ARCHITECTS JAMES FLICKARCHITECT
James Flick, RA, NCARB, LEED AP
214-653-1900
MATT MARSARCHITECT
Matt Mars, RA
214-653-1900
RACHEL HUYNHINTD 4393
INTERIOR DESIGNERS
ELLEN [email protected]
KAREN [email protected]
LINDSEY [email protected]
ALYSSA [email protected]
RACHEL HUYNHINTD 4393
PROJECT CONTRIBUTIONS 1. HILTON TIMES SQUARE
◦ NEW YORK, NEW YORK
2. HARD ROCK HOTEL ◦ DAYTONA, FLORIDA
3. CHATEAU LEMOYNE◦ NEW ORLEANS, LOUISIANA
4. ADMIRAL SEMMES◦ MOBILE ALABAMA
5. OLD PARKLAND◦ DALLAS, TEXAS
6. SOUTH SHORE HARBOR◦ HOUSTON, TEXAS
RACHEL HUYNHINTD 4393
HILTON TIMES SQUARE Duties: Aided in drawing the elevation for the restroom renovations
RACHEL HUYNHINTD 4393
HARD ROCK HOTEL Scope:
◦ Beach, Rock, Speed.... This is Hard Rock Daytona Beach. Sitting on ten acres of oceanfront property, less than three-quarters of a mile south of the Daytona Beach pier, Flick·Mars is envisioning the guestrooms, restaurants, bars, and function space to accentuate the energy created by the thrill of racing mixed with the exuberance of rock and roll music.
◦ The Hard Rock Daytona Beach is comprised of 250 guestrooms and 107 luxury residences on the 11 floors towering above the world famous Daytona beach. The one of a kind property is set to open late 2017.
◦ http://flickmars.com/portfolio/hard-rock-hotel/
Duties: ◦ Transferring sketch floor plans into AutoCAD and updating the CAD file after every
change◦ Rendered floor plans and elevations for presentations ◦ Corrected redlines from the architects and interior designers◦ Helped with creating construction documents and keynotes
RACHEL HUYNHINTD 4393
RENDERINGS GUESTROOMS FLOOR PLAN
RACHEL HUYNHINTD 4393
RENDERINGS KING ROOM ELEVATIONS
RACHEL HUYNHINTD 4393
RENDERINGS DOUBLE QUEEN ELEVATIONS
RACHEL HUYNHINTD 4393
RENDERINGS VARIOUS ELEVATIONS
RACHEL HUYNHINTD 4393
CHATEAU LEMOYNE Duties:
◦ Corrected redlines from the architects and interior designers◦ Helped with creating construction documents and keynotes
RACHEL HUYNHINTD 4393
CONSTRUCTION DOCUMENTS2ND FLOOR PLAN SHEET
RACHEL HUYNHINTD 4393
CONSTRUCTION DOCUMENTSENLARGED FLOOR PLAN WITH DETAILS SHEET
RACHEL HUYNHINTD 4393
CONSTRUCTION DOCUMENTSDETAILS SHEET
RACHEL HUYNHINTD 4393
CONSTRUCTION DOCUMENTSMATERIALS SPECIFICATION SHEET
RACHEL HUYNHINTD 4393
ADMIRAL SEMMES Duties:
◦ Corrected redlines from the architects and interior designers◦ Helped with creating construction documents and keynotes◦ Created material and concept boards for presentations
RACHEL HUYNHINTD 4393
ADMIRAL SEMMES
RACHEL HUYNHINTD 4393
OLD PARKLAND Duties:
◦ Rendered floor plans and elevations for presentations
RACHEL HUYNHINTD 4393
SOUTH SHORE HARBOR Duties:
◦ Transferred drawing from construction documentation sheets to AutoCAD◦ Corrected redlines from the architects and interior designers◦ Helped with creating construction documents and keynotes
RACHEL HUYNHINTD 4393
CONSTRUCTION DOCUMENTELEVATION SHEET
RACHEL HUYNHINTD 4393
FUN WITH FLICK MARS
RACHEL HUYNHINTD 4393
TIMESHEETSWeekly Time Sheet
Flick⋅Mars Rachel Huynh
Week ending: 6/15/2014
Day Phase Project Code Billable HoursNon-Billable
HoursTotal
Monday 6/9/2014 Library
Management7.50 7.50
Tuesday 6/10/2014 Library
Management7.50 7.50
Wednesday 6/11/2014 Hard Rock Hotel 7.50 7.50
Thursday FALSE Hilton Time Square 8.00 8.00
Friday 6/13/2014 Hard Rock Hotel 8.00 8.00
Saturday 6/14/2014
Sunday 6/15/2014
Total hours 38.50 38.50
Employee signature
Date
Weekly Time SheetFlick⋅Mars Rachel Huynh
Week ending:6/22/201
4
Day Phase Project Code Billable HoursNon-Billable
HoursTotal
Monday 6/16/2014 Hard Rock Hotel 9.00 9.00
Tuesday 6/17/2014 Hard Rock Hotel 8.00 8.00
Wednesday 6/18/2014 Libarary Management 8.25 8.25
Thursday 6/19/2014 Hard Rock Hotel 8.25 8.25
Friday 6/20/2014 Hard Rock Hotel 6.50 6.50
Saturday 6/21/2014
Sunday 6/22/2014
Total hours 40.00 40.00
Employee signature Date
RACHEL HUYNHINTD 4393
TIMESHEETSWeekly Time
SheetFlick⋅Mars Rachel Huynh
Week ending:6/29/201
4
Day Phase Project Code Billable HoursNon-Billable
HoursTotal
Monday 6/23/2014 Hard Rock Hotel 8.00 8.00
Tuesday 6/24/2014 Hard Rock Hotel 8.00 8.00 Wednesday 6/25/2014 Hard Rock Hotel 8.00 8.00 Thursday 6/26/2014 Hard Rock Hotel 8.00 8.00 Friday 6/27/2014 Hard Rock Hotel 9.00 9.00 Saturday 6/28/2014 Hard Rock Hotel 9.00 9.00Sunday 6/29/2014
Total hours 50.00 50.00
Employee signature Date
Weekly Time Sheet
Flick⋅Mars Rachel Huynh
Week ending: 7/6/2014
Day Phase Project Code Billable HoursNon-Billable
HoursTotal
Monday 6/30/2014 Hard Rock Hotel 8.00 8.00
Tuesday 7/1/2014 Hard Rock Hotel 8.25 8.25 Wednesday 7/2/2014 Hard Rock Hotel 8.75 8.75 Thursday 7/3/2014 Hard Rock Hotel 8.00 8.00 Friday 7/4/2014 Saturday 7/5/2014 Sunday 7/6/2014 Hard Rock Hotel 11.00
Total hours 44.00 44.00
Employee signature Date
RACHEL HUYNHINTD 4393
TIMESHEETSWeekly Time
SheetFlick⋅Mars Rachel Huynh
Week ending:7/13/201
4
Day Phase Project Code Billable HoursNon-Billable
HoursTotal
Monday 7/7/2014 Hard Rock Hotel 13.00 13.00
Tuesday 7/8/2014 Chateau LeMoyne 8.00 8.00 Wednesday 7/9/2014 Chataeu LeMoyne 8.00 8.00 Thursday 7/10/2014 Chataeu LeMoyne 9.00 9.00 Friday 7/11/2014 Old Parkland 8.00 8.00 Saturday 7/12/2014 Sunday 7/13/2014
Total hours 46.00 46.00
Employee signature Date RACHEL HUYNHINTD 4393