N ISO 90 01-2000 CERTIFIED COMP NY
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 1/142
N ISO 9001-2000 CERTIFIED COMP NY
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 2/142
ROUDLY AN ISO 9001:2000
CERTIFIED COM ANY
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 3/142
COM ANIES ROFILE
FIRMS NAME :
M/s S.M.Asghar ( vt) Limited
n ISO 9001:2000 Certified Company
COM LETE ADDRESS : 908-910, 9
th
Floor, Chapal
laza, Hasrat Mohani Road
Off I.I.Chundrigar Road
Karachi.
COR ORATE STATUS OF FIRM : RIVATE LIMITED.
TELE HONE NO : 00+ 92+21+32468091 -5
FAX NO : 00+92+21+32468090.
FIRMS CUSTOM HOUSE LICENCE NO : 714. (Copy Enclosed).
DATE OF REGISTRATION WITH : 30-03-1980.
CUSTOMS
E- MAIL ADDRESS : [email protected]
E- MAIL ADDRESS : [email protected]
Web- age : http://www.smasghar.com.pk
DATE OF ISSUE OF LICENCE : 30-03-1980.
NUMBER OF STAFF EM LOYED : 20.
YEAR OF ESTABLISHMENT : 1980.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 4/142
EO LE BEHIND THE COM ANY
SYED KHALID JAMAL : CHIEF EXECUTIVE.
SYED SAJID JAMAL : DIRECTOR PROJECTS & COMM DIV
SYED MOHAMMAD ALI KHALID : DIRECTOR
MOHAMMAD ANWER : HEAD OF PORT OPERATIONS.
MOHAMMAD FAYYAZ KHAN : INCHARGE EXPORT DIVISION
MOHD SHARIF KHAN : HEAD OF CUSTOMS DIVISION.
S.IMDAD ALI.ZAIDI : HEAD OF PORT QASIM DIV.
MOHD SALEEM : ASST PORT OPERATION.
MOHD JAVED : ASST PORT OPERATION.
QAZI KHURSHID AHMED : HEAD OF AIRPORT DIV.
SALEEM NOOR : ASST. AIRPORT OPERATIONS
AFTAB AHMED : CO-ORDINATOR SHIPPING COMPANY
SAEED KHAN : HEAD OF COMPUTER DIVISION
DILSHAD A. SIDDIQUI. : MANAGER FINANCE
ASIF KHAN : ASST. MANAGER FINANCE
ATIA FASIAL : ASST. OFFICE CO-ORDINATOR
SYED ADNAN ALI : INCHARGE GD PREPARATION (BY AIR)
ASAD ABBAS : ASST.BILLINGS & ACCOUNTS
MOHSIN KHAN : FIELD OFFICER.
SADDAM HUSSAIN : FIELD OFFICER.
SULEMAN : OFFICE PEON.
USMAN GHANI : OFFICE PEON.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 5/142
SECTION 1 : INTRODUCTION
SECTION 2 : SCOPE OF WORK
SECTION 3 : DOCUMENTATION
REQUIREMENTS
SECTION 4 : PROJECT REFERENCES
SECTION 5 : PICUTRE GALLARY
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 6/142
S.M.ASGHAR ( VT) LIMITED
908-910, 9
th
Floor, Chapal laza, Hasrat Mohani
Road, Off I.I Chundrigar Road, KARACHI
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 7/142
We have a pleasure to give a brief introduction of our Company
M/s. S.M.Asghar (Pvt) Limited , a name famous for its credibility,
reliability & commitment in this part of world.
We are proudly an ISO 9001-2000 Certified Company.
We are among the few & pioneer company who got theISO Certification in Custom Clearance in Pakistan.
With our background experience, M/s. S.M.Asghar (Pvt) Limited
has been able to developed systems and a general flexibility ofapproach tailored & personalized solutions to our Clients most ComplexRequirements that we believe is unparalleled by any competitors.
Most important our customers are able to deal with an InternationalNetwork who can arrange the movement and supervisionof cargo from Europe, and beyond, whilst they onlyinstruct one control office. This International Strengthand wealth of experience combined with a genuinely personalapproach we feel makes us a formidable contender.
Our Credentials our Enthusiasm and our Track Record speak forthemselves.
For over the last 15 Years, M/s. S.M.Asghar (Pvt) Limited have developed & specializes and simultaneously Transformitself into a PROJECT CLEARANCE SPECIALIST.
If one can give a brief look at the Pakistan’s Most Advanced
& the Important Industrial Estate PORT BIN QASIM, by the Grace Of All Mighty Allah it is an Honor for
M/s. S.M.Asghar (Pvt) Limited to perform the Complete Custom
Clearance & the Logistics Support in the form of Local Transportation tothese Prestigious Projects.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 8/142
We are pleased to inform you that by the Grace of All mighty Allah, currently we are Handling Projects for valuing more orless US $ 1.2 Billion Dollars.
You will appreciates that in all of the Projects mentionedbelow we have taken various Exemptions & benefits ofvarious SRO’s from Customer to Customer& on Project to Project Basis.
With our background experience, M/s. S.M.Asghar (Pvt) Limited
has successfully completed all the major & PrestigiousProjects of National Importance as well asInternational Importance.
We on merit got the benefit of various ConcessionarySRO’s & Exemptions to our valued Customer to theirEntire satisfaction & without any problems and difficulty.
Our team of professionals sits with the Customer priorto the start of the Project/Projects & developed systemsand a general flexibility of approach tailored to ourClients most Complex of requirements.
We believe that our Professional approach to ourClient is unparalleled by any competitors.
Few of the recent Projects & Customer References
are given below, for whom we have claimed the various SRO’s& Exemptions to our valued Customer to their entiresatisfaction.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 9/142
MOL MAKORI GAS FIELD SRO: 678(I)/2004, DT: 07-08-2004
GHAMBAT SOUTH GAS PROCESSING FACILITY (GPF II)PROJECT OF PAKISTAN PETROLEUM LIMITED (PPL)
SRO: 678(I)/2004, DT: 07-08-2004
Petrosin Ravi SRO: 678(I)/2004, DT: 07-08-2004
SHELL GAS
SRO: 678(I)/2004, DT: 07-08-2004
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 10/142
SHV ENERGY PAKISTAN Various Equipments & Material Including Break Bulk LPG Mixture
SRO: 678(I)/2004, DT: 07-08-2004
Expansion of Plant: RAVI GAS SRO: 678(I)/2004, DT: 07-08-2004
WEATHERFORD DRILLING
SRO: 678(I)/2004, DT: 07-08-2004
Petrosin Engineering (One of the Largest Private Sector Project US $ 700 Million Dollars)
SRO: 678(I)/2004, DT: 07-08-2004
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 11/142
TRANSASIA REFINERY LTD (Re-Location) (One of the Largest Private Sector Project US $ 700 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
INDUS REFINERY LTD (Re-Location) (Another Largest Private Sector Project US $ 650 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESALINATION & POWER PROJECT” at DHA Karachi (Total Cost of the Project US $ 160 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi
EXPANSION PROJECT & NEW GANTRY CRANE(Total Cost of the Project US $ 400 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 12/142
MIRANI HYDRO POWER DAM PROJECT (The Project Cost US $ 80 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
SATPARA HYDRO POWER DAM PROJECT (The Project Cost US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
MANGLA RAISING HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
MANGLA RAISING HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 13/142
GOMAL ZAM HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DUBER KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
KHAN KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I (The Project Cost US $ 45 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 14/142
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II (The Project Cost US $ 20 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
PROGAS LPG STORAGE & HANDLING TERMIANAL (Private Sector Project US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES (The Second Expansion Phase Project US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
PETROSIN ENGINEERING (Pvt) LTDQADIRPUR 600 MMSOFD EXPANSION PROJECT
(The Project Cost US $ 6 Million Dollars)
SRO: 678(I)/2004, DT: 07-08-2004
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 15/142
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIR
BHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD(The Project Cost US $ 14 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENT
PROGRAM FOR ERRA(The Project Cost US $ 300 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
ALSTOM PAKISTAN LIMITEDFUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.(The Project Cost US $ 20 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 16/142
ALSTOM PAKISTAN LIMITEDZHORLU WIND POWER ( Heavy Transformers)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.
SRO: 575(I)/2006, DT: 05-06-2006
FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN.( The Project Cost US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERINGSETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1
(The Project Cost US $ 130 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 17/142
DESCON ENGINEERINGSETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2
(The Project Cost US $ 130 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERINGSETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)
(The Project Cost US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 18/142
VARIOUS PORTS AT KARACHI
Qasim International Container Limited (QICT) Karachi Port Trust Head office (KPT)
Pakistan International Container Limited (PICT) Karachi International Container Limited (KICT)
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 19/142
Among The restigious rojects At
ort Bin Qasim Few Are Listed below
PARCO WHITE OIL PIPE LINE PROJECT BY CHINA PETROLEUM(The Contractor for PARCO Project Cost US $ 300 Million Dollars)
ICI PTA T-11(The Largest Private Sector Project US $ 480 Million Dollars)
Engro Vopak Terminal Ltd (VCM Tank Farm)
Engro Vopak Terminal Ltd (MEG Tank Farm)
Engro Vopak Terminal Ltd (LPG Tank Farm)
Engro Vopak Terminal Ltd (PARAXYLENE Tank Farm) (Total Investment by Single Largest Group in the Private Sector over US $ 30 Million Dollars)
PROGAS LPG STORAGE & HANDLING TERMINAL(Private Sector Project US $ 50 Million Dollars)
INDUS REFINERY LIMITED(Another Largest Private Sector Project US $ 750 Million Dollars)
TRANASIA REFINERY LIMITED(Another Largest Private Sector Project US $ 800 Million Dollars)
FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES(The Second Expansion Phase Project US $ 30 Million Dollars)
CHINA HARBOR ENGINEERING(The Contractor for EVTL for the EVTL JETTY Private Sector Project US$ 4 Million Dollars)
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 20/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 21/142
Hydro ower Sector
The Government of Pakistan since last 8 Years initiated fewHydropower Power & Dam Projects to overcome the Power Break downCrisis.
Among these Projects of National Importance includes:-
MIRANI HYDRO POWER DAM PROJECT
(The Project Cost US $ 80 Million Dollars)
SATPARA HYDRO POWER DAM PROJECT(The Project Cost US $ 30 Million Dollars)
MANGLA RAISING HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
GOMAL ZAM HYDRO POWER DAM PROJECT
(The Project Cost US $ 100 Million Dollars )
DUBER KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
KHAN KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
ALAI KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
We have privilege to be associated in all the above Hydro PowerProjects.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 22/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 23/142
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II (The Project Cost US $ 20 Million Dollars)
M/s S.M.Asghar (Pvt Limited also have a privilege of Handling
02 chartered flights carrying main booster pumps weighing over 100 Tons by Air for PARCO White Oil Pipeline Project.
We also have a privilege of handling one of the Heaviest and Length WisePiece in History of Pakistan which Weights 265 M/tons and Length
Approx.76 Meters.
REQUIRED FOR CUSTOM CLEARANCE
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 24/142
SCOPE OF WORK
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 25/142
BENEFIT OF VAVARIOUS
CONCESSIONARY
SRO’s & EXEM TIONS
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 26/142
RE ARATION BEFORE ARRIVAL
OF VESSEL
Upon receipt of the written instruction from the Importer /Representatives of the Importer , we will be in close contact with theshipping Company in order to ascertain the expected arrival date( ETA ) of the Ocean going Vessel at the Un-loading Port of theCountry.
CONFIRMATION OF THE ARRIVAL
OF VESSEL:-
We shall inform the arrival and the berthing date of the vesselto the Importer / Representatives of the Importer in order to keep aclose Loop for the berthing of the vessel.
CUSTOM CLEARANCE:
We shall collect in full advance all thenecessary documents for the onward CustomClearance from the Importer /Representatives of the Importer whenintimated and will prepare GD and all therequired documents and formalities to be
submitted to the related Custom Authority andWill Complete the preparation of the GD (Goods Declaration) as perInvoice, Packing List & Bill Of Lading depending on weather the Vesselhas arrived and also subject to the Lodging Of Manifestation of IGM(Import General Manifest) by the Shipping Company / Shipping Agent.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 27/142
OBTAINING THE DELIVERY ORDER:
We shall complete all the formalities required by the relative Shipping Agent /
Main Carrier Agent/ relevant Port Authority and will obtain the DeliveryOrder from the Shipping Company/ OR their Agent against the
presentation/ submission of Original Bill of Lading.The delivery Order's are generally issued after filing of IGM in order toascertain the goods have not been Transshipped.
NECESSARY ASSISTANCE:
We shall provide all necessary Assistance andConsultancy Services Concerning Custom Clearance tothe Importer / Representatives of the Importer.
AIR CARGOES:
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 28/142
We shall also perform the Works Related to the Air Cargo As per request ofImporter / Representatives of the Importer…
DELIVERY AT / TO THE LANT SITE
We shall safely Transport the Cargo by the Trucks, Trailers, Multi Axle, LowBed OR as per the requirement & Nature of Cargo to the Warehouse or theopen storage area as per the instruction of Importer / Representatives ofthe Importer.
CUSTOM DUTIES TAXES
SRO’s AND NECESSARY
ERMITS
All the Plant, Machinery, Equipment and Parts/Spares which are importedinto Pakistan shall be subject to Custom Duties and Taxes Prevailing at thetime of Import.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 29/142
The Duties and Taxes concerns with the Custom Authorities as per
akistan Custom Tariff includes:-
Custom Duty/Duties From 5% Minimum To 20% Maximum
Sales Tax/Taxes 17 %
Income Tax/Taxes 5.5%
The Taxes Concerns with the ort Authorities:-
Port Wharfage
Port Demurrage
Weighment Charges (If any) (for Products like Pipes of Iron/Steel/Coil-Bar)
There Are Two Major Ports in Karachi Namely as below:
Karachi Port
Port Bin Qasim
Karachi Port is Further Divided into 02 Parts, namely;
1) EAST WHARF:
a) Pakistan Container Terminal (PICT) Private Terminal
b) KPT owns few Berths such as Berth No 1 Open, Shed No 02, Shed No03, Berth No 04 Open, Berth 10, 11, 12,13,14,15,16 And 17.
c) Ghass Bunder, For Launches, Steamer and Boats
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 30/142
2) WEST WHARF:
a) Karachi International Container Terminal Ltd (KICT)
b) KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24 And 25
c) Berth Number 25 is for Heavy Lift Cargo that has On Shore HeavyCrane for capacity 50 M/Tons.
For Containerized Cargo the various Yards/Ports are charging different
Handling Charges/Lifting Charges/Examination Charges/RD/Seal BreakingCharges/Yard Storage Charges.
Please note that for all the above mentioned charges the relevantPort /Yard will issue Receipts for the relevant charges.
Excise Taxes @ 0.91-0.95% on Import Value/Assessed Value/ Appraise Value by the Customs or any other Charges / Taxes prevailing at
the time of Import shall be Paid by the I m p o r t e r immediately
before the Clearance of the Consignments from the Port.
Further the completion of GD’s (Bill of Entry) and other Custom formalitiesare subject to the Final Assessment / Valuation / Any SRO Benefits / PCTconfirmation and also the Container / Marks & Number.
Any discrepancy or mistake or dispute arising due to Invoice/ Packing List /
Bill of Lading OR any other relevant documents submitted by the Importer ,
will may render in delay to clear the consignment.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 31/142
SUBMITTAL OF SHI ING GUARANTEE
BOND IN ABSENCE OF ORIGINAL BILL OF LADING
If there is a delay in the arrival of the Original Bill of Lading, can cause a
delay in getting the Goods/ Cargo release of the from the Port
premises/Yard. A Shipping Guarantee Letter/Bond for the said Bill of Lading
would be therefore required by the shipping company in order to issue the
Delivery Order. It shall be discussed and settle before arrival of the vessel.
We will provide all necessary assistance and advice for the Shipping
Guarantee to the Importer / Representatives of the Importer.
During the Unloading of the Break Bulk/ loose Cargo from the vessel
There are chances of getting the goods Damage OR in case we find any
Loss of Goods and or the Goods already Damage on or after its receiving
We shall report to the Importer / Representatives of the Importer or
Arrange a joint survey as soon as possible. Marine/Transit insurance
Shall be arranged by Importer / Representatives of the Importer ,
from Place of Origin up to the Plant Site.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 32/142
METHOD STATEMENT
Newly Implemented Web-BasedOne Customs WeBoc) SYSTEM
At the present there are 02 procedures for Custom Clearance:-
Under this newly implemented procedure if the Vessel is berthed
at any of the below Ports i.e.
Karachi Port Trust (KPT)Karachi International Container Terminal (KICTL)Pakistan International Container Terminal (PICTL)Qasim International Container Terminal (QICTL Port Qasim)Air Freight Unit (AFU)FCL/LCL/Loose/Break Bulk
Goods Declaration (GD) is prepared on Line Under the New WeBOC System
(Via Electronic Mail Data Transfer System).
The G.D (Goods Declaration) is prepared in accordance with thedeclaration of the Importer and the documents provided by the Importeri.e. Commercial Invoice, Bill of Landing and the Packing List. Thereafter theG.D is submitted to the Custom for Assessment on Line.
WEB BASED ONE CUSTOM WeBOC
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 33/142
* The amount of Custom Duties & Taxes and the Sindh Infra Structure
Fee (CESS) has to be paid in advance as per the Importer declaration.
* If the assessment by the WeBOC is done as per the declaration ofImporter, than the G.D is processed and the Importer can take thedelivery of the goods, after the payment of all the necessary Port Dues& Excise Tax.
In case the goods have been processed under WeBOC SYSTEM does notaccept the Importer Declaration, than the Importer may asked for additionalDuties & Taxes or If the Importer wants to Contest with the views of theCustoms than they can go for appeal & meet the Senior Custom Officialsalong with the relevant Documents & Proof to justify their claims.
The Custom Authorities may differ in three basic ways:
1) Disagreement in the PCT OR HS Code Classification.
2) Not Extending the Benefit of the Claimed Benefit/SRO.
3) Disagreement with the Valuation.
The GD is Prepared and filed Online (Via Electronic Filling),as per declaration of the Importer.
If Customs satisfy with all the 03 criteria’s mentioned above i.e.
PCT
SROValuation
The GD is than completed by the Concerned Group. The Importer hasto than pay the Applicable Duties & Taxes after that the GD isforwarded to the Port side for Examination after which the Importer can
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 34/142
take the Delivery of the goods after the payment necessary PortDues.
* If Customs do not satisfy with all the 03 Criteria’s mentioned abovei.e.
PCTSROValuation
Than the GD is forwarded to the Port Side for Physical Examination to
check the goods are in conformity to the declaration of the Importer &under the light of Examination Report GD will be completed by theconcerned Group in the Custom House.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 35/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 36/142
The following documents are required generally by the customs forprocessing the B/E for the Cargo arriving at Sea Port.
I Original Invoice showing complete description of the goods with valueof the each individual item
II Detail Packing List showing complete Description, Quantity GrossWt, Net Wt, Ullage Certificate.
III Original Bill of Lading duly endorsed at the backside in our Favor.
IV Certificate of Origin
V All Govt. Sanctions, Authorization from Government Agencies if any
VII Original Letter of Credit
VIII Sales Tax Registration Certificate
IX Import Registration
X National Tax No Certificate Copy
XI WeBOC Registration (User ID & Pass Word)
Any other document that may be requested by the Custom to verify thedeclaration of Importer
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 37/142
The following documents are required generally by the customs forprocessing the B/E for the Cargo arriving at Air Port.
I Original Invoice showing complete description of the goods withvalue of the each individual item
II Detail Packing List showing complete Description, Quantity, Numbersof Packages, Gross Wt, Net Wt. and Size of the Packages in Cu Meter
III Original Airway Bill
IV Certificate of Origin
V Complete Catalogue/Drawing for Machinery & Equipment.
VI All Govt. Sanctions, Authorization from Government Agenciesif any
VII Original Letter of Credit
VII WeBOC Registration (User ID & Pass Word)
Any other document that may be requested by the Custom to verify thedeclaration of Importer
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 38/142
Further to the above there may be delays in Clearance due to followingreasons:-
I Non availability of the Original Documents, such as BL
II Delay in meeting Custom Queries.
III Strikes / Weather, Act of God, Force Major Etc
IV Delays due to Non-availability of concerned officers.
V Delays in receipts of payments
VI Delays due to the Non-fulfillment of Shipping Companies
VII Delays due to Non-availability of Trucks / Trailer
OSSBLE
DELAYS
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 39/142
PREVIOUSPROJECTS
HANDLED
.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 40/142
CLIENTS ROJECTS
* M/S ICI AKISTAN LTD.
C/o TRANSCAR ROJECTS LTD
ICI TA ROJECT ORT QASIM
* M/S ENGRO AKTANK TERMINAL.
CHEMICAL STORAGE TERMINAL
* M/S NOEL LGA (GERMANY)
L G EX ANSION & MARKETING
* M/S ENGRO ASAHI OLYMER & CHEMICALS.
ENGRO VC LANT ROJECT
* M/s TEKSER INSAAT SAANAYI
CHASMA RIGHT BANK C-65
* M/S FMC. (MARINE LOADING ARM)
FOTCO OIL TERMINAL BIN QASIM
* M/S SECA AKISTAN.
KHI - HYDERABAD BY ASS
* M/S TRANSCAR ROJECTS LTD.
DHABEJI UM ING STATION W-19
* M/S TRANSCAR ROJECTS LTD.
NORTH EAST KARACHI STATION W-18
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 41/142
CLIENTS ROJECTS
* M/S CHINA GUANGXI COR ORATION
ATFEEDER CANAL ROJECT
* M/S CHINA DONGFANG COR ORATION
SEWERAGE TREATMENT ROJECT
* M/S CHINA ETROLEUM
KORANGI SEWERAGE TREATMENT
* M/S CHINA YUNNAN COR ORATION
K T JINNAH BRIDGE HASE II
* M/S CHINA NATIONAL ELECTRIC WIRE & CABLES
QUEENS ROAD OWER STATION
* M/S CHINA HARBOR ENGINEERING
JETTY FOR ENGRO AKTANK
* M/S IJM / IGI JOINT VENTURE.
LBOD SANGHAR ROJECTS
* M/S LIFE LINE ( vt) LTD.
DHURNAL L G GAS EX ANSION
ROJECT
* M/S ENGRO AKTANK TERMINAL.
L G TERMINAL AT BIN QASIM
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 42/142
CLIENTS ROJECTS
* M/S ENGRO AKTANK TERMINAL
VCM TERMINAL HANDLING ROJECT
* M/S HYUNDAI COR KHI OFFICE.
K.E.S.C HIGH TENSION CABLE ROJ.
* M/S HYDERABAD DEVELO MENT AUTHORITY.
MACHINERY UNDER S ANISH GRANT
* M/S CHINA YUNNAN COR ORATION.
MALDIVE S ARLIAMENT BUILDING
* M/S CHINA NATIONAL CHEM ENGG COR .
SUB CONTRACTOR FOR DONGFANG
S2 ROJECT
* ENGRO ASAHI TRADING ( VT) LTD
EX ORT OF VC WORLD WIDE
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 43/142
CLIENTS ROJECTS
* M/S DESCON ENGINEERING WORKED FOR NUMBER OF ROJECTS
1) E TL FOR L G TERMINAL
2) E TL FOR VCM ROJECT
3) EVTL FOR MEG ROJECT
4) FOR ARCO MID COUNTRY REFINERY
5) LASMO OIL BHIT GAS FIELD ROJECT
US $ 6.5 Million Dollars
* M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD
HUB & I RI ROJECT FUNDED BY ADB
£ 15.8 Million Sterling
* M/S HYUNDAI HIDCO HAKAS JV
EX ORT OF HEAVY DREDGING MACHINERY
US $ 2.5 Million Dollars
* M/S AL - NOOR SUGAR MILLS LTD
MDF BOARD FIBRE BUILDING BOARD LANT
(LASSANI)
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 44/142
CLIENTS ROJECTS
* ROCTER & GAMMBLE AKISTAN SOA CA ACITY EX ANSION LANT.
US $ 4.5 Million Dollars
* M/S ENGRO AKTANK TERMINAL.
CHEMICAL STORAGE TERMINAL
US $ 5.5 Million Dollars
* M/S SHV ENERGY AKISTAN
GAS EX ANSION ROJECT
US & 1.5 Million Dollars
* M/S TEKSER INSAAT SANAYI VE TICCARRET
CHASMA RIGHT BANK CANNAL ROJECT C-
65 US $ 260 Million Dollars
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 45/142
BREAK BULK
LIQUID CHEMICALS &
PETROCHEMICALS HANDLING
PROJECTS IN HAND
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 46/142
* SHV ENERGY LIMITED
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* JAMSHORO JOINT VENTURE LIMITED
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* AFTAB TRADERS
LIQUIFIED PETROLEUM GAS (LPG)IN BULK OF VARIOUS PARCELS
* CRESS LPG LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* RELIANCE CONSULTANCY
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* ENGRO POLYMER & CHEMICAL LIMITED
VINYL CHLORIDE (VCM)
IN BULK OF VARIOUS PARCELS
EDC IN BULK OF VARIOUS PARCELS
CAUSTIC SODA IN BULK
ETHELYNE
IN BULK OF VARIOUS PARCELS
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 47/142
UNDER GOING
PROJECTS
IN HAND
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 48/142
* M/S ENGRO FOODS LIMITED
1) LAUNCHING & SETTING U A COM LETE STATE OF AN ART
OF O'MORE ICE CREAM LANT
2) BRAND NEW STATE OF AN ART ENGRO RICE &
AR BOILING LANT
3) EX ANSION OF EXISTING DAIRY MILK LANT.
(OL ER'S MILK)
* M/s. FOUNDATION ENERGY LIMITED-1
SETTING U A STATE OF AN ART WIND OWER ROJECT OF
A CA ACITY 49.50 MW AT JHAM IR, SINDH ROVINCE
* M/s. FOUNDATION ENERGY LIMITED-II
SETTING U A STATE OF AN ART WIND OWER ROJECT OF
A CA ACITY 49.50 MW AT JHAM IR, SINDH ROVINCE
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 49/142
* M/S. AK ARAB REFINERY LIMITED
SETTING U A COM LETE BRAND NEW AS HALT BUILT
UNIT (ABU UNIT)
* ENGRO OLYMER TRADING LIMITED
EX ORT OF VC RESIN (SABZ BRAND) WORLD WIDE
A ROXIMATE EX ORT IN M/TONS 2500 ER MONTH
* M/s. CIVIL AVIATION AUTHORITY
SETTING U A BRAND NEW BENAZIR BHUTTO
INTERNATIONAL AIR ORT, ISLAMABAD, and ACKAGE 06
REFUEL HYDRANT SYSTEM.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 50/142
KARKEY AKISTAN
OWER SHI & OIL SU LY TANKER
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 51/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 52/142
VARIOUS OTHER ROJECTS
OF NATIONAL IM ORTANCE
INCLUDING HYDRO, SEWERAGE
WATER TREATMENT, DAMS
CHEMICAL INDUSTRY
OIL & GAS SECTOR
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 53/142
* M/S CHINA SINOHYDRO COR ORATION
1) GOMAL ZAM DAM HYDRO OWER
2) DUBAR KHAWAR DAM HYDRO OWER
3) KHAN KHAWAR DAM
4) KWSB K-III
* M/S. INDUS REFINERY LIMITED.
HI-TECH 100,000 B SD OIL REFINERY
ON RELOCATION BASIS
* M/S. JAMSHORO JOINT VENTURE
L G EXTRACTION LANT
* M/S. ETROSIN RAVI ENGINEERING
OIL & GAS ROJECTS LTD.
* M/S. SHELL GAS L G AKISTAN LTD
L G ROJECTS / L G GAS
* M/S. BI-WATER INTERNATIONAL
KARACHI WATER & SEWERAGE
BOARD HUB & I RI UM ING
STATION ROJECT
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 54/142
* M/S. DESCON ENGINEERING LTD (HYDRO OWER ROJECTS)
1) SAT ARA DAM ROJECT
2) MIRANI DAM ROJECT
3) MANGLA RAISING ROJECT
4) TUNSA BARRAGE ROJECT
5) HYDERABAD WATER
TREATMENT ROJECT.
* M/S. FAUJI FERTILIZER BIN QASIM LTD
BREAK BULK HANDLING OF
HOS HORIC ACID
* M/S. ENGRO ASAHI OLYMER AND CHEMICAL LTD.
V.C.M / MACHINERY &
EQUI MENT / EX ORT
* M/S. DHA COGEN LTD.
DESALINATION / OWER
ROJECT
* M/S. BAHRIA TOWN HOUSING & INFRASTRUCTURE ROJECT
RE-LOCATION OF LANT &
MACHINERY FOR RE-
FABRICATING HOUSING
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 55/142
* AREVA T&D AKISTAN ( VT) LTD.
132 KV GRID STATION AT
CREEK CITY, DHA
* KHALID RAUF & CO., ( VT) LTD.
INFRASTRUCTURE ROJECTS
LAHORE RING ROAD
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 56/142
HYDRO OWER ROJECTS
From our background experience, strength & experiences from
industrial development projects, S.M.Asghar ( vt) Limited
has rapidly established itself as a key player in infrastructure
projects.
We successfully did the Custom Clearance & In-land
Transportation jobs of large-scale projects like dams, barrages,
highways and housing complexes.
We hold the distinction of being the first ever local company to
do the 07 Major Hydropower Projects Simultaneously of National
Importance in Pakistan
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 57/142
HYDROPOWER
PROJECT
Taunsa Barrage
Rehabilitation And
Modernization
Location: Taunsa Pakistan
Year Of Project March 2006-2007
Cost Of Project US $ 140 Million Dollars
Completion : May 2008
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 58/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 59/142
HYDROPOWER
PROJECTMANGLA DAM
RAISING ROJECT
LOCATION Mangla
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION
COST OF
PROJECT
US $ 140 Million Dollars
Expected
Completion
Date:
September 20 2007
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 60/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 61/142
HYDROPOWER
PROJECT. SAT ARA DAM
HYDRO OWER
ROJECT
LOCATION PAKISTAN
NATURE OF JOB CUSTOM CLERANCE & INLAND TRANSPORTATION.
COST OF
PROJECT
US $ 140 Million Dollars
Completion : March 2007
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 62/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 63/142
roject Name
Kachhi Canal roject
Contract # KC-03
Location: Taunsa Barrage – Kot Addu
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANS ORTATION.
COST OF
ROJECT
US $ 65 MILLION DOLLARS
Completion: January 2009
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 64/142
Project NameGOMAL ZAM
HYDRO OWER
ROJECT
CLIENT CHINA SIOHYDRO COR ORATION
NATURE OF
JOB
CUSTOM CLEARANCE & INLAND
TRANS ORTATION.
COST OF
ROJECT
US $ 220 MILLION DOLLARS
Completion: 4 YEARS
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 65/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 66/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 67/142
Project Name
Duber Khwar
Location:
The project located on river Duber Khwar, right
bank tributary of Indus river near atan in NWF
at a distance 265 Km from Islamabad.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF PROJECT US$ 109 million
Completion: 4 YEARS
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 68/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 69/142
Location:Allai Khwar
Hydropower lant
The roject is located on Allai
Khwar River, Left Tributary of
River Indus near Besham in
NWF , 245 km from Islamabad.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF PROJECT US$ 110 million
Completion: 4 YEARS
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 70/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 71/142
Project Name
MIRANI DAM
Location: In the Dasht River Basin about 30 miles (48 km)
West of Turbat Town in Makran Div of
Baluchistan.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF
PROJECT
US$ 120 million
Completion: 4 YEARS
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 72/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 73/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 74/142
L G Storage & Handling Facilities
Project NameENGRO AKTANK
L G TERMINAL
Location: EASTERN INDUSTRIAL ESTATE ORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF PROJECT US$ 10 million
CAPACITY 4,500 METRIC TONES OF LPG
LPG BULLETS 10 LPG bullets
Completion: 1997 -98
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 75/142
Integrated Bulk Liquid Chemical
Terminal Storage & Handling Facilities
Project Name
ENGRO AKTANK
VCM TERMINAL
Location: EASTERN INDUSTRIAL ESTATE ORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
CAPACITY 41,000 CUBIC METER STORAGE FACILITY
SPHERICAL TANK 2 SPHERICAL TANK
Completion: 1997 -98
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 76/142
In the first phase E TL constructed facilities for the integrated
bulk liquid Chemical and Storage Terminal the first phase comprised construction
of 41,000 cubic meter of storage facility the cost of first phase of the roject was
US $ 60 million the tank farm is situated on reclaimed land in the QA.
ARAXYLENE
A
CETIC
A
CID
HOS HORIC ACID (HANDLING ONLY)
VINYL CHLORIDE MONOMER
A
CRYLONITRILE
LIQUEFIED ETROLEUM GAS
MONO ETHYLENE GLYCOL
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 77/142
Project NameENGRO ASAHI OLYMER
& CHEMICALS LIMITED
Location:EASTERN INDUSTRIAL ESTATE ORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 80 million
CAPACITY 100,000 (T A) VC MANUFACTURING LANT
CLIENTENGRO ASAHI OLYMER & CHEMICALS LTD
Completion: 1999-2000
Engro Asahi olymer & Chemicals Limited (EA CL or the company) is a joint
Venture between Engro Chemical akistan Ltd. (EC L) and Mitsubishi
Corporation (Japan), each with an 80% and 20% shareholding, respectively
EA CL is the only VC manufacturer in akistan with a Capacity
Of 100,000tons per annum (T A) and its operations are located at ort Qasim
Karachi. Its plant was commissioned in November 14, 1999.
Engro Asahi olymer & Chemicals Limited
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 78/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 79/142
ICI T11 TA lant
Project Name ICI TA T11 LANT
Location: EASTERN INDUSTRIAL ESTATE ORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 480 million
CLIENT TRANSCAR ROJECTS UK/ FOOSTER WHEELER UK
Completion: 1998
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 80/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 81/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 82/142
ARCO Mid Country Refinery (100, 000 B D)
Project Name AK ARAB REFINERY COM ANY
Location: MULTAN, AKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 80 million
CLIENT DESCON ENGINEERING
Completion: 1998
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 83/142
JAMSHORO JOINT VENTURE LIMITED
SINGLE LARGEST L G EXTRACTION LANT
Project Name JAMSHORO JOINT VENTURE LIMITED
Location: JAMSHORO, SINDH
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 80 million
CLIENT ASSOCIATED GROU
Completion: 2005
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 84/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 85/142
-------
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 86/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 87/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 88/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 89/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 90/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 91/142
RELOCATION OF 100,000 BARRELS CA ACITY REFINERY
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 92/142
ETRO CANADA REFINERY TO AKISTAN ORT QASIM
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 93/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 94/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 95/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 96/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 97/142
TRANASIA REFINERY LIMITED
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 98/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 99/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 100/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 101/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 102/142
WIND OWER
ROJECTS
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 103/142
FAUJI FERTILIZER ENERGY COM NAY
LIMITED (FFCEL) 49.5 MW WIND
ENERGY ROJECT AT JHAM IR,
KARACHI
Project Name FFCEL WIND ENERGY ROJECT OF CA ACITY 49.5 MW
Location: JHAM IR, NEAR THATTA
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECTUS$ 110 million
CLIENT DESCON ENGINEERING LIMITED
Completion: ALREADY COM LETED
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 104/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 105/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 106/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 107/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 108/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 109/142
Project Name AS HALT BUILT UNIT ROJECT (ABU)
FOR ARCO
Location: ARCO MID COUNTRY REFINERY, MULTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 30 Million
Completion: DECEMBER 2012
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 110/142
Project Name 49.5 MW FOUNDATION WIND ENERGY-1 ROJECT
Location: JHAM IR, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 130 Million
Completion: SE TEMBER 2014
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 111/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 112/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 113/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 114/142
Project Name 49.5 MW FOUNDATION WIND ENERGY-II ( vt) Ltd.
ROJECT
Location: JHAM IR, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 130 Million
Completion: SE TEMBER 2014
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 115/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 116/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 117/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 118/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 119/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 120/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 121/142
Project Name NEW KHANKI BARRAGE HYDRO OWER ROJECT
Location: RIVER CHENAB, DISTT GUJRANWALA
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 70 Million
Completion: SE TEMBER 2016
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 122/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 123/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 124/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 125/142
Project NameAS HALT BUILT UNIT ROJECT (ABU)
FOR ARCO
Location: ARCO MID COUNTRY REFINERY, MULTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 30 Million
Completion:DECEMBER 2012
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 126/142
Project Name METRO HABIB CASH & CARRY AKISTAN ( VT) LTD
Location: HEAD OFFICE THOKAR NIAZ BAIG, MULTAN RD, LHR.
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 3.4
Completion: STILL UNDERGOING
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 127/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 128/142
DHA DESALINATION LANT 3 MIGD
& 94 MW OWER LANT KARACHI
Project Name DHA DESALINATION & OWER LANT
AKISTAN FIRST EVER SEA DESALINATION
& OWER LANT
Location: DHA, HASE VIII. KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 130 million
CLIENT DHA COGEN LIMITED (DCL)
Completion: UNDER CONSTRUCTION
TOTAL VALUE OF L/C ESTABLISHED:
Siemens AG Germany $ 41,400,000 $ 33,120,000
Siemens AG Germany € 6,550,000 € 5,240,000
Alfa Laval AS Copenhagen € 15,165,300 € 12,132,241
Lincas Electro Vertibas € 295,500 € 236,390
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 129/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 130/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 131/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 132/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 133/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 134/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 135/142
BAHRIA TOWN ( VT) LIMITED
RAWAL INDI
Project Name BAHRIA TOWN ( vt) LIMITED
AWAMI VILLAS ROJECT.
TOTAL # OF VILLAS 8000
Location: RAWAL INDI, AKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 120 million
CLIENT BAHRIA TOWN ( vt) LIMITED
Completion: UNDER CONSTRUCTION/ ROGRESS
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 136/142
HEALTH, SAFETY AND ENVIRONMENT
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 137/142
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 138/142
S.M.Asghar ( vt) Limited believes that
A
CCIDENTS DON
’
T JUST
happen, they’re caused, and it is the dutyof the Company to remove and minimize all possible causes ofAccidents.
We at S.M.Asghar ( vt) Limited takes preliminary guide to therecognition of potential hazards to the following.
M O S T - S A F E - L A C E S
M MACHINERY : Sources of Mechanical ower
O O ENINGS : its, Sumps, Ducts & Drains
S STACKS : Stores Materials, Raw & rocess.
T TOOLS : All type of Tools.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 139/142
S A F E - L A C E S
S STRUCTURE : Floors, Walls, Ceilings, Road
A ATMOS HERE : Dust, gases, fumes & Spray.
F FIRE : Fire oints & Fire Exits.
E ELECTRICITY : Wires, Cables, Switches.
RESSURE VESSEL : Boilers & Compressors
L LADDERS : Steps, trestles & Scaffolds
A ATTIRE : rotective Clothing, Helmets
C CRANES : Hoist, Derricks & Ropes / Hooks
E EX LOSIVES : Flammable Liquids, L G, Radioactive.
S For SIGNALS :
Warning Light, Telephone Buzzers.
As a Company olicy we take care of our Employee to the best Standards
because Employees are Our Assets.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 140/142
We provide following safety Equipments to our ort staff such as :
Safety Belts : They are provided to the Staff who
Works On the Ship /Vessel (VCM/L G)
Emergency Lights : In case of Night Delivery at the ort
remise/ Highways
Safety Helmets : At time of delivery at the ort Area
During Loading/ Unloading
Heavy Machineries/ Hazardous Cargo
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 141/142
Safety Boots : At the Ship Derricks & the ort
remises
Safety Glasses : They are provided to the Staff who
Work on the Ship /Vessel.
8/20/2019 INTRODUCTION OF M/s S.M.ASGHAR (Pvt) LIMITED
http://slidepdf.com/reader/full/introduction-of-ms-smasghar-pvt-limited 142/142
HEAVY & SUPER HEAVY LIFTTRANSPORTATION EXPERIENCE
WE CALLED THIS ASABNORMAL LOADS