International Telecommunication Union HIPSSA Project HIPSSA Project Support for Harmonization of the ICT Policies Support for Harmonization of the ICT Policies in Sub-Sahara Africa in Sub-Sahara Africa An overview of the main challenges faced by the stakeholders: coastal countries, landlocked countries, private operators, etc Isabelle Gross – Balancing Act
14
Embed
International Telecommunication Union HIPSSA Project Support for Harmonization of the ICT Policies in Sub-Sahara Africa An overview of the main challenges.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
InternationalTelecommunicationUnion
HIPSSA ProjectHIPSSA Project
Support for Harmonization of the ICT Policies Support for Harmonization of the ICT Policies in Sub-Sahara Africa in Sub-Sahara Africa
An overview of the main challenges faced by the stakeholders: coastal countries, landlocked countries,
private operators, etc
Isabelle Gross – Balancing Act
2
Table of contentsTable of contents
Introduction
Stakeholders at the regional and national level
Legal challenges: behind and ahead
The challenges of the application of the guidelines at the national level
The challenges for landlocked countries
3
Introduction:
“I have little patience with scientists who take a board of wood, look for its thinnest part, and drill a great number of holes where drilling is easy.”
Albert Einstein
- not related to what we discuss today but what about “We have done a great job with this guidelines. So, let’s put in a drawer… …
4
Who are the stakeholders at the regional level?
coastal countries with a landing station and access to international fibre capacity
landlocked countries without a landing station and access to international fibre capacity through a coastal country
5
Who are the stakeholders at the national level? Ministry of ICT & regulator
National incumbent
Other telecoms operators (fixed and mobile)
Data services providers
Content and VAS service providers
Consumers (public and private)
6
► Numerous stakeholders
► Various perspectives & interests
=Many challenges
7
The legal challenges: behind and ahead
► The legal challenges behind:
- conductive regional legal framework to support the guidelines and its principles
* Supplementary Act A/SA/2/01/07 on access and interconnection of ICT sector networks and services
* Supplementary Act A/SA/1/01/07 on the harmonisation of the policies and regulatory framework of the ICT sector (Non-discrimination obligation (Article 3))
8
The legal challenges: behind and ahead
► The legal challenges ahead:
- guidelines adopted as a regulation in Cote d’Ivoire in October 2011
- Regulations, enacted by the Council, “shall have general application’”. Their provisions shall be binding on the Community Institutions as well as in Member states where they are directly applicable.
- introduction of the guidelines in national law
9
The challenges of the application of the guidelines at the national level
► Application of the guidelines or “business as usual”
- overcome the divergent economic interests of the various stakeholders (national incumbent versus ISPs and other telecoms operators)
- need for a detailed implementation programme (in particular the technical side in terms of physical access; co-location) with a timeline and deadlines
10
The challenges of the application of the guidelines at the national level
► Application of the guidelines or “business as usual”
- need for a pricing control model
-strengthening of local expertise and capacity building
- monitoring and dispute resolution mechanism in order to be effective
11
The challenges of the application of the guidelines at the national level
► Application of the guidelines or “business as usual”
Risks:
- 2 speed implementation process among ECOWAS countries
- knock back effect on landlocked countries
12
The challenges for landlocked countries
► Guidelines doesn’t apply to landlocked countries
►Landlocked countries faced with high transit prices and little power of negotiations
13
The challenges for landlocked countries
► Are there any other options or ways to extend the existing guidelines ?
► The notion of “virtual landing station” (the junction between two cross-border terrestrial cables)
14
Thanks a lot for your Thanks a lot for your attentionattention