I-294/I-80 RECONSTRUCTION RE-CONSTRUCTION OF A 2-MILE SECTION OF THE TOLL WAY THAT STARTED FROM MARKHAM YARD BRIDGE AND EXTENDED EASTERLY TO DANVILLE ROAD. ABOVE PHOTOS: MAINLINE BRIDGE OVER THE THORNTON QUARRY OPERATED BY MATERIAL SERVICE CORP LOCATED IN THORNTON, ILLINOIS.
I-294/I-80 RECONSTRUCTION re-construction of a 2-mile section of the toll way that started from MARKHAM yard bridge and extended easterly to Danville road. ABOVE PHOTOS: MAINLINE BRIDGE OVER THE THORNTON QUARRY OPERATED BY MATERIAL SERVICE CORP LOCATED IN THORNTON, ILLINOIS. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
I-294/I-80 RECONSTRUCTIONRE-CONSTRUCTION OF A 2-MILE SECTION OF THE TOLL WAY THAT STARTED FROM MARKHAM YARD BRIDGE AND EXTENDED EASTERLY TO DANVILLE ROAD. ABOVE PHOTOS: MAINLINE BRIDGE OVER THE THORNTON QUARRY OPERATED BY MATERIAL SERVICE CORP LOCATED IN THORNTON, ILLINOIS.
INTERSTATE 355 SOUTH EXTENSION
THE I-355 SOUTH EXTENSION CONSTRUCTION FROM I-55 to I-80 LOCATED IN WILL AND COOK COUNTY, ILLINOIS.
THE PHOTO AT THE RIGHT IS THE 1.2-MILE LONG BRIDGE OVER THE DES PLAINES RIVER (I & M CANAL) WHICH IS A PORTION OF THE 12.5 MILES TOLLWAY PROJECT.
ILLINOIS ROUTE 34
RECONSTRUCTION AND WIDENING OF A 2-MILE SECTION OF THE ROADWAY STARTED FROM LEW STREET AND EXDENDING TO ELDAMAINE STREET IN PLANO, ILLINOIS.
I-57/IL-50 INTERCHANGE RECONSTRUCTION – IN BRADLEY, ILLINOIS
LEFT PHOTO: BRIDGE OVER ILLINOIS ROUTE 50. RIGHT PHOTO: BRIDGE OVER ILLINOIS CENTRAL RAIL ROAD
FPDCC IMPROVEMENTSLEFT PHOTO: CONSTRUCTION OF PHYSICAL EXERCISE STAIR AT THE SWALLOW CLIFF RIGHT PHOTO: CONSTRUCTION OF FISHING PLATFORM AND INSTALLATION OF RIPRAP ALONG THE BANK OF MAPLE LAKE. BOTH PHOTOS ARE LOCATED IN PALOS HILLS, ILLINOIS