Alberta Health and Wellness
Emergency Dept Expansion, Stollery Childrens Hospital / University of Alberta Hospital
Edmonton $18.5 2010-2012 Under construction. PCL Construction.
Alberta Infrastructure / Alberta Health and Wellness
New Food Services Facility, Alberta Hospital
Edmonton $9.5 2011-2012 Announced. Planned construction start May.
Alberta Infrastructure / Alberta Health and Wellness
Edson Healthcare Centre (previously described as New Hospital)
Edson $108.0 2011-2014 Announced.
Alberta Infrastructure / Alberta Health and Wellness
Fort Saskatchewan Community Hospital
Fort Saskatchewan
$87.0 2008-2012 Under construction. EllisDon Construction.
Alberta Infrastructure / Alberta Health and Wellness
QEII Hospital Emergency Room Renovations / Expansion Phase 2
Grande Prairie $9.0 2010-2011 Under construction. Delnor Construction.
Alberta Infrastructure / Alberta Health and Wellness
High Prairie Health Complex (previously described as New Hospital)
High Prairie $90.0 2011-2013 Announced. Planned construction start late summer 2011.
Alberta Infrastructure / Alberta Health and Wellness
Continuing Care Centre Renovations / Upgrades and Dementia Cottage
Lacombe $10.0 On hold. Previously proposed for 2009 - 2010. Deferred pending results of Alberta Health Services review.
Alberta Infrastructure / Alberta Health and Wellness
CHINOOK REGIONAL HOSPITAL FIRST FLOOR RENOVATIONS
Lethbridge $10.0 Proposed.
Alberta Infrastructure / Alberta Health and Wellness
Chinook Regional Hospital Parkade Lethbridge $17.5 2010-2011 Under construction. Graham Construction.
28April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Alberta Infrastructure / Alberta Health and Wellness
Chinook Regional Hospital Re-development Phase 1 (Addition)
Lethbridge $112.7 2012-2015 Announced
Alberta Infrastructure / Alberta Health and Wellness
Lloydminster Continuing Care Project (Replacement for Nursing Home Wing at Dr. Cooke Extended Care Centre)
Lloydminster $40.0 Proposed for 2011 - 2012.
Alberta Infrastructure / Alberta Health and Wellness
Medicine Hat Hospital Renovations phase 1
Medicine Hat $200.0 2011-2015 Announced. Site work in 2011.
Alberta Infrastructure / Alberta Health and Wellness
Fort McMurray Continuing Care Centre (previously described as Long Term Care Centre)
RM of Wood Buffalo (Fort McMurray)
$35.0 Proposed for 2011 - 2012.
Alberta Infrastructure / Alberta Health and Wellness
Strathcona Community County Hospital Phase 2
Strathcona County (Sherwood Park)
$69.0 Proposed for 2013 - 2014
Alberta Infrastructure / Alberta Health and Wellness
Strathcona Community Hospital Phase 1
Strathcona County (Sherwood Park)
$84.0 2010-2012 Under construction. EllisDon Construction. CASA House completed.
Alberta Infrastructure / Alberta Health and Wellness / Alberta Cancer Board
Central Alberta Cancer Centre Radiation Therapy Clinic (Cancer Clinic)
Red Deer $59.5 2010-2013 Under construction. Stuart Olson Dominion Construction.
Alberta Infrastructure / Alberta Health and Wellness / Bethany Care Society
Long Term Care Centre (Affordable Supportive Living Spaces)
Didsbury $26.5 Proposed for 2011 - 2012.
Alberta Infrastructure / Alberta Health and Wellness / Carewest
'Community of Care' Personal Care Facility
Strathmore $35.0 On hold. Project scope under review by Alberta Health Services.
Alberta Infrastructure / Alberta Health and Wellness / Good Samaritan Society
Good Samaritan Care Centre Replacement Facility
Stony Plain $31.0 2010-2011 Under construction. Chandos Construction.
29April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Alberta Infrastructure / Alberta Health and Wellness / Grande Prairie Regional College
Grande Prairie Regional Healthcare Centre (Peace Country Health Centre)
Grande Prairie $520.0 2011-2014 Announced. Planned construction start fall 2011. Includes cancer treatment centre.
Alberta Infrastructure* Four High Schools across Alberta $96.8 2010-2012 Under construction. Clark Builders. Edmonton (Mother Margaret Mary Grades 10-12), Calgary (Northwest Grades 10-12), Spruce Grove (St. Peter the Apostle Grades 9-12) and Sherwood Park (Archbishop Jordan Grades 9-12).
Alberta Infrastructure* Modernization Calgary $35.0 2009-2011 Under construction. Western Canada HS. Clark Builders.
Alberta Infrastructure* Replacement School for Ernest Manning HS
Calgary $33.6 2009-2011 Under construction. West Calgary High School. Stuart Olson Constructors.
Alberta Infrastructure* CAREER AND TECHNOLOGY CENTRE MODERNIZATION
Calgary $6.2 2011 Under construction. Lord Shaughnessy HS. Westcor Construction.
Alberta Infrastructure* New School (K to Grade 12) Drumheller $13.5 2008-2011 Under construction. St. Anthony's.
Alberta Infrastructure* Replacement Facility Edmonton $60.0 2008-2011 Under construction. Victoria School of Performing and Visual Arts. Aman Building Corp.
Alberta Infrastructure* Modernization (previously listed as Renovations)
Edmonton $6.0 2010-2011 Under construction. Prince Charles and Forest Heights Schools. Synergy Projects.
Alberta Infrastructure* Renovations Edmonton $7.8 2010-2011 Under construction. Eastglen High School. Jen - Col Construction.
Alberta Infrastructure* Addition / Modernization Fort Saskatchewan
$13.2 2009-2011 Under construction. Fort Saskatchewan Elementary School / Christian School. Chandos Construction.
Alberta Infrastructure* Replacement School (Grades 5 to 9) Millet $5.4 Proposed. Griffiths - Scott Middle School.
Alberta Infrastructure* Elementary School (K to Grade 6) Olds $8.0 2010-2011 Completed. Holy Trinity. Reed Atwood Builders.
Alberta Infrastructure* Modernization Picture Butte $13.4 2010-2011 Nearing completion. Picture Butte Jr / Sr High School. Western Construction and Combustion Services.
Alberta Infrastructure* Modernization (Phases 1 and 2) Ponoka $11.0 2010-2012 Under construction. Ponoka Composite HS. Graham Construction.
30April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Alberta Infrastructure* High School (Grades 7 to 12), Timberlea
RM of Wood Buffalo (Fort McMurray)
$53.0 2009-2011 Nearing completion. Holy Trinity, including performing arts centre. Aman Building Corp.
Alberta Infrastructure* New Junior High School (Grades 7 to 9)
RM of Wood Buffalo (Fort McMurray)
$40.8 2010-2011 Under construction. Ecole McTavish Jr HS. Dowland Contracting.
Alberta Infrastructure* High School (Grades 7 to 12) Slave Lake $13.7 2009-2011 Completed. St. Francis of Assisi. UFA Construction.
Alberta Infrastructure* Modernization / Addition Smoky Lake County (Vilna)
$10.2 2010-2011 Completed. Vilna School. Binder Construction.
Alberta Infrastructure* Modernization Vauxhall $6.1 2010-2011 Under construction. Vauxhall Elementary. UFA Construction.
Alberta Infrastructure* Modernization Vauxhall $15.5 2010-2011 Under construction. Vauxhall HS. UFA Construction.
Alberta Infrastructure* / B2L Partnership
Ten Schools (P3 Project) across Alberta $253.0 2010-2012 Under construction. Edmonton (three K to Grade 9), Calgary(four Grade 5 to 9, one K to Grade 9), Okotoks (K to Grade 9) and Langdon (Sarah Thompson School, K to Grade 4).
Alberta Solicitor General and Public Security
Provincial Police and Peace Officer Training Centre
Fort MacLeod $120.0 2012-2013 Announced. Planned construction start summer 2012.
All Saints Parish New Catholic Church Lethbridge $15.0 Proposed for 2013 - 2015. Consolidation of St. Basil's, Assumption and St. Patrick's parishes.
All Seniors Care Living Centres
'Laurel' Retirement Residence Edmonton $20.0 2010-2012 Under construction. Man - Shield Construction.
Athabasca University Laboratory Addition / Renovations Athabasca $11.0 2010-2011 Completed
Bearspaw Christian School
Athletics Facility Calgary $5.6 2010-2011 Completed
Bethany Care Society Affordable Housing Complex, Riverview Village
Calgary $11.0 2011-2013 Announced. Planned construction start spring 2011.
Bethany Group 'Peace Hills Lodge' Seniors Facility Wetaskiwin $8.5 2009-2011 Nearing completion. Replacement for current Peace Hills Lodge.
Bow Valley College Campus Redevelopment and Expansion
Calgary $170.0 2006-2012 Under construction. Stuart Olson Constructors.
31April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Brenda Stafford Foundation
Affordable Assisted Living Facility Okotoks $15.3 2010-2012 Under construction. Medican Construction.
Calgary Academy / Tanbridge Academy
'The Academies' Shared Campus (K to Grade 12 Educational Space and Recreation Centre)
Calgary $60.0 Proposed for 2010 - 2011.
Calgary Board of Education
Education Centre Including Dr. Carl Safran Centre
Calgary $80.5 2008-2011 Under construction. EllisDon Construction.
Carrington Communities Seniors Complex Rebuild after Fire Edmonton $10.0 Proposed. Planned completion by spring 2012.
Choices in Community Living Inc.
'Copper Sky Lodge' Assisted Living Facility
Spruce Grove $28.0 2010-2012 Under construction. Krawford Construction.
Christenson Communities Ltd. / Good Samaritans Society
Royal Oak Village Seniors Housing Phases 2 and 3 (Phase 2 Life Lease, Phase 3 Designated Assisted Living)
Lacombe $16.8 2010-2012 Announced. Planned construction start Phase 3 fall 2010. Phase 2 (life lease) to follow phase 3.
City of Calgary Signal Hill Library Addition / Renovation
Calgary $5.4 2010-2011 Completed. Devitt and Forand Contractors.
City of Edmonton Library Renovations / Expansion, Highlands
Edmonton $9.5 Proposed
City of Edmonton NEW LIBRARY BRANCH MILL WOODS
Edmonton $30.0 Proposed
City of Edmonton Jasper Place Library Renewal / Expansion
Edmonton $14.0 2011-2012 Announced
City of Red Deer Civic Centre (City Hall) Renovations / Expansion Phase 1
Red Deer $58.5 On hold. Project has been deferred to 2015 in 2010 budget.
City of Red Deer Native Friendship Centre Red Deer $5.0 Proposed. Estimated cost range $5M to $8M.
Continuum Health Care / Eldercare Communities
Supportive Living Complex High River $6.0 Proposed
Continuum Health Care Holdings Ltd.
Affordable Supportive Living Units, Sunrise Village
Camrose $11.0 2009-2011 Completed. Shunda Consulting and Construction Management.
Covenant Health New Designated Assisted Living Facility
Red Deer $25.0 Proposed for 2011 - 2012. In design stage.
32April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Extendicare Seniors Facility, Eaux Claires Edmonton $25.2 2009-2011 Under construction
Fort McMurray Family Crisis Society
New Women's Shelter RM of Wood Buffalo (Ft McMurray)
$50.0 Proposed
Fresh Start Recovery Centre
Special Care Facility Calgary $6.8 2009-2011 Nearing completion
Government of Alberta New Remand Facility Edmonton $620.0 2008-2012 Under construction. Stuart Olson Constructors.
Grande Prairie and District Society for Christian Education
School Expansion (Phases 1 to 3) Grande Prairie $9.0 2010- Under construction (phase 1).
Grant MacEwan University University Service Centre Building Edmonton $20.0 2010-2011 Completed
Green Acres Foundation Sunny South Lodge Modernization / Renovations
Coaldale $6.8 2009-2011 Completed. Sebring Construction.
High Prairie School Division
Support Services Building High Prairie $10.0 Proposed. Pending funding approval.
Kopernik Polish Heritage Society / Good Samaritan Society
Kopernik Seniors Complex and Community Centre
Edmonton $55.0 On hold
Lac Ste. Anne Foundation Pleasant View Lodge Modernization (New Building)
Mayerthorpe $14.0 2010-2011 Completed. Krawford Construction.
LDS Church LDS Calgary Temple Calgary $24.5 2010-2011 Announced
Mount Royal University 'The Bella Concert Hall' Conservatory of Music / Performance Hall
Calgary $73.0 Proposed. Planned completion in 2013.
Mount Royal University Library Calgary $41.0 Proposed. Pending funding.
Mount Royal University Roderick Mah Centre for Continuous Learning Expansion and Technology Wing Expansion
Calgary $35.5 2009-2011 Nearing completion. PCL Construction.
Mountain View Seniors Housing
Seniors Lodge and Life Lease Building (Replacement Facility for Mount View Seniors Lodge)
Olds $21.6 2008-2011 Completed. Shunda Consulting and Construction Management.
33April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Oi Kwan Foundation Oi Kwan Place Addition / Renovations
Calgary $22.1 2010-2012 Under construction. Graham Construction.
Peace Country Health / Chantelle Management Ltd.
Grande Prairie Campus of Care Grande Prairie $20.0 2010-2011 Under construction. Nahanni Construction.
Points West Living Cold Lake / Alberta Health Services
Supportive Living Facility Cold Lake $17.0 Proposed
Points West Living Inc. Supportive Living Units, Westgate Grande Prairie $11.0 Proposed for 2011.
Points West Living Inc. Seniors Assisted Living Facility Grande Prairie $35.0 2009-2011 Nearing completion
Points West Living Ltd. Continuing Care Facility (Affordable Supportive Living Spaces)
Stettler $8.8 2011-2012 Announced
Public Works and Government Services Canada
Bowden Institute Expansion Bowden $8.8 2011 Announced. UPA Construction Group.
Public Works and Government Services Canada
Drumheller Institute Expansion Drumheller $25.0 Proposed
Public Works and Government Services Canada
Edmonton Maximum Security Institution Expansion
Edmonton $22.7 Proposed
Public Works and Government Services Canada
Edmonton Institute for Women Addition / Renovations
Edmonton $8.0 Proposed.
Red Deer College Sports and Wellness Centre and Health Education Centre (Building Communities Through Learning Phase 2)
Red Deer $100.0 On hold.
Rocky Senior Housing Council
Westview Lodge Replacement Facility
Rocky Mountain House
$10.0 2010-2012 Under construction. Chandos Construction. Two phases.
Rocky View Foundation New Seniors Residence (Supportive Living Units)
Crossfield $9.2 2010-2012 Under construction. Keller Construction.
34April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Santos Property Inc. 'The Gardens at Highway 2' Assisted Living Facility Phase 1
Red Deer $23.0 Proposed for 2011 - 2012.
Shalem Society for Senior Citizens Care
CARE CENTRE (SENIOR CITIZENS HOME)
Calgary $5.8 Proposed
Slim Thorpe Recovery Centre
New Detox and Treatment Facility County of Vermilion River (W of Blackfoot)
$16.2 2009-2011 Under construction
Southern Alberta Institute of Technology (SAIT)
Trades and Technology Complex Calgary $445.0 2010-2012 Under construction. PCL Construction.
Stoney Tribal Administration
Elementary School Stoney IR 142,143,144 (Morley)
$12.0 2010-2011 Under construction. Trumbley and Hampton.
Strathcona Shelter Society NEW WOMEN'S SHELTER (REPLACEMENT BUILDING FOR 'A SAFE PLACE')
Strathcona County (Sherwood Park)
$6.8 Proposed
The University of Calgary Experiential Learning Centre (ELC) Calgary $300.0 2008- Under construction (phase 1 Energy, Environmental, Experiential Learning Centre). EllisDon.
The University of Calgary Taylor Family Digital Library (TFDL) Calgary $163.0 2008-2011 Completed. Cana Construction.
The University of Calgary New Student Residence (Yamnuska Hall)
Calgary $60.0 2009-2011 Completed. Intertech Construction Group.
The University of Calgary Schulich School of Engineering Renovation / Expansion Phase 1
Calgary $23.4 2009-2011 Completed. EllisDon Construction.
The University of Calgary Interior Alterations, Clara Christie Centre for Mouse Genomics
Calgary $6.0 2010-2011 Under construction. PCL Construction.
The University of Calgary SCIENCE BUILDING 'A' RENOVATIONS / REMEDIATION
Calgary $8.0 2011-2013 Announced
The University of Calgary WASTEWATER TREATMENT PLANT
Calgary $16.0 2011-2013 Announced. Graham Construction.
The University of Calgary / NorthWest Healthcare Properties
Renovation of Former 8th and 8th Health Centre for Urban Campus
Calgary $40.0 2009-2011 Completed. Graham Construction.
35April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Town of Beaverlodge / Integrated Life Care Inc.
Seniors' Supportive Living Facility Beaverlodge $15.0 On hold
Town of High River Library Expansion and Theatre Complex
High River $16.7 Proposed.
Town of Innisfail Innisfail Gathering Place (New Library, Seniors Centre and Meeting Rooms)
Innisfail $9.0 2010-2011 Nearing completion. Pentagon Structures.
Trinity Place Foundation 'Glenway' Seniors Housing Facility Calgary $6.0 Proposed. Planned start July 2010.
University of Alberta STUDENT PHYSICAL ACTIVITY AND WELLNESS CENTRE
Edmonton $57.0 Proposed. Four - year project.
University of Alberta Stem Cell Research Facility Edmonton $26.5 Proposed. Planned completion in 2 1/2 years (mid 2013).
University of Alberta CPOC Building Edmonton $35.0 2009-2011 Under construction. Chandos Construction.
University of Alberta Devonian Botanic Garden Ecological Learning Centre
Parkland County $30.0 Proposed
University of Alberta / City of Camrose / Camrose County
Performing Arts Centre, Augustana Campus
Camrose $11.5 Proposed. Fundraising underway.
University of Lethbridge APERTURE RESIDENTIAL PARK STUDENT RESIDENCES PHASE 3 (APARTMENTS)
Lethbridge $15.0 Proposed for 2012.
Webber Academy Performing Arts Centre Calgary $9.9 2010-2011 Under construction. Stuart Olson Dominion.
Westlock Foundation Pembina Lodge Expansion Westlock $14.4 Proposed
Wimco Properties Ltd. 'Elk Island View - Bison Place' Assisted Living Facility
Lamont $6.0 On hold pending improved market conditions.
Manufacturing
Fiberex Glass Corp. Manufacturing Plant Leduc $30.0 Proposed. Pending funding.
Hi - Tech Canada Developments Ltd.
Manufacturing Plant Phase 2 Ponoka $12.0 On hold. Fundraising underway.
36April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Hi Tech Canada Development Inc.
Manufacturing Plant Phase 3 Ponoka $6.0 Proposed for 2011. Pre - built building to be assembled on site.
Hi Tech Canada Development Ltd.
Manufacturing Plant Phase 4 Ponoka $12.0 On hold. Dependent on market conditions.
Lafarge Canada Plant Modernization (Upgrades and Development)
MD of Bighorn (Exshaw)
$600.0 Proposed
Leading Manufacturing Group Ltd.
Oil Tank Manufacturing Facility Vermilion $5.0 2010-2011 Announced. Planned construction start fall 2010.
Quantiam Technologies Furnace Coatings Manufacturing Facility
Edmonton $9.2 2010-2011 Completed. Scott Builders.
Mining
Alter NRG Corp. Fox Creek Coal Gasification Project MD of Greenview (near Fox Creek)
$4,500.0 On hold. Defining project scope. Looking for strategic partner.
Coalspur Mines Ltd. 'Vista' Thermal Coal Mine Yellowhead County (near Hinton)
$185.0 Proposed for 2013 - 2014.
Grande Cache Coal Corporation
Development of #8 Surface Mine and #12 South B2 Underground Mine
Grande Cache $180.0 2009-2012 Under construction. ERCB approval for #8 mine November 2009.
MAXIM Power Corp. Development of #14 Coal Mine Grande Cache $50.0 Proposed for 2010 - 2011. ERCB approval October 2009.
Parsons Creek Aggregates
Parsons Creek Aggregates Limestone Quarry
RM of Wood Buffalo (N of Ft McMurray)
$30.0 Proposed for 2011 - 2012, pending approvals.
Oil & Gas
AltaGas Income Trust Harmattan Co - Stream Project Mountain View County (Harmattan complex)
$100.0 2011-2012 Announced. Cost range $100M to $120M. ERCB approval December 2010.
Free Energy International Inc.
Geothermal Heat to Power Plant(s) MD of Big Lakes $7.0 Proposed
37April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Inclusive Energy Ltd. Liquids Storage Facility Yellowhead County (near Edson)
$40.0 Proposed. Planned completion spring 2011.
Paramount Energy Trust Conversion of Depleted Gas Pool to Natural Gas Storage Facility
near Vegreville $37.0 2010 Announced
Pembina Pipeline Corp. Midstream Capital Projects 2011-2013
across Alberta $225.0 2011-2013 Announced
Sunshine Oilsands 'Muskwa' Heavy Oil Project Phase 1 MD of Opportunity $31.0 Proposed. Five phases in total.
Swan Hills Synfuels LP Coal Gasification Plant MD of Big Lakes (Swan Hills area)
$1,000.0 Proposed for 2011 - 2014. PCL Industrial Management (syngas processing facility).
Oil Sands
Alberta Oilsands Inc. 'Clearwater West' SAGD Production RM of Wood Buffalo (S of Fort McMurray)
$415.0 Proposed. Planned construction start in 2011, pending approvals. Application filed January 2010.
BP Canada / Value Creation Inc.
'Terre de Grace' SAGD Oil Sands Project
RM of Wood Buffalo
$3,500.0 On hold pending financing.
Canadian Natural Resources Ltd. (CNRL)
'Project Horizon' Mining and Drilling Project phase 2 / 3
RM of Wood Buffalo
$1,080.0 Proposed. Approved Jan 2004.
Canadian Natural Resources Ltd. (CNRL)
'Kirby' In - Situ Oil Sands Project Phase 1
RM of Wood Buffalo
$1,250.0 2010-2013 Under construction. Application approved Q3 - 2010.
Canadian Natural Resources Ltd. (CNRL) / North West Upgrading Inc.
Bitumen Upgrader Phase 1 Sturgeon County (near Redwater)
$4,000.0 2012-2014 Announced. EPC SNC-Lavalin, PCL Industrial Management. Site preparation complete.
Cenovus Energy 'Borealis' SAGD Project Phase 1 RM of Wood Buffalo (N of Fort McMurray)
$1,000.0 On hold. Owner expects construction start 2014.
Cenovus Energy Inc. Christina Lake Thermal Expansion Project Phases 1E, 1F and 1G
RM of Wood Buffalo (SE of Conklin)
$3,000.0 Proposed for 2011 - 2016. Applications filed October 2009. Estimated construction Phase 1E 2011- 2014; Phase 1F 2012 - 2015; Phase 1G 2014 - 2016.
Cenovus Energy / ConocoPhillips
'Foster Creek' Oil Sands Project Phases F, G and H
Lac la Biche County
$2,000.0 2011-2017 Announced. ERCB approval September 2010. Site preparation underway.
38April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Cenovus Energy Inc. / ConocoPhillips
'Narrows Lake' In Situ Oil Sand Project using Solvents
RM of Wood Buffalo (Narrow Lake)
$1,600.0 Proposed. Application filed early February.
Connacher Oil & Gas Ltd. 'Great Divide' SAGD Expansion Phase 1
RM of Wood Buffalo (S of Ft McMurray)
$600.0 Proposed for 2012 - 2013
ConocoPhillips Canada / Total Canada
'Surmont Phase 2' Oil Sands Development
RM of Wood Buffalo
$2,000.0 2010-2014 Under construction
Devon Canada Corp. 'Jackfish' Oil Sands Project Phase 3 RM of Wood Buffalo (SE of Conklin)
$1,000.0 Proposed for 2011 - 2015. Application filed Q3 - 2010.
Devon Canada Corp. 'Jackfish' SAGD Oil Sands Project Phase 2 (J2)
RM of Wood Buffalo (SE of Conklin)
$1,060.0 2008-2011 Completed
Dover Operating Corp. (Dover OPCO)
'Dover' COMMERCIAL OILSANDS PROJECT PHASE 1
RM of Wood Buffalo
$2,500.0 Proposed for 2013 - 2015. Application filed February 2011. Five phases in total.
Enbridge Inc. Terminal Tankage (Storage Capacity) Expansion Phases 1 and 2
Strathcona County
$260.0 Proposed for 2011 - 2012, pending regulatory approval.
E-T Energy Ltd. 'Poplar Creek' Bitumen Extraction Project
RM of Wood Buffalo
$103.0 Proposed for 2011 - 2013. Planned construction start late 2011, pending regulatory approvals.
Fort Hills Energy Corp. (Suncor Energy Inc. / Total SA / Teck Cominco)
'Fort Hills' Oil Sands Mine RM of Wood Buffalo
$9,600.0 Proposed. Corporate approval for construction expected by end of 2012. Planned to come onstream in 2016.
Grizzly Oil Sands ULC 'Algar Lake' SAGD Oil Sands Project RM of Wood Buffalo (SW of Fort McMurray)
$500.0 Proposed for 2011 - 2012. SNC - Lavelin.
Horizon North Logistics Inc.
Oil Sands Work Camp northern Alberta $25.0 Proposed
Horizon North Logistics Ltd.
OIL SANDS ACCOMMODATION CAMP
RM of Wood Buffalo (near Ft McMurray)
$20.0 2011 Announced
39April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Husky Energy Inc. / BP PLC
'Sunrise Thermal Project' SAGD Oil Sands Project Phase 1
RM of Wood Buffalo (N of Fort McMurray)
$2,500.0 2012-2013 Announced. SaipamSpA. Application approved. Corporate approval Nov 2010. WorleyParsons Canada EPC field facilities.
Husky Energy Inc. / BP Plc.
'Sunrise Thermal Project' Phase 2 RM of Wood Buffalo
$1,900.0 On hold pending review of costs and project optimization
Imperial Oil Ltd. 'Nabiye' Oil Sands Project MD of Bonnyville (Cold Lake area)
$1,300.0 Proposed. Planned on - stream by 2015.
Imperial Oil Resources / ExxonMobil Canada
'Kearl Lake' Oil Sands Mine Phase 1 RM of Wood Buffalo
$8,000.0 2009-2012 Under construction. Three production trains / phases in total. Application approved (all phases). AMEC (EPC). Fluor Corp infrastructure and facilities.
Ivanhoe Energy 'Tamarack' Bitumen Project Phase 1 RM of Wood Buffalo (near Fort McMurray)
$1,250.0 Proposed for 2012 - 2013. Application filed November 2010.
Japan Canada Oil Sands Limited (JACOS) / Nexen Inc.
Hangingstone SAGD Commercial Production Project
RM of Wood Buffalo (S of Fort McMurray)
$1,200.0 Proposed for 2011 - 2014. Application filed. Approval expected Q3 2011
Korea National Oil Company (KNOC)
'BlackGold' In Situ Oil Sands Project Phase 1
RM of Wood Buffalo (SE of Conklin)
$300.0 2011-2012 Announced. GS Engineering and Construction Corp.
Korea National Oil Corporation (KNOC)
'BlackGold' Oil Sands Project Phase 2
RM of Wood Buffalo (SE of Conklin)
$540.0 Proposed for 2013 - 2015, pending approvals.
Laricina Energy Ltd. 'Germain' Commercial Demonstration Project (Solvent - Cyclic SAGD)
MD of Opportunity $250.0 Proposed for 2011 - 2012, pending approvals. Smaller scale pilot plant approved by ERCB completed.
MEG Energy Corp. In Situ Oil Sands Project Phase 2B RM of Wood Buffalo (Christina Lake)
$1,400.0 2011-2012 Announced. Planned construction start early 2011. Corporate approval December 2010.
N-Solv Corp. Pilot Plant RM of Wood Buffalo
$50.0 Proposed
OPTI Canada / Nexen Inc. 'Long Lake South' SAGD Project Phase 2 (Kinosis)
RM of Wood Buffalo
$2,790.0 On hold due to uncertain financial markets and escalating capital cost. Cost estimates are preliminary. Corporate approval deferred til late 2011.
40April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
OPTI Canada Inc / Nexen Inc.
Ash Processing Pit (part of Long Lake project)
RM of Wood Buffalo
$175.0 2008-2011 Under construction.
Osum Oil Sands Corp. 'Taiga' Oil Sands Project MD of Bonnyville (N of Cold Lake)
$1,570.0 Proposed for 2011 - 2018. Application filed January 2010.
Pengrowth Energy Trust SAGD Pilot Project, Lindbergh RM of Wood Buffalo
$50.0 2011 Announced
Penn West Energy Trust / China Investment Corp.
Development of Seal Lake Operations
MD of Big Lakes (N of High Prairie)
$150.0 2010-2011 Announced
Petrobank Energy and Resources
'May River' Commercial Bitumen Project Phase 1
RM of Wood Buffalo
$250.0 Proposed for 2010 - 2012. Application filed December 2008. FEED underway.
PTI Group Wapasu Creek Lodge Expansion RM of Wood Buffalo (N of Fort McMurray)
$460.0 2009-2011 Nearing completion
Royal Dutch Shell 'Orion' Heavy Oil SAGD Facility (Phases 1 and 2)
MD of Bonnyville (Hilda Lake)
$340.0 2005-2010 On hold. Phase 1 completed, phase 2 on hold pending review. Approved Oct 2004. Phased development, building to 20,000 bpd.
Shell Canada ATHABASCA OIL SANDS PROJECT DEBOTTLENECK PHASE 1
RM of Wood Buffalo / Strathcona County
$2,000.0 Proposed. Muskeg River Mine, Jackpine Mine and Scotford. Corporate decision in 2011.
Shell Canada / Chevron / Marathon Oil
'Quest' CARBON CAPTURE AND STORAGE PROJECT
near Ft Saskatchewan to Thorhild Cty
$900.0 Proposed for 2012 - 2015. Pending corporate approval. Application filed November 2010.
Shell Canada Ltd. 'Carmon Creek' Bitumen Project Northern Sunrise County (NE of Peace River)
$3,450.0 Proposed for 2011 - 2016. Two central processing facilities and three co-generation units.
SilverBirch Energy 'Frontier' Oil Sands Mine Phase 1 RM of Wood Buffalo
$6,000.0 Proposed. Application to be filed early 2011. Approval expected in 2014.
SilverBirch Energy 'Equinox' Oil Sands Mine (Lease 14) RM of Wood Buffalo
$2,500.0 Proposed. Application to be filed with Frontier in early 2011.
Southern Pacific Resource Corp.
'McKay' SAGD Oil Sands Project Phase 1
RM of Wood Buffalo (N of Fort McMurray)
$450.0 2011-2012 Under construction. Application filed May 2009. Approval October 2010.
41April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Suncor Energy Inc. North Steepbank Mine Extension RM of Wood Buffalo
$400.0 On hold. Application approved November 2006.
Suncor Energy Inc. 'Voyageur South' Oil Sands Mining Operation
RM of Wood Buffalo
$4,400.0 On hold pending market conditions. Application filed July 2007. Corporate approval January 2008.
Suncor Energy Inc. 'Firebag' Oil Sands Project Phase 4 RM of Wood Buffalo
$2,000.0 Proposed for 2011 - 2013. ERCB approval March 2010.
Suncor Energy Inc. 'Firebag' Oil Sands Project Stage 3 RM of Wood Buffalo
$900.0 2010-2011 Nearing completion. Cord WorleyParsons.
Suncor Energy Inc. MacKay River SAGD Expansion RM of Wood Buffalo (NW of Fort McMurray)
$1,000.0 On hold pending review of project costs. Application filed Dec 2005.
Suncor Energy Inc. / Total SA
'Voyageur' Oil Sands Third Upgrader (U3)
RM of Wood Buffalo
$11,600.0 2011-2016 Announced. Project does not include bitumen feed to upgrader.
Suncor Energy Services 'Firebag' Administration Complex and Village Camp Core
RM of Wood Buffalo (N of Fort McMurray)
$177.0 On hold. Bird Construction.
Sunshine Oilsands 'West Ells' Oil Sands Project MD of Opportunity $385.0 Proposed for 2011 - 2012.
Syncrude Canada Ltd. South West Sand Storage Conversion
RM of Wood Buffalo
$34.6 Proposed. Application filed.
Syncrude Canada Ltd. Phase 4: Upgrader Expansion Phase 2 / Aurora South Mine Trains 1 and 2
RM of Wood Buffalo (Fort McMurray)
$2,300.0 Proposed. Pre-engineering study underway (AMEC). Expansion SNC-Lavalin, Fluor Daniel. Train 3 AMEC.
Syncrude Canada Ltd. Sulphur Emission Reduction Program (SERP)
RM of Wood Buffalo (Mildred Lake)
$1,600.0 2005-2011 Under construction
Total E&P Canada Ltd. / Suncor Energy Inc.
Joslyn North Mine RM of Wood Buffalo
$6,000.0 Proposed. Application filed early 2006. ERCB conditional approval January 2011. Corporate approval to proceed expected by end of 2012.
TriStar SAGD Pilot Project RM of Wood Buffalo (S of Ft McMurray)
$100.0 Proposed
42April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Williams Canada OFF- GAS EXTRACTION PLANT MODIFICATIONS AND CONSTRUCTION OF DE - ETHANIZER
RM of Wood Buffalo and Redwater
$311.0 2011-2013 Announced
Other Industrial
Defence Construction Canada
Range Control Facility, CFB Suffield Cypress County $5.1 2011-2012 Under construction. Wahl Construction.
Defence Construction Canada
Land Force Western Area Headquarters, CFB Edmonton
Edmonton $17.0 Proposed for 2011.
Defence Construction Canada
Kitting Facility, Canadian Manoeuvre Training Centre, CFB Wainwright
Wainwright $19.5 Proposed for 2011. Cost estimate includes demolition of existing facility. Pending approval.
Defence Construction Canada
Maintenance Facility, CFB Wainwright
Wainwright $30.0 Proposed for 2011 - 2013. Tender call anticipated spring 2011.
Public Works and Government Services Canada
Lethbridge Research Centre Building 102 Exterior Envelope Replacement
Lethbridge $8.0 Proposed. Tenders close April 19.
TransAlta Corp. / TransCanada Pipelines Ltd.
'Project Pioneer' Carbon Capture and Storage (CCS) Project at Keephills
Parkland County $1,400.0 Proposed for 2012 - 2014. FEED underway.
Pipelines
Athabasca County Athabasca Regional Water Pipeline County of Athabasca
$28.0 Proposed for 2011 - 2012. From Boyle to Grassland / Wandering River.
Enbridge Inc. 'Athabasca' Pipeline Capacity Expansion 2
between Cold Lake and Hardisty
$200.0 Proposed. To be completed by early 2014.
Enbridge Inc. 'Waupisoo' Pipeline Expansion Edmonton to Fort McMuyrray
$400.0 2011-2013 Announced. Planned construction start June 2011.
Enbridge Inc. 'Norealis' Bitumen Pipeline, Husky Sunrise to Cheecham Terminal
RM of Wood Buffalo
$475.0 Proposed for 2012 - 2013.
Enbridge Inc. 'Wood Buffalo' Crude Oil Pipeline RM of Wood Buffalo
$370.0 Proposed
43April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Enbridge Inc. Pipelines and Terminal Facilities, Christina Lake Heavy Oil Project
RM of Wood Buffalo
$250.0 Proposed
Enbridge Inc. 'Athabasca' Oil Pipeline Expansion 1 RM of Wood Buffalo to Hardisty
$185.0 Proposed for 2012 - 2013. Application to be filed early 2011.
Enbridge Inc. 'Fort Hills' Bitumen / Diluent Pipelines and Terminal Facilities
RM of Wood Buffalo to near Edmonton
$2,000.0 On hold til markets improve. Originally proposed for 2010 - 2012. Pending approvals.
Enbridge Pipelines 'Woodland' BITUMEN PIPELINE RM of Wood Buffalo (Kearl to Cheecham Terminal)
$100.0 Proposed for 2011 - 2012
Enbridge Pipelines Inc. 'Northern Gateway' Bitumen and Condensate Pipelines (Alberta portion)
RM of Wood Buffalo to Alberta / BC border
$1,500.0 Proposed for 2014 - 2015. Application filed May 2010. Construction cost entire pipeline (Alberta and BC) $5.5 billion.
Enhance Energy Inc. CO2 Pipeline (Alberta Carbon Trunk Line)
near Edmonton to Camrose and Lacombe Counties
$600.0 2012-2014 Announced. Revised application submitted to ERCB November 2010.
Highway 3 Water Committee
Regional Water System Bow Island / Grassy Lake / Burdett
Cty of Forty Mile / MD of Taber
$8.5 Proposed
Inter Pipeline Fund PIPELINE SYSTEM CONNECTION UPGRADES AND EXPANSIONS
Cold Lake area $14.0 2011 Announced
Inter Pipeline Fund COLD LAKE MAIN LINE EXPANSION
Cold Lake area $11.0 2011 Announced
Inter Pipeline Fund 'Polaris Pipeline' Expansion / Extension of Existing Diluent Pipeline
Edmonton area to Kearl Lake oilsands project
$135.0 Proposed for 2010 - 2012. Planned construction start mid - 2010 pending approvals.
Keyera Corp. Pipeline and Storage Facilities central Alberta $11.0 2010 Completed
Keyera Corp. 'Carlos' NATURAL GAS PIPELINE central Alberta $30.0 2010-2011 Nearing completion
Keyera Corp. Pipeline and Connections Edmonton / Fort Saskatchewan
$58.0 Proposed
44April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Keyera Corp. Two 4KM Pipelines Connecting new ADT Facility to Fort Saskatchewan Pipeline System
Edmonton / Strathcona County
$18.0 2011 Under construction. One pipeline has been completed, the other is nearing completion.
Mountain View Regional Water Services Commission
Water Line Twinning Innisfail to Olds $34.0 2010- Under construction (Phase 1 nearing completion).
Pembina Pipeline Corp. Willesden Green Pipeline Expansion, Trunk Line Improvements and Debottlenecking
across Alberta $40.0 2011-2012 Announced
Pembina Pipeline Corp. Drayton Valley Trunk Line Extension central Alberta $6.0 Proposed
Pembina Pipeline Corp. Pipeline Debottleneck and Construction of Truck Terminals
central Alberta $11.0 Proposed
Pembina Pipeline Corp. Oil Pipeline Capacity Expansion central Alberta $23.0 2010-2011 Announced. Pipeline runs from Willseden Green to Buck Creek.
Pembina Pipeline Corp. PIPELINE REACTIVATION / RECERTIFICATION
Yellowhead County (Edson area)
$15.0 2011 Announced
Pembina Pipelines Income Fund
'Nipisi' Heavy Oil and 'Mitsue' Condensate Pipelines
Slave Lake and Whitecourt areas to Edmonton
$440.0 2010-2011 Under construction
Plains Midstream Canada (Plains)
'Rainbow Pipeline II' Butane and Condensate Pipeline
Northern Sunrise County to Strathcona County
$200.0 Proposed for 2011 - 2012.
Swan Hills Synfuels Synthetic Gas Pipeline Swan Hills to Whitecourt
$50.0 Proposed
Vermilion River Regional Water System (VRRWS)
Regional Water System Phase 1 Counties of Vermilion River, Minburn and Two Hills
$31.2 Proposed
Williams Energy 'Boreal' Natural Gas Liquids (NGL) Pipeline
Fort McMurray to Redwater
$283.0 2010-2011 Announced. $US.
45April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Power
Alberta Electric System Operator (AESO)
Rebuild of Electricity Infrastructure Drayton Valley, Wabamun, Edson, Hinton
$30.0 2010-2013 Under construction. Hinton nearing completion.
Alberta Electric System Operator (AESO)
Transmission Reinforcement, Hanna Region
east central Alberta
$1,000.0 Proposed. Stage 1 to be in service by 2012, stage 2 in service by 2017.
Alberta Electric System Operator (AESO)
TRANSMISSION LINE REBUILD (138kV)
Wetaskiwin to Didsbury
$60.0 Proposed. Project includes new substation near Didsbury and upgrades to Ponoka substation
Alberta Electric Systems Operator (AESO)
TRANSMISSION SYSTEM UPGRADE
central Alberta $206.0 Proposed. New substations near Didsbury, Ponoka and Innisfail, substation upgrades Benalto and west Lacombe.
Alberta Electric Systems Operator (AESO)
Transmission Line, Poplar Hills to Grande Prairie
County of Grande Prairie
$20.0 Proposed over five to seven years (completion between 2015 and 2017).
Alberta Electric Systems Operator (AESO)
Transmission Line MD of Greenview / Cty of Grande Prairie
$150.0 Proposed over five to seven years (completion between 2015 and 2017). Line from hamlet of Little Smoky to Grande Prairie.
Alberta Wind Energy Corp.
'Oldman River' Wind Farm (50MW) MD of Pincher Creek (NE of Pincher Creek)
$47.0 Proposed. Pending completion of transmission line Pincher Creek to Lethbridge.
Alberta Wind Energy Corp. / Mainstream Renewable Power
Two Wind Generation Projects (350MW total)
southern Alberta $840.0 Proposed. Windy Point (62MW, planned construction start 2012) and Waterton Colony.
Alberta Wind Energy Corporation / Mainstream Canada
'Oldman 2' Wind Farm (46MW) MD of Pincher Creek (NE of Pincher Creek)
$120.0 2012 Announced. Planned construction start spring 2012.
AltaLink Western Alberta Transmission Line (500kV)
Edmonton to Calgary
$1,100.0 Proposed for 2012 - 2014.. Application filed March 2011.
AltaLink South Foothills Transmission Project (240kV)
Fort Macleod to High River
$345.0 Proposed to start construction summer 2012, pending approvals.
AltaLink TRANSMISSION LINE (240kV) AND 'Chapel Rock' SUBSTATION
MD of Pincher Creek (Pincher Creek to Lundbreck)
$300.0 Proposed. Application to be filed in 2012.
46April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
AltaLink TRANSMISSION LINE (240kV) FROM CASSILS TO BOWMANTON
southern Alberta $400.0 Proposed
AltaLink Management Ltd. TRANSMISSION LINE 666L County of Newell (W of Brooks)
$8.0 Proposed. AUC approval January 2011.
AltaLink Management Ltd. RUSSELL 632S SUBSTATION MD of Pincher Creek
$17.2 Proposed. AUC approval January 2011.
ATCO Electric Transmission Line High Level to Sulphur Point
Mackenzie County (High Level to near Rainbow Lake)
$77.5 2009-2011 Completed
ATCO Power Eastern Alberta Transmission Line (500kV)
Edmonton to Calgary
$1,650.0 Proposed for 2012 - 2014.
Chickadee Creek Energy Inc. / Millar Western
Biomass Energy Project (24MW) Whitecourt $100.0 Proposed for 2010 -2012.
City of Medicine Hat Concentrating Solar Thermal Energy Demonstration Project
Medicine Hat $9.0 Proposed for 2010 - 2012
ENMAX Corp. 'Shepard Energy Centre' Natural Gas Fired Generating Plant (800MW)
Calgary $1,400.0 Proposed for 2011 - 2015. AUC conditional approval October 2010.
ENMAX Energy Corp. 'Bonnybrook Energy Centre' Power Plant (165MW)
Calgary $200.0 Proposed. Pending approvals. Planned in - service early 2013.
EPCOR Distribution and Transmission / AltaLink Management
'Heartland' Transmission Line (500kV)
Wabamun to Ind Heartland NE of Fort Saskatchewan
$387.0 Proposed. Public hearing begins April 11, 2011. Application filed with Alberta Utilities Commission (AUC) September 2010.
Greengate Power Corp. 'Radar Hill' Wind Farm (100MW) Red Deer County (between Red Deer and Pine Lake)
$200.0 Proposed
Greengate Power Corp. 'Blackspring Ridge' Wind Power Project (300MW)
Vulcan County (near Carmangay)
$700.0 Proposed for 2012 - 2013 (phase 1).
Greengate Power Corp. 'Stirling' Wind Farm (100MW) Warner County (Stirling)
$250.0 Proposed for 2011. Pending AUC approval.
47April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Greengate Power Corp. / Capital Power Corp.
'Halkirk' Wind Farm phases 1 and 2 (150MW each)
Paintearth County (near Halkirk)
$350.0 2011-2013 Announced
MAXIM Power Corp. Gas Fired Electric Plant (190MW) Lamont County (NE of Bruderheim)
$140.0 Proposed. To be built next to existing Deerland substation. Pending financing.
MAXIM Power Corp. 'Milner Expansion' Coal - Fired Generating Plant (500MW)
MD of Greenview (near Grande Cache)
$1,400.0 Proposed
Montana Alberta Tie Ltd. (MATL)
Electrical Substation near Lethbridge $6.0 2010 Under construction. SNC-Lavelin.
Naturener Energy Canada 'Prairie Home' Wind Farm Phase 2 (89 MW)
County of Warner $100.0 Proposed for 2011 - 2012
Naturener Energy Canada East Palliser Transmission Line Cypress County $100.0 Proposed
Naturener Energy Canada 'Wild Rose' Wind Farm (200MW) Phase 1
Cypress County (S of Irvine)
$400.0 Proposed. AUC approval October 2010. Dependent on approval of East Palliser Transmission Line.
Naturener Energy Canada 'Wild Rose' Wind Farm Phase 2 (162MW)
Cypress County (S of Medicine Hat)
$410.0 Proposed. Planned to be in - service in 2012.
Nexen / Joss Power 'Hand Hills' Wind Farm (80MW) Starland County (E of Delia)
$200.0 Proposed for 2010 - 2011
Otoka Energy Corp. Waste to Energy Gasification Plant (25MW)
Brazeau County (near Drayton Valley)
$100.0 Proposed construction start phase 1 in 2011. Three phases. Pending approvals.
Plasco Energy Group / Central Waste Management Commission
Plasma Gasification Plant (waste - to - energy conversion)
Red Deer County (Horn Hill Waste Transfer Site)
$93.0 Proposed for 2011 - 2012. Pending federal funding.
Suncor Energy / Teck Resources Ltd.
'Wintering Hills' Wind Farm (88MW) Wheatland County (near Drumheller)
$350.0 2010-2011 Under construction. AUC approval June 2010.
Swan Hills Synfuels Power Generation Plant (300MW) Whitecourt $500.0 Proposed. Planned construction start 2012.
The University of Calgary Cogeneration Plant (12MW) Calgary $48.0 2010-2011 Completed
48April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Trans Canada Corp. 'Saddlebrook' Natural Gas Fired Power Plant (350MW)
MD of Foothills (near High River)
$400.0 Proposed. Pending approvals.
Residential
Alberta Ronald Macdonald House
Ronald McDonald House Red Deer $12.0 2010-2011 Under construction. Timcon Construction.
Alpha - Anderson Joint Venture
Affordable Housing Project Edson $6.5 2010-2011 Announced
Amacon 'St. Albert Village' Condo Towers and Urban Village on Grandin Park Plaza Site
St. Albert $450.0 On hold. Approved by city council May 2008.
Anthem Riverfront Land Holdings
'Waterfront' Condominiums (Three Towers and Five Podiums) plus Townhouses
Calgary $750.0 On hold (sites 2 and 3). EllisDon Construction. Building 1 nearing completion.
Apex Lifestyle Communities
'Union Square' Condominium Apartment Building Phase 2
Calgary $25.0 On hold. EllisDon Construction.
Arcus Developments 'Astoria on 10th' Condominium Tower Calgary $60.0 On hold. Ledcor Construction. Original schedule 2007 - 2010
Asset Builders Corp. Row Housing Complex Sylvan Lake $6.2 Proposed
Assured Developments 'Akoya at the Bridges' Apartment Building Phase 2
Calgary $40.1 On hold.
Avalon Central Alberta 'Verde in Clearview Ridge' Townhouse Development
Red Deer $35.0 2011-2013 Under construction
BCM Developments 'The Maxx' Condominiums Edmonton $15.8 2009-2011 Completed
Bethany Group 'Brookside' Seniors Condominiums Camrose $18.0 2010-2011 Under construction. WCMI Construction Services.
Bond Street Properties 'The Bond Centre' Condominium Towers 1 and 2
RM of Wood Buffalo (Fort McMurray)
$160.0 Proposed. Pending financing.
Bosa Development / Embassy Development
Residential / Retail Complex (Three Towers), East Village
Calgary $300.0 Proposed. Construction over five to seven years.
49April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Brenda Strafford Foundation Ltd.
Affordable Housing Project (Apartment Building)
Calgary $29.0 2008-2011 Completed. Golden Triangle Construction Management.
CAIRN Corporation 'Cairn on the Boulevard' Affordable Housing Project
Grande Prairie $14.0 2011-2013 Announced
Calgary Homeless Foundation
HOME CONSTRUCTION PROJECT Calgary $24.0 Proposed
Cardel Homes 'Lighthouse Landing' Townhouses Building A5
Calgary $9.2 2010-2011 Under construction
Cardel Lifestyles 'Village at Prestwick' Building B (Apartment Building)
Calgary $6.6 Proposed
Cardel Lifestyles Prestwick Place' Apartment Buildings Calgary $20.0 2010-2011 Under construction
Carma Developers / Urban Landmarks Master Builder
'Aurora' Phase 1: Mira Condominium Tower plus Townhouses
Edmonton $325.0 2007-2011 Under construction
Carrington Properties 'L'Attitude' Condominium Apartment Building
Edmonton $15.9 2010-2011 Completed
Century Group Lands Corp.
'Liberty Junction' Apartments and Town House Complex
Red Deer County $41.5 On hold until spring 2011 (Phase 1).
Christenson Developments / Western Asset Management Group (WAM)
'Centre in the Park' Housing / Retail / Commercial Development
Strathcona County (Sherwood Park)
$230.0 2006-2011 Under construction. Can-Der Construction.
City of Calgary The Bridges Phase 2 Site 15 Affordable Housing Project (Mcpherson Place)
Calgary $18.5 Proposed
City of Camrose / Bethany Group
Wild Rose Arena Site Affordable Housing Project
Camrose $9.0 2010-2011 Under construction. WCMI Construction Services.
Cold Lake Affordable Housing Society (CLAHS)
Apartment Complex Cold Lake $5.5 On hold.
Concept Homes Row Housing Development Edmonton $11.0 Proposed
50April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Concord Pacific Inc. Condominium Apartment Building and Townhouses, Eau Claire
Calgary $30.0 On hold pending a shift in the economy.
Cove Properties 'Monarch at Mackenzie' BUILDING 1 PHASE 2
Calgary $7.4 Proposed for 2011 - 2012
Cove Properties 'Nuera 2' Apartment Building Calgary $31.0 Proposed for 2011 - 2012
Cove Properties Ltd. 'Monarch at Mackenzie Towne' Condominium Apartment Building
Calgary $25.0 Proposed
Devonian Properties 'Longboat Landing' Townhouses and Apartments
RM of Wood Buffalo (Fort McMurray)
$560.0 Proposed (phase 2 and phase 4 onwards). Earthworks and deep services anticipated to be completed by early 2013.
Devonian Properties 'Longboat Landing' Earthworks and Deep Services
RM of Wood Buffalo (Ft McMurray)
$90.0 2010-2012 Under construction
Diamond Trust Development
'Sky Tower' Apartment Building Calgary $47.8 On hold. ITC Construction Group.
Edmonton YMCA Boyle Renaissance Phase 1 --'Welcome Village' Affordable Housing and Community Centre
Edmonton $42.2 2010-2012 Under construction. Clark Builders.
Evolution by Greenboro 'Origins at Cranston' APARTMENT CONDOMINIUM BUILDING
Calgary $5.6 Proposed
Evolution by Greenboro 'Valour Park' TOWNHOUSE COMPLEX
Calgary $5.0 Proposed
Greater Edmonton Foundation
Rosslyn Place Apartment Building Addition (New Building)
Edmonton $10.0 2010-2011 Nearing completion. Delnor Construction.
Grosvenor Canada Ltd. 'Drake' Apartment Building Calgary $12.0 Proposed
Habitat for Humanity / Trico Homes
TOWNHOUSES Calgary $13.5 Proposed
Hawthorne Homes 'Mosaic Cranston' Townhouses Calgary $20.0 2010-2012 Under construction
Homburg - Centron Teamworks
Kai Mortenson Towers (Two Residential Towers)
Calgary $130.0 2010-2012 Under construction (tower 1 Oslo parkade). Centron Construction. Construction of tower expected to start spring 2011.
51April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Homes by Avi Townhouses Calgary $7.0 Proposed
Horizon Housing Society AFFORDABLE HOUSING Calgary $9.0 Proposed
IMC Construction Condominium Building Sylvan Lake $5.2 2010-2011 Announced. Planned construction start spring 2010.
Intergulf Cidex 'Treo Beacon Heights' Apartment Building 1
Calgary $7.2 Proposed
Intergulf Cidex 'Treo Beacon Heights' Apartment Building 4
Calgary $6.3 Proposed
Intergulf Cidex 'Treo Beacon Heights' Apartment Buildings 2 and 3
Calgary $6.4 Proposed
Jarvis Bay Developments 'The Savanna' Condominium Complex
Sylvan Lake $20.0 Proposed. Scope of work revised.
Kanas Corporation Apartment Building Calgary $11.1 Proposed
Kanas Corporation Lumino Building C Condo Apartment Building
Calgary $9.0 Proposed for 2011 - 2012.
Kanas Corporation 'Lumino West' Affordable Housing (Apartment Building)
Calgary $11.1 2010-2011 Nearing completion
Kanas Corporation Lumino Building B Apartment Building
Calgary $14.8 2011-2012 Under construction
Lake Placid Developments 'Centuria on the Park' Condo Apartments
Calgary $27.0 Proposed to bring building to grade by March 2011.
Leaside Development Corp.
'Cornerstone Village' Residential Development (Apartment Building and Villa Bungalows)
Olds $50.0 2008-2011 Under construction (phase 2). Four phases. Phases 3 and 4 apartment condominiums.
Libbie Young Centre SUPPORTIVE LIVING UNITS AND COMMUNITY CENTRE
Lloydminster $5.0 2011-2012 Announced. Tender closes April 14.
Luxe Developments Condominium Apartment Building Calgary $32.0 On hold
Luxe Developments 'Vida' CONDOMINIUM APARTMENT BUILDING
Calgary $6.3 2010-2011 Under construction
52April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Medican Developments 'Canvas at Millrise' Condo Building Postfire Renovations
Calgary $12.0 2010-2011 Completed
Medican Developments 'Sierras of Michener Hill' Condominium Complex Phase 1
Red Deer $8.5 2009-2011 Nearing completion
Monarch Group (took over from Medican Developments)
'Axxess' and 'Reflections' Condo Complexes, Beacon Hill
Sylvan Lake $8.1 2008-2011 Under construction. Title to Axxess project transferred to Monarch Land Development.
Mustard Seed Ministry Affordable Housing Tower (Apartment Building)
Calgary $60.0 2011-2012 Announced. Clark Builders. Planned construction start July.
North Peace Housing Foundation
Affordable Housing Project Peace River $7.0 Proposed for 2010 - 2011.
Park Place Communities Row Housing Complex, Schonsee Edmonton $7.5 Proposed
Perera Shawnee Ltd. 'Highbury Tower Residences' Condominiums Phase 2
Calgary $40.5 On hold. Perera Development Group.
Perera Shawnee Ltd. 'Highbury Tower Residences' Condominiums Phase 3
Calgary $32.0 On hold. Originally proposed for 2011 - 2013
Pointe of View Development
'Rocky View Pointe' Condo Apartment Building
Cochrane $25.0 Proposed
ProCura Real Estate 'Mayfair Village' Highrise Apartment Complex phase 1 (South Tower)
Edmonton $56.5 2010-2011 Under construction. Clark Builders.
ProCura Real Estate Services
'Azure' Condo Complex Phase 1 Edmonton $6.5 Proposed.
ProCura Real Estate Services
'Mayfair Village' North (Second) Tower
Edmonton $100.0 Proposed. Clark Builders.
Qualex - Landmark Group 'Luna' Condominium Apartment Building
Calgary $50.0 2010-2011 Under construction. Intertech Construction Group.
Schizophrenia Society of Alberta
'Iris Court' Affordable Supportive Living Facility
Edmonton $5.1 On hold.
Source Development Corp.
'Manchester Station' Condo Apartments
Calgary $25.0 On hold.
53April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Statesman Group of Companies
'Riverside Quays' Condominium Apartments Phase 5
Calgary $28.0 Proposed for 2012 - 2013.
Statesman Group of Companies
'Riverside Quays' Condo Apartments and Townhouses Phase 4
Calgary $18.0 Proposed for 2012 - 2013. Planned start within a year after completion Phase 3.
Statesman Group of Companies
'Landings at Cougar Ridge' Townhouse Development
Calgary $30.0 2010-2012 Announced. Planned construction start spring 2011.
Streetside Development Townhouses and Condo Apartments Calgary $28.0 2011-2013 Under construction
Streetside Development Corp.
'Pefect Fit' CONDOMINIUM APARTMENT BUILDING
Calgary $12.5 Proposed. In redesign
Streetside Developments 'Ginger Park' Townhouse Complex (Buildings S,T,V,X,Y)
Calgary $6.8 Proposed
Swerve Living 'Swerve Living' Condominium Building
Red Deer $9.5 Proposed. Pending funding.
Unity Builders Group 'Wilderness Ridge' Buildings A, B, C, D Rebuild after 2009 Fire
Canmore $15.0 2010-2011 Completed
Urban Landmarks 'The Britnell' Apartments (Two Buildings)
Edmonton $20.5 On hold. Urban Landmarks.
Valour Place Society 'Valour Place' APARTMENT HOUSING FOR MILITARY DURING REHABILITATION / TREATMENT
Edmonton $10.0 Proposed
Westcorp Inc. 'London at Heritage Station' Condominium Towers
Calgary $200.0 2006- Under construction. Towers 1 and 2 completed. To be built in five stages.
Wimco Properties Ltd. 'Elk Island View - Heron Place' Condominium Apartment Building
Lamont $6.0 On hold. Wimco Construction Ltd. Project expected to start after Motel 6, pending improved market conditions.
Wimco Properties Ltd. 'Elk Island View - Swan Place' Condominium Apartment Building
Lamont $6.0 On hold pending improved market conditions.
Wood Buffalo Housing and Development Corporation
'Hawthorne Heights at Eagle Ridge' Townhouses and Apartment Condos
RM of Wood Buffalo (Fort McMurray)
$45.0 2009-2011 Completed
54April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Wood Buffalo Housing and Development Corporation (WBHDC)
'Stony Mountain Plaza' Affordable Housing Project
RM of Wood Buffalo (Fort McMurray)
$32.0 Proposed
Woodfine Developments 'Fusion Plaza' Apartments Phase 1 Grande Prairie $45.0 On hold indefinitely.
Telecommunications
City of Grande Prairie Outdoor Wireless Network Initiative Grande Prairie $6.0 Proposed
TELUS 2011 NETWORK EXPANSION / ENHANCEMENT
across Alberta $650.0 2011 Announced. Fibreoptic lines and cellphone towers.
Tourism/Recreation
Alberta Infrastructure Royal Alberta Museum Renewal / Expansion Phase 1
Edmonton $147.0 Proposed. Bird Construction. Project re-design underway.
Alberta Tourism, Parks and Recreation
Parks Infrastructure Projects 2009-2011
across Alberta $5.4 2009-2011 Completed
Argyll Velodrome Association
Indoor Velodrome and Multi-Use Sports Facility
Edmonton $32.0 Proposed for location by Peter Hemingway Pool
BCP Construction Hotel Blackfalds $7.5 Proposed
Bear Development Corp. Hotel Sylvan Lake $7.0 2010-2011 Completed
Bearspaw - Glendale Community Association
SPORTS FACILITY Rocky View County (Bearspaw)
$6.0 Proposed for 2011 - 2012. Phased development.
Calgary Exhibition and Stampede
'Western Event Centre' Agriculture Arena and Exhibit Hall
Calgary $65.0 Proposed for 2012 - 2014. Part of Stampede Park $400M expansion.
Calgary Science Centre New 'Telus World of Science Calgary' Science Centre
Calgary $69.8 2009-2011 Under construction. Cana Construction. Location near Calgary Zoo.
Calgary Winter Club PHASE 1 - ADDITION Calgary $14.0 2011-2012 Under construction. Chandos Construction.
Calgary Zoo 'Antarctic Landing' Penguin Exhibit Calgary $24.5 2010-2011 Nearing completion. Ledcor Construction.
Cantos Music Foundation King Edward Hotel Redevelopment and Cantos at the King Eddy National Music Centre
Calgary $125.0 Proposed. Museum, recording studio and music centre.
55April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Carlson Hotels Radisson Calgary Airport East Hotel and Conference Centre, near Calgary Airport
Calgary $19.0 2011-2012 Announced. Anticpated construction start spring 2011.
Chateau Inn Ltd. Best Western Hotel Sylvan Lake $10.0 2010-2011 Nearing completion
Chinatown and Little Italy Business Association
MUSEUM AND CULTURAL HERITAGE CENTRE
Edmonton $6.0 Proposed
City of Airdrie Genesis Place Phase 3 (Twin Ice Arena, Meeting and Multi-Use Space)
Airdrie $18.0 Proposed
City of Calgary Devonian Gardens Renovation Phase 2
Calgary $14.5 Proposed. Project will be completed as a continuation of Phase 1.
City of Calgary Brighton Athletic Park (four soccer fields)
Calgary $8.0 Proposed. Part of city's ten - year infrastructure plan (2008 - 2017)
City of Calgary Development of Lynnview Ridge as Parkland, Golf Course
Calgary $22.0 Proposed
City of Calgary Centennial Arena Expansion Calgary $17.0 2010-2011 Completed. Cana Construction.
City of Calgary / Calgary Soccer Federation
'Fields for Life' Artificial Turf Soccer Fields
Calgary $13.0 Proposed. Fundraising underway.
City of Calgary / Seton Sport Recreation Culture and Wellness Society
Recreation Centre, Seton Calgary $70.0 Proposed
City of Calgary / South Fish Creek Recreation Association
South Fish Creek Recreation Centre Expansion (Two Ice Surfaces)
Calgary $21.0 2010-2011 Under construction. Chandos Construction.
City of Calgary / YMCA / Martindale Community Association / United Way / Genesis Land Development Corp.
Genesis Centre of Community Wellness
Calgary $66.0 2009-2011 Under construction. Stuart Olson Constructors.
City of Cold Lake Community Event Centre Phase 1 at the Energy Centre
Cold Lake $15.3 2010-2012 Under construction. Scott Builders. Stage 1 is the hockey rink. Stages 2 / 3 second hockey rink and additional facilities. Estimated cost phases 1 and 2 range $20M to $25M.
56April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
City of Cold Lake COLD LAKE ENERGY CENTRE PHASE 2 (COMMUNITY EVENT CENTRE)
Cold Lake $20.0 2010-2012 Under construction. Scott Builders.
City of Edmonton Recreation Centre / Library, Meadows
Edmonton $80.0 Proposed for 2011-2013.
City of Edmonton Multi - Purpose Facility, Clareview Edmonton $90.0 Proposed. Renovation / expansion of Clareview Twin Arenas, plus new library, Catholic high school.
City of Edmonton Outdoor Pool, Kinsmen Park (Replacement for Queen Elizabeth Pool)
Edmonton $5.5 2009-2011 Nearing completion. Jen - Col Construction.
City of Edmonton North Centre Community Recreation Centre, Commonwealth Stadium
Edmonton $95.0 2009-2012 Under construction. Clark Builders. Field house completed.
City of Edmonton 'Polar Extremes Arctic Shores' Sea Mammals (Pinniped) Exhibit, Valley Zoo
Edmonton $15.0 2010-2011 Under construction. PCL Construction.
City of Edmonton Valley Zoo Entrance and Wander Path Project
Edmonton $35.0 2011-2012 Announced. Planned construction start August 2011.
City of Fort Saskatchewan JUBILEE RECREATION CENTRE RENOVATIONS
Fort Saskatchewan
$7.0 Proposed. To be undertaken after Sportsplex renovations.
City of Grande Prairie Dave Barr Arena Expansion Grande Prairie $14.0 on hold
City of Grande Prairie Aquatics and Wellness Multiplex Grande Prairie $98.2 2009-2011 Under construction. Wright Construction Western Inc. Part of the Community Knowledge Campus.
City of Grande Prairie Prairie Art Gallery Restoration Grande Prairie $10.0 2010-2011 Under construction. Chandos Construction.
City of Lethbridge Two Sheet Ice Arena, West Lethbridge
Lethbridge $19.0 Proposed for 2011 - 2012. Tender call general contractor possible spring 2011.
City of Lethbridge North Lethbridge Regional Park Lethbridge $15.0 Proposed for completion by 2017. Estimated cost range $15M to $20M.
City of Lethbridge Community Arts Centre Lethbridge $12.6 Proposed for 2012. Tenders close April 7.
City of Lethbridge ENMAX Centre Renovations / Expansion
Lethbridge $33.7 2009-2012 Under construction. Ward Bros Construction.
57April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
City of Medicine Hat Regional Event Centre, Box Springs Business Park
Medicine Hat $89.8 On hold.
City of Red Deer Rotary Recreation Park Phase 2 Red Deer $23.0 Proposed for 2011 - 2012. Conversion of current museum to accommodate the Golden Circle Seniors Centre.
City of St. Albert Redevelopment Red Willow Park West
St. Albert $11.0 On hold
City of St. Albert Riel Park Reclamation Phase 2 St. Albert $8.5 2010-2011 Nearing completion
City of Wetaskiwin / County of Wetaskiwin
Aquatic Facility Wetaskiwin $18.6 Proposed
Clearwater County Multi - Use Trail Clearwater County (Rocky Mtn House to Nordegg)
$6.8 Proposed
County of Grande Prairie Regional Sportsplex (Twin Ice Arena and Soccer Pitch)
County of Grande Prairie (Clairmont)
$26.0 2011-2012 Announced. Kaldon Construction.
Dolemo Developments 'Edworthy Club' Health Club Calgary $1,000.0 Proposed. Spa, squash courts, hockey rinks, movie theatre and condo hotel.
Dub Architects Ltd. Redevelopment of Alberta Hotel Edmonton $15.0 2009-2011 Nearing completion
Edmonton Korean Community Centre Foundation
Multicultural Centre, Ellerslie Edmonton $8.4 Proposed
Edmonton Minor Soccer Association
Soccer Facility (27 to 29 Playing Fields)
Parkland County $6.0 Proposed to start construction 2012. Phased project over several years.
Edmonton Volleyball Centre / Edmonton Grads Basketball Centre / Ortona Gymnastics Club
GO Community Centre Court Sports Complex
Edmonton $36.0 2010-2011 Under construction. Clark Builders.
Fort Edmonton Foundation
'Spirit of the First Nations' Aboriginal Village, Fort Edmonton Park
Edmonton $15.0 Proposed.
58April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Fort Edmonton Historical Foundation
Fort Edmonton Park Renovations / Revitalization (Capitol Theatre)
Edmonton $13.9 2010-2011 Under construction. PCL Construction.
Hilton Hotels Homewood Suites Extended Stay Hotel
Calgary $36.3 2010-2012 Under construction. Chamberlain Construction Services.
Innoka Point Resort Corp. Innoka Resort Canmore $15.0 2010-2012 Under construction. Phased development (five buildings).
Louis Bull Tribe Casino Wetaskiwin County
$12.0 Proposed. Pending approvals.
Marmot Basin New High Speed Ski Lift (Paradise Express) and Relocation of Paradise Triple Chair
Jasper National Park
$7.0 2011 Announced
Marriott Hotels Marriott Calgary Airport Calgary $21.8 2010-2011 Completed. Graham Construction.
Marriott Hotels and Resorts
Marriott Hotel RM of Wood Buffalo (Fort McMurray)
$20.0 Proposed
Mayfield Hospitality Hotel and Convention Centre Medicine Hat $25.0 Proposed. Contingent on Regional Event Centre.
MD of Foothills / Dunbow Recreation Board
Indoor Arena next to Heritage Heights School
MD of Foothills $5.8 Proposed
Parks Canada Infrastructure Upgrades Banff National Park
$9.7 Proposed. Projects include Cave and Basin parking lot, roadwork in Banff, washrooms at C&B and Johnston Canyon, improvements to Banff Museum exterior, Sulphur Mtn boardwalk repairs.
Parks Canada Cave and Basin National Historic Site Renovations
Banff National Park (Banff)
$13.8 2010-2012 Announced.
Parks Canada Waterton Lakes National Park Upgrades and Repairs
Waterton Lakes National Park
$9.4 2009-2011 Under construction
Parks Foundation Calgary Perimeter Pathway System (Beltway) Calgary $50.0 2010- Under construction. Multi-year project.
Pipestone Creek Dinosaur Bed Project Committee
'River of Death and Discovery' Dinosaur Centre
Wembley $26.4 2011-2012 Announced. Expected RFP for general contractor early spring 2011.
59April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Platinum Investments Inc. Marriott Courtyard Hotel, Edmonton West
Edmonton $7.5 2010-2011 Completed
Pomeroy Inn & Suites / Olds College
Hotel at Olds College (Part of Canadian Institute for Rural Entrepreneurship)
Olds $12.0 Proposed for 2011 - 2012.
Pumphouse Theatre Theatre Expansion Phase 1 Calgary $10.5 On hold
Red Deer Curling Club Building Renovation Red Deer $5.6 2011 Under construction
Regional Municipality of Wood Buffalo
2011 PARKS PROJECTS RM of Wood Buffalo
$22.0 2011 Announced
Regional Municipality of Wood Buffalo
Anzac Leisure Facility RM of Wood Buffalo (Anzac)
$24.0 Proposed. Possible construction start spring 2011.
Regional Municipality of Wood Buffalo
Performing Arts Centre, MacDonald Island Park
RM of Wood Buffalo (Fort McMurray)
$10.0 Proposed. Feasibility study to be done.
Regional Municipality of Wood Buffalo
Athletic Field, Timberlea High School Site
RM of Wood Buffalo (Ft McMurray)
$15.0 2011-2012 Under construction. Wilco Contractors NW.
River Valley Alliance North Saskatchewan River Valley Trail Phase 1
Devon to Fort Saskatchewan
$110.0 Proposed
Royal Canadian Legion, Kingsway Branch #175
New Legion Building Edmonton $8.7 2010-2011 Nearing completion. PCL Construction.
Strathcona County Recreation Complex Addition / Renovation
Strathcona County (Ardrossan)
$17.1 2010-2011 Completed. Delnor Construction.
Strathcona County Broadmoor Golf Club Addition / Modernization
Strathcona County (Sherwood Park)
$5.1 2010-2011 Under construction. Atkinson Construction.
Strathcona County Millennium Place Expansion Strathcona County (Sherwood Park)
$8.4 2010-2011 Under construction. Delnor Construction.
Temple REIT Refurbishment of Capri Centre as Sheraton Hotel
Red Deer $8.0 2011 Announced
60April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
The Friends of Medalta Society
Medalta Site Restoration, Historic Clay District
Medicine Hat $7.5 2009-2011 Under construction
The Titan Entertainment Group Inc.
'The Titan Project' Entertainment Venue
Rocky View County (Balzac)
$40.0 Proposed for completion in late 2011 or early 2012.
Town of Banff Recreation Centre Redevelopment Phases 1 and 2
Banff $31.0 2009-2011 Completed. Stuart Olson Dominion Construction.
Town of Beaumont Centre Communautaire Beaumont Community Centre (CCBCC)
Beaumont $6.2 Proposed. Project has been placed in the Town's 10-year capital plan.
Town of Beaverlodge New Indoor Pool / Community Centre Beaverlodge $11.6 2010-2012 Under construction.
Town of Blackfalds Fieldhouse (Recreation Facility) Blackfalds $8.0 Proposed. Pending funding.
Town of Canmore Multiplex Canmore $31.4 2011-2012 Announced. Graham Construction and Engineering. Will include library, daycare, aquatics facility, climbing wall, retail space, administration space and community space.
Town of Cochrane New Aquatic Facility Cochrane $26.0 Proposed. Feasibility study completed.
Town of Drumheller Badlands Community (Multi - Use) Facility Phase 1
Drumheller $14.0 2010-2011 Under construction. Dawson Wallace Construction.
Town of Grande Cache Recreation Centre Expansion / Revitalization
Grande Cache $19.8 2009-2011 Completed. Chandos Construction.
Town of Grimshaw Community Multiplex Grimshaw $16.0 2010-2011 Nearing completion. Cormode & Dickson Construction. Arena, fitness centre, walking track and field house.
Town of High River New Recreation Facility High River $20.0 Proposed. No construction expected in 2011.
Town of Mayerthorpe Hockey Arena (Exhibition Centre) Mayerthorpe $5.2 2010-2011 Nearing completion. Chandos Construction.
Town of Morinville Community Cultural Centre Morinville $11.0 2010-2011 Nearing completion. PCL Construction.
Town of Slave Lake Arctic Ice Centre Upgrades and Fieldhouse
Slave Lake $11.9 2010-2011 Under construction. Jen-Col Construction.
Town of Westlock / Westlock County
Westlock 'Spirit Centre' Sports Complex
Westlock $12.6 2010-2011 Under construction. Brenex Construction.
61April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Project Sector/Company Name
ProjectDescription
ProjectLocation
Cost in $ Millions
ConstructionSchedule Remarks
Trestle Creek Golf Resort RV Resort, Recreation Centre, Equine Centre, Sports Park and 27 Hole Golf Course
Parkland County $30.0 Proposed for 2010 - 2014. Construction schedule is for golf course. First nine hole to be completed for play in summer 2011.
United Horsemen of Alberta
Horse Racing Complex Phase 1 Rocky View County (near Balzac)
$35.0 Proposed for 2011 - 2012.
Village of Standard / Standard Community Hall Association
New Community Hall Wheatland County (Standard)
$6.0 Proposed construction start spring 2011. Fundraising underway.
Winsport Canada Canada Olympic Park Facility Expansion and Upgrade
Calgary $322.0 2007-2011 Under construction. Cana Construction. Freestyle ski area completed. Athletic and ice complex.
Winsport Canada Olympic Oval Roof Restoration Calgary $8.0 2011 Announced
62April 01, 2011 Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column
Alberta Finance and Enterprise 4th Floor Commerce Place 10155-102 Street Edmonton, AB T5J 4L6 Canada Telephone: 780.427.6787 Fax: 780.422.0061 Website:www.albertacanada.com
You can access the Inventory of Major Alberta Projects and the following related department publications on the Internet at: http://albertacanada.com/about-alberta/statistics-and-publications.html : ♦ Alberta Oil Sands Industry Quarterly Update ♦ Monthly Economic Review ♦ Highlights of the Alberta Economy ♦ Facts on Alberta ♦ Place-to-Place Price Comparison Survey
© 2011 Government of Alberta ISSN: 1702-2851 ISSN: 1718-1399 (pdf)
Printed in Canada