Introduction of Introduction of Company Company
Management Philosophy
1 Greetings
2 Management Philosophy
3 Organization
5 Business Field
6 Major Performance
4 Certification and Intellectualproperty
ContentsContents
8 Copy of Licensing, Certificationand Intellectual property
7 Major Products Delivery
9 Location
Welcome to ERT Engineering Co., Ltd.
Since now we are in the 21st century of Information Age with infinite competition, the self-innovation and
effort to adapt to changes are absolutely required for either businesses or individuals.
We, ERT Engineering Co., Ltd. are strengthening our competitiveness with increasing specialization in
Rolling Stock Field.
In domestic railroad industry, it is deemed urgent for each company which is specialized in each field such
as civil construction, track, architecture, electric power, signaling, communication, rolling stock, driving ·
operating, inspection & test-facility etc. to be competitive in the global market by preparing comparative
advantages in design, supervision, construction, or related installation supply field based on independent
experience and technology.
All of our executives and employees of ERT Engineering Co., Ltd. promise you not only that we will do our
best to develop the company into the top in railroad, transportation, and 21st-century intellectual
installation areas, playing an essential part in railroad and other related industries, but also that we will put
you first, and grow up with you.
We sincerely thank you for visiting ERT Engineering Co., Ltd. and ask for your continuous care and
concerns.
Thank you very much. January 1, 2014
ERT Engineering Co., Ltd.
1. Greetings1. Greetings
Welcome to ERT Engineering Co., Ltd.
Since now we are in the 21st century of Information Age with infinite competition, the self-innovation and
effort to adapt to changes are absolutely required for either businesses or individuals.
We, ERT Engineering Co., Ltd. are strengthening our competitiveness with increasing specialization in
Rolling Stock Field.
In domestic railroad industry, it is deemed urgent for each company which is specialized in each field such
as civil construction, track, architecture, electric power, signaling, communication, rolling stock, driving ·
operating, inspection & test-facility etc. to be competitive in the global market by preparing comparative
advantages in design, supervision, construction, or related installation supply field based on independent
experience and technology.
All of our executives and employees of ERT Engineering Co., Ltd. promise you not only that we will do our
best to develop the company into the top in railroad, transportation, and 21st-century intellectual
installation areas, playing an essential part in railroad and other related industries, but also that we will put
you first, and grow up with you.
We sincerely thank you for visiting ERT Engineering Co., Ltd. and ask for your continuous care and
concerns.
Thank you very much. January 1, 2014
ERT Engineering Co., Ltd.
2. Management Philosophy2. Management Philosophy
CREATMTYCREATMTY
CHALLENGECHALLENGE
LEADERSHIPLEADERSHIP
Chartered : December 13, 2011
Capital : 400 mill ion Korean won (US$ 4 Mil)
Address : B-501, Pangyo Innovally,
621, Sampyeong-dong, Bundang-gu,
Seongnam-si, Gyeonggi-do,
Republic of Korea
Tel/Fax : +82-31-8018-8988 / +82-31-8018-8985
E-mail : [email protected]
COOPERATIONCOOPERATIONPASSIONPASSION
PASSION PASSION An ind iv idua l wi t h a pass ion o f “ I can do i t ” .
CREATIVITY CREATIVITY
A c rea t i v e t a len t who v iews p rob lems in new ang le
pe rspec t i v e and app l ies c rea t i v e th ink ing & behav io r
t o t he ac tua l work .
CHALLENGECHALLENGESomeone who nev er f ea rs f a i l u re hav ing p roac t i v e
a t t i t udes and indom i tab le cha l lenge sp i r i t s .
LEADERSHIPLEADERSHIP
An ind iv idua l who can respond t o rap id marke t
changes wi t h g rea t d r i v e and mu l t i p layer l eadersh ip
t ha t can cope wi t h ha rdsh ips .
COOPERATIONCOOPERATION A person wi t h mutua l coopera t ion sp i r i t s
조직도3. Organization3. Organization
BOD
President
V. President Technical Advisor
•Promotion/Plan•Sales•Contract Management
Sales Div. Engineering 1Div.
Engineering 2Div.
Machine/ FacilityDiv.
Business Support Div.
R & DInstitute
•International Project•Design/Analysis•Master Operation Plan•Design of Plant
•Sys. Eng.•Operation Plan•Design of Depot•Production of Maint. equipment
•Machine/Facility•Fire Fighting Fac.•Supervision Service of M&F
•Business Support•Asset Managing•Financial/HR/Accounting
•R&D of TPS•R&D of DMS•Other R&D
•Rolling Stocks Parts•E&M•System Eng.•Project Management
New BusinessDevelopment Div.
Certification Certified at Certified by RemarksBusiness Registration Oct. 05, 2012 Bundang District Tax Office
R & D Center Apr. 20, 2012 Korea Industrial Technology Association
Venture Business Certificate Mar. 05, 2012 Korea Technology Finance Corporation
Overseas Construction Mar. 22, 2012 International Contractors Association of Korea
The subject of engineering activities Mar. 09, 2012 Korea Engineering & Consulting Association General Industrial Machinery ,Mechanical Equipment/Facilities
The handbook of engineering companies Oct. 10, 2012 Korea Engineering & Consulting Association General Industrial Machinery ,Mechanical Equipment/Facilities
Research and Development Services Oct. 26, 2012 Minister of Education, Science and Technology
4-1. Certification and licensing
4. Certification and intellectual property4. Certification and intellectual property
Research and Development Services Oct. 26, 2012 Minister of Education, Science and Technology
Factory Registration May. 16 2012 Korea Industrial Complex Corp.
Designation Certified at Certified by Remarks
TPS 3.0 Pro (SW registration) August 1, 2012 Korea Copyright Commission Trains operation simulation S/W
Measurement of conical spring displacement of the Loaded RailVehicle, Measuring the height of the axle box & their MeasuringEquipments
Under Examination (Application No.:1-1-2013-0338220-62)
Korean Intellectual Property Office
The facilities of regular inspection for rollingstocks
Contact force measurement system of the electromagneticcontactor
Under Examination (Application No.:1-1-2013-0295216-36)
Korean Intellectual Property Office
The facilities of regular inspection for rollingstocks
4-2. Intellectual properties
5. 5. Business FieldBusiness Field
· Engineering Services & Case Study of Inspection andMaintenance System for Domestic & International railroad.
· Planning and Layout of the In-Line & Parking track in depot for Rail car fleets
· Consultation & Reporting on specification requirements of Rail Car for RFP or Tender.
· Operational Planning of Fleets on main line & in depot .· Design Engineering of Depot s for light rail, heavy rail,monorail, maglev train s, including turnkey conditions.
Design Engineering & Construction Design Engineering & Construction of Rail Vehicles Depotsof Rail Vehicles Depots
Operational Planning Operational Planning of Rail Car Fleetsof Rail Car Fleets
Design Engineering & Construction Design Engineering & Construction of Machinery & Facilitiesof Machinery & Facilities
· Investigation and Planning of the train formation. · Simulation of the Train Operation & Performance (TPS Simulation).
· Planning of Train Operation as Operating Timetable, and Numbers of Required Vehicles fleets
· Operating System Planning incl. Organization, Process, Required Personnel, Operating Cost plan.
· Maintenance System planning of Wayside facilities· O&M Operation including Train, Depot and facilities.
· Design Engineering & Construction of Machineryand Facilities for Civil Architectures.
· Design & Construction of HVAC System & FireFighting System for Railroad and Road incl. Tunnel
· Investigation and consultation on Energy Utilization and its Planning.
· Investigation/Consultation of Alternative energy resource and Energy Saving and its planning.
Maintenance & Inspection System Maintenance & Inspection System Engineering & PlanningEngineering & Planning
Engineering Service for Domestic Engineering Service for Domestic and International Marketsand International MarketsProducts of Facilities & EquipmProducts of Facilities & Equipments
· Design and Supervision of the Light & Heavy Inspection & Maintenance Shop/System including Optimization.
· Test & Commissioning Plan of Trains.· Establishment of Maintenance System and Investigation of Inspection/Maintenance facilities size.
· Maintenance Philosophy and Maintenance process.· Planning and Specification of Inspection/Maintenancefacilities and Installation Work.
· Planning on Facilities maintenance and its training.
· Introduction from International Market & Development of New Types of equipments.
· Planning and building of automation equipment.· Fabrication and installation of railway maintenanceequipments.
· Production and commissioning of inspection & testequipments.
· Feasibility Study and Basic Planning of Train Operation.
· Working Planning of the Train Operation. from Feasibility to Operation stage.
· Basic and Working design Engineering of inspection , repair and Maintenance System.
· Production and Delivery of Testing/Inspection/Repair /Maintenance quipmentsand Facilities.
· System Engineering incl. Interface Management and RAMSE, and Project Management for E&M and O&M.
Services Period Field Contractor
Basic Design of the KTX Gwangju depot. 2009.10 ~ 2010.10 Inspection DAEWOOEngineering &ConstructionCo., Ltd.
Basic Design Service of the turnkey bidding for Honam High Speed RailwayDepot design & construction. 2010.03 ~ 2010.05 Inspection DAEWOO
Engineering &ConstructionCo., Ltd
Basic Design Service of the connection-line construction between KyungbuHigh Speed Railway and Donghae Nambu Line. 2010.08 ~ 2010.11 Driving & Operating
planning SunKoo Engineering Co., Ltd.
Basic Design Service in Shinbundang Line Northern Extension Subway. 2010.11 ~ 2010.12 Inspection Yooshin Engineering Co., Ltd.
Basic Planning and Feasibility Study of the Joong-ang Line (Dodam-Yeongcheon) Double Track. 2011.02 ~ 2011.12 Driving & Operating
planning3companies involvingSaman Co., Ltd.
Basic Design Service of the West Line(Hongseong-Songsan) Double Track inthe Section 4 Construction. 2011.03 ~ 2011.10 Driving & Operating
PlanningDong-Myeong EngineeringConsultant & Architecture
6-1. Design Engineering
6. 6. Major PerformanceMajor Performance
Basic Design Service of the West Line(Hongseong-Songsan) Double Track inthe Section 4 Construction.
Driving & OperatingPlanning
Dong-Myeong EngineeringConsultant & Architecture
Basic Design Service of the Myeonmok Line Light Railway(LRT) in the privateinvestment project. 2011.11 ~ 2011.11
Inspection Driving & Operating
planningYooshin Engineering Co., Ltd.
Basic Design Service of the Donghae south Line (Doekha) rolling stock in thedepot construction. (T/K) 2011.10 ~ 2012.02 Inspection SeohyunEngineering Co., Ltd.
Basic Design Service of the Shinansan Line (Songsan) Double Track in thedepot construction. (T/K) Inspection DAEWOO
Engineering &ConstructionCo., Ltd.
Performing service of the Airport Express Train Performance Simulation .(TPS) 2012.09 ~ 2012.10 Driving & Operating KORAIL AIRPORT RAILROAD Co.,Ltd.
Basic Design Service of connected railway at Incheon International AirportTerminal 2 (T/K) 2012.11 ~ 2012.12 Driving & Operating
planning Yooshin Engineering Co., Ltd.
Basic Design Service of the Jung-ang Line(Dodam-Yeongcheon) Double Trackin the Section 2 Construction. (T/K) 2012.10 ~ 2012.12 Driving & Operating
planningDAEWOOEngineering &ConstructionCo., Ltd.
Basic Design Service of the Jungang Line(Dodam-Yeongcheon) Double Trackin the Section 11 Construction. 2012.10 ~ 2012.12 Driving & Operating
planningHalla Engineering & ConstructionCorp.
Feasibility Study and basic planning of Danggogae-Jinjeop Double Track. 2013.04 ~ 2013.10 Inspection Yooshin Engineering Co., Ltd.
Basic Design Engineering of Sasang-Hadan section 3 for Busan Metro 2013.08 ~ 2014.01 Safety/Operation DongMyung Tech
Services Period Field Contractor
Implementation Design of the turn-key in Munyang depot of Daegu Line #2. 1997.10 ~ 1998.05 Inspection Daegu Subway Construction
Implementation Design in the Oesam depot of rolling stock on Daejeon Line #1. 1998.01 ~ 2001.02 Inspection Daegu Subway Construction
Implementation Design in the Cheongnyangni depot Sanding Facilities on the Korearailroads (KORAIL). 2003.08 ~ 2003.09 Rolling stock
/Inspection KORAIL
Development of the Railroad DMT Transportation System. 2007.12 ~ 2011.09 Inspection Bumchang Co., Ltd.
Testing and Commissioning of the Magnetic Levitation Train. 2007.10 ~ 2008.09 Rolling stock/Inspection
Korea Institute of Machinery&Materials
6-1. Design Engineering
6. 6. Major PerformanceMajor Performance
Rolling stock/Inspection
Korea Institute of Machinery&Materials
Implementation Design of the In-cheon Urban Railroad Line #2 Section 216. 2009.02 ~ 2009.04 Inspection Dong-ilEngineeringConsultantsCo.,Ltd.
System Engineering Service of the In-cheon Monorail. 2009.02 ~ 2009.09 SE (System Engineering) NTEC ENG Co.,Ltd
Implementation Design of the Operation System on the rolling stock in the In-cheonUrban Railroad Line #2. 2010.03 ~ 2018.08 Inspection Posco Engineering
Implementation and basic design of the extension construction on Incheon Subway Linein Songdo Landmark City. 2012.04 ~ 2013.06 Driving & Operating
/Rolling stockYooshin Engineering Co., Ltd.
Implementation Design of the Bujeon-Masan Double Track (Build Transfer Lease) 2012.09 ~ 2013.12 Trains operating/Driving Sambo Engineering Co.,Ltd.
Basic Implementation Design for automatic equipment and the introduction of EMUHeavy Overhaul facility improvement 2013.04 ~ 2013.09 Inspection
(Involved E&M)Seoul Metropolitan Rapid Transit Corp.
Services Period Field Contractor
Installation of the Incheon Wolmido Tourism Monorail project. 2008.01 ~ 2008.07 Driving&Operatingplanning
ChungsukEngineeringCo.,Ltd.
Proposal of the private project inYongsan-Songpa Magnetic Levitation Train. 2007.12 ~ 2008.01 Inspection
ChungsukEngineeringCo.,Ltd.
Planning of the basic design private investment Project in Sosa-Wonsi Double Track 2008.03 ~ 2009.04 Driving&Operatingplanning Daewoo E&C
Proposal of the Inspection Field of Design & Supervision Service in Wooi-Sinseol UrbanRailroad Private Investment Project. 2009.09 ~ Completion Inspection
ChungsukEngineeringCo.,Ltd.
Planning of the basic design on the private investment Project in Daegok-Sosa DoubleTrack Project.
6-2. Design Engineering for Private Investment Project
6. 6. Major PerformanceMajor Performance
Planning of the basic design on the private investment Project in Daegok-Sosa DoubleTrack Project. 2010.03 ~ 2010.06 Inspection Hyundai Rotem
Planning of the basic design on the private investment Project in Bujeon-Masan DoubleTrack project. 2010.01 ~ 2010.06 Driving&Operating
planning
ChungsukEngineeringCo.,Ltd.
Planning of the basic design on the private investment Project and Writing BusinessProposal in Dongbuk Line Light Railway.
2010.07 ~ Designated date by
project company owner
Inspection/Driving&Operating
planningDongsan ENG
Planning of the basic design on the private proposed project(BTO) in Gwangmyeong -Siheung Subway. 2011.03 ~ 2011.08 Inspection
SamboEngineeringCo.,Ltd.
Planning of the Implementation design on the private investment Project in Bujeon-MasanDouble Track project. 2012.09 ~ 2013.12 Driving&Operating
planning
SKEngineering&Construction Co., Ltd.
Services Period Field ContractorFeasibility study of the basic research on technology transfer Plan on Korean High-SpeedRolling Stock to Brazil. 2008.03 ~ 2008.11 Rolling Stock
/AnalysisKorea RailroadResearch Institute
Consulting of the technical proposal on basic model research of tilting train systemmaintenance system. 2008.03 ~ 2008.06 Analysis
/Inspection KCI Co., Ltd.
Feasibility study of the basic research on High-Speed Rolling Stock Stability Improvement Planand DC EMU Standardization. 2008.07 ~ 2009.05 Analysis
/InspectionKorea RailroadResearch Institute
Maintenance of the Tilting Train System. 2008.08 ~ 2009.07 Assesment/Analysis
Korea RailroadResearch Institute
Support of the Testing & Commissioning and Bogie Maintenance Service in Korean TiltingTrain Stability Research Project. 2008-08 ~ 2009-07 Inspection
/Management Hankuk Fiber Co., Ltd.
6-3. Feasibility Study and Basic Design Engineering
6. 6. Major PerformanceMajor Performance
Support of the Testing & Commissioning and Bogie Maintenance Service in Korean TiltingTrain Stability Research Project.
Inspection/Management
Support of the type test and maintenance service on the KTXⅡ First trainsets. 2010.08 ~ 2010.10 Inspection/Management Hyundai Rotem
Basic design Planning and feasibility study of the Byulnae Line (Amsa-Byulnae) Double Track. 2010.09 ~ 2011.03 Driving plan DongbuEngineering Co.Ltd
Basic design Planning and feasibility study of the Joong-ang Line Dodam-Yeongcheon DoubleTrack. 2011.02 ~ 2011.12
Inspection/Driving&Operating
planning
3 Companies involvingSaman Co., Ltd.
Basic design Planning and feasibility study of Indeogwon-Suwon Double Track. 2012.03 ~ 2013.01 Inspection Cheil/Dongbu/Byucksan
Feasibility study of Paraguay Railway Construction, F/S service 2012.09 ~ 2013.09 Inspection CheilEngineering Co.Ltd
Calculation and Inspection of MPX Guajira Thermal coal project pre-con service 2012.03 ~ 2012.04Inspection
/Driving&Operating/Rolling Stock
SeoyeongEngineering Co.Ltd
Basic design Planning and feasibility study of Gwanggyo-homaesil Double Track. 2012.04 ~ 2012.05 Inspection/Driving plan
CheilEngineering Co.Ltd
Technical Inspection and Calculation of UHG-GS Railway Project 2012.10 ~ 2012.11 Inspection SeoyeongEngineering Co.Ltd
Services Period Field ContractorProject Proposal for Brazil High Speed rail and Application study report to East-South AsianCountries 2007.06 ~ 2007.12 Proposal & Feasibility
reportKorea RailroadResearch Institute
Investigation report for Structural Endurance Life and Passenger Loads for Domestic andInternational Railways 2007.07 ~ 2008.06 Investigation report Korea Railroad
Research Institute
Analysis of Rail Accident and Emergency Management 2007.08 ~ 2008.08 Analysis/Report Seoul Industrial Univ.
Investigation Report on Improvement of Reliability of Next Generation EMU 2007.10 ~ 2008.10 Investigation report Korea RailroadResearch Institute
Test & Evaluation Report of Magnetic Levitation train, including Commissioning 2008.01 ~ 2008.3 Vehicle/Maintenance Korea MachineryResearch Institute
6-3. Feasibility Study and Basic Design Engineering
6. 6. Major PerformanceMajor Performance
standardization of Unit Cost and Life cycle cost of sub-systems of Rolling Stocks 2010.08 ~ 2010.10 Cost Management Hyundai Rotem
Investigation report for technical transfer to Brazil for Korean High Speed Train 2008.10 ~ 2008.11 Investigation report Korea RailroadResearch Institute
Modeling & Methodology of Maintenance System for Tilting Train 2011.02 ~ 2011.12 Analysis & Maintenance KCI Company
Train Operation & Maintenance system for Levitation train 2008.09 ~ 2011.04 Maintenance Hyundai-Rotem
Investigation on Improvement of Vehicle Stability and Standardization of DC EMU 2008.07 ~ 2009.05 Investigation report Korea RailroadResearch Institute
Maintenance System for Tilting Train 2012.03 ~ 2012.04 Evaluation/Analysis Korea RailroadResearch Institute
Commissioning Test for system Stability & Maintenance service of Bogie System for KoreanStandard Tilting Train 2012.04 ~ 2012.05 Analysis & Maintenance HanKuk Fiber Co.Ltd
Evaluation Methodology of Reliability for Next Generation EMU 2008.10 ~ 2009.08 Proposal & Report Korea RailroadResearch Institute
Services Period Field Contractor
Study on Localization of Parts manufacturing for Tilting Train 2009.08 ~ 2010.06 Proposal & Report Korea RailroadResearch Institute
Investigation on Maintenance system and Stabilization of the System for Bogies of Tilting Train 2009.08 ~ 2010.06 Maintenance/Management Korea Railroad
Research Institute
Proposal of Maintenance System for Ulan Bator LRV in Mongolia 2010.01 ~ 2010.10 Proposal OverseasConstruction Institute
Effective Maintenance System for Tilting System 2010.06 ~ 2010.12 Proposal/Analysis Korail
Train Operation & Maintenance Service for Levitation train 2011.04 ~ 2011.08 Maintenance/Management Hyundai-Rotem
6-3. Feasibility Study and Basic Design Engineering
6. 6. Major PerformanceMajor Performance
Train Operation & Maintenance Service for Levitation train 2011.04 ~ 2011.08 Maintenance/Management Hyundai-Rotem
Quantitative Analysis of MPX Guajira Thermal Coal Pjt Pre-Con Service 2012.03 ~ 2012.04 Maintenance & Operation Seoyong EngeeringCo.
Feasibility study Report on Retrofit of Busan Metro # 2 EMU 2013.12 ~ 2014.03 Report/EMU Busan Metro
Services Period Field ContractorStructural Analysis of KTX2 car body. 2007.01 ~ 2007.04 Structural Analysis Hyundai Rotem
Structural Analysis of Salvador EMU car body 2007.02 ~ 2007.10 Structural Analysis Hyundai Rotem
Structural Analysis of TCDD EMU car body 2007.08 ~ 2007.11 Structural Analysis Hyundai Rotem
Structural Analysis of Gyeong-ui Line EMU car body 2007.12 ~ 2008.03 Structural Analysis Hyundai Rotem
TPS analysis based on the input of tilting train & Elapsed Analysis 2007.12 ~ 2008.05 Elapsed Analysis Hyundai Rotem
Structural Analysis of Gyeong-ui Line EMU(M-car) car body 2007.12 ~ 2008.02 Structural Analysis Hyundai Rotem
Structural Analysis of freight car body 2008.02 ~ 2008.04 Structural Analysis Taeyang Heavy Industry
6-4. Analysis / Test / Engineering Service
6. 6. Major PerformanceMajor Performance
Structural Analysis of freight car body 2008.02 ~ 2008.04 Structural Analysis Taeyang Heavy Industry
Structural Analysis of India EMU RS3 body (DT-car) 2008.04 ~ 2008.07 Structural Analysis Hyundai Rotem
Load Test of KTX2 car body. 2008.05 ~ 2008.07 Load Test Hyundai Rotem
Structural Analysis of Almaty EMU the body (HM-car) 2008.07 ~ 2008.08 Structural Analysis Hyundai Rotem
Load Test of India DMRC RS3 EMU the body 2008.08 ~ 2008.09 Load Test Hyundai Rotem
Load Test of Septa EMU the body 2008.09 ~ 2008.12 Load Test Hyundai Rotem
Load Test of KTMB EMU the body 2009.03 ~ 2009.04 Load Test Hyundai Rotem
Load Test of Sao Paulo EMU the body 2009.05 ~ 2009.06 Load Test Hyundai Rotem
Load Test of Tunisia EMU the body 2009.06 ~ 2009.07 Load Test Hyundai Rotem
Load Test of Almaty EMU the body 2009.06 ~ 2009.07 Load Test Hyundai Rotem
Services Period Field ContractorLoad Test of Matangi Rolling Stock the body in New Zealand 2009.09 ~ 2009.11 Load Test Hyundai Rotem
Load Test of KTX2 Rolling Stock the body 2009.09 ~ 2009.11 Load Test Hyundai Rotem
Load Test of the next generation EMU the body 2009.12 ~ 2010.01 Load Test Hyundai Rotem
Load Test of MBTA2 passenger Rolling Stock the body 2009.12 ~ 2010.04 Load Test Hyundai Rotem
Load Test of 90-car trains the body on Gyeongjeon Line 2010.03 ~ 2010.04 Load Test Hyundai Rotem
Load Test of mareumarayi EMU the body in Turkey. 2010.03 ~ 2010.05 Load Test Hyundai Rotem
Load Test of Bangalore EMU the body in India. 2010.04 ~ 2010.05 Load Test Hyundai Rotem
Load Test of RS3 EMU the body in India. 2010.12 ~ 2011.02 Load Test Hyundai Rotem
6-4. Analysis / Test / Engineering Service
6. 6. Major PerformanceMajor Performance
Load Test of RS3 EMU the body in India. 2010.12 ~ 2011.02 Load Test Hyundai Rotem
Load Test of Incheon Subway Line 2 City Railway Rolling Stock the body 2011.01 ~ 2011.03 Load Test Hyundai Rotem
Concept design services of Tramcar steering 2011.01 ~ 2011.01 Technical services Korea Interfacial Scienceand Engineering Institute
Load Test of Gyeongchun Line Seat type EMU the body 2011.02 ~ 2011.04 Load Test Hyundai Rotem
Load Test of Greece AM3 EMU the body 2011.02 ~ 2011.03 Load Test Hyundai Rotem
Structural Analysis of Thai Ballast Hopper Car 2011.10 ~ 2011.10 Structural Analysis Korea Interfacial Scienceand Engineering Institute
Load Test of Ukraine EMU the body 2011.10 ~ 2011.11 Load Test Hyundai Rotem
Test support services of Rolling Stock Bogie Roller rig 2012.01 ~ 2012.04 Load Test Hyundai Rotem
Load Test of Denver EMU the body 2012.01 ~ 2012.04 Load Test Hyundai Rotem
Load Test of Turkey Electric Locomotive the body 2012.10 ~ 2012.12 Load Test Hyundai Rotem
Load Test of main line type 138-car trains M'1 the body 2013.01 ~ 2013.02 Load Test Hyundai Rotem
Services Period Field ContractorDesign Engineering for Official Residence in DaeGu, PoHang, etc. as Private Investment Project 2008.11~2010.04 Facility Dept. of Depense
Design Engineering for Naval Official Residence & Facilities as Private Investment Project 2008.11~2010.07 Facility Dept. of Depense
Design Engineering of Private Investment Project for Air Force Facilities in DaeGu 2009.04~2009.07 Facility Dept. of Depense
Basic & Working Design Engineering of Private Investment Project for Army Facilities in YangKu 2009.07~2010.07 Facility Dept. of Depense
Design Engineering of Army Facilities in DamYang as Private Investment Project 2009.09~2009.10 Facility Dept. of Depense
Design Engineering of Marine Corps Facilities in PoHang as Private Investment Project 2009.09~2010.03 Facility Dept. of Depense
Design Engineering of Marine Corps Facilities in JinHae as Private Investment Project 2009.11~2010.07 Facility Dept. of Depense
Design Engineering of Army Facilities in Pocheon as Private Investment Project 2010.08~2011.01 Facility Dept. of Depense
6-5-1. Architect Design/Engineering (HVAC for Military)
6. 6. Major PerformanceMajor Performance
Design Engineering for Electric & Mechanical Facilities of Ammunition 2012.07~2013.03 Facility Dept. of Depense
Design Engineering for Army Facilities of Indoor Shooting Gallery 2013.06~2013.10 Facility Dept. of Depense
Services Period Field ContractorWorking Design Engineering Stage 1 for Baku Metro in Azerbaijan 2011.12~2012.12 Facility Baku Metro, Azerbaijan
Working Design Engineering Stage 2 for Baku Metro in Azerbaijan(Blue Line) 2013.01~2013.08 Facility Baku Metro, Azerbaijan
Basic Design Engineering for Orang Tramway in Algeria 2012.11~2013.12 Facility Algeria Metro
Basic Design Engineering for Annaba Tramway #1 in Algeria 2012.11~2013.12 Facility Algeria Metro
Design Engineering for Bid of Etihad Railway Stage 2 Package A&B 2013.01~2013.12 Facility DoHwa Eng. Co., Ltd.
Design Engineering for Bid of Manila LRT1 Extension, Operation and Maintenance Infrastructure (Mechanical Scope) 2013.04~2013.07 Facility SamAn Co., Ltd
6-5-2. Architect Design/Engineering (HVAC for Overseas Subway train & Tram)
Services Period Field ContractorConstruction Design Engineering for 2 stations of GaeGu Metro #2, including Dasa Station 1995.04~1995.10 Facility Dae-Gu Metro
Construction Design Engineering for 4 stations of GaeGu Metro #2, including SungSu Station 1995.04~1995.10 Facility Dae-Gu Metro
Construction Design Engineering for 2 stations of GaeGu Metro #2, including SooSung Station 1995.04~1995.10 Facility Dae-Gu Metro
Construction Design Engineering for 2 stations of Busan Metro 1997.04~1998.06 Facility Bu-San Metro
Construction Design Engineering for DongMyo station of Seoul Metro 1997.12~1998.05 Facility Seoul Metro
Construction Design Engineering 2 stations of Seoul Metro #9 1997.12~1998.12 Facility Seoul Metro
Construction Retrofit Design Engineering 2 stations of Seoul Metro #6 1998.02~1998.06 Facility Seoul Metro
6-5-3 Architect Design/Engineering (HVAC for Domestic Subway)
6. 6. Major PerformanceMajor Performance
Construction Design Engineering for 2 stations of Busan Metro #3, including Bulmangol, Yeonsan Station 1998.10~1998.12 Facility Bu-San Metro
Construction Design Engineering of GuangJu Metro (Turn-Key Base) 1999.01~1999.04 Facility Guang-Ju Metro
Construction Design Engineering of Seoul Metro #9 (Turn-Key Base) 2008.01~2008.06 Facility Seoul Metro
Construction Design Engineering of Substation for Korail KyungBu Line (NaePan) 2011.12~2012.12 Facility Korea Rail Network Auth.
Under Construction Design Engineering of Water Collection System on 11th Zone of KorailKaneung-Wonju Line 2013.01~2013.06 Facility Korea Rail Network Auth.
Under Construction Design Engineering of QRA on 11th Zone of Korail Kaneung-Wonju Line 2013.01~2013.06 Facility Korea Rail Network Auth.
Construction Design Engineering of New Hakik station for Korail #1 2012.08~2013.12 Facility Korea Rail Network Auth.
Construction Design Engineering of Yeungjong station for InChon Airport Line 2012.09~2013.05 Facility Korea Rail Network Auth.
Construction Design Engineering of Jije station for Korail Seoul Suburban High Speed Rail 2012.12~2013.11 Facility Korea Rail Network Auth.
Services Period Field ContractorSinWol Resident Center Office 1997.01~1997.02 Facility YangCheon-Ku Office
Engineering College Building for University of Seoul 1997.02~1997.04 Facility University of Seoul
Resident House of GunYang University 1997.04~1997.05 Facility Gun-Yang Univ. Hospital
DukYang-Ku Office Building 1997.04~1997.11 Facility Gun-Yang Univ. Hospital
SungNam Kyungyeong Building of Yonsei University 1997.06~1997.08 Facility LG Construction Co.
Lab. Building of Health College for Korea University 1997.10~1998.02 Facility Korea University
Gymnasium Facility of Hyundai High Scool 1997.09~1997.02 Facility Hyundai Scool
International Exhibition for Tourists in GangWon-Do 1997.10~1997.02 Facility KangWon-Do Office
Gymnasium Facility for NamHae 1998.06~1998.07 Facility NamHae City
Design Change of Head office Building for Welcome Company 1998.06~1998.07 Facility WelCome Co. Building
6-5-4. Architect Design/Engineering (HVAC for Buildings)
6. 6. Major PerformanceMajor Performance
Senior Welfare Center of SungDong-Ku, Seoul 1998.09~1998.10 Facility SeoungDong-Ku Office
Marine Science Center in TongYoung City 1999.01~1999.03 Facility TongYoung City
Academic Information Center of BuKyung University 1999.03~1999.04 Facility PuKyung National Univ.
Senior Town in KyungNam-Do 1999.05~1999.08 Facility KeangNam Enterprise Ltd.
BTL Project for JunNong, SinMuk, and MangWoo Elementary Scool, in Seoul 2006.07~2007.01 Facility Seoul Metropolitan of Education
Basic & Working Design Engineering for Construction of InChon Senior Welfare Center 2007.06~2007.08 Facility Construction Center of InCheonMetropolitan City
Design Engineering for Head Office Building of GuangJu National Health Insurance 2008.11~2008.12 Facility National Health Insurance Service
Design Engineering of Mechanical Facilities Remodeling for Ritz Carton CC 2008.11~2009.10 Facility Ritz Carlton l, Seoul
Design Engineering of Mapo Comprehensive Welfare Center 2009.03~2009.10 Facility MaPo-Ku Office
Design Engineering of Ulsan Public Prosecutor’s office Building 2010.02~2010.07 Facility Dept. of Justice
Design Engineering of JinJu Branch for ChangWon Public Prosecutor’s office Building 2010.01~2011.05 Facility Dept. of Justice
Design Engineering of JinJu Branch for ChangWon Public Prosecutor’s office Building 2011.01~2011.07 Facility CheongJu Distric Court
Design Engineering of Inchon Family park 2011.07~2011.09 Facility Construction Center of InCheonMetropolitan City
Services Period Field ContractorYeung Dong Jeil Hospital 1996.08~1996.09 Facility Samsung Medical Center
Medical Engineering College Building of GunYang Univ. 1996.09~1996.10 Facility Gun-Yang Univ. Hospital
Min Maternity Hospital 1996.09~1996.10 Facility Min Hospital
KangSeo Jeil Hospital 1997.01~1997.11 Facility Samsung Medical Center
PoChon JungMun Medical College 1998.03~1998.03 Facility Cha Hospital
Industrial Disater Hospital in SunChon City 1998.05~1998.06 Facility K-MEDI
TongYoung Hospital 1998.10~1999.03 Facility Tong-Young City
6-5-4. Architect Design/Engineering (HVAC for Buildings)
6. 6. Major PerformanceMajor Performance
TongYoung Hospital 1998.10~1999.03 Facility Tong-Young City
Services Period Field Contractor
Design Engineering of Incineration Plant in YoungJong-Do 1998.02~1998.03 Facility Korea Train Express
Design Engineering of Incineration Plant in JangHeung-Kun 2006.04~2006.05 Facility Jang-Heung Kun
Design Engineering of Sewage treatment Plant in HyunPoong 2006.04~2007.02 Facility Dal-Seoung Kun
Design Engineering of Environmental Resource Plant in IkSan 2006.07~2007.01 Facility Ik-San City
Design Engineering of Sewage treatment Plant in JuMunJin 2007.05~2007.06 Facility Gang-Neung City
6-5-5. Architect Design/Engineering (HVAC for Environmental Facilities)
Equipment Period Field Contractor
Power Supplies ...etc 2001.09 ~ 2001.10 Production / Supply Metropolitan rapid Transitcorp.
Development of KTX pressure wave test equipment 2001.10 ~ 2001.12 Development Korea rail Network Authority
Sales of Surge Tester 2001.11 ~ 2001.12 Production / Supply Seoul Metro
Wheel tread measuring device 2002.03 ~ 2002.05 Development/Production / Supply
Korea rail Network Authority
Peak Detector 2002.03 ~ 2002.05 Development Korea Research Institute ofStandards and Science
Lift Tables 2002.09 ~ 2002.10 Production / Supply Seoul Metropolitan rapidTransit corp.
Development/Production / Supply
Korea Railroad ResearchInstitute.
6-6-1. Major Equipment Deliveries
6. 6. Major PerformanceMajor Performance
Wheel tread shape measuring instrument 2003.04 ~ 2003.05 Development/Production / Supply
Korea Railroad ResearchInstitute.
Speed On Screen Display 2003.12 ~ 2004.01 Production / Supply Korea Train Express
Tight Lock Coupler Spring Force(CS-Force) 2005.09 ~ 2005.12 Production / Supply KORAIL
Side Door Force for EMU (SD-Force) 2005.10 ~ 2005.12 Production / Supply KORAIL
Contact pressure Force for EMU (CP-Force) 2005.10 ~ 2005.12 Production / Supply KORAIL
Tilting Bogie prototype delivery 2006.07 ~ 2008.07 Development Korea Railroad ResearchInstitute.
Gauge-adjustable wheelset Mock-up and Testing Jig production 2007.02 ~ 2007.05 Production / Supply Korea Railroad ResearchInstitute.
EUT Deviation Safety wheelset For bogie test 2008.03 Development Korea Railroad ResearchInstitute.
Leveling Valves Ass,y delivery 2008.05 ~ 2008.06 Production / Supply SEOULMETRO
Development of Maglev track inspection equipment 2008.06 ~ 2008.09 Development/Production / Supply Hyundai Rotem
Equipment Period Field Contractor
Delivery of Tilting Bogie maintenance products 2008.07 ~ 2008.10 Production / Supply Korea Railroad ResearchInstitute.
Delivery of Mini Prof Wheel 2008.08 Production / Supply Busan Metro
Producing of Testing Twin Towers 2008.08 ~ 2008.10 Production / Supply Seoul Metro
Improvement of equipment and peripherals Bogie dynamic characteristics testequipment 2008.11 ~ 2009.02 Production / Supply Korea Railroad Research
Institute.
Bogie dynamic characteristics test equipment rail wheel 2009.05 ~ 2009.09 Development/Production / Supply
Korea Railroad ResearchInstitute.
The Catenary-current Collection Run Tester Bogie 2009.07 ~ 2010.04 Development/Production / Supply
Korea Railroad ResearchInstitute.
6-6-2. Major Equipment Delivery
6. 6. Major PerformanceMajor Performance
The Catenary-current Collection Run Tester Bogie 2009.07 ~ 2010.04 Development/Production / Supply
Korea Railroad ResearchInstitute.
Previous Installation of Research Test Equipment & Moving services 2009.12 ~ 2010.02 Supply Korea Railroad ResearchInstitute.
Jumper connector (2) (for Mugunghwa) 2010.03 ~ 2010.05 Production / Supply KORAIL
Greece AM3 EMU Mock-up 2011.01 ~ 2011.01 Production / Supply Hyundai Rotem
Producing of Weight for load test 2011.01 ~ 2011.01 Production / Supply Korea Railroad ResearchInstitute.
Production and installation of Bogie Dynamic Simulator Boundary condition settingdevice 2012.02 ~ 2012.03 Development
/Production / SupplyKorea Railroad ResearchInstitute.
Development of Rolling Stock Electrical Supplies Contact pressure tester 2012.10 ~ 현재Development/Production
The Small and MediumBusiness Administration
Development of Bogie Conical Spring Load Tester 2013.01 ~ 현재Development/Production
Incheon Airport Railroad
7-1. Measuring Equipment
7. Major Products Delivery7. Major Products Delivery
Wheel tread shape Measuring Equipment
Surge Tester
Various inspection DevicesSpeed On Screen Display
7-2. Cleaning Equipment
7. Major Products Delivery7. Major Products Delivery
Parts Washing Machines Filter Washing Machines Portable Air Pressure Washing Machines
Body Washing MachinesBogie Washing Machines
7-3. Transport Equipment
7. Major Products Delivery7. Major Products Delivery
Body Pedestal Lifting Jack
Portable Lifting Work bench
7-4. Test & Inspection Equipment
7. Major Products Delivery7. Major Products Delivery
Bogie load comprehensive tester
Bogie Lifting Devices Pantograph Simulated testing Machine
7-4. Test & Inspection Equipment
7. Major Products Delivery7. Major Products Delivery
Rubber Spring Tester
7-5. Various Jigs & Frames
7. Major Products Delivery7. Major Products Delivery
Various tanksVarious shelves and jigs
8. Licensing, certification, and copies of the intellectual property8. Licensing, certification, and copies of the intellectual property
Business Registration Certificate Venture Business Confirmation
8. Licensing, certification, and copies of the intellectual property8. Licensing, certification, and copies of the intellectual property
R & D Services Declaration CardR & D Center Certificate
8. Licensing, certification, and copies of the intellectual property8. Licensing, certification, and copies of the intellectual property
Engineering Businesses Declaration Card
8. Licensing, certification, and copies of the intellectual property8. Licensing, certification, and copies of the intellectual property
Certification of International Contractor Factory Registration Certification
8. Licensing, certification, and copies of the intellectual property8. Licensing, certification, and copies of the intellectual property
Certificate of Intellectual Rights
8. Licensing, certification, and copies of the intellectual property8. Licensing, certification, and copies of the intellectual property
Program Registration Card
찾아오시는길
< By car > -Using GPS Navigation,*T-MAP(Smartphone, GalaxyS etc.) : Set “Pangyo Innovalley” as destination.*INAVI Navigation : Set “Pangyo Innovalley” as destination.*If unable to search “Innovalley” : Set “Pangyo Innovalley” as destination.-Next building to "POSCO ICT" which is located at the intersection of the destination(It reads "POSCO ICT" at the top of the POSCO ICT building)
< By public transportation >-Use No. 330 or No. 350 bus at the bus station located at Exit 3 of YatapSubway Station on Bundang Line, .Get off at "Innovally Station"-Use No. 71, 72 or 75 town bus at Exit 1 of Pangyo Subway Station on Shinbundang Line-Using an express bus, take No. 1007, 1007-1, 5600(Gangbyeon Station), or 9005 bus at Jamsil Station, or No. 400 at Suwon, and get off at "Sampyeong Bridge Station".
9. Location
< By car > -Using GPS Navigation,*T-MAP(Smartphone, GalaxyS etc.) : Set “Pangyo Innovalley” as destination.*INAVI Navigation : Set “Pangyo Innovalley” as destination.*If unable to search “Innovalley” : Set “Pangyo Innovalley” as destination.-Next building to "POSCO ICT" which is located at the intersection of the destination(It reads "POSCO ICT" at the top of the POSCO ICT building)
< By public transportation >-Use No. 330 or No. 350 bus at the bus station located at Exit 3 of YatapSubway Station on Bundang Line, .Get off at "Innovally Station"-Use No. 71, 72 or 75 town bus at Exit 1 of Pangyo Subway Station on Shinbundang Line-Using an express bus, take No. 1007, 1007-1, 5600(Gangbyeon Station), or 9005 bus at Jamsil Station, or No. 400 at Suwon, and get off at "Sampyeong Bridge Station".
< Address > B-501, Pangyo Innovally, 621, Sampyeong-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, South Korea
< Tel > +82-31-8018-8987~8
< Fax > +82-31-8018-8985